SEC Info  
    Home      Search      My Interests      Help      Sign In      Please Sign In

Not FM Canada Inc., et al. – ‘S-4/A’ on 7/1/05 – EX-10.21

On:  Friday, 7/1/05, at 12:03pm ET   ·   Accession #:  950133-5-2948   ·   File #s:  333-124394, -01, -02, -03, -04, -05, -06, -07, -08, -09, -10, -11, -12, -13

Previous ‘S-4’:  ‘S-4/A’ on 5/9/05   ·   Next:  ‘S-4/A’ on 7/11/05   ·   Latest:  ‘S-4/A’ on 7/14/05

Find Words in Filings emoji
 
  in    Show  and   Hints

  As Of                Filer                Filing    For·On·As Docs:Size              Issuer               Agent

 7/01/05  Not FM Canada Inc.                S-4/A                  6:14M                                    Bowne - DC/FA
          Standard Aero Holdings Inc.
          Standard Aero Canada Inc.
          Standard Aero (Alliance) Inc.
          Standard Aero, Inc.
          Standard Aero (San Antonio) Inc.
          Standard Aero Redesign Services Inc.
          Standard Aero (US) Inc.
          Standard Aero (US) Legal Inc.
          Standard Aero Materials Inc.
          Nova Scotia 3091782
          Standard Aero Ltd
          Nova Scotia 3091781
          Nova Scotia 3091783

Pre-Effective Amendment to Registration of Securities Issued in a Business-Combination Transaction   —   Form S-4
Filing Table of Contents

Document/Exhibit                   Description                      Pages   Size 

 1: S-4/A       Amendment #2 to Form S-4 for Standard Aero          HTML    109K 
                          Holdings, Inc.                                         
 2: EX-5.1      Opinion re: Legality                                HTML     31K 
 3: EX-5.2      Opinion re: Legality                                HTML     13K 
 4: EX-5.3      Opinion re: Legality                                HTML     18K 
 5: EX-10.21    Material Contract                                    414   1.93M 
 6: EX-10.23    Material Contract                                   HTML  10.62M 


EX-10.21   —   Material Contract
Exhibit Table of Contents

Page (sequential) | (alphabetic) Top
 
11st Page   -   Filing Submission
"Table of Contents
83. Contractor Acquired Property (CAP)
94. Contractor Communications Network (CCN)
"5. Contractor Property Control Records
128. Uniform Material Movement and Issue Priority System (UMMIPS)
1410. Actions Required on Supply Status Codes
"11. Production Problems
1512. Disposition of Government Property
1713. Discrepancies Incident to Shipment
1815. Contractor Preservation, Packaging, Packing, and Marking
"16. Contractor Reporting
"18. Other
1919. References
38Services
51Insurance
57Data
111Totals
185Estimated
329On Condition Maintenance
EX-10.211st Page of 414TOCTopPreviousNextBottomJust 1st
 

EXHIBIT 10.21 Appendix B HEADQUARTERS OKLAHOMA CITY AIR LOGISTICS CENTER UNITED STATES AIR FORCE TINKER AIR FORCE BASE, OKLAHOMA 73145 APPENDIX B CONTRACT NUMBER: F34601-99-D-0002 PMS: SEE PAGE 2 RFP NUMBER: F34601-98-R-0038/F41608-98-R-0084 OC-ALC/LP-1 ABB CONTRACT NO(s): P0002133, P0002134, P0002162 PHONE NO (405) 736-7855 TYPE: GFM & CAP GOVERNMENT PROPERTY MANAGEMENT Type Work: Repair/Overhaul of T56/TF39 Engines, Fuel Accessories and 2LM on T56 and TF39 Engines. TABLE OF CONTENTS [Download Table] Paragraph Page --------- ---- 1. Terms Explained...................................................... 3 2. Government Furnished Material/Property (GFM/GFP)..................... 7 3. Contractor Acquired Property (CAP)................................... 8 4. Contractor Communications Network (CCN).............................. 8 5. Contractor Property Control Records.................................. 9 6. Stock levels of (GFM)................................................ 10 7. Recorder Points...................................................... 11 8. Uniform Material Movement and Issue Priority System (UMMIPS)......... 12 9. Military Standard Requisitions and Issue Procedures (MILSTRIP)....... 12 10. Actions Required on Supply Status Codes.............................. 13 11. Production Problems.................................................. 14 12. Disposition of Government Property................................... 14 13. Discrepancies Incident to Shipment................................... 16 14. Disposition of Condemned Government Property......................... 17 15. Contractor Preservation, Packaging, Packing, and Marking............. 17 16. Contractor Reporting................................................. 18 17 Visits............................................................... 18 18. Other................................................................ 18 19. References........................................................... 19 LIST OF ATTACHMENTS [Download Table] Instructions for Preparation of Requisitions........................... Atch 1 Instructions for Preparation of Turn-In Documents...................... Atch 2 Government Furnished Material Authorized (or MRL)...................... Atch 3 CCN/G009 Reporting Requirements........................................ Atch 4 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.212nd Page of 414TOC1stPreviousNextBottomJust 2nd
Appendix B PMS/WORKLOAD MANAGER T-56 ENGINE EARL RAY SA-ALC/LPE COMM: 210-925-7174 DSN: 945-7174 TF-39 ENGINE ELLA SAINE SA-ALC/LPE COMM: 210-925-6344 DSN 945-6344 MANAGEMENT CONTROL SA-ALC/LPCC AUTHORITY (MCA) AND BILL VELTEN or LOU MONTGOMERY G009 REPORTING COMM: 210-925-4794 DSN 945-4794 CONTRACTING OFFICER ROBERT W. DRIVER OC-ALC/LT (SOUTH) COMM: 210-925-7411 DSN 945-7411 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 2
EX-10.213rd Page of 414TOC1stPreviousNextBottomJust 3rd
Appendix B PURPOSE STATEMENT This Appendix B is part of the contract and provides detailed instructions pertaining to the management and control of government owned property and instructions/guidance on how the property is obtained, maintained, protected, controlled, accounted for, and disposed of. These instructions expand the general guidance given in the Federal Acquisition Regulation (FAR) Part 45.5, which is incorporated by reference and made part of this contract. If/when the provisions of this appendix conflict with the existing FAR, Part 45, or other government directives, the contractor will contact the Contracting Officer for guidance. A summary of the methodology to be instituted for management and control of property for this workload is as follows: a. Consumable and reparable/investment direct material will be Government-furnished material (GFM) after contract award. (See Attachment Three (3) for applicable Federal Stock Classes). GFM used in repair of Exhibit Line Items (ELINs) will be requisitioned by the Contractor after contract award. b. GFM does not include indirect materials, such as: hacksaw blades, lathe tool bits, drill bits, probes, files, masking tape, wiping rags, lighting supplies, gloves, washroom supplies, solvents, office supplies, janitorial supplies, cleaning compounds, and similar items. c. The Government will supply Base Operating Support (BOS) services (Attachment 1 to this contract) until the lease in furtherance for the Propulsion Business Area (PBA) is executed. d. The Air Force, Navy, and Coast Guard will retain end-item management responsibilities, to include end-item repair and condemnation forecasting, budgeting, shipment, and condemnation approval. All items listed in this Contract as Exhibit Line Items (ELINs) for repair are considered "end-items" and the Government will retain ownership and furnish these items to the Contractor as GFM for the life of the contract. 1. TERMS IS EXPLAINED: Terms and definitions are included in the regulations referenced in paragraph 19 of this appendix and are supplemented, as follows, when applicable: a. Abbreviated Contract Number: An eight position alpha numeric designator that represents the contract number and is used in requisitioning material and reporting transactions in the G009 Transaction Reporting System. The first position indicates the ALC with Management Control Authority (MCA) for the contract. The MCA for this contract will be transferring from SA-ALC to OC-ALC sometime in the future. Until the MCA changes, the first position indicator will be a "P". Once the MCA transitions to OC-ALC, the first position will be a "H". The remaining seven positions are the control number. This contract will utilize three (3) Abbreviated Contract Numbers. One for TF-39, one for Air Force T-56, and one for Navy T-56. For financial tracking purposes, the Abbreviated Contract Numbers will change every quarter. Procurement Buyer must contact SA-ALC/FMPW (COMM: 210-925-4861, DSN 945-4861) every quarter to obtain these numbers. b. Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a government contract [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 3
EX-10.214th Page of 414TOC1stPreviousNextBottomJust 4th
Appendix B in the field. The ACO is normally located in the Defense Contract Management Area Operations (DCMAO) office. The ACO is responsible for ensuring the contractor performs in accordance with the terms of the contract. c. Agency Peculiar Property (APP): Government owned personal property for military operations. It includes end items and integral components of military weapon systems along with related peculiar support equipment, which are not readily available as a commercial items. It does not include normal government material, special test equipment, special tooling, or facilities. Also referred to as military property. d. Bench Stock (BS): Low cost, high usage, non-sensitive, consumable material stored in work areas for contract performance. Quantities of such stock shall not exceed that amount normally consumed in a 75-day period, or as established in the contractors approved property control system. (Normally only used for broken units of issue) e. Contractor Acquired Property (CAP): Property procured, local manufactured or otherwise provided by the contractor for the performance of the contract. Title to which is vested in the government. (FAR Part 45-101) NOTE: MUST BE REPORTED THROUGH THE G009 SYSTEM TO THE ALC AND MUST CONTAIN THE CORRECT COST. f. Consumable Item: Items not subject to repair, which are consumed in use. However, used items may be reconditioned and used again if still serviceable and safety of flight is not jeopardized. Also, referred to as expense items with an ERRC designator of XB3 and XF3, and ERRC codes of N and P. g. Contractor Furnished Property (CFP): Property other than GFP and CAP, furnished and financed by the contractor without separate reimbursement per the terms of the contract, title to which remains with the contractor until consumed. h. Contractor Communications Network (CCN): Provides the contractor with a computerized electronic method of transmitting (through the Internet) Government Furnished Material and End Item Transaction Reporting System (G009) data transactions. The CCN DAASC Automated Message Exchange System (DAMES) portion will still be used to transmit MILSTRIP requisitions and receive data regarding their status. Government Furnished Material and End Item Transaction Reporting System (G009) data transactions and reports of Discrepancies SF Form 364 may also be transmitted using the DAMES portion of CCN. i. Direct Parts and Materials: Those parts or materials purchased, supplied, manufactured or fabricated by the contractor for the sole purpose of incorporating them into or making them a part of the end product or components thereof covered by this contract. j. Expendability, Recoverability, Repairability Category (ERRC) Code: The ERRC code is assigned to an Air Force item to determine the extent of repair for that item. k. Government Furnished Equipment (GFE): An all inclusive term to define all types of equipment defined in FAR Part 45. It includes facilities, plant equipment, agency peculiar property and special tooling. For the purpose of reporting dollar values on the annual DOD [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 4
EX-10.215th Page of 414TOC1stPreviousNextBottomJust 5th
Appendix B Property in the Custody of Contractors (DD Form 1662), items must be categorized as to the specific FAR definitions of property. l. Government Furnished Material (GFM): Government property, sent to the contractor, which may be incorporated into or attached to an end item to be delivered under a contract or which may be consumed in the performance of a contract. It includes, but is not limited to raw and processed material, parts, components, assemblies, and small tools and supplies. GFM is also referred to as "materials" and "direct materials" under the terms of the contract (FAR 45.301) m. Government Furnished Property (GFP): All property in the possession of or acquired by the government and subsequently delivered to or otherwise made available to the contractor. GFP includes the end item to be repaired by the contractor. This also includes Government Furnished (plant) Equipment (GFE), Government Furnished Materials (GFM) and Contractor Acquired Property (CAP) (FAR 45.101) (1) Special Tooling (ST): All jigs, dies, fixtures, molds, patterns, taps, gauges, other equipment, and manufacturing aids, and replacements thereof, which are of such a specialized nature that, without substantial modification or alteration, their use is limited to the development or production of particular supplies or parts thereof, or the performance of particular services. The term includes all components of such items but does not include consumable property, test equipment, or buildings, nonserviceable structures (see FAR 45.301) (except foundations and similar improvements necessary for the installation of special tooling), general or special machine tools, or similar capital items. (2) Special Test Equipment (STE): Electrical, electronic, hydraulic, pneumatic, mechanical, or other items or assemblies of equipment which are of such a specialized nature that, without modification or alteration, the use of such items (if they are to be used separately) or assemblies is limited to testing in the development or production of particular supplies or parts thereof, or in the performance of particular services. The term "special test equipment" includes all components of any assemblies of such equipment but does not include consumable property, special tooling, or buildings, nonserviceable structures (see FAR 45.301) (except foundations and similar improvements necessary for the installation of special test equipment), general or special machine tools, or similar capital items. (3) Facilities: Industrial property (other than material, tooling, agency peculiar property and test equipment) for production, maintenance, research, development, or test, including real property and rights therein, buildings, structures, improvements, and plant equipment. n. Government Property (GP): All types of property owned or leased to the Government or acquired by the government under the terms of the contract. Government property includes GFM/GFP and CAP. (FAR 45-101) (1) Investment Items: These are nonconsumable items with an Expendability-Recoverability-Repairability Category (ERRC) Designator of XD1, XD2, ND2, or NF2 (ERRC codes C, T, S, and U are normally nonconsumable items.) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 5
EX-10.216th Page of 414TOC1stPreviousNextBottomJust 6th
Appendix B (2) Expense Items: These are consumable items with an ERRC Designator of XB3 and XF3. (ERRC codes N and P are normally consumable items.) (3) Material Support Division (MSD) Items: Items that have an ERRC code of N, P, C, T, S, or U. The ERRC is the only way to distinguish reparability. The items use to be referred to as Expense items or Line replacement units/Shop replacement units. o. Hazardous Material: Any used or unused property, including scrap and waste, that is ignitable, corrosive, reactive or toxic because of its quantity, concentration, or physical, chemical or infectious characteristics. The property can be in a solid, liquid, semi liquid or contained gas form and may cause or significantly contribute to an increase in mortality or serious illness, or pose a substantial threat or potential hazard to human health or the environment when improperly treated, stored, transported, disposed of, or otherwise managed. p. Loan Agreement: A contractual arrangement that accomplishes the actual loan of government property and contains all of the information concerning the loan. Included are the names or descriptions of the property, purpose of the loan, use of property, the period of the loan, the place from or to which the property is to be delivered or returned, maintenance requirements, if any, and any other provisions considered necessary. q. Loan Control Officer: An individual at the contract managing ALC who has the responsibility for all Government Furnished Equipment (GFE)/loan items who validates and tracts all contractor GFE requisitions, in accordance with AFM 67-1, Volume 1, Part 1, Chapter 10. r. Management Control Activity (MCA): DOD component designated activity that initially receives and controls requisitions for Government Furnished Material supplied from the wholesale DOD supply system to support defense contracts or requirements. s. Material Return Program (MRP): A means by which a contractor identifies excess government furnished material to the source of supply and the source of supply provides disposition information back to the contractor. DOD 4100.37, and DLA Customer Assistance Handbook, pages 3-9 and 3-10. t. Plant Clearance Officer (PCO): An individual authorized to act on behalf of the ACO on all plant clearance matters concerning the screening, localization, redistribution and marketing of excess Government Property. u. Procuring Contracting Officer (PCO): The person responsible for entering into a contract on behalf of the government. The PCO will ordinarily be located at the funding Air Logistics Center (ALC). v. Production Management Specialist (PMS): An individual, at the contracting ALC, assigned to the contract to act as liaison for production, supply and transportation issues. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 6
EX-10.217th Page of 414TOC1stPreviousNextBottomJust 7th
Appendix B w. Property Control Procedures: A detailed written description of the contractors operation for the control, use, and care of property while in the contractors possession. x. Property Administrator (PA): An individual authorized to act on behalf of the ACO on all matters concerning the management of Government owned property. y. Property Records: Records that include all documentation concerning Government Property. z. Sensitive Property: Property for which the theft, loss or misplacement could be potentially dangerous to the public safety or community security, and which must be subject to exceptional physical security, control and accountability. The following types of property should be designated as "sensitive" in the contractors property management system: weapons, ammunitions, explosives, narcotics, and dangerous drugs. 2. GOVERNMENT FURNISHED MATERIAL/PROPERTY: (GFM/GFP) a. Federal Stock Classes (FSC): Contractor requisition/procurement of GFP is limited to FSCs authorized as listed on Attachment 3 of this appendix. GFM identified in Attachment 3 of this appendix includes direct parts and materials. The contractor will not requisition, procure, nor be provided with, any other materials by the Government; however, if the material is not available, the contractor will provide said material as CFM in accordance with Clause H-917 of this contract and this appendix, as appropriate. (1) Expense (ERRC Code N and P) and Investment/MSD (ERRC Code C, T, S, and U) - material used in repair of exhibit line items (end-items) will be utilized for the contract. (2) GFE, as authorized on this contract, is identified in Attachments 2 and 3 to this contract. The contractor will comply with the GFE-related clauses in the contract. While the GFE is in the possession of the contractor, it is the contractor's responsibility to provide routine maintenance and calibration of the GFE to ensure the GFE is returned to the Government in the same condition as when provided, less normal wear and tear. GFE is provided for the accomplishment of the T56 engine workload for the United States Navy and USAF and TF39 USAF engine workloads. The T56 Navy GFE is the property of the US Navy and will accompany the Navy T56 workload if it is reassigned to another repair source. NOTE: GFM IDENTIFIED ON ATTACHMENT THREE OF THIS APPENDIX INCLUDES DIRECT PARTS AND MATERIALS AND HAS BEEN AUTHORIZED. b. The contractor will requisition the applicable supply management publications through the Contract Administration Office (CAO) who will establish an account with the local Publications Distributions Office (PDO) for the contractor. Essential publications are: [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 7
EX-10.218th Page of 414TOC1stPreviousNextBottomJust 8th
Appendix B (1) FEDLOG, logistical information system or equivalent DOD publications. The contractor will provide a CD-ROM reader capable of reading a 4.72-inch compact disk. The CD-ROM reader must conform to High Sierra and ISO 9660 Standards. (2) DODM 4000.25 Military Standard Requisitioning and Issue Procedures (MILSTRIP). (3) DLA Customer Assistance Handbook. (4) DD FORMS 1348-1A (FOUR PART) (5) AFMAN 23-110, Volume 2, CD-ROM Version. NOTE: THE CONTRACTOR SHALL NOT ORDER GFM OR PURCHASE CAP MATERIAL FOR ANY OTHER CONTRACT BY USING REQUISITIONING PROCEDURES OR CAP FUNDS ASSIGNED TO THIS CONTRACT. c. Initial GFP Support: The contractor shall requisition initial GFP stock, using the stock level establishment criteria provided in paragraph 6 of this Appendix B as guidance. It must be noted that the pipeline time will be excluded in determining initial stock levels. d. Follow-on GFP Support: The contractor shall requisition authorized GFP items required to maintain stock levels, in accordance with paragraph 9 of this Appendix B. 3. CONTRACTOR ACQUIRED PROPERTY (CAP): a. Contractor Acquired Property are items prescribed as authorized GFM in Attachment three of this appendix. The contractor is authorized, subject to the obligation of adequate funds, to acquire CAP EOQ material items (ERRCs other than T, C, S, U) without additional written approval when GFM is not or will not be available in sufficient time to produce ordered ELINs. Acquisition will not normally exceed quantities required for immediate consumption. CAP will be retained in a secured storage area and treated as GFM (to include reporting all CAP transactions through the G009 system). The contractor shall insure that quantities obtained with CAP funds are canceled from requisitioning backorders to prevent accumulation of GFM in excess of stock levels authorized. In addition, the contractor will process the receipt of CAP material through the G009. Transaction Reporting System using the actual cost of the material. This cost must agree with the billing submitted to the ACO for payment. b. Each month, billings for actual CAP expenditures, supported by invoices, shall be submitted by the contractor to the Contract Administration Office (CAO). These expenditures shall be identified by NSN, CAGE Code, Part Number, Noun, ERRC, quantity purchased, and cost per item. Expenditures for CAP shall be limited to the amount of CAP funds authorized on this contract. c. The contractor will not use CAP funds for other than GFM identified in Attachment three without prior written permission of the PMS/ES. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 8
EX-10.219th Page of 414TOC1stPreviousNextBottomJust 9th
Appendix B d. The contractor shall acquire only CAP which has been developed and produced to meet federal/military standards and specifications, or an industry standard adopted by the Department of Defense. The contractor shall contact the ACO if there is doubt as to whether or not proposed CAP meets appropriate standards and specifications 4. CONTRACTOR COMMUNICATIONS NETWORK (CCN): INTERNET AND DAMES a. The success of any contract depends upon how fast and efficient communications are passed. They are passed to the sources of supply (SOS) for MILSTRIP documents, Reports of Discrepancies (ROD's), SF Forms 364, DAMES, Government Furnished Material, and End Item Transactions. They are received through the G009 reporting system to the contract managing ALC. b. The purpose of the CCN is to improve the flow of supplies to the contractor and to facilitate reporting of GFM transactions, inventory status, end item production, and reporting shipping discrepancies ROD's (SF Forms 364). This is accomplished by providing a direct on line interface between the contractor and DOD logistics activities. c. The G009/GFM interface to the DoD supply system will be provided by the contractor through the Internet. The DAASC Automated Message Exchange System (DAMES) software will be provided by Defense Automated Addressing System Center (DAASC). d. DAMES software installation will be accomplished by the contractor. Initial MILSTRIP/GFM training will be provided by the contract managing ALC, the cost will be borne by the government. Any retraining required by the contractor may result in travel to the managing ALC; the cost will be borne by the contractor. e. The contractor shall be required to provide the CCN hardware in accordance with Attachment Four. The hardware upkeep, maintenance and operational cost (including personnel) shall be borne by the contractor. SA-ALC/LPCC, (210) 925-4794, will be advised of system failures which cannot be corrected within 24 hours. 5. CONTRACTOR PROPERTY CONTROL RECORDS: a. The official property records are described in FAR subpart 45.505. The contractor shall establish a property control record for each line item. Property records shall be current at all times. Property records are to be kept current and an audit trail maintained from property acquisition to consumption in use or final disposition. Property accounting records, including debit and credit support documentation, and are considered part of the official government contract records. b. FAR 45.505-1 states that the following basic information is required on all material records, whether mechanized or manual: (1) Name, description and National Stock Number (NSN) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 9
EX-10.2110th Page of 414TOC1stPreviousNextBottomJust 10th
Appendix B (2) Quantity received (or fabricated in house), issued, on hand and on order. (3) Unit of measure (each, feet, etc). (4) Unit price (from receipt document or stock list data). (5) Contract or project number relating to contract. (6) Location. (7) Posting references (to include support documentation i.e. issues, receipts, inventory recording etc, and dates of transactions). (8) Disposition. c. In addition to FAR requirements, the following data is required to enable requirements planning and stock control: (1) Quantity due in (on order or being fabricated). (2) Expendability, reparability, recoverability category (ERRC) code. (3) Stock levels and reorder points. (4) Quantity per assembly (QPA) from Material Requirements List (MRL) or Technical Order (TO). (5) Replacement percentage factor (from MRL or actual experience). (6) Commercial and Government Entity (CAGE) code number. d. FAR Subpart 45.505-14 describes the annual report which gives the acquisition cost of all government property in the contractors custody. Details for completing this report are on the reverse of DD Form 1662, DOD Property in the Custody of Contractors. This form is available from the property administrator. e. Other reports may be required in accordance with FAR Subpart 45.508, 45.6 and the Contract Data Requirements List (CDRL) DD Form 1423. e. In addition to the above, a separate record of requisition numbers shall be maintained and shall include the NSN of the item requisitioned, the unit of issue, the quantity requisitioned, the document number, and the date the item was received by the contractor. The record shall be current at all times. 6. STOCK LEVELS OF GOVERNMENT FURNISHED MATERIAL (GFM): [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 10
EX-10.2111th Page of 414TOC1stPreviousNextBottomJust 11th
Appendix B a. Initial stock levels of GFM (ERRC N & P) shall be initially computed by the contractor for the first 60 days requirement. A minimum monthly quantity estimate shall be provided if the actual is unknown. The most current repair/replacement historical data available should be used to establish stock levels. If no historical data is available, the contractor shall contact the PMS for assistance in establishing these levels. b. This appendix specifies the maximum stock levels of GFM authorized to be on hand or on order at any given time. These levels shall be maintained only in those instances when the contractor's usage and/or reorder time experience justifies a need for the maximum levels to prevent production slippage or work stoppage. Minimum stock levels will be maintained as a normal procedure. c. Communication of stock levels begins with the number of end items to be repaired and in what time frame is determined. Apply the following when this determination is made: (1) Stock levels are a combination of pipeline time (in months) and stockage objective (in months). Note, however, that pipeline time shall be excluded by the contractor in determining initial stock levels, A stock level is the maximum months of stock authorized to be on hand or on order at any time. (2) The following elements of information apply to the computation of stock levels: [Enlarge/Download Table] CONUS -------------------------------------- ERRC CODE ERRC DESIGNATOR PIPELINE TIME STOCKAGE OBJECTIVE STOCK LEVEL --------- --------------- ------------- ------------------ ----------------- T XD2 31 DAYS + 45 DAYS = 76 DAYS (2 1/2 MO) N XB3 31 DAYS + 45 DAYS = 76 DAYS (2 1/2 MO) P XF3 31 DAYS + 45 DAYS = 76 DAYS (2 1/2 MO) NOTE: For OVERSEAS requirements, use the following pipeline time: * To Alaska, Hawaii, South America, Caribbean, North Atlantic - 69 Days ** To Northern Europe, Mediterranean, Africa - 74 Days *** To Western Pacific - 84 Days (3) Formula for computing stock levels: (a) Computing the Monthly Demand Rate (MDR) 1. Divide the number of end items to be repaired/overhauled each year by 12 and multiply this by the quantity per end item (QPA). Example: the yearly production quantity is 60 each, and the quantity per end item is 10 each (60:12=05, 05x10=50) 2. Obtain the item's replacement percentage from the historical data. Example: the [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 11
EX-10.2112th Page of 414TOC1stPreviousNextBottomJust 12th
Appendix B replacement percent for the item is 50%. Multiply this percent by the MDR computed above to obtain the applicable net MDR (.5x50 = 25 net MDR). (b) The stock level equals the MDR multiplied by the number of months for the stockage objective and pipeline time. Example: for an ERRC Code T item, the stockage objective of 1.5 months, and pipeline time of 1 month is multiplied by the MDR of 25 (1.5 + 1 = 2.5, 2.5 x 25 = 62.5, rounded to 63 stock level quantity). d. For low usage (round up to 1 each), low dollar items (under $30.00 stock-listed price (SLP)), a safety level of three each or an equivalent unit of issue will be established and maintained. 7. REORDER POINTS: a. Recorder of additional expense GFM will be predicated on future delivery orders. b. If projected production requirements of contract line items are not received during the first 60 days after LMKAC exits transition, no additional GFM will be ordered. c. If projected production requirements of contract line items are not received during the first 120 days after LMKAC exits transition, the contractor shall request disposition instructions from the ACO. d. The recorder point (in months) represents the number of months of stock required to be on hand or on order to support issues/demands during the pipeline time required to requisition and receive replenishment requirements. e. The reorder point (in months) shall be established as the pipeline time. f. The reorder point quantity shall be established by multiplying the reorder point by the MDR. Example: for an ERRC Code T (XD2) item, a one month reorder point times 25 MDR equals a recorder point quantity of 25. g. A reduced pipeline time will be used when the contractor's experience reflects pipeline time less than authorized above. An increase to the authorized pipeline time must be approved by the PMS through the ACO. 8. UNIFORM MATERIAL MOVEMENT AND ISSUE PRIORITY SYSTEM (UMMIPS): The Joint Chiefs of Staff (JCS) or their designated representative has assigned a Force Activity Designator (FAD) II to this contract for use in determining the proper requisition priority. The contractor will enter the appropriate priority designator in columns 60-61 of the requisition. The appropriate priority designator for FAD II is determined by relating the urgency of need designator (UND) to the assigned FAD II as illustrated in Attachment A-l, Chapter 23, part 1, [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 12
EX-10.2113th Page of 414TOC1stPreviousNextBottomJust 13th
Appendix B volume 1, AFM 67-1. Requisitioning priorities shall be established by the contractor using the following urgency of need formula: a. On FAD II, only use priority 02, 05, and 12. (1) UND "A" with FAD II equals priority 02. Use this priority when a work stoppage exists or will exist if material is not received within eight days. (2) UND "B" with FAD II equals priority 05. Use this priority when production capability will be impaired if material is not received within normal order and shipping times. (3) UND "C" with FAD II equals priority 12. Use this priority when requisitioning (a) initial operating stock and for (b) normal stock replenishment. b. The object of proper stock control is to have all requirements planned well in advance where only the lowest priority (12) is used. The use of high priority for stock replenishment is poor stock management and serves to defeat the priority system. 9. MILITARY STANDARD REQUISITION AND ISSUE PROCEDURES (MILSTRIP): The Department of Defense (DOD) 4000.25-1-M gives detailed guidance on accomplishing MILSTRIP requisitions, modifiers and follow up actions. This can be accomplished by electrical (DAMES) of manual process. The contractor shall prepare and process requisitions in accordance with regulation, as supplemented by the following: a. The contractor shall ensure all items and quantities are authorized and the requisitions are properly prepared in accordance with the MILSTRIP format (Attachment One, of this appendix). A requisition control record will be maintained and document numbers assigned to each day's requisitions. Entries will be maintained to indicate date material requisitioned, material on order and material received. b. In the event an item is urgently required to prevent a production slippage or work stoppage, the contractor shall: (1) Requisition the GFM required to relieve the production stoppage, with an advice code of (2C) (fill or kill) in card columns 65-66 and priority 02 in card column 60-61. The requisition quantity should not exceed the quantity required to relieve the production slippage or work stoppage. At the same time take action to cancel any requisitions, currently on back order, for this item and input a new requisition with the adjusted quantity. NOTE: A NORMAL REQUISITION USING ADVICE CODE 2L MUST BE SUBMITTED FIRST. IF UNACCEPTABLE STATUS IS RECEIVED THEN USE THE 2C ADVICE CODE. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 13
EX-10.2114th Page of 414TOC1stPreviousNextBottomJust 14th
Appendix B (2) Upon receipt of the denied 2C requisition (status code "CB" from the source of supply (SOS)), and in accordance with the provisions of contract clause H-917, the contractor will locally procure the items with funds specified in the contract. c. When material requisitioned is to be shipped to a supplemental station activity address other than the contractors home location. The contractor will enter the supplemental address EZ station number in columns 45-50 and signal code L in column 51: d. Requisitions will be prepared in accordance with instructions in Attachment 1 of this appendix. e. Requisition follow-ups, modifiers, cancellations, etc.; will be routed to F7M routing identifier code while SA-ALC is the MCA for the contract. Once the MCA transitions to 0C-ALC use F8M as the routing identifier code. f. Agency Peculiar Loan Property Requisitions will be in accordance with Attachment 5 (Instructions for preparation of GFP (Loan Equipment Requisitions). Requisitions will be submitted after completion of AFLC/AFSC Form 8, submitted by SA-ALC/FMPW. 10. ACTIONS REQUIRED ON SUPPLY STATUS CODES: a. An advice code may be entered by the contractor in card columns 65 and 66 of the requisition to provide instructions to the source of supply (SOS) when such data are considered essential to a supply action. A status code is inserted in the same field by the SOS to advise the contractor of the action taken after the requisition was processed. b. Once requisitions are input there is a continuing need to monitor the returned status codes. This is because each requisition must pass an edit check to ensure the item is valid under the terms of the contract. Also, some supply status codes may ask the requisitioner to revalidate, provide additional information or further justify the request for the item requisitioned. Failure to reply can cause the requisition to be canceled. c. Back 0rder Validation Listings of contractor requisitions on back order for ALC managed items will be forwarded, by the ALC to the contractor semiannually, for validation. Letters of transmittal for these listings will contain instructions for the contractor's validation or cancellation of back orders. 11. PRODUCTION PROBLEMS: a. The contractor shall report all potential supply support deficiencies that could cause production slippage or work stoppage to the ACO. This should be accomplished by telephone and followed up in writing. Instructions for the preparation of reports required by the GFM Manager and PMS can be found in AFMCM 66-266, Volume 1, Attachment 5 and 6. These reports will be forwarded to the managing ALC via the G009 system. GFM reports shall identify the GFM items which are critical or have long procurement lead time and the work stoppage date. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 14
EX-10.2115th Page of 414TOC1stPreviousNextBottomJust 15th
Appendix B If problems are not resolved, the contractor shall report them to the ACO. The ACO will forward all problems to the PCO and PMS. b. Contract Line Items received with missing Material Support Division (MSD) components: The contractor will immediately process a Report of Discrepancy (ROD), SF Form 364, in accordance with AFR 400-54, and provide the missing item report, including the ROD Number, to the ACO. The report will specify the missing items by NSN/PN. 12. DISPOSITION OF GOVERNMENT PROPERTY: a. These instructions apply to all government owned property, or property procured with government funds, that is determined to be excess by the contracting ALC for the fulfillment of this contract. b. If a follow-on contract is being awarded, to the incumbent contractor, or in the negotiation or solicitation stage. The existing GFM/GFP may be retained to the extent required to support the current contract and the follow-on contract. (1) Ninety days prior to contract expiration, the contractor shall submit a letter to the managing ALC requesting retention and eventual transfer of GFM/GFP to the follow-on contract. The letter must contain the following information: noun, NSN, P/N, ERRC, code, dollar value, and quantity on hand to be retained. (2) If the retention/transfer of GFM/GFP is approved, the contractor shall submit a "ship in place" document to the Property Administrator. Copies of transfer documents shall be furnished through the ACO and PCO to the Production Management Specialist (3) If the managing ALC disapproves retention of the GFM/GFP, disposition instructions will be provided to the contractor. All disposal actions should be completed within 30 days of receipt of instructions. (4) If the follow-on contract is awarded to other than the incumbent, the following applies: (a) A listing of all GFM by NSN/PN and quantity will be provided to the PMS. (b) GFM will be packaged and identified in accordance with existing FAR regulations and shipped per instructions of PMS. c. In the event this contract or any delivery order placed against this contract is terminated. Disposition of GFP determined to be excess to the needs of this contract will be in accordance with paragraph 12d (3) of this Appendix B. d. The contractor shall review stock positions on all GFM every 90 days. The contractor will initiate disposition action within 30 days following determination of excess GFM. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 15
EX-10.2116th Page of 414TOC1stPreviousNextBottomJust 16th
Appendix B (1) When the contract is within 60 days of completion, the contractor shall review all requisition control records. All back order requisitions for which a positive supply action has not been received will be canceled and a new requisition, with an advice code "2C" (fill or kill) in 65-66, will be submitted. The new requisition quantity will be limited to the amount required to complete the contract. (2) The contractor shall obtain disposition instructions from the PMS for unserviceable investment items which are removed from the end item and are not to be repaired under the terms of this contract. Unserviceable expense items removed from the end item shall be condemned and disposed of in accordance with paragraph 14. (3) The contractor shall prepare a listing of excess local purchase (LP), local manufacture (LM), AF managed items code in the stock list as "JCD" (deleted) and items code "N" (expense) in the stock list regardless of condition or line item dollar value. The list shall include GFP by NSN, part number, noun, quantity, and dollar value. Then submitted through the ACO to the PMS for disposition instructions. (4) Serviceable AF stock listed items with a $50 or more line item value shall be returned to the ALC responsible for managing the FSC of the items. Defense Logistics Agency (DLA) and Other Services Stock Fund (OSSF) items with the same value shall be shipped to the ALC managing and funding the contract effort. (5) Items valued at less than $50 per line item shall be disposed of by the contractor using plant clearance procedures. (6) The contractor shall use DD Form 1348-1A, DOD Single Line Item Release/Receipt Document, for turn in of GFP. Instructions for completion of this form are attached. e. Work involved in packing, crating, and preparing excess government property for shipment, either during contract performance or at contract completion, shall be authorized under the over and above provisions of the contract, unless such excess inventory exceeds the stock level limits as defined in the Appendix B. f. If the ACO determines that the excess government property exceeds the stock level limits authorized in accordance with Appendix B, the contractor shall bear the cost of packing, crating, and preparing the unauthorized excess inventory for shipment, provided that such excess is not the result of decreased production requirements directed by the contracting officer. g. Transportation costs for excess inventory, defined in the above paragraph, which are borne by the government in accordance with the government property provisions of the contract, will be deducted from payments due under the contract. h. Directed Disposal: (1) Contracting ALC representatives, during a visit, may direct on the spot disposition of excess material discovered. Representatives of the ALC, the contract administration activity, and [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 16
EX-10.2117th Page of 414TOC1stPreviousNextBottomJust 17th
Appendix B the contractor, must be in agreement that such items are excess to total contract requirements prior to disposal action. (2) The contractor will be instructed in writing as to the items and quantities to be eliminated from stock. i. The contractor shall assure that all excess reparable contracted end items being returned to the AF have the note "Contract Excess" entered on the DD Form 1348-1A (shipping document) to preclude. ALC recording of such excess as additional reparable generations. The contractor shall insure that excess contracted end items are returned to the contracting ALC unless another address is specified by the ACO. j. Package and Shipment of Expense Items: (1) Expense items still in their original package shall be shipped as is. (2) All remaining expense items shall be packaged "Level A" and shipped "Level C" in accordance with MIL-STD 2073-1B. (3) The contractor may use commercial packaging if equal to or better than MIL-STD 2073-1B. (4) The contractor should refer to the basic contract for cost of packaging and shipping. 13. DISCREPANCIES INCIDENT TO SHIPMENT: SF Form 361/364 a. There are transportation and item discrepancies, each having different reporting requirements. Detailed information for each report is in the pertinent service publications. b. The most common discrepancies are those item transactions which are misidentified, have variations in quantity, dubious condition, non-requisitioned items, lost/damaged parcel post, or excessive packaging. Supply discrepancies will be reported on SF Form 364, Report of Discrepancy (ROD). The completed form will be forwarded through the CAO/QA activity for corrective action. The items received and reported, on SF Form 364, as overages will be processed according to the disposition of excess GFM criteria specified in this appendix. Transportation discrepancies will be reported on SF Form 361 Transportation Discrepancy. When the shipping activity is an ALC, the focal point for receipt/control of SF 364 is DDOO-XI, Inventory Integrity Branch. c. Misdirected shipments of GFM shall be immediately reported to the Property Administrator (PA) by telephone, and followed in writing within three workdays. The PA will issue appropriate disposition instructions for the misdirected items. NOTE: EXCESS ITEMS, RECEIVED BY THE CONTRACTOR, CAN BE RECEIVED INTO THE G009 SYSTEM AND A REPORT OF DISCREPANCY BE COMPLETED AND PROVIDED TO THE ACO FOR CORRECTIVE ACTION. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 17
EX-10.2118th Page of 414TOC1stPreviousNextBottomJust 18th
Appendix B 14. D1SPOSITION OF CONDEMNED GOVERNMENT PROPERTY: a. Unserviceable GFM (ERRC code N&P items shall be condemned and disposed of at the contractors facility in accordance with the terms of this contract and/or government approved scrap procedures. b. Disposition instructions for all ERRC code C, T, S and U items, such as critical items, MSD and save list items that are condemned during the performance of this contract shall be requested through the ACO/CO from the ALC. c. The contractor shall submit a listing of condemned ST/STE (ERRC code S&U) to the contracting ALC. The listing shall identify the condemned items by NSN, PN, noun and quantity; and shall be submitted together with a letter of transmittal titled (Request for Disposition of ST/STE condemned on Contract Number). Disposition instructions will be provided by the contract managing ALC. 15. CONTRACTOR PRESERVATION, PACKAGING, PACKING, AND MARKING: a. The contractor will comply with preservation, packaging, and packing instruction stipulated on or attached to the AFMC Form 158, (Packaging Requirements) if attached, or as specified in the contract. b. The contractor will also comply with MIL-STD-129M dated 15 May 1997, or as specified in the contract. c. Expense items in their original package shall be shipped as is. All remaining items to be returned shall be packaged in accordance with MIL-STD 2073-1C or as specified on the AFMC Form 158. A1l items are to be identified with the appropriate NSN/Part Number. 16. CONTRACTOR REPORTING: The contractor shall comply with DD Form 1423-1, Contract Data Requirements List, regarding the GFM and End Item Transaction Reporting System (G009)(DI-ALSS-81533). Submit this report via the CCN Internet (http://g009.ogden.disa.mil:8003/). Submit contractor requisitions by national stock number via DAMES through DAASC. 17. VISITS: Surveillance visits will be made by the CO/ACO and or the contracting ALC representatives, when such visits are considered necessary, particularly in relation to contract material control and production schedules. 18. OTHER: [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 18
EX-10.2119th Page of 414TOC1stPreviousNextBottomJust 19th
Appendix B a. The contractor shall not obtain GFP or purchase CAP material through the utilization of requisition codes or CAP funds assigned to this contract for any other contract. b. The contractor shall not transfer GFP charged to this contract to any other contract, contractor, or activity, without the advance approval of the GFM Management Unit, PMS, through the ACO, and PCO. c. The government reserves the right to withdraw any GP in the possession of the contractor to supply other urgent USAF requirements. If any item so removed by the government is still required to complete the contract, the contractor shall take appropriate action to replace the removed item. d. When, during the last six months of the contract, it becomes evident that an option shall most probably be exercised, the PCO will notify the contractor through the ACO to maintain stock levels necessary to meet the option workload. e. Utilization of Precious Metals: Contracts requiring the use of precious metals: gold, silver, and platinum should determine which form is needed such as pure, braze, etc., by National Stock Number (NSN) while ensuring government stocks are utilized for the requirement. Prior to any negotiation to provide precious metals as GFP, the procuring activity will ascertain the availability of reserve stocks from the precious metal GFP monitor, OC-ALC/FMIRD. The policy is contained in AFM 67-1, Volume VI, Chapter 4, paragraph 6.d. Requisitions for precious metals will be fowarded to the applicable PMS. Disposition of scrap bearing precious metals shall be per FAR Part 45, paragraph 45.607. The PMS will review the requisition to see that it includes: (1) Valid Contract Number. (2) NSN. (3) Data that identifies the item or component in which the precious metal will be used. (4) Quantity of precious metal which will be used per item or component, if known. (5) Name and phone number of a contact point at the requisitioning activity. If the requisition is valid as submitted, the PMS will forward the message to DISC-ODBA/YC, 700 Robbins Ave, Philadelphia PA 19111, after annotating the correspondence with his name and phone number. If the requisition is invalid, the requisition will be returned to the requisitioning activity. (6) Transfer, retention request, and return of agency peculiar-loan property will be in accordance with Attachment 5, Loan Instructions. 19. REFERENCES: a. Federal Acquisition Regulation (FAR), Subpart 45, Management of Government Property in the possession of contractors. (Current Version). [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 19
EX-10.2120th Page of 414TOC1stPreviousNextBottomJust 20th
Appendix B b. Defense Federal Acquisition Regulation Supplement (DFARS). Subpart 245.5, Management of Government Property in the possession of Contractors. (Current Version). c. Military Standard Requisition and Issue Procedures (MILSTRIP), DODM 4000.25-1 (Current Version). d. Federal Acquisition Regulation (FAR) Subpart 52, Solicitation Provisions and Contract Clauses. e. AFMCM 66-266, Government Furnished Material/End Item Transaction Reporting System Vol I(G009). f. AFMCI 21-113, Contract maintenance Programs for Depot Maintenance Activity Group (DMAG). g. Other DOD and military service directives if specifically referenced in the contract special clauses or appendices. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 20
EX-10.2121st Page of 414TOC1stPreviousNextBottomJust 21st
Appendix B APPENDIX "B" ATTACHMENT 1 INSTRUCTIONS FOR PREPARING GOVERNMENT FURNISHED MATERIAL (GFM) REQUISITION MANUAL: DD Form 1348-1A, National Stock Number (NSN) DD Form 1348-6, Part Number (PN) AF Form 923 MECHANICAL; (DAMES) VIA (CCN) NOTE: USE DD FORM 1346-6, DOD SINGLE LINE ITEM RELEASE/RECEIPT DOCUMENT, FOR REQUISITIONS BY MANUFACTURERS PART NUMBER AND MAIL TO OC-ALC/FMIRD, TINKER AFB, OKLAHOMA, EXTENSION 405-736-3028, AND MARK THE ENVELOPE: DO35 INPUT. Card Columns: 1-3 Enter the appropriate three-position code: [Enlarge/Download Table] Domestic Shipment Overseas Shipment Description ----------------- ----------------- ----------- A0A A01 NSN/NATO stock number A0B A02 Manufacturers part number A0D A04 Non-stocklisted or kit number (NC, ND, K) A0E A05 Manufacturer's part number and the part number and the part number will not fit in card columns 8-22, if a prior requisition was rejected and the item represents a valid requirement. The Identification Data portion of the DD Form 1348-6 will be fully completed. [Download Table] Card Columns: 4-6 Management Control Activity (MCA) for the contract: Enter "F7M" SA-ALC (This code will be used until Engine Management (SA-ALC/LP) transitions to OC-ALC (Estimated date 30 Sep 00). After transition use "F8M" OC-ALC. Card Column: 7 Enter S (If automated) or enter T (If manual reporting). Media and status code. Card Columns: 8-22 Enter the NSN or NSN/Material Management Aggregation Code (MMAC) or the manufacturers part number. If the part number will not fit, enter as many characters as possible and include the entire part number in block 1 of the DD Form 1348-6. Card Columns: 23-24 Enter the two-position code for the unit of issue, i.e. EA = Each, FT = Foot. Card Columns: 25-29 Enter the quantity required and prefix with zeros to fill the field. If quantity exceeds 99,999, prepare additional requisition. Card Columns: 30-35 Enter your EZ number. Card Column: 36 Enter the last digit of the calendar year in which the requisition originated. Card Columns: 37-39 Enter the Julian date. Card Column: 40 Enter M. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 21
EX-10.2122nd Page of 414TOC1stPreviousNextBottomJust 22nd
Appendix B [Download Table] Card Columns: 41-43 Enter a three-digit serial number; number the requisitions consecutively. Do not use the same number twice on the same day. Card Column: 44 Demand code, enter "R" if a recurring demand to replenish material used on a day-to-day basis. Enter "N" if non recurring demand, a demand made on a one-time basis. Card Columns: 45-50 Enter Y in column 45, the last digit of the contract year in column 46, and enter the last four characters of the contract number in columns 47-50. Card Columns: 51-56 Enter CPRP87 cc 51, signal code. "C" - Ship to requisitioner, bill to activity designated in cc 52. "L" - Ship to supplementary address; bill to activity designated in cc 52. cc 52, funding ALC, "P" San Antonio. cc 53, fund code, "R" Industrial fund. cc 54-56, distribution code, Enter "P87" SA-ALC (This code will be used until Engine Management (SA-ALC/LP) transitions to OC-ALC (Estimated date 30 Sep 00). After transition use "H91" OC-ALC. Card Columns: 57-59 Project code, use 879. Card Columns: 60-61 Priority code enter the appropriate priority (see Appendix "B", Paragraph 8). Card Columns: 62-64 Required delivery date, enter the Julian date by which the material is required: (Must be filled.) Card Columns: 65-66 Advice code, leave blank or enter appropriate code. 2A Item not locally obtainable through manufacture, fabrication, or procurement. 2B Requested item only will suffice. Do not substitute/interchange. Also applies to "obsolete" items previous rejected with status code CJ. 2C Do not back order. Reject unfilled quantity not available to meet standard delivery. 2D Furnish exact quantity requested. 2J Do not substitute or back order any unfilled quantities. 2L Quantity reflected in quantity field exceeds normal demands; this is a confirmed valid requirement. Card Columns: 67-71 Leave blank. Card Column: 72 For initial issue (installation) of GFM use management code "F"; for exchange or replenishment, use management code "J". Card Columns: 73-80 Enter the abbreviated contract number. Use P0002133 for TF-39, P0002134 for Air Force T-56, and P0002162 for Navy T56. These numbers will change each quarter (See Paragraph 1. "TERMS EXPLAINED", Sub-Paragraph a.). [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 22
EX-10.2123rd Page of 414TOC1stPreviousNextBottomJust 23rd
Appendix B APPENDIX "B" ATTACHMENT 2 INSTRUCTIONS FOR PREPARING SHIPPING DOCUMENT FOR GOVERNMENT FURNISHED PROPERTY (GFP) TURN IN NOTE: DD FORM 1348-1 IS THE ONLY AUTHORIZED RETURN DOCUMENT; (DO NOT USE DD FORM 1149). [Download Table] Card Columns: 1-2 Document identifier - Enter D6 Card Column: 3 See codes for return of GFM from repair contractor (Attachment 2A). Card Columns: 4-5 Routing identifier a. In column 4 - enter "F". b. In column 5 - enter the item manager ALC for items supplied by the ALC or the nearest geographical ALC for DLA/OSSF items. CODE ALC ---- ----------------- F Sacramento ALC G Ogden ALC H Oklahoma City ALC L Warner Robins ALC P San Antonio ALC Card Column: 6 Enter "Z" for ALC supplied items or "B" for DLA/OSSF supplied items. Card Column: 7 Status code - "F" for (GFM) "G" for (GFE). Card Columns: 8-22 Stock number - enter NSN of item being returned. Card Columns: 23-24 Unit of issue - enter the two letter abbreviation as shown in the catalog or stocklist. Example: EA for each, FT for feet. Card Columns: 25-29 Quantity (Must fill) - "If card column 72 is "J", then "Quantity" shall be one. If card column 72 is other than "J", then "Quantity" shall be the quantity being returned." Add: "Quantity should be the quantity being returned." Card Columns: 30-43 Document number. Card Columns: 30-35 Enter contractor's activity address code (EZ___ ). Card Column: 36 Enter the last numeric digit of the calendar year in which the turn in originated. Example: 1998 enter (8). Card Column: 37-39 Enter the Julian date, numeric consecutive day of the calendar year. Example: 23 March is 082. Card Columns: 40-43 Enter a four-digit serial number assigned to each turn-in. The serial number will be assigned by the contractor returning the item and is not to be duplicated on any one day. Card Column: 44 Demand code - leave blank. Card Column: 45 Enter code "Y". Card Column: 46 Enter the last digit of the contract year identified in the contract number. Card Columns: 47-50 Enter the last four digits of the contract number. If the [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 23
EX-10.2124th Page of 414TOC1stPreviousNextBottomJust 24th
Appendix B [Download Table] turn-in is against a basic ordering agreement, enter the same funding ALC that was used when the material was requisitioned. Card Column: 51 Signal code - enter "C". Card Columns: 52-53 Fund Code - (Must fill) - enter "HR" for funding ALC and identifying the applicable fund code that was used when the material was requisitioned. Card Column: 54 Distribution - enter "P". Card Column: 55 Leave blank. Card Column: 56 a. Enter Y if one of the following conditions exists. 1. The turn-in is because more material was received than the quantity that was requisitioned. 2. The turn-in is because the item had a latent defect when received. 3. The turn-in is because the item received is not what was ordered. 4. The turn-in is serviceable GFM issued for testing purposes under an unsatisfactory report. 5. The turn-in is directed by an Item Manager to satisfy another requirement elsewhere. b. Enter a "K" in column 56 if the item being returned was originally requisitioned for loan/bailment. c. If one of the above conditions does not exist, leave column 56 blank. Card Columns: 57-59 Project - Leave blank. Card Columns: 60-61 Priority - Leave blank unless directed otherwise by the contracting officer. Card Columns: 62-65 Leave blank. Card Column: 66 Enter "R". Card Columns: 67-69 Leave blank. Card Column: 70 Ownership Purpose - Enter "A". Card Column: 71 Condition code - Enter applicable condition code, "A" for serviceable, "F" for unserviceable (reparable). Card Column: 72 Management Code - (Must fill). a. Enter "F" if returning serviceable GFM requisitioned as initial issue. b. Enter "H" when returning GFE. c. Enter "J" when returning GFM that is unserviceable Material Support Division (MSD) material (Budget code 8 and ERRC "T"). d. Enter "P" when returning "D" coded material. Card Columns: 73-80 Leave blank. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 24
EX-10.2125th Page of 414TOC1stPreviousNextBottomJust 25th
Appendix B APPENDIX "B" ATTACHMENT 2A CODES FOR THE RETURN OF GOVERNMENT FURNISHED MATERIAL FROM REPAIR CONTRACTORS Because the return of GFM/GFE from the repair contractors is critical to our operation, it is imperative that the contractor place the correct code on the DD Form 1348-1A when returning material. The following codes indicate the reason for return. Please use the correct codes. These codes will determine the proper credit to allow/deny. [Download Table] CC-1-4 CC-72 EXPLANATION ------ ----- ----------- D6LB A ASSEMBLY, END ITEM TREATED AS A PURCHASE. THE AF WILL RECEIVE A BILL FROM THE CONTRACTOR. D6LC C END ITEM FROM CONVERSION OR MODIFICATION. NO CREDIT PROVIDED. D6LK D DISASSEMBLY, TREATED AS A PURCHASE, THE AF WILL RECEIVE A BILL. D6LE E RECLAMATION, NO CREDIT IS PROVIDED. D6HF F GFM, CREDIT IS BASED ON CREDIT INDICATOR AND CONDITION CODE OF THE ITEM. D6HG G GOVERNMENT FURNISHED AIRCRAFT EQUIPMENT. CREDIT BASED ON CREDIT INDICATOR AND CONDITION CODE OF THE ITEM. D4MC H END-ITEM FROM REPAIR/TEST. TREATED AS A PURCHASE. THE AF WILL RECEIVE A BILL FROM THE CONTRACTOR. D6RJ J EXCHANGE ITEM. CUSTOMER WILL/HAS TURNED IN AN UNSERVICEABLE ITEM FOR A SERVICEABLE ITEM. CREDIT IS BASED ON THE CREDIT INDICATOR AND CONDITION CODE OF THE ITEM. D6NL L LOAN, BAILMENT OR LEASE. NO CREDIT IS PROVIDED. RETURN OF LOAN ITEM. D6HP BLANK MATERIAL RECEIVED WITHOUT DOCUMENTATION. NO CREDIT IS PROVIDED. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 25
EX-10.2126th Page of 414TOC1stPreviousNextBottomJust 26th
Appendix B APPENDIX "B" ATTACHMENT 3 GOVERNMENT FURNISHED MATERIAL (GFM) AUTHORIZED The GFM which the contractor is authorized to requisition is listed below by Federal Stock Class (FSC). The contractor is also authorized to requisition items in certain other Federal Stock Classes and non stock listed items when they are determined to be direct parts and materials in accordance with Section H of the contract. All GFM must be authorized, in writing, by the Equipment Specialist (ES). [Download Table] 1560 1610 1620 1650 1680 1730 2010 2310 2520 2540 2810 2835 2840 2910 2915 2920 2925 2938 2940 2945 2950 2990 2995 3010 3020 3040 3110 3120 3130 4010 4020 4030 4140 4320 4330 4710 4720 4730 4810 4820 4920 5120 5305 5306 5307 5310 5311 5315 5320 5325 5330 5331 5340 5342 5355 5360 5365 5370 5395 5640 5703 5820 5905 5910 5915 5930 5935 5940 5945 5950 5960 5962 5970 5975 5990 5995 5999 6020 6105 6110 6125 6130 6145 6150 6620 6625 6685 7690 8105 8115 8135 8145 9330 9390 9505 9905 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 26
EX-10.2127th Page of 414TOC1stPreviousNextBottomJust 27th
Appendix B APPENDIX "B" ATTACHMENT 4 CONTRACTOR COMMUNICATIONS NETWORK (CCN) FOR GOVERNMENT FURNISHED MATERIAL AND END ITEM PRODUCTION REPORTING SYSTEM (G009) AND SUPPLY REQUISITIONING 1. GENERAL: a. The purpose of this attachment is to provide the specific conditions, hardware specifications, and communications interface to support contractor GFM and/or End Item reporting requirements and supply requisitions, b. HOST LOCATIONS: (1) A web server located at Hill AFB, Utah will act as host for G009 on-line transaction processing. The contractor shall be required to complete a DISA Form 41 for security access prior to log-on to system. The DISA Form 41 must be returned to SA-ALC/FMPW for user ID and Internet address. A fax, number must also be provided for timely return of access ID. Contractors may request file transfer capability and will utilize FTP procedures provided by the managing ALC at the time of the request. (2) The DLA/DAASC front-end computer at Wright Patterson AFB, Ohio will act as host for GFM requisitions. The contractor will be required to sign a DAAS Automated Message Exchange System (DAMES) customer license agreement that will be furnished by DAASC. The contractor terminal, using the dedicated telephone line provided by the contractor and the software provided by DAASC, will dial-up the DAASC computer to initiate the transmitting or receiving of requisition related information. 2. TECHNICAL CONSIDERATIONS: The contractor shall provide the following hardware/software to meet the specifications indicated: a. PERSONAL COMPUTER HARDWARE/SOFTWARE: Minimum system configuration requirements are. (1) 486 PC 66 DX (a Pentium processor is recommended). (2) The PC will require Internet access and a WEB browser tool for system access and must be IBM compatible. (3) Microsoft Windows 3.1 or later. (Prefer Windows 95) (4) Mouse or compatible pointing device. (5) 16 MB RAM if running Windows 95.30 MB if running Windows NT. (6) Hard Disk Drive (100MB). [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 27
EX-10.2128th Page of 414TOC1stPreviousNextBottomJust 28th
Appendix B (7) Video card accelerator (1MB). (8) VGA or SVGA graphics card compatible with Windows 95 and Windows NT and capable of a minimum 800 x 600 graphics in 256 colors. 15 inch SVGA monitor. (9) Printer. (10) Read/Write/Delete access to hard drive. b. Specific Network Connectivity Requirements for (DAAS) System Contractor (GFM) Requisitions. (1) Communications on the PC uses TCP/IP running custom FTP developed by DAASC especially for VOLTS. A WINSOCK-DLL is required for TCP/IP to function; (2) For modem connectivity (the only approved method for Foreign Military Sales (FMS) customers) a 14.4 BPS modem which supports Microcom Network Protocol (MNP). (3) asynchronous communications using XMODEM protocol. (4) FTP using Point to Point Protocol (PPP) communications. c. Specific DOS Connectivity requirements for (DAAS) system contractor (GFM) requisitions. (1) Hayes Auto-dial model or Hayes compatible, (2) 9600 baud capability minimum. (3) Modem must be capable of understanding the Hayes AT command set. (4) Modem must be connected via direct dial telephone circuit. (5) Asynchronous communications port (configured as COM1 or COM2). (6) DOS Version 3.0 or higher. Version of DOS and BASIC Interpreter must be compatible. 3. RESPONSIBILITY OF CONTRACTOR: a. Capability for direct dial telephone line hook-up for the system data transmission shall be provided by the contractor with no call waiting or other line interruption features (DAMES DOS CONNECTIVITY ONLY). b. Capability of internet connectivity for transmission of material requisitions shall be provided by the contractor (DAMES INTERNET CONNECTIVITY ONLY). [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 28
EX-10.2129th Page of 414TOC1stPreviousNextBottomJust 29th
Appendix B c. The contractor will receive DAMES software from DAASC. Immediately upon receipt, the contractor shall install the software and make electronic connectivity with DAASC (DAMES CONNECTIVITY ONLY). d. Initial training will be provided by San Antonio Air Logistics Center (ALC). Follow up training will be the responsibility of the contractor. e. The contractor is responsible for the maintenance of the hardware and for providing supplies (e.g. paper, ink, ribbon, extra, disks). f. It is the contractor's responsibility to keep the system operational and compatible with specifications identified above. g. The contractor shall use the G009 system for all End Item and GFM reporting, as appropriate. h. System failures that cannot be corrected within 24 hours shall be reported to SA-ALC/LPCC by the fastest means possible. i. Point of contract for G009 assistance is listed in paragraph 4a(4) of this attachment. Point of contact for DAMES assistance is DAASC (513) 656-3227. 4. SYSTEM AUTHORIZATION ACCESS REQUEST (SAAR) FORM: a. The following procedures explain how to fill out the DISA Form 41. (1) Check the type of request block "INITIAL" and skip to DATE. (2) PART I: Complete blocks one through eight and sign the USER SIGNATURE and DATE. Insert your DoDAAC "EZ Number" in block 5. Have your supervisor complete blocks 19, 20, 21 and 22. On the second page fill in your mailing address in Block 34. (3) OMIT PARTS II and III. (4) POINTS OF CONTACT: The requester will mail or FAX the DISA Form 41 to the appropriate ALC POC: SA-ALC/LPCC ATTENTION: GLENDA LUKENS 485 Quentin Road, Suite 8 KELLY AFE, TX 78241 COMM: 210-925-4794 DSN: 945-4794 FAX: 210-925-1939 (5) USER ID: The user ID on the Internet will be standard for all users. NOTE: Use lower case letters. After receiving your User ID, the password can be obtained by calling: OL-AD MSG/SOC Point of contact is Melanie Wirick, 801-777-8184 FAX 801-777-4221. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 29
EX-10.2130th Page of 414TOC1stPreviousNextBottomJust 30th
Appendix B (6) INTERNET ADDRESS: http://g009.ogden.disa.mil:8003/ NOTE: YOU WILL BE REQUIRED TO CHANGE THIS PASSWORD FOLLOWING YOUR INITIAL ENTRY TO THE SYSTEM. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 30
EX-10.2131st Page of 414TOC1stPreviousNextBottomJust 31st
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 T56 ENGINE AND ACCESSORIES SUPPORT SUBCONTRACT No. LMKAC-98-000l BETWEEN STANDARD AERO SAN ANTONIO, INC. AND LOCKHEED MARTIN KELLY AIRCRAFT CENTER 23 September, 1998 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 1 of 81
EX-10.2132nd Page of 414TOC1stPreviousNextBottomJust 32nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 TABLE OF CONTENTS [Download Table] GENERAL TERMS AND CONDITIONS ARTICLE 1 INTEGRATION CLAUSE PAGE 5 ARTICLE 2 SERVICES PAGE 7 ARTICLE 3 DEFINITIONS PAGE 8 ARTICLE 4 TERM PAGE 11 ARTICLE 5 PAYMENT PAGE 12 ARTICLE 6 TAXES, DUTIES AND ASSESSMENTS PAGE 12 ARTICLE 7 STANDARDS OF PERFORMANCE PAGE 12 ARTICLE 8 CHANGES PAGE 13 ARTICLE 9 ORDERING PROCESS PAGE 14 ARTICLE 10 RESERVED PAGE 17 ARTICLE 11 INSURANCE PAGE 17 ARTICLE 12 WARRANTIES PAGE 18 ARTICLE 13 DELAYS, DEFAULT, TERMINATION PAGE 19 ARTICLE 14 ASSIGNMENTS PAGE 19 ARTICLE 15 PROPERTY PAGE 19 ARTICLE 16 DISPUTES PAGE 21 ARTICLE 17 GOVERNING LAW PAGE 22 ARTICLE 18 COMPLIANCE WITH LAWS AND REGULATIONS PAGE 22 ARTICLE 19 DATA PAGE 23 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 2 of 81
EX-10.2133rd Page of 414TOC1stPreviousNextBottomJust 33rd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] ARTICLE 20 RESERVED PAGE ART1CLE 21 INDEPENDENT CONTRACTOR PAGE 24 ARTICLE 22 GRATUITIES PAGE 25 ARTICLE 23 SUBCONTRACT ADMINISTRATION PROVISIONS PAGE 25 GOVERNMENT FLOWDOWN CLAUSES AND PROVISIONS PAGE 27 SPECIAL PROVISIONS PAGE 30 SP 1 SELLER'S SUBCONTRACT CLAUSES PAGE 30 SP 2 RESERVED SP 3 STATUS REVIEWS PAGE 31 SP 4 DEFENSE RATED CONTRACT PAGE 31 SP 5 SPECIAL PROVISIONS RELATIVE TO UNPRICED ORDERS PAGE 31 SP 6 NOTICE OF INCORPORATION OF SECTION K PAGE 33 SP 7 SELLER'S PERSONNEL PAGE 33 SP 8 UNION ORGANIZATIONS PAGE 34 SP 9 ECONOMIC PRICE ADJUSTMENT PAGE 34 SP 10 PRICE REDETERMINATION-PROSPECTIVE PAGE 36 SP 11 WORKLOAD CHANGES PAGE 36 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 3 of 81
EX-10.2134th Page of 414TOC1stPreviousNextBottomJust 34th
SUBCONTRACT 18 September 1998 NO LMKAC 98-0002 [Download Table] ARTICLE 20 RESERVED PAGE ARTICLE 21 INDEPENDENT CONTRACTOR PAGE 24 ARTICLE 22 GRATUITIES PAGE 25 ARTICLE 23 SUBCONTRACT ADMINISTRATION PROVISIONS PAGE 25 GOVERNMENT FLOWDOWN CLAUSES AND PROVISIONS PAGE 27 SPECIAL PROVISIONS PAGE 30 SP 1 SELLER'S SUBCONTRACT CLAUSES PAGE 30 SP 2 RESERVED SP 3 STATUS REVIEWS PAGE 31 SP 4 DEFENSE RATED CONTRACT PAGE 31 SP 5 SPECIAL PROVISIONS RELATIVE TO UNPRICED ORDERS PAGE 31 SP 6 NOTICE OF INCORPORATION OF SECTION K PAGE 33 SP 7 SELLER'S PERSONNEL PAGE 33 SP 8 UNION ORGANIZATIONS PAGE 34 SP 9 ECONOMIC PRICE ADJUSTMENT PAGE 34 SP 10 PRICE REDETERMINATION-PROSPECTIVE PAGE 36 SP 11 WORKLOAD CHANGES PAGE 36 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 3 of 81
EX-10.2135th Page of 414TOC1stPreviousNextBottomJust 35th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] APPLICABLE EXHIBITS ------------------- EXHIBIT "A" SUBCONTRACT DATA REQUIREMENT LISTS EXHIBIT "B" FIXED-PRICE EXHIBIT LINE ITEM NUMBERS EXHIBIT "C" FIXED-PRICE EXHIBIT LINE ITEM NUMBERS EXHIBIT "D" FIXED-PRICE EXHIBIT LINE ITEM NUMBERS EXHIBIT "E" FIXED-PRICE EXHIBIT LINE ITEM NUMBERS EXHIBIT "F" PAYMENTS EXHIBIT "G" SASA'S PROPOSAL Dated 23 September 1998 EXHIBIT "H" FACILITIES SUBLEASE EXHIBIT "I" LIST OF SURGE ITEMS EXHIBIT "J" OCCUPANCY EXPENSE BY FISCAL YEAR EXHIBIT "K" HUMAN RESOURCES/MEDICAL SERVICES EXPENSE BY FISCAL YEAR EXHIBIT "L" PROPRIETARY INFORMATION AGREEMENT EXHIBIT "M" OFFEROR REPRESENTATIONS AND CERTIFICATIONS-COMMERCIAL ITEMS EXHIBIT "N" BENEFIT PLAN COSTS FOR PBA PERSONNEL [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 4 of 81
EX-10.2136th Page of 414TOC1stPreviousNextBottomJust 36th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 T56 ENGINE SUPPORT SUBCONTRACT NUMBER: LMKAC 98-0001 This Subcontract is made and entered into as of this 23rd day of September 1998, by and between Standard Aero San Antonio, Inc. (herein "Seller" or SASA), a wholly-owned subsidiary of Standard Aero Limited, and Lockheed Martin Kelly Aircraft Center (herein "Buyer" or "LMKAC"), a wholly-owned subsidiary of Lockheed Martin Corporation. WITNESSETH: 1. Subject to the Government Award of a subcontract to Buyer for the Propulsion Business Area as outlined in RFP# F41608-98-R-0084 at San Antonio AFB, it is Buyer's intent to exclusively utilize Seller to perform depot repair operations of the T56 propulsion engines, modules, components, fuel accessories, and engine electronic components. Seller also agrees to complete Work in Process (WIP) and to provide support 2-level (2LM) maintenance operations for the T56 engine if so ordered by the Government. 2. Seller is willing and able to perform the Services identified in this subcontract pursuant to the terms and subject to the conditions hereinafter set forth. NOW THEREFORE, in consideration of the mutual covenants and agreements hereinafter set forth, the parties agree as follows: GENERAL TERMS AND CONDITIONS ARTICLE 1 INTEGRATION CLAUSE 1.0 GENERAL This subcontract document incorporates and establishes the terms and conditions by which all obligations performed by the Parties hereunder shall be governed. 1.1 APPLICABLE PROVISIONS. The provisions of this subcontract listed below are integrated in full text or by reference and constitute the complete and exclusive agreement between the Buyer and the Seller relative to the subject matter defined herein. It supercedes all prior oral and written representations, communications and agreements unless expressly incorporated in this document. All pre-printed terms included on any [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 5 of 81
EX-10.2137th Page of 414TOC1stPreviousNextBottomJust 37th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 purchase order forms which may be used for administrative purposes or to order additional services under this subcontract, shall be deemed not applicable and superceded by the terms stated herein. The subcontract consists of the following documents and all other documents incorporated therein: 1.2 APPLICABLE EXHIBITS "A" Subcontract Data Requirements Lists "B" Fixed-Price Exhibit Line Item Numbers "C" Fixed-Price Exhibit Line Item Numbers "D" Fixed-Price Exhibit Line Item Numbers "E" Fixed-Price Exhibit Line Item Numbers "F" Payment Terms "G" SASA's Proposal dated 28 Aug 1998 "H" Facilities Sublease "I" List of Surge Items "J" Occupancy Expense by Fiscal Year "K" Human Resources/Medical Services Expense By Fiscal Year "L" Proprietary Information Agreement "M" Offeror Representations and Certifications-Commercial Items "N" Benefit Plan Costs for PBA Personnel 1.3 ORDER OF PRECEDENCE This order of precedence is for the provisions of this subcontract. In the event of an inconsistency or conflict in this Subcontract and any documents attached hereto or incorporated herein by reference unless otherwise provided herein, the inconsistency or conflict shall be resolved by giving precedence to the Subcontract document in the following order: (a) General Terms and Conditions of this Subcontract [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 6 of 81
EX-10.2138th Page of 414TOC1stPreviousNextBottomJust 38th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 (b) Contractor Work Specification and; (c) Representations made in Seller's proposal. 1.4 TYPE OF SUBCONTRACT This is a firm, fixed price subcontract with Economic Price Adjustment, Price Redetermination-Prospective, and Over-And-Above provisions, for the services specified, and effective for the period stated, in the Term Section of this subcontract. For any indefinite quantity items or services identified in this subcontract, if the Buyer's requirements do not result in the quantities described as "estimated" or "maximum" in the Exhibits "B", "C", "D" and "E", then the provisions of Special Provision 10 as applicable will apply. ARTICLE 2 SERVICES 2.1 SERVICES TO BE PROVIDED (A) PROGRAM SUMMARY The Seller shall furnish all labor, bench stock, and consumable materials as described in Article 15, 15.1, technical manuals, and required support equipment not provided as Government Furnished Equipment but necessary to accomplish the full spectrum of depot repair support and two level (2LM) maintenance for the T56 Engine. This effort will be compliant with SASA's Proposal EXHIBIT "G". The Seller's cost for depot repair support and two level (2LM) for the T56 engine is based on the occurrence factors established in Seller's proposal and the flow calendar days in Exhibits "B", "C", "D", and "E". The Seller shall provide and maintain a quality assurance and inspection program IAW ISO 9002 or equivalent. If equivalent is proposed, it will be subject to approval by the Buyer, or the Buyer's designated representative. The Seller shall provide all data and requirements associated with the above work as defined in SASA's Proposal and the Subcontract Data Requirements List (SDRL). Additionally the Seller shall provide, within 30 calendar days of contract award, a Property Control Plan which embodies the requirements of FAR Part 45, Government Property which is incorporated by reference. The services are more particularly described in EXHIBIT "G", SASA's Proposal, attached hereto, and incorporated herein. The term "services" shall hereinafter be used when referring to the work, services, and tasks in EXHIBIT "C", singularly or collectively. Prices for the services are defined in EXHIBIT "B", "C", "D", and "E", Fixed Price Exhibit Line Items. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 7 of 81
EX-10.2139th Page of 414TOC1stPreviousNextBottomJust 39th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 (B) PLACE OF PERFORMANCE All tasks prescribed by SASA'S PROPOSAL that are presently being performed at SA-ALC (Kelly AFB, TX) must continue to be performed at this location unless prior approval is provided in writing by the Buyer. Workload which is on a repair contract (or a purchase request has been initiated for a repair contract) at the time of PBA contract award may continue to be performed off the Kelly AFB installation until the expiration of those pre-existing contracts. It is Buyer's intent to maintain the same proportionate level of PBA workload as is performed today (minimum 200,000 productive hours annually up to 300,000 hours annually) at Seller's facility over the life of the PBA contract to include any exercised options. In the event of a surge or acceleration by the Government, on Buyer's request, the Seller will propose to Buyer the location to perform the surged work. Any work performed under Surge requirements in Seller's facilities is above and beyond the pre-PBA levels. After mutual review, Buyer will direct Seller as to where the work will be performed. Additional Government work will be provided and performed under the same terms and conditions as the replaced work. Any non-PBA work replacing Government work will be subject to negotiations of revised terms and conditions to coincide with any cost impact, such as leasing provisions. There may be occasions when repair efforts must be performed at various other locations from time-to-time which will be determined on an Over-and-above Basis. (C) When circumstances occur that requires travel to other locations at LMKAC's direction, these requirements will be identified on the ordering document and be compliant with all requirements designated in the Government Joint Travel Regulation ARTICLE 3 DEFINITIONS 3.1 The following definitions shall apply to the terms used in this subcontract by Seller in the course of performance of its obligations under this Subcontract, unless otherwise defined herein: A. Abbreviated Contract Number: An eight position alphanumeric designator that represents the contract number and is used in requisitioning material and reporting transactions in the G009 Government-Furnished Material and End Item Transaction Reporting System. The first position for SA-ALC will be a "P", and the remaining seven positions are the control number. B. Administrative Contracting Officer (ACO). A contracting officer assigned the responsibility for the post-award functions related to the administration of a Government contract in the field. The ACO is responsible for ensuring the contractor performs in accordance with the terms of the contract. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 8 of 81
EX-10.2140th Page of 414TOC1stPreviousNextBottomJust 40th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 C. Agency-Peculiar Property (APP): Government-owned personal property for military operations. It includes end items and integral support equipment which are not readily available as a commercial item. It does not include normal Government material, special test equipment, special tooling, or facilities. Also referred to as military property. (FAR 45.301) D. Bench Stock: Shall mean common expendable items such as nuts, bolts, screws, lugs, fastening devices, rivets, terminals, and plumbing fittings (excluding electronic components such as resistors, diodes, transistors, capacitors and integrated circuits) having a unit price of $3.00 dollars or less. E. Consumable Item: Shall mean items such as sealants, adhesives, lubricants, chemicals, paint, cleaners, solvents, abrasives, fabrics, etc., which are considered consumed during the repair process. F. Contractor-Furnished Property (CFP): Property other than Government-furnished property (GFP) which is furnished and funded by the contractor per the terms of the contract. Title to all CFP remains with the contractor until consumed. G. Defense Automatic Addressing System Center (DAASC): The center for automatic data processing located at Wright-Patterson AFB, Ohio. H. DAASC Automated Message Exchange System (DAMES): The automated system which provides the capability to communicate with DAASC, sending and receiving logistics transactions and narrative text through a modem using a standard dedicated telephone line. NOTE: This is not a requirement if the contractor uses the Internet. I. Direct Parts and Materials: Those parts or materials purchased, supplied, manufactured, or fabricated for the sole purpose of incorporating them into or making them a part of the end product or components covered by this contract. J. Expendability, Recoverability, Repairability Category (ERRC) Code: The ERRC code is assigned to an Air Force item to indicate the extent of repair for that item. K. Facilities: Industrial property (other than material, tooling, agency-peculiar property, and test equipment) for production, maintenance, research, development, or test, including real property and rights therein: buildings, structures, improvements and plant equipment. L. Government-Furnished Equipment (GFE): An all inclusive term to define all types of equipment defined in FAR, Part 45. It includes facilities, plant equipment, agency-peculiar property, and special tooling/special test equipment. For the purpose of annually reporting dollar values on Department of Defense (DOD) property in the custody of contractors (DD Form 1662), items must be categorized according to the specific FAR property definitions. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 9 of 81
EX-10.2141st Page of 414TOC1stPreviousNextBottomJust 41st
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 M. Government-Furnished Material (GFM): Government property (GP), sent to the contractor, which may be incorporated into or attached to an end item to be delivered under a contract or which may be consumed in the performance of a contract. It includes, but is not limited to, raw and processed material, parts, components, and assemblies. GFM is also referred to as "materials" under the terms of the contract. (FAR 45.301) N. Government-Furnished Property (GFP): All property in the possession of or acquired by the Government and subsequently deliver or otherwise made available to the contractor. It also includes GFE and GFM. (FAR 45.101) O. Government Property (GP): All types of property owned or leased to the Government or acquired by the Government under the terms of the contract. GP includes GFM/GFP. (FAR 45.101) P. Hazardous Material: Any used or unused property, including scrap and waste, that is ignitable, corrosive, reactive, or toxic because of its quality, concentration, physical, chemical, or infectious characteristics. The property can be in a solid, liquid, semi-liquid, or contained gas form and may cause or significantly contribute to an increase in serious illness or mortality or pose a substantial threat or potential hazard to the environment when improperly treated, stored, transported, disposed of, or otherwise managed. Q. Hazardous Waste: Any used of unused hazardous material that has no known use and, therefore, must be discarded. This includes hazardous material not otherwise disposed of through plant clearance that the contractor has been authorized, by the plant clearance officer, to dispose of as hazardous waste. R. Julian Date: A method used by the Government to track calendar days according to a system usually covering one year and referring the calendar days of each week to the calendar days of the month. (Example: Julian Date 6133. Number 6 refers to the year 1996, and 133 refers to the twelfth day of May (May 12, 1996). S. Local Manufacture (LM): The manufacture of items for the Government using GFM and contracted labor. NOTE: Local manufactured property is considered CAP. T. Management Control Activity (MCA): DoD component-designated activity that initially receives and controls requisitions for GFM supplied from the wholesale DOD supply system to support defense contracts or requirements. V. Material Return Program (MRP): A means by which a contractor identifies excess GFM to the Source of Supply (SOS), and the SOS provides disposition information back to the contractor. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 10 of 81
EX-10.2142nd Page of 414TOC1stPreviousNextBottomJust 42nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 the Source of Supply (SOS), and the SOS provides disposition information back to the contractor. W. Consumable Item: An item that is not expended during the repair process but is used in support of the repair process. Also referred to as an investment item. X. Procuring Contracting Officer (PCO): The person responsible for entering into a contract on behalf of the Government. The PCO will ordinarily be located at the funding ALC. Y. Production Management Specialist (PMS): An individual assigned by the contracting activity to act as liaison for production, supply, and transportation issues. Z. Property Control Procedures: A detailed written description of the contractor's operation for the control, use, and care of property furnished by the Government or Buyer under the terms and conditions of this subcontract and while in the contractor's possession. AA. Property Administrator (PA): An individual authorize to act on behalf of the ACO on all matters concerning the management of Government-owned property. AB. Property Records: Records that are construed to include all documents reflecting the status of GP. AC. Reparable Support Division (RSD) Items: Items that have an ERRC code of "C" (XD1) or "T" (XD2). These items are referred to as line replacement units (LRU) and shop replacement units (SRU). Also referred to as an investment or nonconsumable item. As of 1 Oct 97, RSD became known as MSD (Material Support Division). AD. System Support Division (SSD) Items: Items that have an ERRC code of "N" (XB3) or "P" (XF3). Also referred to as expense or consumable items. As of 1 Oct 97, SSD became known as MSD (Material Support Division). AE. Virtual On-Line Logistics Transaction System (VOLTS): A Windows-based version of DAMES by which users have the capability to communicate with the Air Force via an asynchronous modem over a dial-up line or via the Internet. AF. Best Estimated Quantity(BEQ) is the estimate of the most likely quantities expected to generate for repair. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 11 of 82
EX-10.2143rd Page of 414TOC1stPreviousNextBottomJust 43rd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 W. Conconsumable Item: An item that is not expended during the repair process but is used in support of the repair process. Also referred to as an investment item. X. Procuring Contracting Officer (PCO): The person responsible for entering into a contract on behalf of the Government. The PCO will ordinarily be located at the funding ALC. Y. Production Management Specialist (PMS): An individual assigned by the contracting activity to act as liaison for production, supply, and transportation issues. Z. Property Control Procedures: A detailed written description of the contractor's operation for the control, use, and care of property furnished by the Government or Buyer under the terms and conditions of this subcontract and while in the contractor's possession. AA. Property Administrator (PA): An individual authorize to act on behalf of the ACO on all matter concerning the management of Government-owned property. AB. Property Records: Records that are construed to include all documents reflecting the status of GP. AC. Reparable Support Division (RSD) Items: Items that have an ERRC code of "C" (XD1) or "T" (XD2). These items are referred to as line replacement units (LRU) and shop replacement units (SRU). Also referred to as an investment or nonconsumable item. As of 1 Oct 97, RSD became known as MSD (Material Support Division). AD. System Support Division (SSD) Items: Items that have an ERRC code of "N" (XB3) or "P" (XF3). Also referred to as expense or consumable items. As of 1 Oct 97, SSD became known as MSD (Material Support Division). AE. Virtual On-Line Logistics Transaction System (VOLTS): A Windows-based version of DAMES by which users have the capability to communicate with the Air Force via an asynchronous modem over a dial-up line or via the Internet. AF. Best Estimated Quantity(BEQ) is the estimate of the most likely quantities expected to generate for repair. ARTICLE 4 TERM [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 11 of 81
EX-10.2144th Page of 414TOC1stPreviousNextBottomJust 44th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 4.1 EFFECTIVE DATE This Subcontract will be in effect beginning on the date of contract award with an initial ordering period of seven (7) years. The ordering period will not be less than five (5) years from the completion of the transition period and not more than fifteen (15) years from the date of contract award. The terms of this Subcontract shall continue to apply until all matters arising in respect thereof under this Subcontract have been discharged. 4.2 OPTION PERIODS Subsequent to the initial ordering period, the Buyer may exercise options for annual increments. It is Buyer's intent, based on Seller's good performance during the prior Subcontract period and the Buyer's requirements under its prime contract, to exercise these options. An option, if exercised, will immediately follow the prior contract period. The Buyer may exercise an option without obligation to exercise succeeding year options(s). An option may be exercised by Buyer executing a formal modification to the Subcontract at a period to be agreed prior to expiration. The materials and service furnished under an option shall be subject to the same terms and conditions as those contained in the basic contract. 4.3 OPTION TO EXTEND PERIOD OF PERFORMANCE AND INCREASE QUANTITY Notwithstanding any period of performance set out in this Article, the Buyer may, at its option and by unilateral Written notice, extend the Subcontract for an additional period not to exceed 120 calendar days, and may increase the quantity of supplies or services which may be ordered hereunder, in an amount not to exceed [/\] of the BEQ's of each ELIN as detailed in Exhibits B, C, D, E. The unit prices set forth in the Fixed Price Exhibit Line Items shall apply to any extension or increase in quantity ordered pursuant to this option provision and delivery shall be at the same rate as set forth in the Exhibits B, C, D, and E The provisions for surged work (Exhibit I) is not applicable to this provision. ARTICLE 5 PAYMENT All payment terms for services to be performed under this Subcontract are defined in Exhibit F. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 12 of 82
EX-10.2145th Page of 414TOC1stPreviousNextBottomJust 45th
SUBC0NTRACT 23 September 1998 NO LMKAC 98-0001 4.1 EFFECTIVE DATE This Subcontract will be in effect beginning on the date of contract award with an initial ordering period of seven (7) years. The ordering period will not be less than five (5) years from the completion of the transition period and not more than fifteen (15) years from the completion of the transition period. The terms of this Subcontract shall continue to apply until ail matters arising in respect thereof under this Subcontract have been discharged. 4.2 OPTION PERIODS Subsequent to the initial ordering period, the Buyer may exercise options for annual increments. It is Buyer's intent, based on Seller's good performance during the prior Subcontract period and the Buyer's requirements under its prime contract, to exercise these options. An option, if exercised, will immediately follow the prior contract period. The Buyer may exercise an option without obligation to exercise succeeding year options(s). An option may be exercised by Buyer executing a formal, modification to the Subcontract at a period to be agreed prior to expiration. The materials and services furnished under an option shall be subject to the same terms and conditions as those contained in the basic contract. 4.3 OPTION TO EXTEND PERIOD OF PERFORMANCE AND INCREASE QUANTITY Notwithstanding any period of performance set out in this Article, the Buyer may, at its option and by unilateral written notice, extend the Subcontract for an additional period not to exceed 120 calendar days, and may increase the quantity of supplies or services which may be ordered hereunder, in an amount not to exceed 25% of the BEQ's of each ELIN as detailed in Exhibits B, C, D, E. The unit prices set forth in the Fixed Price Exhibit Line Items shall apply to any extension or increase in quantity ordered pursuant to this option provision and delivery shall be at the same rate as set forth in the Exhibits B, C, D, and E. The provisions for surged work (Exhibit I) is not applicable to this provision. ARTICLE 5 PAYMENT All payment terms for services to be performed under this Subcontract are defined in Exhibit F. ARTICLE 6 TAXES, DUTIES AND ASSESSMENTS [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 12 of 81
EX-10.2146th Page of 414TOC1stPreviousNextBottomJust 46th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 6.1 TAXES-FEDERAL, STATE AND LOCAL The contract price provided in the Fixed Price Exhibit Line Items includes all applicable Federal, State and Local taxes and duties that are deemed to apply at the time of order placement. ARTICLE 7 STANDARDS OF PERFORMANCE 7.1 Seller shall perform all Subcontract services in accordance with the Specifications, standards or drawings, as applicable, in accordance with those defined in SASA's Proposal, EXHIBIT "G". 7.2 SUPERCEDING SPECIFICATION All refereness in any Buyer or Government specification incorporated herein to either Buyer or Government specifications shall be deemed to include all specifications supplementary to or superceding the specifications so referred to, to the extent that such supplementary or superceding specifications are in effect at the date of Seller's latest quotation, if Seller was furnished or otherwise notified of the existence of such supplementary or superceding specification at the time of said quotation. 7.3 BUYER APPROVALS AND ACCEPTANCE Seller agrees that any and all Buyer approvals of Seller's technical and quality specification, plans, procedures, and reports shall not relieve Seller from Seller's obligations to perform all of the requirements of this contract, nor shall be used as conclusive evidence of Seller compliance with such requirements. Unless expressly and specifically stated otherwise herein, Seller compliance with such or all test/inspection/acceptance criteria shall not necessarily constitute a total basis for Buyer acceptance thereof. Buyer acceptance of Seller performance will be evidenced by acceptance by Buyer of Seller's DD25O or mutually agreeable similar document for work performed in accordance with Seller's proposal and Buyer's inspection, if required. ARTICLE 8 CHANGES [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 13 of 81
EX-10.2147th Page of 414TOC1stPreviousNextBottomJust 47th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 8.1 CHANGES IN SERVICES The Seller shall not make any changes in the materials to be delivered, specifications and amendments thereto, or delivery requirements, or any other changes, unless authorized by an amendment to this Subcontract. During the term of this Subcontract and any extension thereof, Buyer may, by written notice, make certain changes within the general scope of the Subcontract, limited to one or more of the following items: (i) repair and overhaul specifications; (ii) place of inspection, acceptance, or point of delivery and (iii) delivery Exhibits B, C, D, and E. Should any such change increase or decrease the cost of or the time required for performance of this order, an equitable adjustment will be negotiated prior to commencement of the change or as soon as practical after the notification of the change is given. Seller shall notify the Buyer no later than 10 calendar days after the change is issued whether an equitable adjustment will be required and provide the Buyer with a proposal within 60 calendar days after notification is provided to the Buyer. 8.2 CHANGES REQUIRED BY PRIME CONTRACT Seller agrees that upon request of Buyer, it will negotiate in good faith with Buyer relative to amendments to this Subcontract to incorporate additional provisions herein or to change provisions hereof, as Buyer and Seller may reasonably deem necessary in order to comply with the provisions of the prime contract or with the provisions of amendments to the prime contract. If any such amendment to this Subcontract causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the work under this Subcontract, an equitable adjustment shall be negotiated pursuant to this clause. 8.3 REQUIREMENT FOR SURGE Seller shall accommodate workload surge by planning flexibility in all operations to ensure the ability to respond to crisis, national emergency and significant fluctuations in demand. The specific end items which are subject to surge requirements are delineated specifically in Exhibit I, List of Surge Items. The magnitude of the surge is 30% of the stated BEQ for the stated items. 8.4 COST OR PRICING DATA RESERVED [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 14 of 81
EX-10.2148th Page of 414TOC1stPreviousNextBottomJust 48th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 ARTICLE 9 ORDERING PROCESS FOR ADDITIONAL SERVICES 9.1 FIXED-PRICE SERVICES The Buyer may place orders for any additional services covered under the Fixed Price Exhibit line Items for fixed price services under this Subcontract as required. The orders shall be manifested in the form of a written Purchase Order, or by letter, telex, fax or other customary means defined in the Notices Article which include references to the Buyer's Order number. Each order shall provide the item description, quantity, serial numbers (if applicable to the item) required input and delivery schedules and other information necessary to confirm the identity of the services and the applicable scheduled price and delivery. 9.2 OVER AND ABOVE FIXED PRICE SERVICES Work required that is not priced separately as a Exhibit Line Item Number will be proposed as "over and above" work. The work for these items shall be accomplished when, and as directed, by the Buyer or the Buyer's designated representative in accordance with the procedures below: (1) The Seller shall prepare and submit a work request proposal for all necessary over and above items in the format and detail prescribed by the Buyer or the Buyer's designated representative. Negotiations will be completed prior to commencement of work whenever practicable, but on repairs/efforts exceeding 250 estimated hours, agreement will be accomplished no later than the time of completion of 40% of the work. Failure to agree upon a reasonable price shall be considered a question of fact subject to the Disputes Clause of this Subcontract. Written authorization to proceed on over and above items must be received from the Buyer or the Buyer's designated representative before performance. At the end of 24 months after contract award, Buyer and Seller will revisit the magnitude and complexity of over and above changes performed during that 24 months. In the event the review indicates a reasonable number of these changes could be accommodated at no cost considering administrative costs for processing, Buyer and Seller agree to negotiate such a threshold in good faith. The price negotiated by the Buyer or the Buyer's designated representative shall be based on "hands on" labor hours multiplied by the contract fixed hourly rate. The number of "hands on" labor hours required shall be negotiated between the subcontractor and the Buyer or the Buyer's designated representative. The Seller may, on occasion, be required to support the Buyer in negotiations with Buyer's Customer and will be construed as part of this requirement. "Hands on" labor hours to be used in negotiating fixed hourly rate items are restricted to only that labor performed by personnel actually engaged in the direct performance of work required (2) "Hands on" labor shall not include any labor performed by support or supervisory type quality control, storing and issuing personnel. The fixed hourly rate includes charges for "hands on" labor [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 15 of 81
EX-10.2149th Page of 414TOC1stPreviousNextBottomJust 49th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 cost, bench stock, any labor cost not included in the definition of "hands on" labor for which the Seller accounts as direct labor; material handling, burdens; general and administration expenses; and other allowable costs and profit. The fixed hourly rate does not include direct parts and materials. Direct parts and materials are hereby defined as those parts and materials purchased or supplied by the offeror for the sole purpose of incorporating them into or making them a part of the end products or components thereof covered by this contract. Direct parts and materials shall not include parts and materials such as, but not limited to, office stationary and supplies, sweeping compounds and equipment, personnel washroom supplies, lighting supplies, gloves, hacksaw blades, lathe tool bits, drill bits, files, masking tape, and other similar items. Direct parts and material include packaging, packing, marking, and/or modification of exterior shipping containers (including buying new shipping containers) as approved by the Buyer or the Buyer's designated representative, provided that the cost of such materials is not otherwise covered in the indirect rates used in determining the fixed prices under this contract. Contractor furnished direct parts and materials will be identified in the work request proposal identified in paragraph one (1) above (3) At any time during contract performance, when sufficient data becomes available on a repetitive task being performed in the fixed hourly rate category, either the subcontractor or the Buyer or the Buyer's designated representative may request a negotiation to establish a firm-fixed-price for that item for the remaining life of the contract. Under no circumstances will the subcontractor accept direction from or provide data to any other organization or individual outside of LMKAC without the expressed approval from the Buyer or the Buyer's designated representative. This provision does not apply to affiliate companies of Seller. The types of "over and above" work which are not part of the priced workload are defined below for the purpose of pricing different labor skills. (a) ENGINEERING/TECHNICAL/LABORATORY May include, but not be limited to, tasks such as engineering investigations used to determine the cause of reported equipment failure or malfunction. Also may include technical assistance for modifications and upgrades to components or engines for safety reasons, to correct a deficiency, or to improve performance. Additionally, may include technical analysis to determine and accomplish necessary rework, replacement, or modification. (b) ALL OTHER May include, but not limited to, tasks such as repair of components or engines with sporadically low volume demands, such that assignment of a priced workload control number is not feasible; removal of a component or engine from storage or inactive status to return it to active, serviceable status; servicing and preservation of a component or engine prior to placement in storage or inactive status (Reference Exhibit G). Additionally, may include disassembly, inspection, repair, assembly and testing engines and components to determine and accomplish necessary rework, replacement, or modification (i.e., Time Compliance Technical [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 16 of 81
EX-10.2150th Page of 414TOC1stPreviousNextBottomJust 50th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 Orders (TCTOs). 9.3 DEFINITIZATION/INVOICING Except as may be provided elsewhere herein, the Seller shall submit a firm fixed price quotation, with supporting documentation, for each line item. Upon receipt of the proposal, Buyer upon acceptance of the proposal will definitize the order. Supplies and /or services rendered for acceptance and payment will be accompanied by a properly executed DD250, Material Inspection and Receiving Report, or mutually agreeable similar document. After completion of the order, the Seller will submit to the Buyer an invoice for which payment is to be made. 9.4 DELIVERY ORDERS 1. The Seller shall furnish the necessary personnel, labor, bench stock, consumable material, support services and all things necessary and/or incidental to providing the critical skills, critical materials and services called for to support the Seller's statement of Work when an order is issued by the Buyer or his Designee in accordance with the procedure set forth in this Subcontract. The Seller agrees to provide the labor at the rates cited in Exhibit G. No effort shall be expended by the Seller until so authorized by the Buyer or the Buyer's on-site Representative: 2. It shall be the obligation of Buyer to advise the Seller of the name or names of persons authorized to act as Designee of the Buyer. 3. It is understood that this is a "requirements Subcontract" and that the Buyer has no obligation, other than as defined under its terms, to issue such orders. 4. Orders shall be placed in accordance with this Article. Each order shall also reference the appropriate CLIN and if applicable, include a not-to-exceed price. For over-and-above repair work, upon determining the corrective action required to make the repair, the Seller shall provide the Buyer a firm labor hour proposal to perform the repairs and the return delivery date. All work to be accomplished as over-and-above shall be authorized by the Buyer or Buyers on-site Representative only after the hours required to accomplish the over-and-above task have been negotiated by the Seller and the Buyer. 5. Payment for over and above work shall be reimbursed at the negotiated hours times the hourly rate in CLIN 0006AA or 0006AB and subsequent option years. ARTICLE 10 INDEMNIFICATION [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 17 of 81
EX-10.2151st Page of 414TOC1stPreviousNextBottomJust 51st
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 SECTION l0.1 (A) Seller agrees that it will indemnify and hold harmless Buyer and the Government from and against all liability, damages, losses, and judgments which may be suffered by, accrue against, be charged to, or recoverable from Buyer or Buyer's representatives by reason of loss or damage to property of third persons, or injury to or death of any person in connection with the performance of work conducted by Seller. Buyer agrees that it will indemnify and hold harmless Seller from and against all liability, damages, losses, and judgments which may be suffered by, accrued against, be charged to or recoverable from Seller or its representatives by reason of loss or damage to property of third persons, or injury to or death of any person solely in connection with the activities of the Seller to the extent due to Seller's negligence or willful misconduct. (B) Without in any way limiting the foregoing undertakings, in the event Seller, its employees, agents, Sellers and/or lower-tier Sellers enter premises occupied by or under the control of Buyer, the Government, or third parties in the performance of this Subcontract, Seller and its Sellers and lower-tier Sellers shall maintain public liability and property damage insurance covering the obligations set forth above, and shall maintain proper worker's compensation insurance or approved self insurance program covering all its employees performing this Subcontract at the reasonable limits set forth in the "Insurance" Article of this Subcontract. ARTICLE 11 INSURANCE 11.1 SELLER'S INSURANCE REQUIREMENTS 1. The Seller shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract. a) Workmen's Compensation and Employer's Liability Insurance as required by law except that if this contract is to be performed in a State, or Country which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State or Country will be satisfactory. The required Workmen's Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000. b) General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy. c) Automobile Liability Insurance. This insurance shall be required on the comprehensive form [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 18 of 81
EX-10.2152nd Page of 414TOC1stPreviousNextBottomJust 52nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required. 2. Prior to starting work being performed on a Government installation under this Subcontract, and prior to its renewal annually thereafter, Seller shall furnish to Buyer, Certificates of Insurance, acceptable to Buyer, evidencing the foregoing insurance indicating that Buyer shall receive 30 calendar days prior Notice of Cancellation or material change and adding Buyer as additional insured by endorsement. ARTICLE 12 WARRANTIES 12.1 GENERAL 1. The Seller warrants all T56 services furnished under this Contract will be free from defects in workmanship for 500 hours of operating engine time for the engines, modules, and components as described in the SASA proposal. 2. The Seller shall provide to Buyer any and all Seller and Vendor Warranties with a minimum of 500 hours engine operating time on items to be delivered under the Contract or any order hereunder. 3. The Seller, after reasonable investigation, agrees to either give credit or re-perform or repair or replace at Buyer's option and without charge to Buyer all workmanship which does not conform to the above warranty. All work required under this warranty shall be performed without cost to the Buyer. Re-performance, repair, or replacement other than by the Seller is subject to the Buyer's prior written approval. 4. This warranty does not extend to any item which has been subject to misuse, neglect, or accident, nor does it extend to any item which has been repaired or altered by other than the Seller. 5. The remedies available to Buyer for warranty claims against Seller shall be exclusively limited to repair or replacement of the nonconforming work. In no event shall Seller be liable for consequential damages, whether based on theories of contract or tort, including, without limitation, loss of revenue or loss of use of the property. 6. THE FOREGOING WARRANTIES ARE GIVEN IN LIEU OF ANY OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, WITHOUT LIMITATION, ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR PURPOSE, SUCH OTHER WARRANTIES BEING ENTIRELY DISCLAIMED BY SELLER. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 19 of 81
EX-10.2153rd Page of 414TOC1stPreviousNextBottomJust 53rd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 ARTICLE 13 DELAYS, DEFAULT, TERMINATION The Parties' rights and remedies regarding delays, default, and termination under this Subcontract, shall be in accordance with FAR Clause 52.214-4 in the GOVERNMENT FLOWDOWN CLAUSES AND PROVISIONS of this Subcontract. ARTICLE 14 ASSIGNMENTS 14.1 NOTICE AND CONSENT Neither this Subcontract nor any duty, interest or rights nor any sums becoming due to Seller hereunder shall be delegated or assigned by Seller without the prior written consent of Buyer (which shall not be unreasonably withheld) except that claims for monies due or to become due Seller from Buyer under this Subcontract may be assigned without such consent, to a bank, trust company or other financial institution, including any federal lending agency. Buyer shall be furnished with two signed copies of such assignment. Payment to an assignee of any such claim shall be subject to set-off or recoupment for any present or future claim or claims which Buyer may have against Seller. Buyer reserves the right to make direct settlements or adjustments in price, or both, with Seller under the terms of this order notwithstanding any assignment of claims for monies due or to become due hereunder and without notice to the assignee. Any attempted assignment or delegation in contravention of this provision shall be void. ARTICLE 15 PROPERTY 15.1 RESPONSIBILITY FOR SUPPLIES Except as otherwise provided herein, the Seller shall be responsible for any government furnished supplies and property in its possession covered in this Subcontract in accordance with the provisions of FAR Part 45 and FAR 52.245-2 incorporated by reference in GOVERNMENT FLOWDOWN CLAUSES AND PROVISIONS of this Subcontract. Consumable materials such as, but not limited to, [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 20 of 81
EX-10.2154th Page of 414TOC1stPreviousNextBottomJust 54th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 office stationary and supplies, sweeping compounds and equipment, personnel washroom supplies, lighting supplies gloves, hacksaw blades, lathe, tool bits, drill bits, files, masking tape, and other similar items are examples of materials required to be provided by the Seller under the terms and conditions of this contract. 15.2 SELLER ACQUIRED MATERIAL 1. In the event the Seller is required to acquire any material other than listed in 15.1 above, the Seller shall, to the best of its ability, acquire materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials, and take all cash and trade discounts, rebates, allowances, credits, commissions, and other benefits. When unable to take advantage such benefits, it shall promptly notify the Buyer to that effect, and give the reason therefore. The Seller shall provide any benefits that would accrue to the Government from commercial warranties supplied with repair/purchase of material as a trade practice. Where Seller acquires parts on the open market all parts shall be new, unused, best priced from available source. Parts included in the Allison catalog will be charged at list price less [/\] Allison Authorized Maintenance Center discounts (currently [/\] discount) plus [/\] material mark-up (material mark-up includes material handling, transportation, profit and general and administrative expenses). For parts not listed in the Allison Catalog, Seller will be paid actual cost plus [/\] material mark-up. In the event Seller is required to manage an order book or source parts utilizing a government vehicle such as a Basic Ordering Agreement, Seller will be paid [/\] general and administrative expenses. 15.3 EXCESS INVENTORY - DISPOSITION OF GOVERNMENT PROPERTY 1. The Seller shall dispose of any excess Government property generated during contract performance or at contract completion in accordance with the orders as issued by the Buyer. 2. Work involved in packing, crating and preparing excess Government property for shipment, either during subcontract performance or at contract completion, shall be authorized under the over and above provision of the Subcontract. 15.4 GOVERNMENT FURNISHED EQUIPMENT (GFE) Government furnished equipment is that government equipment identified in Seller's proposal, Exhibit G. All equipment identified by the Seller in its proposal will be available for use. Cost to move any of this equipment to any facility outside of Kelly AFB or for revised plant layouts will be at the sole expense of Seller. Equipment not selected by the Seller will be removed at the expense of Greater Kelly Development Corporation (GKDC). Any equipment not identified may [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 21 of 81
EX-10.2155th Page of 414TOC1stPreviousNextBottomJust 55th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 be transferred to GKDC and will have to obtained through lease provisions from GKDC if later required by Seller. The Seller is responsible for all routine maintenance of GFE or GKDC equipment while under the control and operation of the Seller. The Seller shall not alter any of this equipment from its intended purpose without the express permission of the Buyer. As there are multiple subcontractors engaged on this project, it is expected that prior to end of transition that they will memorialize a methodology for sharing common equipment. A copy of that memorialization will be provided to Buyer immediately upon execution and will be added as an addenda to this subcontract. GFE which is common use will be equitably assigned by Buyer. 15.5 FOB ORGIN The FOB point under this Subcontract is Origin, in accordance with FAR 52.247-29, incorporated by reference in the Government Flowdown Section. ARTICLE 16 16.1 DISPUTES (a) In the event of any dispute with respect to the execution or interpretation of this Contract, the parties shall endeavor to settle their differences amicably. This shall be accomplished by referring the possible dispute in writing to two mutually agreeable successive levels of management beyond the operating program management with details of what has been attempted to resolve the issues and any progress made. Each succeeding level shall have fifteen calendar days to resolve the dispute. In the event an amicable resolution cannot be reached, including any questions regarding the disputes existence, validity, or termination, the dispute shall be referred to and finally resolved by arbitration under the rules of the American Arbitration Association. The arbitral panel shall consist of three (3) arbitrators. Each Party shall select an arbitrator and these arbitrators shall select a third who shall preside over the arbitral panel. Discovery will be permitted and the arbitrators shall render a decision within ninety (90) calendar days after completion of the arbitration. The decision of the arbitrators shall be consistent with the applicable law. The place of arbitration shall be Texas. (b) All information and data disclosed by either Party in connection with the arbitration of any dispute relating to this Contract shall be treated by the Parties, the representatives of the Parties, and the arbitration panel as information and data disclosed in confidence and proprietary, and no disclosure of such information shall be made by the other Party, its representatives, and agents. (c) The arbitrators shall divide all costs incurred in conducting the arbitration in the final award in accordance with what they deem just and equitable under the circumstances. The arbitrators shall state their award and the respective proportions to both Parties. Each Party shall bear the burden of its own counsel fees incurred in connection with arbitration proceedings under this Contract. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 22 of 81
EX-10.2156th Page of 414TOC1stPreviousNextBottomJust 56th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 (d) The arbitrator's decision will be final and binding upon and will be the sole and exclusive award will be enforceable in the applicable courts of law. (e) This clause takes precedence over the Disputes clause in 52.212-4. ARTICLE 17 GOVERNING LAW 17.1 RIGHTS, REMEDIES AND CHOICE OF LAW The rights and remedies herein reserved to the Buyer shall be in addition to any other or further rights and remedies provided in law or equity and all the rights and obligations of the parties shall be governed and constituted by the laws of the State of Texas. ARTICLE 18 COMPLIANCE WITH LAWS AND REGULATIONS 18.1 GENERAL Buyer and Seller agree to comply with all applicable local, state, provincial and federal laws and executive orders and regulations issued pursuant thereto and agrees to defend, indemnify, and hold each other harmless from any claim, suit, loss, cost, damage, expense (including attorneys' fees), reduction to the Buyer's prime contract price by the Government, or other liability by reason of each other's violation thereof. Nothing in this Subcontract or in any requirement under this Subcontract shall be construed to mean that either party should perform such work in violation of any law, statute, code or ordinance. 18.2 COMPLIANCE WITH REGULATIONS FOR WORK PERFORMED ON A GOVERNMENT INSTALLATION In the event Seller, its employees, agents, subcontractors and/or lower-tier subcontractors enter premises occupied by or under the control of the Government, to perform work under this subcontract, such personnel will be required to comply with all Safety, Health, Environmental, Security, and all other regulations required of all other civilian personnel working on such Government premises, as required under the Prime Contract, and defined in the GOVERNMENT FLOWDOWN CLAUSES AND PROVISIONS, and SPECIAL PROVISIONS Sections of this Subcontract. ARTICLE 19 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 23 of 81
EX-10.2157th Page of 414TOC1stPreviousNextBottomJust 57th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 DATA 19.1 TECHNICAL DATA: BUYER FURNISHED DOCUMENTATION Buyer will coordinate the delivery of information, specifications and documents defined as required in SASA's Proposal as Buyer or Government furnished, in a timely fashion, to assist Seller in performing the Services set forth in SASA's Proposal. 19.2 TECHNICAL DATA: SELLER FURNISHED DOCUMENTATION The Seller will provide Technical and other Data as required by the Subcontract Data Requirements List. The data shall comply with the applicable regulations and specifications as required in the Subcontract. 19.3 RESERVED 19.4 RIGHTS IN DATA 19.4.1 Reproduction. Rights Buyer does not grant or convey to Seller by this Subcontract (i) Any reproduction rights in or to the articles called for hereunder, or (ii) any right to use designs, drawings, or other information belonging to Buyer or supplied by or on behalf of the Buyer for use in the performance of this contract, in the production, manufacture or design of any articles for anyone other than Buyer or the Government, where the Government has such rights. (ii) Unless separately defined in this Subcontract the parties shall retain all rights, titles and interest in and to all information, data, designs and inventions furnished to each other for the purpose of assisting in the performance of the Subcontract or in the submission of a proposal for such performance, whether furnished prior to or after acceptance of the Subcontract. (iii) No information, data, designs and inventions including that provided by the Government, including information regarding the award or performance of this Subcontract shall be reproduced or used by the receiving party, except in the performance of this contract, or disclosed by the receiving party to others without the consent of the originating party. Upon completion of performance hereunder, all such information, data, designs and inventions shall be promptly returned to the originating party. 19.4.2 Government's Rights in Data [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 24 of 81
EX-10.2158th Page of 414TOC1stPreviousNextBottomJust 58th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 The Parties agree that the Government's rights, if any, in data produced under this Subcontract shall be governed by FAR Clause 52.227-14, incorporated by reference in the GOVERNMENT FLOWDOWN CLAUSES AND PROVISIONS. 19.4.3 Proprietary Information Agreement A proprietary information agreement setting forth the rights and obligations of the party regarding proprietary information is set forth in Exhibit L. ARTICLE 20 (RESERVED) ARTICLE 21 INDEPENDENT CONTRACTOR 21.1 RELATIONSHIP OF THE PARTIES Seller's relationship to Buyer in the performance of this Subcontract is that of an independent contractor. Seller's personnel performing services under this Subcontract shall, at all times, be under Seller's exclusive control and direction. Buyer has agreed to perform certain common services for all subcontractors which are as follows: 1) Complete payroll services for subcontractor exempt (not including those exempts that Seller retains on its Home Office payroll) and non-exempt employees at the rate of $l60 per employee annually for providing payroll checks; 2)Administrative costs for providing Medical and Human Resources Services to include: hiring administration (screening of applicants) benefits administration, employee data base administration, employee relations, induction training, development of training programs with technical schools, and general first aid, internal security, and pre-employment medical defined as providing access to audio screening and drug screening (and during Transition only providing access to required medical physicals for employees working in designated OSHA areas) at a rate per annum in accordance with the rates in Exhibit K, Schedule G-Human Resources/Medical Services Expense by Fiscal Year. Seller will reimburse Buyer monthly in accordance with and for the benefits provided on the common benefits on Attachment N. By providing these services LMKAC does not in any way assume liability for any employees working in the PBA other than its own. 3) Landlord services to include leased facilities, facility repair and maintenance utilities, custodial, E,H&S, quality assurance interface with in accordance with the rates in Exhibit L, Schedule F-Occupancy Expenses by Fiscal Year. These costs will be provided to Seller for inclusion in their CLIN price to Buyer. Additionally below the line of Seller's CLIN pricing, Buyer will add additional cost for providing Logistics and Warehouse Services to include Packaging, Handling, Storage, and Transportation (PHST), inter-plant transportation, GFM, Reparables, and Postal type services. Buyer will also add on [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 25 of 81
EX-10.2159th Page of 414TOC1stPreviousNextBottomJust 59th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 G&A below the Seller CLIN price line. In the event Seller brings commercial work to the Kelly facility all of the above rates will be revisited repriced and negotiated between Buyer and Seller as necessary to reflect the changed condition. Finally, if Buyer or Seller believes the cost associated with these relationships have changed, either may provide a proposal to the each other substantiating said changes and both parties will negotiate valid changes on good faith. ARTICLE 22 22.0 GRATUITIES The Seller shall not offer gratuities (in the form of entertainment, gifts, or otherwise) to any officer, official or employee of Buyer or the Government with a view toward securing this Subcontract or securing favorable treatment with respect to the award or amendment of this Subcontract or the making of any determination with respect to the performance of this Subcontract. ARTICLE 23 SUBCONTRACT ADMINISTRATION PROVISIONS 23.1 NOTICES All notices, requests or designation given in connection with this Subcontract will be given in writing and will be sent by first class mail, (postage prepaid) telegram, teletype, telex, fax, cable or any other customary means of communication to the addresses listed below, unless either party hereto notifies the other party of a different address. Such changes in addressee for the serving of notices shall be changed by official notice from one party to the other party. If to Seller: Standard Aero San Antonio, Inc. Eden 100 Building 5100 Eden Avenue, Suite 105 Minneapolis, MN 55436 Attn: Paul Soubry Jr. Telephone: 204778-2754 Fax: 204778-2227 and if to Buyer: Lockheed Martin Kelly Aircraft Center 4335 Piedras Dr. W. Suite 210 Page 26 of 81
EX-10.2160th Page of 414TOC1stPreviousNextBottomJust 60th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 San Antonio, TX.,78228 Attn: Hal Chaitman Telephone: (210) 738-9580 FAX: (210) 738-0316 or to such other address as either party shall from time to time designate by notice to the other party. 23.2 ADMINISTRATION The Seller's Point of Contact has sole responsibility for representing Seller in matters affecting the requirements of the Subcontract. The requirements of this Subcontract can be modified only by written direction of the Buyer's Subcontract Administrator or by issuance of an amendment to this Subcontract. The Seller's Point of Contact for this Agreement is Paul Soubry Jr. Seller may redesignate its Point of Contact by written notice to Buyer. The Buyer's Director of Contracts or designated delegates has sole responsibility for representing Buyer in matters affecting the requirements of the Subcontract. The requirements of this Subcontract can be modified only by written direction of these representatives or by issuance of an amendment to this Subcontract. The Buyer's representative for this Subcontract is: Comelius McElveen 23.3 BUYER REPRESENTATION Buyer may, during the performance of all Services, provide a Engine Repair Representative, who shall have the authority on behalf of the Buyer to bind Buyer, to accept performance of the Services and furnishing of materials, sign work orders, for additional over and above work, Non-Routine work or Extra Services and purchase orders issued by the appropriate authorizing agency identified in this Subcontract, and in general so represent Buyer in connection with the services provided by the Seller. All inspections and examinations by Buyer and its Representatives shall be performed in such manner as to not unduly delay or hinder the performance by Seller of its obligations hereunder or its normal commercial business practices. Seller will allow the Buyer Representative access to all services being performed under this Subcontract. GOVERNMENT FLOWDOWN CLAUSES AND PROVISIONS 1.0 GENERAL The provisions of the Federal Acquisition Regulations (FAR) as referenced herein are incorporated into this Contract with the same force and effect as if they were given in full text. Upon request, Buyer will [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 27 of 81
EX-10.2161st Page of 414TOC1stPreviousNextBottomJust 61st
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 make their full text available. The effective date of the mandatory FAR flow down clauses for this contract and referenced in these terms and conditions shall be the same as the corresponding clauses in the prime contract effective on the date of contract award. Any changes which affect the FAR clauses listed herein and as dictated by the respective U.S. Government prime contract, shall become part of this contract and the date of applicability shall be same as the date of applicability to the prime contract. 2.0 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) (a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause. (b) The use in this solicitation or contract of any DOD Federal Acquisition Regulation Supplement, (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation. 3.0 PRIME CONTRACT CLAUSES INCORPORATED BY REFERENCE The provisions of the Federal Acquisition Regulations (FAR) and other clauses and provisions from the contract resulting from U.S. Air Force Request for Proposal No. F41608-98-R-0084 as referenced herein are incorporated into this Subcontract with the same force and effect as if they were given in full text. Where necessary or appropriate to derive proper meaning in this Subcontract, where not otherwise inconsistent with the terms of the clause, "Contractor" shall mean "Seller", "Contracting Officer" shall mean "Buyer" and "Government" shall mean Buyer or the Government, whenever appearing in the clauses." 3.1 FULL TEXT PRIME CONTRACT CLAUSES The Clause reference numbers shown below are incorporated from the referenced prime contract: FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) [Download Table] CLAUSE NUMBER TITLE ------------- ----- 52.246-11 Higher Level Contract Quality Requirement (Apr 1984) Complete the blank as follows: (b) ISO 9002 or equivalent 52.247-29 F.O.B. Origin (Jun 1988) 52.147-32 F.O.B Origin, Freight Prepaid (Jun 1988) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 28 of 81
EX-10.2162nd Page of 414TOC1stPreviousNextBottomJust 62nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] 52.247-34 F.O.B Destination (Nov 1991) 52.247-65 F.O.B. Origin, Prepaid Freight Small Package Shipment (Jan 1991) 52.252-2 Clauses Incorporated By Reference (Feb 1998) 52.207.3 Right of First Refusal of Employment (Nov 1991) 52.212-4 Contract Terms and Conditions--Commercial Items (May 1998) Addenda - (c) Changes. The Contracting Officer may make unilateral changes to the list of Time Compliance Technical Orders (TCTO) referenced in this document as well as the ordering period referenced in paragraph (a) of the ordering clause. All other changes in the terms and conditions of this contract may be made only by written agreement of the parties. 52.212-5 Contract Terms and Conditions Required to implement Statutes or Executive Orders-Commercial Items (Apr 98) 52.222-3 Convict Labor 52.233-3 Protest After Award 52.203-6 Restriction on Subcontractor Sales to the Government with Alternate I 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity 52.219-8 Utilization of Small Business Concerns and Small Disadvantaged Business Concerns 52.219-9 Small, Small Disadvantaged and Women-Owned Small Business Subcontracting Plan 52.222-26 Equal Opportunity 52.222-35 Affirmative Action for Special Disabled and Vietnam Era Veterans 52.222-36 Affirmative Action for Handicapped Workers 52.222-37 Employment Reports on Special Disabled Veterans and [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 29 of 81
EX-10.2163rd Page of 414TOC1stPreviousNextBottomJust 63rd
SUBCONTRACT 23 September 1998 NO LMKACS 98-0001 [Download Table] Veterans of the Vietnam Era 52.216-18 Ordering (Oct 1995) The blanks are completed as follows: (a) issued from the effective date as it appears on the face of this contract through a period of seven years. Beginning at the end of the first year, the Contracting Officer may adjust the above ordering period on an annual basis through the issuance of a unilateral modification. Etc..... 52.216-19 Ordering Limitations (Oct 1995) (a) $2,500 (b) (1) $300,000,000 (b) (2) $300,000,000 (b) (3) 10 Calendar days (c) 30 calendar days SPECIAL PROVISIONS SELLER'S LOWER TIER SUBCONTRACT CLAUSES AND MANAGEMENT SP 1.0 FLOWDOWN CLAUSES (a) In the event any of the clauses of these Terms and Conditions require the Seller to incorporate their content, either in full or in substance in Seller's subcontracts or purchase orders, said clauses shall be so incorporated by the Seller. (b) The absence of any requirement herein that the Seller pass on to its subcontractors the content or substance of any statute or law of the United States, or any regulation having the force and effect of law, shall not constitute a waiver, relief, or exemption of the Seller from compliance with such statute, law or regulation. SP 1.1 SUBCONTRACT MANAGEMENT Seller is responsible for the management of its subcontractors/supplier/vendors with visibility through the lowest tier of subcontractors. The Seller shall insure that each subcontract contains all specifications, special requirements, and clauses needed to comply with the requirements of this contract. Seller shall encourage and, where applicable, shall require its subcontractors to submit risk analysis, alternate technical proposals and proposals for off-the-shelf hardware as a means of achieving practical [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 30 of 81
EX-10.2164th Page of 414TOC1stPreviousNextBottomJust 64th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 tradeoffs. Any technical, schedule and/or cost problems encountered by the Seller or its subcontractors shall be promptly reported to the Buyer. SP 1.2 LOWER-TIER SUBCONTRACTS No Subcontract shall be made by the Seller with any other party for furnishing any of the completed or substantially completed articles (except spare parts), or work herein contracted for without the written approval of the Buyer. SPECIAL PROVISION 2 (RESERVED) SPECIAL PROVISION 3 SP 3.0 STATUS REVIEWS Buyer or Contracting Officer, or his designated representative, may visit Seller's facilities to review progress, discuss problems/failures and witness testing pertaining to the requirements of this contract. Seller shall provide adequate information in response to reasonable requests of Buyer or Contracting Officer or his authorized representative on contract performance as required. SPECIAL PROVISION 4 SP 4.0 DEFENSE RATED CONTRACT The Prime Contract (F34601-99-D-0002) has a United States Government priority rating of D0-A1 certified for National Defense under DMS regulation No. 1. SPECIAL PROVISION 5 SP 5.0 SPECIAL PROVISIONS RELATIVE TO UNPRICED ORDERS RESERVED SPECIAL PROVISION 6 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 31 of 81
EX-10.2165th Page of 414TOC1stPreviousNextBottomJust 65th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 SP 6.0 NOTICE OF INCORPORATION OF SECTION K Exhibit M, Section K will not be distributed with the contract; however, it is incorporated in and forms a part of this Subcontract as though furnished in full text herewith: [Download Table] Section Tide ------- ---- K Offeror Representations and Certifications- Commercial Items SPECIAL PROVISION 7 SP 7.0 SELLER'S PERSONNEL 1. Any employees of the Seller providing services hereunder at any United States military installation shall at all times be in the employment of the Seller and shall not be employees of the Buyer or the Government 2. The Seller shall instruct each employee assigned to perform services hereunder aboard any United States military installation to render said services in accordance with all directives and regulations applying to Seller employees, as issued or approved by the Commanding Officer of the facility to which the employee is assigned. In the event there is a conflict between the Seller and the Facility Commanding Officer as to the applicability of a local facility regulation, Buyer or Buyer's Site Manager shall be immediately notified as to enforcement of the disputed regulation. 3. If the Buyer or Buyer's Site Manager finds it to be in the best interest of Buyer, he may at any time during the performance of this Subcontract, order the Seller to remove any of his personnel from further performance under this Subcontract for reasons of unethical conduct, security, misconduct, or for violation of installation regulations. In the event that it becomes necessary to replace any Seller personnel for any of the above reasons, the Seller shall accomplish the removal immediately. When the reason for the removal request is due solely to misconduct on the part of the employee, replacement shall be at the Seller's expense and not chargeable to the Buyer. 4. All Seller Employees performing work on a Government Installation under this Subcontract shall comply with the Security, Safety and Accident Prevention requirements established for that Installation. Any violation of these regulations and requirements, unless reasonably and promptly corrected as directed by the Government or by the Buyer Representatives, shall be grounds for termination of this Subcontract in accordance with the Default Clause. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 32 of 81
EX-10.2166th Page of 414TOC1stPreviousNextBottomJust 66th
SUBCONTRACT 23 September 1998 NO LMKAC98-0001 SPECIAL PROVISION 8 SP 8.0 UNION ORGANIZATIONS In the event of initiation of a labor union organization at LMKAC or at any of its subcontractors, the centralized LMKAC Human Resources Group, with subcontractor representation, will serve as the lead organization to address all workforce concerns/issues and will serve as the point of contact representing LMKAC and all of its subcontractors. Should the results of any attempt to establish a labor union organization representing any or the entire non-exempt workforce prove to be successful, the centralized LMKAC Human Resources Group, with subcontractor representation, will represent Lockheed Martin and any LMKAC subcontractors in any and all Labor Union discussions and/or negotiations. SPECIAL PROVISION 9 SP 9.0 ECONOMIC PRICE ADJUSTMENT (EPA) (a) The originally proposed contract unit prices that comprise the Total Aggregate Price (TAP) will be adjusted annually for changes in the national economy. Adjustments will be made to each year beginning in FY 2001 based upon the formula specified in paragraph (f) of this clause and the computation worksheet at the end of this clause. Adjustments may be downward or upward. (b) No adjustment will be made unless the net escalation amount is greater than [/\] per year. If the net increase or decrease exceeds [/\] per year, an adjustment to all prices for that year will be made. (c) The standards of measurement for this clause will be:. (1) Material index - Producer Price Index for Aircraft Engine Parts and Accessories, Product Cost 3724-4, not seasonally adjusted, as it appears in the periodical Producer Price Indexes published by the U.S. Department of Labor, Bureau of Labor Statistics (BLS). (2) Labor index - Employment Cost Index for Total Compensation, Aircraft Manufacturing (ECI 3721), private industry, not seasonally adjusted, as it appears in the periodical Monthly Labor Review as published by the U.S. Department of Labor, Bureau of Labor Statistics (BLS). (3) The base indices shall be those announced or published as final by the BLS for the latest reporting period preceding contract award. The current period indices shall be those [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 33 of 81
EX-10.2167th Page of 414TOC1stPreviousNextBottomJust 67th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 announced or published as final for the latest period preceding the FY for which the review/adjustment is to be made. (4) In the event the BLS discontinues or suspends publication of the index in paragraphs c(l) and c(2), the parties shall agree upon an appropriate substitute for the discontinued index for use under this clause. In the event the BLS significantly alters the method of calculating the indices, appropriate adjustment shall be made by the parties to put the contract on a comparable basis with the indices calculated before the change or the parties shall agree to an appropriate substitute index. If the parties cannot agree to a substitute or comparable index, the Contracting Officer shall unilaterally determine an appropriate index within 60 days after an index has been discontinued or altered in method of calculation. (d) Required economic adjustments for contract line items will be determined 6 months prior to the start of the fiscal year. This economic price adjustment will be determined as follows: Multiply the current period indices for labor by [/\] and material by [/\] and total for a current period composite index. Multiply the base period indices for labor by [/\] and material by [/\] and total for a base period composite index. Subtract the base period composite index from the current period composite index and divide the difference by the base period composite index. Multiply the result times the unit price to determine the price adjustment. Add the price adjustment to the original unit price to determine the adjusted unit price or to determine the adjusted hourly rates. (e) Use the following criteria for making calculations under this clause, round: (1) decimals to 3 decimal places; (2) dollar calculations to the nearest whole dollar; (3) up numbers equal to or greater than 5; (4) down numbers less than or equal to 4 (f) Any dispute arising under this clause shall be determined according to the "Disputes" clause of this contract. (g) Computation Worksheet: [Download Table] Result --------------------- Example Labor Materials Composite ------- ----- --------- --------- Assigned Weight 40% 60% Index (1) Current Period Indices [/\] [/\] [/\] (2) Subtract Base Period Indices [/\] [/\] [/\] (3) Equals Rate Difference [/\] [/\] [/\] [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 34 of 81
EX-10.2168th Page of 414TOC1stPreviousNextBottomJust 68th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 (4) Labor Adjustment Factor (3)/(2) [/\] [/\] [/\] (5) Original Unit Price [/\] [/\] [/\] (6) Price Adjustment (4) times (5) [/\] [/\] [/\] (7) Adjusted Unit Price (5) plus (6) [/\] [/\] [/\] SPECIAL PROVISION 10 SP 10.0 PRICE REDETERMINATION-PROSPECTIVE (a) General. The unit prices stated in this contract shall be periodically redetermined in accordance with this clause, except that (1) the prices for services performed before the first effective date of price redetermination (see paragraph (c) of this clause) shall remain fixed and (2) in no event shall the total amount paid under this contract exceed the Total Aggregate. Price, as adjusted for inflation, included in this contract. (b) Total Aggregate Price. The Total Aggregate Price (TAP) shall be comprised of the sum of products of the original contract unit prices times the BEQs of all CLINs/ELINs in any given year. For comparison purposes, the TAP shall be adjusted for changes in BEQs and economic price fluctuations by the use of a Price Redetermination Model and EPA Clause H-901. To determine the price variance for any one year, the model shall, for each ELIN, compare the redetermined price times the revised BEQ to the TAP unit price, adjusted for inflation, times the revised BEQ. The sum of the redetermined prices for each year shall not exceed the adjusted TAP. (c) Basis for redetermination. The basis and methodology for redetermination shall be as set forth below: (Note: The methodology will be excerpted from the contractor's proposal and incorporated herein.) (d) Price redetermination periods. For the purpose of price redetermination, performance of this contract is divided into successive periods. The first period shall extend from the date of contract award to the end of the fiscal year following the "trigger point". The trigger point is defined as: 30 September 2002. The second and each succeeding period shall extend for 12 months from the end of the last preceding period, except that the parties may agree to vary the length of the final period. The first day of the second and each succeeding period shall be the effective date of price redetermination for that period. (e) Data submission. (1) Six months before the end of each redetermination period, the Government shall provide: [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 35 of 81
EX-10.2169th Page of 414TOC1stPreviousNextBottomJust 69th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 (i) revised BEQs for each CLIN/SubClin/ELIN in electronic and hard copy format. (ii) Total Aggregate Price adjusted IAW Price Adjustment Model and EPA Clause H-901. (2) Not more than two (2) months after the Government has provided revised BEQs and adjusted the TAP, the contractor shall submit proposed prices for services that may be performed in the next succeeding period. The offeror shall provide these prices in the electronic and hard copy format as provided in (e)(1)(i) above and sufficient documentation to support the accuracy and reliability of this estimate and (ii) to show that the prices were proposed in accordance with this contract. (3) If the contractor fails to submit the data required by subparagraph (2) of this section, within the time specified, the Contracting Officer may suspend payments under this contract until the data are furnished. (f) Price redetermination. Upon the Contracting Officer's receipt of the data required by paragraph (e)(2) of this clause, the Contracting Officer shall validate that contractor prices were redetermined in accordance with contract method. (g) Contract modifications. Each redetermination of prices shall be evidenced by a bilateral modification to this contract, stating the redetermined prices that apply during the redetermination period. (h) Disagreements. If the contractor and the Contracting Officer fail to agree upon redetermined prices for any price redetermination period within 60 days (or within such other period as the parties agree) after the date on which the data required by paragraph (e) of this clause are to be submitted, disagreements shall be resolved by Alternative Disputes Resolution procedures. Pending final Settlement, price redetermination for subsequent periods, if any, shall continue to be negotiated as provided in this clause. (i) Termination. If this contract is terminated, prices shall continue to be established in accordance with this clause for (1) completed services accepted by the Government and (2) those services not terminated under a partial termination. All other elements of the termination shall be resolved in accordance with other applicable clauses of this contract. SPECIAL PROVISION 11 SP 11 WORKLOAD CHANGES H-905 Workload Changes [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 36 of 81
EX-10.2170th Page of 414TOC1stPreviousNextBottomJust 70th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 (a) If the Government causes situations to occur which are beyond the contractor's control and which result in significant changes to the cost and time required to repair engines, the contractor may request contract adjustments by notifying the Contracting Officer in writing within 60 calendar days from the date of the event which resulted in significant changes. Some examples of these situations include: (1) Changes in engine usage which result in major increases in engine cycle times (2) Changes in organizational or intermediate level maintenance procedures and approaches which adversely impact depot repair costs or times (3) Government approved engine or component modifications by others which adversely impact depot repair costs or times (4) Significant changes in the environment in which the engines are used (e.g., as a result of sustained deployments in desert areas or other hostile environments in support of regional conflicts) which adversely impact depot repair costs or times. (b) On the basis of the most accurate information available to the contractor, the notice shall state: (1) The date, nature, and circumstances of the event. (2) The particular elements of contract performance for which the contractor may seek an equitable adjustment under this clause, including: (i) Contract line items that have been or may have been affected by the alleged change (ii) Labor or materials or both that have been or may be added, deleted, or wasted by the alleged change (iii) Estimated adjustments to the contract price, delivery schedule, and other provisions affected by the alleged change (c) The Contracting Officer shall within 60 calendar days after receipt of the notice respond in writing and indicate agreement or disagreement with the contractor's request for a contract adjustment. If the Contracting Officer confirms that an event beyond the contractor's control has resulted in significant changes, an equitable adjustment to the contract shall be made. If the contractor's information is inadequate to make a decision, the Contracting Officer shall advise the contractor what additional information is required and establish the date by which it is to be furnished and the date thereafter by which the Government will respond. Changes to the contract made as a result of a request for equitable adjustment, shall be bilateral. (d) The Government will consider an equitable adjustment in the contract price, for future years, in the event of significant changes in the total amount of workload for an individual category of work regardless of whether the change results from one of the causes in (a)(l)-(4) above or from some other cause. Category of work is defined as: [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 37 of 81
EX-10.2171st Page of 414TOC1stPreviousNextBottomJust 71st
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 T56 Engine: Reduction Gear Box Turbine Model -7 and -15 Compressor Module Torquemeter Overhaul for USAF/Coast Guard/Navy -7, -15Turbine Model-15 2LM USAF -7 and -15 (if CLINS 0003 and 0004 awarded) Changes shall be measured by comparing the sum of the actual quantities ordered times the contract unit price for those ELINs during any fiscal year. The parties agree that no equitable adjustment shall be requested or made under this clause unless the amount computed for the actual quantities ordered during the previous Government fiscal year varies from that computed for the BEQ quantities by more than 20% above or below the amount computed for the BEQ quantities. Either party must make notification of a request for equitable adjustment under this clause within 60 days after the end of a Government fiscal year. EXAMPLE [Download Table] ELIN FY 99 BEQs FY 99 Orders Unit Price BEQ Total Order Total ---- ---------- ------------ ---------- --------- ----------- E074 684 500 $100 $ 68,400 $50,000 E075 356 300 $100 $ 35,600 $30,000 E076 34 10 $1,000 $ 34,000 $10,000 -------- ------- $138,000 $90,000 $138,000 minus $90,000 equals $48,000 $48,000 divided by $90,000 equals 53% (greater than 20%), therefore either party may request an equitable adjustment in contract price (applied prospectively to FY 2000 unit prices). (e) Any price adjustment made under this clause shall be independent of the H-902, Price Redetermination, and H-901, Economic Price Adjustment clauses and shall not be included in the Total Aggregate Price as described in those clauses. (f) The exclusive remedy for changes in the amount of work performed on this contract shall be a contract price adjustment as provided in this clause. Changes in the amount of work performed on this contract shall not constitute a breach of this contract. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 38 of 81
EX-10.2172nd Page of 414TOC1stPreviousNextBottomJust 72nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 SPECIAL PROVISION 12 SP-12 FRACTURE CRITICAL/DURABILITY CRITICAL PARTS Engine parts listed in the TRD have been declared to be fracture critical, durability critical, or flight safety critical. These are critical parts and failure of same could result in an aircraft mishap. The parts must be procured only from Government approved sources for the duration of this contract. No waiver to or release of this clause will be granted. (OC-ALC 98-073) SPECIAL PROVISION 13 SP-13 GOVERNMENT FURNISHED MATERIAL USAGE (a) The two types of Government-furnished material (GFM) referenced in this contract are defined as: (1) GFM repair parts to be requisitioned from the Government and used to repair end items; and (2) exhibit line items (ELINs), which are end items provided to the contractor, without requisition, to be repaired under the terms of this contract. "Repair parts" are defined as any direct material used in the repair of an ELIN that is not otherwise identified as an ELIN. Contractor shall requisition GFM repair parts to be used in repair of exhibit line items after contract award. Any GFM that does not meet contractor quality and specification standards will be referred to the Government for disposition with supporting rationale. The Government, in conjunction with the contractor, shal1 make the final determination of the usability of the GFM. The Contractor shall scrap only those items that have been condemned by the Government. Contractor shall utilize contractor-furnished material (CFM) repair parts when GFM repair parts are not available. The Government will retain management of and supply all items listed as exhibit line items (ELINs) for the life of the contract. (b) A "sub-ELIN" is defined as a part/component/assembly that is a separate ELIN on the contract but is also a lower-tier, sub-indentured part/component/assembly used in the repair of another (higher-tier) ELIN. When ELINs, which are end items provided to the contractor for repair, cannot be repaired because sub-ELINs necessary to such repair are either not in the ELINs or must be scrapped, the Government shall make such sub-ELINs available for repair. Such sub-ELINs shall be made available in a timely manner in order to maintain delivery schedules. In the event that a sub-ELIN in reparable condition is not provided by the Government, the government may either provide a new sub-ELIN or direct the contractor to provide a new sub-ELIN; accordingly, the parties shall negotiate an equitable adjustment. (OC-ALC 98-075) SPECIAL PROVISION 14 SP-14 EXEMPTED WORKLOAD SEP For the purposes of clause I-173, entitled Requirements (FAR [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 38a of 81
EX-10.2173rd Page of 414TOC1stPreviousNextBottomJust 73rd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 52.216-21), the Government is not required to order from the contractor the following: (a) Navy T56 requirements identified in ELINs B01B-B03K, C01B-C03K, D01B-D03K, and E01B-E03K. (b) F100 module and engine workload which has been designated by the Defense Depot Maintenance Council (DDMC) as core workload to the Government. (c) Workload which is on repair contract (or on an initiated purchase request) at the time of the PBA contract award, until the expiration of those pre-existing contracts or contracts resulting from an initiated purchase request. (d) Foreign Military Sales (FMS) workload. (e) F100 module and accessory workload generating within the European theater. (OC-ALC 98-077) SPECIAL PROVISION 15 SP-15 JOINT INVENTORY The Government and the contractor will jointly inventory the equipment and Government-owned material currently used to perform the PBA workload. The purpose of this inventory will be to transfer custody of the equipment items identified in the contractor's proposal to be used to perform the workload, transfer custody of Government-owned material, and to transfer custody of the remaining equipment items to the Greater Kelly Development Corporation (GKDC), or for disposition through routine Air Force supply procedures. The joint inventory will be accomplished in accordance with the procedures described in the contractor's approved transition integration plan (TIP). Equipment discovered or identified during the Joint Inventory that had not been previously identified by the Government and that is required for performance will be added to the Contractor's list of GFE if requested by the Contractor. SPECIAL PROVISION 16 SP-16 CONTRACTOR ACQUIRED MATERIAL (CAP) PROCEDURES AND LIMITATIONS 1998 (a) The contractor is authorized, subject to the obligation of adequate funds, to acquire CAP EOQ material items (ERRCs other than t, c, s, and u) without additional written approval when GFM is not or will not be available in sufficient time to produce ordered ELINs. CAP reparable items (ERRCs t, c, s, and u) require ACO/PCO approval prior to acquisition. In no event shall the Contractor acquire and invoice the Government for material in excess of the order obligation amount for CAP. If CAP is required which exceeds the order obligation amount, the Contractor shall notify the ACO with the circumstances and request the Government's disposition. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 38b of 8l
EX-10.2174th Page of 414TOC1stPreviousNextBottomJust 74th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 (b) The Contractor shall submit invoices specifying the CAP acquired through the ACO to the payment office specified in this contract. Specific invoice procedures shall be established between the Contractor and the ACO after award of this contract. The invoice shall reference CLIN 0007 and the specific ELIN for which the CAP was acquired and utilized. (c) Appendix B shall be used for GFM requisitioning and reporting instructions. (OC-ALC 98-082) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 38c of 81
EX-10.2175th Page of 414TOC1stPreviousNextBottomJust 75th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT A-SUBCONTRACT DATA REQUIREMENT LIST The following data items are required to be submitted by SASA with the distribution and frequency as stated in the Exhibit J contract data item description at no additional cost as provided for in accordance with CLIN 0006. A001 Comprehensive Engine Management System (CEMS) Reporting A002 Changes to the EJ/FJ Stock Record Account Number A003 Time Compliance Technical Order (TCTO) Reporting A004 Certificate of Deletion A005 Comprehensive Engine Management System(CEMS) Reporting A006 Alert/Safe-Alert A007 Response to an Alert/Safe-Alert A008 Gov't Furnished Mat'l (GFM) and End Item Transaction Reporting A009 Teardown Deficiency Report A00A Quality Deficiency Report A00B Logbooks & Records, Aircraft & Aeronautical Equipment A00C Gov't Furnished Equipment Repair Status Report A00D Airframe & Engine Tracked Components & Related Equipment A00E Gov't Furnished Information Deficiency Report A00F Failure Summary and Analysis Report A00G Teardown Deficiency Report A00H Records Transmittal and Receipt A00I Request for Engineering or Technical Assistance A00J Request for Engineering or Technical Assistance A00K Contractor's Progress Status & Management Report A00L Conference Agenda A00M Conference Minutes [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 39 of 81
EX-10.2176th Page of 414TOC1stPreviousNextBottomJust 76th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT B-FIXED PRICE EXHIBIT LINE ITEM NUMBERS The negotiated subcontractor ELIN Pricing attached hereto as pages numbered 1 through X constitutes Exhibit B. STANDARD AERO Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN UNIT PRICES - EXHIBIT B 14-Sep-98 [Download Table] ELIN DESCRIPTION FY99 FY00 FY01 FY02 FY03 ---- ----------- ---- ---- ---- ---- ---- B001 Shaft, Turbine B002 Reduction Gearbox B003 Turbine Inlet Case B004 Rear Turbine Bearing Support B005 Combustion Liner B006 Prop Brake Assembly B007 Cold Section B008 Cold Section B009 Cold Section B00A Intentionally Left Blank. B00B Intentionally Left Blank. [/\] B00C Intentionally Left Blank. B00D Turbine Tie Bolt B00E Housing, Antifriction B00F Turbine Rotor B00G Combustion Liner B00H Turbine Rotor B00J Front Turbine Bearing Support B00K Support Assy B00L Torquemeter B00M Speed Sensing Control B00N Fuel Pump Assembly B00P Shaft Assy B00Q Case, Combustion B00R Vane, Nozzle B00S Vane, Nozzle B00T Support, Turbine B00U Seal R T X B00V Housing, Gearbox [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 40 of 81
EX-10.2177th Page of 414TOC1stPreviousNextBottomJust 77th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] B00W Vane, Nozzle B00X Support, Turbine B00Y Vane, Nozzle B00Z Case, Combustion B010 Chamber, Combustion B011 Case, Combustion B012 Nozzle B013 Housing B014 Case And Vane B015 Support, Turbine B016 Nozzle, Turbine B017 Power Section B018 Power Section B019 Power Section B01A Power Section B01B Power Section B01C Gearbox [/\] B01D Torquemeter B01E Power Section B01F Gearbox B01G Torquemeter B01H Power Section B01J Gearbox B01K Torquemeter B0IL 501-K17 Power Section B01M 501-K17 Turbine Section B01N Compressor Rotor Assy B01P Nozzle B01Q Gearshaft B01R Case, Compressor B01S Spur Gear B01T Case And Vane B01U Spur Gear B01V Diffuser B01W Gearbox Housing B01X Gear, Spur B01Y Support, Assy B01Z Case And Vane B020 Seal, Labyrinth B021 Brake, Prop Shaft B022 Combustion Liner B023 Turbine Rotor (All Series iii) B024 Vane, Turbine Engine [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 41 of 81
EX-10.2178th Page of 414TOC1stPreviousNextBottomJust 78th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] B025 Vane, Turbine Engine B026 Container (Planetary Gear) B027 Container B028 Container, Power Section B029 Container, Torquemeter B02A Anti-Friction Housing B02B Turbine Disk B02C Cable Assy (-425) B02D Valve Assy (-14/16) B02E Valve Assy (-14/16) B02F Harness (-16/425) B02G Harness (-14) B02H Pump Assy B02J Harness (-14) B02K Harness (-425) B02L Fuel Control (-14) [/\] B02M Fuel Control (-16) B02N Valve Assy (-14/425) B02P Fuel Control (-425) B02Q Valve, Solenoid B02R Pump Assy (All) B02S Cable Assy (-425) B02T Pump Assy (All SeriesIII) B02U Solenoid (-425/427) B02V Wiring Harness B02W Pump & Filter (All) B02X Pump Assy (All) B02Y Control Assy B02Z Pump, Rotary B030 Wiring Harness B031 Coordinator Control B032 Switch Assy, Thrust B033 Control Coordinator B034 Vibrator B035 Control B036 Rotary Pump B037 Coordinator Control B038 Valve, Solenoid B039 Cable Assy B03A Valve, Temperature B03B Valve B03C Actuator B03D Fuel Nozzle [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 42 of 81
EX-10.2179th Page of 414TOC1stPreviousNextBottomJust 79th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] B03E Valve B03F Case, Turbine B03G Turbine Vane Support B03H Case And Vane Assy [/\] B03J Case And Vane Assy B03K Case And Nozzle [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 43 of 81
EX-10.2180th Page of 414TOC1stPreviousNextBottomJust 80th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT C-FIXED PRICE LINE ITEMS The negotiated Subcontract ELIN Pricing attached hereto constitutes Exhibit C. STANDARD AERO Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN UNIT PRICES - EXHIBIT B 14-Sep-98 [Download Table] ELIN DESCRIPTION FY99 FY00 FY01 FY02 FY03 ---- ----------- ---- ---- ---- ---- ---- B001 Shaft, Turbine B002 Reduction Gearbox B003 Turbine Inlet Case B004 Rear Turbine Bearing Support B005 Combustion Liner B006 Prop Brake Assembly B007 Cold Section B008 Cold Section B009 Cold Section B00A Intentionally Left Blank B00B Intentionally Left Blank [/\] B00C Intentionally Left Blank B00D Turbine Tie Bolt B00E Housing, Antifriction B00F Turbine Rotor B00G Combustion Liner B00H Turbine Rotor B00J Front Turbine Bearing Support B00K Support Assy B00L Torquemeter B00M Speed Sensing Control B00N Fuel Pump Assembly B00P Shaft Assy B00Q Case, Combustion B00R Vane, Nozzle B00S Vane, Nozzle B00T Support, Turbine B00U Seal R T X B00V Housing, Gearbox B00W Vane, Nozzle B00X Support, Turbine [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 44 of 81
EX-10.2181st Page of 414TOC1stPreviousNextBottomJust 81st
SUBC0NTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] B00Y Vane, Nozzle B00Z Case, Combustion B010 Chamber, Combustion B011 Case, Combustion B012 Nozzle B013 Housing B014 Case And Vane B015 Support, Turbine B016 Nozzle, Turbine B017 Power Section B018 Power Section B019 Power Section B01A Power Section B01B Power Section [/\] B01C Gearbox B01D Torquemeter B01E Power Section B01F Gearbox B01G Torquemeter B01H Power Section B01J Gearbox B01K Torquemeter B01L 501-K17 Power Section B01M 501-K17 Turbine Section B01N Compressor Rotor Assy B01P Nozzle B01Q Gearshaft B01R Case, Compressor B01S Spur Gear B01T Case And Vane B01U Spur Gear B01V Diffuser B01W Gearbox Housing B01X Gear, Spur B01Y Support, Assy B01Z Case And Vane B020 Seal, Labyrinth B021 Brake, Prop Shaft B022 Combustion Liner B023 Turbine Rotor (All Serires III) B024 Vane, Turbine Engine B025 Vane, Turbine Engine B026 Container (Planetary Gear) [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 45 of 81
EX-10.2182nd Page of 414TOC1stPreviousNextBottomJust 82nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] B027 Container B028 Container, Power Section B029 Container, Torquemeter B02A Anti-Friction Housing B02B Turbine Disk B02C Cable Assy (-425) B02D Valve Assy (-14/16) B02E Valve Assy (-14/16) B02F Harness (-16/425) B02G Harness (-14) B02H Pump Assy B02J Harness (-14) B02K Harness (-425) [/\] B02L Fuel Control (-14) B02M Fuel Control (-16) B02N Valve Assy (-14/425) B02P Fuel Control (-425) BO2Q Valve, Solenoid B02R Pump Assy (All) B02S Cable Assy (-425) BO2T Pump Assy (All SeriesIII) B02U Solenoid (-425/427) B02V Wiring Harness B02W Pump & Filter (All) B02X Pump Assy (All) B02Y Control Assy B02Z Pump, Rotary B030 Wiring Harness B031 Coordinator Control B032 Switch Assy, Thrust B033 Control Coordinator B034 Vibrator B035 Control B036 Rotary Pump B037 Coordinator Control B038 Valve, Solenoid B039 Cable Assy B03A Valve, Temperature B03B Valve B03C Actuator B03D Fuel Nozzle B03E Valve B03F Case, Turbine [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 46 of 81
EX-10.2183rd Page of 414TOC1stPreviousNextBottomJust 83rd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] B03G Turbine Vane Support B03H Case And Vane Assy B03J Case And Vane Assy [/\] B03K Case And Nozzle [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 47 of 81
EX-10.2184th Page of 414TOC1stPreviousNextBottomJust 84th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT D-FIXED PRICE LINE ITEM NUMBERS The negotiated Subcontract ELIN Pricing attached hereto as pages numbered 1 through X constitutes Exhibit D. STANDARD AERO Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN UNIT PRICES - EXHIBIT D 14-Sep-98 [Download Table] ELIN DESCRIPTION FY99 FY00 FY01 FY02 FY03 ---- ----------- ---- ---- ---- ---- ---- D001 Shaft, Turbine D002 Reduction Gearbox D003 Turbine Inlet Case D004 Rear Turbine Bearing Support D005 Combustion Liner D006 Prop Brake Assembly D007 Cold Section D008 Cold Section D009 Cold Section D00A Intentionally Left Blank. D00B Intentionally Left Blank. [/\] D00C Intentionally Left Blank. D00D Turbine Tie Bolt D00E Housing, Antifriction D00F Turbine Rotor D00G Combustion Liner D00H Turbine Rotor D00J Front Turbine Bearing Support D00K Support Assy D00L Torquemeter D00M Speed Sensing Control D00N Fuel Pump Assembly D00P Shaft Assy D00Q Case, Combustion D00R Vane, Nozzle D00S Vane, Nozzle D00T Support, Turbine D00U Seal R T X D00V Housing, Gearbox D00W Vane, Nozzle D00X Support, Turbine D00Y Vane, Nozzle [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 48 of 81
EX-10.2185th Page of 414TOC1stPreviousNextBottomJust 85th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] D00Z Case, Combustion D010 Chamber, Combustion D011 Case, Combustion D012 Nozzle D013 Housing D014 Case And Vane D015 Support, Turbine D016 Nozzle, Turbine D017 Power Section D018 Power Section D019 Power Section D01A Power Section D01B Power Section D01C Gearbox D01D Torquemeter D01E Power Section [/\] D01F Gearbox D01G Torquemeter D01H Power Section D01J Gearbox D01K Torquemeter D01L 501-K17 Power Section D01M 501-K17 Turbine Section D01N Compressor Rotor Assy D01P Nozzle D01Q Gearshaft D01R Case, Compressor D01S Spur Gear D01T Case And Vane D01U Spur Gear D01V Diffuser D01W Gearbox Housing D01X Gear, Spur D01Y Support, Assy D01Z Case And Vane D020 Seal, Labyrinth D021 Brake, Prop Shaft D022 Combustion Liner D023 Turbine Rotor (All Series III) D024 Vane, Turbine Engine D025 Vane, Turbine Engine D026 Container (Planetary Gear) D027 Container D028 Container, Power Section D029 Container, Torquemeter D02A Anti-Friction Housing D02B Turbine Disk [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 49 of 81
EX-10.2186th Page of 414TOC1stPreviousNextBottomJust 86th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] D02C Cable Assy (-425) D02D Valve Assy (-14/16) D02E Valve Assy (-14/16) D02F Harness (-16/425) D02G Harness (-14) D02H Pump Assy D02J Harness (-14) D02K Harness (-425) D02L Fuel Control (-14) D02M Fuel Control (-16) D02N Valve Assy (-14/425) D02P Fuel Control (-425) D02Q Valve, Solenoid D02R Pump Assy (All) D02S Cable Assy (-425) D02T Pump Assy (All SeriesIII) [/\] D02U Solenoid (-425/427) D02V Wiring Harness D02W Pump & Filter (All) D02X Pump Assy (All) D02Y Control Assy D02Z Pump, Rotary D030 Wiring Harness D031 Coordinator Control D032 Switch Assy, Thrust D033 Control Coordinator D034 Vibrator D035 Control D036 Rotary Pump D037 Coordinator Control D038 Valve, Solenoid D039 Cable Assy D03A Valve, Temperature D03B Valve D03C Actuautor D03D Fuel Nozzle D03E Valve D03F Case, Turbine D03G Turbine Vane Support D03H Case And Vane Assy D03J Case And Vane Assy D03K Case And Nozzle D0GL Fuel Nozzle D0GM Fuel Control D0GN Fuel Control D0GP Pump and Filter D0GQ Cable AS [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 50 of 81
EX-10.2187th Page of 414TOC1stPreviousNextBottomJust 87th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] D0GR Actuator D0GS Valve Assy D0GT Valve, Temp D0GU Filter, Fluid D0GV Control, Assy D0GW Fuel, Fluid D0GX Amplifier, Electronic D0GY Igniter, Spark D0GZ Harness, Wiring D0H0 Harness, Wiring [/\] D0H1 Ignition Coil D0H2 Valve Assy D0H3 Pump Assy D0H4 Pump Assy X D0H5 Valve, Solenoid D0H6 Valve, Solenoid D0H7 Switch, Pressure D0H8 Relay Assy D0H9 Cable Assy D0HA Cable Assy D0HB Cable Assy D0HC Harness, Wiring D0HD Valve D0LV Power Section D0LW Power Section [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 51 of 81
EX-10.2188th Page of 414TOC1stPreviousNextBottomJust 88th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT E - FIXED PRICE EXHIBIT LINE ITEM NUMBERS The negotiated Subcontract ELIN Pricing attached hereto constitutes Exhibit E. STANDARD AERO Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN UNIT PRICES - EXHIBIT E 14-Sep-98 [Download Table] ELIN DESCRIPTION FY99 FY00 FY01 FY02 FY03 ---- ----------- ---- ---- ---- ---- ---- E001 Shaft, Turbine E002 Reduction Gearbox E003 Turbine Inlet Case E004 Rear Turbine Bearing Support E005 Combustion Liner E006 Prop Brake Assembly E007 Cold Section E008 Cold Section E009 Cold Section E00A Intentionally Left Blank. E00B Intentionally Left Blank. [/\] E00C Intentionally Left Blank. E00D Turbine Tie Bolt E00E Housing, Antifriction E00F Turbine Rotor E00G Combustion Liner E00H Turbine Rotor E00J Front Turbine Bearing Support E00K Support, Assy E00L Torquemeter E00M Speed Sensing Control E00N Fuel Pump Assembly E00P Shaft Assy E00Q Case, Combustion E00R Vane, Nozzle E00S Vane, Nozzle E00T Support, Turbine E00U Seal R T X E00V Housing, Gearbox E00W Vane, Nozzle E00X Support, Turbine E00Y Vane, Nozzle [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 52 of 81
EX-10.2189th Page of 414TOC1stPreviousNextBottomJust 89th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] E00Z Case, Combustion E010 Chamber, Combustion E011 Case, Combustion E012 Nozzle E013 Housing E014 Case And Vane E015 Support, Turbine E016 Nozzle, Turbine E017 Power Section E018 Power Section E019 Power Section E01A Power Section E01B Power Section E01C Gearbox E01D Torquemeter E01E Power Section E01F Gearbox E01G Torquemeter E01H Power Section [/\] E01J Gearbox E01K Torquemeter E01L 501-K17 Power Section E01M 501-K17 Turbine Section E01N Compressor Rotor Assy E01P Nozzle E01Q Gearshaft E01R Case, Compressor E01S Spur Gear E01T Case And Vane E01U Spur Gear E01V Diffuser E01W Gearbox Housing E01X Gear, Spur E01Y Support, Assy E01Z Case And Vane E020 Seal, Labyrinth E021 Brake, Prop Shaft E022 Combustion Liner E023 Turbine Rotor (All Serires III) E024 Vane, Turbine Engine E025 Vane, Turbine Engine E026 Container (Planetary Gear) E027 Container E028 Container, Power Section E029 Container, Torquemeter E02A Anti-Friction Housing E02B Turbine Disk [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 53 of 81
EX-10.2190th Page of 414TOC1stPreviousNextBottomJust 90th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] E02C Cable Assy (-425) E02D Valve Assy (-14/16) E02E Valve Assy (-14/16) E02F Harness (-16/425) E02G Harness (-14) E02H Pump Assy E02J Harness (-14) E02K Harness (-425) E02L Fuel Control (-14) E02M Fuel Control (-16) E02N Valve Assy (-14/425) E02P Fuel Control (-425) E02Q Valve Solenoid E02R Pump Assy (All) E02S Cable Assy (-425) E02T Pump Assy (All Series III) E02U Solenoid (-425/427) E02V Wiring Harness E02W Pump & Filter (All) [/\] E02X Pump Assy (All) E02Y Control Assy E02Z Pump, Rotary E030 Wiring Harness E031 Coordinator Control E032 Switch Assy, Thrust E033 Control Coordinator E034 Vibrator E035 Control E036 Rotary Pump E037 Coordinator Control E038 Valve, Solenoid E039 Cable Assy E03A Valve, Temperature E03B Valve E03C Actuator E03D Fuel Nozzle E03E Valve E03F Case, Turbine E03G Turbine Vane Support E03H Case And Vane Assy E03J Case And Vane Assy E03K Case And Nozzle E0GL Fuel Nozzle E0GM Fuel Control E0GN Fuel Control E0GP Pump And Filter E0GQ Cable AS [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 54 of 81
EX-10.2191st Page of 414TOC1stPreviousNextBottomJust 91st
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] E0GR Actuator E0GS Valve Assy E0GT Valve, Temp E0GU Filter, Fluid E0GV Control, Assy E0GW Filter, Fluid E0GX Amplifier, Electronic E0GY Igniter, Spark E0GZ Harness, Wiring E0H0 Harness, Wiring [/\] E0H1 Ignition Coil E0H2 Valve Assy E0H3 Pump Assy E0H4 Pump Assy X E0H5 Valve, Solenoid E0H6 Valve, Solenoid E0H7 Switch, Pressure E0H8 Relay Assy E0H9 Cable Assy E0HA Cable Assy E0HB Cable Assy E0HC Harness, Wiring E0HD Valve E0LV Power Section E0LW Power Section [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 55 of 81
EX-10.2192nd Page of 414TOC1stPreviousNextBottomJust 92nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT F PAYMENT TERMS 1.0 SUPPLIES OR SERVICE AND PRICES/COSTS Seller shall furnish to Buyer the supplies and services as called for hereunder necessary to support the T56 Engine Services. The supplies and services are described in the contractor work statement included in this Subcontract and Exhibits attached thereto and shall be furnished in accordance with mutually acceptable terms and conditions also contained in the Subcontract. 2.0 PAYMENT TERMS I. INVOICING PROCEDURES Invoicing procedures for this subcontract become effective at contract Notice to Proceed. Within fourteen (14) calendar days after delivery of the services F.O.B Kelly AFB, Seller will present Buyer an invoice and supporting documentation in the form of a DD250 or mutually agreeable similar document for all fixed price work, work-in-process, and for all negotiated over-and-above labor hours and cost of material acquired by Seller. Buyer shall pay these invoices within thirty (30) calendar days from receipt of a valid invoice by wire transfer or by check to the address noted below: The following are the payment provisions for: -AA SubCLINS under Subcontract line item numbers 000l through 0004 SubCLINS or the above SLINS are for Transition and are fixed price. Costs associated with these SLINS, except for systems implementation and facilities restructuring which will be invoiced during COP, will be invoiced monthly by division of the Transition period (300 calendar days/10 months) by 30 and will be for 1/10th of the cost. -AB SubCLINS under SLINS 0001 through 0004 SubCLINS AB for the above SLINS are for the completion of Work-in Process(WIP) and are fixed-price level of effort. WIP will be invoiced not more than every 30 calendar days for hours performed at the proposed fixed price rate. -AC SubCLINS under SLINS 0001 through 0004 and SubCLINS AC for the SLINS are for completion of Repair Operations and are fixed price with economic price adjustment commencing FY 2001. Invoices for costs incurred against these SLINS will be submitted as each ELIN is completed based on costs in the ELIN prices -SLIN 0006 Over and Above Rates Over and Above rates are for the SubCLINS 0006AA Eng/Tech Lab and 0006AB, All Other Rates for each Fiscal Year are as follows: [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 56 of 81
EX-10.2193rd Page of 414TOC1stPreviousNextBottomJust 93rd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] FY99 FY00 FY01 ---- ---- ---- [/\] [/\] [/\] WIP rate is [/\] -SLIN 0007 Contractor Acquired Replacement Parts and Direct (Material) Seller acquired purchase parts, subcontracted parts and materials (including those required to manufacture/produce items) set forth in Appendix B of Exhibit M as GFM, which are later found to be not available from the Government will be paid to the Seller in accordance with the provisions of Exhibit F and will be chargeable to SLIN 0007. 0007AA CAP MATERIAL IN SUPPORT OF ITEMS 0001AA THROUGH 0004AA. 0007AB CAP MATERIAL IN SUPPORT OF ITEMS 0001AB THROUGH 0004AB. 0007AC CAP MATERIAL IN SUPPORT OF ITEMS 0001AC THROUGH 0004AC. 2. INVOICE DOCUMENTATION Invoices submitted by Seller to Buyer shall include the following information: a. Itemized report of non-fixed price over-and-above labor, including job number, task description and labor hours by regular time and overtime labor categories. (All billable overtime must be pre-approved by Buyer.) b. Itemized report of non-fixed price material by individual job number (which matches any [ILLEGIBLE] c. Invoices for fixed priced labor shall include a Certificate of Completion; invoices for materials shall include a Certificate of Conformance and proof of shipment. 3. BILLING INFORMATION An original and two copies of all invoices and one set of supporting information will be mailed to: TBD PAYMENT INFORMATION [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 57 of 81
EX-10.2194th Page of 414TOC1stPreviousNextBottomJust 94th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 All payments will be made by Buyer to the following address: TBD 5. DISCREPANT INVOICES In the event that Buyer in good faith, claims amounts included in an invoice are not in accordance with this Subcontract, it must notify Seller in writing, within ten (10) calendar days of receipt of the invoice of the reasons for and factual details of the discrepancy. If Seller does not thereafter resolve the discrepancy by submitting a corrected invoice prior to the required payment date identified in this Article, Buyer will submit payment for all remaining undisputed amounts. The unpaid disputed amounts will be resolved by mutual negotiations within thirty (30) calendar days after Seller's receipt of the initial notification. Final payment will be made against a corrected invoice. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 58 of 81
EX-10.2195th Page of 414TOC1stPreviousNextBottomJust 95th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT G -STANDARD AERO SAN SANTONIO, INC. PROPOSAL DATED 23 SEPTEMBER 1998 The statement of work included herein with any assumptions and pricing in conjunction with the provisions agreed to in this Subcontract constitutes SASA's proposal. Included in this section: - Summary of Assumptions - Transition Cost Summary - Detailed Pricing submitted to LMKAC - Transition Integration Plan for T56 - Continuing Operations Plan for T56 - Contractor Work Specification for T56 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 59 of 81
EX-10.2196th Page of 414TOC1stPreviousNextBottomJust 96th
Confidential - Competition Sensitive Summary of Assumptions for SASA Sub-contract with LMKAC All numbers are in U.S. dollars. Pricing is provided based on the BEQ's in the PBA RFP. If the Navy pulls it's workload out of these BEQ's, prices are subject to re-determination. FEEMS are included in the ELIN pricing. Labour hours are based on Standard Aero Ltd actual history, utilizing an average/standard deviation methodology. SASA to occupy San Antonio-based facility in building 360 (335,000 square feet) for PBA workload plus test cells. This includes 652, 655, and temporarily 535. Minimum of 200,000 hours and up-to 300,000 hours to Winnipeg. LMKAC to complete negotiations with Greater Kelly Development Corporation (GKDC) for favorable lease terms on land and facilities. Assumes SASA has no environmental clean-up costs. Lease charges are currently allocated on square feet initially and for continuing operations (COP). GKDC lease incentive plan is flowed down to SASA. Any environmental disturbances made by SASA must be capped by SASA. GFM/GFE approach to Standard Aero - Government Furnished Material and Equipment. No GFE rates in GKDC sublease from LMKAC. LMKAC will provide a purchase order for commercially-acquired material when GFM sources cannot supply parts. Labour issues: - LMKAC common H/R wage scales/benefits (2 shifts). Overtime at time-and-a-half. - Productivity on total hours (ie. % of hours that are chargable) is a [/\] - Americans With Disabilities (AWD) is assumed to have no fiscal impact to SASA. Labour Selling rates: FY99 [/\] FY00 [/\] FY01 - FY13 [/\] WIP Completion [/\] O & A [/\] ELIN: End line item pricing, in this case term-fixed labour/consumables pricing, begins in continuing operations phase. This includes all new inductions beginning August 8, 1999. TIP: TIP payments to be made by LMKAC equally over 10 months following contract award (starting Oct. 31/98) FY99 in FY99$, FY99 is inflated by 3.9% to FY00$, FY01 and beyond are in FY99$. Inflation must be added to the out-years to get then-year dollars. During TIP and into COP, SASA will be subcontracting plating services for work that will be performed by LMKAC in Building 301. It is our estimate that this represents a range of 20,000 to 30,000 hours each year depending on the ELIN mix and Government surge requirements. We propose for processes internally subcontracted to LMKAC. SASA pays the proposed price per hour, less 10%, multiplied by the standard number of hours required to accommodate material handling and administration. SASA will provide details of each item to be subcontracted and the standard number of hours required to perform the tasks. SASA reserves the right to subcontract the workload outside LMKAC, should LMKAC not be able to meet the cost, turntime or quality requirements as agreed. Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.2197th Page of 414TOC1stPreviousNextBottomJust 97th
Confidential - Competition Sensitive TRANSITION COST RECOVERY [Download Table] CLIN 3 and 4 CLIN 2 CLIN 1 Cost Item Element 2LM, Accy, Engines Accy & Engines Engines --------- -------------------- ------------------ -------------- ------- AA01 MIS $ [/\] AA02 Redesign $ [/\] AA06 Salaries/Relocation $ [/\] AA09 Training $ [/\] AA16 Calibration/M.Guards $ [/\] AA18 Software-Test Stands $ [/\] Profit TOTAL $ [/\] Key Assumptions: 1.) No need to construct new building or addition ie. Bldg 360 will have 335,000 sq. feet available for Standard Aero. 2.) No environmental costs or business disruption costs incorporated. 3.) Equipment remains GFE to Standard Aero. 4.) Common tooling lists for T56 and TF39, submitted under the TF39 proposal, will be allocated equitably between engine lines. A 12% mark-up on TIP costs has been incorporated, to provide an early revenue stream in transition. Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.2198th Page of 414TOC1stPreviousNextBottomJust 98th
Confidential - Competition Sensitive Schedule A - ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] ELIN Org FY04- FLOW []CHECK Unit 0001 Unit Type Maintenance NOUN NSN FY99 FY00 FY01 FY02 FY03 FY13 DAYS FEEMS Hours ---- ---- ------------------- ---- --- ---- ----- ----- ----- ----- ----- ---- ------- ----- B001 SA T56 Engine and LRUs [/\/\] [/\/\] 1 1 1 1 1 -- 18 x 33 B002 SA T56 Engine and LRUs 102 407 407 407 407 -- 28 285 B003 SA T56 Engine and LRUs 8 32 34 34 34 -- 30 68 B004 SA T56 Engine and LRUs 24 103 109 109 109 -- 32 25 B005 SA T56 Engine and LRUs 139 603 638 638 638 -- 6 x 10 B006 SA T56 Engine and LRUs 17 71 75 75 75 -- 13 20 B007 SA T56 Engine and LRUs 2 6 7 7 7 -- 25 x 310 B008 SA T56 Engine and LRUs 6 24 26 26 28 -- 25 x 289 B009 SA T56 Engine and LRUs 74 299 299 299 299 -- 28 x 480 B00A SA T56 Engine and LRUs 0 0 0 0 0 -- B00B SA T56 Engine and LRUs 0 0 0 0 0 -- B00C SA T56 Engine and LRUs 0 0 0 0 0 -- B00D SA T56 Engine and LRUs 14 56 60 60 60 -- 12 x 15 B00E SA T56 Engine and LRUs 16 68 71 71 71 -- 18 24 B00F SA T56 Engine and LRUs 39 153 153 153 153 -- 16 x 81 B00G SA T56 Engine and LRUs 88 359 381 581 381 -- 8 x 10 B00H SA T56 Engine and LRUs 43 175 174 174 174 -- 18 x 85 B00J SA T56 Engine and LRUs 14 80 83 83 83 -- 28 28 B00K SA T56 Engine and LRUs 44 167 198 188 198 -- 7 10 B00L SA T56 Engine and LRUs 84 338 335 335 335 -- 11 x 52 B00M SA T56 Engine and LRUs 62 421 446 446 446 -- 5 x 9 B00N SA T56 Engine and LRUs 24 89 105 105 105 -- 12 x 18 B00P SA T56 Engine and LRUs 20 83 86 88 88 -- 8 x 13 B00Q SA T56 Engine and LRUs 19 81 85 85 85 -- 10 x 12 B00R SA T56 Engine and LRUs 176 741 787 787 787 -- 8 3 B00S SA T56 Engine and LRUs 115 483 513 513 513 -- 7 3 B00T SA T56 Engine and LRUs 1 33 49 49 49 -- 7 15 B00U SA T56 Engine and LRUs 20 85 80 90 90 -- 9 9 B00V SA T56 Engine and LRUs 27 108 108 108 108 -- 15 21 B00W SA T56 Engine and LRUs 89 417 443 443 443 -- 7 4 B00X SA T56 Engine and LRUs 28 117 124 124 124 -- 7 15 B00Y SA T56 Engine and LRUs 185 799 400 400 400 -- 12 9 B00Z SA T56 Engine and LRUs 45 188 199 199 199 -- 11 x 8 B010 SA T56 Engine and LRUs 35 148 157 157 157 -- 9 x 8 B011 SA T56 Engine and LRUs 21 87 92 92 92 -- 11 21 B012 SA T56 Engine and LRUs 87 1,220 1,502 1,502 1,502 -- 5 4 B013 SA T56 Engine and LRUs 61 255 271 271 271 -- 13 24 B014 SA T56 Engine and LRUs 3 13 14 14 14 -- 12 28 B015 SA T56 Engine and LRUs 35 147 156 156 156 -- 28 38 B016 SA T56 Engine and LRUs 142 597 833 833 633 -- 7 4 B017 SA T56 Engine and LRUs 1 1 1 1 1 -- 37 1,296 B018 SA T56 Engine and LRUs 7 25 24 24 24 -- 37 1,296 B019 SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 B01A SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 B01B SA T56 Engine and LRUs 3 20 17 17 17 -- 37 1,296 B01C SA T56 Engine and LRUs 6 25 18 18 18 -- 28 285 B01D SA T56 Engine and LRUs 4 14 11 11 11 -- 11 52 B01E SA T56 Engine and LRUs 2 8 14 14 14 -- 37 1,296 B01F SA T56 Engine and LRUs 3 9 8 8 8 -- 28 258 B01G SA T56 Engine and LRUs 2 8 6 6 6 -- 11 52 B01H SA T56 Engine and LRUs 1 5 5 5 5 -- 37 1,652 B01J SA T56 Engine and LRUs 1 5 4 4 4 -- 28 285 B01K SA T56 Engine and LRUs 1 2 2 2 2 -- 11 52 B01L SA T56 Engine and LRUs 6 32 31 31 31 -- 30 795 B01M SA T56 Engine and LRUs 1 3 3 3 3 -- 30 332 B01N SA Navy T56 20 81 36 38 38 -- 30 85 B01P SA Navy T56 6 26 12 12 12 -- 11 3 B01Q SA Navy T56 6 22 10 10 10 -- 30 29 B01R SA Navy T56 18 74 35 35 35 -- 21 113 B01S SA Navy T56 7 27 13 13 13 -- 15 29 B01T SA Navy T56 10 38 18 18 18 -- 31 21 B01U SA Navy T56 1 2 2 2 2 -- 30 18 B01V SA Navy T56 29 116 55 55 55 -- 31 26 B01W SA Navy T56 1 3 2 2 2 -- 30 33 B01X SA Navy T56 3 4 2 2 2 -- 28 18 B01Y SA Navy T56 33 134 83 83 83 -- 32 25 B01Z SA Navy T56 7 28 13 13 13 -- 12 28 B020 SA Navy T56 45 183 88 88 88 -- 12 11 B021 SA Navy T56 18 70 33 33 33 -- 13 20 B022 SA Navy T56 329 1,324 824 624 824 -- 8 10 B023 SA Navy T56 42 167 79 79 79 -- 18 81 B024 SA Navy T56 6 32 32 32 32 -- 30 5 B025 SA Navy T56 4 22 22 22 22 -- 30 2 B026 SA Navy T56 1 2 2 2 2 -- 30 4 BO27 SA Navy T56 2 9 9 9 9 -- 30 4 BO28 SA Navy T56 4 14 8 8 8 -- 28 4 B029 SA Navy T56 1 5 5 5 5 -- 30 4 B02A SA Navy T56 82 249 118 118 118 -- 18 24 B02B SA Navy T56 3 12 12 12 12 -- 30 9 B02C SA Navy T56 1 3 3 3 3 -- 30 6 B02D SA Navy T56 14 59 28 28 28 -- 5 8 B02E SA Navy T56 16 74 35 35 35 -- 8 11 B02F SA Navy T56 2 8 3 3 3 -- 3 7 B02G SA Navy T56 6 25 12 12 12 -- 30 7 B02H SA Navy T56 10 40 19 19 19 -- 30 18 B02J SA Navy T56 6 28 12 12 12 -- 30 7 B02K SA Navy T56 3 11 5 5 5 -- 30 7 B02L SA Navy T56 14 55 30 30 30 -- 30 81 B02M SA Navy T56 12 48 22 22 22 -- 30 81 B02N SA Navy T56 18 83 30 30 30 -- 30 78 B02P SA Navy T56 6 25 12 12 12 -- 30 81 B02Q SA Navy T56 9 38 17 17 17 -- 4 8 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.2199th Page of 414TOC1stPreviousNextBottomJust 99th
Confidential - Competition Sensitive Schedule A - ELIN Pricing Summary / Exhibit B [Enlarge/Download Table] ELIN Org FY04- FLOW [ ]CHECK Unit 0001 Unit Type Maintenance NOUN NSN FY99 FY00 FY01 FY02 FY13 DAYS FEEMS Hours ---------- ---- ---------------- ---- --- ----- ------ ------ ------ ------ ---- -------- -------- B02R SA Navy T56 [/\/\] [/\/\] 5 21 10 10 10 -- 8 5 B02S SA Navy T56 2 9 4 4 4 -- 30 5 B02T SA Navy T56 2 8 4 4 4 -- 30 9 B02U SA Navy T56 13 52 24 24 24 -- 30 6 B02V SA Navy T56 1 2 2 2 2 -- 30 7 B02W SA Navy T56 8 24 11 11 11 -- 30 9 B02X SA Navy T56 18 63 30 30 30 -- 30 9 B02Y SA Navy T56 12 50 24 24 24 -- 30 9 B02Z SA Navy T56 12 51 24 24 24 -- 30 9 B030 SA Navy T56 3 12 6 6 6 -- 6 7 B031 SA Navy T56 6 23 11 11 11 -- 30 6 B032 SA Navy T56 6 22 10 10 10 -- 30 8 B033 SA Navy T56 4 15 6 6 6 -- 30 8 B034 SA Navy T56 15 61 29 29 29 -- 30 6 B035 SA Navy T56 5 20 9 9 9 -- 5 8 B036 SA Navy T56 5 20 8 8 8 -- 5 9 B037 SA Navy T56 3 12 5 5 5 -- 30 8 B038 SA Navy T56 19 78 37 37 37 -- 10 8 B039 SA Navy T56 2 7 3 3 3 -- 4 6 B03A SA Navy T56 10 42 20 20 20 -- 30 13 B03B SA Navy T56 18 75 35 35 35 -- 5 6 B03C SA Navy T56 40 161 76 76 76 -- 30 6 B03D SA Navy T56 291 1,174 554 554 554 -- 30 3 B03E SA Navy T56 6 23 11 11 11 -- 30 6 B03F SA Navy T56 7 29 13 13 13 -- 30 26 B03G SA Navy T56 6 24 11 11 11 -- 7 10 B03H SA Navy T56 14 58 26 26 26 -- 30 68 B03J SA Navy T56 2 9 4 4 4 -- 30 68 B03K SA Navy T56 2 7 3 3 3 -- 30 68 ----- ------ ------ ------ ------ -------- 121 0 3,254 14,517 12,000 12,000 12,000 14,985.1 ----- ------ ------ ------ ------ -------- Cost Summary ------- 0001AA Transition Transition -- 0001AC Repair Ops T-56 F-100 TF-39 Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21100th Page of 414TOC1stPreviousNextBottomJust 100th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- -------- ------- --- ----- B001 [/\/\] $-- [/\/\] -- -- 688 418 -- [/\/\] B002 $-- -- -- 564,053 342,959 -- B003 $-- -- -- 11,354 6,904 -- B004 $-- -- -- 12,650 7,691 -- B005 $-- -- -- 29,310 17,821 -- B006 $-- -- -- 7,041 4,281 -- B007 $-- -- -- 12,948 7,873 -- B008 $-- -- -- 36,161 21,987 -- B009 $-- 6,80,800 -- 741,051 450,578 -- B00A $-- -- -- -- -- -- B00B $-- -- -- -- -- -- B00C $-- -- -- -- -- -- B00D $-- -- -- -- 4,244 2,581 -- B00E $-- -- -- -- 8,042 4,890 -- B00F $-- -- -- -- 66,122 40,204 -- B00G $-- -- -- -- 17,336 10,541 -- B00H $-- -- -- -- 77,295 46,997 -- B00J $-- -- -- -- 8,263 5,024 -- B00K $-- -- -- -- 9,517 5,787 -- B00L $-- -- -- -- 91,408 55,579 -- B00M $-- -- -- -- 11,413 6,939 -- B00N $-- -- -- -- 8,969 5,466 -- B00P $-- -- -- -- 5,531 3,363 -- B00Q $-- -- -- -- 4,603 2,799 -- B00R $-- -- -- -- 12,224 7,433 -- B00S $-- -- -- -- 6,597 4,011 -- B00T $-- -- -- -- 319 194 -- B00U $-- -- -- -- 3,808 2,316 -- B00V $-- -- -- -- 11,938 7,259 -- B00W $-- -- -- -- 8,570 5,211 -- B00X $-- -- -- -- 8,947 5,440 -- B00Y $-- -- -- -- 36,464 22,171 -- B00Z $-- -- -- -- 7,072 4,300 -- B010 $-- -- -- -- 5,500 3,344 -- B011 $-- -- -- -- 9,390 5,709 -- B012 $-- -- -- -- 5,800 3,527 -- B013 $-- -- -- -- 30,661 18,643 -- B014 $-- -- -- -- 1,762 1,072 -- B015 $-- -- -- -- 27,733 16,862 -- B016 $-- -- -- -- 12,291 7,473 -- BO17 $-- -- 9,200 -- 27,022 16,430 -- BO18 $-- -- 64,400 -- 189,147 115,006 -- B019 $-- -- 36,800 -- 108,083 65,717 -- B01A $-- -- 36,800 -- 108,083 65,717 -- B01B $-- -- 27,600 -- 81,063 49,289 -- B01C $-- -- -- -- 33,179 20,174 -- B01D $-- -- -- -- 4,353 2,647 -- B01E $-- -- 18,400 -- 54,042 32,859 -- B01F $-- -- -- -- 16,137 9,812 -- B01G $-- -- -- -- 2,177 1,324 -- B01H $-- -- 9,200 -- 34,464 20,955 -- B01J $-- -- -- -- 5,529 3,362 -- B01K $-- -- -- -- 1,089 662 -- B01L $-- -- -- -- 132,640 80,649 -- B01M $-- -- -- -- 6,933 4,215 -- B01N $-- -- -- -- 35,446 21,552 -- B01P $-- -- -- -- 315 191 -- B01Q $-- -- -- -- 3,673 2,233 -- B01R $-- -- -- -- 42,585 25,893 -- B01S $-- -- -- -- 4,284 2,605 -- B01T $-- -- -- -- 4,319 2,626 -- B01U $-- -- -- -- 371 226 -- B01V $-- -- -- -- 15,490 9,418 -- B01W $-- -- -- -- 688 418 -- B01X $-- -- -- -- 1,114 677 -- B01Y $-- -- -- -- 17,392 10,575 -- B01Z $-- -- -- -- 4,113 2,501 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21101st Page of 414TOC1stPreviousNextBottomJust 101st
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 1999 ------------------------------------ ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ----------- --------- ---------- ---------- -------- -------- ---------- --------- --------- --- ----- B020 [/\/\] $-- [/\/\] -- -- -- 10,395 8,320 -- [/\/\] B021 $-- -- -- -- 7,456 4,534 -- B022 $-- -- -- -- 69,373 42,181 -- B023 $-- -- -- -- 71,209 43,297 -- B024 $-- -- -- -- 576 350 -- B025 $-- -- -- -- 169 103 -- B026 $-- -- -- -- 77 47 -- B027 $-- -- -- -- 156 95 -- B028 $-- -- -- -- 311 189 -- B029 $-- -- -- -- 77 47 -- B02A $-- -- -- -- 31,164 18,849 -- B02B $-- -- -- -- 544 331 -- B02C $-- -- -- -- 115 70 -- B02D $-- -- -- -- 1,618 984 -- B02E $-- -- -- -- 4,046 2,460 -- B02F $-- -- -- -- 275 167 -- B02G $-- -- -- -- 824 501 -- B02H $-- -- -- -- 3,717 2,260 -- B02J $-- -- -- -- 824 501 -- B02K $-- -- -- -- 413 251 -- B02L $-- -- -- -- 23,787 14,463 -- B02M $-- -- -- -- 20,389 12,397 -- B02N $-- -- -- -- 25,941 15,773 -- B02P $-- -- -- -- 10,195 6,199 -- B02Q $-- -- -- -- 1,041 633 -- B02R $-- -- -- -- 905 550 -- B02S $-- -- -- -- 232 141 -- B02T $-- -- -- -- 363 221 -- B02U $-- -- -- -- 1,502 913 -- B02V $-- -- -- -- 138 84 -- B02W $-- -- -- -- 1,087 661 -- B02X $-- -- -- -- 2,897 1,761 -- B02Y $-- -- -- -- 2,271 1,381 -- B02Z $-- -- -- -- 2,173 1,321 -- B030 $-- -- -- -- 413 251 -- B031 $-- -- -- -- 747 454 -- B032 $-- -- -- -- 692 421 -- B033 $-- -- -- -- 724 440 -- B034 $-- -- -- -- 1,867 1,135 -- B035 $-- -- -- -- 947 576 -- BO36 $-- -- -- -- 905 550 -- BO37 $-- -- -- -- 544 331 -- B038 $-- -- -- -- 2,196 1,335 -- B039 $-- -- -- -- 232 141 -- B03A $-- -- -- -- 2,686 1,633 -- B03B $-- -- -- -- 2,079 1,264 -- B03C $-- -- -- -- 4,622 2,810 -- B03D $-- -- -- -- 17,207 10,462 -- B03E $-- -- -- -- 692 421 -- B03F $-- -- -- -- 3,861 2,347 -- B03G $-- -- -- -- 1,312 798 -- B03H $-- -- -- -- 19,891 12,094 -- B03J $-- -- -- -- 2,841 1,727 -- B03K $-- -- -- -- 2,841 1,727 -- --- --- -------- ---------- --------- --------- --- 121 -- -- 883,200 -- 3,214,387 1,954,432 -- --- --- -------- ---------- --------- --------- --- Cost Summary ------- 0001AA Transition -- -- -- 24,080,540 -- -- -- 0001AC Repair Ops T-56 -- -- 883,200 -- 3,214,387 1,954,432 -- F-100 TF-39 -- -- -- -- -- -- -- -- -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21102nd Page of 414TOC1stPreviousNextBottomJust 102nd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 1999 ------------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ------ --------- ---------- ---------- -------- -------- --- --------- --------- --- ----- Totals [/\/\] [/\/\] -- 883,200 -- 3,214,387 1,954,432 -- [/\/\] --- ------- --- --------- --------- --- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21103rd Page of 414TOC1stPreviousNextBottomJust 103rd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 2000 ----------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- B001 [/\/\] $-- [/\/\] -- -- 688 418 -- [/\/\] B002 $-- -- -- 2,250,681 1,368,473 -- B003 $-- -- -- 45,422 27,818 -- B004 $-- -- -- 54,288 33,007 -- B005 $-- -- -- 127,148 77,310 -- B006 $-- -- -- 29,410 17,882 -- B007 $-- -- -- 38,841 23,617 -- B008 $-- -- -- 144,645 87,948 -- B009 $-- 2,750,800 -- 2,994,249 1,820,582 -- B00A $-- -- -- -- -- -- B00B $-- -- -- -- -- -- B00C $-- -- -- -- -- -- B00D $-- -- -- -- 16,977 10,323 -- B00E $-- -- -- -- 34,180 20,782 -- B00F $-- -- -- -- 259,402 157,723 -- B00G $-- -- -- -- 72,366 44,001 -- B00H $-- -- -- -- 314,568 191,266 -- B00J $-- -- -- -- 35,415 21,533 -- B00K $-- -- -- -- 40,445 24,592 -- B00L $-- -- -- -- 365,633 222,315 -- B00M $-- -- -- -- 77,489 47,115 -- B00N $-- -- -- -- 37,083 22,547 -- B00P $-- -- -- -- 22,955 13,957 -- B00Q $-- -- -- -- 19,622 11,931 -- B00R $-- -- -- -- 51,464 31,291 -- B00S $-- -- -- -- 27,704 16,845 -- B00T $-- -- -- -- 10,545 6,412 -- B00U $-- -- -- -- 16,187 9,842 -- B00V $-- -- -- -- 47,753 29,035 -- B00W $-- -- -- -- 36,094 21,946 -- B00X $-- -- -- -- 37,383 22,730 -- B00Y $-- -- -- -- 157,480 95,752 -- B00Z $-- -- -- -- 29,546 17,964 -- B010 $-- -- -- -- 23,259 14,142 -- B011 $-- -- -- -- 38,904 23,655 -- B012 $-- -- -- -- 105,597 64,206 -- B013 $-- -- -- -- 128,174 77,933 -- B014 $-- -- -- -- 7,636 4,643 -- B015 $-- -- -- -- 116,474 70,819 -- B016 $-- -- -- -- 51,674 31,419 -- BO17 $-- -- 9,200 -- 27,022 16,430 -- BO18 $-- -- 230,000 -- 675,523 410,736 -- B019 $-- -- 138,000 -- 405,313 246,441 -- B01A $-- -- 138,000 -- 405,313 246,441 -- B01B $-- -- 184,000 -- 540,418 328,589 -- B01C $-- -- -- -- 138,248 84,059 -- B01D $-- -- -- -- 15,236 9,264 -- B01E $-- -- 82,800 -- 243,188 147,865 -- B01F $-- -- -- -- 48,412 29,436 -- B01G $-- -- -- -- 8,706 5,293 -- B01H $-- -- 46,000 -- 172,313 104,771 -- B01J $-- -- -- -- 27,641 16,807 -- B01K $-- -- -- -- 2,177 1,324 -- B01L $-- -- -- -- 530,559 322,594 -- B01M $-- -- -- -- 20,796 12,645 -- B01N $-- -- -- -- 143,556 87,286 -- B01P $-- -- -- -- 1,366 831 -- B01Q $-- -- -- -- 13,465 8,187 -- B01R $-- -- -- -- 175,075 106,450 -- B01S $-- -- -- -- 16,525 10,047 -- B01T $-- -- -- -- 16,410 9,978 -- B01U $-- -- -- -- 742 451 -- B01V $-- -- -- -- 61,961 37,674 -- B01W $-- -- -- -- 2,067 1,257 -- B01X $-- -- -- -- 1,467 904 -- B01Y $-- -- -- -- 70,625 42,942 -- B01Z $-- -- -- -- 16,448 10,001 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21104th Page of 414TOC1stPreviousNextBottomJust 104th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 2000 ------------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- B020 [/\/\] $-- [/\/\] -- -- -- 42,270 25,701 -- [/\/\] B021 $-- -- -- -- 28,995 17,630 -- B022 $-- -- -- -- 279,179 169,748 -- B023 $-- -- -- -- 283,137 172,155 -- B024 $-- -- -- -- 3,064 1,863 -- B025 $-- -- -- -- 926 563 -- B026 $-- -- -- -- 156 95 -- BO27 $-- -- -- -- 701 426 -- BO28 $-- -- -- -- 1,091 663 -- B029 $-- -- -- -- 390 237 -- B02A $-- -- -- -- 125,159 76,100 -- B02B $-- -- -- -- 2,173 1,321 -- B02C $-- -- -- -- 346 211 -- B02D $-- -- -- -- 6,818 4,146 -- B02E $-- -- -- -- 16,637 10,116 -- B02F $-- -- -- -- 824 501 -- B02G $-- -- -- -- 3,435 2,089 -- B02H $-- -- -- -- 14,865 9,038 -- B02J $-- -- -- -- 3,573 2,172 -- B02K $-- -- -- -- 1,512 919 -- B02L $-- -- -- -- 93,450 56,820 -- B02M $-- -- -- -- 81,556 49,588 -- B02N $-- -- -- -- 102,147 62,108 -- B02P $-- -- -- -- 42,477 25,827 -- B02Q $-- -- -- -- 4,159 2,529 -- B02R $-- -- -- -- 3,804 2,313 -- B02S $-- -- -- -- 1,401 633 -- B02T $-- -- -- -- 1,450 881 -- B02U $-- -- -- -- 6,009 3,654 -- B02V $-- -- -- -- 275 167 -- B02W $-- -- -- -- 4,347 2,643 -- B02X $-- -- -- -- 11,411 6,938 -- B02Y $-- -- -- -- 9,465 5,755 -- B02Z $-- -- -- -- 9,237 5,617 -- B030 $-- -- -- -- 1,650 1,003 -- B031 $-- -- -- -- 2,862 1,740 -- B032 $-- -- -- -- 2,542 1,546 -- B033 $-- -- -- -- 2,718 1,652 -- B034 $-- -- -- -- 7,590 4,615 -- B035 $-- -- -- -- 3,785 2,302 -- B036 $-- -- -- -- 3,623 2,203 -- BO37 $-- -- -- -- 2,173 1,321 -- BO38 $-- -- -- -- 9,012 5,480 -- B039 $-- -- -- -- 809 492 -- B03A $-- -- -- -- 11,279 6,858 -- B03B $-- -- -- -- 8,666 5,269 -- B03C $-- -- -- -- 18,604 11,312 -- B03D $-- -- -- -- 69,417 42,207 -- B03E $-- -- -- -- 2,657 1,616 -- B03F $-- -- -- -- 15,991 9,723 -- B03G $-- -- -- -- 5,245 3,189 -- B03H $-- -- -- -- 82,407 50,105 -- B03J $-- -- -- -- 12,787 7,775 -- B03K $-- -- -- -- 9,947 6,048 -- --- --- --------- --- ---------- --------- --- 121 -- -- 3,578,800 -- 13,107,816 7,969,898 -- --- --- --------- --- ---------- --------- --- Cost Summary ------- 0001AA Transition 0001AC Repair Ops T-56 -- -- 3,578,800 -- 13,107,816 7,969,898 -- F-100 TF-39 -- -- -- -- -- -- -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21105th Page of 414TOC1stPreviousNextBottomJust 105th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A-ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 2000 ------------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ------ --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- Totals [/\/\] -- [/\/\] -- 3,578,800 -- 13,107,818 7,969,898 -- [/\/\] --- --------- --- ---------- --------- --- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21106th Page of 414TOC1stPreviousNextBottomJust 106th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A-ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 1999 ------------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ------ --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- B001 [/\/\] $-- [/\/\] -- -- 688 415 -- [/\/\] B002 $-- -- -- 564,053 342,959 -- B003 $-- -- -- 11,354 6,904 -- B004 $-- -- -- 12,650 7,891 -- B005 $-- -- -- 29,310 17,821 -- B006 $-- -- -- 7,041 4,281 -- B007 $-- -- -- 12,948 7,673 -- B008 $-- -- -- 36,161 21,987 -- B009 $-- 680,800 -- 741,051 450,578 -- B00A $-- -- -- -- -- -- B00B $-- -- -- -- -- -- B00C $-- -- -- -- -- -- B00D $-- -- -- -- 4,244 2,581 -- B00E $-- -- -- -- 8,042 4,890 -- B00F $-- -- -- -- 66,122 40,204 -- B00G $-- -- -- -- 17,336 10,541 -- B00H $-- -- -- -- 77,295 46,897 -- B00J $-- -- -- -- 8,263 5,024 -- B00K $-- -- -- -- 9,517 5,787 -- B00L $-- -- -- -- 91,408 55,579 -- B00M $-- -- -- -- 11,413 6,939 -- B00N $-- -- -- -- 8,989 5,466 -- B00P $-- -- -- -- 5,531 3,363 -- B00Q $-- -- -- -- 4,603 2,799 -- B00R $-- -- -- -- 12,224 7,433 -- B00S $-- -- -- -- 6,597 4,011 -- B00T $-- -- -- -- 319 194 -- B00U $-- -- -- -- 3,808 2,316 -- B00V $-- -- -- -- 11,938 7,259 -- B00W $-- -- -- -- 8,570 5,211 -- B00X $-- -- -- -- 8,947 5,440 -- B00Y $-- -- -- -- 36,464 22,171 -- B00Z $-- -- -- -- 7,072 4,300 -- B010 $-- -- -- 5,500 3,344 -- B011 $-- -- -- 9,390 5,709 -- B012 $-- -- -- 5,800 3,527 -- B013 $-- -- -- 30,661 18,643 -- B014 $-- -- -- 1,762 1,072 -- B015 $-- -- -- 27,733 16,862 -- B016 $-- -- -- 12,291 7,473 -- B017 $-- 9,200 -- 27,022 16,430 -- B018 $-- 64,400 -- 189,147 115,006 -- B019 $-- 36,800 -- 108,083 65,717 -- B01A $-- 36,800 -- 108,083 65,717 -- B01B $-- 27,600 -- 81,063 49,289 -- B01C $-- -- -- 33,179 20,174 -- B01D $-- -- -- 4,353 2,647 -- B01E $-- 18,400 -- 54,042 32,859 -- B01F $-- -- -- 16,137 9,812 -- B01G $-- -- -- 2,177 1,324 -- B01H $-- 9,200 -- 34,464 20,955 -- B01J $-- -- -- 5,529 3,362 -- B01K $-- -- -- 1,089 662 -- B01L $-- -- -- 132,640 80,649 -- B01M $-- -- -- 6,933 4,215 -- B01N $-- -- -- 35,446 21,552 -- B01P $-- -- -- 315 191 -- B01Q $-- -- -- 3,673 2,233 -- B01R $-- -- -- 42,585 25,893 -- B01S $-- -- -- 4,284 2,605 -- B01T $-- -- -- 4,319 2,626 -- B01U $-- -- -- 371 226 -- B01V $-- -- -- 15,490 9,418 -- B01W $-- -- -- 655 418 -- B01X $-- -- -- 1,114 677 -- B01Y $-- -- -- 17,392 10,575 -- B01Z $-- -- -- 4,113 2,501 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21107th Page of 414TOC1stPreviousNextBottomJust 107th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A-ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 1999 ----------------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---------- --------- ---------- ---------- -------- -------- ---------- --------- --------- --- ----- B020 [/\/\] $-- [/\/\] -- -- -- 10,395 6,320 -- [/\/\] B021 $-- -- -- -- 7,458 4,534 -- B022 $-- -- -- -- 69,373 42,181 -- B023 $-- -- -- -- 71,209 43,297 -- B024 $-- -- -- 576 350 -- B025 $-- -- -- 169 103 -- B026 $-- -- -- 77 47 -- B027 $-- -- -- -- 156 95 -- B028 $-- -- -- -- 311 189 -- B029 $-- -- -- -- 77 47 -- B02A $-- -- -- -- 31,164 18,949 -- B02B $-- -- -- -- 544 331 -- B02C $-- -- -- -- 115 70 -- B02D $-- -- -- -- 1,618 984 -- B02E $-- -- -- -- 4,046 2,460 -- B02F $-- -- -- -- 275 167 -- B02G $-- -- -- -- 824 501 -- B02H $-- -- -- -- 3,717 2,260 -- B02J $-- -- -- -- 824 501 -- B02K $-- -- -- -- 413 251 -- B02L $-- -- -- -- 23,787 14,463 -- B02M $-- -- -- -- 20,389 12,397 -- B02N $-- -- -- -- 25,941 15,773 -- B02P $-- -- -- -- 10,195 6,199 -- B02Q $-- -- -- -- 1,041 633 -- B02R $-- -- -- -- 905 550 -- B02S $-- -- -- -- 232 141 -- B02T $-- -- -- -- 363 221 -- B02U $-- -- -- -- 1,502 913 -- B02V $-- -- -- -- 138 84 -- B02W $-- -- -- -- 1,087 661 -- B02X $-- -- -- -- 2,897 1,761 -- B02Y $-- -- -- -- 2,271 1,381 -- B02Z $-- -- -- -- 2,173 1,321 -- B030 $-- -- -- -- 413 251 -- B031 $-- -- -- -- 747 454 -- B032 $-- -- -- -- 692 421 -- B033 $-- -- -- -- 724 440 -- B034 $-- -- -- -- 1,867 1,135 -- B035 $-- -- -- -- 947 576 -- B036 $-- -- -- -- 905 550 -- B037 $-- -- -- -- 544 331 -- B038 $-- -- -- -- 2,196 1,335 -- B039 $-- -- -- -- 232 141 -- B03A $-- -- -- -- 2,686 1,633 -- B03B $-- -- -- -- 2,079 1,264 -- B03C $-- -- -- -- 4,622 2,810 -- B03D $-- -- -- -- 17,207 10,462 -- B03E $-- -- -- -- 692 421 -- B03F $-- -- -- -- 3,861 2,347 -- B03G $-- -- -- -- 1,312 798 -- B03H $-- -- -- -- 19,891 12,094 -- B03J $-- -- -- -- 2,841 1,727 -- B03K $-- -- -- -- 2,841 1,727 -- --- --- ------- ---------- --------- --------- --- 121 -- -- 883,200 -- 3,214,387 1,954,432 -- --- --- ------- ---------- --------- --------- --- Cost Summary ------- 0001AA Transition -- -- 24,080,540 -- -- -- 0001AC Repair Ops T-56 -- -- 883,200 -- 3,214,387 1,954,432 -- F-100 TF-39 -- -- -- -- -- -- -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21108th Page of 414TOC1stPreviousNextBottomJust 108th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY 2001 ------------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ------ --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- Totals [/\/\] -- [/\/\] -- 3,588,000 -- 12,065,493 7,336,138 -- [/\/\] === ========= === ========== ========= === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21109th Page of 414TOC1stPreviousNextBottomJust 109th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit B [Enlarge/Download Table] FY 2002 ----------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- B001 [/\/\] $-- [/\/\] -- -- 688 418 -- [/\/\] B002 $-- -- -- 2,250,681 1,368,473 -- B003 $-- -- -- 48,260 29,343 -- B004 $-- -- -- 57,446 34,930 -- B005 $-- -- -- 134,529 81,797 -- B006 $-- -- -- 31,066 18,889 -- B007 $-- -- -- 45,315 27,553 -- B008 $-- -- -- 156,698 95,276 -- B009 $-- 2,750,800 -- 2,994,249 1,820,582 -- B00A $-- -- -- -- -- -- B00B $-- -- -- -- -- -- B00C $-- -- -- -- -- -- B00D $-- -- -- -- 18,189 11,059 -- B00E $-- -- -- -- 35,688 21,699 -- B00F $-- -- -- -- 259,402 157,723 -- B00G $-- -- -- -- 76,802 46,698 -- B00H $-- -- -- -- 312,770 190,173 -- B00J $-- -- -- -- 37,185 22,610 -- B00K $-- -- -- -- 42,825 26,039 -- B00L $-- -- -- -- 364,545 221,653 -- B00M $-- -- -- -- 82,092 49,914 -- B00N $-- -- -- -- 39,331 23,915 -- B00P $-- -- -- -- 24,338 14,798 -- B00Q $-- -- -- -- 20,592 12,520 -- B00R $-- -- -- -- 54,659 33,234 -- B00S $-- -- -- -- 29,425 17,891 -- B00T $-- -- -- -- 15,657 9,520 -- B00U $-- -- -- -- 17,138 10,420 -- B00V $-- -- -- -- 47,753 29,035 -- B00W $-- -- -- -- 38,345 23,315 -- B00X $-- -- -- -- 39,621 24,091 -- B00Y $-- -- -- -- 78,838 47,936 -- B00Z $-- -- -- -- 31,275 19,016 -- B010 $-- -- -- -- 24,673 15,002 -- B011 $-- -- -- -- 41,140 25,014 -- B012 $-- -- -- -- 130,006 79,047 -- B013 $-- -- -- -- 136,217 82,823 -- B014 $-- -- -- -- 8,224 5,000 -- B015 $-- -- -- -- 123,605 75,155 -- B016 $-- -- -- -- 54,790 33,314 -- B017 $-- -- 9,200 -- 27,022 16,430 -- B018 $-- -- 220,800 -- 648,502 394,306 -- B019 $-- -- 138,000 -- 405,313 246,441 -- B01A $-- -- 138,000 -- 405,313 246,441 -- B01B $-- -- 156,400 -- 459,355 279,300 -- B01C $-- -- -- -- 99,538 60,522 -- B01D $-- -- -- -- 11,970 7,278 -- B01E $-- -- 128,800 -- 378,293 230,012 -- B01F $-- -- -- -- 43,033 26,165 -- B01G $-- -- -- -- 6,530 3,971 -- B01H $-- -- 46,000 -- 172,313 104,771 -- B01J $-- -- -- -- 22,114 13,446 -- B01K $-- -- -- -- 2,177 1,324 -- B01L $-- -- -- -- 513,980 312,514 -- B01M $-- -- -- -- 20,796 12,645 -- B01N $-- -- -- -- 67,348 40,949 -- B01P $-- -- -- -- 630 383 -- B01Q $-- -- -- -- 6,119 3,721 -- B01R $-- -- -- -- 82,805 50,348 -- B01S $-- -- -- -- 7,957 4,838 -- B01T $-- -- -- -- 7,773 4,726 -- B01U $-- -- -- -- 742 451 -- B01V $-- -- -- -- 29,379 17,863 -- B01W $-- -- -- -- 1,379 838 -- B01X $-- -- -- -- 742 451 -- B01Y $-- -- -- -- 33,204 20,189 -- B01Z $-- -- -- -- 7,636 4,643 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21110th Page of 414TOC1stPreviousNextBottomJust 110th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit B [Enlarge/Download Table] FY 2002 ----------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- B020 [/\/\] $-- [/\/\] -- -- -- 19,866 12,079 -- [/\/\] B021 $-- -- -- -- 13,889 8,311 -- B022 $-- -- -- -- 131,576 80,002 -- B023 $-- -- -- -- 133,939 81,439 -- B024 $-- -- -- -- 3,064 1,863 -- B025 $-- -- -- -- 926 563 -- B026 $-- -- -- -- 156 95 -- B027 $-- -- -- -- 701 426 -- B028 $-- -- -- -- 467 284 -- B029 $-- -- -- -- 390 237 -- B02A $-- -- -- -- 59,312 36,063 -- B02B $-- -- -- -- 2,173 1,321 -- B02C $-- -- -- -- 346 211 -- B02D $-- -- -- -- 3,235 1,967 -- B02E $-- -- -- -- 7,869 4,785 -- B02F $-- -- -- -- 413 251 -- B02G $-- -- -- -- 1,650 1,003 -- B02H $-- -- -- -- 7,060 4,283 -- B02J $-- -- -- -- 1,650 1,003 -- B02K $-- -- -- -- 686 417 -- B02L $-- -- -- -- 50,974 30,993 -- B02M $-- -- -- -- 37,379 22,728 -- B02N $-- -- -- -- 48,642 29,576 -- B02P $-- -- -- -- 20,389 12,397 -- B02Q $-- -- -- -- 1,965 1,195 -- B02R $-- -- -- -- 1,810 1,101 -- B02S $-- -- -- -- 463 282 -- B02T $-- -- -- -- 724 440 -- B02U $-- -- -- -- 2,774 1,687 -- B02V $-- -- -- -- 275 167 -- B02W $-- -- -- -- 1,992 1,211 -- B02X $-- -- -- -- 5,433 3,304 -- B02Y $-- -- -- -- 4,543 2,762 -- B02Z $-- -- -- -- 4,347 2,643 -- B030 $-- -- -- -- 824 501 -- B031 $-- -- -- -- 1,368 832 -- B032 $-- -- -- -- 1,155 703 -- B033 $-- -- -- -- 1,087 661 -- B034 $-- -- -- -- 3,608 2,194 -- B035 $-- -- -- -- 1,704 1,036 -- B036 $-- -- -- -- 1,631 992 -- B037 $-- -- -- -- 1,087 661 -- B038 $-- -- -- -- 4,276 2,600 -- B039 $-- -- -- -- 348 211 -- B03A $-- -- -- -- 5,371 3,265 -- B03B $-- -- -- -- 4,044 2,459 -- B03C $-- -- -- -- 8,781 5,339 -- B03D $-- -- -- -- 32,757 19,917 -- B03E $-- -- -- -- 1,270 772 -- B03F $-- -- -- -- 7,168 4,359 -- B03G $-- -- -- -- 2,405 1,462 -- B03H $-- -- -- -- 39,782 24,188 -- B03J $-- -- -- -- 5,683 3,456 -- B03K $-- -- -- -- 4,263 2,592 -- --- --- --------- --- ---------- --------- --- 1 -- -- 3,588,000 -- 12,065,493 7,336,138 -- --- --- --------- --- ---------- --------- --- Cost Summary ------- 0001AA Transition 0001AC Repair Ops T-56 -- -- 3,588,000 -- 12,065,493 7,336,138 -- F-100 TF-39 -- -- -- -- -- -- -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21111th Page of 414TOC1stPreviousNextBottomJust 111th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit B [Enlarge/Download Table] FY 2002 ------------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ------ --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21112th Page of 414TOC1stPreviousNextBottomJust 112th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41808-96-R-0084 Schedule A- ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY2003 ----------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead Q&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- B001 [/\/\] $-- [/\/\] -- -- 688 418 -- [/\/\] B002 $-- -- -- 2,250,681 1,368,473 -- B003 $-- -- -- 48,260 29,343 -- B004 $-- -- -- 57,448 34,930 -- B005 $-- -- -- 134,529 81,797 -- B006 $-- -- -- 31,066 18,889 -- B007 $-- -- -- 45,315 27,553 -- B008 $-- -- -- 156,698 95,276 -- B009 $-- 2,750,800 -- 2,994,249 1,820,582 -- B00A $-- -- -- -- -- -- B00B $-- -- -- -- -- -- B00C $-- -- -- -- -- -- B00D $-- -- -- -- 18,189 11,059 -- B00E $-- -- -- -- 35,688 21,699 -- B00F $-- -- -- -- 259,402 157,723 -- B00G $-- -- -- -- 76,802 46,698 -- B00H $-- -- -- -- 312,770 190,173 -- B00J $-- -- -- -- 37,185 22,610 -- B00K $-- -- -- -- 42,825 26,039 -- B00L $-- -- -- -- 364,545 221,653 -- B00M $-- -- -- -- 82,092 49,914 -- B00N $-- -- -- -- 39,331 23,315 -- B00P $-- -- -- -- 24,338 14,798 -- B00Q $-- -- -- -- 20,592 12,520 -- B00R $-- -- -- -- 54,659 33,234 -- B00S $-- -- -- -- 29,425 17,891 -- B00T $-- -- -- -- 15,657 9,520 -- B00U $-- -- -- -- 17,138 10,420 -- B00V $-- -- -- -- 47,753 28,035 -- B00W $-- -- -- -- 38,345 23,915 -- B00X $-- -- -- -- 39,621 24,091 -- B00Y $-- -- -- -- 78,838 47,936 -- B00Z $-- -- -- -- 31,275 19,016 -- B010 $-- -- -- -- 24,673 15,002 -- B011 $-- -- -- -- 41,140 25,014 -- B012 $-- -- -- -- 130,006 79,047 -- B013 $-- -- -- -- 136,217 82,823 -- B014 $-- -- -- -- 8,224 5,000 -- B015 $-- -- -- -- 123,605 75,155 -- B016 $-- -- -- -- 54,790 33,314 -- B017 $-- -- 9,200 -- 27,022 16,430 -- B018 $-- -- 220,800 -- 648,502 394,306 -- B019 $-- -- 138,000 -- 405,313 246,441 -- B01A $-- -- 138,000 -- 405,313 246,441 -- B01B $-- -- 156,400 -- 459,355 279,300 -- B01C $-- -- -- -- 99,538 60,522 -- B01D $-- -- -- -- 11,970 7,278 -- B01E $-- -- 128,800 -- 378,293 230,012 -- B01F $-- -- -- -- 43,033 26,165 -- B01G $-- -- -- -- 6,530 3,971 -- B01H $-- -- 46,000 -- 172,313 104,771 -- B01J $-- -- -- -- 22,114 13,446 -- B01K $-- -- -- -- 2,177 1,324 -- B01L $-- -- -- -- 513,980 312,514 -- B01M $-- -- -- -- 20,796 12,645 -- B01N $-- -- -- -- 67,348 40,949 -- B01P $-- -- -- -- 630 383 -- B01Q $-- -- -- -- 6,119 3,721 -- B01R $-- -- -- -- 82,805 50,348 -- B01S $-- -- -- -- 7,957 4,838 -- B01T $-- -- -- -- 7,773 4,726 -- B01U $-- -- -- -- 742 451 -- B01V $-- -- -- -- 29,379 17,863 -- B01W $-- -- -- -- 1,379 838 -- B01X $-- -- -- -- 742 451 -- B01Y $-- -- -- -- 33,204 20,189 -- B01Z $-- -- -- -- 7,636 4,643 -- B020 $-- -- -- -- 19,869 12,079 -- B021 $-- -- -- -- 13,869 8,311 -- B022 $-- -- -- -- 131,576 80,002 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21113th Page of 414TOC1stPreviousNextBottomJust 113th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] FY2003 ----------------------------------- ELIN Direct Direct Direct Direct Total 0001 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead Q&A COM Price ---------- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- B023 [/\/\] $-- [/\/\] -- -- -- 133,939 81,438 -- [/\/\] B024 $-- -- -- -- 3,064 1,863 -- B025 $-- -- -- -- 926 563 -- B026 $-- -- -- -- 156 95 -- B027 $-- -- -- -- 701 426 -- B028 $-- -- -- -- 467 284 -- B029 $-- -- -- -- 390 237 -- B02A $-- -- -- -- 59,312 36,063 -- B02B $-- -- -- -- 2,173 1,321 -- B02C $-- -- -- -- 346 211 -- B02D $-- -- -- -- 3,235 1,987 -- B02E $-- -- -- -- 7,869 4,785 -- B02F $-- -- -- -- 413 251 -- B02G $-- -- -- -- 1,650 1,003 -- B02H $-- -- -- -- 7,060 4,293 -- B02J $-- -- -- -- 1,650 1,003 -- B02K $-- -- -- -- 686 417 -- B02L $-- -- -- -- 50,974 30,993 -- B02M $-- -- -- -- 37,379 22,728 -- B02N $-- -- -- -- 48,642 29,576 -- B02P $-- -- -- -- 20,389 12,397 -- B02Q $-- -- -- -- 1,965 1,195 -- B02R $-- -- -- -- 1,810 1,101 -- B02S $-- -- -- -- 463 282 -- B02T $-- -- -- -- 724 440 -- B02U $-- -- -- -- 2,774 1,687 -- B02V $-- -- -- -- 275 187 -- B02W $-- -- -- -- 1,992 1,211 -- B02X $-- -- -- -- 5,433 3,304 -- B02Y $-- -- -- -- 4,543 2,762 -- B02Z $-- -- -- -- 4,347 2,643 -- B030 $-- -- -- -- 824 501 -- B031 $-- -- -- -- 1,368 832 -- B032 $-- -- -- -- 1,155 703 -- B033 $-- -- -- -- 1,087 681 -- B034 $-- -- -- -- 3,608 2,194 -- B035 $-- -- -- -- 1,704 1,036 -- B036 $-- -- -- -- 1,631 992 -- B037 $-- -- -- -- 1,087 661 -- B038 $-- -- -- -- 4,276 2,600 -- B039 $-- -- -- -- 346 211 -- B03A $-- -- -- -- 5,371 3,265 -- B03B $-- -- -- -- 4,044 2,459 -- B03C $-- -- -- -- 8,781 5,339 -- B03D $-- -- -- -- 32,757 19,917 -- B03E $-- -- -- -- 1,270 772 -- B03F $-- -- -- -- 7,168 4,359 -- B03G $-- -- -- -- 2,405 1,462 -- B03H $-- -- -- -- 39,782 24,188 -- B03J $-- -- -- -- 5,683 3,456 -- B03K $-- -- -- -- 4,263 2,592 -- --- --- --------- --- ---------- --------- --- 121 -- -- 3,588,000 -- 12,065,493 7,336,138 -- --- --- --------- --- ---------- --------- --- Cost Summary ------- 0001AA Transition 0001AC Repair Ops T-56 F-100 TF-39 Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21114th Page of 414TOC1stPreviousNextBottomJust 114th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary/Exhibit B [Download Table] ELIN 0001 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- ------- ------- ------- ------- ------- B001 B001 [/\/\] [/\/\] 2,255 2,343 2,255 2,255 2,255 B002 B002 18,098 16,804 18,098 18,098 18,098 B003 B003 4,645 4,827 4,645 4,645 4,645 B004 B004 1,725 1,792 1,725 1,725 1,725 B005 B005 690 717 690 690 690 B006 B006 1,356 1,409 1,356 1,356 1,356 B007 B007 21,187 22,013 21,187 21,187 21,187 B008 B008 19,725 20,494 19,725 19,725 19,725 B009 B009 43,069 44,749 43,069 43,069 43,069 B00A B00A -- -- -- -- -- B00B B00B -- -- -- -- -- B00C B00C -- -- -- -- -- B00D B00D 992 1,031 992 992 992 B00E B00E 1,645 1,709 1,645 1,645 1,645 B00F B00F 5,549 5,765 5,549 5,549 5,549 B00G B00G 660 685 660 660 660 B00H B00H 5,883 6,112 5,883 5,883 5,883 B00J B00J 1,932 2,007 1,932 1,932 1,932 B00K B00K 708 735 708 708 708 B00L B00L 3,561 3,700 3,561 3,561 3,561 B00M B00M 602 626 602 602 602 B00N B00N 1,226 1,274 1,226 1,226 1,226 B00P B00P 905 940 905 905 905 B00Q B00Q 793 824 793 793 793 B00R B00R 227 236 227 227 227 B00S B00S 188 195 188 188 188 B00T B00T 1,046 1,087 1,046 1,046 1,046 B00U B00U 623 648 623 623 623 B00V B00V 1,447 1,504 1,447 1,447 1,447 B00W B00W 283 294 283 283 283 B00X B00X 1,046 1,087 1,046 1,046 1,046 B00Y B00Y 645 670 645 645 645 B00Z B00Z 514 534 514 514 514 B010 B010 514 534 514 514 514 B011 B011 1,463 1,521 1,463 1,463 1,463 B012 B012 283 294 283 283 283 B013 B013 1,645 1,709 1,645 1,645 1,645 B014 B014 1,923 1,998 1,823 1,923 1,923 B015 B015 2,593 2,694 2,593 2,593 2,593 B016 B016 283 294 283 283 283 B017 B017 98,728 102,579 98,728 98,728 98,728 B018 B018 98,728 102,579 98,728 98,728 98,728 B019 B019 98,728 102,579 98,728 98,728 98,728 B01A B01A 98,728 102,579 98,728 98,728 98,728 B01B B01B 98,728 102,579 98,728 98,728 98,728 B01C B01C 18,098 18,804 18,098 18,098 18,098 B01D B01D 3,561 3,700 3,561 3,561 3,561 B01E B01E 98,728 102,579 98,728 98,728 98,728 B01F B01F 17,605 18,291 17,605 17,605 17,605 B01G B01G 3,561 3,700 3,561 3,561 3,561 B01H B01H 123,083 127,883 123,083 123,083 123,083 B01J B01J 18,093 18,799 18,093 18,093 18,093 B01K B01K 3,561 3,700 3,561 3,561 3,561 B01L B01L 54,263 56,379 54,263 54,263 54,263 B01M B01M 22,686 23,571 22,686 22,686 22,686 B01N B01N 5,800 6,027 5,800 5,800 5,800 B01P B01P 172 179 172 172 172 B01Q B01Q 2,003 2,081 2,003 2,003 2,003 B01R B01R 7,743 8,045 7,743 7,743 7,743 B01S B01S 2,003 2,081 2,003 2,003 2,003 B01T B01T 1,413 1,468 1,413 1,413 1,413 B01U B01U 1,216 1,264 1,216 1,216 1,216 B01V B01V 1,748 1,816 1,748 1,748 1,748 B01W B01W 2,256 2,344 2,256 2,256 2,256 B01X B01X 1,216 1,264 1,216 1,216 1,216 B01Y B01Y 1,725 1,792 1,725 1,725 1,725 B01Z B01Z 1,923 1,998 1,923 1,923 1,923 B020 B020 756 785 756 756 756 B021 B021 1,356 1,409 1,356 1,356 1,356 B022 B022 690 717 690 690 690 B023 B023 5,549 5,765 5,549 5,549 5,549 B024 B024 313 326 313 313 313 B025 B025 138 143 138 138 138 B026 B026 255 265 255 255 255 B027 B027 255 265 255 255 255 B028 B028 255 265 255 255 255 B029 B029 255 265 255 255 255 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21115th Page of 414TOC1stPreviousNextBottomJust 115th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary/Exhibit B [Enlarge/Download Table] ELIN 0001 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---------- ---- ---- --- --------- --------- --------- --------- --------- BO2A BO2A [/\/\] [/\/\] 1,645 1,709 1,645 1,645 1,645 BO2B BO2B 593 618 593 593 593 BO2C BO2C 378 393 378 378 376 BO2D BO2D 378 393 378 378 378 BO2E BO2E 736 765 736 736 736 BO2F BO2F 450 467 450 450 450 BO2G BO2G 450 467 450 450 450 BO2H BO2H 1,216 1,264 1,216 1,216 1,216 BO2J BO2J 450 467 450 450 450 BO2K BO2K 450 467 450 450 450 BO2L BO2L 5,561 5,778 5,561 5,561 5,561 BO2M BO2M 5,561 5,778 5,561 5,561 5,561 BO2N BO2N 5,306 5,513 5,306 5,306 5,306 BO2P BO2P 5,561 5,778 5,561 5,561 5,561 BO2Q BO2Q 378 393 378 378 378 BO2R BO2R 593 616 593 593 593 BO2S BO2S 378 393 378 378 378 BO2T BO2T 593 616 593 593 593 BO2U BO2U 378 393 378 378 378 BO2V BO2V 450 467 450 450 450 BO2W BO2W 593 616 593 593 593 BO2X BO2X 593 616 593 593 593 BO2Y BO2Y 619 644 619 619 619 BO2Z BO2Z 593 616 593 593 593 BO30 BO30 450 457 450 450 450 BO31 BO31 407 423 407 407 407 BO32 BO32 378 393 378 378 378 BO33 BO33 593 516 593 593 593 BO34 BO34 407 423 407 407 407 BO35 BO35 619 644 619 619 619 BO36 BO36 593 616 593 593 593 BO37 BO37 593 616 593 593 593 BO38 BO38 378 393 378 378 378 BO39 BO39 378 393 378 378 378 BO3A BO3A 879 913 879 879 879 BO3B BO3B 378 393 378 378 378 BO3C BO3C 378 393 378 378 378 BO3D BO3D 194 201 194 194 194 BO3E BO3E 378 393 378 378 378 BO3F BO3F 1,805 1,875 1,805 1,805 1,805 BO3G BO3G 715 743 715 715 715 BO3H BO3H 4,650 4,831 4,650 4,650 4,650 BO3J BO3J 4,650 4,831 4,650 4,650 4,650 BO3K BO3K 4,650 4,831 4,650 4,650 4,650 --------- --------- --------- --------- --------- 121 1,105,226 1,148,330 1,105,226 1,105,226 1,105,226 --------- --------- --------- --------- --------- Cost Summary ------- 0001AA Transition 0001AC Repair Ops T-56 F-100 TF-39 Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21116th Page of 414TOC1stPreviousNextBottomJust 116th
Confidential Competitive-Sensitive Schedule A- ELIN Pricing Summary/Exibit C [Enlarge/Download Table] KLIN ORG FY 04- FLOW [ ]Check Unit 0002 UNIT TYPE MAINTENANCE NOUN NSN FY99 FY00 FY01 FY02 FY 03 FY13 DAYS FEEMS Hours ---- ---- ------------------- ---- --- ---- ----- ----- ----- ----- ------ ---- -------- ----- C001 SA T56 Engine and LRUs [/\/\] [/\/\] 1 1 1 1 1 -- 16 33 C002 SA T56 Engine and LRUs 102 407 407 407 407 -- 26 X 265 C003 SA T56 Engine and LRUs 8 32 34 34 34 -- 30 68 C004 SA T56 Engine and LRUs 24 103 100 100 100 -- 32 25 C005 SA T56 Engine and LRUs 139 803 638 638 638 -- 6 X 10 C006 SA T56 Engine and LRUs 17 71 75 75 75 -- 13 20 C007 SA T56 Engine and LRUs 2 6 7 7 7 -- 25 X 310 C008 SA T56 Engine and LRUs 6 24 26 26 26 -- 25 X 280 C009 SA T56 Engine and LRUs 74 299 299 299 299 -- 26 X 460 C00A SA T56 Engine and LRUs 0 0 0 0 0 -- C00B SA T56 Engine and LRUs 0 0 0 0 0 -- C00C SA T56 Engine and LRUs 0 0 0 0 0 -- C00D SA T56 Engine and LRUs 14 58 80 80 80 -- 12 X 15 C00E SA T56 Engine and LRUs 16 88 71 71 71 -- 16 24 C00F SA T56 Engine and LRUs 30 153 153 153 153 -- 16 X 81 C00G SA T56 Engine and LRUs 88 359 381 381 381 -- 8 X 10 C00H SA T56 Engine and LRUs 43 175 174 174 174 -- 18 X 56 C00J SA T56 Engine and LRUs 14 60 63 63 63 -- 25 26 C00K SA T56 Engine and LRUs 44 187 198 198 198 -- 7 10 C00L SA T56 Engine and LRUs 84 336 335 335 335 -- 11 X 52 C00M SA T56 Engine and LRUs 82 421 446 446 446 -- 5 X 9 C00N SA T56 Engine and LRUs 24 88 105 105 105 -- 12 X 18 C00P SA T56 Engine and LRUs 20 83 88 88 88 -- 8 X 13 C00Q SA T56 Engine and LRUs 18 81 85 85 85 -- 10 X 12 C00R SA T56 Engine and LRUs 176 741 787 787 787 -- 8 3 C00S SA T56 Engine and LRUs 115 483 513 513 513 -- 7 3 C00T SA T56 Engine and LRUs 1 33 49 49 49 -- 7 15 C00U SA T56 Engine and LRUs 20 85 90 90 90 -- 9 9 C00V SA T56 Engine and LRUs 27 108 108 108 108 -- 15 21 C00W SA T56 Engine and LRUs 89 417 443 443 443 -- 7 4 C00X SA T56 Engine and LRUs 28 117 124 124 124 -- 7 15 C00Y SA T56 Engine and LRUs 185 790 400 400 400 -- 12 9 C00Z SA T56 Engine and LRUs 45 188 199 199 199 -- 11 X 8 C010 SA T56 Engine and LRUs 35 148 157 157 157 -- 9 X 8 C011 SA T56 Engine and LRUs 21 87 92 92 92 -- 11 21 C012 SA T56 Engine and LRUs 67 1,220 1,502 1,502 1,502 -- 5 4 C013 SA T56 Engine and LRUs 81 255 271 271 271 -- 13 24 C014 SA T56 Engine and LRUs 3 13 14 14 14 -- 12 28 C015 SA T56 Engine and LRUs 35 147 158 158 158 -- 25 36 C016 SA T56 Engine and LRUs 142 597 833 833 833 -- 7 4 C017 SA T56 Engine and LRUs 1 1 1 1 1 -- 37 1,296 C018 SA T56 Engine and LRUs 7 25 24 24 24 -- 37 1,296 C019 SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 C01A SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 C01B SA T56 Engine and LRUs 3 20 17 17 17 -- 37 1,296 C01C SA T56 Engine and LRUs 6 25 18 18 18 -- 28 265 C01D SA T56 Engine and LRUs 4 14 11 11 11 -- 11 52 C01E SA T56 Engine and LRUs 2 9 14 14 14 -- 37 1,296 C01F SA T56 Engine and LRUs 3 9 8 8 8 -- 28 258 C01G SA T56 Engine and LRUs 2 8 6 6 6 -- 11 52 C01H SA T56 Engine and LRUs 1 5 5 5 5 -- 37 1,652 C01J SA T56 Engine and LRUs 1 5 4 4 4 -- 28 265 C01K SA T56 Engine and LRUs 1 2 2 2 2 -- 11 52 C01L SA T56 Engine and LRUs 8 32 31 31 31 -- 30 795 C01M SA T56 Engine and LRUs 1 3 3 3 3 -- 30 332 C01N SA Navy T56 20 81 38 38 38 -- 30 85 C01P SA Navy T56 5 26 12 12 12 -- 11 3 C01Q SA Navy T56 5 22 10 10 10 -- 30 29 C01R SA Navy T56 16 74 35 35 35 -- 21 113 C01S SA Navy T56 7 27 13 13 13 -- 15 29 C01T SA Navy T56 10 38 18 18 18 -- 31 21 C01U SA Navy T56 1 2 2 2 2 -- 30 18 C01V SA Navy T56 29 116 55 55 55 -- 31 26 C01W SA Navy T56 1 3 2 2 2 -- 30 33 C01X SA Navy T56 3 4 2 2 2 -- 28 18 C01Y SA Navy T56 33 134 63 63 63 -- 32 25 C01Z SA Navy T56 7 28 13 13 13 -- 12 28 C020 SA Navy T56 45 183 88 88 88 -- 12 11 C021 SA Navy T56 18 70 33 33 33 -- 13 20 C022 SA Navy T56 329 1,324 624 624 624 -- 8 10 C023 SA Navy T56 42 167 79 79 79 -- 18 81 C024 SA Navy T56 6 32 32 32 32 -- 30 5 C025 SA Navy T56 4 22 22 22 22 -- 30 2 C026 SA Navy T56 1 2 2 2 2 -- 30 4 C027 SA Navy T56 2 9 9 9 9 -- 30 4 C028 SA Navy T56 4 14 6 6 6 -- 20 4 C029 SA Navy T56 1 5 5 5 5 -- 30 4 C02A SA Navy T56 62 249 116 118 118 -- 16 24 C02B SA Navy T56 3 12 12 12 12 -- 30 9 C02C SA Navy T56 1 3 3 3 3 -- 30 6 C02D SA Navy T56 14 59 28 28 28 -- 5 6 C02E SA Navy T56 18 74 35 35 35 -- 9 11 C02F SA Navy T56 2 6 3 3 3 -- 3 7 C02G SA Navy T56 6 25 12 12 12 -- 30 7 C02H SA Navy T56 10 40 19 19 19 -- 30 18 C02J SA Navy T56 6 26 12 12 12 -- 30 7 C02K SA Navy T56 3 11 5 3 3 -- 30 7 C02L SA Navy T56 14 55 30 30 30 -- 30 81 C02M SA Navy T56 17 48 22 22 22 -- 30 81 C02N SA Navy T56 16 63 30 30 30 -- 30 78 C02P SA Navy T56 6 25 12 12 12 -- 30 81 C02Q SA Navy T56 9 38 17 17 17 -- 4 6 C02R SA Navy T56 5 21 10 10 10 -- 9 9 C02S SA Navy T56 2 9 4 4 4 -- 30 6 C02T SA Navy T56 2 8 4 4 4 -- 30 8 C02U SA Navy T56 13 52 24 24 24 -- 30 6 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21117th Page of 414TOC1stPreviousNextBottomJust 117th
Confidential Competitive-Sensitive Schedule A- ELIN Pricing Summary/Exibit C [Enlarge/Download Table] KLIN ORG FY 04- FLOW [ ]Check Unit 0002 UNIT TYPE MAINTENANCE NOUN NSN FY99 FY00 FY01 FY02 FY 03 FY13 DAYS FEEMS Hours ---- ---- ---------------- ---- --- ----- ------ ------ ------ ------ ------ ---- -------- ----------- C02V SA Navy T56 [/\/\] [/\/\] 1 2 2 2 2 -- 30 7 C02W SA Navy T56 6 24 11 11 11 -- 30 9 C02X SA Navy T56 16 63 30 30 30 -- 30 9 C02Y SA Navy T56 12 80 24 24 24 -- 30 9 C02Z SA Navy T56 12 81 24 24 24 -- 30 9 C030 SA Navy T56 3 12 6 6 6 -- 8 7 C031 SA Navy T56 6 23 11 11 11 -- 30 6 C032 SA Navy T56 6 22 10 10 10 -- 30 6 C033 SA Navy T56 4 15 8 8 8 -- 30 9 C034 SA Navy T56 15 61 29 29 29 -- 30 6 C035 SA Navy T56 6 20 9 9 9 -- 6 6 C036 SA Navy T56 8 20 9 9 9 -- 6 9 C037 SA Navy T56 3 12 6 6 6 -- 30 9 C038 SA Navy T56 19 78 37 37 37 -- 10 6 C039 SA Navy T56 2 7 3 3 3 -- 4 6 C03A SA Navy T56 10 42 20 20 20 -- 30 13 C03B SA Navy T56 18 75 35 35 35 -- 8 6 C03C SA Navy T56 40 161 76 76 76 -- 30 8 C03D SA Navy T56 291 1,174 554 554 554 -- 30 3 C03E SA Navy T56 8 23 11 11 11 -- 30 6 C03F SA Navy T56 7 29 13 13 13 -- 30 26 C03G SA Navy T56 6 24 11 11 11 -- 7 10 C03H SA Navy T56 14 58 28 28 28 -- 30 68 C03J SA Navy T56 2 9 4 4 4 -- 30 68 C03K SA Navy T56 2 7 3 3 3 -- 30 68 C0GL SA Fuel Accessories 472 2,183 2,142 2,142 2,142 -- 2 X 3 C0GM SA Fuel Accessories 24 134 141 141 141 -- 30 X 81 C0GN SA Fuel Accessories 8 196 189 189 189 -- 30 X 78 C0GP SA Fuel Accessories 4 18 18 18 18 -- 30 7 C0GQ SA Fuel Accessories 3 11 11 11 11 -- 30 8 C0GR SA Fuel Accessories 120 337 400 400 400 -- 9 4 C0GS SA Fuel Accessories 36 180 185 185 185 -- 9 X 11 C0GT SA Fuel Accessories 17 78 84 84 84 -- 28 X 13 C0GU SA Fuel Accessories 1 6 6 6 6 -- 8 X 7 C0GV SA Fuel Accessories 195 839 919 919 919 -- 4 X 9 C0GW SA Fuel Accessories 4 17 18 18 16 -- 5 X 11 C0GX SA Fuel Accessories 128 648 806 806 806 -- 6 6 C0GY SA Fuel Accessories 28 107 114 114 114 -- 9 X 2 C0GZ SA Fuel Accessories 13 50 51 51 51 -- 8 7 C0H0 SA Fuel Accessories 1 5 6 8 6 -- 8 7 C0H1 SA Fuel Accessories 14 80 62 82 62 -- 6 X 5 C0H2 SA Fuel Accessories 36 138 156 156 156 -- 5 X 6 C0H3 SA Fuel Accessories 31 125 137 137 137 -- 5 6 C0H4 SA Fuel Accessories 16 73 79 79 79 -- 5 6 C0H5 SA Fuel Accessories 9 34 34 34 34 -- 5 X 6 C0H6 SA Fuel Accessories 14 48 48 48 48 -- 4 X 6 C0H7 SA Fuel Accessories 55 230 243 243 243 -- 8 X 8 C0H8 SA Fuel Accessories 20 84 76 76 76 -- 5 3 C0H9 SA Fuel Accessories 7 26 30 30 30 -- 4 6 C0HA SA Fuel Accessories 4 14 15 15 15 -- 8 X 5 C0HB SA Fuel Accessories 7 25 27 27 27 -- 4 6 C0HC SA Fuel Accessories 44 184 195 195 195 -- 3 7 C0HD SA Fuel Accessories 20 127 73 73 73 -- 10 6 ----- ------ ------ ------ ------ ----------- 149 0 4,583 20,472 18,045 18,045 18,045 15,305,1 ===== ====== ====== ====== ====== =========== Cost Summary ------- 0002AA Transition 0002AC Repair OPS T-58 F-100 TF-30 Fuel Accy Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept 5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21118th Page of 414TOC1stPreviousNextBottomJust 118th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- C001 [/\/\] $-- [/\/\] -- -- 661 402 -- [/\/\] C002 $-- -- -- 541,436 329,207 -- C003 $-- -- -- 10,899 6,627 -- C004 $-- -- -- 12,142 7,383 -- C005 $-- -- -- 28,135 17,107 -- C006 $-- -- -- 6,759 4,110 -- C007 $-- -- -- 12,429 7,557 -- C008 $-- -- -- 34,711 21,105 -- C009 $-- 680,800 -- 711,336 432,511 -- C00A $-- -- -- -- -- -- C00B $-- -- -- -- -- -- C00C $-- -- -- -- -- -- C00D $-- -- -- -- 4,074 2,477 -- C00E $-- -- -- -- 7,720 4,694 -- C00F $-- -- -- -- 63,470 38,592 -- C00G $-- -- -- -- 16,641 10,118 -- C00H $-- -- -- 74,195 45,113 -- C00J $-- -- -- 7,932 4,823 -- C00K $-- -- -- 9,135 5,554 -- C00L $-- -- -- 87,743 53,350 -- C00M $-- -- -- 10,955 6,661 -- C00N $-- -- -- 8,629 5,247 -- C00P $-- -- -- 5,309 3,228 -- C00Q $-- -- -- 4,418 2,687 -- C00R $-- -- -- 11,734 7,135 -- C00S $-- -- -- 6,332 3,850 -- C00T $-- -- -- 306 186 -- C00U $-- -- -- 3,656 2,223 -- C00V $-- -- -- 11,460 6,968 -- C00W $-- -- -- 8,226 5,002 -- C00X $-- -- -- 8,589 5,222 -- C00Y $-- -- -- 35,002 21,282 -- C00Z $-- -- -- 6,789 4,128 -- C010 $-- -- -- 5,279 3,210 -- C011 $-- -- -- 9,013 5,480 -- C012 $-- -- -- 5,568 3,385 -- C013 $-- -- -- 29,432 17,895 -- C014 $-- -- -- 1,692 1,029 -- C015 $-- -- -- 26,621 16,186 -- C016 $-- -- -- 11,798 7,173 -- C017 $-- 9,200 -- 25,938 15,771 -- C018 $-- 64,400 -- 181,552 110,395 -- C019 $-- 35,800 -- 103,749 63,082 -- C01A $-- 35,800 -- 103,749 63,082 -- C01B $-- 27,600 -- 77,813 47,312 -- C01C $-- -- -- 31,848 19,365 -- C01D $-- -- -- 4,178 2,540 -- C01E $-- 18,400 -- 51,875 31,541 -- CO1F $-- -- -- 15,490 9,418 -- C01G $-- -- -- 2,090 1,271 -- C01H $-- 9,200 -- 33,082 20,114 -- C01J $-- -- -- 5,307 3,227 -- C01K $-- -- -- 1,045 635 -- C01L $-- -- -- 127,321 77,415 -- C01M $-- -- -- 6,655 4,046 -- C01N $-- -- -- 34,025 20,688 -- C01P $-- -- -- 302 184 -- C01Q $-- -- -- 3,526 2,144 -- C01R $-- -- -- 40,878 24,855 -- C01S $-- -- -- 4,112 2,500 -- C01T $-- -- -- 4,146 2,521 -- C01U $-- -- -- 356 217 -- C01V $-- -- -- 14,869 9,041 -- C01W $-- -- -- 661 402 -- C01X $-- -- -- 1,069 650 -- C01Y $-- -- -- 16,695 10,151 -- C01Z $-- -- -- 3,946 2,400 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21119th Page of 414TOC1stPreviousNextBottomJust 119th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------ --- ----- C020 [/\/\] $-- [/\/\] -- -- 9,978 6,067 -- [/\/\] C021 $-- -- -- 7,157 4,352 -- C022 $-- -- -- 66,592 40,489 -- C023 $-- -- -- 68,353 41,561 -- C024 $-- -- -- 553 336 -- C025 $-- -- -- 162 99 -- C026 $-- -- -- 74 45 -- C027 $-- -- -- 150 91 -- C028 $-- -- -- 298 181 -- C029 $-- -- -- 74 45 -- C02A $-- -- -- 29,914 18,189 -- C02B $-- -- -- 523 318 -- C02C $-- -- -- 110 67 -- C02D $-- -- -- 1,554 945 -- C02E $-- -- -- 3,884 2,362 -- C02F $-- -- -- 264 161 -- C02G $-- -- -- 791 481 -- C02H $-- -- -- 3,568 2,169 -- C02J $-- -- -- 791 481 -- C02K $-- -- -- 396 241 -- C02L $-- -- -- 22,833 13,883 -- C02M $-- -- -- 19,572 11,900 -- C02N $-- -- -- 24,901 15,141 -- C02P $-- -- -- 9,786 5,950 -- C02Q $-- -- -- 999 607 -- C02R $-- -- -- 869 528 -- C02S $-- -- -- 222 135 -- C02T $-- -- -- 348 212 -- C02U $-- -- -- 1,441 876 -- C02V $-- -- -- 132 30 -- C02W $-- -- -- 1,043 634 -- C02X $-- -- -- 2,781 1,691 -- C02Y $-- -- -- 2,180 1,326 -- C02Z $-- -- -- 2,086 1,268 -- C030 $-- -- -- 396 241 -- C031 $-- -- -- 717 436 -- C032 $-- -- -- 665 404 -- C033 $-- -- -- 695 422 -- C034 $-- -- -- 1,792 1,089 -- C035 $-- -- -- 909 553 -- C036 $-- -- -- 869 528 -- C037 $-- -- -- 523 318 -- C038 $-- -- -- 2,108 1,282 -- C039 $-- -- -- 222 135 -- C03A $-- -- -- 2,579 1,568 -- C03B $-- -- -- 1,996 1,214 -- C03C $-- -- -- 4,437 2,698 -- C03D $-- -- -- 16,517 10,043 -- C03E $-- -- -- 665 404 -- C03F $-- -- -- 3,706 2,253 -- C03G $-- -- -- 1,259 766 -- C03H $-- -- -- 19,093 11,609 -- C03J $-- -- -- 2,727 1,658 -- C03K $-- -- -- 2,727 1,658 -- C0GL $-- -- -- 26,789 16,289 -- C0GM $-- -- -- 39,144 23,800 -- C0GN $-- -- -- 12,451 7,570 -- C0GP $-- -- -- 529 321 -- C0GQ $-- -- -- 332 202 -- C0GR $-- -- -- 10,793 6,562 -- C0GS $-- -- -- 7,770 4,724 -- C0GT $-- -- -- 4,382 2,665 -- C0GU $-- -- -- 132 8O -- C0GV $-- -- -- 33,902 20,614 -- C0GW $-- -- -- 863 525 -- C0GX $-- -- -- 15,286 9,294 -- C0GY $-- -- -- 1,139 693 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21120th Page of 414TOC1stPreviousNextBottomJust 120th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 1999 ------------------------------------ ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ----------- --------- ---------- ---------- -------- -------- ---------- --------- --------- --- ----- C0GZ [/\/\] $-- [/\/\] -- -- 1,714 1,042 -- [/\/\] C0H0 $-- -- -- 132 80 -- C0H1 $-- -- -- 1,407 856 -- C0H2 $-- -- -- 3,992 2,427 -- C0H3 $-- -- -- 3,702 2,251 -- C0H4 $-- -- -- 1,910 1,161 -- C0H5 $-- -- -- 999 607 -- C0H6 $-- -- -- 1,554 945 -- C0H7 $-- -- -- 6,100 3,709 -- C0H8 $-- -- -- 1,379 839 -- C0H9 $-- -- -- 777 472 -- C0HA $-- -- -- 444 270 -- C0HB $-- -- -- 777 472 -- C0HC $-- -- -- 5,804 3,529 -- C0HD $-- -- -- 2,218 1,349 -- --- --- ------- ---------- --------- --------- --- -- 883,200 -- 3,271,919 1,989,413 -- --- --- ------- ---------- --------- --------- --- Cost Summary ------- 0002AA Transition -- -- 24,520,292 -- -- -- 0002AC Repair Ops T-56 -- -- 883,200 -- 3,085,498 1,876,064 -- F-100 -- TF-39 $-- -- -- -- -- -- -- Fuel/Accy -- -- -- -- 186,421 113,349 -- --- --- ------- ---------- --------- --------- --- Totals $-- -- 883,200 -- 3,271,919 1,989,413 -- === === ======= ========== ========= ========= === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21121st Page of 414TOC1stPreviousNextBottomJust 121st
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 2000 ------------------------------------ ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ----------- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- C001 [/\/\] $-- [/\/\] -- -- 661 402 -- [/\/\] C002 $-- -- -- 2,160,434 1,313,601 -- C003 $-- -- -- 43,600 26,510 -- C004 $-- -- -- 52,109 31,684 -- C005 $-- -- -- 122,050 74,210 -- C006 $-- -- -- 28,231 17,165 -- C007 $-- -- -- 37,284 22,670 -- C008 $-- -- -- 138,845 84,421 -- C009 $-- 2,750,800 -- 2,874,187 1,747,582 -- C00A $-- -- -- -- -- -- C00B $-- -- -- -- -- -- C00C $-- -- -- -- -- -- C00D $-- -- -- -- 16,297 9,909 -- C00E $-- -- -- -- 32,809 19,949 -- C00F $-- -- -- -- 249,001 151,399 -- C00G $-- -- -- -- 69,465 42,236 -- C00H $-- -- -- 301,955 183,596 -- C00J $-- -- -- 33,995 20,670 -- C00K $-- -- -- 38,823 23,606 -- C00L $-- -- -- 350,972 213,401 -- C00M $-- -- -- 74,382 45,226 -- C00N $-- -- -- 35,596 21,643 -- C00P $-- -- -- 22,034 13,397 -- C00Q $-- -- -- 18,835 11,452 -- C00R $-- -- -- 49,400 30,037 -- C00S $-- -- -- 26,593 16,169 -- C00T $-- -- -- 10,122 6,155 -- C00U $-- -- -- 15,538 9,447 -- C00V $-- -- -- 45,839 27,871 -- C00W $-- -- -- 34,647 21,066 -- C00X $-- -- -- 35,884 21,819 -- C00Y $-- -- -- 151,166 91,913 -- C00Z $-- -- -- 28,361 17,244 -- C010 $-- -- -- 22,327 13,575 -- C011 $-- -- -- 37,344 22,706 -- C012 $-- -- -- 101,363 61,631 -- C013 $-- -- -- 123,035 74,809 -- C014 $-- -- -- 7,329 4,456 -- C015 $-- -- -- 111,804 67,980 -- C016 $-- -- -- 49,602 30,160 -- C017 $-- 9,200 -- 25,938 15,771 -- C018 $-- 230,000 -- 648,437 394,267 -- C019 $-- 138,000 -- 389,061 236,559 -- C01A $-- 138,000 -- 389,061 236,559 -- C01B $-- 184,000 -- 518,749 315,413 -- C01C $-- -- -- 132,705 80,688 -- C01D $-- -- -- 14,625 8,892 -- C01E $-- 82,800 -- 233,437 141,936 -- C01F $-- -- -- 46,471 28,256 -- C01G $-- -- -- 8,356 5,081 -- C01H $-- 46,000 -- 165,404 100,570 -- C01J $-- -- -- 26,533 16,133 -- C01K $-- -- -- 2,090 1,271 -- C01L $-- -- -- 509,285 309,659 -- C01M $-- -- -- 19,962 12,138 -- C01N $-- -- -- 137,800 83,786 -- C01P $-- -- -- 1,311 797 -- C01Q $-- -- -- 12,925 7,859 -- C01R $-- -- -- 168,055 102,182 -- C01S $-- -- -- 15,862 9,645 -- C01T $-- -- -- 15,752 9,578 -- C01U $-- -- ' -- 713 433 -- C01V $-- -- -- 59,746 36,163 -- C01W $-- -- -- 1,984 1,206 -- C01X $-- -- -- 1,427 868 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21122nd Page of 414TOC1stPreviousNextBottomJust 122nd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 2000 ----------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- C01Y [/\/\] $-- [/\/\] -- -- 67,793 41,220 -- [/\/\] C01Z $-- -- -- 15,788 9,600 -- C020 $-- -- -- 40,575 24,671 -- C021 $-- -- -- 27,832 16,923 -- C022 $-- -- -- 267,984 162,941 -- C023 $-- -- -- 271,784 165,252 -- C024 $-- -- -- 2,941 1,788 -- C025 $-- -- -- 889 540 -- C026 $-- -- -- 150 91 -- C027 $-- -- -- 673 409 -- C028 $-- -- -- 1,047 637 -- C029 $-- -- -- 374 228 -- C02A $-- -- -- 120,140 73,048 -- C02B $-- -- -- 2,086 1,268 -- C02C $-- -- -- 332 202 -- C02D $-- -- -- 6,545 3,979 -- C02E $-- -- -- 15,970 9,710 -- C02F $-- -- -- 791 481 -- C02G $-- -- -- 3,297 2,005 -- C02H $-- -- -- 14,268 8,676 -- C02J $-- -- -- 3,429 2,085 -- C02K $-- -- -- 1,451 883 -- C02L $-- -- -- 89,703 54,542 -- C02M $-- -- -- 78,286 47,600 -- C02N $-- -- -- 98,052 59,618 -- C02P $-- -- -- 40,773 24,791 -- C02Q $-- -- -- 3,992 2,427 -- C02R $-- -- -- 3,652 2,220 -- C02S $-- -- -- 999 607 -- C02T $-- -- -- 1,391 846 -- C02U $-- -- -- 5,768 3,507 -- C02V $-- -- -- 264 161 -- C02W $-- -- -- 4,172 2,537 -- C02X $-- -- -- 10,953 6,660 -- C02Y $-- -- -- 9,085 5,524 -- C02Z $-- -- -- 8,867 5,391 -- C030 $-- -- -- 1,584 963 -- C031 $-- -- -- 2,747 1,670 -- C032 $-- -- -- 2,440 1,484 -- C033 $-- -- -- 2,609 1,586 -- C034 $-- -- -- 7,285 4,430 -- C035 $-- -- -- 3,634 2,209 -- C036 $-- -- -- 3,478 2,114 -- C037 $-- -- -- 2,086 1,268 -- C038 $-- -- -- 8,651 5,260 -- C039 $-- -- -- 777 472 -- C03A $-- -- -- 10,827 6,583 -- C03B $-- -- -- 8,318 5,058 -- C03C $-- -- -- 17,858 10,858 -- C03D $-- -- -- 66,634 40,515 -- C03E $-- -- -- 2,551 1,551 -- C03F $-- -- -- 15,350 9,333 -- C03G $-- -- -- 5,035 3,061 -- C03H $-- -- -- 79,102 48,096 -- C03J $-- -- -- 12,274 7,463 -- C03K $-- -- -- 9,548 5,805 -- C0GL $-- -- -- 122,767 74,645 -- C0GM $-- -- -- 218,548 132,883 -- C0GN $-- -- -- 305,050 185,478 -- C0GP $-- -- -- 2,374 1,444 -- C0GQ $-- -- -- 1,219 741 -- C0GR $-- -- -- 30,307 18,427 -- C0GS $-- -- -- 33,847 23,620 -- C0GT $-- -- -- 20,108 12,226 -- C0GU $-- -- -- 791 481 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21123rd Page of 414TOC1stPreviousNextBottomJust 123rd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 2000 ------------------------------------ ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---------- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- C0GV [/\/\] $-- [/\/\] -- -- 145,868 88,692 -- [/\/\] C0GW $-- -- -- 3,670 2,231 -- C0GX $-- -- -- 77,146 46,907 -- C0GY $-- -- -- 4,689 2,851 -- C0GZ $-- -- -- 6,595 4,010 -- C0H0 $-- -- -- 659 400 -- C0H1 $-- -- -- 6,032 3,668 -- C0H2 $-- -- -- 15,306 9,306 -- C0H3 $-- -- -- 14,927 9,076 -- C0H4 $-- -- -- 8,717 5,300 -- C0H5 $-- -- -- 3,772 2,293 -- C0H6 $-- -- -- 5,323 3,237 -- C0H7 $-- -- -- 25,510 15,511 -- C0H8 $-- -- -- 5,792 3,522 -- C0H9 $-- -- -- 2,883 1,753 -- C0HA $-- -- -- 1,554 945 -- C0HB $-- -- -- 2,773 1,686 -- C0HC $-- -- -- 24,269 14,756 -- C0HD $-- -- -- 14,086 8,565 -- --- --- --------- --- ---------- --------- --- 149 -- -- 3,578,800 -- 13,691,806 8,324,980 -- --- --- --------- --- ---------- --------- --- Cost Summary ------- 0002AA Transition 0002AC Repair Ops T-56 -- -- 3,578,800 -- 12,582,225 7,650,325 -- F-100 -- TF-39 -- -- -- -- -- -- -- Fuel Accy -- -- -- -- 1,109,581 674,655 -- --- --- --------- --- ---------- --------- --- Totals -- -- 3,578,800 -- 13,691,806 8,324,980 -- === === ========= === ========== ========= === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21124th Page of 414TOC1stPreviousNextBottomJust 124th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public Pritvate Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY2001 ----------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- C001 [/\/\] $-- [/\/\] -- -- 661 402 -- [/\/\] C002 $-- -- -- 2,160,434 1,313,601 -- C003 $-- -- -- 46,325 28,167 -- C004 $-- -- -- 55,144 33,529 -- C005 $-- -- -- 129,135 78,518 -- C006 $-- -- -- 29,820 18,132 -- C007 $-- -- -- 43,498 26,448 -- C008 $-- -- -- 150,415 91,456 -- C009 $-- 2,750,800 -- 2,874,187 1,747,582 -- C00A $-- -- -- -- -- -- C00B $-- -- -- -- -- -- C00C $-- -- -- -- -- -- C00D $-- -- -- -- 17,460 10,616 -- C00E $-- -- -- -- 34,257 20,829 -- C00F $-- -- -- -- 249,001 151,399 -- C00G $-- -- -- -- 73,723 44,825 -- C00H $-- -- -- 300,229 182,547 -- C00J $-- -- -- 35,694 21,703 -- C00K $-- -- -- 41,108 24,995 -- C00L $-- -- -- 349,927 212,765 -- C00M $-- -- -- 78,800 47,913 -- C00N $-- -- -- 37,754 22,856 -- C00P $-- -- -- 23,362 14,205 -- C00Q $-- -- -- 19,766 12,018 -- C00R $-- -- -- 52,467 31,901 -- C00S $-- -- -- 28,245 17,174 -- C00T $-- -- -- 15,029 9,138 -- C00U $-- -- -- 16,451 10,002 -- C00V $-- -- -- 45,839 27,871 -- C00W $-- -- -- 36,807 22,380 -- C00X $-- -- -- 38,033 23,125 -- C00Y $-- -- -- 75,677 46,014 -- C00Z $-- -- -- 30,020 18,253 -- C010 $-- -- -- 23,684 14,401 -- C011 $-- -- -- 39,490 24,011 -- C012 $-- -- -- 124,793 75,877 -- C013 $-- -- -- 130,755 79,502 -- C014 $-- -- -- 7,894 4,800 -- C015 $-- -- -- 118,649 72,141 -- C016 $-- 9,200 -- 52,593 31,978 -- C017 $-- 220,800 -- 25,938 15,771 -- C018 $-- 138,000 -- 622,498 378,495 -- C019 $-- 138,000 -- 389,061 236,559 -- C01A $-- 156,400 -- 389,061 236,559 -- C01B $-- -- -- 440,936 268,101 -- C01C $-- -- -- 95,547 58,095 -- C01D $-- 128,800 -- 11,490 6,986 -- C01E $-- -- -- 363,125 220,789 -- C0IF $-- -- -- 41,308 25,116 -- C01G $-- 46,000 -- 6,268 3,811 -- C01H $-- -- -- 165,404 100,570 -- C01J $-- -- -- 21,228 12,907 -- C01K $-- -- -- 2,090 1,271 -- C01L $-- -- -- 493,371 299,983 -- C01M $-- -- -- 19,962 12,138 -- C0IN $-- -- -- 64,648 39,307 -- C01P $-- -- -- 605 368 -- C01Q $-- -- -- 5,874 3,572 -- C01R $-- -- -- 79,485 48,329 -- C01S $-- -- -- 7,638 4,644 -- C01T $-- -- -- 7,462 4,537 -- C01U $-- -- -- 713 433 -- C01V $-- -- -- 26,201 17,147 -- C01W $-- -- -- 1,323 805 -- C01X $-- -- -- 713 433 -- C01Y $-- -- -- 31,872 19,379 -- C01Z $-- -- -- 7,329 4,456 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21125th Page of 414TOC1stPreviousNextBottomJust 125th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public Pritvate Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY2001 ----------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- --------- --------- --- ----- C020 [/\/\] $-- [/\/\] -- -- 19,069 11,595 -- [/\/\] C021 $-- -- -- 13,121 7,978 -- C022 $-- -- -- 126,300 76,794 -- C023 $-- -- -- 128,569 78,173 -- C024 $-- -- -- 2,941 1,788 -- C025 $-- -- -- 889 540 -- C026 $-- -- -- 150 91 -- C027 $-- -- -- 673 409 -- C028 $-- -- -- 448 273 -- C029 $-- -- -- 374 228 -- C02A $-- -- -- 56,934 34,617 -- C02B $-- -- -- 2,086 1,268 -- C02C $-- -- -- 332 202 -- C02D $-- -- -- 3,105 1,888 -- C02E $-- -- -- 7,554 4,593 -- C02F $-- -- -- 396 241 -- C02G $-- -- -- 1,584 963 -- C02H $-- -- -- 6,777 4,121 -- C02J $-- -- -- 1,584 963 -- C02K $-- -- -- 659 400 -- C02L $-- -- -- 48,930 29,751 -- C02M $-- -- -- 35,880 21,816 -- C02N $-- -- -- 46,691 28,390 -- C02P $-- -- -- 19,572 11,900 -- C02Q $-- -- -- 1,886 1,147 -- C02R $-- -- -- 1,738 1,057 -- C02S $-- -- -- 444 270 -- C02T $-- -- -- 695 422 -- C02U $-- -- -- 2,663 1,619 -- C02V $-- -- -- 264 161 -- C02W $-- -- -- 1,912 1,163 -- C02X $-- -- -- 5,215 3,171 -- C02Y $-- -- -- 4,360 2,651 -- C02Z $-- -- -- 4,172 2,537 -- C030 $-- -- -- 791 481 -- C031 $-- -- -- 1,313 799 -- C032 $-- -- -- 1,109 674 -- C033 $-- -- -- 1,043 634 -- C034 $-- -- -- 3,464 2,106 -- C035 $-- -- -- 1,636 995 -- C036 $-- -- -- 1,566 952 -- C037 $-- -- -- 1,043 634 -- C038 $-- -- -- 4,104 2,495 -- C039 $-- -- -- 332 202 -- C03A $-- -- -- 5,155 3,135 -- C03B $-- -- -- 3,882 2,360 -- C03C $-- -- -- 8,429 5,125 -- C03D $-- -- -- 31,444 19,119 -- C03E $-- -- -- 1,219 741 -- C03F $-- -- -- 6,881 4,184 -- C03G $-- -- -- 2,308 1,404 -- C03H $-- -- -- 38,187 23,219 -- C03J $-- -- -- 5,456 3,317 -- C03K $-- -- -- 4,092 2,488 -- C0GL $-- -- -- 121,575 73,921 -- C0GM $-- -- -- 229,966 139,825 -- C0GN $-- -- -- 294,157 178,855 -- C0GP $-- -- -- 2,374 1,444 -- C0GQ $-- -- -- 1,219 741 -- C0GR $-- -- -- 35,973 21,872 -- C0GS $-- -- -- 35,610 21,852 -- C0GT $-- -- -- 21,654 13,166 -- C0GU $-- -- -- 791 481 -- C0GV $-- -- -- 159,778 97,149 -- C0GW $-- -- -- 3,884 2,362 -- C0GX $-- -- -- 72,370 44,003 -- C0GY $-- -- -- 4,995 3,037 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21126th Page of 414TOC1stPreviousNextBottomJust 126th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY2002 ---------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------ ---- ----- C01T [/\/\] $-- [/\/\] [/\/\] -- -- 7,462 4,537 -- [/\/\] C01U $-- -- -- 713 433 -- C01V $-- -- -- 28,201 17,147 -- C01W $-- -- -- 1,323 805 -- C01X $-- -- -- 713 433 -- C01Y $-- -- -- 31,872 19,379 -- C01Z $-- -- -- 7,329 4,456 -- C020 $-- -- -- 19,069 11,595 -- C021 $-- -- -- 13,121 7,978 -- C022 $-- -- -- 126,300 76,794 -- C023 $-- -- -- 128,569 78,173 -- C024 $-- -- -- 2,941 1,788 -- C025 $-- -- -- 889 540 -- C026 $-- -- -- 150 91 -- C027 $-- -- -- 673 409 -- C028 $-- -- -- 448 273 -- C029 $-- -- -- 374 228 -- C02A $-- -- -- 56,934 34,617 -- C02B $-- -- -- 2,086 1,268 -- C02C $-- -- -- 332 202 -- C02D $-- -- -- 3,105 1,888 -- C02E $-- -- -- 7,554 4,593 -- C02F $-- -- -- 396 241 -- C02G $-- -- -- 1,584 963 -- C02H $-- -- -- 6,777 4,121 -- C02J $-- -- -- 1,584 963 -- C02K $-- -- -- 659 400 -- C02L $-- -- -- 48,930 29,751 -- C02M $-- -- -- 35,880 21,816 -- C02N $-- -- -- 46,691 28,390 -- C02P $-- -- -- 19,572 11,900 -- C02Q $-- -- -- 1,886 1,147 -- C02R $-- -- -- 1,738 1,057 -- C02S $-- -- -- 444 270 -- C02T $-- -- -- 695 422 -- C02U $-- -- -- 2,663 1,619 -- C02V $-- -- -- 264 161 -- C02W $-- -- -- 1,912 1,163 -- C02X $-- -- -- 5,215 3,171 -- C02Y $-- -- -- 4,360 2,651 -- C02Z $-- -- -- 4,172 2,537 -- C030 $-- -- -- 791 481 -- C031 $-- -- -- 1,313 799 -- C032 $-- -- -- 1,109 674 -- C033 $-- -- -- 1,043 634 -- C034 $-- -- -- 3,464 2,106 -- C035 $-- -- -- 1,636 995 -- C036 $-- -- -- 1,566 952 -- C037 $-- -- -- 1,043 634 -- C038 $-- -- -- 4,104 2,495 -- C039 $-- -- -- 332 202 -- C03A $-- -- -- 5,155 3,135 -- C03B $-- -- -- 3,882 2,360 -- C03C $-- -- -- 8,429 5,125 -- C03D $-- -- -- 31,444 19,119 -- C03E $-- -- -- 1,219 741 -- C03F $-- -- -- 6,881 4,184 -- C03G $-- -- -- 2,308 1,404 -- C03H $-- -- -- 38,187 23,219 -- C03J $-- -- -- 5,456 3,317 -- Standard Aero Proprietory - Not Releasable FPR Submission to LM Sept.05/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21127th Page of 414TOC1stPreviousNextBottomJust 127th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 2002 --------------------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---------- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- C03K [/\/\] $-- [/\/\] -- -- 4,092 2,488 -- [/\/\] C0GL $-- -- -- 121,575 73,921 -- C0GM $-- -- -- 229,966 139,825 -- C0GN $-- -- -- 294,157 178,855 -- C0GP $-- -- -- 2,374 1,444 -- C0GQ $-- -- -- 1,219 741 -- C0GR $-- -- -- 35,973 21,872 -- C0GS $-- -- -- 35,610 21,652 -- C0GT $-- -- -- 21,654 13,166 -- C0GU $-- -- -- 791 481 -- C0GV $-- -- -- 159,778 97,149 -- C0GW $-- -- -- 3,884 2,362 -- C0GX $-- -- -- 72,370 44,003 -- C0GY $-- -- -- 4,995 3,037 -- C0GZ $-- -- -- 6,727 4,090 -- C0H0 $-- -- -- 791 481 -- C0H1 $-- -- -- 6,232 3,789 -- C0H2 $-- -- -- 17,304 10,521 -- C0H3 $-- -- -- 16,361 9,948 -- C0H4 $-- -- -- 9,434 5,736 -- C0H5 $-- -- -- 3,772 2,293 -- C0H6 $-- -- -- 5,323 3,237 -- C0H7 $-- -- -- 26,953 16,388 -- C0H8 $-- -- -- 5,239 3,186 -- C0H9 $-- -- -- 3,327 2,023 -- C0HA $-- -- -- 1,664 1,012 -- C0HB $-- -- -- 2,995 1,821 -- C0HC $-- -- -- 25,720 15,639 -- C0HD $-- -- -- 8,096 4,923 -- --- --------- --- ---------- --------- --- 149 -- 3,588,000 -- 12,705,981 7,725,572 -- === ========= === ========== ========= === Cost Summary ------- 0002AA Transition 0002AC Repair Ops T-56 F-100 TF-39 Fuel Accy Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21128th Page of 414TOC1stPreviousNextBottomJust 128th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit C [Enlarge/Download Table] FY2001 ---------------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- C0GZ [/\/\] $-- [/\/\] -- -- 6,727 4,090 -- [/\/\] C0H0 $-- -- -- 791 481 -- C0H1 $-- -- -- 6,232 3,789 -- C0H2 $-- -- -- 17,304 10,521 -- COH3 $-- -- -- 16,361 9,948 -- C0H4 $-- -- -- 9,434 5,736 -- C0H5 $-- -- -- 3,772 2,293 -- C0H6 $-- -- -- 5,323 3,237 -- C0H7 $-- -- -- 26,953 16,388 -- C0H8 $-- -- -- 5,239 3,186 -- C0H9 $-- -- -- 3,327 2,023 -- C0HA $-- -- -- 1,664 1,012 -- C0HB $-- -- -- 2,995 1,821 -- C0HC $-- -- -- 25,720 15,639 -- C0HD $-- -- -- 8,096 4,923 -- --- --------- --- ---------- --------- --- 149 -- 3,588,000 -- 12,705,981 7,725,572 -- --- --------- --- ---------- --------- --- Cost Summary ------- 0002AA Transition 0002AC Repair Ops T-56 -- -- 3,588,000 -- 11,581,697 7,041,977 -- F-100 -- TF-39 $-- -- -- -- -- -- -- Fuel Accy -- -- -- -- 1,124,284 683,594 -- --- --- --------- --- ---------- --------- --- Totals -- -- 3,588,000 -- 12,705,981 7,725,572 -- === === ========= === ========== ========= === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21129th Page of 414TOC1stPreviousNextBottomJust 129th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit C [Enlarge/Download Table] FY2002 ----------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- C001 [/\/\] $-- [/\/\] -- -- 661 402 -- [/\/\] C002 $-- -- -- 2,160,434 1,313,601 -- C003 $-- -- -- 46,325 28,167 -- C004 $-- -- -- 55,144 33,529 -- C005 $-- -- -- 129,135 78,518 -- C006 $-- -- -- 29,620 18,132 -- C007 $-- -- -- 43,498 26,448 -- C008 $-- -- -- 150,415 91,456 -- C009 $-- 2,750,800 -- 2,874,187 1,747,582 -- C00A $-- -- -- -- -- -- C00B $-- -- -- -- -- -- C00C $-- -- -- -- -- -- C00D $-- -- -- -- 17,460 10,616 -- C00E $-- -- -- -- 34,257 20,829 -- C00F $-- -- -- -- 249,001 151,399 -- C00G $-- -- -- -- 73,723 44,825 -- C00H $-- -- -- 300,229 182,547 -- C00J $-- -- -- 35,694 21,703 -- C00K $-- -- -- 41,108 24,995 -- C00L $-- -- -- 349,927 212,765 -- C00M $-- -- -- 78,800 47,913 -- C00N $-- -- -- 37,754 22,956 -- C00P $-- -- -- 23,352 14,205 -- C00Q $-- -- -- 19,766 12,018 -- C00R $-- -- -- 52,467 31,901 -- C00S $-- -- -- 28,245 17,174 -- C00T $-- -- -- 15,029 9,138 -- C00U $-- -- -- 16,451 10,002 -- C00V $-- -- -- 45,839 27,871 -- C00W $-- -- -- 36,807 22,380 -- C00X $-- -- -- 38,033 23,125 -- C00Y $-- -- -- 75,677 46,014 -- C00Z $-- -- -- 30,020 18,253 -- C010 $-- -- -- 23,684 14,401 -- C011 $-- -- -- 39,490 24,011 -- C012 $-- -- -- 124,793 75,877 -- C013 $-- -- -- 130,755 79,502 -- C014 $-- -- -- 7,894 4,800 -- C015 $-- -- -- 118,649 72,141 -- C016 $-- -- -- 52,593 31,978 -- C017 $-- 9,200 -- 25,938 15,771 -- C018 $-- 220,800 -- 622,498 378,495 -- C019 $-- 138,000 -- 389,061 236,559 -- C01A $-- 138,000 -- 389,061 236,559 -- C01B $-- 156,400 -- 440,936 268,101 -- C01C $-- -- -- 95,547 58,035 -- C01D $-- -- -- 11,490 6,986 -- C01E $-- 128,800 -- 363,125 220,789 -- C01F $-- -- -- 41,308 25,116 -- C01G $-- -- -- 6,268 3,811 -- C01H $-- 46,000 -- 165,404 100,570 -- C01J $-- -- -- 21,228 12,907 -- C01K $-- -- -- 2,090 1,271 -- C01L $-- -- -- 493,371 299,983 -- C01M $-- -- -- 19,962 12,138 -- C01N $-- -- -- 64,648 39,307 -- C01P $-- -- -- 605 368 -- C01Q $-- -- -- 5,874 3,572 -- C01R $-- -- -- 79,485 48,329 -- C01S $-- -- -- 7,638 4,644 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21130th Page of 414TOC1stPreviousNextBottomJust 130th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 2003 ---------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- C001 [/\/\] $-- [/\/\] -- -- 661 402 -- [/\/\] C002 $-- -- -- 2,160,434 1,313,601 -- C003 $-- -- -- 46,325 28,167 -- C004 $-- -- -- 55,144 33,529 -- C005 $-- -- -- 129,135 78,518 -- C006 $-- -- -- 29,820 18,132 -- C007 $-- -- -- 43,498 26,448 -- C008 $-- -- -- 150,415 91,456 -- C009 $-- 2,750,800 -- 2,874,187 1,747,582 -- C00A $-- -- -- -- -- -- C00B $-- -- -- -- -- -- C00C $-- -- -- -- -- -- C00D $-- -- -- -- 17,460 10,616 -- C00E $-- -- -- -- 34,257 20,829 -- C00F $-- -- -- -- 249,001 151,399 -- C00G $-- -- -- -- 73,723 44,825 -- C00H $-- -- -- 300,229 182,547 -- C00J $-- -- -- 35,694 21,703 -- C00K $-- -- -- 41,108 24,995 -- C00L $-- -- -- 349,927 212,765 -- C00M $-- -- -- 78,800 47,913 -- C00N $-- -- -- 37,754 22,956 -- C00P $-- -- -- 23,362 14,205 -- C00Q $-- -- -- 19,766 12,018 -- C00R $-- -- -- 52,467 31,901 -- C00S $-- -- -- 28,245 17,174 -- C00T $-- -- -- 15,029 9,138 -- C00U $-- -- -- 16,451 10,002 -- C00V $-- -- -- 45,839 27,871 -- C00W $-- -- -- 36,807 22,380 -- C00X $-- -- -- 38,033 23,125 -- C00Y $-- -- -- 75,677 46,014 -- C00Z $-- -- -- 30,020 18,253 -- C010 $-- -- -- 23,684 14,401 -- C011 $-- -- -- 39,490 24,011 -- C012 $-- -- -- 124,793 75,877 -- C013 $-- -- -- 130,755 79,502 -- C014 $-- -- -- 7,894 4,800 -- C015 $-- -- -- 118,649 72,141 -- C016 $-- -- -- 52,593 31,978 -- C017 $-- 9,200 -- 25,938 15,771 -- C018 $-- 220,800 -- 622,498 378,495 -- C019 $-- 138,000 -- 389,061 236,559 -- C01A $-- 138,000 -- 389,061 236,559 -- C01B $-- 156,400 -- 440,936 268,101 -- C01C $-- -- -- 95,547 58,095 -- C01D $-- -- -- 11,490 6,986 -- C01E $-- 128,800 -- 363,125 220,789 -- C0IF $-- -- -- 41,308 25,116 -- C01G $-- -- -- 6,268 3,811 -- C01H $-- 46,000 -- 165,404 100,570 -- C01J $-- -- -- 21,228 12,907 -- C01K $-- -- -- 2,090 1,271 -- C01L $-- -- -- 493,371 299,983 -- C01M $-- -- -- 19,962 12,138 -- C01N $-- -- -- 64,648 39,307 -- C01P $-- -- -- 605 368 -- C01Q $-- -- -- 5,874 3,572 -- C01R $-- -- -- 79,485 48,329 -- C01S $-- -- -- 7,638 4,644 -- C01T $-- -- -- 7,462 4,537 -- C01U $-- -- -- 713 433 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21131st Page of 414TOC1stPreviousNextBottomJust 131st
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 2003 ---------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- C01V [/\/\] $-- [/\/\] -- -- 28,201 17,147 -- [/\/\] C01W $-- -- -- 1,323 805 -- C01X $-- -- -- 713 433 -- C01Y $-- -- -- 31,872 19,379 -- C01Z $-- -- -- 7,329 4,456 -- C020 $-- -- -- 19,069 11,595 -- C021 $-- -- -- 13,121 7,978 -- C022 $-- -- -- 126,300 76,794 -- C023 $-- -- -- 128,569 78,173 -- C024 $-- -- -- 2,941 1,788 -- C025 $-- -- -- 889 540 -- C026 $-- -- -- 150 91 -- C027 $-- -- -- 673 409 -- C028 $-- -- -- 448 273 -- C029 $-- -- -- 374 228 -- C02A $-- -- -- 56,934 34,617 -- C02B $-- -- -- 2,086 1,268 -- C02C $-- -- -- 332 202 -- C02D $-- -- -- 3,105 1,888 -- C02E $-- -- -- 7,554 4,593 -- C02F $-- -- -- 396 241 -- C02G $-- -- -- 1,584 963 -- C02H $-- -- -- 6,777 4,121 -- C02J $-- -- -- 1,584 963 -- C02K $-- -- -- 659 400 -- C02L $-- -- -- 48,930 29,751 -- C02M $-- -- -- 35,880 21,816 -- C02N $-- -- -- 46,691 28,390 -- C02P $-- -- -- 19,572 11,900 -- C02Q $-- -- -- 1,886 1,147 -- C02R $-- -- -- 1,738 1,057 -- C02S $-- -- -- 444 270 -- C02T $-- -- -- 695 422 -- C02U $-- -- -- 2,663 1,619 -- C02V $-- -- -- 264 161 -- C02W $-- -- -- 1,912 1,163 -- C02X $-- -- -- 5,215 3,171 -- C02Y $-- -- -- 4,360 2,651 -- C02Z $-- -- -- 4,172 2,537 -- C030 $-- -- -- 791 481 -- C031 $-- -- -- 1,313 799 -- C032 $-- -- -- 1,109 674 -- C033 $-- -- -- 1,043 634 -- C034 $-- -- -- 3,464 2,106 -- C035 $-- -- -- 1,636 995 -- C036 $-- -- -- 1,566 952 -- C037 $-- -- -- 1,043 634 -- C038 $-- -- -- 4,104 2,495 -- C039 $-- -- -- 332 202 -- C03A $-- -- -- 5,155 3,135 -- C03B $-- -- -- 3,882 2,360 -- C03C $-- -- -- 8,429 5,125 -- C03D $-- -- -- 31,444 19,119 -- C03E $-- -- -- 1,219 741 -- C03F $-- -- -- 6,881 4,184 -- C03G $-- -- -- 2,308 1,404 -- C03H $-- -- -- 38,187 23,219 -- C03J $-- -- -- 5,458 3,317 -- C03K $-- -- -- 4,092 2,488 -- C0GL $-- -- -- 121,575 73,921 -- C0GM $-- -- -- 229,968 139,825 -- C0GN $-- -- -- 294,157 178,855 -- Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21132nd Page of 414TOC1stPreviousNextBottomJust 132nd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit C [Enlarge/Download Table] FY 2003 --------------------------------------- ELIN Direct Direct Direct Direct Total 0002 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- C0GP [/\/\] $-- [/\/\] -- -- 2374 1,444 -- [/\/\] C0GQ $-- -- -- 1,219 741 -- C0GR $-- -- -- 35,973 21,872 -- C0GS $-- -- -- 35,610 21,652 -- C0GT $-- -- -- 21,654 13,166 -- C0GU $-- -- -- 791 481 -- C0GV $-- -- -- 159,778 97,149 -- C0GW $-- -- -- 3,884 2,362 -- C0GX $-- -- -- 72,370 44,003 -- C0GY $-- -- -- 4,995 3,037 -- C0GZ $-- -- -- 6,727 4,090 -- C0H0 $-- -- -- 791 481 -- C0H1 $-- -- -- 6,232 3,789 -- C0H2 $-- -- -- 17,304 10,521 -- C0H3 $-- -- -- 16,361 9,948 -- C0H4 $-- -- -- 9,434 5,736 -- C0H5 $-- -- -- 3,772 2,293 -- C0H6 $-- -- -- 5,323 3,237 -- C0H7 $-- -- -- 26,953 16,388 -- C0H8 $-- -- -- 5,239 3,186 -- C0H9 $-- -- -- 3,327 2,023 -- C0HA $-- -- -- 1,664 1,012 -- C0HB $-- -- -- 2,995 1,821 -- C0HC $-- -- -- 25,720 15,639 -- C0HD $-- -- -- 8,096 4,923 -- --- --- --------- --- ---------- --------- --- 149 -- -- 3,588,000 -- 12,705,981 7,725,572 -- --- --- --------- --- ---------- --------- --- Cost Summary ------- 0002AA Transition 0002AC Repair Ops T-56 F-100 TF-39 Fuel Accy Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21133rd Page of 414TOC1stPreviousNextBottomJust 133rd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary / Exhibit C [Download Table] ELIN 0002 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- ------- ------- ------- ------- ------- C001 C001 [/\/\] [/\/\] 2,171 2,255 2,171 2,171 2,171 C002 C002 17,419 18,098 17,419 17,419 17,419 C003 C003 4,471 4,645 4,471 4,471 4,471 C004 C004 1,660 1,725 1,660 1,660 1,660 C005 C005 664 690 664 664 664 C006 C006 1,305 1,356 1,305 1,305 1,305 C007 C007 20,392 21,187 20,392 20,392 20,392 C008 C008 18,984 19,725 18,984 18,984 18,984 C009 C009 41,452 43,069 41,452 41,452 41,452 C00A C00A -- -- -- -- -- C00B C00B -- -- -- -- -- C00C C00C -- -- -- -- -- C00D C00D 955 992 955 955 955 C00E C00E 1,583 1,645 1,583 1,583 1,583 C00F C00F 5,341 5,549 5,341 5,341 5,341 C00G C00G 635 660 635 635 635 C00H C00H 5,662 5,883 5,662 5,662 5,662 C00J C00J 1,859 1,932 1,859 1,859 1,859 C00K C00K 681 708 681 681 681 C00L C00L 3,428 3,561 3,428 3,428 3,428 C00M C00M 580 602 580 580 580 C00N C00N 1,180 1,226 1,180 1,180 1,180 C00P C00P 871 905 871 871 871 C00Q C00Q 763 793 763 763 763 C00R C00R 219 227 219 219 219 C00S C00S 181 188 181 181 181 C00T C00T 1,006 1,045 1,006 1,006 1,006 C00U C00U 600 623 600 600 600 C00V C00V 1,393 1,447 1,393 1,393 1,393 C00W C00W 273 283 273 273 273 C00X C00X 1,006 1,046 1,006 1,006 1,006 C00Y C00Y 621 645 621 621 621 C00Z C00Z 495 514 495 495 495 C010 C010 495 514 495 495 495 C011 C011 1,409 1,463 1,409 1,409 1,409 C012 C012 273 283 273 273 273 C013 C013 1,583 1,645 1,583 1,583 1,583 C014 C014 1,850 1,923 1,850 1,850 1,850 C015 C015 2,496 2,593 2,496 2,496 2,496 C016 C016 273 283 273 273 273 C017 C017 95,022 98,728 95,022 95,022 95,022 C018 C018 95,022 98,728 95,022 95,022 95,022 C019 C019 95,022 98,728 95,022 95,022 95,022 C01A C01A 95,022 98,728 95,022 95,022 95,022 C01B C01B 95,022 98,728 95,022 95,022 95,022 C01C C01C 17,419 18,098 17,419 17,419 17,419 C01D C01D 3,428 3,561 3,428 3,428 3,428 C01E C01E 95,022 98,728 95,022 95,022 95,022 C01F C01F 16,944 17,605 16,944 16,944 16,944 C01G C01G 3,428 3,561 3,428 3,428 3,428 C01H C01H 118,463 123,083 118,463 118,463 118,463 C01J C01J 17,414 18,093 17,414 17,414 17,414 C01K C01K 3,428 3,561 3,428 3,428 3,428 C01L C01L 52,226 54,263 52,226 52,226 52,226 C01M C01M 21,834 22,686 21,834 21,834 21,834 C01N C01N 5,583 5,800 5,583 5,583 5,583 C01P C01P 166 172 166 166 166 C01Q C01Q 1,928 2,003 1,928 1,928 1,928 C01R C01R 7,452 7,743 7,452 7,452 7,452 C01S C01S 1,928 2,003 1,928 1,928 1,928 C01T C01T 1,360 1,413 1,360 1,360 1,360 C01U C01U 1,170 1,216 1,170 1,170 1,170 C01V C01V 1,683 1,748 1,683 1,683 1,683 C01W C01W 2,171 2,256 2,171 2,171 2,171 C01X C01X 1,170 1,216 1,170 1,170 1,170 C01Y C01Y 1,660 1,725 1,660 1,660 1,660 C01Z C01Z 1,850 1,923 1,850 1,850 1,850 C020 C020 728 756 728 728 728 C021 C021 1,305 1,356 1,305 1,305 1,305 C022 C022 664 690 664 664 664 C023 C023 5,341 5,549 5,341 5,341 5,341 C024 C024 302 313 302 302 302 C025 C025 132 138 132 132 132 C026 C026 245 255 245 245 245 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21134th Page of 414TOC1stPreviousNextBottomJust 134th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary/Exhibit C [Download Table] ELIN 0002 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- ------- ------- ------- ------- ------- C027 C027 [/\/\] [/\/\] 245 255 245 245 245 C028 C028 245 255 245 245 245 C029 C029 245 255 245 245 245 C02A C02A 1,583 1,645 1,583 1,583 1,583 C02B C02B 571 593 571 571 571 C02C C02C 364 378 364 364 364 C02D C02D 364 378 364 364 364 C02E C02E 708 736 708 708 708 C02F C02F 433 450 433 433 433 C02G C02G 433 450 433 433 433 C02H C02H 1,170 1,216 1,170 1,170 1,170 C02J C02J 433 450 433 433 433 C02K C02K 433 450 433 433 433 C02L C02L 5,352 5,561 5,352 5,352 5,352 C02M C02M 5,352 5,561 5,352 5,352 5,352 C02N C02N 5,107 5,306 5,107 5,107 5,107 C02P C02P 5,352 5,561 5,352 5,352 5,352 C02Q C02Q 364 378 364 364 364 C02R C02R 571 593 571 571 571 C02S C02S 364 378 364 364 364 C02T C02T 571 593 571 571 571 C02U C02U 364 378 364 364 364 C02V C02V 433 450 433 433 433 C02W C02W 571 593 571 571 571 C02X C02X 571 593 571 571 571 C02Y C02Y 596 619 596 596 596 C02Z C02Z 571 593 571 571 571 C030 C030 433 450 433 433 433 C031 C031 392 407 392 392 392 C032 C032 364 378 364 364 364 C033 C033 571 593 571 571 571 C034 C034 392 407 392 392 392 C035 C035 596 619 596 596 596 C036 C036 571 593 571 571 571 C037 C037 571 593 571 571 571 C038 C038 364 378 364 364 364 C039 C039 364 378 364 364 364 C03A C03A 846 879 846 846 846 C03B C03B 364 378 364 364 364 C03C C03C 364 378 364 364 364 C03D C03D 186 194 185 185 185 C03E C03E 364 378 364 364 364 C03F C03F 1,737 1,805 1,737 1,737 1,737 C03G C03G 689 715 689 689 689 C03H C03H 4,475 4,650 4,475 4,475 4,475 C03J C03J 4,475 4,650 4,475 4,475 4,475 C03K C03K 4,475 4,650 4,475 4,475 4,475 C0GL C0GL 186 194 186 186 186 C0GM C0GM 5,352 5,561 5,352 5,352 5,352 C0GN C0GN 5,107 5,306 5,107 5,107 5,107 C0GP C0GP 433 450 433 433 433 C0GQ C0GQ 364 378 364 364 364 C0GR C0GR 295 307 295 295 295 C0GS C0GS 708 736 708 708 708 C0GT C0GT 846 879 846 846 846 C0GU C0GU 433 450 433 433 433 C0GV C0GV 571 593 571 571 571 C0GW C0GW 708 735 708 708 708 C0GX C0GX 392 407 392 392 392 C0GY C0GY 144 149 144 144 144 C0GZ C0GZ 433 450 433 433 433 C0H0 C0H0 433 450 433 433 433 C0H1 C0H1 330 343 330 330 330 C0H2 C0H2 364 378 364 364 364 C0H3 C0H3 392 407 392 392 392 C0H4 C0H4 392 407 392 392 392 C0H5 C0H5 364 378 364 364 364 C0H6 C0H6 364 378 364 364 364 C0H7 C0H7 364 378 364 364 364 C0H8 C0H8 226 235 226 226 226 C0H9 C0H9 364 378 364 364 364 C0HA C0HA 364 378 364 364 364 C0HB C0HB 364 378 364 364 364 C0HC C0HC 433 450 433 433 433 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21135th Page of 414TOC1stPreviousNextBottomJust 135th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary/Exhibit C [Download Table] ELIN 0002 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- --------- --------- --------- --------- --------- C0HD C0HD [/\/\] [/\/\] 364 378 364 364 364 149 1,084,829 1,127,137 1,084,829 1,084,829 1,084,829 Cost Summary ------- 0002AA Transition 0002AC Repair Ops T-58 F-100 TF-39 Fuel Accy Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21136th Page of 414TOC1stPreviousNextBottomJust 136th
Confidential - Competition Sensitive Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] ELIN Org FY04- FLOW [ ]CHECK UNIT 0003 Unit Type Maintenance Noun NSN FY99 FY00 FY01 FY02 FY03 FY13 DAYS FEEMS HOURS ---- ---- ------------------- ---- --- ---- ----- ----- ----- ----- ----- ---- -------- ----- D001 SA T56 Engine and LRUs [/\/\] [/\/\] 1 1 1 1 1 -- 18 33 D002 SA T56 Engine and LRUs 74 272 267 267 267 -- 28 X 265 D003 SA T56 Engine and LRUs 8 32 34 34 34 -- 30 88 D004 SA T56 Engine and LRUs 24 103 109 109 109 -- 32 25 D005 SA T56 Engine and LRUs 140 803 638 638 638 -- 0 X 10 D006 SA T56 Engine and LRUs 17 71 75 75 75 -- 13 20 D007 SA T56 Engine and LRUs 2 0 7 7 7 -- 25 X 310 D008 SA T56 Engine and LRUs 8 24 26 26 26 -- 25 X 289 D009 SA T56 Engine and LRUs 39 129 123 123 123 -- 28 X 480 D00A SA T56 Engine and LRUs 0 0 0 0 0 -- D00B SA T56 Engine and LRUs 0 0 0 0 0 -- D00C SA T56 Engine and LRUs 0 0 0 0 0 -- D00D SA T56 Engine and LRUs 14 50 50 50 50 -- 12 X 15 D00E SA T56 Engine and LRUs 18 58 71 71 71 -- 15 24 D00F SA T56 Engine and LRUs 30 108 105 105 105 -- 18 X 81 D00G SA T56 Engine and LRUs 88 356 381 381 381 -- 8 X 10 D00H SA T56 Engine and LRUs 22 72 69 69 69 -- 18 X 88 D00J SA T56 Engine and LRUs 14 60 83 83 83 -- 26 28 D00K SA T56 Engine and LRUs 44 187 198 198 198 -- 7 10 D00L SA T56 Engine and LRUs 48 164 157 157 157 -- 11 X 52 D00M SA T56 Engine and LRUs 83 421 446 446 448 -- 5 X 9 D00N SA T56 Engine and LRUs 24 99 105 105 105 -- 12 X 18 D00P SA T56 Engine and LRUs 20 83 88 88 88 -- 8 X 13 D00Q SA T56 Engine and LRUs 19 81 85 85 85 -- 10 X 12 D00R SA T56 Engine and LRUs 170 741 787 787 787 -- 8 3 D00S SA T56 Engine and LRUs 115 483 513 513 513 -- 7 3 D00T SA T56 Engine and LRUs 1 33 49 49 49 -- 7 15 D00U SA T56 Engine and LRUs 20 85 90 90 90 -- 9 9 D00V SA T56 Engine and LRUs 27 108 108 108 108 -- 15 21 D00W SA T56 Engine and LRUs 99 417 443 443 443 -- 7 4 D00X SA T56 Engine and LRUs 28 117 124 124 124 -- 7 15 D00Y SA T56 Engine and LRUs 185 700 400 400 400 -- 12 9 D00Z SA T56 Engine and LRUs 45 188 188 188 188 -- 11 X 8 D010 SA T56 Engine and LRUs 35 148 157 157 157 -- 9 X 8 D011 SA T56 Engine and LRUs 21 87 92 92 92 -- 11 21 D012 SA T56 Engine and LRUs 67 1,220 1,502 1,502 1,502 -- 5 4 D013 SA T56 Engine and LRUs 01 255 271 271 271 -- 13 24 D014 SA T56 Engine and LRUs 3 13 14 14 14 -- 12 28 D015 SA T56 Engine and LRUs 35 147 158 158 158 -- 28 38 D016 SA T56 Engine and LRUs 142 507 833 833 833 -- 7 4 D017 SA T56 Engine and LRUs 1 1 1 1 1 -- 37 1,296 D018 SA T56 Engine and LRUs 7 25 24 24 24 -- 37 1,296 D019 SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 D01A SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 D01B SA T56 Engine and LRUs 3 20 17 17 17 -- 37 1,296 D01C SA T56 Engine and LRUs 6 25 18 18 18 -- 28 285 D01D SA T56 Engine and LRUs 4 14 11 11 11 -- 11 52 D01E SA T56 Engine and LRUs 2 8 14 14 14 -- 37 1,296 D01F SA T56 Engine and LRUs 3 8 8 8 8 -- 28 258 D01G SA T56 Engine and LRUs 2 8 8 8 8 -- 11 52 D01H SA T56 Engine and LRUs 1 5 5 5 5 -- 37 1,652 D01J SA T56 Engine and LRUs 1 5 4 4 4 -- 28 285 D01K SA T56 Engine and LRUs 1 2 2 2 2 -- 11 52 D01L SA T56 Engine and LRUs 8 32 31 31 31 -- 30 795 D01M SA T56 Engine and LRUs 1 3 3 3 3 -- 30 332 D01N SA Navy T56 20 81 38 38 38 -- 30 85 D01P SA Navy T56 6 26 12 12 12 -- 11 3 D01Q SA Navy T56 6 22 10 10 10 -- 30 29 D01R SA Navy T56 18 74 35 35 35 -- 21 113 D01S SA Navy T56 7 27 13 13 13 -- 15 28 D01T SA Navy T56 10 38 18 18 18 -- 31 21 D01U SA Navy T56 1 2 2 2 2 -- 30 18 D01V SA Navy T56 29 116 55 55 55 -- 31 26 D01W SA Navy T56 1 3 2 2 2 -- 30 33 D01X SA Navy T56 3 4 2 2 2 -- 28 18 D01Y SA Navy T56 33 134 83 83 83 -- 32 25 D01Z SA Navy T56 7 26 13 13 13 -- 12 28 D020 SA Navy T56 45 183 88 88 88 -- 12 11 D021 SA Navy T56 18 70 33 33 33 -- 12 20 D022 SA Navy T56 329 1,324 824 824 824 -- 6 10 D023 SA Navy T56 42 187 79 79 79 -- 18 81 D024 SA Navy T56 6 32 32 32 32 -- 30 5 D025 SA Navy T56 4 22 22 22 22 -- 30 2 D026 SA Navy T56 1 2 2 2 2 -- 30 4 D027 SA Navy T56 2 9 9 9 9 -- 30 4 D028 SA Navy T56 4 14 6 6 6 -- 29 4 D029 SA Navy T56 1 5 5 5 5 -- 30 4 D02A SA Navy T56 62 249 118 118 118 -- 18 24 D02B SA Navy T56 3 12 12 12 12 -- 30 9 D02C SA Navy T56 1 3 3 3 3 -- 30 8 D02D SA Navy T56 14 50 28 28 28 -- 5 8 D02E SA Navy T56 18 74 35 35 35 -- 8 11 D02F SA Navy T56 2 8 3 3 3 -- 3 7 D02G SA Navy T56 6 25 12 12 12 -- 30 7 D02H SA Navy T56 10 40 18 18 18 -- 30 18 D02J SA Navy T56 6 26 12 12 12 -- 30 7 D02K SA Navy T56 3 11 5 5 5 -- 30 7 D02L SA Navy T56 14 55 30 30 30 -- 30 81 D02M SA Navy T56 12 46 22 22 22 -- 30 81 D02N SA Navy T56 18 83 30 30 30 -- 30 78 D02P SA Navy T56 6 25 12 12 12 -- 30 81 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21137th Page of 414TOC1stPreviousNextBottomJust 137th
Confidential - Competition Sensitive Lockhead Martin Kelly Aircraft Center Propultion Business Area Public/Private Competition F41008-06-R-0084 ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] ELIN 0003 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- --------- --------- --------- --------- --------- D02E D02E [/\/\] [/\/\] 858 883 858 858 858 D02F D02F 402 416 402 402 402 D02G D02G 402 418 402 402 402 D02H D02H 1,087 1,129 1,087 1,087 1,087 D02J D02J 402 418 402 402 402 D02K D02K 402 418 402 402 402 D02L D02L 4,969 5,163 4,969 4,969 4,969 D02M D02M 4,969 5,163 4,969 4,969 4,969 D02N D02N 4,742 4,927 4,742 4,742 4,742 D02P D02P 4,989 5,163 4,959 4,959 4,959 D02Q D02Q 338 351 338 338 338 D02R D02R 530 550 530 530 530 D02S D02S 338 351 338 338 338 D02T D02T 530 550 530 530 530 D02U D02U 338 351 338 338 338 D02V D02V 402 418 402 402 402 D02W D02W 530 550 530 530 530 D02X D02X 530 550 530 530 530 D02Y D02Y 554 575 554 554 554 D02Z D02Z 530 650 530 530 530 D030 D030 402 418 402 402 402 D031 D031 364 378 364 364 364 D032 D032 338 351 338 338 338 D033 D033 530 550 530 530 530 D034 D034 384 378 364 364 364 D035 D035 554 575 554 554 554 D036 D036 530 550 530 530 530 D037 D037 530 550 530 530 530 D038 D038 338 351 338 338 338 D039 D039 338 351 338 338 338 D03A D03A 785 818 785 785 785 D03B D03B 338 351 338 338 338 D03C D03C 338 351 338 338 338 D03D D03D 173 180 173 173 173 D03E D03E 338 351 338 338 338 D03F D03F 1,813 1,676 1,813 1,813 1,813 D03G D03G 838 664 639 639 639 D03H D03H 4,155 4,317 4,155 4,155 4,155 D03J D03J 4,155 4,317 4,155 4,155 4,155 D03K D03K 4,155 4,317 4,155 4,155 4,155 D0GL D0GL 173 180 173 173 173 D0GM D0GM 4,969 5,163 4,969 4,969 4,969 D0GN D0GN 4,742 4,927 4,742 4,742 4,742 D0GP D0GP 402 418 402 402 402 D0GQ D0GQ 338 351 338 338 338 D0GR D0GR 274 285 274 274 274 D0GS D0GS 658 683 658 658 658 D0GT D0GT 785 818 785 785 785 D0GU D0GU 402 418 402 402 402 D0GV D0GV 530 550 530 530 530 D0GW D0GW 658 683 658 658 658 D0GX D0GX 364 378 364 364 364 D0GY D0GY 133 139 133 133 133 D0GZ D0GZ 402 418 402 402 402 D0H0 D0H0 402 418 402 402 402 D0H1 D0H1 308 518 306 306 306 D0H2 D0H2 338 351 338 338 338 D0H3 D0H3 364 378 364 364 364 D0H4 D0H4 364 378 364 364 364 D0H5 D0H5 338 351 338 338 338 D0H6 D0H6 338 351 338 338 338 D0H7 D0H7 338 351 338 338 338 D0H8 D0H8 210 218 210 210 210 D0H9 D0H9 338 351 338 338 338 D0HA D0HA 338 351 338 338 338 D0HB D0HB 338 351 338 338 338 D0HC D0HC 402 418 402 402 402 D0HD D0HD 338 351 338 338 338 D0LV D0LV 166,809 173,314 168,809 168,809 168,809 D0LW D0LW 166,809 173,314 168,809 168,809 168,809 151 1,340,887 1,393,182 1,340,887 1,340,887 1,340,887 Cost Summary ------- 0003AA Transition 0003AC Repair Ops T-56 F-100 TF-39 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21138th Page of 414TOC1stPreviousNextBottomJust 138th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- D001 [/\/\] $-- [/\/\] -- -- 623,68 379 [/\/\] D002 $-- -- -- 370,814 225,465 D003 $-- -- -- 10,289 6,256 D004 $-- -- -- 11,462 6,969 D005 $-- -- -- 26,750 16,265 D006 $-- -- -- 6,380 3,879 D007 $-- -- -- 11,733 7,134 D008 $-- -- -- 32,768 19,924 D009 $-- 358,800 -- 353,905 215,183 D00A $-- -- -- -- -- D00B $-- -- -- -- -- D00C $-- -- -- -- -- D00D $-- -- -- 3,846 2,338 D00E $-- -- -- 7,288 4,431 D00F $-- -- -- 46,090 28,024 D00G $-- -- -- 15,709 9,552 D00H $-- -- -- 35,835 21,789 D00J $-- -- -- 7,488 4,553 D00K $-- -- -- 8,624 5,243 D00L $-- -- -- 47,332 28,779 D00M $-- -- -- 10,508 6,389 D00N $-- -- -- 8,146 4,953 D00P $-- -- -- 5,012 3,048 D00Q $-- -- -- 4,171 2,536 D00R $-- -- -- 11,077 6,735 D00S $-- -- -- 5,978 3,635 D00T $-- -- -- 289 176 D00U $-- -- -- 3,451 2,098 D00V $-- -- -- 10,818 6,578 D00W $-- -- -- 7,766 4,722 D00X $-- -- -- 8,108 4,930 D00Y $-- -- -- 33,042 20,090 D00Z $-- -- -- 6,409 3,897 D010 $-- -- -- 4,984 3,030 D011 $-- -- -- 8,509 5,173 D012 $-- -- -- 5,256 3,196 D013 $-- -- -- 27,784 16,893 D014 $-- -- -- 1,597 971 D015 $-- -- -- 25,131 15,280 D016 $-- -- -- 11,137 6,772 D017 $-- 9,200 -- 24,486 14,888 D018 $-- 64,400 -- 171,397 104,214 D019 $-- 36,800 -- 97,941 59,550 D01A $-- 36,800 -- 97,941 59,550 D01B $-- 27,600 -- 73,456 44,663 D01C $-- -- -- 30,065 18,280 D01D $-- -- -- 3,944 2,398 D01E $-- 18,400 -- 48,970 29,775 D01F $-- -- -- 14,622 8,891 D01G $-- -- -- 1,973 1,200 D01H $-- 9,200 -- 31,229 18,988 D01J $-- -- -- 5,010 3,046 D01K $-- -- -- 987 600 D01L $-- -- -- 120,193 73,080 D01M $-- -- -- 6,282 3,820 D01N $-- -- -- 32,120 19,530 D01P $-- -- -- 285 174 D01Q $-- -- -- 3,328 2,024 D01R $-- -- -- 38,589 23,463 D01S $-- -- -- 3,882 2,360 D01T $-- -- -- 3,914 2,380 D01U $-- -- -- 336 205 D01V $-- -- -- 14,037 8,535 D01W $-- -- -- 624 379 D01X $-- -- -- 1,009 614 D01Y $-- -- -- 15,760 9,583 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21139th Page of 414TOC1stPreviousNextBottomJust 139th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit D [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------ --- ----- D01Z [/\/\] $-- [/\/\] -- -- 3,727 2,266 [/\/\] D020 $-- -- -- 9,419 5,727 D021 $-- -- -- 6,757 4,108 D022 $-- -- -- 62,863 38,222 D023 $-- -- -- 64,526 39,234 D024 $-- -- -- 522 317 D025 $-- -- -- 153 93 D026 $-- -- -- 70 43 D027 $-- -- -- 142 86 D028 $-- -- -- 282 171 D029 $-- -- -- 70 43 D02A $-- -- -- 28,239 17,170 D02B $-- -- -- 493 300 D02C $-- -- -- 104 63 D02D $-- -- -- 1,457 892 D02E $-- -- -- 3,666 2,229 D02F $-- -- -- 249 152 D02G $-- -- -- 747 454 D02H $-- -- -- 3,368 2,048 D02J $-- -- -- 747 454 D02K $-- -- -- 374 228 D02L $-- -- -- 21,555 13,106 D02M $-- -- -- 18,476 11,234 D02N $-- -- -- 23,507 14,293 D02P $-- -- -- 9,238 5,617 D02Q $-- -- -- 943 573 D02R $-- -- -- 820 499 D02S $-- -- -- 210 128 D02T $-- -- -- 329 200 D02U $-- -- -- 1,361 827 D02V $-- -- -- 125 76 D02W $-- -- -- 985 599 D02X $-- -- -- 2,625 1,596 D02Y $-- -- -- 2,058 1,251 D02Z $-- -- -- 1,969 1,197 D030 $-- -- -- 374 228 D031 $-- -- -- 677 411 D032 $-- -- -- 627 382 D033 $-- -- -- 656 399 D034 $-- -- -- 1,691 1,028 D035 $-- -- -- 858 522 D036 $-- -- -- 820 499 D037 $-- -- -- 493 300 D038 $-- -- -- 1,990 1,210 D039 $-- -- -- 210 128 D03A $-- -- -- 2,434 1,480 D03B $-- -- -- 1,884 1,146 D03C $-- -- -- 4,188 2,546 D03D $-- -- -- 15,592 9,480 D03E $-- -- -- 627 382 D03F $-- -- -- 3,498 2,127 D03G $-- -- -- 1,189 723 D03H $-- -- -- 18,024 10,959 D03J $-- -- -- 2,574 1,565 D03K $-- -- -- 2,574 1,565 D0GL $-- -- -- 25,289 15,377 D0GM $-- -- -- 36,952 22,468 D0GN $-- -- -- 11,754 7,146 D0GP $-- -- -- 499 303 D0GQ $-- -- -- 314 191 D0GR $-- -- -- 10,189 6,195 D0GS $-- -- -- 7,335 4,460 D0GT $-- -- -- 4,137 2,515 D0GU $-- -- -- 125 76 D0GV $-- -- -- 32,004 19,459 D0GW $-- -- -- 815 495 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21140th Page of 414TOC1stPreviousNextBottomJust 140th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 1999 ----------------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---------- --------- ---------- ---------- -------- -------- ---------- --------- --------- --- ----- D0GX [/\/\] $-- [/\/\] -- -- 14,430 8,774 [/\/\] D0GY $-- -- -- 1,975 854 D0GZ $-- -- -- 1,618 964 D0H0 $-- -- -- 125 76 D0H1 $-- -- -- 1,329 808 D0H2 $-- -- -- 3,769 2,291 D0H3 $-- -- -- 3,495 2,125 D0H4 $-- -- -- 1,803 1,095 D0H5 $-- -- -- 943 573 D0H6 $-- -- -- 1,457 892 D0H7 $-- -- -- 5,759 3,501 D0H8 $-- -- -- 1,302 792 D0H9 $-- -- -- 733 446 D0HA $-- -- -- 420 255 D0HB $-- -- -- 733 446 D0HC $-- -- -- 5,479 3,331 D0HD $-- -- -- 2,094 1,273 D0LV $-- 92,000 -- 488,314 296,907 D0LW $-- 230,000 -- 1,220,785 742,269 --- --- ------- ---------- --------- --------- --- 151 -- -- 883,200 -- 4,256,739 2,588,209 -- --- --- ------- ---------- --------- --------- --- Cost Summary ------- 0003AA Transition -- -- 27,778,100 -- -- -- 0003AC Repair Ops T-56 -- -- 561,200 -- 2,371,657 1,442,030 -- F-100 TF-39 $-- -- -- -- -- -- -- Fuel Accy -- -- -- 175,984 107,003 -- T-56 2LM -- -- 322,000 -- 1,709,098 1,039,177 -- --- --- ------- ---------- --------- --------- --- Totals $-- -- 883,200 -- 4,256,739 2,588,209 -- === === ======= ========== ========= ========= === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21141st Page of 414TOC1stPreviousNextBottomJust 141st
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Pulic/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2000 ----------------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---------- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- D001 [/\/\] $-- [/\/\] -- -- 965 658 [/\/\] D002 $-- -- -- 2,109,245 1,438,622 D003 $-- -- -- 63,694 43,443 D004 $-- -- -- 76,124 51,921 D005 $-- -- -- 178,299 121,610 D006 $-- -- -- 41,241 28,129 D007 $-- -- -- 54,467 37,149 D008 $-- -- -- 202,835 138,344 D009 $-- 1,185,800 -- 1,811,527 1,235,562 D00A $-- -- -- -- -- D00B $-- -- -- -- -- D00C $-- -- -- -- -- D00D $-- -- -- 23,807 16,238 D00E $-- -- -- 47,930 32,691 D00F $-- -- -- 256,769 175,131 D00G $-- -- -- 101,479 69,214 D00H $-- -- -- 181,487 123,784 D00J $-- -- -- 49,662 33,872 D00K $-- -- -- 56,716 38,683 D00L $-- -- -- 250,259 170,690 D00M $-- -- -- 108,662 74,113 D00N $-- -- -- 52,001 35,458 D00P $-- -- -- 32,189 21,955 D00Q $-- -- -- 27,516 18,767 D00R $-- -- -- 72,167 49,222 D00S $-- -- -- 38,849 26,497 D00T $-- -- -- 14,787 10,086 D00U $-- -- -- 22,699 15,482 D00V $-- -- -- 66,964 45,673 D00W $-- -- -- 50,615 34,522 D00X $-- -- -- 52,423 35,755 D00Y $-- -- -- 220,833 150,620 D00Z $-- -- -- 41,431 28,259 D010 $-- -- -- 32,616 22,245 D011 $-- -- -- 54,555 37,209 D012 $-- -- -- 148,078 100,997 D013 $-- -- -- 179,738 122,591 D014 $-- -- -- 10,707 7,303 D015 $-- -- -- 163,330 111,400 D016 $-- -- -- 72,463 49,423 D017 $-- 9,200 -- 37,893 25,845 D018 $-- 230,000 -- 947,281 646,098 D019 $-- 138,000 -- 568,368 387,658 D01A $-- 138,000 -- 568,368 387,658 D01B $-- 184,000 -- 757,825 516,878 D01C $-- -- -- 193,864 132,226 D01D $-- -- -- 21,365 14,572 D01E $-- 82,800 -- 341,021 232,595 D01F $-- -- -- 67,888 46,304 D01G $-- -- -- 12,208 8,326 D01H $-- 46,000 -- 241,634 164,808 D01J $-- -- -- 38,761 26,437 D01K $-- -- -- 3,053 2,083 D01L $-- -- -- 743,999 507,449 D01M $-- -- -- 29,162 19,890 DO1N $-- -- -- 201,308 137,303 D01P $-- -- -- 1,916 1,307 D01Q $-- -- -- 18,882 12,879 D01R $-- -- -- 245,506 167,449 D01S $-- -- -- 23,172 15,805 D01T $-- -- -- 23,012 15,695 D01U $-- -- -- 1,041 710 D01V $-- -- -- 86,887 59,262 D01W $-- -- -- 2,898 1,977 D01X $-- -- -- 2,085 1,422 D01Y $-- -- -- 99,037 87,548 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21142nd Page of 414TOC1stPreviousNextBottomJust 142nd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2000 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- D01Z [/\/\] $-- [/\/\] -- -- 23,084 15,731 [/\/\] D020 $-- -- -- 59,275 40,429 D021 $-- -- -- 40,659 27,732 D022 $-- -- -- 391,490 267,018 D023 $-- -- -- 397,041 270,804 D024 $-- -- -- 4,296 2,930 D025 $-- -- -- 1,299 886 D026 $-- -- -- 219 150 D027 $-- -- -- 983 670 D028 $-- -- -- 1,530 1,043 D029 $-- -- -- 547 373 D02A $-- -- -- 175,509 119,707 D02B $-- -- -- 3,048 2,079 D02C $-- -- -- 486 331 D02D $-- -- -- 9,561 6,521 D02E $-- -- -- 23,330 15,913 DQ2F $-- -- -- 1,155 788 D02G $-- -- -- 4,817 3,285 D02H $-- -- -- 20,844 14,217 D02J $-- -- -- 5,010 3,417 D02K $-- -- -- 2,120 1,446 D02L $-- -- -- 431,045 89,380 D02M $-- -- -- 114,365 78,003 D02N $-- -- -- 143,241 97,698 D02P $-- -- -- 59,565 40,626 D02Q $-- -- -- 5,832 3,978 D02R $-- -- -- 5,335 3,639 D02S $-- -- -- 1,459 995 D02T $-- -- -- 2,033 1,386 D02U $-- -- -- 8,426 5,747 D02V $-- -- -- 386 263 D02W $-- -- -- 6,095 4,157 D02X $-- -- -- 16,001 10,914 D02Y $-- -- -- 13,272 9,052 D02Z $-- -- -- 12,954 8,835 D030 $-- -- -- 2,313 1,578 D031 $-- -- -- 4,013 2,737 D032 $-- -- -- 3,565 2,432 D033 $-- -- -- 3,811 2,599 D034 $-- -- -- 10,643 7,259 D035 $-- -- -- 5,308 3,621 D036 $-- -- -- 5,080 3,465 D037 $-- -- -- 3,048 2,079 D038 $-- -- -- 12,638 8,620 D039 $-- -- -- 1,135 774 D03A $-- -- -- 15,817 10,788 D03B $-- -- -- 12,152 8,288 D03C $-- -- -- 26,088 17,794 D03D $-- -- -- 97,343 66,393 D03E $-- -- -- 3,726 2,541 D03F $-- -- -- 22,424 15,294 D03G $-- -- -- 7,356 5,017 D03H $-- -- -- 115,558 78,817 D03J $-- -- -- 17,931 12,230 D03K $-- -- -- 13,945 9,513 D0GL $-- -- -- 179,346 122,324 D0GM $-- -- -- 319,270 217,760 D0GN $-- -- -- 445,838 303,950 D0GP $-- -- -- 3,469 2,366 D0GQ $-- -- -- 1,781 1,215 D0GR $-- -- -- 44,274 30,197 D0GS $-- -- -- 58,751 38,707 D0GT $-- -- -- 29,376 20,036 D0GU $-- -- -- 1,155 788 D0GV $-- -- -- 213,094 145,342 D0GW $-- -- -- 5,361 3,656 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21143rd Page of 414TOC1stPreviousNextBottomJust 143rd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2000 ----------------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- D0GX [/\/\] $-- [/\/\] -- -- 112,701 76,888 [/\/\] D0GY $-- -- -- 6,850 4,672 D0GZ $-- -- -- 9,634 6,571 D0H0 $-- -- -- 962 856 D0H1 $-- -- -- 8,812 8,010 D0H2 $-- -- -- 22,359 15,250 D0H3 $-- -- -- 21,807 14,873 D0H4 $-- -- -- 12,734 8,685 D0H5 $-- -- -- 5,510 3,758 D0H6 $-- -- -- 7,777 5,304 D0H7 $-- -- -- 37,267 25,418 DOH8 $-- -- -- 8,461 5,771 DOH9 $-- -- -- 4,212 2,873 D0HA $-- -- -- 2,270 1,548 D0HB $-- -- -- 4,051 2,763 D0HC $-- -- -- 35,453 24,181 D0HD $-- -- -- 20,578 14,036 D0LV $-- 487,600 -- 4,005,063 2,731,674 D0LW $-- 1,094,800 -- 8,992,498 6,133,379 --- --------- --- ---------- ---------- --- 151 -- 3,597,200 -- 28,936,270 19,736,130 -- --- --------- --- ---------- ---------- --- Cost Summary ------- 0003AA Transition 0003AC Repair Ops T-56 -- 2,014,800 -- 14,317,755 9,765,498 -- F-100 TF-39 $-- -- -- -- -- -- Fuel Accy -- -- 1,62O,953 1,105,580 -- T-56 2LM -- 1,582,400 -- 12,997,561 8,865,053 -- --- --------- --- ---------- ---------- --- Totals -- 3,597,200 -- 28,936,270 19,736,130 -- === ========= === ========== ========== === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21144th Page of 414TOC1stPreviousNextBottomJust 144th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2001 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- D001 [/\/\] $-- [/\/\] -- -- 695 471 [/\/\] D002 $-- -- -- 1,491,596 1,009,500 D003 $-- -- -- 48,754 32,996 D004 $-- -- -- 58,035 39,278 D005 $-- -- -- 135,906 91,980 D006 $-- -- -- 31,384 21,240 D007 $-- -- -- 45,779 30,983 D008 $-- -- -- 158,301 107,137 D009 $-- 1,131,600 -- 1,244,348 842,164 D00A $-- -- -- -- -- D00B $-- -- -- -- -- D00C $-- -- -- -- -- D00D $-- -- -- 18,375 12,436 D00E $-- -- -- 36,053 24,400 D00F $-- -- -- 179,843 121,716 D00G $-- -- -- 77,588 52,511 D00H $-- -- -- 125,299 84,801 D00J $-- -- -- 37,566 25,424 D00K $-- -- -- 43,263 29,280 D00L $-- -- -- 172,595 116,811 D00M $-- -- -- 82,932 56,127 D00N $-- -- -- 39,734 26,892 D00P $-- -- -- 24,587 16,640 D00Q $-- -- -- 20,802 14,079 D00R $-- -- -- 55,218 37,371 D00S $-- -- -- 29,726 20,118 D00T $-- -- -- 15,817 10,705 D00U $-- -- -- 17,313 11,717 D00V $-- -- -- 48,242 32,650 D00W $-- -- -- 28,737 26,217 D00X $-- -- -- 40,027 27,090 D00Y $-- -- -- 79,645 53,903 D00Z $-- -- -- 31,594 21,383 D010 $-- -- -- 24,926 16,870 D011 $-- -- -- 41,561 28,128 D012 $-- -- -- 131,336 88,887 D013 $-- -- -- 137,610 93,133 D014 $-- -- -- 8,308 5,623 D015 $-- -- -- 124,869 84,510 D016 $-- -- -- 55,351 37,461 D017 $-- 9,200 -- 27,298 18,475 D018 $-- 220,800 -- 655,136 443,390 D019 $-- 138,000 -- 409,460 277,119 D01A $-- 138,000 -- 409,460 277,119 D01B $-- 156,400 -- 464,054 314,068 D01C $-- -- -- 100,557 68,056 D01D $-- -- -- 12,092 8,184 D01E $-- 128,800 -- 382,163 258,645 D01F $-- -- -- 43,474 29,423 D01G $-- -- -- 6,597 4,465 D01H $-- 46,000 -- 174,076 117,813 D01J $-- -- -- 22,341 15,120 D01K $-- -- -- 2,200 1,489 D01L $-- -- -- 519,239 351,416 D01M $-- -- -- 21,009 14,219 D01N $-- -- -- 68,037 46,047 D01P $-- -- -- 636 431 D01Q $-- -- -- 6,182 4,184 D01R $-- -- -- 83,652 56,615 D01S $-- -- -- 8,038 5,440 D01T $-- -- -- 7,853 5,315 D01U $-- -- -- 750 508 D01V $-- -- -- 29,679 20,087 D01W $-- -- -- 1,393 943 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21145th Page of 414TOC1stPreviousNextBottomJust 145th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2001 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ------ D01X [/\/\] $-- [/\/\] -- -- 750 508 [/\/\] D01Y $-- -- -- 33,543 22,702 D01Z $-- -- -- 7,714 5,221 D020 $-- -- -- 20,069 13,583 D021 $-- -- -- 13,809 9,346 D022 $-- -- -- 132,922 89,961 D023 $-- -- -- 135,309 91,576 D024 $-- -- -- 3,095 2,095 D025 $-- -- -- 936 633 D026 $-- -- -- 158 107 D027 $-- -- -- 708 479 D028 $-- -- -- 472 319 D029 $-- -- -- 394 267 D02A $-- -- -- 59,919 40,553 D02B $-- -- -- 2,195 1,486 D02C $-- -- -- 350 237 D02D $-- -- -- 3,268 2,212 D02E $-- -- -- 7,950 5,380 D02F $-- -- -- 417 282 D02G $-- -- -- 1,667 1,128 D02H $-- -- -- 7,132 4,827 D02J $-- -- -- 1,667 1,128 D02K $-- -- -- 693 469 D02L $-- -- -- 51,495 34,851 D02M $-- -- -- 37,762 25,557 D02N $-- -- -- 49,139 33,257 D02P $-- -- -- 20,598 13,941 D02Q $-- -- -- 1,985 1,343 D02R $-- -- -- 1,829 1,238 D02S $-- -- -- 468 317 D02T $-- -- -- 731 495 D02U $-- -- -- 2,802 1,897 D02V $-- -- -- 278 188 D02W $-- -- -- 2,012 1,362 D02X $-- -- -- 5,489 3,715 D02Y $-- -- -- 4,589 3,106 D02Z $-- -- -- 4,391 2,972 D030 $-- -- -- 832 563 D031 $-- -- -- 1,382 935 D032 $-- -- -- 1,167 790 D033 $-- -- -- 1,098 743 D034 $-- -- -- 3,645 2,467 D035 $-- -- -- 1,721 1,165 D036 $-- -- -- 1,648 1,115 D037 $-- -- -- 1,098 743 D038 $-- -- -- 4,319 2,923 D039 $-- -- -- 350 237 D03A $-- -- -- 5,426 3,672 D03B $-- -- -- 4,085 2,765 D03C $-- -- -- 8,870 6,003 D03D $-- -- -- 33,093 22,397 D03E $-- -- -- 1,283 868 D03F $-- -- -- 7,242 4,901 D03G $-- -- -- 2,429 1,644 D03H $-- -- -- 40,189 27,200 D03J $-- -- -- 5,742 3,886 D03K $-- -- -- 4,307 2,915 D0GL $-- -- -- 127,950 86,595 D0GM $-- -- -- 242,023 163,789 D0GN $-- -- -- 309,579 209,521 D0GP $-- -- -- 2,499 1,691 D0GQ $-- -- -- 1,283 868 D0GR $-- -- -- 37,859 25,622 D0GS $-- -- -- 37,477 25,364 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21146th Page of 414TOC1stPreviousNextBottomJust 146th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2001 ----------------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---------- --------- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- D0GT [/\/\] $-- [/\/\] -- -- 22,789 15,424 [/\/\] D0GU $-- -- -- 832 563 D0GV $-- -- -- 168,155 113,806 D0GW $-- -- -- 4,088 2,766 D0GX $-- -- -- 76,164 51,547 D0GY $-- -- -- 5,257 3,558 D0GZ $-- -- -- 7,080 4,791 D0HO $-- -- -- 832 563 D0H1 $-- -- -- 6,559 4,439 D0H2 $-- -- -- 18,211 12,325 D0H3 $-- -- -- 17,218 11,653 D0H4 $-- -- -- 9,928 6,719 D0H5 $-- -- -- 3,970 2,687 D0H6 $-- -- -- 5,603 3,792 D0H7 $-- -- -- 28,367 19,198 D0H8 $-- -- -- 5,514 3,732 D0H9 $-- -- -- 3,502 2,370 D0HA $-- -- -- 1,751 1,185 D0HB $-- -- -- 3,152 2,133 D0HC $-- -- -- 27,069 18,320 D0HD $-- -- -- 8,521 5,767 D0LV $-- 515,200 -- 3,048,618 2,063,279 D0LW $-- 1,122,400 -- 6,641,633 4,495,002 --- --------- --- ---------- ---------- --- 151 -- 3,606,400 -- 20,031,201 13,556,949 -- --- --------- --- ---------- ---------- --- Cost Summary ------- 0003AA Transition 0003AC Repair Ops T-56 -- 1,968,800 -- 9,157,719 6,197,868 -- F-100 TF-39 $-- -- -- -- -- -- Fuel Accy -- -- 1,183,230 800,800 -- T-56 2LM -- 1,637,600 -- 9,690,251 6,558,281 -- --- --------- --- ---------- ---------- --- Totals -- 3,606,400 -- 20,031,201 13,556,949 -- === ========= === ========== ========== === Standard Aero Proprietary - Not Releasable FPR Submission to LM-Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21147th Page of 414TOC1stPreviousNextBottomJust 147th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2002 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- D0O1 [/\/\] $-- [/\/\] -- -- 695 471 [/\/\] D002 $-- -- -- 1,491,596 1,009,500 D003 $-- -- -- 48,754 32,996 D004 $-- -- -- 58,035 39,278 D005 $-- -- -- 135,906 91,980 D006 $-- -- -- 31,384 21,240 D007 $-- -- -- 45,779 30,983 D008 $-- -- -- 158,301 107,137 D009 $-- 1,131,600 -- 1,244,348 842,164 D00A $-- -- -- -- -- D00B $-- -- -- -- -- D0OC $-- -- -- -- -- D0OD $-- -- -- 18,375 12,436 D0OE $-- -- -- 36,053 24,400 D0OF $-- -- -- 179,843 121,716 D0OG $-- -- -- 77,588 52,511 D0OH $-- -- -- 125,299 84,801 D0OJ $-- -- -- 37,566 25,424 D0OK $-- -- -- 43,263 29,280 D0OL $-- -- -- 172,595 116,811 D0OM $-- -- -- 82,832 56,127 D0ON $-- -- -- 39,734 26,892 D00P $-- -- -- 24,587 16,640 D0OQ $-- -- -- 20,802 14,079 D0OR $-- -- -- 55,218 37,371 D00S $-- -- -- 29,726 20,118 D0OT $-- -- -- 15,817 10,705 D0OU $-- -- -- 17,313 11,717 D00V $-- -- -- 48,242 32,650 D00W $-- -- -- 38,737 26,217 D00X $-- -- -- 40,027 27,090 D00Y $-- -- -- 79,645 53,903 D00Z $-- -- -- 31,594 21,383 D010 $-- -- -- 24,926 16,870 D011 $-- -- -- 41,561 28,128 D012 $-- -- -- 131,336 88,887 D013 $-- -- -- 137,610 93,133 D014 $-- -- -- 8,308 5,623 D015 $-- -- -- 124,869 84,510 D016 $-- -- -- 55,351 37,461 D017 $-- 9,200 -- 27,298 18,475 D018 $-- 220,800 -- 655,136 443,390 D019 $-- 138,000 -- 409,460 277,119 D01A $-- 138,000 -- 409,460 277,119 D01B $-- 156,400 -- 464,054 314,068 D01C $-- -- -- 100,557 68,056 D01D $-- -- -- 12,092 8,184 D01E $-- 128,800 -- 382,163 258,645 D01F $-- -- -- 43,474 29,423 D01G $-- -- -- 6,597 4,465 D01H $-- 46,000 -- 174,076 117,813 D01J $-- -- -- 22,341 15,120 D01K $-- -- -- 2,200 1,489 DO1L $-- -- -- 519,239 351,416 D01M $-- -- -- 21,009 14,219 D01N $-- -- -- 68,037 46,047 D01P $-- -- -- 636 431 D01Q $-- -- -- 6,182 4,184 D01R $-- -- -- 83,652 56,615 D01S $-- -- -- 8,038 5,440 D01T $-- -- -- 7,853 5,315 Standard Aero Proprietary - Not Releasable FPR Submission to LM-Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21148th Page of 414TOC1stPreviousNextBottomJust 148th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2002 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- -------- ------ --- ----- D01U [/\/\] $-- [/\/\] -- -- 750 508 [/\/\] D01V $-- -- -- 29,679 20,087 D01W $-- -- -- 1,393 943 D01X $-- -- -- 750 508 D01Y $-- -- -- 33,543 22,702 D01Z $-- -- -- 7,714 5,221 D020 $-- -- -- 20,069 13,583 D021 $-- -- -- 13,809 9,346 D022 $-- -- -- 132,922 89,961 D023 $-- -- -- 135,309 91,576 D024 $-- -- -- 3,095 2,095 D025 $-- -- -- 936 633 D026 $-- -- -- 158 107 D027 $-- -- -- 708 479 D028 $-- -- -- 472 319 D029 $-- -- -- 394 267 D02A $-- -- -- 59,919 40,553 D02B $-- -- -- 2,195 1,486 D02C $-- -- -- 350 237 D02D $-- -- -- 3,268 2,212 D02E $-- -- -- 7,950 5,380 D02F $-- -- -- 417 282 D02G $-- -- -- 1,657 1,128 D02H $-- -- -- 7,132 4,827 D02J $-- -- -- 1,667 1,128 D02K $-- -- -- 693 469 D02L $-- -- -- 51,495 34,851 D02M $-- -- -- 37,762 25,557 D02N $-- -- -- 49,139 33,257 D02P $-- -- -- 20,598 13,941 D02Q $-- -- -- 1,985 1,343 D02R $-- -- -- 1,829 1,238 D02S $-- -- -- 468 317 DO2T $-- -- -- 731 495 D02U $-- -- -- 2,802 1,897 D02V $-- -- -- 278 188 D02W $-- -- -- 2,012 1,362 D02X $-- -- -- 5,489 3,715 DO2Y $-- -- -- 4,589 3,106 D02Z $-- -- -- 4,391 2,972 D030 $-- -- -- 832 563 D031 $-- -- -- 1,382 935 D032 $-- -- -- 1,167 790 D033 $-- -- -- 1,098 743 D034 $-- -- -- 3,645 2,467 D035 $-- -- -- 1,721 1,165 D036 $-- -- -- 1,648 1,115 D037 $-- -- -- 1,098 743 D038 $-- -- -- 4,319 2,923 D039 $-- -- -- 350 237 D03A $-- -- -- 5,426 3,672 D03B $-- -- -- 4,085 2,765 D03C $-- -- -- 8,870 6,003 D03D $-- -- -- 33,093 22,397 D03E $-- -- -- 1,283 868 D03F $-- -- -- 7,242 4,901 D03G $-- -- -- 2,429 1,644 D03H $-- -- -- 40,189 27,200 D03J $-- -- -- 5,742 3,886 D03K $-- -- -- 4,307 2,915 D0GL $-- -- -- 127,950 86,595 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21149th Page of 414TOC1stPreviousNextBottomJust 149th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit D [Enlarge/Download Table] FY 2002 ----------------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- D0GM [/\/\] $-- [/\/\] -- -- 242,023 163,799 [/\/\] D0GN $-- -- -- 309,579 209,521 D0GP $-- -- -- 2,499 1,691 D0GQ $-- -- -- 1,283 868 D0GR $-- -- -- 37,859 25,622 D0GS $-- -- -- 37,477 25,364 D0GT $-- -- -- 22,789 15,424 D0GU $-- -- -- 832 563 D0GV $-- -- -- 168,155 113,806 D0GW $-- -- -- 4,088 2,766 D0GX $-- -- -- 76,164 51,547 D0GY $-- -- -- 5,257 3,558 D0GZ $-- -- -- 7,080 4,791 D0H0 $-- -- -- 832 563 D0H1 $-- -- -- 6,559 4,439 D0H2 $-- -- -- 18,211 12,325 D0H3 $-- -- -- 17,218 11,653 D0H4 $-- -- -- 9,928 6,719 D0H5 $-- -- -- 3,970 2,687 D0H6 $-- -- -- 5,603 3,792 D0H7 $-- -- -- 28,367 19,198 D0H8 $-- -- -- 5,514 3,732 D0H9 $-- -- -- 3,502 2,370 D0HA $-- -- -- 1,751 1,185 D0HB $-- -- -- 3,152 2,133 D0HC $-- -- -- 27,069 18,320 D0HD $-- -- -- 8,521 5,767 D0LV $-- 515,200 -- 3,048,618 2,063,279 D0LW $-- 1,122,400 6,641,633 4,495,002 --- --------- --- ---------- ---------- --- 151 -- 3,606,400 -- 20,031,201 13,556,949 -- --- --------- --- ---------- ---------- --- Cost Summary ------- 0003AA Transition 0003AC Repair Ops T-56 F-100 TF-39 Fuel Accy T-56 2LM Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21150th Page of 414TOC1stPreviousNextBottomJust 150th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit D [Enlarge/Download Table] FY 2003 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- D001 [/\/\] $-- [/\/\] -- -- 695 471 [/\/\] D002 $-- -- -- 1,49,596 1,009,500 D003 $-- -- -- 48,754 32,996 D004 $-- -- -- 58,035 39,278 D005 $-- -- -- 135,906 91,980 D006 $-- -- -- 31,384 21,240 D007 $-- -- -- 45,779 30,983 D008 $-- -- -- 158,301 107,137 D009 $-- 1,131,600 -- 1,244,348 842,164 D00A $-- -- -- -- -- D00D $-- -- -- -- -- D00C $-- -- -- -- -- D00D $-- -- -- 18,375 12,436 D00E $-- -- -- 36,053 24,400 D00F $-- -- -- 179,843 121,716 D00G $-- -- -- 77,588 52,511 D00H $-- -- -- 125,299 84,801 D00J $-- -- -- 37,566 25,424 D00K $-- -- -- 43,263 29,280 D00L $-- -- -- 172,595 116,811 D00M $-- -- -- 82,932 56,127 D00N $-- -- -- 39,734 26,892 D00P $-- -- -- 24,587 16,640 D00Q $-- -- -- 20,802 14,079 D00R $-- -- -- 55,218 37,371 D00S $-- -- -- 29,726 20,118 D00T $-- -- -- 15,817 10,705 D00U $-- -- -- 17,313 11,717 D00V $-- -- -- 48,242 32,650 D00W $-- -- -- 38,737 26,217 D00X $-- -- -- 40,027 27,090 D00Y $-- -- -- 79,645 53,903 D00Z $-- -- -- 31,594 21,383 D010 $-- -- -- 24,926 16,870 D011 $-- -- -- 41,561 28,128 D012 $-- -- -- 131,336 88,887 D013 $-- -- -- 137,610 93,133 D014 $-- -- -- 8,308 5,623 D015 $-- -- -- 124,869 84,510 D016 $-- -- -- 55,351 37,461 D017 $-- 9,200 -- 27,298 18,475 D018 $-- 220,800 -- 655,136 443,390 D019 $-- 138,000 -- 409,460 277,119 D01A $-- 138,000 -- 409,460 277,119 D01B $-- 156,400 -- 464,054 314,068 D01C $-- -- -- 100,557 68,056 D01D $-- -- -- 12,092 8,184 D01E $-- 128,800 -- 382,163 258,645 D01F $-- -- -- 43,474 29,423 D01G $-- -- -- 6,597 4,465 D01H $-- 46,000 -- 174,076 117,813 D01J $-- -- -- 22,341 15,120 D01K $-- -- -- 2,200 1,489 D01L $-- -- -- 519,239 351,416 D01M $-- -- -- 21,009 14,219 D01N $-- -- -- 68,037 46,047 D01P $-- -- -- 636 431 D01Q $-- -- -- 5,182 4,184 D01R $-- -- -- 83,652 56,615 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21151st Page of 414TOC1stPreviousNextBottomJust 151st
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] FY 2003 ----------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------ --- ----- D01S [/\/\] $-- [/\/\] -- -- 8,038 5,440 [/\/\] D01T $-- -- -- 7,853 5,315 D01U $-- -- -- 750 508 D01V $-- -- -- 29,679 20,087 D01W $-- -- -- 1,393 943 D01X $-- -- -- 750 508 D01Y $-- -- -- 33,543 22,702 D01Z $-- -- -- 7,714 5,221 D020 $-- -- -- 20,069 13,583 D021 $-- -- -- 13,809 9,346 D022 $-- -- -- 132,922 89,961 D023 $-- -- -- 135,309 91,576 D024 $-- -- -- 3,095 2,095 D025 $-- -- -- 936 633 D026 $-- -- -- 158 107 DO27 $-- -- -- 708 479 DO28 $-- -- -- 472 319 D029 $-- -- -- 394 267 D02A $-- -- -- 59,919 40,553 D02B $-- -- -- 2,195 1,486 D02C $-- -- -- 350 237 D02D $-- -- -- 3,268 2,212 D02E $-- -- -- 7,950 5,380 D02F $-- -- -- 417 282 D02G $-- -- -- 1,667 1,128 D02H $-- -- -- 7,132 4,827 D02J $-- -- -- 1,667 1,128 D02K $-- -- -- 693 469 D02L $-- -- -- 51,495 34,851 D02M $-- -- -- 37,762 25,557 D02N $-- -- -- 49,139 33,257 D02P $-- -- -- 20,598 13,941 D02Q $-- -- -- 1,985 1,343 D02R $-- -- -- 1,829 1,238 D02S $-- -- -- 468 317 D02T $-- -- -- 731 495 D02U $-- -- -- 2,802 1,897 D02V $-- -- -- 278 188 D02W $-- -- -- 2,012 1,362 D02X $-- -- -- 5,489 3,715 D02Y $-- -- -- 4,589 3,106 D02Z $-- -- -- 4,391 2,972 D030 $-- -- -- 832 563 D031 $-- -- -- 1,382 935 D032 $-- -- -- 1,167 790 D033 $-- -- -- 1,098 743 D034 $-- -- -- 3,645 2,467 D035 $-- -- -- 1,721 1,165 D036 $-- -- -- 1,648 1,115 DO37 $-- -- -- 1,098 743 DO38 $-- -- -- 4,319 2,923 D039 $-- -- -- 350 237 D01A $-- -- -- 5,426 3,672 D01B $-- -- -- 4,085 2,765 D01C $-- -- -- 8,870 6,003 D01D $-- -- -- 33,093 22,397 D01E $-- -- -- 1,283 868 D01F $-- -- -- 7,242 4,901 D01G $-- -- -- 2,429 1,644 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21152nd Page of 414TOC1stPreviousNextBottomJust 152nd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit D [Enlarge/Download Table] FY2003 --------------------------------- ELIN Direct Direct Direct Direct Total 0003 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- D03H [/\/\] $-- [/\/\] -- -- 40,189 27,200 [/\/\] D03J $-- -- -- 5,742 3,886 D03K $-- -- -- 4,307 2,915 D0GL $-- -- -- 127,950 86,595 D0GM $-- -- -- 242,023 163,799 D0GN $-- -- -- 309,579 209,521 D0GP $-- -- -- 2,499 1,691 D0GQ $-- -- -- 1,283 868 D0GR $-- -- -- 37,859 25,622 D0GS $-- -- -- 37,477 25,364 D0GT $-- -- -- 22,789 15,424 D0GU $-- -- -- 832 563 D0GV $-- -- -- 168,155 113,806 D0GW $-- -- -- 4,088 2,766 D0GX $-- -- -- 76,164 51,547 D0GY $-- -- -- 5,257 3,558 DOGZ $-- -- -- 7,080 4,791 D0H0 $-- -- -- 832 563 D0H1 $-- -- -- 6,559 4,439 D0H2 $-- -- -- 18,211 12,325 D0H3 $-- -- -- 17,218 11,653 D0H4 $-- -- -- 9,928 6,719 D0H5 $-- -- -- 3,970 2,687 D0H6 $-- -- -- 5,603 3,792 D0H7 $-- -- -- 28,367 19,198 D0H8 $-- -- -- 5,514 3,732 D0H9 $-- -- -- 3,502 2,370 D0HA $-- -- -- 1,751 1,185 D0HB $-- -- -- 3,152 2,133 D0HC $-- -- -- 27,069 18,320 D0HD $-- -- -- 8,521 5,767 D0LV $-- 515,200 -- 3,048,618 2,063,279 D0LW $-- 1,122,400 -- 6,641,633 4,495,002 --- --- --------- --- ---------- ---------- --- 151 -- -- 3,606,400 -- 20,031,201 13,556,949 -- --- --- --------- --- ---------- ---------- --- Cost Summary ------- 0003AA Transition 0003AC Repair Ops T-56 F-100 TF-39 Fuel Accy T-562LM Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21153rd Page of 414TOC1stPreviousNextBottomJust 153rd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary/Exhibit D [Download Table] ELIN 0003 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- ------- ------- ------- ------- ------- D001 D001 [/\/\] [/\/\] 2,015 2,094 2,015 2,015 2,015 D002 D002 16,174 16,804 16,174 16,174 16,174 D003 D003 4,151 4,313 4,151 4,151 4,151 D004 D004 1,541 1,602 1,541 1,541 1,541 D005 D005 817 841 817 817 817 D006 D006 1,211 1,259 1,211 1,211 1,211 D007 D007 18,934 18,672 18,934 18,934 18,934 D008 D008 17,627 18,314 17,627 17,627 17,627 D009 D009 38,489 38,990 38,489 38,489 38,489 D00A D00A -- -- -- -- -- D00B D00B -- -- -- -- -- D00C D00C -- -- -- -- -- D00D D00D 887 921 887 887 887 D00E D00E 1,470 1,527 1,470 1,470 1,470 D00F D00F 4,959 5,152 4,958 4,958 4,958 D00G D00G 590 613 590 590 590 D00H D00H 5,257 5,482 5,257 5,257 5,257 D00J D00J 1,728 1,794 1,728 1,728 1,728 D00K D00K 633 657 633 633 633 D00L D00L 3,183 3,307 3,183 3,183 3,183 D00M D00M 538 558 538 538 538 D00N D00N 1,098 1,138 1,098 1,096 1,098 D00P D00P 809 840 809 809 809 D00Q D00Q 709 738 709 709 709 D00R D00R 203 211 203 203 203 D00S D00S 168 174 168 168 168 D00T D00T 935 971 935 935 935 D00U D00U 557 579 557 557 557 D00V D00V 1,293 1,344 1,293 1,293 1,293 D00W D00W 253 263 253 253 253 D00X D00X 935 971 935 935 935 D00Y D00Y 576 598 576 576 576 D00Z D00Z 460 478 460 460 460 D010 D010 460 478 460 460 460 D011 D011 1,308 1,358 1,308 1,308 1,308 D012 D012 253 283 253 253 253 D013 D013 1,470 1,527 1,470 1,470 1,470 D014 D014 1,718 1,785 1,718 1,718 1,718 D015 D015 2,317 2,408 2,317 2,317 2,317 D016 D016 253 283 253 253 253 D017 D017 88,229 91,670 88,229 88,229 88,229 D018 D018 88,229 91,670 88,229 88,229 88,229 D019 D019 88,229 91,670 88,229 88,229 88,229 D01A D01A 88,229 91,670 88,229 88,229 88,229 D01B D01B 88,229 91,670 88,229 88,229 88,229 D01C D01C 16,174 16,804 16,174 16,174 16,174 D01D D01D 3,183 3,307 3,183 3,183 3,183 D01E D01E 88,229 91,670 88,229 88,229 88,229 D01F D01F 15,733 16,346 15,733 15,733 15,733 D01G D01G 3,183 3,307 3,183 3,183 3,183 D01H D01H 109,994 114,283 109,994 109,994 109,994 D01J D01J 16,169 16,800 16,169 16,169 16,169 D01K D01K 3,183 3,307 3,183 3,183 3,183 D01L D01L 48,492 50,383 48,492 48,492 48,492 D01M D01M 20,273 21,084 20,273 20,273 20,273 D01N D01N 5,183 5,386 5,183 5,183 5,183 D01P D01P 154 160 154 154 154 D01Q D01Q 1,790 1,860 1,790 1,790 1,790 D01R D01R 6,920 7,189 6,920 6,920 6,920 D01S D01S 1,790 1,860 1,790 1,790 1,790 D01T D01T 1,283 1,312 1,283 1,283 1,283 D01U D01U 1,087 1,129 1,087 1,087 1,087 D01V D01V 1,562 1,623 1,562 1,562 1,562 D01W D01W 2,016 2,094 2,016 2,016 2,016 D01X D01X 1,087 1,128 1,087 1,087 1,087 D01Y D01Y 1,541 1,802 1,541 1,541 1,541 D01Z D01Z 1,718 1,785 1,718 1,718 1,718 D020 D020 676 702 676 676 676 D021 D021 1,211 1,259 1,211 1,211 1,211 D022 D022 617 641 617 617 617 D023 D023 4,959 5,152 4,959 4,959 4,959 D024 D024 280 291 280 280 280 D025 D025 123 128 123 123 123 D026 D026 228 237 228 228 228 D027 D027 228 237 228 228 228 D028 D028 228 237 228 228 228 D029 D029 228 237 228 228 228 D02A D02A 1,470 1,527 1,470 1,470 1,470 D02B D02B 530 550 530 530 530 D02C D02C 338 351 338 338 338 D02D D02D 338 351 338 338 338 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21154th Page of 414TOC1stPreviousNextBottomJust 154th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary / Exhibit D [Enlarge/Download Table] ELIN 0003 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- --------- --------- --------- --------- --------- D02E D02E [/\/\] [/\/\] 858 883 858 858 858 D02F D02F 402 416 402 402 402 D02G D02G 402 418 402 402 402 D02H D02H 1,087 1,129 1,067 1,087 1,087 D02J D02J 402 418 402 402 402 D02K D02K 402 418 402 402 402 D02L D02L 4,969 5,163 4,969 4,969 4,969 D02M D02M 4,969 5,163 4,969 4,969 4,969 D02N D02N 4,742 4,927 4,742 4,742 4,742 D02P D02P 4,989 5,163 4,969 4,969 4,969 D02Q D02Q 338 351 338 338 338 D02R D02R 530 550 530 530 530 D02S D02S 338 351 338 338 338 D02T D02T 530 550 530 530 530 D02U D02U 338 351 338 338 338 D02V D02V 402 418 402 402 402 D02W D02W 530 550 530 530 530 D02X D02X 530 550 530 530 530 D02Y D02Y 554 575 554 554 554 D02Z D02Z 530 550 530 530 530 D030 D030 402 418 402 402 402 D031 D031 364 378 364 364 364 D032 D032 338 351 338 338 338 D033 D033 530 550 530 530 530 D034 D034 364 378 364 364 364 D035 D035 554 575 554 554 554 D036 D036 530 550 530 530 530 D037 D037 530 550 530 530 530 D038 D038 338 351 338 338 338 D039 D039 338 351 338 338 338 D03A D03A 785 816 785 785 785 D03B D03B 338 351 338 338 338 D03C D03C 338 351 338 338 338 D03D D03D 173 180 173 173 173 D03E D03E 338 351 338 338 338 D03F D03F 1,613 1,678 1,613 1,613 1,613 D03G D03G 639 664 639 639 639 D03H D03H 4,155 4,317 4,155 4,155 4,155 D03J D03J 4,155 4,317 4,155 4,155 4,155 D03K D03K 4,155 4,317 4,155 4,155 4,155 D0GL D0GL 173 180 173 173 173 D0GM D0GM 4,969 5,163 4,969 4,969 4,969 D0GN D0GN 4,742 4,927 4,742 4,742 4,742 D0GP D0GP 402 418 402 402 402 D0GQ D0GQ 338 351 338 338 338 D0GR D0GR 274 285 274 274 274 D0GS D0GS 658 683 658 658 658 D0GT D0GT 785 818 785 785 785 D0GU D0GU 402 418 402 402 402 D0GV D0GV 530 550 530 530 530 D0GW D0GW 658 683 658 658 658 D0GX D0GX 364 378 364 364 364 D0GY D0GY 133 139 133 133 133 D0GZ D0GZ 402 418 402 402 402 D0H0 D0H0 402 418 402 402 402 D0H1 D0H1 306 318 306 306 306 D0H2 D0H2 338 351 338 338 338 D0H3 D0H3 384 378 384 384 384 D0H4 D0H4 364 378 364 364 364 D0H5 D0H5 338 351 338 338 338 D0H6 D0H6 338 351 338 338 338 D0H7 D0H7 338 351 338 338 338 D0H8 D0H8 210 218 210 210 210 D0H9 D0H9 338 351 338 338 338 D0HA D0HA 338 351 338 338 338 D0HB D0HB 338 351 338 338 338 D0HC D0HC 402 418 402 402 402 D0HD D0HD 338 351 338 338 338 D0LV D0LV 166,809 73,314 168,809 166,809 166,809 D0LW D0LW 166,809 73,314 166,809 166,809 166,809 151 1,340,887 1,393,182 1,340,887 1,340,887 1,340,887 Cost Summary ------- 0003AA Transition 0003AC Repair Ops T-56 F-100 TF-39 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21155th Page of 414TOC1stPreviousNextBottomJust 155th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary / Exhibit D [Download Table] ELIN 0003 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- ------- --------- --------- --------- --------- Fuel Accy T-56 2LM Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21156th Page of 414TOC1stPreviousNextBottomJust 156th
Confidential - Competition Sensitive Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] ELIN Org FY 04- FLOW [ ] Check Unit 0004 Unit Type Maintenance NOUN NSN FY99 FY00 FY01 FY02 FY 03 FY 13 DAYS FEEMS Hours ---- ---- ------------------- ---- --- ---- ----- ----- ----- ----- ------ ---- --------- ----- E001 SA T56 Engine and LRUs [/\/\] [/\/\] 0 1 1 1 1 -- 18 33 E002 SA T56 Engine and LRUs 74 272 267 267 267 -- 28 X 265 E003 SA T56 Engine and LRUs 8 32 34 34 34 -- 30 58 E004 SA T56 Engine and LRUs 24 103 109 109 109 -- 32 25 E005 SA T56 Engine and LRUs 140 603 638 638 638 -- 6 X 10 E006 SA T56 Engine and LRUs 17 71 75 75 75 -- 13 20 E007 SA T56 Engine and LRUs 2 6 7 7 7 -- 25 X 310 E008 SA T56 Engine and LRUs 8 24 26 26 26 -- 25 X 289 E009 SA T56 Engine and LRUs 39 129 123 123 123 -- 28 X 450 E00A SA T56 Engine and LRUs 0 0 0 0 0 0 -- E00B SA T56 Engine and LRUs 0 0 0 0 0 0 -- E00C SA T56 Engine and LRUs 0 0 0 0 0 0 -- E00D SA T56 Engine and LRUs 14 56 60 60 60 -- 12 X 15 E00E SA T56 Engine and LRUs 16 68 71 71 71 -- 16 24 E00F SA T56 Engine and LRUs 30 108 105 105 105 -- 16 X 81 E00G SA T56 Engine and LRUs 86 359 381 381 381 -- 6 X 10 E00H SA T56 Engine and LRUs 22 72 69 69 69 -- 16 X 86 E00J SA T56 Engine and LRUs 14 60 63 63 63 -- 26 28 E00K SA T56 Engine and LRUs 44 187 198 198 198 -- 7 10 E00L SA T56 Engine and LRUs 48 164 157 157 157 -- 11 X 52 E00M SA T56 Engine and LRUs 63 421 446 446 446 -- 5 X 9 E00N SA T56 Engine and LRUs 24 99 105 105 105 -- 12 X 15 E00P SA T56 Engine and LRUs 20 83 88 88 88 -- 6 X 13 E00Q SA T56 Engine and LRUs 19 81 85 85 85 -- 10 X 12 E00R SA T56 Engine and LRUs 176 741 787 787 787 -- 8 3 E00S SA T56 Engine and LRUs 115 483 513 513 513 -- 7 3 E00T SA T56 Engine and LRUs 0 33 49 49 49 -- 7 15 E00U SA T56 Engine and LRUs 20 85 90 90 90 -- 9 9 E00V SA T56 Engine and LRUs 27 108 108 108 108 -- 15 21 E00W SA T56 Engine and LRUs 99 417 443 443 443 -- 7 4 E00X SA T56 Engine and LRUs 28 117 124 124 124 -- 7 15 E00Y SA T56 Engine and LRUs 185 799 400 400 400 -- 12 9 E00Z SA T56 Engine and LRUs 45 188 199 199 199 -- 11 x 8 E010 SA T56 Engine and LRUs 35 148 157 157 157 -- 9 x 8 E011 SA T56 Engine and LRUs 21 87 92 92 92 -- 11 21 E012 SA T56 Engine and LRUs 67 1,220 1,502 1,502 1,502 -- 5 4 E013 SA T56 Engine and LRUs 61 255 271 271 271 -- 13 24 E014 SA T56 Engine and LRUs 3 13 14 14 14 -- 12 38 E015 SA T56 Engine and LRUs 35 147 156 156 156 -- 28 58 E016 SA T56 Engine and LRUs 142 597 633 633 633 -- 7 4 E017 SA T56 Engine and LRUs 1 1 1 1 1 -- 37 1,296 E018 SA T56 Engine and LRUs 7 25 24 24 24 -- 37 1,296 E019 SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 E01A SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 E01B SA T56 Engine and LRUs 3 20 17 17 17 -- 37 1,296 E01C SA T56 Engine and LRUs 6 25 18 18 18 -- 28 265 E01D SA T56 Engine and LRUs 4 14 11 11 11 -- 11 52 E01E SA T56 Engine and LRUs 2 9 14 14 14 -- 37 1,296 E01F SA T56 Engine and LRUs 3 9 8 8 8 -- 28 258 E01G SA T56 Engine and LRUs 2 8 6 6 6 -- 11 52 E01H SA T56 Engine and LRUs 1 5 5 5 5 -- 37 1,652 E01J SA T56 Engine and LRUs 1 5 4 4 4 -- 28 265 E01K SA T56 Engine and LRUs 0 2 2 2 2 -- 11 52 E01L SA T56 Engine and LRUs 8 32 31 31 31 -- 30 795 E01M SA T56 Engine and LRUs 1 3 3 3 3 -- 30 332 E01N SA Navy T56 20 81 38 38 38 -- 30 85 E01P SA Navy T56 6 26 12 12 12 -- 11 3 E01Q SA Navy T56 6 22 10 10 10 -- 30 29 E01R SA Navy T56 18 74 35 35 35 -- 21 113 E01S SA Navy T56 7 27 13 13 13 -- 15 29 E01T SA Navy T56 10 38 18 18 18 -- 31 21 E01U SA Navy T56 0 2 2 2 2 -- 30 18 E01V SA Navy T56 29 116 55 55 55 -- 31 26 E01W SA Navy T56 1 3 2 2 2 -- 30 33 E01X SA Navy T56 3 4 2 2 2 -- 28 15 E01Y SA Navy T56 33 134 63 63 63 -- 32 25 E01Z SA Navy T56 7 28 13 13 13 -- 12 28 E020 SA Navy T56 45 183 86 86 86 -- 12 11 E021 SA Navy T56 16 70 33 33 33 -- 13 20 E022 SA Navy T56 329 1,324 624 624 624 -- 6 10 E023 SA Navy T56 42 167 79 79 79 -- 18 85 E024 SA Navy T56 6 32 32 32 32 -- 30 5 E025 SA Navy T56 4 22 22 22 22 -- 30 2 E026 SA Navy T56 0 2 2 2 2 -- 30 4 E027 SA Navy T56 2 9 9 9 9 -- 30 4 E028 SA Navy T56 4 14 6 6 6 -- 29 4 E029 SA Navy T56 1 5 5 5 5 -- 30 4 E02A SA Navy T56 62 249 118 118 118 -- 16 24 E02B SA Navy T56 3 12 12 12 12 -- 30 9 E02C SA Navy T56 0 3 3 3 3 -- 30 6 E02D SA Navy T56 14 59 28 28 28 -- 5 6 E02E SA Navy T56 18 74 35 35 35 -- 9 11 E02F SA Navy T56 2 6 3 3 3 -- 3 7 E02G SA Navy T56 6 25 12 12 12 -- 30 7 E02H SA Navy T56 10 40 19 19 19 -- 30 18 E02J SA Navy T56 6 26 12 12 12 -- 30 7 E02K SA Navy T56 3 11 5 5 5 -- 30 7 E02L SA Navy T56 14 55 30 30 30 -- 30 81 E02M SA Navy T56 12 48 22 22 22 -- 30 81 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21157th Page of 414TOC1stPreviousNextBottomJust 157th
Confidential - Competition Sensitive Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] ELIN Org FY04- FLOW [ ] Check Unit 0004 Unit Type Maintenance NOUN NSN FY99 FY00 FY01 FY02 FY03 FY13 DAYS FEEMS Hours ---- ---- ------------------- ---- --- ------ ------ ------ ------ ------ ----- ---- --------- -------- E02N SA Navy T56 [/\/\] [/\/\] 16 83 30 30 30 -- 30 78 E02P SA Navy T56 6 23 12 12 12 -- 30 81 E02Q SA Navy T56 9 36 17 17 17 -- 4 6 E02R SA Navy T56 5 21 10 10 10 -- 9 9 E02S SA Navy T56 2 9 4 4 4 -- 30 8 E02T SA Navy T56 2 8 4 4 4 -- 30 9 E02U SA Navy T56 13 52 24 24 24 -- 30 8 E02V SA Navy T56 0 2 2 2 2 -- 30 7 E02W SA Navy T56 6 24 11 11 11 -- 30 9 E02X SA Navy T56 16 63 30 30 30 -- 30 9 E02Y SA Navy T56 12 50 24 24 24 -- 30 9 E02Z SA Navy T56 12 51 24 24 24 -- 30 9 E030 SA Navy T56 3 12 6 6 6 -- 6 7 E031 SA Navy T56 6 23 11 11 11 -- 30 6 E032 SA Navy T56 6 22 10 10 10 -- 30 6 E033 SA Navy T56 4 15 6 6 6 -- 30 9 E034 SA Navy T56 15 61 29 29 29 -- 30 6 E035 SA Navy T56 5 20 9 9 9 -- 5 9 E036 SA Navy T56 5 20 9 9 9 -- 5 9 E037 SA Navy T56 3 12 6 6 6 -- 30 9 E038 SA Navy T56 19 78 37 37 37 -- 10 6 E039 SA Navy T56 2 7 3 3 3 -- 4 6 E03A SA Navy T56 10 42 20 20 20 -- 30 13 E03B SA Navy T56 14 75 35 35 35 -- 6 6 E03C SA Navy T56 40 161 76 76 76 -- 30 6 E03D SA Navy T56 291 1,174 554 554 554 -- 30 3 E03E SA Navy T56 6 23 11 11 11 -- 30 6 E03F SA Navy T56 7 29 13 13 13 -- 30 26 E03G SA Navy T56 6 24 11 11 11 -- 7 16 E03H SA Navy T56 14 58 28 28 28 -- 30 68 E03J SA Navy T56 2 9 4 4 4 -- 30 68 E03K SA Navy T56 2 7 3 3 3 -- 30 68 E0GL SA Fuel Accessories 472 2,163 2,142 2,142 2,142 -- 2 X 3 E0GM SA Fuel Accessories 24 134 141 141 141 -- 30 X 81 E0GN SA Fuel Accessories 8 196 189 189 189 -- 30 X 78 E0GP SA Fuel Accessories 4 18 16 16 16 -- 30 7 E0GQ SA Fuel Accessories 3 11 11 11 11 -- 30 8 E0GR SA Fuel Accessories 120 337 400 400 400 -- 9 4 E0GS SA Fuel Accessories 36 180 165 165 165 -- 9 X 11 E0GT SA Fuel Accessories 17 78 84 84 84 -- 28 X 13 E0GU SA Fuel Accessories 1 6 6 6 6 -- 8 X 7 E0GV SA Fuel Accessories 195 839 919 919 919 -- 4 X 9 E0GW SA Fuel Accessories 4 17 18 18 18 -- 5 X 11 E0GX SA Fuel Accessories 128 646 606 606 606 -- 6 6 E0GY SA Fuel Accessories 26 107 114 114 114 -- 9 X 2 E0GZ SA Fuel Accessories 13 50 51 51 51 -- 6 7 E0H0 SA Fuel Accessories 1 5 6 6 6 -- 6 7 E0H1 SA Fuel Accessories 14 60 62 62 62 -- 6 X 5 E0H2 SA Fuel Accessories 36 138 156 156 156 -- 6 X 6 E0H3 SA Fuel Accessories 31 125 137 137 137 -- 6 6 E0H4 SA Fuel Accessories 16 73 79 79 79 -- 5 6 E0H5 SA Fuel Accessories 9 34 34 34 34 -- 5 X 6 E0H6 SA Fuel Accessories 14 48 48 48 48 -- 4 X 6 E0H7 SA Fuel Accessories 55 230 243 243 243 -- 8 X 6 E0H8 SA Fuel Accessories 20 84 76 76 76 -- 5 3 E0H9 SA Fuel Accessories 7 26 30 30 30 -- 4 6 E0HA SA Fuel Accessories 4 14 15 15 15 -- 8 X 6 E0HB SA Fuel Accessories 7 25 27 27 27 -- 4 6 E0HC SA Fuel Accessories 44 184 195 195 195 -- 3 7 E0HD SA Fuel Accessories 20 127 73 73 73 -- 10 6 E0LV SA T56 TWO-LEVEL MAINT 10 53 56 56 56 -- 37 2,584 E0LW SA T56 TWO-LEVEL MAINT 25 119 122 122 122 -- 37 2,584 ----- ------ ------ ------ ------ -------- 151 0 4,484 20,019 17,576 17,576 17,576 20,473.8 ===== ====== ====== ====== ====== ======== Cost Summary ------- 0004AA Transition 0004AC Repair Ops T-56 F-100 TF-39 Fund Accy T-56, 2LM TF-39 2LM Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21158th Page of 414TOC1stPreviousNextBottomJust 158th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- ---------- ---------- --------- --- ----- E001 [/\/\] $-- [/\/\] -- -- -- -- [/\/\] E002 $-- -- -- 370,814 225,465 E003 $-- -- -- 10,289 6,256 E004 $-- -- -- 11,462 6,969 E005 $-- -- -- 26,750 16,265 E006 $-- -- -- 6,380 3,879 E007 $-- -- -- 11,733 7,134 E008 $-- -- -- 32,768 19,924 E009 $-- 358,800 -- 353,905 215,183 E00A $-- -- -- -- -- E00B $-- -- -- -- -- E00C $-- -- -- -- -- E00D $-- -- -- 3,846 2,338 E00E $-- -- -- 7,288 4,431 E00F $-- -- -- 46,090 28,024 E00G $-- -- -- 15,709 9,552 E00H $-- -- -- 35,835 21,789 E00J $-- -- -- 7,488 4,553 E00K $-- -- -- 8,624 5,243 E00L $-- -- -- 47,332 28,779 E00M $-- -- -- 10,508 6,389 E00N $-- -- -- 8,146 4,953 E00P $-- -- -- 5,012 3,048 E00Q $-- -- -- 4,171 2,536 E00R $-- -- -- 11,077 6,735 E00S $-- -- -- 5,978 3,635 E00T $-- -- -- -- -- E00U $-- -- -- 3,451 2,098 E00V $-- -- -- 10,818 6,578 E00W $-- -- -- 7,766 4,722 E00X $-- -- -- 8,108 4,930 E00Y $-- -- -- 33,042 20,090 E00Z $-- -- -- 6,409 3,897 E010 $-- -- -- 4,984 3,030 E011 $-- -- -- 8,509 5,173 E012 $-- -- -- 5,256 3,196 E013 $-- -- -- 27,784 16,893 E014 $-- -- -- 1,597 971 E015 $-- -- -- 25,131 15,280 E016 $-- -- -- 11,137 6,772 E017 $-- 9,200 -- 24,486 14,888 E018 $-- 64,400 -- 171,397 104,214 E019 $-- 36,800 -- 97,941 59,550 E01A $-- 36,800 -- 97,941 59,550 E01B $-- 27,600 -- 73,456 44,663 E01C $-- -- -- 30,065 18,280 E01D $-- -- -- 3,944 2,398 E01E $-- 18,400 -- 48,970 29,775 E01F $-- -- -- 14,622 8,891 E01G $-- -- -- 1,973 1,200 E01H $-- 9,200 -- 31,229 18,988 E01J $-- -- -- 5,010 3,046 E01K $-- -- -- -- -- E01L $-- -- -- 120,193 73,080 E01M $-- -- -- 6,282 3,820 E01N $-- -- -- 32,120 19,530 E01P $-- -- -- 285 174 E01Q $-- -- -- 3,328 2,024 E01R $-- -- -- 38,589 23,463 E01S $-- -- -- 3,882 2,360 E01T $-- -- -- 3,914 2,380 E01U $-- -- -- -- -- E01V $-- -- -- 14,037 8,535 E01W $-- -- -- 624 379 E01X $-- -- -- 1,009 614 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21159th Page of 414TOC1stPreviousNextBottomJust 159th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A- ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------ --- ----- E01Y [/\/\] $-- [/\/\] -- -- 15,760 9,583 [/\/\] E01Z $-- -- -- 3,727 2,266 E020 $-- -- -- 9,419 5,727 E021 $-- -- -- 6,757 4,108 E022 $-- -- -- 62,863 38,222 E023 $-- -- -- 64,526 39,234 E024 $-- -- -- 522 317 E025 $-- -- -- 153 83 E026 $-- -- -- -- -- E027 $-- -- -- 142 86 E028 $-- -- -- 232 171 E029 $-- -- -- 70 43 E02A $-- -- -- 28,239 17,170 E02B $-- -- -- 493 300 E02C $-- -- -- -- -- E02D $-- -- -- 1,467 892 E02E $-- -- -- 3,666 2,229 E02F $-- -- -- 249 152 E02G $-- -- -- 747 454 E02H $-- -- -- 3,368 2,048 E02J $-- -- -- 747 454 E02K $-- -- -- 374 228 E02L $-- -- -- 21,555 13,106 E02M $-- -- -- 18,476 11,234 E02N $-- -- -- 23,507 14,293 E02P $-- -- -- 9,238 5,617 E02Q $-- -- -- 943 573 E02R $-- -- -- 820 499 E02S $-- -- -- 210 128 E02T $-- -- -- 329 200 E02U $-- -- -- 1,361 827 E0ZV $-- -- -- -- -- E02W $-- -- -- 985 599 E02X $-- -- -- 2,625 1,596 E02Y $-- -- -- 2,058 1,251 E02Z $-- -- -- 1,969 1,197 E03O $-- -- -- 374 228 E031 $-- -- -- 677 411 E032 $-- -- -- 627 382 E033 $-- -- -- 656 399 E034 $-- -- -- 1,691 1,028 E035 $-- -- -- 858 522 E036 $-- -- -- 820 499 E037 $-- -- -- 493 300 E038 $-- -- -- 1,990 1,210 E039 $-- -- -- 210 128 E03A $-- -- -- 2,434 1,480 E03B $-- -- -- 1,884 1,146 E03C $-- -- -- 4,188 2,546 E03D $-- -- -- 15,592 9,480 E03E $-- -- -- 627 382 E03F $-- -- -- 3,498 2,127 E03G $-- -- -- 1,189 723 E03H $-- -- -- 18,024 10,959 E03J $-- -- -- 2,574 1,565 E03K $-- -- -- 2,574 1,565 E0GL $-- -- -- 25,289 15,377 E0GM $-- -- -- 36,952 22,468 E0GN $-- -- -- 11,754 7,146 E0GP $-- -- -- 499 303 E0GQ $-- -- -- 314 191 E0GR $-- -- -- 10,189 6,195 E0GS $-- -- -- 7,335 4,460 E0GT $-- -- -- 4,137 2,515 E0GU $-- -- -- 125 78 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21160th Page of 414TOC1stPreviousNextBottomJust 160th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 1999 ----------------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- ---------- --------- --------- --- ----- E0GV [/\/\] $ -- [/\/\] -- -- 32,004 19,458 [/\/\] E0GW $ -- -- -- 815 495 E0GX $ -- -- -- 14,430 8,774 E0GY $ -- -- -- 1,075 654 E0GZ $ -- -- -- 1,618 984 E0H0 $ -- -- -- 125 76 E0H1 $ -- -- -- 1,329 808 E0H2 $ -- -- -- 3,769 2,291 E0H3 $ -- -- 3,495 2,125 E0H4 $ -- -- -- 1,803 1,096 E0H5 $ -- -- -- 943 573 E0H6 $ -- -- -- 1,467 892 E0H7 $ -- -- -- 5,759 3,501 E0H8 $ -- -- -- 1,302 792 E0H9 $ -- -- -- 733 446 E0HA $ -- -- -- 420 255 E0HB $ -- -- -- 733 446 E0HC $ -- -- -- 5,479 3,331 E0HD $ -- -- -- 2,094 1,273 E0LV $ -- 92,000 -- 488,314 296,907 E0LW $ -- 230,000 -- 1,220,785 742,269 ------ -------- ---------- --------- --------- --- 151 -- 883,200 -- 4,254,204 2,586,668 -- ------ -------- ---------- --------- --------- --- Cost Summary ------- 0004AA Transition -- 27,778,100 -- -- -- 0004AC Repair Ops T-56 -- 561,200 -- 2,369,122 1,440,489 -- F-100 TF-39 $ -- -- -- -- -- -- Fuel Accy -- -- 175,984 107,003 -- T-56 2LM 322,000 -- 1,709,098 1,039,177 -- TF-39 2LM $ -- -- -- -- -- -- ------ -------- ---------- --------- --------- --- Totals 30,61 883,200 -- 4,254,204 2,586,668 -- ====== ======== ========== ========= ========= === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21161st Page of 414TOC1stPreviousNextBottomJust 161st
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY2000 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- E001 [/\/\] $-- [/\/\] -- -- 965 658 [/\/\] E002 $-- -- -- 2,109,245 1,438,622 E003 $-- -- -- 63,694 43,443 E004 $-- -- -- 76,124 51,921 E005 $-- -- -- 178,299 121,610 E006 $-- -- -- 41,241 28,129 E007 $-- -- -- 54,467 37,149 E008 $-- -- -- 202,835 138,344 E009 $-- 1,185,800 -- 1,811,527 1,235,562 E00A $-- -- -- -- -- E00B $-- -- -- -- -- E00C $-- -- -- -- -- E00D $-- -- -- 23,807 16,238 E00E $-- -- -- 47,930 32,691 E00F $-- -- -- 256,769 175,131 E00G $-- -- -- 101,479 69,214 E00H $-- -- -- 181,487 123,784 E00J $-- -- -- 49,662 33,872 E00K $-- -- -- 56,716 38,683 E00L $-- -- -- 250,259 170,690 E00M $-- -- -- 108,662 74,113 E00N $-- -- -- 52,001 35,468 E00P $-- -- -- 32,189 21,955 E00Q $-- -- -- 27,516 18,767 E00R $-- -- -- 72,167 49,222 E00S $-- -- -- 38,849 26,497 E00T $-- -- -- 14,787 10,086 E00U $-- -- -- 22,699 15,482 E00V $-- -- -- 66,964 45,673 E00W $-- -- -- 50,615 34,522 E00X $-- -- -- 52,423 35,755 E00Y $-- -- -- 220,833 150,620 E00Z $-- -- -- 41,431 28,259 E010 $-- -- -- 32,616 22,246 E011 $-- -- -- 54,555 37,209 E012 $-- -- -- 148,078 100,997 E013 $-- -- -- 179,738 122,591 E014 $-- -- -- 10,707 7,303 E015 $-- -- -- 163,330 111,400 E016 $-- -- -- 72,463 49,423 E017 $-- 9,200 -- 37,893 25,845 E018 $-- 230,000 -- 947,281 646,098 E019 $-- 138,000 -- 568,368 387,658 E01A $-- 138,000 -- 568,368 387,658 E01B $-- 184,000 -- 757,825 516,878 E01C $-- -- -- 193,864 132,226 E01D $-- -- -- 21,365 14,572 E01E $-- 82,800 -- 341,021 232,595 E01F $-- -- -- 67,888 46,304 E01G $-- -- -- 12,208 8,326 E01H $-- 46,000 -- 241,634 164,808 E01J $-- -- -- 38,761 26,437 E01K $-- -- -- 3,053 2,083 E01L $-- -- -- 743,999 507,449 E01M $-- -- -- 29,162 19,890 E01N $-- -- -- 201,308 137,303 E01P $-- -- -- 1,916 1,307 E01Q $-- -- -- 18,882 12,879 E01R $-- -- -- 245,506 167,449 E01S $-- -- -- 23,172 15,805 E01T $-- -- -- 23,012 15,695 E01U $-- -- -- 1,041 710 E01V $-- -- -- 56,887 59,262 E01W $-- -- -- 2,698 1,977 E01X $-- -- -- 2,085 1,422 E01Y $-- -- -- 99,037 67,548 E01Z $-- -- -- 23,064 15,731 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21162nd Page of 414TOC1stPreviousNextBottomJust 162nd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit D [Download Table] ELIN 0003 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- ---------- ------- ------- ------- ------- ------- D001 D001 [/\/\] [/\/\] 2,015 2,094 2,015 2,015 2,015 D002 D002 16,174 16,804 16,174 16,174 16,174 D003 D003 4,151 4,313 4,151 4,151 4,151 D004 D004 1,541 1,602 1,541 1,541 1,541 D005 D005 817 841 817 817 817 D006 D006 1,211 1,258 1,211 1,211 1,211 D007 D007 16,834 19,672 18,934 16,834 18,834 D008 D008 17,627 18,314 17,627 17,627 17,627 D009 D009 38,489 38,990 38,489 38,489 38,489 D00A D00A -- -- -- -- -- D00B D00B -- -- -- -- -- D00C D00C -- -- -- -- -- D00D D00D 887 921 887 887 887 D00E D00E 1,470 1,527 1,470 1,470 1,470 D00F D00F 4,959 5,152 4,959 4,959 4,959 D00G D00G 590 613 590 590 590 D00H D00H 5,257 5,462 5,257 5,257 5,257 D00J D00J 1,728 1,794 1,726 1,728 1,728 D00K D00K 633 657 633 633 633 D00L D00L 3,183 3,307 3,183 3,183 3,183 D00M D00M 538 558 538 538 538 D00N D00N 1,096 1,138 1,096 1,096 1,096 D00P D00P 809 840 809 809 809 D00Q D00Q 709 736 709 709 709 D00R D00R 203 211 203 203 203 D00S D00S 168 174 168 168 168 D00T D00T 835 971 935 935 935 D00U D00U 557 579 557 557 557 D00V D00V 1,293 1,344 1,293 1,293 1,293 D00W D00W 253 263 253 253 253 D00X D00X 835 971 835 835 835 D00Y D00Y 576 599 576 576 576 D00Z D00Z 460 478 460 460 460 D010 D010 460 478 460 460 460 D011 D011 1,308 1,358 1,308 1,308 1,308 D012 D012 253 263 253 253 253 D013 D013 1,470 1,527 1,470 1,470 1,470 D014 D014 1,718 1,785 1,718 1,718 1,718 D015 D015 2,317 2,408 2,317 2,317 2,317 D016 D016 253 263 253 253 253 D017 D017 88,229 91,670 88,229 88,229 88,229 D018 D018 88,229 91,670 88,229 88,229 88,229 D019 D019 88,229 91,670 88,229 88,229 88,229 D01A D01A 88,229 91,670 88,229 88,229 88,229 D01B D01B 88,229 91,670 88,229 88,229 88,229 D01C D01C 16,174 16,804 16,174 16,174 16,174 D01D D01D 3,183 3,307 3,183 3,183 3,183 D01E D01E 88,229 91,670 88,229 88,229 88,229 D01F D01F 15,733 16,346 15,733 15,733 15,733 D01G D01G 3,183 3,307 3,183 3,183 3,183 D01H D01H 109,994 114,283 109,994 109,994 109,994 D01J D01J 16,169 16,800 16,169 16,169 16,169 D01K D01K 3,183 3,307 3,183 3,183 3,183 D01L D01L 48,492 50,383 48,492 48,492 48,492 D01M D01M 20,273 21,084 20,273 20,273 20,273 D01N D01N 5,183 5,388 5,183 5,183 5,183 D01P D01P 154 160 154 154 154 D01Q D01Q 1,790 1,860 1,790 1,790 1,790 D01R D01R 6,920 7,189 6,920 6,920 6,920 D01S D01S 1,790 1,880 1,790 1,790 1,790 D01T D01T 1,283 1,312 1,283 1,283 1,283 D01U D01U 1,087 1,129 1,087 1,087 1,087 D01V D01V 1,562 1,823 1,562 1,562 1,562 D01W D01W 2,016 2,094 2,016 2,016 2,016 D01X D01X 1,087 1,129 1,087 1,087 1,087 D01Y D01Y 1,541 1,802 1,541 1,541 1,541 D01Z D01Z 1,718 1,785 1,718 1,718 1,718 D020 D020 676 702 676 676 676 D021 D021 1,211 1,259 1,211 1,211 1,211 D022 D022 617 641 617 617 617 D023 D023 4,959 5,152 4,959 4,959 4,959 D024 D024 280 291 280 280 280 D025 D025 123 128 123 123 123 D026 D026 228 237 228 228 228 D027 D027 228 237 228 228 228 D028 D028 228 237 228 228 228 D029 D029 228 237 228 228 228 D02A D02A 1,470 1,527 1,470 1,470 1,470 D02B D02B 530 550 530 530 530 D02C D02C 338 351 338 338 338 D02D D02D 338 351 338 338 338 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21163rd Page of 414TOC1stPreviousNextBottomJust 163rd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary/Exhibit D [Enlarge/Download Table] ELIN 0003 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- --------- --------- --------- --------- --------- D02E D02E [/\/\] [/\/\] 858 663 658 658 658 D02F D02F 402 416 402 402 402 D02G D02G 402 416 402 402 402 D02H D02H 1,087 1,129 1,087 1,087 1,087 D02J D02J 402 418 402 402 402 D02K D02K 402 418 402 402 402 D02L D02L 4,969 5,163 4,969 4,969 4,969 D02M D02M 4,969 5,163 4,969 4,969 4,969 D02N D02N 4,742 4,827 4,742 4,742 4,742 D02P D02P 4,988 5,163 4,969 4,969 4,969 D02Q D02Q 338 351 336 336 336 D02R D02R 530 550 530 530 530 D02S D02S 338 351 338 338 338 D02T D02T 530 550 530 530 530 D02U D02U 338 351 338 338 338 D02V D02V 402 418 402 402 402 D02W D02W 530 550 530 530 530 D02X D02X 530 550 530 530 530 D02Y D02Y 554 575 554 554 554 D02Z D02Z 530 550 530 530 530 D030 D030 402 418 402 402 402 D031 D031 364 378 364 364 364 D032 D032 338 351 338 338 338 D033 D033 530 550 530 530 530 D034 D034 364 550 364 364 364 D035 D035 554 378 554 554 554 D036 D036 530 575 530 530 530 D037 D037 530 550 530 530 530 D038 D038 338 351 338 338 338 D039 D039 338 351 338 338 338 D03A D03A 785 816 785 785 785 D03B D03B 338 351 338 338 338 D03C D03C 338 351 338 338 338 D03D D03D 173 180 173 173 173 D03E D03E 338 351 338 338 338 D03F D03F 1,613 1,676 1,613 1,613 1,613 D03G D03G 639 664 639 639 639 D03H D03H 4,155 4,317 4,155 4,155 4,155 D03J D03J 4,155 4,317 4,155 4,155 4,155 D03K D03K 4,155 4,317 4,155 4,155 4,155 D0GL D0GL 173 180 173 173 173 D0GM D0GM 4,969 5,163 4,969 4,969 4,969 D0GN D0GN 4,742 4,927 4,742 4,742 4,742 D0GP D0GP 402 418 402 402 402 D0GQ D0GQ 338 351 338 338 338 D0GR D0GR 274 285 274 274 274 D0GS D0GS 658 683 658 658 658 D0GT D0GT 785 516 785 785 785 D0GU D0GU 402 418 402 402 402 D0GV D0GV 530 550 530 530 530 D0GW D0GW 658 683 658 658 658 D0GX D0GX 364 378 364 364 364 D0GY D0GY 133 139 133 133 133 D0GZ D0GZ 402 418 402 402 402 D0H0 D0H0 402 418 402 402 402 D0H1 D0H1 306 318 306 306 306 D0H2 D0H2 338 351 338 338 338 D0H3 D0H3 364 378 364 364 364 D0H4 D0H4 364 378 364 364 364 D0H5 D0H5 338 351 338 338 338 D0H6 D0H6 338 351 338 338 338 D0H7 D0H7 338 351 338 338 338 D0H8 D0H8 210 218 210 210 210 D0H9 D0H9 338 351 338 338 338 D0HA D0HA 338 351 338 338 338 D0HB D0HB 338 351 338 338 338 D0HC D0HC 402 418 402 402 402 D0HD D0HD 338 351 338 338 338 D0LV D0LV 166,809 173,314 166,809 166,809 166,809 D0LW D0LW 166,809 173,314 166,809 166,809 166,809 151 1,340,887 1,393,182 1,340,887 1,340,887 1,340,887 Cost Summary ------- 0003AA Transition 0003AC Repair Ops T-56 F-100 TF-39 Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept. 5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21164th Page of 414TOC1stPreviousNextBottomJust 164th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary/Exhibit D [Download Table] ELIN 0003 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP FY03 UP ---- ---- ---- --- --------- --------- --------- --------- --------- Fuel Accy T-S6 2LM Totals Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept. 5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21165th Page of 414TOC1stPreviousNextBottomJust 165th
Confidential - Competition Sensitive Schedule A - ELIN Pricing Summary/Exhibit E [Enlarge/Download Table] ELIN Org FY04- FLOW [ ]Check Unit 0004 Unit Type Maintenance Noun NSN FY99 FY00 FY01 FY02 FY03 FY13 DAYS FEEMS Hours ---- ---- ------------------- ---- --- ---- ----- ----- ----- ----- ----- ---- -------- ----- E001 SA T56 Engine and LRUs [/\/\] [/\/\] 0 1 1 1 1 -- 18 33 E002 SA T56 Engine and LRUs 74 272 267 267 267 -- 28 X 263 E003 SA T56 Engine and LRUs 8 32 34 34 34 -- 30 58 E004 SA T56 Engine and LRUs 24 103 109 109 109 -- 32 25 E005 SA T56 Engine and LRUs 140 603 638 638 638 -- 8 X 10 E006 SA T56 Engine and LRUs 17 71 75 75 75 -- 13 20 E007 SA T56 Engine and LRUs 2 6 7 7 7 -- 25 X 310 E008 SA T56 Engine and LRUs 6 24 26 26 26 -- 25 X 289 E009 SA T56 Engine and LRUs 35 129 123 123 123 -- 20 X 480 E00A SA T56 Engine and LRUs 0 0 0 0 0 0 -- E00B SA T56 Engine and LRUs 0 0 0 0 0 0 -- E00C SA T56 Engine and LRUs 0 0 0 0 0 0 -- E00D SA T56 Engine and LRUs 14 56 60 60 60 -- 12 X 15 E00E SA T56 Engine and LRUs 16 68 71 71 71 -- 16 24 E00F SA T56 Engine and LRUs 30 108 105 105 105 -- 16 X 81 E00G SA T56 Engine and LRUs 86 359 381 381 381 -- 8 X 10 E00H SA T56 Engine and LRUs 22 72 69 69 69 -- 18 X 86 E00J SA T56 Engine and LRUs 14 80 63 63 63 -- 26 28 E00K SA T56 Engine and LRUs 44 187 198 198 198 -- 7 10 E00L SA T56 Engine and LRUs 48 164 157 157 157 -- 11 X 52 E00M SA T56 Engine and LRUs 63 421 446 446 446 -- 5 X 8 E00N SA T56 Engine and LRUs 24 99 105 105 105 -- 12 X 18 E00P SA T56 Engine and LRUs 20 83 88 88 88 -- 8 X 13 E00Q SA T56 Engine and LRUs 19 81 85 85 85 -- 10 X 12 E00R SA T56 Engine and LRUs 176 741 787 787 787 -- 8 3 E00S SA T56 Engine and LRUs 115 483 513 513 513 -- 7 3 E00T SA T56 Engine and LRUs 0 33 49 49 49 -- 7 15 E00U SA T56 Engine and LRUs 20 85 90 90 90 -- 9 9 E00V SA T56 Engine and LRUs 27 108 106 106 106 -- 15 21 E00W SA T56 Engine and LRUs 99 417 443 443 443 -- 7 4 E00X SA T56 Engine and LRUs 28 117 124 124 124 -- 7 15 E00Y SA T56 Engine and LRUs 185 799 400 400 400 -- 12 9 E00Z SA T56 Engine and LRUs 45 188 199 199 199 -- 11 X 8 E010 SA T56 Engine and LRUs 35 148 157 157 157 -- 9 X 8 E011 SA T56 Engine and LRUs 21 87 92 92 92 -- 11 21 E012 SA T56 Engine and LRUs 67 1,220 1,502 1,502 1,502 -- 5 4 E013 SA T56 Engine and LRUs 61 255 271 271 271 -- 13 24 E014 SA T56 Engine and LRUs 3 13 14 14 14 -- 12 28 E015 SA T56 Engine and LRUs 35 147 156 156 156 -- 28 38 E016 SA T56 Engine and LRUs 142 597 633 633 633 -- 7 4 E017 SA T56 Engine and LRUs 1 1 1 1 1 -- 37 1,296 E018 SA T56 Engine and LRUs 7 25 24 24 24 -- 37 1,296 E019 SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 E01A SA T56 Engine and LRUs 4 15 15 15 15 -- 37 1,296 E01B SA T56 Engine and LRUs 3 20 17 17 17 -- 37 1,296 E01C SA T56 Engine and LRUs 6 25 18 18 18 -- 28 265 E01D SA T56 Engine and LRUs 4 14 11 11 11 -- 11 52 E01E SA T56 Engine and LRUs 2 9 14 14 14 -- 37 1,296 E01F SA T56 Engine and LRUs 3 9 8 8 8 -- 28 258 E01G SA T56 Engine and LRUs 2 8 6 6 6 -- 11 52 E01H SA T56 Engine and LRUs 1 5 5 5 5 -- 37 1,652 E01J SA T56 Engine and LRUs 1 5 4 4 4 -- 28 265 E01K SA T56 Engine and LRUs 0 2 2 2 2 -- 11 52 E01L SA T56 Engine and LRUs 6 32 31 31 31 -- 30 795 E01M SA T56 Engine and LRUs 1 3 3 3 3 -- 30 332 E01N SA Navy T56 20 81 38 38 38 -- 30 85 E01P SA Navy T56 6 26 12 12 12 -- 11 3 E01Q SA Navy T56 6 22 10 10 10 -- 30 29 E01R SA Navy T56 18 74 35 35 35 -- 21 113 E01S SA Navy T56 7 27 13 13 13 -- 15 29 E01T SA Navy T56 10 38 18 18 18 -- 31 21 E01U SA Navy T56 0 2 2 2 2 -- 30 18 E01V SA Navy T56 29 116 55 55 55 -- 31 26 E01W SA Navy T56 1 3 2 2 2 -- 30 33 E01X SA Navy T56 3 4 2 2 2 -- 28 18 E01Y SA Navy T56 33 134 83 83 83 -- 32 25 E01Z SA Navy T56 7 28 13 13 13 -- 12 28 E020 SA Navy T56 45 183 86 86 86 -- 12 11 E021 SA Navy T56 16 70 33 33 33 -- 13 20 E022 SA Navy T56 329 1,524 624 624 624 -- 6 10 E023 SA Navy T56 42 167 79 79 79 -- 18 85 E024 SA Navy T56 6 32 32 32 32 -- 30 5 E025 SA Navy T56 4 22 22 22 22 -- 30 2 E026 SA Navy T56 0 2 2 2 2 -- 30 4 E027 SA Navy T56 2 9 9 9 9 -- 30 4 E028 SA Navy T56 4 14 6 6 6 -- 29 4 E029 SA Navy T56 1 5 5 5 5 -- 30 4 E02A SA Navy T56 62 249 118 118 118 -- 16 24 E02B SA Navy T56 3 12 12 12 12 -- 30 8 E02C SA Navy T56 0 3 3 3 3 -- 30 8 E02D SA Navy T56 14 59 28 28 28 -- 5 8 E02E SA Navy T56 18 74 35 35 35 -- 9 11 E02F SA Navy T56 2 6 3 3 3 -- 3 7 E02G SA Navy T56 8 25 12 12 12 -- 30 7 E02H SA Navy T56 10 40 19 19 19 -- 30 18 E02J SA Navy T56 6 26 12 12 12 -- 30 7 E02K SA Navy T56 3 11 5 5 5 -- 30 7 E02L SA Navy T56 14 55 30 30 30 -- 30 81 E02M SA Navy T56 12 46 22 22 22 -- 30 81 Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept. 5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21166th Page of 414TOC1stPreviousNextBottomJust 166th
Confidential - Competition Sensitive Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] ELIN Org FY04- FLOW [ ]CHECK Unit 0004 Unit Type Maintenance NOUN NSN FY99 FY00 FY01 FY02 FY03 FY13 DAYS FEEMS Hours ---- ---- ------------------- ---- --- ----- ------ ------ ------ ------ ----- ---- -------- -------- E02N SA Navy T56 [/\/\] [/\/\] 16 63 30 30 30 -- 30 78 E02P SA Navy T56 6 25 12 12 12 -- 30 81 E02Q SA Navy T56 9 36 17 17 17 -- 4 6 E02R SA Navy T56 5 21 10 10 10 -- 9 9 E02S SA Navy T56 2 9 4 4 4 -- 30 6 E02T SA Navy T56 2 8 4 4 4 -- 30 9 E02U SA Navy T56 13 52 24 24 24 -- 30 6 E02V SA Navy T56 0 2 2 2 2 -- 30 7 E02W SA Navy T56 6 24 11 11 11 -- 30 9 E02X SA Navy T56 16 63 30 30 30 -- 30 9 E02Y SA Navy T56 12 50 24 24 24 -- 30 9 E02Z SA Navy T56 12 51 24 24 24 -- 30 9 E030 SA Navy T56 3 12 8 8 8 -- 6 7 E031 SA Navy T56 6 23 11 11 11 -- 30 6 E032 SA Navy T56 6 22 10 10 10 -- 30 6 E033 SA Navy T56 4 15 6 6 6 -- 30 9 E034 SA Navy T56 15 61 29 29 29 -- 30 6 E035 SA Navy T56 5 20 9 9 9 -- 5 9 E036 SA Navy T56 5 20 9 9 9 -- 5 9 E037 SA Navy T56 3 12 6 6 6 -- 30 9 E038 SA Navy T56 19 78 37 37 37 -- 10 6 E039 SA Navy T56 2 7 3 3 3 -- 4 6 E03A SA Navy T56 10 42 20 20 20 -- 30 13 E03B SA Navy T56 18 75 35 35 35 -- 6 6 E03C SA Navy T56 40 161 76 76 76 -- 30 6 E03D SA Navy T56 291 1,174 554 554 554 -- 30 3 E03E SA Navy T56 6 23 11 11 11 -- 30 6 E03F SA Navy T56 7 29 13 13 13 -- 30 26 E03G SA Navy T56 6 24 11 11 11 -- 7 10 E03H SA Navy T56 14 50 26 26 26 -- 30 68 E03J SA Navy T56 2 9 4 4 4 -- 30 68 E03K SA Navy T56 2 7 3 3 3 -- 30 68 E0GL SA Fuel Accessories 472 2,163 2,142 2,142 2,142 -- 2 X 3 E0GM SA Fuel Accessories 24 134 141 141 141 -- 30 X 81 E0GN SA Fuel Accessories 8 196 189 189 189 -- 30 X 78 E0GP SA Fuel Accessories 4 18 18 18 18 -- 30 7 E0GQ SA Fuel Accessories 3 11 11 11 11 -- 30 6 E0GR SA Fuel Accessories 120 337 400 400 400 -- 9 4 E0GS SA Fuel Accessories 36 180 163 163 163 -- 9 X 11 E0GT SA Fuel Accessories 17 78 64 64 64 -- 28 X 13 E0GU SA Fuel Accessories 1 6 6 6 6 -- 8 X 7 E0GV SA Fuel Accessories 195 839 919 919 919 -- 4 X 9 E0GW SA Fuel Accessories 4 17 18 18 18 -- 5 X 11 E0GX SA Fuel Accessories 126 646 606 606 606 -- 6 6 E0GY SA Fuel Accessories 26 107 114 114 114 -- 9 X 2 E0GZ SA Fuel Accessories 13 50 51 51 51 -- 6 7 E0H0 SA Fuel Accessories 1 5 6 6 6 -- 6 7 E0H1 SA Fuel Accessories 14 60 62 62 62 -- 6 X 5 E0H2 SA Fuel Accessories 36 138 156 156 156 -- 6 X 6 E0H3 SA Fuel Accessories 31 125 137 137 137 -- 6 6 E0H4 SA Fuel Accessories 16 73 79 79 79 -- 5 6 E0H5 SA Fuel Accessories 9 34 34 34 34 -- 5 X 6 E0H6 SA Fuel Accessories 14 48 48 48 48 -- 4 X 6 E0H7 SA Fuel Accessories 55 230 243 243 243 -- 8 X 16 E0H8 SA Fuel Accessories 20 84 76 76 76 -- 5 3 E0H9 SA Fuel Accessories 7 26 30 30 30 -- 4 6 E0HA SA Fuel Accessories 4 14 15 15 15 -- 8 X 6 E0HB SA Fuel Accessories 7 25 27 27 27 -- 4 6 E0HC SA Fuel Accessories 44 184 195 195 195 -- 3 7 E0HD SA Fuel Accessories 20 127 73 73 73 -- 10 6 E0LV SA Fuel Accessories 10 53 56 56 56 -- 37 2,584 E0LW SA Fuel Accessories 25 119 122 122 122 -- 37 2,584 ----- ------ ------ ------ ------ --- --- -------- 151 0 4,484 20,019 17,576 17,576 17,576 20,473.6 ===== ====== ====== ====== ====== === === ======== Cost Summary ------- 0004AA Transition 0004AC Repair Ops T-56 F-100 TF-39 Fuel Accy T-56 2LM TF-39 2LM Totals Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21167th Page of 414TOC1stPreviousNextBottomJust 167th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- ------- --- ----- E001 [/\/\] $-- [/\/\] -- -- -- -- [/\/\] E002 $-- -- -- 370,814 225,465 E003 $-- -- -- 10,289 6,256 E004 $-- -- -- 11,462 6,969 E005 $-- -- -- 26,750 16,265 E006 $-- -- -- 6,380 3,879 E007 $-- -- -- 11,733 7,134 E008 $-- -- -- 32,768 19,924 E009 $-- 358,800 -- 353,905 215,183 E00A $-- -- -- -- -- E00B $-- -- -- -- -- E00C $-- -- -- -- -- E00D $-- -- -- 3,846 2,338 E00E $-- -- -- 7,288 4,431 E00F $-- -- -- 46,090 28,024 E00G $-- -- -- 15,709 9,552 E00H $-- -- -- 35,835 21,789 E00J $-- -- -- 7,488 4,553 E00K $-- -- -- 8,624 5,543 E00L $-- -- -- 47,332 28,779 E00M $-- -- -- 10,508 6,389 E00N $-- -- -- 8,146 4,953 E00P $-- -- -- 5,012 3,048 E00Q $-- -- -- 4,171 2,536 E00R $-- -- -- 11,077 6,735 E00S $-- -- -- 5,978 3,635 E00T $-- -- -- -- -- E00U $-- -- -- 3,451 2,098 E00V $-- -- -- 10,818 6,578 E00W $-- -- -- 7,766 4,722 E00X $-- -- -- 8,108 4,930 E00Y $-- -- -- 33,042 20,090 E00Z $-- -- -- 6,409 3,897 E010 $-- -- -- 4,984 3,030 E011 $-- -- -- 8,509 5,173 E012 $-- -- -- 5,256 3,196 E013 $-- -- -- 27,784 16,893 E014 $-- -- -- 1,597 971 E015 $-- -- -- 25,131 15,280 E016 $-- -- -- 11,137 6,772 E017 $-- 9,200 -- 24,486 14,888 E018 $-- 64,400 -- 171,397 104,214 E019 $-- 36,800 -- 97,941 59,550 E01A $-- 36,800 -- 97,941 59,550 E01B $-- 27,600 -- 73,456 44,663 E01C $-- -- -- 30,065 18,280 E01D $-- -- -- 3,944 2,398 E01E $-- 18,400 -- 48,970 29,775 E01F $-- -- -- 14,622 8,891 E01G $-- -- -- 1,973 1,200 E01H $-- 9,200 -- 31,229 18,988 E01J $-- -- -- 5,010 3,046 E01K $-- -- -- -- -- E01L $-- -- -- 120,193 73,080 E01M $-- -- -- 6,282 3,820 E01N $-- -- -- 32,120 19,530 E01P $-- -- -- 285 174 E01Q $-- -- -- 3,328 2,024 E01R $-- -- -- 38,589 23,463 E01S $-- -- -- 3,882 2,360 E01T $-- -- -- 3,914 2,380 E01U $-- -- -- -- -- E01V $-- -- -- 14,037 8,535 E01W $-- -- -- 624 379 E01X $-- -- -- 1,009 614 Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21168th Page of 414TOC1stPreviousNextBottomJust 168th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit E [Enlarge/Download Table] FY 1999 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------ --- ----- E01Y [/\/\] $-- [/\/\] -- -- 15,760 9,583 [/\/\] E01Z $-- -- -- 3,727 2,226 E020 $-- -- -- 9,419 5,727 E021 $-- -- -- 6,757 4,106 E022 $-- -- -- 62,863 38,222 E023 $-- -- -- 64,526 39,234 E024 $-- -- -- 522 317 E025 $-- -- -- 153 93 E026 $-- -- -- -- -- E027 $-- -- -- 142 86 E028 $-- -- -- 282 171 E029 $-- -- -- 70 43 E02A $-- -- -- 28,239 17,170 E02B $-- -- -- 493 300 E02C $-- -- -- -- -- E02D $-- -- -- 1,467 892 E02E $-- -- -- 3,666 2,229 E02F $-- -- -- 249 152 E02G $-- -- -- 747 454 E02H $-- -- -- 3,368 2,048 E02J $-- -- -- 747 454 E02K $-- -- -- 374 228 E02L $-- -- -- 21,555 13,106 E02M $-- -- -- 18,476 11,234 E02N $-- -- -- 23,507 14,293 E02P $-- -- -- 9,238 5,617 E02Q $-- -- -- 943 573 E02R $-- -- -- 820 499 E02S $-- -- -- 210 128 E02T $-- -- -- 329 200 E02U $-- -- -- 1,361 827 E02V $-- -- -- -- -- E02W $-- -- -- 985 599 E02X $-- -- -- 2,625 1,596 E02Y $-- -- -- 2,058 1,251 E02Z $-- -- -- 1,969 1,197 E030 $-- -- -- 374 228 E031 $-- -- -- 677 411 E032 $-- -- -- 627 382 E033 $-- -- -- 656 399 E034 $-- -- -- 1,691 1,028 E035 $-- -- -- 858 522 E036 $-- -- -- 820 499 E037 $-- -- -- 493 300 E038 $-- -- -- 1,990 1,210 E039 $-- -- -- 210 128 E03A $-- -- -- 2,434 1,480 E03B $-- -- -- 1,884 1,146 E03C $-- -- -- 4,188 2,546 E03D $-- -- -- 15,592 9,480 E03E $-- -- -- 627 382 E03F $-- -- -- 3,498 2,127 E03G $-- -- -- 1,189 723 E03H $-- -- -- 18,024 10,959 E03J $-- -- -- 2,574 1,565 E03K $-- -- -- 2,574 1,565 E0GL $-- -- -- 25,289 15,377 E0GM $-- -- -- 36,952 22,468 E0GN $-- -- -- 11,754 7,146 E0GP $-- -- -- 499 303 E0GQ $-- -- -- 314 191 E0GR $-- -- -- 10,189 6,195 E0GS $-- -- -- 7,335 4,460 E0GT $-- -- -- 4,137 2,515 E0GU $-- -- -- 125 76 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21169th Page of 414TOC1stPreviousNextBottomJust 169th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit E [Enlarge/Download Table] FY 1999 ------------------------------------ ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- ---------- --------- --------- --- ----- E0GV [/\/\] $ -- [/\/\] -- -- 32,004 19,458 [/\/\] E0GW $ -- -- -- 815 495 E0GX $ -- -- -- 14,430 8,774 E0GY $ -- -- -- 1,075 654 E0GZ $ -- -- -- 1,618 984 E0H0 $ -- -- -- 125 76 E0H1 $ -- -- -- 1,329 808 E0H2 $ -- -- -- 3,769 2,291 E0H3 $ -- -- -- 3,495 2,125 E0H4 $ -- -- -- 1,803 1,096 E0H5 $ -- -- -- 943 573 E0H6 $ -- -- -- 1,467 892 E0H7 $ -- -- -- 5,759 3,501 E0H8 $ -- -- -- 1,302 792 E0H9 $ -- -- -- 733 446 E0HA $ -- -- -- 420 255 E0HB $ -- -- -- 733 446 E0HC $ -- -- -- 5,479 3,331 E0HD $ -- -- -- 2,094 1,273 E0LV $ -- 92,000 -- 488,314 296,907 E0LW $ -- 230,000 -- 1,220,785 742,269 ----- ------- ---------- --------- --------- --- 151 -- 883,200 -- 4,254,204 2,586,668 -- ----- ------- ---------- --------- --------- --- Cost Summary ------- 0004AA Transition -- 27,778,100 -- -- -- 0004AC Repair Ops T-56 -- 561,200 -- 2,369,122 1,440,489 -- F-100 TF-39 $ -- -- -- -- -- -- Fuel Accy -- -- 175,984 107,003 -- T-56 2LM 322,000 -- 1,709,098 1,039,177 -- TF-39 2LM $ -- -- -- -- -- -- ------ ------- ---------- --------- --------- --- Totals 30.61 883,200 -- 4,254,204 2,586,668 -- ====== ======= ========== ========= ========= === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21170th Page of 414TOC1stPreviousNextBottomJust 170th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 2000 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- ---- --------- --------- --- ----- E001 [/\/\] $-- [/\/\] -- -- 965 658 [/\/\] E002 $-- -- -- 2,109,245 1,438,622 E003 $-- -- -- 63,694 43,443 E004 $-- -- -- 76,124 51,921 E005 $-- -- -- 178,299 121,610 E006 $-- -- -- 41,241 28,129 E007 $-- -- -- 54,467 37,149 E008 $-- -- -- 202,835 138,344 E009 $-- 1,186,800 -- 1,811,527 1,235,562 E00A $-- -- -- -- -- E00B $-- -- -- -- -- E00C $-- -- -- -- -- E00D $-- -- -- 23,807 16,238 E00E $-- -- -- 47,930 32,691 E00F $-- -- -- 256,769 175,131 E00G $-- -- -- 101,479 69,214 E00H $-- -- -- 181,487 123,784 E00J $-- -- -- 49,662 33,872 E00K $-- -- -- 56,716 38,683 E00L $-- -- -- 250,259 170,690 E00M $-- -- -- 108,662 74,113 E00N $-- -- -- 52,001 35,468 E00P $-- -- -- 32,189 21,955 E00Q $-- -- -- 27,516 18,767 E00R $-- -- -- 72,167 49,222 E00S $-- -- -- 38,849 26,497 E00T $-- -- -- 14,787 10,086 E00U $-- -- -- 22,699 15,482 E00V $-- -- -- 66,964 45,673 E00W $-- -- -- 50,615 34,522 E00X $-- -- -- 52,423 35,755 E00Y $-- -- -- 220,833 150,620 E00Z $-- -- -- 41,431 28,259 E010 $-- -- -- 32,616 22,246 E011 $-- -- -- 54,555 37,209 E012 $-- -- -- 148,078 100,997 E013 $-- -- -- 179,738 122,591 E014 $-- -- -- 10,707 7,303 E015 $-- -- -- 163,330 111,400 E016 $-- -- -- 72,453 49,423 EO17 $-- 9,200 -- 37,893 25,845 EO18 $-- 230,000 -- 947,281 646,098 E019 $-- 138,000 -- 568,368 387,658 E01A $-- 138,000 -- 568,368 387,658 E01B $-- 184,000 -- 757,825 516,878 E01C $-- -- -- 193,864 132,226 E01D $-- -- -- 21,365 14,572 E01E $-- 82,800 -- 341,021 232,595 E01F $-- -- -- 67,888 46,304 E01G $-- -- -- 12,208 8,326 E01H $-- 46,000 -- 241,634 164,808 E01J $-- -- -- 38,761 26,437 E01K $-- -- -- 3,053 2,083 E01L $-- -- -- 743,999 507,449 E01M $-- -- -- 29,162 19,890 E01N $-- -- -- 201,308 137,303 E01P $-- -- -- 1,916 1,307 E01Q $-- -- -- 18,882 12,879 E01R $-- -- -- 245,506 167,449 E01S $-- -- -- 23,172 15,805 E01T $-- -- -- 23,012 15,695 E01U $-- -- -- 1,041 710 E01V $-- -- -- 86,887 59,262 E01W $-- -- -- 2,898 1,977 E01X $-- -- -- 2,085 1,422 E01Y $-- -- -- 89,037 87,548 E01Z $-- -- -- 23,064 15,731 Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21171st Page of 414TOC1stPreviousNextBottomJust 171st
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit E [Enlarge/Download Table] FY 2000 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- E020 [/\/\] $-- [/\/\] -- -- 59,275 40,429 [/\/\] E021 $-- -- -- 40,659 27,732 E022 $-- -- -- 391,490 267,018 E023 $-- -- -- 397,041 270,804 E024 $-- -- -- 4,296 2,930 E025 $-- -- -- 1,299 886 E026 $-- -- -- 219 150 EO27 $-- -- -- 983 670 EO28 $-- -- -- 1,530 1,043 E029 $-- -- -- 547 373 E02A $-- -- -- 175,509 119,707 E02B $-- -- -- 3,048 2,079 E02C $-- -- -- 486 331 E02D $-- -- -- 9,561 6,521 E02E $-- -- -- 23,330 15,913 E02F $-- -- -- 1,155 788 E02G $-- -- -- 4,817 3,285 E02H $-- -- -- 20,844 14,217 E02J $-- -- -- 5,010 3,417 E02K $-- -- -- 2,120 1,446 E02L $-- -- -- 131,045 89,380 E02M $-- -- -- 114,365 78,003 E02N $-- -- -- 143,241 97,698 E02P $-- -- -- 59,565 40,626 E02Q $-- -- -- 5,832 3,978 E02R $-- -- -- 5,335 3,639 E02S $-- -- -- 1,459 995 E02T $-- -- -- 2,033 1,386 E02U $-- -- -- 8,426 5,747 E02V $-- -- -- 386 263 E02W $-- -- -- 6,095 4,157 E02X $-- -- -- 16,001 10,914 E02Y $-- -- -- 13,272 9,052 E02Z $-- -- -- 12,954 8,835 E030 $-- -- -- 2,313 1,578 E031 $-- -- -- 4,013 2,737 E032 $-- -- -- 3,565 2,432 E033 $-- -- -- 3,811 2,599 E034 $-- -- -- 10,643 7,259 E035 $-- -- -- 5,308 3,621 E036 $-- -- -- 5,080 3,465 EO37 $-- -- -- 3,048 2,079 EO38 $-- -- -- 12,638 8,620 E039 $-- -- -- 1,135 774 E03A $-- -- -- 15,817 10,788 E03B $-- -- -- 12,152 8,288 E03C $-- -- -- 26,088 17,794 E03D $-- -- -- 97,343 66,393 E03E $-- -- -- 3,726 2,541 E03F $-- -- -- 22,424 15,294 E03G $-- -- -- 7,356 5,017 E03H $-- -- -- 115,558 78,817 E03J $-- -- -- 17,931 12,230 E03K $-- -- -- 13,948 9,513 E0GL $-- -- -- 179,346 122,324 E0GM $-- -- -- 319,270 217,760 E0GN $-- -- -- 445,638 303,950 E0GP $-- -- -- 3,469 2,368 E0GQ $-- -- -- 1,781 1,215 E0GR $-- -- -- 44,274 30,197 E0GS $-- -- -- 58,751 38,107 E0GT $-- -- -- 29,378 20,038 E0GU $-- -- -- 1,155 788 E0GV $-- -- -- 213,094 145,342 E0GW $-- -- -- 5,361 3,658 E0GX $-- -- -- 112,701 78,888 E0GY $-- -- -- 5,850 4,672 Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21172nd Page of 414TOC1stPreviousNextBottomJust 172nd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 2000 ----------------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- E0GZ [/\/\] $ -- [/\/\] -- -- 9,634 6,571 [/\/\] E0HO $ -- -- -- 962 656 E0H1 $ -- -- -- 8,812 6,010 E0H2 $ -- -- -- 22,359 15,250 E0H3 $ -- -- -- 21,807 14,873 E0H4 $ -- -- -- 12,734 8,685 E0H5 $ -- -- -- 5,510 3,758 E0H6 $ -- -- -- 7,777 5,304 E0H7 $ -- -- -- 37,267 25,418 E0H8 $ -- -- -- 8,461 5,771 E0H9 $ -- -- -- 4,212 2,873 E0HA $ -- -- -- 2,270 1,548 E0HB $ -- -- -- 4,051 2,763 E0HC $ -- -- -- 35,453 24,181 E0HD $ -- -- -- 20,578 14,036 E0LV $ -- 487,600 -- 4,005,063 2,731,674 E0LW $ -- 1,094,800 -- 8,992,498 6,133,379 --------- --- ---------- ---------- --- 151 3,597,200 -- 28,936,270 19,736,130 -- --------- --- ---------- ---------- --- Cost Summary ------- 0004AA Transition 0004AC Repair Ops T-56 -- 2,014,800 -- 14,317,755 9,765,498 -- F-100 TF-39 $ -- -- -- -- -- -- Fuel Accy -- -- 1,620,953 1,105,580 -- T-56 2LM 1,582,400 -- 12,997,561 8,865,053 -- TF-39 2LM $ -- -- -- -- -- -- ------ --------- --- ---------- ---------- --- Totals 14,33 3,597,200 -- 28,936,270 19,736,130 -- ====== ========= === ========== ========== === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21173rd Page of 414TOC1stPreviousNextBottomJust 173rd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 2001 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- E001 [/\/\] $-- [/\/\] -- -- 695 471 [/\/\] E002 $-- -- -- 1,491,596 1,009,500 E003 $-- -- -- 48,754 32,996 E004 $-- -- -- 58,035 39,278 E005 $-- -- -- 135,906 91,980 E006 $-- -- -- 31,384 21,240 E007 $-- -- -- 45,779 30,983 E008 $-- -- -- 158,301 107,137 E009 $-- 1,131,600 -- 1,244,348 842,164 E00A $-- -- -- -- -- E00B $-- -- -- -- -- E00C $-- -- -- -- -- E00D $-- -- -- 18,375 12,436 E00E $-- -- -- 36,053 24,400 E00F $-- -- -- 179,843 121,716 E00G $-- -- -- 77,588 52,511 E00H $-- -- -- 125,299 84,801 E00J $-- -- -- 37,566 25,424 E00K $-- -- -- 43,263 29,280 E00L $-- -- -- 172,595 116,811 E00M $-- -- -- 82,932 56,127 E00N $-- -- -- 39,734 26,892 E00P $-- -- -- 24,587 16,640 E00Q $-- -- -- 20,802 14,079 E00R $-- -- -- 55,218 37,371 E00S $-- -- -- 29,726 20,118 E00T $-- -- -- 15,817 10,705 E00U $-- -- -- 17,313 11,717 E00V $-- -- -- 48,242 32,650 E00W $-- -- -- 38,737 26,217 E00X $-- -- -- 40,027 27,090 E00Y $-- -- -- 79,645 53,903 E00Z $-- -- -- 31,594 21,383 E010 $-- -- -- 24,926 16,870 E011 $-- -- -- 41,561 28,128 E012 $-- -- -- 131,336 88,887 E013 $-- -- -- 137,610 93,133 E014 $-- -- -- 8,308 5,623 E015 $-- -- -- 124,869 84,510 E016 $-- -- -- 55,351 37,461 E017 $-- 9,200 -- 27,298 18,475 E018 $-- 220,800 -- 655,136 443,390 E019 $-- 138,000 -- 409,460 277,119 E01A $-- 138,000 -- 409,460 277,119 E01B $-- 156,400 -- 464,054 314,068 E01C $-- -- -- 100,557 68,056 E01D $-- -- -- 12,092 8,184 E01E $-- 128,800 -- 382,163 258,645 E01F $-- -- -- 43,474 29,423 E01G $-- -- -- 6,597 4,465 E01H $-- 46,000 -- 174,076 117,813 E01J $-- -- -- 22,341 15,120 E01K $-- -- -- 2,200 1,489 E01L $-- -- -- 519,239 351,416 E01M $-- -- -- 21,009 14,219 E01N $-- -- -- 68,037 46,047 E01P $-- -- -- 636 431 E01Q $-- -- -- 6,182 4,184 E01R $-- -- -- 83,652 56,615 E01S $-- -- -- 8,038 5,440 E01T $-- -- -- 7,853 5,315 E01U $-- -- -- 750 508 E01V $-- -- -- 29,679 20,087 E01W $-- -- -- 1,393 943 E01X $-- -- -- 750 508 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21174th Page of 414TOC1stPreviousNextBottomJust 174th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit E [Enlarge/Download Table] FY2001 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- E01Y [/\/\] $-- [/\/\] -- -- 33,543 22,702 [/\/\] E01Z $-- -- -- 7,714 5,221 E020 $-- -- -- 20,069 13,583 E021 $-- -- -- 13,809 9,346 E022 $-- -- -- 132,922 89,961 E023 $-- -- -- 135,309 91,576 E024 $-- -- -- 3,095 2,095 E025 $-- -- -- 936 633 E026 $-- -- -- 158 107 E027 $-- -- -- 708 479 E028 $-- -- -- 472 319 E029 $-- -- -- 394 267 E02A $-- -- -- 59,919 40,553 E02B $-- -- -- 2,195 1,486 E02C $-- -- -- 350 237 E02D $-- -- -- 3,268 2,212 E02E $-- -- -- 7,950 5,380 E02F $-- -- -- 417 282 E02G $-- -- -- 1,667 1,128 E02H $-- -- -- 7,132 4,827 E02J $-- -- -- 1,667 1,128 E02K $-- -- -- 693 469 E02L $-- -- -- 51,495 34,851 E02M $-- -- -- 37,762 25,557 E02N $-- -- -- 49,139 33,257 E02P $-- -- -- 20,598 13,941 E02Q $-- -- -- 1,985 1,343 E02R $-- -- -- 1,829 1,238 E02S $-- -- -- 468 317 E02T $-- -- -- 731 495 E02U $-- -- -- 2,802 1,897 E02V $-- -- -- 278 188 E02W $-- -- -- 2,012 1,362 E02X $-- -- -- 5,489 3,715 E02Y $-- -- -- 4,589 3,106 E02Z $-- -- -- 4,391 2,972 E030 $-- -- -- 832 563 E031 $-- -- -- 1,382 935 E032 $-- -- -- 1,167 790 E033 $-- -- -- 1,098 743 E034 $-- -- -- 3,645 2,467 E035 $-- -- -- 1,721 1,165 E036 $-- -- -- 1,648 1,115 E037 $-- -- -- 1,098 743 E038 $-- -- -- 4,319 2,923 E039 $-- -- -- 350 237 E03A $-- -- -- 5,426 3,672 E03B $-- -- -- 4,085 2,765 E03C $-- -- -- 8,870 6,003 E03D $-- -- -- 33,093 22,397 E03E $-- -- -- 1,283 868 E03F $-- -- -- 7,242 4,901 E03G $-- -- -- 2,429 1,644 E03H $-- -- -- 40,189 27,200 E03J $-- -- -- 5,742 3,886 E03K $-- -- -- 4,307 2,915 E0GL $-- -- -- 127,950 86,595 E0GM $-- -- -- 242,023 163,799 E0GN $-- -- -- 309,579 209,521 E0GP $-- -- -- 2,499 1,691 E0GQ $-- -- -- 1,283 868 E0GR $-- -- -- 37,859 25,622 E0GS $-- -- -- 37,477 25,364 E0GT $-- -- -- 22,789 15,424 E0GU $-- -- -- 832 563 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21175th Page of 414TOC1stPreviousNextBottomJust 175th
Confidential-Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit E [Enlarge/Download Table] FY2001 ----------------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---------- --------- ---------- ---------- -------- --------- --- --------- ---------- --- ----- E0GV [/\/\] $ -- [/\/\] -- -- 168,155 113,806 [/\/\] E0GW $ -- -- -- 4,088 2,766 E0GX $ -- -- -- 76,164 51,547 E0GY $ -- -- -- 5,257 3,558 E0GZ $ -- -- -- 7,080 4,791 E0H0 $ -- -- -- 832 563 E0H1 $ -- -- -- 6,559 4,439 E0H2 $ -- -- -- 18,211 12,325 E0H3 $ -- -- -- 17,218 11,653 E0H4 $ -- -- -- 9,928 6,719 E0H5 $ -- -- -- 3,970 2,687 E0H6 $ -- -- -- 5,603 3,792 E0H7 $ -- -- -- 28,367 19,198 E0H8 $ -- -- -- 5,514 3,732 E0H9 $ -- -- -- 3,502 2,370 E0HA $ -- -- -- 1,751 1,185 E0HB $ -- -- -- 3,152 2,133 E0HC $ -- -- -- 27,069 18,320 E0HD $ -- -- -- 8,521 5,767 E0LV $ -- 515,200 -- 3,048,618 2,063,279 E0LW $ -- 1,122,400 -- 6,641,633 4,495,002 --------- --- ---------- ---------- --- 151 3,606,400 -- 20,031,201 13,556,949 -- --------- --- ---------- ---------- --- Cost Summary ------- 0004AA Transition 0004AC Repair Ops T-56 -- 1,968,800 -- 9,157,719 6,197,868 -- F-100 TF-39 $ -- -- -- -- -- -- Fuel Accy -- -- 1,183,230 800,800 -- T-56 2LM 1,637,600 -- 9,690,251 6,558,281 -- TF-39 2LM $ -- -- -- -- -- -- ------ --------- --- ---------- ---------- --- Totals 25.67 3,606,400 -- 20,031,201 13,556,949 -- ====== ========= === ========== ========== === Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21176th Page of 414TOC1stPreviousNextBottomJust 176th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 2002 ----------------------------- ELIN Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- E001 [/\/\] $-- [/\/\] -- -- 685 471 [/\/\] E002 $-- -- -- 1,491,596 1,009,500 E003 $-- -- -- 48,754 32,896 E004 $-- -- -- 58,035 39,278 E004 $-- -- -- 135,906 81,980 E006 $-- -- -- 31,384 21,240 E007 $-- -- -- 45,779 30,983 E008 $-- -- -- 158,301 107,137 E009 $-- 1,131,600 -- 1,244,348 842,164 E00A $-- -- -- -- -- E00B $-- -- -- -- -- E00C $-- -- -- -- -- E00D $-- -- -- 18,375 12,436 E00E $-- -- -- 36,053 24,400 E00F $-- -- -- 179,843 121,716 E00G $-- -- -- 77,588 52,511 E00H $-- -- -- 125,299 84,801 E00J $-- -- -- 37,566 25,424 E00K $-- -- -- 43,263 29,280 E00L $-- -- -- 172,595 116,811 E00M $-- -- -- 82,932 56,127 E00N $-- -- -- 39,734 26,892 E00P $-- -- -- 24,587 16,640 E00Q $-- -- -- 20,802 14,079 E00R $-- -- -- 55,218 37,371 E00S $-- -- -- 29,726 20,118 E00T $-- -- -- 15,817 10,705 E00U $-- -- -- 17,313 11,717 E00V $-- -- -- 48,242 32,650 E00W $-- -- -- 38,737 26,217 E00X $-- -- -- 40,027 27,090 E00Y $-- -- -- 79,645 53,903 E00Z $-- -- -- 31,594 21,383 E010 $-- -- -- 24,926 16,870 E011 $-- -- -- 41,561 28,128 E012 $-- -- -- 131,336 88,887 E013 $-- -- -- 137,610 93,133 E014 $-- -- -- 8,308 5,623 E015 $-- -- -- 124,869 84,510 E016 $-- -- -- 55,351 37,481 E017 $-- 9,200 -- 27,298 18,475 E018 $-- 220,800 -- 655,136 443,390 E019 $-- 138,000 -- 409,460 277,119 E01A $-- 138,000 -- 409,460 277,119 E01B $-- 156,400 -- 464,054 314,068 E01C $-- -- -- 100,557 68,056 E01D $-- -- -- 12,092 8,184 E01E $-- 128,800 -- 382,163 258,645 E01F $-- -- -- 43,474 29,423 E01G $-- -- -- 6,597 4,465 E01H $-- 46,000 -- 174,076 117,813 E01J $-- -- -- 22,341 15,120 E01K $-- -- -- 2,200 1,489 E01L $-- -- -- 519,239 351,416 E01M $-- -- -- 21,009 14,219 E01N $-- -- -- 68,037 46,047 E01P $-- -- -- 636 431 E01Q $-- -- -- 6,182 4,184 E01R $-- -- -- 83,652 56,615 E01S $-- -- -- 8,038 5,440 E01T $-- -- -- 7,853 5,315 E01U $-- -- -- 750 508 E01V $-- -- -- 29,679 20,087 E01W $-- -- -- 1,393 943 E01X $-- -- -- 750 508 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21177th Page of 414TOC1stPreviousNextBottomJust 177th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 2002 ----------------------------- ELIN Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- --------- --- ----- E01Y [/\/\] $-- [/\/\] -- -- 33,543 22,702 [/\/\] E01Z $-- -- -- 7,714 5,221 E020 $-- -- -- 20,069 13,583 E021 $-- -- -- 13,809 9,346 E022 $-- -- -- 132,922 89,961 E023 $-- -- -- 135,309 91,576 E024 $-- -- -- 3,095 2,095 E025 $-- -- -- 936 633 E026 $-- -- -- 158 107 E027 $-- -- -- 708 479 E028 $-- -- -- 472 319 E029 $-- -- -- 394 267 E02A $-- -- -- 59,919 40,553 E02B $-- -- -- 2,195 1,486 E02C $-- -- -- 350 237 E02D $-- -- -- 3,268 2,212 E02E $-- -- -- 7,950 5,380 E02F $-- -- -- 417 282 E02G $-- -- -- 1,667 1,128 E02H $-- -- -- 7,132 4,827 E02J $-- -- -- 1,667 1,128 E02K $-- -- -- 693 469 E02L $-- -- -- 51,495 34,851 E02M $-- -- -- 37,762 25,557 E02N $-- -- -- 49,139 33,257 E02P $-- -- -- 20,598 13,941 E02Q $-- -- -- 1,985 1,343 E02R $-- -- -- 1,829 1,238 E02S $-- -- -- 468 317 E02T $-- -- -- 731 495 E02U $-- -- -- 2,802 1,897 E02V $-- -- -- 278 188 E02W $-- -- -- 2,012 1,362 E02X $-- -- -- 5,489 3,715 E02Y $-- -- -- 4,589 3,106 E02Z $-- -- -- 4,391 2,972 E030 $-- -- -- 832 563 E031 $-- -- -- 1,382 935 E032 $-- -- -- 1,167 790 E033 $-- -- -- 1,098 743 E034 $-- -- -- 3,645 2,467 E035 $-- -- -- 1,721 1,165 E036 $-- -- -- 1,648 1,115 E037 $-- -- -- 1,098 743 E038 $-- -- -- 4,319 2,923 E039 $-- -- -- 350 237 E03A $-- -- -- 5,426 3,672 E03B $-- -- -- 4,085 2,765 E03C $-- -- -- 8,870 6,003 E03D $-- -- -- 33,093 22,397 E03E $-- -- -- 1,283 868 E03F $-- -- -- 7,242 4,901 E03G $-- -- -- 2,429 1,644 E03H $-- -- -- 40,189 27,200 E03J $-- -- -- 5,742 3,886 E03K $-- -- -- 4,307 2,915 E0GL $-- -- -- 127,950 86,595 E0GM $-- -- -- 242,023 163,799 E0GN $-- -- -- 309,579 209,521 E0GP $-- -- -- 2,499 1,691 E0GQ $-- -- -- 1,283 868 E0GR $-- -- -- 37,859 25,822 E0GS $-- -- -- 37,477 25,364 E0GT $-- -- -- 22,789 15,424 E0GU $-- -- -- 832 563 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21178th Page of 414TOC1stPreviousNextBottomJust 178th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit E [Enlarge/Download Table] FY2002 ------------------------------- ELIN Labor Direct Direct Direct Total 0004 Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---------- ----- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- E0GV [/\/\] $-- [/\/\] -- -- 168,156 113,806 [/\/\] E0GW $-- -- -- 4,088 2,766 E0GX $-- -- -- 76,164 51,547 E0GY $-- -- -- 5,257 3,558 E0GZ $-- -- -- 7,080 4,791 E0H0 $-- -- -- 832 563 E0H1 $-- -- -- 6,559 4,439 E0H2 $-- -- -- 18,211 12,325 E0H3 $-- -- -- 17,218 11,653 E0H4 $-- -- -- 9,928 6,718 E0H5 $-- -- -- 3,970 2,687 E0H6 $-- -- -- 5,603 3,792 E0H7 $-- -- -- 28,367 19,198 E0H8 $-- -- -- 5,514 3,732 E0H9 $-- -- -- 3,502 2,370 E0HA $-- -- -- 1,751 1,185 E0HB $-- -- -- 3,152 2,133 E0HC $-- -- -- 27,069 18,320 E0HD $-- -- -- 8,521 5,767 E0LV $-- 515,200 -- 3,048,618 2,063,279 E0LW $-- 1,122,400 -- 6,641,633 4,495,002 --------- --- ---------- ---------- 151 3,606,400 -- 20,031,201 13,556,949 --------- --- ---------- ---------- Cost Summary ------- 0004AA Transition 0004AC Repair Ops T-56 F-100 TF-39 Fuel Accy T-56 2LM TF-39 2LM Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21179th Page of 414TOC1stPreviousNextBottomJust 179th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary/Exhibit E [Enlarge/Download Table] FY2003 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- --------- --------- --- ----- E001 [/\/\] $-- [/\/\] -- -- 695 471 [/\/\] E002 $-- -- -- 1,491,596 1,009,500 E003 $-- -- -- 48,754 32,996 E004 $-- -- -- 58,035 39,278 E005 $-- -- -- 135,906 91,980 E006 $-- -- -- 31,384 21,240 E007 $-- -- -- 45,779 30,983 E008 $-- -- -- 158,301 107,137 E009 $-- 1,131,600 -- 1,244,348 842,164 E00A $-- -- -- -- -- E00B $-- -- -- -- -- E00C $-- -- -- -- -- E00D $-- -- -- 18,375 12,436 E00E $-- -- -- 36,053 24,400 E00F $-- -- -- 179,843 121,716 E00G $-- -- -- 77,588 52,511 E00H $-- -- -- 125,299 84,801 E00J $-- -- -- 37,566 25,424 E00K $-- -- -- 43,263 29,280 E00L $-- -- -- 172,595 116,811 E00M $-- -- -- 82,932 56,127 E00N $-- -- -- 39,734 26,892 E00P $-- -- -- 24,587 16,640 E00Q $-- -- -- 20,802 14,079 E00R $-- -- -- 55,218 37,371 E00S $-- -- -- 29,726 20,118 E00T $-- -- -- 15,817 10,705 E00U $-- -- -- 17,313 11,717 E00V $-- -- -- 48,242 32,650 E00W $-- -- -- 38,737 26,217 E00X $-- -- -- 40,027 27,090 E00Y $-- -- -- 79,645 53,903 E00Z $-- -- -- 31,594 21,383 E010 $-- -- -- 24,926 16,870 E011 $-- -- -- 41,561 28,128 E012 $-- -- -- 131,336 88,887 E013 $-- -- -- 137,610 93,133 E014 $-- -- -- 8,308 5,623 E015 $-- -- -- 124,869 84,510 E016 $-- -- -- 55,351 37,461 E017 $-- 9,200 -- 27,298 18,475 E018 $-- 220,800 -- 655,136 443,390 E019 $-- 138,000 -- 409,460 277,119 E01A $-- 138,000 -- 409,460 277,119 E01B $-- 156,400 -- 464,054 314,068 E01C $-- -- -- 100,557 68,056 E01D $-- -- -- 12,092 8,184 E01E $-- 128,800 -- 382,163 258,645 E01F $-- -- -- 43,474 29,423 E01G $-- -- -- 6,597 4,465 E01H $-- 46,000 -- 174,076 117,813 E01J $-- -- -- 22,341 15,120 E01K $-- -- -- 2,200 1,489 E01L $-- -- -- 519,239 351,416 E01M $-- -- -- 21,009 14,219 E01N $-- -- -- 68,037 46,047 E01P $-- -- -- 636 431 E01Q $-- -- -- 6,182 4,184 E01R $-- -- -- 83,652 56,615 E01S $-- -- -- 8,038 5,440 E01T $-- -- -- 7,853 5,315 E01U $-- -- -- 750 508 E01V $-- -- -- 29,679 20,087 E01W $-- -- -- 1,393 943 E01X $-- -- -- 750 508 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21180th Page of 414TOC1stPreviousNextBottomJust 180th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 2003 ----------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- -------- --- -------- ------- --- ----- E01Y [/\/\] $-- [/\/\] -- -- 33,543 22,702 [/\/\] E01Z $-- -- -- 7,714 5,221 E020 $-- -- -- 20,069 13,583 E021 $-- -- -- 13,809 9,346 E022 $-- -- -- 132,922 89,961 E023 $-- -- -- 135,309 91,576 E024 $-- -- -- 3,095 2,095 E025 $-- -- -- 936 633 E026 $-- -- -- 158 107 E027 $-- -- -- 708 479 E028 $-- -- -- 472 319 E029 $-- -- -- 394 267 E02A $-- -- -- 59,919 40,553 E02B $-- -- -- 2,195 1,486 E02C $-- -- -- 350 237 E02D $-- -- -- 3,268 2,212 E02E $-- -- -- 7,950 5,380 E02F $-- -- -- 417 282 E02G $-- -- -- 1,667 1,128 E02H $-- -- -- 7,132 4,827 E02J $-- -- -- 1,667 1,128 E02K $-- -- -- 693 469 E02L $-- -- -- 51,495 34,851 E02M $-- -- -- 37,762 25,557 E02N $-- -- -- 49,139 33,257 E02P $-- -- -- 20,598 13,941 E02Q $-- -- -- 1,985 1,343 E02R $-- -- -- 1,829 1,238 E02S $-- -- -- 468 317 E02T $-- -- -- 731 495 E02U $-- -- -- 2,802 1,897 E02V $-- -- -- 278 188 E02W $-- -- -- 2,012 1,362 E02X $-- -- -- 5,489 3,715 E02Y $-- -- -- 4,589 3,106 E02Z $-- -- -- 4,391 2,972 E030 $-- -- -- 832 563 E031 $-- -- -- 1,382 935 E032 $-- -- -- 1,167 790 E033 $-- -- -- 1,098 743 E034 $-- -- -- 3,645 2,467 E035 $-- -- -- 1,721 1,165 E036 $-- -- -- 1,648 1,115 E037 $-- -- -- 1,098 743 E038 $-- -- -- 4,319 2,293 E039 $-- -- -- 350 237 E03A $-- -- -- 5,426 3,672 E03B $-- -- -- 4,085 2,765 E03C $-- -- -- 8,870 6,003 E03D $-- -- -- 33,093 22,397 E03E $-- -- -- 1,283 868 E03F $-- -- -- 7,242 4,901 E03G $-- -- -- 2,429 1,644 E03H $-- -- -- 40,189 27,200 E03J $-- -- -- 5,742 3,886 E03K $-- -- -- 4,307 2,915 E0GL $-- -- -- 127,950 86,595 E0GM $-- -- -- 242,023 163,799 E0GN $-- -- -- 309,579 209,521 E0GP $-- -- -- 2,499 1,691 E0GQ $-- -- -- 1,283 868 E0GR $-- -- -- 37,659 25,822 E0GS $-- -- -- 37,477 25,364 E0GT $-- -- -- 22,789 15,424 E0GU $-- -- -- 832 563 Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21181st Page of 414TOC1stPreviousNextBottomJust 181st
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Enlarge/Download Table] FY 2003 ----------------------------------- ELIN Direct Direct Direct Direct Total 0004 Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead G&A COM Price ---- --------- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- E0GV [/\/\] $-- [/\/\] -- -- 168,155 113,806 [/\/\] E0GW $-- -- -- 4,088 2,766 E0GX $-- -- -- 76,164 51,547 E0GY $-- -- -- 5,257 3,558 E0GZ $-- -- -- 7,080 4,791 E0H0 $-- -- -- 832 563 E0H1 $-- -- -- 6,559 4,439 E0H2 $-- -- -- 18,211 12,325 E0H3 $-- -- -- 17,218 11,653 E0H4 $-- -- -- 9,928 6,719 E0H5 $-- -- -- 3,970 2,687 E0H6 $-- -- -- 5,603 3,792 E0H7 $-- -- -- 28,367 19,198 E0H8 $-- -- -- 5,514 3,732 E0H9 $-- -- -- 3,502 2,370 E0HA $-- -- -- 1,751 1,185 E0HB $-- -- -- 3,152 2,133 E0HC $-- -- -- 27,069 18,320 E0HD $-- -- -- 8,521 5,767 E0HV $-- 515,200 -- 3,048,618 2,063,279 E0HW $-- 1,122,400 -- 6,641,633 4,495,002 --------- --- ---------- ---------- 151 3,606,400 -- 20,031,201 13,556,949 --------- --- ---------- ---------- Cost Summary ---------- 0004AA Transition 0004AC Repair Ops T-56 F-100 TF-39 Fuel Accy T-58 2LM TF-39 2LM Totals Standard Aero Proprietory - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21182nd Page of 414TOC1stPreviousNextBottomJust 182nd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary / Exhibit E [Download Table] ELIN 0004 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP ---- ---- ---- --- ------- ------- ------- ------- E001 E001 [/\/\] [/\/\] 2,015 2,094 2,015 2,015 E002 E002 10,174 10,804 10,174 10,174 E003 E003 4,151 4,313 4,151 4,151 E004 E004 1,541 1,002 1,541 1,541 E005 E005 617 841 617 617 E006 E006 1,211 1,259 1,211 1,211 E007 E007 18,934 19,872 18,934 18,934 E008 E008 17,027 18,314 17,627 17,627 E009 E009 38,489 39,990 38,480 38,480 E00A E00A -- -- -- -- E00B E00B -- -- -- -- E00C E00C -- -- -- -- E00D E00D 887 921 887 887 E00E E00E 1,470 1,527 1,470 1,470 E00F E00F 4,959 5,152 4,959 4,959 E00G E00G 590 813 590 590 E00H E00H 5,257 5,462 5,257 5,257 E00J E00J 1,726 1,794 1,726 1,726 E00K E00K 633 857 633 633 E00L E00L 3,183 3,307 3,183 3,183 E00M E00M 538 559 538 538 E00N E00N 1,096 1,136 1,096 1,096 E00P E00P 809 840 809 809 E00Q E00Q 709 738 709 709 E00R E00R 203 211 203 203 E00S E00S 168 174 168 168 E00T E00T 935 971 935 935 E00U E00U 557 579 557 557 EO0V EO0V 1,293 1,344 1,293 1,293 EO0W EO0W 253 263 253 253 E00X E00X 935 971 935 935 E00Y E00Y 576 599 576 576 E00Z E00Z 480 478 480 480 E010 E010 480 478 480 480 E011 E011 1,308 1,359 1,308 1,308 E012 E012 253 263 253 253 E013 E013 1,470 1,527 1,470 1,470 E014 E014 1,718 1,785 1,718 1,718 E015 E015 2,317 2,408 2,317 2,317 E016 E016 253 203 253 253 E017 E017 88,229 91,670 88,229 88,229 E018 E018 88,229 91,670 88,229 88,229 E019 E019 88,229 91,670 88,229 88,229 E01A E01A 88,229 91,670 88,229 88,229 E01B E01B 88,229 91,670 88,229 88,229 E01C E01C 16,174 16,804 16,174 16,174 E01D E01D 3,183 3,307 3,183 3,183 E01E E01E 88,229 91,670 88,229 88,229 E01F E01F 15,733 16,340 15,733 15,733 E01G E01G 3,183 3,307 3,183 3,183 E01H E01H 109,994 114,283 109,994 109,994 E01J E01J 16,169 16,800 16,169 16,169 E01K E01K 3,183 3,307 3,183 3,183 E01L E01L 48,492 50,383 48,492 48,492 E01M E01M 20,273 21,084 20,273 20,273 E01N E01N 5,183 5,386 5,183 5,183 E01P E01P 154 100 154 154 E01Q E01Q 1,790 1,560 1,790 1,790 E01R E01R 6,920 7,189 6,920 6,920 E01S E01S 1,790 1,860 1,790 1,790 E01T E01T 1,283 1,312 1,283 1,283 E01U E01U 1,087 1,129 1,087 1,087 E01V E01V 1,562 1,823 1,562 1,562 E01W E01W 2,016 2,094 2,016 2,016 E01X E01X 1,087 1,129 1,087 1,087 E01Y E01Y 1,541 1,602 1,541 1,541 E01Z E01Z 1,718 1,785 1,718 1,718 E020 E020 576 702 678 678 E021 E021 1,211 1,259 1,211 1,211 E022 E022 617 841 617 617 E023 E023 4,950 5,152 4,950 4,950 E024 E024 280 291 280 280 E025 E025 123 126 123 123 E026 E026 225 237 226 226 E027 E027 225 237 226 226 E028 E028 225 237 226 226 E029 E029 225 237 226 226 E02A E02A 1,470 1,527 1,470 1,470 E02B E02B 530 550 530 530 Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21183rd Page of 414TOC1stPreviousNextBottomJust 183rd
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule A - ELIN Pricing Summary / Exhibit E [Download Table] ELIN 0004 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP ---------- ---- ---- --- --------- ------- --------- --------- E02C E02C [/\/\] [/\/\] 338 351 338 338 E02D E02D 338 351 338 338 E02E E02E 658 883 658 658 E02F E02F 402 418 402 402 E02G E02G 402 418 402 402 E02H E02H 1,087 1,120 1,087 1,087 E02J E02J 402 418 402 402 E02K E02K 402 418 402 402 E02L E02L 4,969 5,183 4,969 4,969 E02M E02M 4,969 5,183 4,969 4,969 E02N E02N 4,742 4,827 4,742 4,742 E02P E02P 4,969 5,183 4,969 4,969 E02Q E02Q 338 351 338 338 E02R E02R 530 550 530 530 E02S E02S 338 351 338 338 E02T E02T 530 550 530 530 E02U E02U 338 351 338 338 E02V E02V 402 418 402 402 E02W E02W 530 550 530 530 E02X E02X 530 550 530 530 E02Y E02Y 554 575 554 554 E02Z E02Z 530 550 530 530 E030 E030 402 418 402 402 E031 E031 364 378 364 364 E032 E032 338 351 338 338 E033 E033 530 550 530 530 E034 E034 364 378 364 364 E035 E035 554 575 554 554 E036 E036 530 550 530 530 E037 E037 530 550 530 530 E038 E038 338 351 338 338 E039 E039 338 351 338 338 E03A E03A 785 816 785 785 E03B E03B 338 351 338 338 E03C E03C 338 351 338 338 E03D E03D 173 180 173 173 E03E E03E 338 351 338 338 E03F E03F 1,613 1,676 1,613 1,613 E03G E03G 639 664 639 639 E03H E03H 4,155 4,317 4,155 4,155 E03J E03J 4,155 4,317 4,155 4,155 E03K E03K 4,155 4,317 4,155 4,155 E0GL E0GL 173 180 173 173 E0GM E0GM 4,969 5,163 4,969 4,969 E0GN E0GN 4,742 4,927 4,742 4,742 E0GP E0GP 402 418 402 402 E0GQ E0GQ 338 351 338 338 E0GR E0GR 274 285 274 274 E0GS E0GS 658 683 658 658 E0GT E0GT 785 816 785 785 E0GU E0GU 402 418 402 402 E0GV E0GV 530 550 530 530 E0GW E0GW 858 883 858 858 E0GX E0GX 384 378 384 384 E0GY E0GY 133 139 133 133 E0GZ E0GZ 402 418 402 402 E0H0 E0H0 402 418 402 402 E0H1 E0H1 308 318 308 308 E0H2 E0H2 338 351 338 338 E0H3 E0H3 364 378 364 364 E0H4 E0H4 364 378 364 364 E0H5 E0H5 338 351 338 338 EOH6 EOH6 338 351 338 338 EOH7 EOH7 338 351 338 338 E0H8 E0H8 210 218 210 210 E0H9 E0H9 338 351 338 338 E0HA E0HA 338 351 338 338 E0HB E0HB 338 351 338 338 E0HC E0HC 402 418 402 402 E0HD E0HD 338 351 338 338 E0HV E0HV 166,809 173,314 166,809 166,809 E0HW E0HW 166,809 173,314 166,809 166,809 151 1,340,887 1,393,182 1,340,887 1,340,887 Cost Summary ---------- 0004AA Transition 0004AC Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21184th Page of 414TOC1stPreviousNextBottomJust 184th
Confidential - Competition Sensitive Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 ELIN Pricing Summary / Exhibit E [Download Table] ELIN 0004 ELIN NOUN NSN FY99 UP FY00 UP FY01 UP FY02 UP ---- ---- ---- --- ------- ------- ------- ------- Repair Ops T-56 F-100 TF-39 Fuel Accy T-56 2LM TF-39 2LM Totals Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\/\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS COLUMN; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21185th Page of 414TOC1stPreviousNextBottomJust 185th
Confidential - Competition Sensitive SUBCLIN AB - WORK IN PROGRESS [Download Table] OFFEROR SASA [Download Table] Composite Labor/Hr ODC/Hr OH/Hr G&A/Hr COM/Hr Rate/Hr Total -------- ------ ----- ------ ------ --------- ----- 0001AB 157,000 [/\] 0 $0.00 $0.00 $0.00 [/\] [/\] 0002AB 217,000 [/\] 0 $0.00 $0.00 $0.00 [/\] [/\] 0003AB 221,000 [/\] 0 $0.00 $0.00 $0.00 [/\] [/\] 0004AB 235,000 [/\] 0 $0.00 $0.00 $0.00 [/\] [/\] TOTAL WIP 830,000 CLIN 0006 - OVER AND ABOVE RATES EXHIBIT F CLIN 0006 AA ENG/TECH/LAB [Download Table] Estimated ELIN FY Hours Labor/Hr ODC/Hr OH/Hr G&A/Hr COM/Hr RATE TOTAL ---- --- --------- -------- ------ ----- ------ ------ ---- ----- F001 99 1,126 [/\] $0.00 $0.00 $0.00 $0.00 [/\] $ [/\] F002 00 1,126 [/\] $0.00 $0.00 $0.00 $0.00 [/\] $ [/\] F003 01 1,126 [/\] $0.00 $0.00 $0.00 $0.00 [/\] $ [/\] 3,378 [/\] -- $ -- $ -- $ -- [/\] $ [/\] CLIN 0006 AB ALL OTHER [Download Table] Estimated ELIN FY Hours Labor/Hr ODC/Hr OH/Hr G&A/Hr COM/Hr RATE TOTAL ----- --- --------- -------- ------ ----- ------ ------ ---- ----- F0016 99 20,295 [/\] $0.00 $0.00 $0.00 $0.00 [/\] $ [/\] F0017 00 20,295 [/\] $0.00 $0.00 $0.00 $0.00 [/\] $ [/\] F0018 01 20,295 [/\] $0.00 $0.00 $0.00 $0.00 [/\] $ [/\] 60,885 [/\] $ -- $ -- $ -- $ -- [/\] $ [/\] Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21186th Page of 414TOC1stPreviousNextBottomJust 186th
Confidential - Competition Sensitive [Download Table] COST PROPOSAL SUMMARY OFFEROR SASA F41608-98-R-0684 FY 1999-2001 [Enlarge/Download Table] Labor Labor CLIN/Sub CLIN Hrs Rate Labor Cost Material SubCont ODC Overhead CAA COM Price ------------- ----- ----- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----- CLIN 0001 T56, TF39 AND F100 0001AA Transition [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0001AB WIP [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0001AC Repair Oprs [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TOTAL CLIN 0001 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] CLIN 0002 T56, TF39, F100, and Fuel Accessories 0002AA Transition [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0002AB WIP [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0002AC Repair Oprs [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TOTAL CLIN 0002 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] CLIN 0003 T56, TF39, F100, FA and T56 2LM 0003AA Transition [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0003AB WIP [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0003AC Repair Oprs [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TOTAL CLIN 0003 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] CLIN 0004 T56, TF39, F100, FA, T56 2LM, and TF39 2LM 0004AA Transition [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0004AB WIP [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0004AC Repair Oprs [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TOTAL CLIN 0004 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] CLIN 0006 0006AA [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0006AB [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21187th Page of 414TOC1stPreviousNextBottomJust 187th
Confidential - Competition Sensitive [Enlarge/Download Table] B01A [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] B01U [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] B004 [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21188th Page of 414TOC1stPreviousNextBottomJust 188th
Confidential - Competition Sensitive [Download Table] COST PROPOSAL FY 1999 OFFEROR SASA F41608-98-R-0084 [Enlarge/Download Table] Direct Direct Labor Labor Direct Direct Total CLIN/Sub CLIN Hrs Rate Labor Cost Material SubCont ODC Overhead CAA COM Price ------------- ------ ------ ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----- CLIN 0001 T56, TF39 AND F100 0001AA Transition [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0001AC Repair Operations T56 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] F100 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TF39 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] **TOTAL 0001AC [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] **[ILLEGIBLE] [/\] [/\] TOTAL CLIN 0001 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] CLIN 0002 T56, TF39, F100, and Fuels Accessories 0002AA Transition [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0002AC Repair Operations T56 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] F100 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TF39 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Fuel Acc [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Total 0002AC [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TOTAL CLIN 0002 [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] CLIN 0003 T56, TF39, F100, FA and T56 2LM 0003AA Transition [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0003AC Repair Operations T56 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] F100 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TF39 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Fuel Acc [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] T56 2LM [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Total 0003AC [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TOTAL CLIN 0003 [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] CLIN 0004 T56, TF39, F100, FA, T56 2LM, and TF39 2LM 0004AA Transition [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] 0004AC Repair Operations T56 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] F100 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TF39 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Fuel Acc [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] T56 2LM [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TF39 2LM [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Total 0004AC [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] TOTAL CLIN 0004 [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] UNIT COST BREAKDOWN ELINs NSNs [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [ILLEGIBLE] [/\] Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21189th Page of 414TOC1stPreviousNextBottomJust 189th
Confidential - Competition Sensitive [Download Table] COST PROPOSAL FY 1999 OFFEROR SASA F41608-98-R-0084 [Enlarge/Download Table] Direct Direct Direct Direct Total CLIN/SubCLIN Labor Hrs Labor Rate Labor Cost Material Sub-Cost ODC Overhead G&A COM Price ------------ --------- ---------- ---------- -------- -------- --- -------- --- --- ----- [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21190th Page of 414TOC1stPreviousNextBottomJust 190th
Confidential - Competition Sensitive [Download Table] COST PROPOSAL FY 2000 OFFEROR SASA F41608-98-R-0084 [Enlarge/Download Table] Direct Direct Direct Direct Total CLIN/SubCLIN Labor Hrs Labor Rate Labor Cost Material Sub-Cost ODC Overhead G&A COM Price ------------ --------- ---------- ----------- -------- ----------- --- ----------- ----------- --- ----- CLIN 0001 T56, TF39 AND F100 0001AA Transition [/\] [/\] 0 0 0 0 0 0 0 [/\] 0001AC Repair Operations T56 [/\] [/\] 24,076,364 0 3,572,000 0 23,107,816 2,969,898 0 [/\] F100 [/\] [/\] 0 0 0 0 0 0 0 [/\] TF39 [/\] [/\] 0 0 0 0 0 0 0 [/\] **TOTAL 0001AC [/\] [/\] 24,076,364 0 3,572,000 0 23,107,816 2,969,898 0 [/\] [ILLEGIBLE] TOTAL CLIN 0001 [/\] [/\] 24,076,364 0 3,572,000 0 23,107,816 2,969,898 0 [/\] CLIN 0002 T56, TF39, F100, and Fuels Accessories 0002AA Transition [/\] [/\] 23,092,226 0 0 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] 0002AC Repair Operations T56 [/\] [/\] [ILLEGIBLE] 0 3,572,000 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] F100 [/\] [/\] 0 0 0 0 0 0 0 [/\] TF39 [/\] [/\] 0 0 0 0 0 0 0 [/\] Fuel Acc [/\] [/\] [ILLEGIBLE] 0 0 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] Total 0002AC [/\] [/\] [ILLEGIBLE] 0 3,572,000 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] TOTAL CLIN 0002 [/\] [/\] [ILLEGIBLE] 0 3,572,000 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] CLIN 0003 T56, TF39, F100, FA, and T56 2LM 0003AA Transition [/\] [/\] 0 0 0 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] 0003AC Repair Operations T56 [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] F100 [/\] [/\] 0 0 0 0 0 0 0 [/\] TF39 [/\] [/\] 0 0 0 0 0 0 0 [/\] Fuel Acc [/\] [/\] [ILLEGIBLE] 0 0 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] T56 2LM [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] Total 0003AC [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] TOTAL CLIN 0003 [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] CLIN 0004 T56, TF39, F100, FA, T56 2LM AND TF39 2LM 0004AA Transition [/\] [/\] 0 0 0 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] 0004AC Repair Operations T56 [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] F100 [/\] [/\] 0 0 0 0 0 0 0 [/\] TF39 [/\] [/\] 0 0 0 0 0 0 0 [/\] Fuel Acc [/\] [/\] [ILLEGIBLE] 0 0 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] T56 2LM [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] TF39 2LM [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] Total 0004AC [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] TOTAL CLIN 0004 [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] UNIT COST BREAKDOWN ELINs NSNs [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] 0 0 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 40 0 0 0 40 40 0 [/\] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] 0 0 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] [ILLEGIBLE] 0 [ILLEGIBLE] 0 [ILLEGIBLE] [ILLEGIBLE] 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21191st Page of 414TOC1stPreviousNextBottomJust 191st
Confidential - Competition Sensitive [Download Table] COST PROPOSAL FY 2000 OFFEROR SASA F41608-98-R-0084 [Enlarge/Download Table] Direct Direct Direct Direct Total CLIN/SubCLIN Labor Hrs Labor Rate Labor Cost Material Sub-Cost ODC Overhead G&A COM Price ------------ --------- ---------- ---------- -------- -------- --- -------- --- --- ----- [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21192nd Page of 414TOC1stPreviousNextBottomJust 192nd
Confidential - Competition Sensitive [Download Table] COST PROPOSAL FY 2001 OFFEROR SASA F41608-98-R-0084 [Enlarge/Download Table] Direct Direct Direct Direct Total CLIN/SubCLIN Labor Hrs Labor Rate Labor Cost Material Sub-Cont ODC Overhead Q&A COM Price ------------ --------- ---------- ---------- -------- --------- --- ---------- ---------- --- ----- CLIN 0001 T56, TF39 AND F100 0001AA Transition [/\] [/\] 0 0 0 0 0 0 0 [/\] 0001AC Repair Operations T36 [/\] [/\] 20,513,022 0 3,582,000 0 12,065,493 7,334,138 0 [/\] F100 [/\] [/\] 0 0 0 0 0 0 0 [/\] TF39 [/\] [/\] 0 0 0 0 0 0 0 [/\] **Total 0001AC [/\] [/\] 20,513,022 0 3,582,000 0 12,065,493 7,334,138 0 [/\] **Two AC [ILLEGIBLE] TOTAL CLIN 0001 [/\] [/\] 20,513,022 0 3,582,000 0 12,065,493 7,334,138 0 [/\] CLIN 0002 T56, TF39, F100 and Fuels Accessories 0002AA Transition [/\] [/\] 0 0 0 0 0 0 0 [/\] 0002AC Repair Operations T36 [/\] [/\] 19,658,060 0 3,382,000 0 11,981,697 7,041,977 0 [/\] F100 [/\] [/\] 0 0 0 0 0 0 0 [/\] TF39 [/\] [/\] 0 0 0 0 0 0 0 [/\] Fuel Acc [/\] [/\] 1,881,477 0 0 0 1,124,284 483,986 0 [/\] Total 0002AC [/\] [/\] 21,539,537 0 3,582,000 0 12,905,981 7,725,572 0 [/\] TOTAL CLIN 0002 [/\] [/\] 21,539,537 0 3,582,000 0 12,905,981 7,725,572 0 [/\] CLIN 0003 T56, TF39, F100, FA and T56 2LM 0003AA Transition [/\] [/\] 0 0 0 0 0 0 0 [/\] 0003AC Repair Operations T36 [/\] [/\] 11,156,994 0 1,968,800 0 9,157,719 6,197,868 0 [/\] F100 [/\] [/\] 0 0 0 0 0 0 0 [/\] TF39 [/\] [/\] 0 0 0 0 0 0 0 [/\] Fuel Acc [/\] [/\] 1,441,555 0 0 0 1,123,230 800,800 0 [/\] T56 2LM [/\] [/\] 11,805,826 0 1,637,600 0 9,690,231 6,938,281 0 [/\] Total 0003AC [/\] [/\] 24,404,375 0 3,606,400 0 20,031,201 13,556,949 0 [/\] TOTAL CLIN 0003 [/\] [/\] 24,404,375 0 3,606,400 0 20,031,201 13,556,949 0 [/\] CLIN 0004 T56, TF39, F100, FA, T56 2LM and TF39 2LM 0004AA Transition [/\] [/\] 0 0 0 0 0 0 0 [/\] 0004AC Repair Operations T36 [/\] [/\] 11,156,994 0 1,968,800 0 9,157,719 6,397,868 0 [/\] F100 [/\] [/\] 0 0 0 0 0 0 0 [/\] TF39 [/\] [/\] 0 0 0 0 0 0 0 [/\] Fuel Acc [/\] [/\] 1,441,555 0 0 0 1,183,230 800,800 0 [/\] T56 2LM [/\] [/\] 11,805,826 0 1,637,600 0 9,690,231 6,938,281 0 [/\] TF39 2LM [/\] [/\] 0 0 0 0 0 0 0 [/\] Total 0004AC [/\] [/\] 24,404,375 0 2,606,400 0 20,031,201 13,556,949 0 [/\] TOTAL CLIN 0004 [/\] [/\] 24,404,375 0 2,606,400 0 20,021,201 13,556,949 0 [/\] UNIT COST BREAKDOWN ELINs NSNs [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 12,325 0 9,200 0 10,117 6,847 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 6,806 0 0 0 2,367 1,786 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 73 0 0 0 60 40 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 1,996 0 0 0 1,636 1,109 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 66,325 0 9,200 0 94,440 36,040 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] [ILLEGIBLE] [ILLEGIBLE] [/\] [/\] 0 0 0 0 0 0 0 [/\] Standard Aero Proprietary - Not Releasable FPR Submission to LM - Sept.5/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21193rd Page of 414TOC1stPreviousNextBottomJust 193rd
THIS DOCUMENT ESTABLISHES THE MINIMUM WORK REQUIREMENT TO COMPLETE THE TRANSITION INTEGRATION PLAN AS DEFINED IN EXHIBITS B THROUGH E. THE FOLLOWING IS APPLICABLE TO STANDARD AERO SAN ANTONIO SPECIFIC WORKLOAD BASED ON THE AWARDED CLIN. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 1
EX-10.21194th Page of 414TOC1stPreviousNextBottomJust 194th
TIP-1 INTRODUCTION TO OC-LM TRANSITION INTEGRATION PLAN (TIP). Integrated Management and event-based planning is the framework for the PBA TIP. Our detailed plan ensures proper tracking of all key events, increases management visibility into progress, permits early detection of undesirable trends, and establishes conditions for activity completion to aid in progress tracking and risk evaluation/reduction. The plan is our primary management tool for tracking program progress, providing visibility into progress, and identifying technical and programmatic areas for emphasis to reduce transition risk. The event-based planning describes the program in terms of: - EVENTS - major program milestones selected by management as checkpoints for measuring program maturity. Each event is defined and aligned with our customer's expectation. - SIGNIFICANT ACCOMPLISHMENTS - principal activities which describe what must be done prior to each event. Significant accomplishments are drawn from the WBS and CWS and show completion of discrete steps in the process. - ACCOMPLISHMENT CRITERIA - objective evidence that work has been completed and provides closure for a significant accomplishment. Accomplishment criteria are measurable and defined conditions for proceeding toward the next event. The plan is divided into eight separate areas: 1.1 Transition Overview and Common Events 1.2 Quality 1.2.1 OC-ALC ISO 9002 Compliance 1.2.2 LMKAC ISO 9002 Compliance 2.1 F100 Engine Transition and Completion of Work In Process 2.2 TF39 Engine Transition and Completion of Work in Process 2.3 T56 Engine Transition and Completion of Work In Process 2.4 Fuel Accessories Transition and Completion of Work In Process 2.5 TF39 Two Level Maintenance Addendum (Transition and Completion of Work In Process) 2.6 T56 Two Level Maintenance Addendum (Transition and Completion of Work In Process) Due to page constraints and for ease in evaluation, we have limited our TIP detail to three levels of work breakdown structure in most cases. Narrative for the tasks contained in the TIP may be found in paragraphs IIA-2 through IIA-9 of the Transition Section. Each major level in the TIP references the corresponding paragraph. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 1
EX-10.21195th Page of 414TOC1stPreviousNextBottomJust 195th
TIP-1.1 TRANSITION OVERVIEW (RFP Exhibits B,C,D, or E) TOP LEVEL PLAN [Enlarge/Download Table] 1997 1998 1999 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 PROGRAM PLANNING (Paragraph IIA-2) 3/3/97 8/24/00 79 RISK MANAGEMENT (Paragraph IIA-3) 3/3/97 8/31/00 126 SUPPLY SUPPORT (Paragraph IIA-4) 3/3/97 8/22/00 226 STORAGE (Paragraph IIA-4) 1/26/98 7/30/99 265 TRANSPORTATION (Paragraph IIA-4) 5/1/98 8/22/00 [Enlarge/Download Table] 1997 1998 1999 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 280 LOGISTICS SUPPORT (Paragraph IIA-4) 5/1/97 8/22/00 [LINE CHART] 307 WORK IN PROCESS (WIP)(Paragraph IIA-5) 9/30/98 8/2/99 318 WORKFORCE TRANSITION (SEE INDIVIDUAL 3/3/97 8/22/00 PLANS) (Para IIA-5 & 6) 451 PBA CONTRACTS PREVIOUSLY AWARDED 8/11/97 8/22/00 FOR RQMTS (Para IIA-5.2) 465 FACILITIES (SEE INDIV PLANS) (Para 9/30/98 8/21/00 IIA-7 & Facilities & Equipment Data) 481 EQUIPMENT & TOOLING (See Indiv Plans) 3/3/97 8/22/00 (Para IIA-7 & Fac & Equip Data) [Enlarge/Download Table] 1997 1998 1999 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 494 COMMUNICATIONS (Paragraph IIA-7) 9/30/98 8/22/00 [LINE CHART] 497 REAL ESTATE/REAL PROPERTY 9/30/98 8/22/00 (Paragraph IIA-7) 499 BASE OPERATIONS SUPPORT 9/30/98 8/22/00 (Paragraph IIA-7) 501 QUALITY (SEE SEPARATE ISO 9002 PLANS) 9/30/98 8/2/99 (Paragraph IIA-8) 513 CRITICAL PROCESS DEMOS (SEE INDIVIDUAL 5/13/98 7/29/99 PLANS) (Paragraph IIA-9) 521 COMPUTER RESOURCES (INFO SYSTEMS) 3/3/97 8/22/00 (Para IIA-4) [Enlarge/Download Table] 1997 1998 1999 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 544 FULL RATE PRODUCTION (EXIT TRANSITION) 8/2/99 8/22/00 [LINE CHART] 545 COMPLETE ALL PBA TRANSITION EXIT 8/22/00 8/22/00 CRITERIA 549 KELLY AIR FORCE BASE CLOSURE 7/13/01 7/13/01 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 2 Source Selection Sensitive
EX-10.21196th Page of 414TOC1stPreviousNextBottomJust 196th
DETAILED PLAN [Enlarge/Download Table] 1998 1999 2000 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 PROGRAM PLANNING (Paragraph IIA-2) 3/3/97 8/24/00 3 Complete PBA Pre-Contract Award 3/3/97 6/30/98 Transition Activities 21 Implement Transition Management 5/1/98 10/9/98 Team 22 Define OC-LM Organization and 5/1/98 5/29/98 identify initial cadre 23 Activate Team at Tinker upon 9/30/98 9/30/98 contract award [Enlarge/Download Table] 1998 1999 2000 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 24 Train Transition team 10/6/98 10/6/98 [LINE CHART] 28 Deploy Transition Team Members 9/30/98 10/9/98 to Kelly 29 Transition Management Team In 10/9/98 10/9/98 Place 30 Implement Contract Administration 9/30/98 8/24/00 Structure 31 Activate Team at Tinker upon 9/30/98 9/30/98 contract award 33 Implement subcontracts & 10/1/98 10/30/98 finalize MOAs [Enlarge/Download Table] 1998 1999 2000 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 41 Submit CDRLs 10/9/98 8/24/00 [LINE CHART] 42 Submit initial CDRL 10/9/98 11/12/98 requirements 48 Verify CDRL requirements/ 10/30/98 10/30/98 other requirements 49 Update schedule for 10/30/98 11/6/98 submittals (as required) 50 Complete CDRL submittals for 11/6/98 8/24/00 transition period 51 Post Contract Award Conference 10/19/98 11/2/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 3
EX-10.21197th Page of 414TOC1stPreviousNextBottomJust 197th
[Enlarge/Download Table] 1998 1999 2000 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 65 Implement Transition Plan controls 9/30/98 8/24/00 [LINE CHART] 66 Review/Implement Schedule 9/30/98 10/30/98 Performance Status Reporting 67 Review/Implement Over & Above 9/30/98 11/6/98 Planning & Coordination Process 68 Review/Implement Accounting 9/30/98 12/28/98 System 72 Review new work planning process 9/30/98 10/30/98 73 Implement Monitor Cost/Schedule/ 9/30/98 8/24/00 Performance Controls [Enlarge/Download Table] 1998 1999 2000 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 74 Implement Financial Management 3/3/97 8/24/00 [LINE CHART] Process 75 Establish Financial Planning 3/3/97 5/29/98 Baseline 76 Verify Baseline 9/30/98 10/30/98 77 Long Range & Short Range Budget 11/2/98 5/31/99 Requirements 78 Update Long Range & Short Range 6/1/99 8/24/00 Budget Requirements (as required) 79 RISK MANAGEMENT (Paragraph IIA-3) 3/3/97 8/31/00 [Enlarge/Download Table] 1998 1999 2000 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 80 Identify potential risks & develop 3/3/97 9/30/98 [LINE CHART] mitigation strategies 81 Activate Risk Management Executive 9/30/98 9/30/98 Group 82 Review/Implement Transition Risk 9/30/98 8/24/00 Management Process 83 Implement Risk Management Program 9/30/98 10/2/98 Schedule 84 Track Key Completion Dates for Each 9/30/98 8/22/00 Sub-Area 85 F100 2/3/99 9/9/99 [Enlarge/Download Table] 1998 1999 2000 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 92 TF39 9/30/98 8/2/99 [LINE CHART] 101 T56 9/30/98 8/2/99 117 Fuel Accessories 9/30/98 8/22/00 118 F100 Accessories 9/30/98 8/22/00 119 TF39 & T56 Accessories 9/30/98 8/2/99 120 Airframe Accessories 9/30/98 8/21/00 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 4 Source Selection Sensitive
EX-10.21198th Page of 414TOC1stPreviousNextBottomJust 198th
[Enlarge/Download Table] 1998 1999 2000 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 121 Complete Lessons Learned 1/4/99 8/31/00 [LINE CHART] 122 Develop Lessons Learned for all 1/4/99 8/23/00 groups 123 Implement changes to the PBA 1/11/99 8/23/00 Transition (as applicable) 124 Establish control points to 1/11/99 8/23/00 monitor progress 125 Dessiminate information through 1/11/99 8/31/00 corporate channels 126 SUPPLY SUPPORT (Paragraph IIA-4) 3/3/97 8/22/00 [Enlarge/Download Table] 1997 1998 1999 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 127 Complete Pre-Contract Award 3/3/97 5/29/98 [LINE CHART] Activities 128 Forecast preliminary material 3/3/97 5/29/98 requirements 129 Review Inventory Management 3/3/97 5/29/98 Process 130 Review Vendor Source Approval 3/3/97 5/29/98 Process 131 Review Purchasing Process 3/3/97 5/29/98 132 Activate Supply Support Team 9/30/98 9/30/98 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 133 Review/Implement Inventory 10/1/98 10/30/98 [LINE CHART] Management Process 134 Review/Implement Vendor Source 10/1/98 10/30/98 Approval Process 135 Review/Implement Purchasing Process 10/1/98 10/30/98 136 Joint Material Inventory 9/30/98 2/1/99 137 Establish Joint Inventory Team 9/30/98 11/12/98 138 Establish procedures for 11/13/98 11/25/98 Inventory [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 139 Accomplish Joint Inventory with 11/30/98 12/31/98 [LINE CHART] SA-ALC 140 Publish results of Joint 1/4/99 1/8/99 Inventory 141 76ABW/LG process adjustments 1/4/99 1/15/99 to DO35 (as required) 142 Update material requirement 1/19/99 2/1/99 forecasts upon inventory completion 143 Transfer ownership of inventory 1/19/99 2/1/99 to OC-ALC 144 Material Management Process 9/30/98 8/22/00 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 5
EX-10.21199th Page of 414TOC1stPreviousNextBottomJust 199th
[Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 172 TF39 & T56 Engines 9/30/98 8/2/99 [LINE CHART] 173 76ABW/LG/LGS extract DO35K 10/1/98 10/30/98 demand data 174 Transfer data to OC-LM 11/2/98 11/6/98 175 Validate forecast 11/9/98 11/20/98 requirements 176 Identify & expedite critical 11/9/98 2/2/99 items 177 Establish item records 11/9/98 11/20/98 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 178 Set Initial Special Levels 11/9/98 11/20/98 [LINE CHART] 179 Check backorder status for 11/9/98 2/2/99 estimated delivery 180 Track due-ins 11/9/98 2/2/99 181 Identify & expedite critical 11/10/98 2/2/99 items as needed 182 Receive & process transfer 1/19/99 2/1/99 documents 183 Establish SSC/DMSC (Kelly) 9/30/98 2/1/99 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 193 Material Management Support 2/1/99 2/1/99 [LINE CHART] Process in place for TF39 & T56 194 Receive updates to BEQs 2/2/99 8/2/99 195 Forecast requirements for 2/2/99 8/2/99 production during transition 196 Order & stock material for 2/2/99 8/2/99 production during transition 197 Identify & expedite critical 2/2/99 8/2/99 items as needed 198 Fuel & Airframe Accessories 9/30/98 8/22/00 (TINKER & KELLY) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 6 Source Selection Sensitive
EX-10.21200th Page of 414TOC1stPreviousNextBottomJust 200th
[Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 199 76ABW/LG/LGS extract DO35K demand data 9/30/98 10/30/98 [LINE CHART] 200 Transfer data to OC-LM 11/2/98 11/6/98 201 Validate forecast requirements 11/9/98 12/1/98 202 Identify & expedite critical items 11/9/98 2/2/99 203 Establish item records 11/9/98 12/1/98 204 Set Initial Special Levels 11/9/98 12/1/98 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 205 Check backorder status for estimated 11/9/98 2/2/99 [LINE CHART] delivery 206 Track due-ins 11/9/98 2/2/99 207 Identify & expedite critical items 11/10/98 2/2/99 as needed 208 Receive & process transfer documents 1/19/99 2/1/99 209 Existing SSC/DMSC (Tinker) ready for 2/1/99 2/1/99 production 210 SSC/DMSC (Kelly) ready for production 9/30/98 2/1/99 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 220 Material Management Process in place 2/1/99 2/1/99 [LINE CHART] for Accessories 221 Receive updates to BEQs 2/2/99 8/17/00 222 Forecast requirements for production 2/2/99 8/22/00 during transition 223 Order & stock material for production 2/2/99 8/22/00 during transition 224 Identify & expedite critical items 2/2/99 8/22/00 as needed 225 Supply Support Process In Place 2/1/99 2/1/99 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 226 STORAGE (PARAGRAPH IIA-4) 1/26/98 7/30/99 [LINE CHART] 227 Complete Pre-Contract Award Activities 1/26/98 6/2/98 228 Identify storage requirements 1/26/98 5/18/98 229 Identify facilities requirements 1/26/98 6/2/98 230 Storage at Kelly (MOA with DLA for 9/30/98 12/8/98 Transition) 231 MOA with DLA and GKDC for necessary 9/30/98 10/30/98 resources [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 7
EX-10.21201st Page of 414TOC1stPreviousNextBottomJust 201st
[Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 232 Establish schedule for storage 11/2/98 11/6/98 [LINE CHART] facilities/processes review 233 Review warehouse facilities/stockrooms 11/9/98 11/13/98 & equipment 234 Review shipping & receiving facilities 11/16/98 11/20/98 235 Personnel in place for continued support 11/23/98 12/1/98 236 Validate storage processes 12/2/98 12/8/98 237 Storage Process in Place for Support of PBA 12/8/98 12/8/98 WIP/Production [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 238 LMKAC Assumes Warehouse Function for 5/1/98 7/30/99 [LINE CHART] Continuing Operations 239 Complete Pre-Contract Award Activities 5/1/98 6/26/98 249 Review layouts & storage requirements 9/30/98 10/30/98 252 Identify specific equipment 11/2/98 11/20/98 253 Hire personnel 11/23/98 5/17/99 254 Install equipment 11/23/98 7/14/99 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 255 Stock material in new location 7/15/99 7/30/99 [LINE CHART] 256 Warehouse Operational 7/30/99 7/30/99 257 Storage at Tinker (MOA with DLA for 9/30/98 12/4/98 Transition/Continuing Operations) 258 MOA with DLA for necessary resources 9/30/98 9/30/98 259 Establish schedule for storage 9/30/98 10/30/98 facilities/processes review 260 Review warehouse facilities/stockrooms & 11/2/98 11/6/98 equipment [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 261 Review shipping & receiving facilities 11/9/98 11/18/98 [LINE CHART] 262 Personnel In Place for PBA Workload 9/30/98 11/25/98 263 Validate storage processes 11/30/98 12/4/98 264 Storage Process in Place 12/8/98 12/8/98 265 TRANSPORTATION (Paragraph IIA-4) 5/1/98 8/22/00 266 Pre-Contract Award Activities 5/1/98 5/29/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 8 Source Selection Sensitive
EX-10.21202nd Page of 414TOC1stPreviousNextBottomJust 202nd
[Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 267 Develop transportation 5/1/98 5/29/98 [LINE CHART] requirements & procedures 268 Kelly & Tinker Locations 9/30/98 8/22/00 269 MOA in place for support 9/30/98 10/30/00 272 Complete equipment/tooling/ 9/30/98 8/22/00 material transport to Tinker 280 LOGISTICS SUPPORT (Paragraph IIA-4) 5/1/97 8/22/00 281 Pre-Contract Award Activities 5/1/97 5/29/98 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 282 Review logistics support 5/1/97 5/29/98 [LINE CHART] elements 283 Review TOs for Requirements 5/1/97 5/29/98 Baseline 284 Engineering Process Assessment 9/30/98 8/22/00 285 Identify engineering systems 9/30/98 11/25/98 requirements 286 Review engineering systems 11/30/98 12/28/98 process 287 Update process as required 12/29/98 1/20/99 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 288 Monitor changes and adjust 1/21/99 8/22/00 [LINE CHART] process as necessary 289 Repair Development Process 9/30/98 8/22/00 290 Implement process for repair 9/30/98 12/28/98 development 291 Review scrap material history 9/30/98 12/28/98 292 Review current material held for 1/4/99 1/15/99 engineering evaluation 293 Prepare & submit repair 1/19/99 8/15/00 development improvement/VECP [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 294 Upon approval, submit TO changes 4/14/99 8/22/00 [LINE CHART] (as required) to Program Office 295 Data Management 9/30/98 8/22/00 296 Review/Implement Management 9/30/98 8/22/00 Process for PBA TOs 297 Review library process 9/30/98 11/13/98 298 Verify TOs in place 11/16/98 12/22/98 299 Identify & obtain updates as 11/16/98 12/30/98 required [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 9
EX-10.21203rd Page of 414TOC1stPreviousNextBottomJust 203rd
[Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 300 Review TO Update process to 12/31/98 1/29/99 [LINE CHART] maintain Library with current 301 Submit TO Changes (as 2/1/99 8/22/00 required) to Program Office 302 Review/Implement Records 9/30/98 8/22/00 Management for PBA 303 Review Records Management 9/30/98 11/25/98 Process for PBA Workload 304 Implement Records Management 11/25/98 11/25/98 Process 305 Review/Monitor Records 11/30/98 8/22/00 Management during Transition [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 306 Logistics Support in place for 1/29/99 1/29/99 [LINE CHART] PBA Workload 307 WORK IN PROCESS (WIP) (Paragraph IIA 5) 9/30/98 8/2/99 308 Identify Team to conduct physical 9/30/98 11/18/98 inventory 309 Establish Inventory Procedures 11/19/98 1/4/99 310 Inventory WIP with ACO/Government 1/5/99 1/26/99 Representatives 311 Negotiate WIP with ACO 1/27/99 2/2/99 [Enlarge/Download Table] 1998 1999 2000 2001 ---------- -------------- -------------- ---------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 312 Assume WIP 2/3/99 2/3/99 [LINE CHART] 313 Complete WIP 2/4/99 8/2/99 314 F100 2/4/99 6/25/99 315 TF39/T56 2/4/99 8/2/99 316 Accessories 2/4/99 8/2/99 317 WIP Complete 8/2/99 8/2/99 [Enlarge/Download Table] 1997 1998 1999 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 318 WORKFORCE TRANSITION (SEE INDIVIDUAL 3/3/97 8/22/00 [LINE CHART] PLANS) (Paragraph IIA-5 319 Workforce Transition Pre-Contract 3/3/97 9/2/98 Award Activities 320 Determine 3/3/97 5/30/97 manpower/personnel/training 321 Information Fair #l (Pre-Award) 6/6/97 6/6/97 322 Information Fair #2 (Pre-Award) 7/12/97 7/12/97 323 Review/Update 6/2/97 6/1/98 manpower/personnel/training [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 10 Source Selection Sensitive
EX-10.21204th Page of 414TOC1stPreviousNextBottomJust 204th
[Enlarge/Download Table] 1997 1998 1999 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 324 LMKAC Pre-Award Activities 5/1/98 5/21/98 [LINE CHART] 328 Develop Skills Cap Analysis & 5/22/98 5/9/98 Contingency Plan 329 Information Fair #3 (Pre-Award) 8/15/98 8/15/98 330 Review Information Fair #3 8/17/98 9/2/98 Results 334 Manpower 9/30/98 8/22/00 335 Accomplish final review of 9/30/98 10/6/98 manpower Organization [Enlarge/Download Table] 1997 1998 1999 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 336 Identify hiring requirements to 10/7/98 10/9/98 [LINE CHART] Personnel Organization 337 Review manpower authorization 10/13/98 11/2/98 distribution 338 Reallocate Manpower requirements 11/3/98 11/16/98 as required 339 Realign manpower throughout 11/17/98 8/22/00 Transition as required 340 Personnel 9/30/98 8/21/00 341 PBA PGM PROVIDES RIGHT OF FIRST 9/30/98 10/9/98 REFUSAL [Enlarge/Download Table] 1997 1998 1999 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 342 Finalize MOA with Kelly 10/7/98 10/8/98 [LINE CHART] Personnel Office 343 Kelly Location 9/30/98 8/21/00 344 Submit request to SA-ALC/MQ 10/1/98 10/9/98 for Stand-Up 345 Transition Management Team on 10/9/98 10/9/98 site at Kelly. 346 Establish OL for Initial 10/13/98 10/30/98 Cadre 347 Staffing for Assumption of 9/30/98 8/21/00 WIP/Production [Enlarge/Download Table] 1997 1998 1999 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 348 Kelly Temporary Loans to 10/13/98 6/30/99 [LINE CHART] OL 349 Identify requirements 10/13/98 10/16/98 for personnel loans to Kelly 350 Kelly Personnel Office 10/19/98 10/30/98 identifies potential 351 Verify Temporary 11/2/98 1/27/99 employees' 352 Move employees to OL 11/5/98 2/2/99 359 Adjust Loans for Fill 11/16/98 12/15/98 Actions (Permanent/Term) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 11
EX-10.21205th Page of 414TOC1stPreviousNextBottomJust 205th
[Enlarge/Download Table] 1997 1998 1999 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 360 Return Employees to 12/16/98 6/25/99 [LINE CHART] Kelly 361 Reduction in force 6/30/99 6/30/99 362 Hire Kelly Workers for Pba 10/13/98 11/20/98 Workload 363 Kelly Worker 10/13/98 10/16/98 Recruitment Week 367 Select personnel for 10/19/98 11/13/98 employment 372 Update Skills Gap 10/26/98 11/20/98 Analysis & Contingency Plan [Enlarge/Download Table] 1997 1998 1999 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 373 Hire Term Employees 10/26/98 8/21/00 [LINE CHART] (Former Kelly Employees) 374 Hire employees 10/26798 11/13/98 375 Verify 10/28/98 11/17/98 training/certification 376 Employees report to OL 11/4/98 2/2/99 383 Release Term employees 3/1/99 8/21/00 (as required) 384 Transfer Kelly Employees 11/2/98 7/3/00 to Tinker Location [Enlarge/Download Table] 1997 1998 1999 -------------- -------------- -------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 385 Transfer employees to 11/2/98 3/1/99 [LINE CHART] OL 386 Process/Orientation 11/2/98 3/1/99 387 Establish Transfer 11/2/98 3/27/00 Schedule 388 Employees available to 11/5/98 5/26/00 support workload at Kelly 389 Move employees to 1/4/99 7/3/00 Tinker 390 Contract Field Team (CFT) 9/30/98 8/21/00 Augmentation [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q4 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 399 LMKAC Hiring 9/30/98 3/1/99 [LINE CHART] 400 Finalize Transition 10/1/98 10/1/98 industry team members 401 LMKAC team visits Kelly & 10/2/98 10/2/98 SA-ALC Leaders 402 Phase in managers, key 10/2/98 10/15/98 supervisors, and HR 403 Verify & approve staffing 9/30/98 10/9/98 plans 404 OC-LM RECEIVES RIGHT 9/30/98 10/9/98 OF FIRST REFUSAL EMPL [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 12 Source Selection Sensitive
EX-10.21206th Page of 414TOC1stPreviousNextBottomJust 206th
[Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 405 Finalize personnel 9/30/98 10/15/98 [LINE CHART] processing check list/ procedures 406 Complete final review & 9/30/98 10/20/98 prioritization of applicants by 407 Prepare new employee 9/30/98 10/21/98 information packet 408 Conduct applicant open 10/23/98 10/23/98 house 409 Interview incumbent 10/20/98 11/2/98 employees with Right of First 410 Interview and select 10/26/98 11/2/98 incumbent CFT employees [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 411 Select incumbent employees 11/2/98 11/30/98 [LINE CHART] with Right of First Refusal 412 Interview qualified 11/16/98 12/30/98 applicants for new hire 413 Select & provide offer 11/2/98 1/19/99 letters for prospective employees 414 Establish personnel 11/2/98 l/6/99 reporting & processing schedule 415 Define/coordinate position 1/25/99 2/26/99 requirements for 416 Complete LMKAC 10/1/98 2/26/99 Orientation/In-Processing [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 417 Complete pre-employment 10/1/98 2/26/99 [LINE CHART] medicals (as required 418 Obtain licenses/ 2/1/99 2/26/99 certifications 419 LMKAC employees in place 3/1/99 3/1/99 420 Tinker Location 11/2/98 7/11/00 421 Kelly Transfers to Tinker 1/4/99 7/3/00 422 Move Employees from Kelly 1/4/99 7/3/00 to Tinker [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 423 New Hires from Labor Pools 11/2/98 7/11/00 [LINE CHART] 424 Select Employees from 11/2/98 6/19/00 Skilled Workers Register 431 Select Employees from 11/30/98 7/11/00 Wage Grade Helper Register (Groups 436 Training 9/30/98 7/11/00 437 Transition Team Training 10/6/98 10/6/98 438 Program review/Team 10/6/98 10/6/98 training [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 13
EX-10.21207th Page of 414TOC1stPreviousNextBottomJust 207th
[Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 439 Transition Lessons Learned 10/6/98 10/6/98 [LINE CHART] Training (Public & Private) 440 Finalize Team control 10/6/98 10/6/98 systems 441 New Hires 9/30/98 7/11/00 442 Finalize training 9/30/98 10/9/98 requirements 443 Update Skills Audit/Skills 10/19/98 2/28/00 Required (Gap Analysis) 444 Establish prioritized 10/19/98 12/31/98 training schedule [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 445 Finalize training sources 10/28/98 12/31/98 [LINE CHART] 446 Identify personnel for 12/28/98 2/25/00 training 447 Train/PAC certify 1/12/99 7/11/00 personnel 445 OL Fully Operational 9/30/98 2/2/99 449 Trained Workforce In Place at Kelly 2/2/99 2/2/99 for WIP/Production 450 Trained Workforce In Place at 7/ll/00 7/11/00 Tinker [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 451 PBA CONTRACTS PREVIOUSLY AWARDED FOR 8/11/97 8/22/00 [LINE CHART] REQUIREMENTS 452 Pre-Contract Award Activities 8/11/97 9/25/98 453 Personnel in Place to monitor 8/11/97 8/11/97 PBA Requirements Contracts 454 Database in place for tracking 8/12/97 9/25/98 455 Verify Contracts information 10/29/98 10/30/98 456 Review Requirements Contracts with 11/3/98 11/17/98 PBA Program Office [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 457 Update Database with Review results 11/18/98 11/25/98 [LINE CHART] 458 Government provide subsequent 11/25/98 8/17/00 database updates 459 Update database upon receipt of 11/30/98 8/17/00 changes 460 Coordinate w/Government (90 days 11/25/98 8/22/00 prior to termination action) 464 Process in Place for PBA 11/25/98 11/25/98 Requirements Contracts 465 FACILITIES (SEE INDIV PLANS)(Para 9/30/98 8/21/00 IIA-7 & Facilities & Equip Data) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 14 Source Selection Sensitive
EX-10.21208th Page of 414TOC1stPreviousNextBottomJust 208th
[Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 466 Establish Team for Facilities 9/30/98 10/21/98 [LINE CHART] Review 467 Review facilities transition 10/22/98 10/23/98 468 At Kelly 11/2/98 8/21/00 469 F100 (Building 301, 334, 360, 11/2/98 8/18/99 647, 655) 470 TF39 (Building 30l, 303, 324, 11/2/98 8/2/99 334, 360) 471 T56 (Building 301, 360, 535, 11/2/98 8/2/99 647, 652/655) [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 472 Fuel Accessories (Building 308, 11/2/98 8/21/00 [LINE CHART] 309, 329, 333, 345, 348, 647) 473 TF39 2LM (Building 347, 375, 11/2/98 8/2/99 655) 474 T56 2LM (Building 324, 535) 11/2/98 8/2/99 475 At Tinker 10/1/98 5/29/00 476 F100 (Building 3001 & Test Cell) 10/1/98 5/3/99 477 Fuel Accessories (Building 210) 12/1/98 5/29/00 [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 478 Fuel Accessories (Building 10/1/98 2/25/99 [LINE CHART] 3108/3902) 479 Fuel Accessories (Building 2/26/99 8/23/99 3001/210) 480 Facilities In Place 5/29/00 5/29/00 481 EQUIPMENT & TOOLING (SEE INDIV PLANS) 3/3/97 8/22/00 (Para IIA-7 & Fac & Equip 482 Pre-Contract Award Activities 3/3/97 5/22/98 484 Review List at Post Award 10/19/98 10/30/98 [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 485 Joint Equipment Inventory 9/30/98 12/22/98 [LINE CHART] 486 Establish Team for Joint 9/30/98 11/6/98 Inventory for GFP 487 Accomplish Joint Inventory 11/9/98 12/8/98 488 Change records & transfer 11/9/98 12/22/98 custody to OC-ALC 489 Calibration Plan 11/9/98 1/29/99 490 Review current tooling 11/9/98 11/20/98 calibration system & requirements [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 15
EX-10.21209th Page of 414TOC1stPreviousNextBottomJust 209th
[Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 491 Accomplish calibration 11/23/98 1/29/99 [LINE CHART] requirements as required 492 Equipment & Tooling in place to 2/3/99 2/3/99 assume WIP/Production 493 Equipment & Tooling in place to 8/22/00 8/22/00 Exit Transition 494 COMMUNICATIONS (Paragraph IIA-7) 9/30/98 8/22/00 495 Communication in place at Tinker 9/30/98 9/30/98 496 MOA for utilization of existing PBA 9/30/98 8/22/00 communications at Kelly [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 497 REAL ESTATE/REAL PROPERTY (Paragraph 9/30/98 8/22/00 [LINE CHART] IIA-7) 498 MOAs processed for Required Real 9/30/98 8/22/00 Estate at Kelly 499 BASE OPERATIONS SUPPORT 9/30/98 8/22/00 (Paragraph IIA-7) 500 MOA in place for existing PBA 9/30/98 8/22/00 support at Kelly 501 QUALITY (SEE SEPARATE ISO 9002 PLANS) 9/30/98 8/2/99 (Paragraph IIA-8) 502 ISO 9002 Compliance 10/1/98 8/2/99 [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 503 Complete OC-ALC ISO 9002 DCMC 10/1/98 10/1/98 [LINE CHART] Audit 504 Complete Kelly ISO 9002 1/29/99 1/29/99 505 Complete LMKAC ISO 9002 DCMC 8/2/99 8/2/99 Audit 506 ISO 9002 Compliance Complete 8/2/99 8/2/99 507 Warranty 9/30/98 2/3/99 508 Review proposed Warranty Plan 9/30/98 11/4/98 [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 509 Train personnel on procedures 11/5/98 11/6/98 [LINE CHART] 510 Advise customers of warranty 1/25/99 1/29/99 process 511 Implement Warranty Process (on 2/3/99 2/3/99 production inductions only) 512 Warranty In Place (for Production 2/3/99 2/3/99 Units Only) 513 CRITICAL PROCESS DEMOS (SEE INDIVIDUAL 5/13/98 7/29/99 PLANS)(Paragraph IIA-9) 514 F100 (Previously Accomplished Under 5/13/98 4/1/99 F100 Core) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 16 Source Selection Sensitive
EX-10.21210th Page of 414TOC1stPreviousNextBottomJust 210th
[Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 515 TF39 (See Individual Plan for 3/1/99 7/13/99 [LINE CHART] Details) 516 T56 (See Individual Plan for 5/3/99 7/21/99 Details) 517 Fuel Accessories (See Individual 2/3/99 7/29/99 Plan for Details) 518 TF39 2LM (See Individual Plan for 3/1/99 7/22/99 Details) 519 T56 2LM (None required) 5/3/99 5/3/99 520 Process Demonstrations Complete 7/29/99 7/29/99 [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 04 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 521 COMPUTER RESOURCES 3/3/97 8/22/00 [LINE CHART] (INFORMATION SYSTEMS)(Para 522 Pre-Contract Award Activities 3/3/97 5/29/98 523 Review data system requirements 3/3/97 5/29/98 Plan 524 MOA in place for utilization of 9/30/98 8/22/00 existing PBA computer resources at Kelly 525 Verify data system requirements 9/30/98 10/30/98 526 Establish system-to-system protocol 9/30/98 10/30/98 [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 527 Establish DO42(CEMS), 9/30/98 12/7/98 [LINE CHART] GO81(CAMS)&G009 Interfaces 528 Tinker Location 9/30/98 10/28/98 529 Kelly Location 9/30/98 12/7/98 530 LMKAC Information Systems in place 9/30/98 2/25/99 for Transition 531 Confirm use of required USAF 9/30/98 10/28/98 systems 532 Launch/Implement LMKAC Business 9/30/98 2/25/99 Systems (Accounting & HR) Source Selection Sensitive 17
EX-10.21211th Page of 414TOC1stPreviousNextBottomJust 211th
[Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 533 LMKAC Systems in preparation for 9/30/98 7/26/99 [LINE CHART] Repair Operations 534 Develop Information System 9/30/98 2/25/99 537 Test/Implement Information 9/30/98 7/26/99 System 543 Declare LMKAC Systems 7/26/99 7/26/99 Implemented for Repair Operations 544 FULL RATE PRODUCTION (EXIT TRANSITION) 8/2/99 8/22/00 545 F100 Full Production Capability at 9/9/99 9/9/99 OC-ALC Location [Enlarge/Download Table] 1998 1999 2000 [ILLEGIBLE] -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 546 TF39/T56 Full Production capability 8/2/99 8/2/99 [LINE CHART] at LMKAC 547 Fuel & Airframe Accessories at 8/22/00 8/22/00 OC-LM 548 COMPLETE ALL PBA TRANSITION EXIT 8/22/00 8/22/00 CRITERIA 549 KELLY AIR FORCE BASE CLOSURE 7/13/01 7/13/01 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 18 Source Selection Sensitive
EX-10.21212th Page of 414TOC1stPreviousNextBottomJust 212th
TIP-1.2 OC-LM QUALITY TRANSITION INTEGRATION PLANS See paragraph IIA-8 for details. TIP-1.2.1 OC-ALC ISO 9002 (RFP Exhibits B, C, D, or E) TOP LEVEL PLAN [Enlarge/Download Table] 1997 1998 1999 2000 [ILLEGIBLE] ---------- -------------- -------------- -------------- ----------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 PHASE I (Paragraph IIA-8.1) 6/16/97 11/5/97 14 PHASE 2 (Paragraph IIA-8.1) 8/1/97 9/2/98 24 PHASE 3 (Paragraph IIA-8.1) 3/2/98 10/1/98 47 PHASE 4 (Paragraph IIA-8.1) 8/3/98 9/30/98 DETAILED PLAN [Enlarge/Download Table] 1997 1998 1999 2000 2001 -------------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 PHASE I (Paragraph IIA-8.1) 6/16/97 11/5/97 3 PLAN 6/16/97 8/15/97 4 Create Project Plan 6/16/97 6/16/97 5 Commit to 7/25/97 7/25/97 Implementation 6 Kick Off Meeting 8/15/97 8/15/97 [Enlarge/Download Table] 1997 1998 1999 2000 2001 -------------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 7 Select ISO IPT 7/1/97 7/8/97 [LINE CHART] 8 EDUCATION 6/16/97 8/14/97 9 Train IPT 6/16/97 8/14/97 10 GAP ANALYSIS 7/30/97 9/5/97 11 Documentation 7/30/97 9/5/97 12 Systems 7/30/97 9/5/97 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 19
EX-10.21213th Page of 414TOC1stPreviousNextBottomJust 213th
[Enlarge/Download Table] 1997 1998 1999 2000 2001 -------------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 13 Create ISO Page 7/15/97 11/5/97 [LINE CHART] 14 PHASE 2 (Paragraph IIA-8.1) 8/1/97 9/2/98 15 DOCUMENT QUALITY 8/1/97 9/2/98 MANAGEMENT 16 Train 8/1/97 8/25/97 17 ISO Requirements 8/1/97 8/25/97 18 Format 8/1/97 8/25/97 19 Review/Revise/Write 9/1/97 9/2/98 [Enlarge/Download Table] 1997 1998 1999 2000 2001 -------------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 20 Quality Policy 11/3/97 5/15/98 [LINE CHART] Manual 21 Directorate 3/2/98 6/15/98 Business/Quality 22 Instructions 9/1/97 6/15/98 23 Review for 6/16/98 9/2/98 Consistency 24 PHASE 3 (Paragraph IIA-8.1) 3/2/98 10/1/98 25 IMPLEMENT 3/2/98 10/1/98 [Enlarge/Download Table] 1997 1998 1999 2000 2001 -------------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 --- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 26 Train 3/2/98 10/1/98 [LINE CHART] 27 Work Instructions/ 3/2/98 10/1/98 Procedure 28 Perform 3/2/98 10/1/98 29 IAW Instructions 3/2/98 10/1/98 30 IAW Procedures 3/2/98 10/1/98 31 Revise 7/1/98 10/1/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 20 Source Selection Sensitive
EX-10.21214th Page of 414TOC1stPreviousNextBottomJust 214th
[Enlarge/Download Table] 1997 1998 1999 2000 2001 -------------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 -- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 32 Instructions 7/1/98 10/1/98 [LINE CHART] 33 Procedures 7/1/98 10/1/98 34 Internal Audit 3/2/98 6/5/98 35 Select & Train 3/2/98 4/1/98 Auditors 36 Audit Plan 3/2/98 3/2/98 37 Audit 3/2/98 4/24/98 [Enlarge/Download Table] 1997 1998 1999 2000 2001 -------------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 -- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 38 Corrective Action 3/17/98 5/6/98 [LINE CHART] Outbrief 39 Corrective Action 6/1/98 6/5/98 Follow-up 40 Internal Audit-Prep 5/5/98 7/31/98 for DCMC 41 Audit Plan 5/5/98 7/31/98 42 Select & Train 5/5/98 5/8/98 Auditors 43 Internal Audit 5/5/98 5/20/98 of PBA [Enlarge/Download Table] 1997 1998 1999 2000 2001 -------------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 -- --------- ------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 44 Out Brief 5/5/98 5/5/98 [LINE CHART] 45 Correct Findings 5/5/98 5/26/98 46 Follow-up 7/21/98 7/31/98 47 PHASE 4 (Paragraph IIA-8.1) 8/3/98 9/30/98 48 DCMC Audit 8/3/98 9/30/98 49 Pre-Assessment Audit 8/3/98 8/28/98 50 Correct Findings 8/31/98 9/30/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 21
EX-10.21215th Page of 414TOC1stPreviousNextBottomJust 215th
TIP-1.2.2 LMKAC ISO 9002 (RFP Exhibits B, C, D, or E) TOP LEVEL PLAN [Enlarge/Download Table] 1998 1999 2000 2001 -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 -- --------- -------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 PHASES 1 & 2: GAP 9/30/98 2/26/99 ANALYSIS & INTERNAL 11 PHASE 3: 12/28/98 5/19/99 DOCUMENTATION 17 PHASE 4: 1/27/99 7/30/99 IMPLEMENTATION DETAILED PLAN [Enlarge/Download Table] 1998 1999 2000 2001 2002 ---------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 -- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 PHASES 1 & 2: GAP 9/30/98 2/26/99 ANALYSIS & INTERNAL 3 Third Party Gap Analysis 9/30/98 10/14/98 4 Internal Audits 9/30/98 2/26/99 5 Select Auditors 9/30/98 10/14/98 6 Audit Plan 10/15/98 10/15/98 [Enlarge/Download Table] 1998 1999 2000 2001 2002 ---------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 -- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 7 LMKAC ISO Plan 10/19/98 10/30/98 [LINE CHART] Orientation 8 Audit 10/19/98 1/13/99 9 Corrective Action 11/2/98 2/4/99 Outbrief 10 Corrective Action 11/16/98 2/26/99 Follow-Up 11 PHASE 3: 12/28/98 5/19/99 DOCUMENTATION 12 Review/Revise/Write 12/28/98 5/19/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 22 Source Selection Sensitive
EX-10.21216th Page of 414TOC1stPreviousNextBottomJust 216th
[Enlarge/Download Table] 1998 1999 2000 2001 2002 ---------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 -- --------- -------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 13 Quality Policies 12/28/98 1/26/99 [LINE CHART] Manual 14 Department 1/27/99 4/21/99 Quality Procedures Manuals 15 Department Work 2/25/99 5/19/99 Instructions 16 Review 3/25/99 5/19/99 17 PHASE 4: 1/27/99 7/30/99 IMPLEMENTATION, 18 Training 1/27/99 7/30/99 [Enlarge/Download Table] 1998 1999 2000 2001 2002 ---------- -------------- -------------- -------------- -------------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 -- --------- -------- ------- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 19 LMKAC Quality 1/27/99 2/24/99 [LINE CHART] System Overview 20 Quality 2/25/99 5/19/99 Procedures 21 Work Instructions 2/25/99 5/19/99 22 DCMC Audit 5/20/99 7/1/99 23 DCMC 7/30/99 7/30/99 Qualification Audit [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 23
EX-10.21217th Page of 414TOC1stPreviousNextBottomJust 217th
PRODUCT LINE TRANSITION INTEGRATION PLANS Our Product Line Transition Integration Plans show the individual engine or fuel accessories plan for each sub-area. The plans depict our selected events and supporting accomplishments for successfully transitioning through the major gates of the each engine or accessories with entrance and exit points. Each plan is tailored for the respective workload movement depending on its continuing operations location [Download Table] 2.1 F100 Engine Purposely Omitted 2.2 TF39 Engine Transition from Kelly AFB to LMKAC 2.3 T56 Engine Transition from Kelly AFB to LMKAC 2.4 Fuel Accessories TF39 Transition from Kelly AFB to LMKAC T56 Transition from Kelly AFB to LMKAC Airframe Transition from Kelly AFB to Tinker AFB 2.5 TF39 2LM Addendum Transition from Kelly AFB to LMKAC 2.6 T56 2LM Addendum Transition from Kelly AFB to LMKAC Key events tracked in the individual schedules include: - Facility Activation - Equipment Transfer - Manage SA-ALC WIP - Establish Manpower Base - Logistics Support - Production Phase-in - Critical Process Demonstrations - Initial Operating Capability - Full Operating Capability [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 24 Source Selection Sensitive
EX-10.21218th Page of 414TOC1stPreviousNextBottomJust 218th
TIP-1.3 PURPOSELY OMITTED [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 25
EX-10.21219th Page of 414TOC1stPreviousNextBottomJust 219th
TIP-1.4 (RFP EXHIBITS B, C, D, OR E) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 26 Source Selection Sensitive
EX-10.21220th Page of 414TOC1stPreviousNextBottomJust 220th
TIP-1.5 TF39 ENGINE TRANSITION INTEGRATION PLAN. (RFP Exhibits B, C, D or E) TOP LEVEL PLAN [Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 --- --------- -------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 TRANSITION TF39 ENGINE 9/30/98 8/2/99 MODULE & COMPONENT 3 Logistics Pre-Planning 9/30/98 1/29/99 (Paragraph IIA-4) 9 Manage SA-ALC WIP 1/5/99 8/2/99 (Paragraph IIA-5) 15 Establish LMKAC Manpower 10/1/98 3/1/99 Base (Paragraphs IIA-5 & 6) 104 Facility Transition 11/10/98 8/2/99 (Para IIA-7 & Facilities & Equipment Data) 108 Equipment Transfer 11/9/98 8/2/99 (Para IIA-7 & Facilities & Equipment Data) 113 Production Phase-in at 9/30/98 8/2/99 Kelly 114 Plan Process 9/30/98 1/19/99 Demonstrations 115 Production at SA-ALC 2/3/99 8/2/99 (Paragraph IIA-5) 116 TF39 Critical Process 2/12/99 7/13/99 Demos (Para IIA-9) 157 Transition Review 7/30/99 8/2/99 158 TF39 INITIAL OPERATING 2/3/99 2/3/99 CAPABILITY AT KELLY 159 TF39 FULL OPERATING 8/2/99 8/2/99 CAPABILITY AT KELLY 160 TF39 TRANSITION 8/2/99 8/2/99 COMPLETE [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 27
EX-10.21221st Page of 414TOC1stPreviousNextBottomJust 221st
DETAILED PLAN [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ----- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 TRANSITION TF39 ENGINE 9/30/98 8/2/99 MODULE & COMPONENT 3 Logistics Pre-Planning 9/30/98 1/29/99 (Paragraph IIA-4) 4 Review WCDs/job 11/10/98 1/14/99 standards/tech data & current 5 Verify/Establish labor & 11/10/98 1/14/99 material standards 6 Stocklist & order 1/15/99 1/29/99 non-available consumables [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ----- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 7 Evaluate tech data 11/10/98 12/23/98 [LINE CHART] availability & update TO libraries 8 Systems Interface & 9/30/98 12/4/98 data systems transfer 9 Manage SA-ALC WIP 1/5/99 8/2/99 (Paragraph IIA-5) 10 Inventory WIP 1/5/99 1/26/99 11 Negotiate WIP with ACO 1/27/99 2/2/99 12 Assign manpower resources 1/5/99 2/2/99 [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ----- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 13 OC-LM assumes WIP 2/3/99 2/3/99 [LINE CHART] 14 Complete WIP 2/4/99 8/2/99 15 Establish LMKAC Manpower Base 10/1/98 3/1/99 (Paragraphs IIA-5 & 6) 16 Recruit SA-ALC personnel 10/13/98 10/16/98 (Post Award) 17 Personnel in place 2/2/99 2/2/99 for WIP 18 LMKAC Hiring Plan 10/1/98 2/26/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 28 Source Selection Sensitive
EX-10.21222nd Page of 414TOC1stPreviousNextBottomJust 222nd
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ----- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 19 Trained LMKAC Workforce 3/1/99 3/1/99 [LINE CHART] in place to Exit Transition 20 Manpower Phase in at 10/13/98 2/26/99 Kelly 104 Facility Transition/ 11/10/98 8/2/99 Integration (Paragraph IIA-7 & Facilities & 105 Building 301, 303, 324, 11/10/98 12/23/98 334, & 360 Facilities Review 106 Facilities Available for 2/3/99 2/3/99 WIP Assumption 107 LMKAC Responsible for 8/2/99 8/2/99 Repair Facilities for Continuing [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ----- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 108 Equipment Transfer 11/9/98 8/2/99 [LINE CHART] (Paragraph IIA-7 & Facilities & Equipment 109 Accomplish Joint 11/9/98 12/8/98 Inventory 110 Submit paperwork for 11/9/98 12/15/98 transfer 111 Equipment available to 2/3/99 2/3/99 assume WIP 112 Internal transfer to 8/2/99 8/2/99 LMKAC 113 Production Phase in at Kelly 9/30/98 8/2/99 [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ----- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 114 Plan Process 9/30/98 1/19/99 [LINE CHART] Demonstrations 115 Production at SA-ALC 2/3/99 8/2/99 (Paragraph IIA-5) 116 TF39 Critical Process 2/12/99 7/13/99 Demonstrations (Paragraph 117 II - Machining & 3/1/99 4/30/99 Grinding Stationary Components 118 III - Machining & 3/25/99 5/27/99 Grinding Rotating Components 119 II - Chrome Plating 3/10/99 5/4/99 (Shaft Journals) [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ----- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 120 II - Nickel Plating 3/15/99 4/23/99 [LINE CHART] 121 II - Silver Plating 3/22/99 4/30/99 122 II - Glass Bead Peening 3/10/99 3/23/99 123 II - Shot Peening 3/15/99 3/26/99 124 II - Welding (Titanium, 3/30/99 4/26/99 Nickel, Cobalt Alloys) 125 III - Dabber Weld 4/5/99 5/14/99 (CDP/HPT Seal Serrations) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 29
EX-10.21223rd Page of 414TOC1stPreviousNextBottomJust 223rd
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- ------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 126 II - Brazing, Tube 4/12/99 5/7/99 [LINE CHART] Joints (TMF Lube/ Drain Lines) 127 II - Brazing, 4/19/99 5/31/99 Honeycomb Bonding (CDP Stationary 128 II - Thermal Spray, 4/15/99 5/12/99 Stat. Components (Compressor 129 II - Thermal Spray, 4/15/99 5/12/99 Stat, Seal Surfaces (HPT Vent 130 II - Thermal Spray, 4/15/99 5/12/99 Rot. Components (Spools, HPT 131 III - Thermal Spray, 4/15/99 5/27/99 Rot. Components (S2 Comp Dsk, [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 132 II - Electro 4/22/99 5/19/99 [LINE CHART] Discharge Machining (LPT Nozzles) 133 II - Electro Chemical 5/3/99 5/31/99 Grinding (Air Seals) 134 III - Rotor Assembly 3/1/99 7/13/99 Process (All Rotors) 135 III - Rotor Blade Tip 4/15/99 6/17/99 Grinding 136 II - Rotor Balancing 4/30/99 7/2/99 137 II - Rotating 4/22/99 6/3/99 Component Static Balance [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 138 III - Stage 2 HPT 5/3/99 7/6/99 [LINE CHART] Nozzle Assembly & Grind Process 139 III - Combustor 4/15/99 5/27/99 Overhaul 140 II - Structural Frame 4/2/99 7/6/99 Assembly Process (FF, CRF, 141 II - Compressor 4/8/99 5/19/99 Stator Assembly Process 142 II - Low Pressure 5/19/99 6/16/99 Turbine Stator Assembly Process 143 III - Fan Stator 3/10/99 4/6/99 Assembly Process [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 144 III - Gearbox 3/15/99 4/23/99 [LINE CHART] Assembly Process 145 II - Fluoresent 2/24/99 3/23/99 Penetrant Inspection 146 II - Magnetic 3/1/99 3/26/99 Particle Inspection 147 II - Radiographic 3/8/99 4/2/99 Inspection (TMF Tube Joints) 148 II - Ultrasonic 3/15/99 4/9/99 Inspection (LPT Disks, Fan Disks) 149 II - Eddy Current 2/24/99 3/23/99 Inspection [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 30 Source Selection Sensitive
EX-10.21224th Page of 414TOC1stPreviousNextBottomJust 224th
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 150 I - Paint/Corrosion 3/1/99 3/26/99 [LINE CHART] Control 151 II - Grit Blast 3/1/99 3/26/99 (Cleaning & Plasma Spray Preparation) 152 II - Chemical 2/24/99 3/23/99 Cleaning/Stripping 153 II - Disassembly, 2/12/99 4/16/99 Components 154 II - Airfoil Repair 2/24/99 3/23/99 (Type I) 155 III - Airfoil Repair 2/12/99 4/16/99 (Type II) [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 156 II - Honeycomb Seal 3/29/99 5/7/99 [LINE CHART] Repair (Dim. Restoration/SPAD 157 Transition Review 7/30/99 8/2/99 158 TF39 INITIAL OPERATING 2/3/99 2/3/99 CAPABILITY AT KELLY 159 TF39 FULL OPERATING 8/2/99 8/2/99 CAPABILITY AT KELLY 160 TF39 TRANSITION COMPLETE 8/2/99 8/2/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 31
EX-10.21225th Page of 414TOC1stPreviousNextBottomJust 225th
TIP-1.6 T56 ENGINE TRANSITION INTEGRATION PLAN. (RFP Exhibits B, C, D, or E) TOP LEVEL PLAN [Enlarge/Download Table] [ILLIGIBLE] 1999 2000 ------------ ----------------------- ----------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 T56 PBA TRANSITION PLAN 9/30/98 8/2/99 3 Launch T56 Transition Team 10/1/98 8/2/99 4 Logistics Support (Paragraph 10/1/98 2/3/99 IIA-4) 10 Manage SA-ALC WIP (Paragraph IIA-5) 1/5/99 8/2/99 15 Manpower Transition (Paragraphs 10/1/98 3/1/99 IIA-5 & 6) 20 Facilities Transition (Para IIA-7 & 11/9/98 8/2/99 Facilities & Equipment Data) 32 Equipment/Tooling Transfer (Para IIA-7 10/1/98 8/2/99 & Facilities & Equipment Data) 39 Production Phase-In at Kelly 9/30/98 8/2/99 40 Current Systems Analysis 9/30/98 12/14/98 45 Process Modifications (as 12/15/98 2/3/99 required) 52 T56 Production Phase-In 2/3/99 8/2/99 (Para IIA-5) 54 Critical Processes Demonstrations 5/3/99 7/21/99 (Paragraph IIA-9) 98 Transition Review 7/30/99 8/2/99 99 T56 INITIAL OPERATING CAPABILITY AT 2/3/99 2/3/99 KELLY [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 32 Source Selection Sensitive
EX-10.21226th Page of 414TOC1stPreviousNextBottomJust 226th
DETAILED PLAN [Enlarge/Download Table] [ILLIGIBLE] 1999 2000 ----------- ----------------------- ----------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 T56 PBA TRANSITION PLAN 9/30/98 8/2/99 3 Launch T56 Transition Team 10/1/98 8/2/99 4 Logistics Support (Paragraph 10/1/98 2/3/99 IIA-4) 5 Review WCDs/job standard/tech data 10/1/98 12/14/98 & current established procedures 6 Verify/Establish labor & material 12/15/98 2/3/99 standards [Enlarge/Download Table] [ILLIGIBLE] 1999 2000 ----------- ----------------------- ----------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 7 Stocklist & order non-available 1/14/99 1/28/99 [LINE CHART] consumbles 8 Evaluate tech data availability & 11/5/98 12/18/98 update TO liabraries 9 Systems Interface & data systems 10/1/98 12/7/98 transfer 10 Manage SA-ALC WIP (Paragraph II-5) 1/5/99 8/2/99 11 Conduct physical inventory of WIP 1/5/99 1/26/99 12 Identify & resolve variances with 1/27/99 2/2/99 ACO [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 33
EX-10.21227th Page of 414TOC1stPreviousNextBottomJust 227th
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 13 OC-LM assumes WIP 2/3/99 2/3/99 [LINE CHART] 14 Complete WIP 2/4/99 8/2/99 15 Manpower Transition 10/1/98 3/1/99 (Paragraphs IIA-5 & 6) 16 Recruit SA-ALC personnel 10/13/98 10/16/98 Post Award) 17 Personnel in place in WIP 2/2/99 2/2/99 assumption 18 LMKAC Hiring Plan 10/1/98 2/26/99 [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 19 Trained LMKAC Workforce 3/1/99 3/1/99 [LINE CHART] in place to exit Transition 20 Facilities Transition/ 11/9/98 8/2/99 Integration (Paragraph IIA-7 & Facilities & Equipment Data) 21 Conduct Joint Review of 11/9/98 12/11/98 Buildings required during Transition 22 Building 301 - 11/9/98 11/13/98 Industrial Plating 23 Building 360 - T56 11/16/98 11/20/98 Engine Overhaul 24 Building 535 - T56 11/23/98 11/25/98 Outdoor Test Pad [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 34 Source Selection Sensitive
EX-10.21228th Page of 414TOC1stPreviousNextBottomJust 228th
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 25 Building 652/655 - 11/30/98 12/4/98 [LINE CHART] Herrera Engine Test Facility 26 Building 647 - Engine 12/7/98 12/11/98 Container Repair 27 Immediate Maintenance/ 12/14/98 5/28/99 Upgrade required 28 Detail facilities 12/14/98 1/5/99 requiring maintenance/ upgrade 29 Facilities Repair/ 1/6/99 5/28/99 Maintenance 30 Facilities in place to 2/3/99 2/3/99 assume T56 - WIP/Production [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 31 LMKAC responsible for 8/2/99 8/2/99 [LINE CHART] Repair Facilities for Continuing Operations 32 Equipment/Tooling Transfer 10/1/98 8/2/99 (Paragraph IIA-7 & Facilities & Equipment Data) 33 Review Equipment/Tooling 10/1/98 10/29/98 list for T56 PBA - Post award 34 Conduct Joint Equipment/ 11/9/98 12/15/98 Tooling Inventory 35 Accomplish joint 11/9/98 12/8/98 inventory 36 Submit paperwork for 12/2/98 12/15/98 transfer [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 35
EX-10.21229th Page of 414TOC1stPreviousNextBottomJust 229th
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ----------- ----------------------- ---------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 37 Equipment/Tooling in Place to 2/3/99 2/3/99 [LINE CHART] assume WIP/Production 38 Internal transfer to LMKAC 8/2/99 8/2/99 39 Production Phase-In at Kelly 9/30/98 8/2/99 40 Current System Analysis 9/30/98 12/14/98 45 Process Modification (as 12/15/98 2/3/99 required) 52 T56 Production Phase-In 2/3/99 8/2/99 (Paragraph IIA-5) [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ----------- ----------------------- ---------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 53 Production at SA-ALC 2/3/99 8/2/99 [LINE CHART] 54 Critical Process 5/3/99 7/21/99 Demonstration (Paragraph IIA-9) 55 II - Component Cleaning 5/3/99 5/5/99 56 T56 Power Section 5/3/99 5/13/99 57 I - Power 5/3/99 5/3/99 Section/Compressor module/turbine Module 58 II - Power Section 5/4/99 5/6/99 assembly/module installation [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 36 Source Selection Sensitive
EX-10.21230th Page of 414TOC1stPreviousNextBottomJust 230th
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ----------- ----------------------- ---------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- ------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 59 III - Power Section testing 5/7/99 5/13/99 [LINE CHART] 60 T56 Compressor 5/3/99 6/15/99 61 III - Compressor module 5/3/99 5/7/99 assembly 62 II - Inspect & repair 5/10/99 5/12/99 compressor air inlet housing assembly & extention shaft 63 II - Inspect & repair 5/13/99 5/17/99 Compressor case 64 II - Inspect & repair 5/18/99 5/20/99 compressor vane assemblies [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ----------- ----------------------- ---------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- ------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 65 II - Inspect & repair 5/21/99 5/26/99 [LINE CHART] compressor rotor assembly (wheels, blades & tie bolt) 66 II - Inspect & repair 5/27/99 5/31/99 compressor diffuser case 67 II - Inspect & repair 6/1/99 6/3/99 accessory drive housing 68 II - Inspect & repair the 6/4/99 6/8/99 combustion outer casing, inner casing and liner 69 III - Inspect & repair 6/9/99 6/15/99 combustion liner 70 T56 Turbine 5/3/99 6/22/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 37
EX-10.21231st Page of 414TOC1stPreviousNextBottomJust 231st
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 -- --------- ------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 71 III - Turbine 5/3/99 5/7/99 [LINE CHART] Module assembly 72 II - Inspect & 5/10/99 5/12/99 repair turbine coupling shaft & turbine-to- compressor tie 73 II - Inspect & 5/13/99 5/17/99 repair turbine inlet casing 74 II - Insp&repair 5/18/99 5/20/99 turbine front bearing cage, turbine front bearing spt&turbine 75 II - Inspect & 5/21/99 5/26/99 repair turbine guide vane & seal support 76 III - Inspect & 5/27/99 6/2/99 repair turbine rotor assembly (wheels, spacers blades & tie bolt) [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 -- --------- ------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 77 III - Inspect & 6/3/99 6/9/99 [LINE CHART] repair turbine vane segment assemblies 78 II - Inspect & 6/10/99 6/14/99 repair turbine vane casing 79 II - Inspect & 6/15/99 6/17/99 repair turbine rear bearing support assembly 80 II - Inspect & 6/18/99 6/22/99 test turbine thermocouples 81 RGB & Torquemeter 5/3/99 7/21/99 82 I - Reduction Gear 5/3/99 5/3/99 Box Disassembly [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 38 Source Selection Sensitive
EX-10.21232nd Page of 414TOC1stPreviousNextBottomJust 232nd
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 -- --------- ------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 83 III - Reduction 5/4/99 5/10/99 [LINE CHART] gearbox assembly 84 III - Reduction 5/11/99 5/17/99 gearbox testing 85 I - Torquemeter & 5/18/99 5/18/99 safety coupling disassembly 86 III - Inspect, 5/19/99 5/26/99 repair, & test torquemeter & safety coupling assembly 87 II - Inspect, 5/27/99 5/31/99 repair, & test torquemeter pickup 88 II - Inspect & 6/1/99 6/3/99 repair reduction gear front housing [Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 -- --------- ------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 89 II - Inspect & 6/4/99 6/8/99 [LINE CHART] repair reduction gear rear housing 90 II - Inspect & 6/9/99 6/11/99 repair main & innner diaphragms 91 III - Inspect & 6/14/99 6/18/99 repair propeller brake 92 III - Inspect & 6/21/99 6/25/99 repair main drive gear 93 III - Inspect & 6/28/99 7/2/99 repair propeller shaft 94 II - Inspect & 7/6/99 7/8/99 repair planet gear assembly [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 39
EX-10.21233rd Page of 414TOC1stPreviousNextBottomJust 233rd
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 --- --------- ------- ------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 95 II - Gear & spline 7/9/99 7/13/99 [LINE CHART] inspection 96 II - Labyrinth 7/14/99 7/16/99 seal inspection 97 II - Bearing 7/19/99 7/21/99 Inspection 98 Transition Review 7/30/99 8/2/99 99 T56 INITIAL OPERATING 2/3/99 2/3/99 CAPABILITY AT KELLY 100 T56 FULL OPERATING 8/2/99 8/2/99 CAPABILITY AT KELLY UNDER LMKAC 101 T56 TRANSITION COMPLETE 8/2/99 8/2/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 40 Source Selection Sensitive
EX-10.21234th Page of 414TOC1stPreviousNextBottomJust 234th
TIP-1.7 Fuel Accessories Transition Integration Plan Addendum. (RFP Exhibits C, D or E) Top Level Plan [Enlarge/Download Table] 1998 1999 2000 ---------- -------------- -------------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 -- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- 1 CONTRACT AWARD - FUEL 9/30/98 9/30/98 [LINE CHART] ACCESSORIES 2 TRANSITION OC-ALC 10/1/98 8/22/00 ACCESSORIES 3 Logistics Support 10/1/98 8/16/99 (Paragraph IIA-4) 8 Manage SA-ALC WIP 10/1/98 5/5/99 (Paragraph IIA-5) 14 Establish OC-ALC Manpower Base 10/13/98 7/11/00 (Paragraphs IIA-5 & 6) 31 Facility Activation (Para 10/1/98 5/29/00 IIA-7 & Facilities & Equipment Data) 39 Equipment Transfer (Para 11/9/98 8/22/00 IIA-7 & Facilities & Equipment Data) 55 Production Phase-in at 10/1/98 8/22/00 OC-ALC 56 Plan Process Demonstrations 10/1/98 1/20/99 57 F100 C&A Phase-in (Para IIA-5) 2/3/99 8/22/00 58 Production at SA-ALC 2/3/99 8/21/00 59 F100 C&A Critical Process 2/4/99 7/2/99 Demonstrations (Para IIA-9) 74 Production at OC-ALC 7/6/99 8/22/00 75 Airframe Fuel Accessories 2/3/99 8/21/00 Phase-in (Paragraph IIA-5) 76 Production at SA-ALC 2/3/99 8/21/00 [Enlarge/Download Table] 1998 1999 2000 ---------- -------------- -------------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- 103 TRANSITION TF39 FUEL 9/30/98 8/2/99 [LINE CHART] ACCESSORIES 104 Logistics Support (Paragraph 10/1/98 12/14/98 IIA-4) 109 Manage SA-ALC WIP (Paragraph 10/1/98 2/3/99 IIA-5) 115 Establish OC-LM (LMKAC) Manpower 10/1/98 3/1/99 Base (Para IIA-5 & 6) 120 Facility Activation (Para IIA-7 0/30/98 8/2/99 & Facilities & Equipment Data) 134 Equipment Transfer (Para IIA-7 & 11/9/98 8/2/99 Facilities & Equipment Data) 140 Production Phase-In at Kelly 9/30/98 8/2/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 41
EX-10.21235th Page of 414TOC1stPreviousNextBottomJust 235th
[Enlarge/Download Table] 1998 1999 2000 ---------- -------------- -------------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- 141 Plan Process Demonstrations 9/30/98 1/19/99 [LINE CHART] 142 Production at SA-ALC (Paragraph 2/3/99 8/2/99 IIA-5) 143 TF39 C&A Critical Process 3/1/99 7/29/99 Demonstrations (Para IIA-9) 158 Transition Review 7/30/99 8/2/99 159 TF39 C&A INITIAL OPERATING 2/3/99 2/3/99 CAPABILITY 160 TF39 C&A FULL OPERATING CAPABILITY 8/2/99 8/2/99 161 TF39 C&A TRANSITION COMPLETE 8/2/99 8/2/99 162 163 TRANSITION T56 ACCESSORIES 9/30/98 8/2/99 164 Launch T56 Accessories Transition 9/30/98 8/2/99 Team 165 Logistics Support (Paragraph IIA-4) 10/1/98 2/2/99 [Enlarge/Download Table] 1998 1999 2000 ---------- -------------- -------------- ID TASK NAME START FINISH Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 --- --------- -------- -------- -- -- -- -- -- -- -- -- -- -- -- 171 Manage SA-ALC WIP (Paragraph IIA-5) 1/5/99 8/2/99 [LINE CHART] 176 Manpower Transition (Paragraphs 10/1/98 3/1/99 IIA-5 & 6) 181 Facilities Transition (Para IIA-7 & 11/9/98 8/2/99 Facilities & Equipment Data) 192 Equipment/Tooling Transfer (Para 10/1/98 8/2/99 IIA-7 & Facilities & Equip Data) 199 T56 Production Phase-In at Kelly 9/30/98 8/2/99 200 Analyze current system 9/30/98 12/14/98 205 Modify processes (as required) 12/15/98 2/2/99 212 Production Phase-In (Paragraph 2/3/99 8/2/99 IIA-5) 213 T56 C&A Critical Processes 5/3/99 7/13/99 Demonstrations (Para IIA-9) 236 Transition Review 7/30/99 8/2/99 237 T56 ACCESSORIES INITIAL 2/3/99 2/3/99 OPERATING CAPABILITY 238 T56 ACCESSORIES FULL 8/2/99 8/2/99 OPERATING CAPABILITY 239 T56 ACCESSORIES TRANSITION 8/2/99 8/2/99 COMPLETE [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 42 Source Selection Sensitive
EX-10.21236th Page of 414TOC1stPreviousNextBottomJust 236th
DETAILED PLAN [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- -------- -------- -- -- -- -- -- -- -- -- 1 CONTRACT AWARD - FUEL ACCESSORIES 9/30/98 9/30/98 [LINE CHART] 2 TRANSITION OC-ALC ACCESSORIES 10/1/98 8/22/00 3 Logistics Support (Paragraph IIA-4) 10/1/98 8/16/99 4 Input labor & material standards 10/1/98 6/11/99 5 Establish WCD & ITS Routing Document 10/30/98 8/16/99 6 Establish shop floor TO libraries 10/l/98 3/25/99 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- -------- -------- -- -- -- -- -- -- -- -- 7 Systems Interface & data transfer 10/1/98 6/18/99 [LINE CHART] 8 Manage SA-ALC WIP (Paragraph IIA-5) 10/1/98 5/5/99 9 Joint Material Inventory 11/30/98 12/31/98 10 Joint WIP Inventory 1/5/99 1/26/99 11 Setup Operating Location 10/1/98 2/3/99 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- -------- -------- -- -- -- -- -- -- -- -- 12 Confirm WIP with ACO 1/27/99 2/2/99 [LINE CHART] 13 Assume WIP production at SA-ALC 2/3/99 5/5/99 14 Establish OC-ALC Manpower Base 10/13/98 7/11/00 (Paragraphs IIA-5&6) 15 Recruit SA-ALC personnel 10/13/98 11/13/98 16 Phase 1 - Manpower Buildup 2/4/99 8/9/99 17 Transfer personnel 2/4/99 6/14/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 43
EX-10.21237th Page of 414TOC1stPreviousNextBottomJust 237th
[Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- -------- -------- -- -- -- -- -- -- -- -- 18 Update PAC certification 3/5/99 5/13/99 [LINE CHART] 19 Hire personnel 2/4/99 6/25/99 20 Train & PAC certify personnel 2/26/99 8/9/99 21 Phase 2 - Manpower Buildup 8/10/99 1/27/00 22 Transfer personnel 8/10/99 1/20/00 23 Update PAC certification 9/22/99 12/6/99 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- -------- -------- -- -- -- -- -- -- -- -- 24 Hire personnel 8/10/99 1/5/00 [LINE CHART] 25 Train & PAC certify personnel 8/10/99 1/27/00 26 Phase 3 - Manpower Buildup 1/28/00 7/11/00 27 Transfer personnel 1/28/00 7/3/00 28 Update PAC certification 3/13/00 5/19/00 29 Hire personnel 1/28/00 6/19/00 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- -------- -------- -- -- -- -- -- -- -- -- 30 Train & PAC certify personnel 1/28/00 7/11/00 [LINE CHART] 31 Facility Activation (Paragraph IIA-7 10/1/98 5/29/00 & Facilities & Equipment Data) 32 Bldg 210 Air/Fuel Accessory 12/1/98 5/29/00 Test Cells 33 Design 12/1/98 6/4/99 34 Contracting 6/7/99 9/7/99 35 Construction 9/8/99 5/29/00 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 44 Source Selection Sensitive
EX-10.21238th Page of 414TOC1stPreviousNextBottomJust 238th
[Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- ------- ------- -- -- -- -- -- -- -- -- 36 Facility Site Preparations 10/1/98 8/23/99 [LINE CHART] 37 Site Preparation Buildings 10/1/98 2/25/99 3108/3902 38 Site Preparation Buildings 2/26/99 8/23/99 3001/210 39 Equipment Transfer (Paragraph 11/9/98 8/22/00 IIA-7 & Facilities & Equipment Data) 40 Accomplish Joint Equipment 11/9/98 12/8/98 Inventory 41 Phase 1 - 65 Stands 2/4/99 9/28/99 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- ------- ------- -- -- -- -- -- -- -- -- 42 Disconnect, pack, ship 2/4/99 7/19/99 [LINE CHART] 43 Install & calibrate test stands 3/5/99 9/28/99 44 Phase 2 - 65 Stands 7/20/99 3/17/00 45 Disconnect, pack, ship 7/20/99 1/5/00 46 Install & calibrate test stands 8/17/99 3/17/00 47 Phase 3 - 64 Stands 1/6/00 8/15/00 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 -- --------- ------- ------- -- -- -- -- -- -- -- -- 48 Disconnect, pack, ship 1/6/00 6/19/00 [LINE CHART] 49 Install & calibrate test stands 2/4/00 8/15/00 50 Building 210 - Air/Fuel Accessory 6/6/00 8/22/00 Test Cells 51 Disconnect, pack, ship 6/6/00 6/19/00 52 Install & calibrate - 3 stands 6/20/00 7/18/00 53 Disconnect, pack, ship 7/19/00 8/1/00 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 45
EX-10.21239th Page of 414TOC1stPreviousNextBottomJust 239th
[Enlarge/Download Table] 1999 2000 ----------------- ------------ ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 -- --------- ------- ------- -- -- -- -- -- -- -- -- 54 Install & calibrate- 3 stands 8/2/00 8/22/00 [LINE CHART] 55 Production Phase-in at OC-ALC 10/1/98 8/22/00 56 Plan Process Demonstrations 10/1/98 1/20/99 57 F100 C&A Phase-in (Paragraph IIA-5) 2/3/99 8/22/00 58 Production at SA-ALC 2/3/99 8/21/00 59 F100 C&A Critical Process 2/4/99 7/2/99 Demonstrations (Paragraph IIA-9) [Enlarge/Download Table] 1999 2000 ----------------- ------------ ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 -- --------- ------- ------- -- -- -- -- -- -- -- -- 60 II - UFC Overhaul & Test 2/4/99 3/11/99 [LINE CHART] 61 III - Main Fuel Control 220 3/12/99 4/15/99 Overhaul & Test 62 III - Augmentor Fuel Control 4/16/99 5/20/99 220 Overhaul & Test 63 III - Fuel Pump Overhaul 5/21/99 6/1/99 & Test 64 III - Augmentor Fuel Pump 6/14/99 7/2/99 Overhaul & Test 65 III - EEC Overhaul & Test 2/4/99 3/4/99 [Enlarge/Download Table] 1999 2000 ----------------- ------------ ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 -- --------- ------- ------- -- -- -- -- -- -- -- -- 66 III - Anti-Ice Valve 3/5/99 3/18/99 [LINE CHART] Overhaul & Test 67 III - CENC Overhaul & Test 3/19/99 4/15/99 68 III - Oil Cooler Overhaul & 2/4/99 2/18/99 Test 69 III - Scavenge Pump Overhaul 2/19/99 3/11/99 & Test 70 III - Valves Overhaul & Test 3/12/99 4/1/99 71 III - P&D Valve Overhaul & 4/2/99 4/15/99 Test [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 46 Source Selection Sensitive
EX-10.21240th Page of 414TOC1stPreviousNextBottomJust 240th
[Enlarge/Download Table] 1999 2000 --------------------- --------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- --- --- --- --- --- --- --- --- 72 III - TT2.5 Sensor Overhaul & Test 2/4/99 2/25/99 [LINE CHART] 73 III - N2 Sensor Overhaul & Test 2/26/99 3/18/99 74 Production at OC-ALC 7/6/99 8/22/00 75 Airframe Fuel Accessories Phase-in 2/3/99 8/21/00 (Paragraph IIA-5) 76 Production at SA-ALC 2/3/99 8/21/00 77 Fuel Accessories Critical Process 2/3/99 5/19/99 Demonstration (Paragraph IIA-9) [Enlarge/Download Table] 1999 2000 --------------------- --------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- --- --- --- --- --- --- --- --- 78 III - Heat Exchanger UA534149-21 2/3/99 2/17/99 [LINE CHART] Epoxy, Welding & Test 79 III - Heat Exchanger UA534149-19 2/18/99 3/3/99 Epoxy, Welding & Test 80 II - Heater Strainer 147601-2 Test 3/4/99 3/24/99 81 III - Valve 3214468-3-1 Overhaul 2/3/99 2/24/99 & Test 82 III - Quadrant 43051-017 Overhaul 2/25/99 3/17/99 & Test 83 III - Receptacle 2761117-102 3/18/99 4/7/99 Overhaul & Test [Enlarge/Download Table] 1999 2000 --------------------- --------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- --- --- --- --- --- --- --- --- 84 III - Valve 255299-4 Overhaul & 4/8/99 4/28/99 [LINE CHART] Test 85 III - Valve Assembly 2660415 4/29/99 5/19/99 Overhaul & Test 86 III - Pump 53-58147-25 Ovehaul & 2/3/99 2/17/99 Test 87 III - Fuel Pump 60-357-1 Potting, 2/18/99 3/3/99 Dielectric, Insulation, Bonding 88 III - Fuel Pump 60-367-2 Potting, 3/4/99 3/17/99 Dielectric, Insulation, Bonding 89 II - Starter Generator 23046-019 2/3/99 2/24/99 Test [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 47
EX-10.21241st Page of 414TOC1stPreviousNextBottomJust 241st
[Enlarge/Download Table] 1999 2000 --------------------- --------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- --- --- --- --- --- --- --- --- 90 II - Starter Generator 30B37-31B 2/25/99 3/17/99 [LINE CHART] Test 91 II - Actuator 40283D Test 3/18/99 4/7/99 92 II - Actuator 151709 Test 4/8/99 4/28/99 93 II - Actuator 107797A100 Test 4/29/99 5/19/99 94 II - Valve 1321-575030M2 Test 2/3/99 2/24/99 95 II - Valve 40405 Test 2/25/99 3/17/99 [Enlarge/Download Table] 1999 2000 --------------------- --------------- ID TASK NAME START FINISH Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 --- --------- -------- -------- --- --- --- --- --- --- --- --- 96 II - Value 136885-1 Test 3/18/99 4/7/99 [LINE CHART] 97 Production at OC-ALC 5/20/99 8/21/00 98 Transition Review 8/21/00 8/22/00 99 FUEL ACCESSORIES INITIAL OPERATING 9/28/99 9/28/99 CAPABILITY 100 FUEL ACCESSORIES FULL OPERATING 8/22/00 8/22/00 CAPABILITY 101 OC-ALC TRANSITION COMPLETE 8/22/00 8/22/00 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- --------------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- --- --- --- --- --- --- --- --- 102 103 TRANSITION TF39 FUEL ACCESSORIES 9/30/98 8/2/99 [LINE CHART] 104 Logistics Support (Paragraph IIA-4) 10/1/98 12/14/98 105 Input labor & material standards 10/1/98 11/12/98 106 Establish WCD & ITS Routing Document 10/30/98 12/14/98 107 Establish shop floor TO libraries 11/3/98 12/9/98 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 48 Source Selection Sensitive
EX-10.21242nd Page of 414TOC1stPreviousNextBottomJust 242nd
[Enlarge/Download Table] [IILEGIBLE] 1999 [IILEGIBLE] ----------- -------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 108 Systems Interface & data transfer 10/1/98 10/29/98 [LINE CHART] 109 Manage SA-ALC WIP (Paragraph IIA-5) 10/1/98 2/3/99 110 Joint Material Inventory 11/30/98 12/31/98 111 Joint WIP Inventory 1/5/99 1/26/99 112 Confirm WIP with ACO 1/27/99 2/2/99 113 Setup Operating Location 10/1/98 2/3/99 [Enlarge/Download Table] [IILEGIBLE] 1999 [IILEGIBLE] ----------- -------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 114 Assume WIP production at SA-ALC 2/3/99 2/3/99 [LINE CHART] 115 Establish OC-LM (LMKAC) Manpower Base 10/1/98 3/1/99 (Paragraphs IIA-5 & 6) 116 Recruit SA-ALC personnel (Post Award) 10/13/98 10/16/98 117 Personnel in Place for WIP 2/3/99 2/3/99 118 LMKAC Hiring Plan 10/1/98 2/26/99 119 Trained LMKAC Workforce in place to exit 3/1/99 3/1/99 Transition [Enlarge/Download Table] [IILEGIBLE] 1999 [IILEGIBLE] ----------- -------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 120 Facility Activation (Paragraph IIA-7 & 10/30/98 8/2/99 [LINE CHART] Facilities & Equipment Data) 121 Bldg 333/Hydraulic/Pneudraulic Overhaul 10/30/98 1/27/99 & Test 125 Bldg 345/Advanced Fuel Accessories Test 11/2/98 1/28/99 129 Bldg 348/Fuel Accessories Repair & Test 11/2/98 2/2/99 133 LMKAC responsible for Repair Facilities 8/2/99 8/2/99 for Continuing Operations 134 Equipment Transfer (Paragraph IIA-7 & 11/9/98 8/2/99 Facilities & Equipment Data) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 49
EX-10.21243rd Page of 414TOC1stPreviousNextBottomJust 243rd
[Enlarge/Download Table] [IILEGIBLE] 1999 [IILEGIBLE] ----------- -------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 135 Joint Equipment Inventory 11/9/98 12/8/98 [LINE CHART] 136 Identify equipment to be maintained & 12/9/98 1/6/99 repair (as required) 137 Submit Paperwork for transfer to OC-LM 11/16/98 12/15/98 138 Equipment/Tooling in place to assume 2/3/99 2/3/99 WIP/Production 139 Internal Transfer to LMKAC 8/2/99 8/2/99 140 Production Phase-In at Kelly 9/30/98 8/2/99 [Enlarge/Download Table] [IILEGIBLE] 1999 [IILEGIBLE] ----------- -------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 141 Plan Process Demonstrations 9/30/98 1/19/99 [LINE CHART] 142 Production at SA-ALC (Paragraph IIA-5) 2/3/99 8/2/99 143 TF39 C&A Critical Process Demonstrations 3/1/99 7/29/99 (Paragraph IIA-9) 144 III - AC Tachometer Generator Inspect, 3/1/99 3/19/99 Repair, & Test 145 III - P&D Value Inspect, Repair, & Test 3/1/99 3/26/99 146 III - CIT Sensor Inspect, Repair, & Test 3/15/99 3/26/99 [Enlarge/Download Table] [IILEGIBLE] 1999 [IILEGIBLE] ----------- -------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 147 III - "B" Model Anti-Icing Air Valve 3/15/99 4/2/99 [LINE CHART] Inspect, Repair, & Test 148 III - FWD Scavenge Pump Inspect, 3/29/99 4/16/99 Repair, & Test 149 III - Ignition Exciter Inspect, Repair, 3/29/99 4/16/99 & Test 150 III - Oil-Fuel Cooler Inspect, Repair, 3/29/99 4/16/99 & Test 151 III - Lube & Scavenge Pump Inspect, 4/26/99 5/14/99 Repair, & Test 152 III - "B" Model Fuel Control Inspect, 5/20/99 6/17/99 Repair, & Test [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 50 Source Selection Sensitive
EX-10.21244th Page of 414TOC1stPreviousNextBottomJust 244th
[Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 153 III - Oil Tank Inspect, Repair, & 6/1/99 6/14/99 [LINE CHART] Test 154 III - "B" Model Fuel Nozzle 6/15/99 7/13/99 Cluster Inspect, Repair, & Test 155 III - Fuel Heater Inspect, Repair, 7/1/99 7/29/99 & Test 156 III - Main Fuel Pump Inspect, 7/1/99 7/29/99 Repair, & Test 157 III - VSV Actuator Inspect, 7/1/99 7/29/99 Overhaul, & Test 158 Transition Review 7/30/99 8/2/99 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 159 TF39 C&A INITIAL OPERATING CAPABILITY 2/3/99 2/3/99 [LINE CHART] 160 TF39 C&A FULL OPERATING CAPABILITY 8/2/99 8/2/99 161 TF39 C&A TRANSITION COMPLETE 8/2/99 8/2/99 162 163 TRANSITION T56 ACCESSORIES 9/30/98 8/2/99 164 Launch T56 Accessories Transition 9/30/98 8/2/99 Team [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 165 Logistics Support (Paragraph IIA-4) 10/1/98 2/2/99 [LINE CHART] 166 Review WCDs/job standards/tech 10/1/98 12/14/98 data & current established procedures 167 Verify/Establish labor & material 12/15/98 2/2/99 standards 168 Stocklist & order non-available 1/14/99 1/28/99 consumables 169 Evaluate tech data availability & 11/5/98 12/18/98 update TO libraries 170 Systems Interface & data systems 10/1/98 12/7/98 transfer [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 51
EX-10.21245th Page of 414TOC1stPreviousNextBottomJust 245th
[Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 171 MANAGE SA-ALC WIP (PARAGRAPH IIA-5) 1/5/99 8/2/99 [LINE CHART] 172 Conduct physical inventory of WIP 1/5/99 1/26/99 173 Identify and resolve variances 1/27/99 2/2/99 with ACO 174 OC-LM assumes WIP 2/3/99 2/3/99 175 Complete WIP 2/3/99 8/2/99 176 MANPOWER TRANSITION (PARAGRAPHS IIA-5 10/1/98 3/1/99 & 6) [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 177 Recruit SA-ALC personnel 10/13/98 10/16/98 [LINE CHART] (Post Award) 178 Personnel in place for WIP 2/3/99 2/3/99 assumption 179 LMKAC Hiring Plan 10/1/98 3/1/99 180 Trained LMKAC Workforce in Place 3/1/99 3/1/99 to exit Transition 181 FACILITIES TRANSITION/INTEGRATION 11/9/98 8/2/99 (PARAGRAPH IIA-7 & Facilities & EQUIPMENT DATA) 182 CONDUCT JOINT REVIEW OF BUILDINGS 11/9/98 12/8/98 REQUIRED DURING TIP [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- -------- -- -- -- -- -- -- -- -- 183 Building 308 - Electronics 11/9/98 11/13/98 [LINE CHART] Repair 184 Building 309 - Fuel Accessory 11/16/98 11/20/98 Repair 185 Building 333 - Hydraulic/ 11/23/98 12/1/98 Pneudraulic Overhaul & Test 186 Building 348 - Fuel Accessories 12/2/98 12/8/98 Repair & Test 187 IMMEDIATE MAINTENANCE/UPGRADE 12/9/98 6/14/99 REQUIRED 188 Detail facilities requiring 12/9/98 1/21/99 maintenance/upgrade for Transition [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 52 Source Selection Sensitive
EX-10.21246th Page of 414TOC1stPreviousNextBottomJust 246th
[Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- -------- -- -- -- -- -- -- -- -- 189 Facilities Repair/Maintenance 1/22/99 6/14/99 [LINE CHART] 190 Facilities in place to assume T56 WIP/Production 2/3/99 2/3/99 191 LMKAC Responsible for Repair Facilities for 8/2/99 8/2/99 Continuing Operations 192 Equipment/Tooling Transfer (Paragraph IIA-7 & 10/1/98 8/2/99 Facilities & Equipment Data) 193 Review Equipment/Tooling list for T56 Accessories- 10/1/98 10/30/98 Post award 194 Conduct Joint Equipment/Tooling Inventory 11/9/98 12/15/98 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- -------- -- -- -- -- -- -- -- -- 195 Accomplish joint inventory 11/9/98 12/8/98 [LINE CHART] 196 Submit paperwork for transfer 12/2/98 12/15/98 197 Eguipment/Tooling in place to assume T56 2/3/99 2/3/99 WIP/Production 198 Internal Transfer to LMKAC 8/2/99 8/2/99 199 T56 Production Phase-In at Kelly 9/30/98 8/2/99 200 Analyze current system 9/30/98 12/14/98 [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- -------- ------- -- -- -- -- -- -- -- -- 205 Modify processes (as reqaired) 12/15/98 2/2/99 [LINE CHART] 212 Production Phase-In (Paragraph IIA-5) 2/3/99 8/2/99 213 T56 C&A Critical Processes Demonstrations 5/3/99 7/13/99 (Paragraph IIA-9) 214 I - Fuel Control, including electro 5/3/99 5/3/99 mechanical rotary actuator disassembly 215 II - Inspect, repair & test fuel control, 5/4/99 5/6/99 including electro mechanical rotor actuator 216 I - Temperature Datum Valve, including motor 5/7/99 5/7/99 generator assembly [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 53
EX-10.21247th Page of 414TOC1stPreviousNextBottomJust 247th
[Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- 217 I - Fuel pump, high pressure fuel filter, 5/10/99 5/10/99 [LINE CHART] Paralleling valve disassembly 218 II - Inspect repair & test fuel pump, fuel 5/11/99 5/13/99 filters, & pressure switches 219 I - Fuel nozzles disassembly 5/14/99 5/14/99 220 II - Inspect, repair & test fuel nozzles 5/17/99 5/19/99 221 I - Ignition exciter disassembly 5/20/99 5/20/99 222 II - Inspect, repair & test ignition exciter 5/21/99 5/26/99 & ignition relay [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- 223 I - Speed sensitive valve disassembly 5/27/99 5/27/99 [LINE CHART] 224 I - Speed sensitive control disassembly 5/28/99 5/28/99 225 II - Inspect, repair & test speed sensitive 5/31/99 6/2/99 valve 226 II - Inspect, repair & test speed sensitive 6/3/99 6/7/99 control 227 I - Coordinator control disassembly 6/8/99 6/8/99 228 II - Inspect, repair & test coordinator 6/9/99 6/11/99 control [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- 229 II - Inspect, repair & test spark igniters 6/14/99 6/16/99 [LINE CHART] 230 II - Inspect, repair & test anti-icing 6/17/99 6/21/99 solenoid valve, compressor bleed air valves, & anti-icing 231 II - Inspect, repair & test thermocouples & 6/22/99 6/24/99 power unit harness assemblies 232 II - Inspect, repair & test temperature 6/25/99 6/29/99 datum valve including motor generator 233 II - Inspect, repair & test temperature 6/30/99 7/2/99 datum control amplifier 234 II - Inspect, repair & test paralleling 7/6/99 7/8/99 valve, drain valves, & shutoff valves [Enlarge/Download Table] [ILLEGIBLE] 1999 [ILLEGIBLE] ----------- ----------------- ----------- ID TASK NAME START FINISH Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 --- --------- ------- ------- -- -- -- -- -- -- -- -- 235 II - Inspect repair & test oil pumps & 7/9/99 7/13/99 [LINE CHART] filters 236 Transition Review 7/30/99 8/2/99 237 T56 ACCESSORIES INITIAL OPERATING CAPABILITY AT 2/3/99 2/3/99 LMKAC 238 T56 ACCESSORIES FULL OPERATING CAPABILITY AT 8/2/99 8/2/99 LMKAC 239 T56 ACCESSORIES TRANSITION COMPLETE 8/2/99 8/2/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 54 Source Selection Sensitive
EX-10.21248th Page of 414TOC1stPreviousNextBottomJust 248th
TIP-1.8 TF39 2LM ENGINE TRANSITION INTEGRATION PLAN ADDENDUM (RFP Exhibit E) TOP LEVEL PLAN [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 3Q00 ---- ---- ---- ---- ---- ---- ---- ---- ---- ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 3Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- ---- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 TRANSITION TF39 2LM ADDENDUM 9/30/98 8/2/99 3 Logistic Pre-Planning (Paragraph 9/30/98 1/5/99 IIA-4) 10 Manage TF39 2LM WIP (Paragraph 1/5/99 8/2/99 IIA-5) 16 Establish LMKAC Manpower Base 10/1/98 7/27/99 (Paragraph IIA-5 & 6) 112 Facility Transition/Integration 11/5/98 8/2/99 (Paragraph IIA-7 & Facilities & Equipment Data) 116 Equipment Transfer (Paragraph 11/9/98 8/2/99 IIA-7 & Facilities & Equipment Data) 121 Production Phase-in at Kelly 11/5/98 8/2/99 122 Plan Process Demonstrations 11/5/98 1/12/99 123 Production Phase-In at SA-ALC 2/3/99 8/2/99 (Paragraph IIA-5) 124 Engine Assembly/Module 3/1/99 7/22/99 Install Critical Process Demos (Para IIA-9) 139 Engine Test & Inspection 7/1/99 7/29/99 Demonstration 142 TF39 Trailer/Container 3/8/99 4/16/99 Maintenance 143 Transition Review 7/30/99 8/2/99 144 TF39 2LM INITIAL OPERATING 2/3/99 2/3/99 CAPABILITY AT KELLY [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 3Q00 ---- ---- ---- ---- ---- ---- ---- ---- ---- ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 3Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- ---- 145 TF39 2LM FULL OPERATING 8/2/99 8/2/99 [LINE CHART] CAPABILITY AT KELLY UNDER 146 TF39 2LM TRANSITION COMPLETE 8/2/99 8/2/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 55
EX-10.21249th Page of 414TOC1stPreviousNextBottomJust 249th
DETAILED PLAN [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 ---- ---- ---- ---- ---- ---- ---- ---- ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 TRANSITION TF39 2LM ADDENDUM 9/30/98 8/2/99 3 Logistic Pre-Planning (Paragraph 9/30/98 1/5/99 IIA-4) 4 Review job standards/tech data & 10/29/98 12/11/98 current established procedures 5 Verify/Establish labor & 10/29/98 12/11/98 material standards 6 Verify/Establish consumable 11/5/98 12/18/98 materials list [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 ---- ---- ---- ---- ---- ---- ---- ---- ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- 7 Stocklist & order non-available 12/21/98 1/5/99 [LINE CHART] comsumable 8 Evaluate tech data availability 11/12/98 12/28/98 & update TO libraries 9 System Interface & data System 9/30/98 12/1/98 transfer 10 Manage TF39 2LM WIP (Paragraph 1/5/99 8/2/99 IIA-5) 11 Inventory WIP 1/5/99 1/26/99 12 Negotiate WIP with ACO 1/27/99 2/2/99 [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 ---- ---- ---- ---- ---- ---- ---- ---- ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- 13 Assign manpower resources 1/5/99 2/2/99 [LINE CHART] 14 OC-LM Assumes WIP 2/3/99 2/3/99 15 Complete WIP 2/4/99 8/2/99 16 Establish LMKAC Manpower Base 10/1/98 7/27/99 (Paragraph IIA-5 & 6) 17 Recruit SA-ALC personnel (Post 10/13/98 10/16/98 Award) 18 Personnel in place for WIP 2/3/99 2/3/99 assumption [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 ---- ---- ---- ---- ---- ---- ---- ---- ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1Q00 2Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- 19 LMKAC Hiring Plan 10/1/98 2/26/99 [LINE CHART] 20 Trained LMKAC Workforce in Place 3/1/99 3/1/99 to Exit Transition 21 Manpower Phase in at Kelly for 10/13/98 7/27/99 2LM 112 Facility Transition/Integration 11/5/98 8/2/99 (Paragraph IIA-7 & Facilities & Equipment Date) 113 Bldg 375 (2LM Area Only), 347, 11/5/98 12/18/98 655 Facilities Review [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 56 Source Selection Sensitive
EX-10.21250th Page of 414TOC1stPreviousNextBottomJust 250th
[Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2QQQ ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2QQQ --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- 114 Facilities available for WIP assumption 2/3/99 2/3/99 [LINE CHART] 115 LMKAC responsible for Repair Facilities for Continuing Operations 8/2/99 8/2/99 116 Equipment Transfer (Paragraph IIA-7 & Facilities & Equipment Data) 11/9/98 8/2/99 117 Accomplish Joint Inventory (Bldg 375) 11/9/98 12/8/98 118 Submit paperwork for transfer 11/16/98 12/15/98 119 Equipment available to assume WIP 2/3/99 2/3/99 [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- 119 Equipment available to assume WIP 2/3/99 2/3/99 [LINE CHART] 120 Internal Transfer to LMKAC 8/2/99 8/2/99 121 Production Phase-in at Kelly 11/5/98 8/2/99 122 Plan Process Demonstrations 11/5/98 1/12/99 123 Production Phase-In at SA-ALC (Paragraph IIA-5) 2/3/99 8/2/99 124 Engine Assembly/ModuleInstallation Critical Process Demos (Paragraph IIA-9) 3/1/99 7/22/99 [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- 125 QEC Installation 3/1/99 3/19/99 [LINE CHART] 126 Fan Stator Case Installation 3/15/99 4/2/99 127 Fan Rotor Installation 3/29/99 4/23/99 128 Gearbox Installation 4/12/99 5/7/99 129 TRF Installation 4/29/99 5/19/99 130 LPT Rotor Installation 5/12/99 6/9/99 [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 --- --------- -------- -------- ---- ---- ---- ---- ---- ---- ---- ---- 131 LPT Case Installation 5/27/99 6/16/99 [LINE CHART] 132 TMF Installation 6/10/99 6/30/99 133 HPT Installation 6/22/99 7/20/99 134 Combustor Installation 7/1/99 7/22/99 135 Combustor Installation 7/1/99 7/22/99 136 Compressor Installation 5/7/99 6/18/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 57
EX-10.21251st Page of 414TOC1stPreviousNextBottomJust 251st
[Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 --- --------- ------- ------- ---- ---- ---- ---- ---- ---- ---- ---- 137 Compressor Case Installation 6/1/99 6/21/99 [LINE CHART] 138 Fan Frame Installation 6/15/99 7/6/99 139 Engine Test & Inspection 7/1/99 7/29/99 Demonstration 140 Engine Inspection 7/15/99 7/28/99 141 Engine Test Cell Run 7/1/99 7/29/99 142 TF39 Trailer/Container 3/8/99 4/16/99 Maintenance [Enlarge/Download Table] 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 ID TASK NAME START FINISH 3Q98 4Q98 1Q99 2Q99 3Q99 4Q99 1QQQ 2Q00 --- --------- ------- ------- ---- ---- ---- ---- ---- ---- ---- ---- 143 Transition Review 7/30/99 8/2/99 [LINE CHART] 144 TF39 2LM INITIAL OPERATING 2/3/99 2/3/99 CAPABILITY AT KELLY 145 TF39 2LM FULL OPERATING 8/2/99 8/2/99 CAPABILITY AT KELLY UNDER LMKAC 146 TF39 2LM TRANSITION COMPLETE 8/2/99 8/2/99 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 58 Source Selection Sensitive
EX-10.21252nd Page of 414TOC1stPreviousNextBottomJust 252nd
TIP-1.9 T56 2LM ENGINE TRANSITION INTEGRATION PLAN ADDENDUM. (RFP EXhibits D, OR E) TOP LEVEL PLAN [Enlarge/Download Table] [ILLEGIBLE] 1998 1999 ------------ -------------------------- -------------------------- ID TASK NAME START FINISH QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 TRANSITION T56 ADDENDUM 9/30/98 8/2/99 3 Logistics Support 10/1/98 2/3/99 (Paragraph 11A-4) 9 Manage SA-ALC WIP 1/5/99 8/2/99 (Paragraph IIA-5) 14 Manpower Transition 10/1/98 3/1/99 (Paragraphs IIA-5 & 6) 19 Facilities Transition 11/9/98 8/2/99 (Paragraph IIA-7 & Facilities & Equipment Data) 28 Equipment/Tooling Transfer 10/1/98 8/2/99 (Para IIA-7 & Facilifies & Equipment Data) 35 T56 Production Phase In 9/30/98 8/2/99 36 Current Systems Analysis 9/30/98 12/14/98 41 Modified processes (as 12/15/98 2/3/99 required) 45 Production at SA-ALC 2/3/99 8/2/99 (Paragraph IIA-S) 49 T56 2LM Critical 5/3/99 5/3/99 Processes Demonstrations (Paragraph IIA-9) 51 Transition Review 7/30/99 8/2/99 52 T56 2LM INITIAL OPERATING 2/3/99 2/3/99 CAPABILITY AT KELLY 53 T56 2LM FULL OPERATING 8/2/99 8/2/99 CAPABILITY AT KELLY [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 59
EX-10.21253rd Page of 414TOC1stPreviousNextBottomJust 253rd
DETAILED PLAN [Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 1 CONTRACT AWARD 9/30/98 9/30/98 [LINE CHART] 2 TRANSITION T56 2LM ADDENDUM 9/30/98 8/2/99 3 Logistics Support 10/1/98 2/3/99 (Paragraph IIA-4) 4 Review WCDs/job 10/1/98 12/15/98 standards/tech data & current established 5 Verify/Establish labor & 12/16/98 2/3/99 material standards 6 Stocklist & order 1/13/99 1/27/99 nonconsumables [Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 7 Evaluate each data 11/5/98 12/18/98 [LINE CHART] availability & update TO libraries 8 Systems Interface & data 10/1/98 12/7/98 systems transfer 9 MANAGE SA-ALC WIP 1/5/99 8/2/99 (PARAGRAPH IIA-5) 10 Conduct physical 1/5/99 1/26/99 inventory of WIP 11 Identify and resolve 1/27/99 2/2/99 variances with ACO 12 OC-LM assumes WIP 2/3/99 2/3/99 [Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 13 Complete WIP 2/4/99 8/2/99 [LINE CHART] 14 MANPOWER TRANSITION 10/1/98 3/1/99 (PARAGRAPHS IIA-5 & 6) 15 Recruit SA-ALC personnel 10/13/98 10/16/98 (Post Award) 16 Personnel in place for 2/3/99 2/3/99 WIP assumption 17 LMKAC Hiring Plan 10/1/98 2/26/99 [Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 18 LMKAC Workforce in place 3/1/99 3/l/99 [LINE CHART] to exit transition 19 FACILITIES TRANSITION 11/9/98 8/2/99 (PARAGRAPH IIA-7 & FACILITIES & EQUIPMENT 20 Conduct Joint Review of 11/9/98 11/18/98 Building required during 21 Building 324 - 2LM 11/9/98 11/13/98 22 Building 535 - T56 11/16/98 11/18/98 Outdoor Test Pad 23 Immediate Maintenance 11/19/98 5/28/99 Upgrade required [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 60 Source Selection Sensitive
EX-10.21254th Page of 414TOC1stPreviousNextBottomJust 254th
[Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 24 Detail facilities 11/19/98 1/5/99 [LINE CHART] requiring maintenance/ upgrade 25 Facilities Repair/ 1/6/99 5/28/99 Maintenance 26 Facilities in place 2/3/99 2/3/99 to assume T56 WIP/ Production 27 LMKAC responsible for 8/2/99 8/2/99 Repair Facilities for Continuing 28 EQUIPMENT/TOOLING 10/1/98 8/2/99 TRANSFER (PARA IIA-7 & FACILITIES & EQUIPMENT 29 Review Equipment/ 10/1/98 10/29/98 Tooling list for T56 2LM PBA [Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 30 CONDUCT JOINT 11/9/98 12/15/98 [LINE CHART] EQUIPMENT/TOOLING INVENTORY 31 Accomplish joint 11/9/98 12/8/99 inventory 32 Submit Paperwork 12/2/98 12/15/98 for Transfer 33 Equipment/Tooling in 2/3/99 2/3/99 place to assume T56 2LM WIP/Production 34 Internal Transfer to 8/2/99 8/2/99 LMKAC 35 T56 PRODUCTION PHASE IN 9/30/98 8/2/99 [Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 38 Current System 9/30/98 12/14/98 [LINE CHART] Analysis 41 Modified processes 12/15/98 2/3/99 (as required) 48 Production at SA-ALC 2/3/99 8/2/99 (Paragraph IIA-5) 49 T56 2LM Critical 5/3/99 5/3/99 Processes Demonstrations (Paragraph 50 No Specific 5/3/99 5/3/99 processes 51 Transition Review 7/30/99 8/2/99 [Enlarge/Download Table] 1998 1999 2000 ------------------- -------------------------- -------------------------- ID TASK NAME START FINISH QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 -- --------- -------- -------- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 52 T56 2LM INITIAL 2/3/99 2/3/99 [LINE CHART] OPERATING CAPABILITY AT KELLY 53 T56 2LM FULL OPERATING 8/2/99 8/2/99 CAPABILITY AT KELLY 54 T56 2LM TRANSITION 8/2/99 8/2/99 COMPLETE [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 61
EX-10.21255th Page of 414TOC1stPreviousNextBottomJust 255th
[Enlarge/Download Table] [ILLEGIBLE] 1999 2000 ------------ -------------------------- ------------------- TASK NAME QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 --------- ----- ----- ----- ----- ----- ----- ----- ----- ----- CONTRACT AWARD [LINE CHART] TRANSACTION PBA WORKLOAD Operation Location Activation Process in place for PBA Contracts Supply Support System in place Warranty in place F100 ENGINE Workforce in place Process Demonstrations Complied with ISO 9002 Achieved Flowdays & BEQs F100 COMPLETE TF39/T56 ENGINES (INCL 2LM) Workforce in place Process Demonstrations TF39 T56 Complied with ISO 9002 Achieved Flowdays & BEQs TF39/T56 COMPLETE FUEL ACCESSORIES Workforce in place Process Demonstrations Complied with ISO 9002 Achieved Flowdays & BEQs FUEL ACCESS COMPLETE PBA TRANSITION COMPLETE [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 62 Source Selection Sensitive
EX-10.21256th Page of 414TOC1stPreviousNextBottomJust 256th
THIS DOCUMENT ESTABLISHES THE MINIMUM WORK REQUIREMENT TO COMPLETE THE CONTINUOUS OPERATION PLAN AS DEFINED IN EXHIBIT B THROUGH E. THE FOLLOWING IS APPLICABLE TO STANDARD AERO SAN ANTONIO SPECIFIC WORKLOAD AND AWARDED CLIN. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 1
EX-10.21257th Page of 414TOC1stPreviousNextBottomJust 257th
COP-1 TIME-PHASED CONTINUING OPERATION PLAN (COP). (L-900 4.3.1, 4.3.2, 4.3.3, M-900 6.2.1) THE OC-LM TEAM OFFERS DECADES OF RELEVANT OVERHAUL AND REPAIR EXPERIENCE, INCLUDING CURRENT EXPERIENCE ON THE F100 CORE, TF39, AND T56. IN ADDITION, WE HAVE THE PEOPLE, FACILITIES, EQUIPMENT, COMMITMENT TO EXCELLENCE, AND A WELL-THOUGHT-OUT CONTINUING OPERATIONS PLAN. WE HAVE EVERYTHING IN PLACE TO EXCEL THROUGHOUT CONTINUING OPERATIONS. To demonstrate the soundness of our approach and understanding of the PBA requirements for sustained production, the RFP requires that we create and implement a time-phased Continuing Operations Plan (COP) that realistically addresses: - Approaches to avoid price escalation - Fleet Readiness - BEQs and Flowdays - Surge requirements - Tracking Over & Above - Risk Management - Small business participation - Warranties - Qualifying sources The OC-LM Team offers the lowest risk continuing PBA operations because we have the needed experience, people, facilities, equipment, commitment, and plan, plus the unmatchable experience of already performing a substantial portion of the workloads today. Specifically: - OC-ALC is the source of repair for the F100 engines and components. We have 24% of the modules and 50% of the whole engines. - Lockheed Martin has 380 personnel on Contract Field Teams (CFT) performing maintenance on the TF39 today. Additionally, Chromalloy and OC-ALC combined are repairing one-third of the TF39 component repair workload. Chromalloy is the largest TF39 parts repair source for the USAF. - Standard Aero Limited is working 200,000 hours of T56 workload in overflow contracts today and they have the largest T56 overhaul and repair market share in the world with 39%. As PBA workloads pass transition exit criteria, they will enter the continuing operation phase. Our TIP provides the details of this time-phased plan. The COP describes how we apply decades of military support experience to the PBA workload, reinforces our claims with detailed plans and specific examples, and explicitly addresses all of the required topics. COP-1.1 APPROACHES TO AVOID PRICE ESCALATION (L-900 4.3.3, M-900 6.2.1.3) The RFP requires that we describe our approaches to avoid price escalation. Since our approach is closely tied to our overall repair versus replace strategy and our process improvement plan, we have grouped these topics in Repair Operations, Section IIB-2. In addition, this section describes our ability to avoid price escalation through our suggestion programs, labor standard reductions, and product flowtime reductions. Repair Operations describes how our professional engineering, planning, and production teams avoid price escalation by reducing labor, material, and flowdays through continuous process improvements. It provides specific examples of some of our innovative achievements on our current workload and our proposed benefits on the PBA's ten critical end items, in Section IIB-3. We are incorporating Section IIB-2 by reference into the OC-LM Continuing Operations Plan. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 1
EX-10.21258th Page of 414TOC1stPreviousNextBottomJust 258th
COP-2 APPROACH TO MEET TRD REQUIREMENTS. (L-900 4.3.1, 4.3.6, M-900 6.2.1, TRD-3.1) OC-LM STRIVES DAILY TO IMPROVE FLEET READINESS ON OUR CURRENT WORKLOADS. WE HAVE THE MANAGEMENT TOOLS AND EXPERIENCE TO PROVIDE THE BEST SOLUTIONS TO THE PBA WORKLOAD CHALLENGES. ONE OF OUR PRIMARY THRUSTS WILL BE TO AGGRESSIVELY ADDRESS THE UNACCEPTABLE WAR READINESS ENGINE (WRE) LEVELS AND ENGINES NOT MISSION CAPABLE SUPPLY (ENMCS) RATES BY REDUCING FLOWDAYS. DRIVING DOWN FLOWDAYS CREATES PRODUCTION MARGIN. WE WILL ALSO EVALUATE THE BENEFITS OF INCREASING PEOPLE, MACHINES, FACILITIES, OUTSOURCING OR OTHER INFRASTRUCTURE INVESTMENTS. FLOWDAY REDUCTION, HOWEVER, CREATES MARGIN WITHOUT INFRASTRUCTURE COSTS/CHANGES. WE WILL WORK WITH OUR TEAM MEMBERS TO SET CHALLENGING YET ACHIEVABLE GOALS AT OC-ALC FOR THE F100 AND AT LMKAC FOR THE TF39 AND T56. The TRD requirements focus on ensuring that we improve fleet readiness, requiring that we meet BEQ, flowday, and surge requirements; track over and above work; manage risks; commit to small business participation; and address additional workload. We will improve f1eet readiness through our Agile Logistics initiatives to meet the BEQ and flowday requirements of the PBA workload. The following sections demonstrate that we have the infrastructure, material support and personnel plans to meet the PBA requirements. Additionally, we have a clear understanding of the PBA surge requirements. Our surge contingency plan has served us well in the past, ensuring that we have the capacity, material, and skilled labor required to surge work to meet emergency need. Surge support will be available immediately upon contract award. Tracking and visibility of over and above work is a function that we perform on a daily basis. Our existing systems will ensure the control of labor and materials associated with over and above work. Risk management functions are an integral part of our overall program planning and management process. Our management teams have the resources to identify risk elements and develop work-arounds to resolve issues quickly. OC-LM is strongly committed to small, disadvantage, and women-owned businesses. We have a detailed small business program with an impressive track record. We will continue to actively encourage the participation of small business in our contracting process. COP-2.1 FLEET READINESS THROUGH AGILE LOGISTICS (L-900 4.1.3, 4.3.1, 4.3.6, M-900 6.0, TRD-3.1) We will improve fleet readiness by using the principle of Agile Logistics to meet the BEQ and flowday requirements. The complexity of the post-Cold War situation, limited military resources, and austere budgets require that we apply Agile Logistics tenets so that we can flexibly, responsively, and efficiently manage the PBA workloads. Our Agile Logistics benefits are shown in Figure COP-2-1. Extensively ingrained in our daily operation, the OC-LM Team's Agile Logistics approach: - Improves the Air Force's Mission Readiness (i.e. WREs and ENMCS) - Sustains the DoD's Force Structure - Anticipates Changing World Scenarios to Minimize Impact to Customer - Efficiently Responds to Fluctuating Customer Demands [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 2 Source Selection Sensitive
EX-10.21259th Page of 414TOC1stPreviousNextBottomJust 259th
[Enlarge/Download Table] AGILE LOGISTICS TENETS STRATEGY BENEFITS ---------------------- -------- -------- Reduce Process Flowdays - Apply Kaizen Process to - Dramatic Flow Time Reductions PBA - More Efficient Operation and - Utilize Cellular Shop Expanded Throughput Process Arrangement Reduce Inventories - Establish Fast Response - Reduced On-Hand Material Commercial Contracts for - Lower Storage and Handling Industry Partners Costs Repair/Prioritize on Demand - Prioritize Induction - Enhanced DoD Readiness Schedule Reduce Contract Repair Cost - Utilize Expanded Repair - Lower Material Costs vs. Replacement - Lower Labor Costs - Establish more Efficient Processes Reduce Repair Time - Utilize One Piece Flows - Reduced Cycle-Time vs. Batch Processing - Improved Readiness (Increased - Introduce Latest WRE Levels and Reduced ENMCS) State-of-the-Art Repair Equipment Fast Transportation - Utilize Direct Shipment - Improved and Timely User to/from Users Support - Apply Commercial Transportation Practices Consolidated Serviceable - Utilize One-for-One - Timely Induction of Inventory (CSI)/ Ordering Reparables Consolidated Reparable - Establish Management of - Improved Stock Levels to Inventory (CRI) Facility CSI/CRI by Industry Support Repair Operations Partner Shipment on Demand - Prioritize Daily - Improved User Readiness - Improve Coordination with - Parts and Engines Where They Propulsion Management are Needed on Time. Organization Direct Shipment - Utilize Dedicated - Minimizes Transportation - Contractor to User Transportation Team Delays - User to Contractor - Prioritize User Shipment - Avoids Second Destination Destinations Charges Reduce Military Specifications - Identify Non-Value Added - Eliminates Non-Value Added and Standards. Specifications Requirements - Identify Applicable - Eliminates Unnecessary Commercial Standards Oversight Requirements Maximize Commercial Practices - Identify Commercial Best - Leverage Maximizes Benefits Practices from the Government - Industry - Identify Single Process Partnership Initiatives (SPI) FIGURE COP-2-1 AGILE LOGISTICS TENETS, STRATEGIES, AND BENEFITS Our carefully devised Agile Logistics strategies maximize best-value support to the warfighters. REDUCE PROCESS FLOWDAYS We will reduce flowdays to a minimum. Team members will capitalize on the fact that they are currently performing significant amounts of overhaul/repair work on the three PBA engines. By using critical path management techniques and incorporating our process improvements, we will drive flowdays down to the numbers shown in Figure COP-2-2 Additionally, we will use cellularized work centers (see IIB-2, IIB-3) where appropriate, to improve product flow. This concept has been embraced by numerous companies worldwide and proven to yield significant reductions in flow time. The LMKAC team is adept in the use of this technique to cut flowdays to a minimum. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 3
EX-10.21260th Page of 414TOC1stPreviousNextBottomJust 260th
[CHART] FIGURE COP-2-2 FLOWDAY REDUCTIONS By using process improvements, commercial best practices, and multiple shifts, we will reduce flowdays early in the continuing operations phase by an average of 37% across the PBA engines. The Navy F110-400 workload, transitioned to OC-ALC in FY93, is one example of successful flowday reduction. This program challenged us from the beginning with severe material shortages. At our customer's request, we inducted additional reparable engines to cannibalize for critical parts until the material could be obtained through normal supply channels. While our actions satisfied our customer and maintained mission readiness, actual flowdays were increased temporarily. Finding this situation unacceptable, we immediately: - Increased Communication with the Navy to Clarify Workscope - Initiated Improvements by Standardizing Repair Processes Within the F101 and F110 Family - Improved Material Flow by Injecting the Right Mix of Parts In the first year, we turned the situation around, cutting flowdays by 48%. Over the next three years, the flowdays were reduced by an additional 45%. Figure COP-2-3 graphically depicts the results of our continuous process improvement efforts for this workload. You can be assured the same level of dedication will be applied to the PBA workload. FIGURE COP-2-3 F110-400 FLOWDAY REDUCTION. The dramatic reduction in flowdays for this Navy engine is proof that our continuous process improvement approach works! [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 4 Source Selection Sensitive
EX-10.21261st Page of 414TOC1stPreviousNextBottomJust 261st
T56 FLOWDAYS: Standard Aero is already producing T56 engines for the Canadian AF in only 20 flowdays in their Winnipeg facility. They will incorporate their lessons learned into the Kelly facilities to produce like results on the PBA engines. Standard Aero will meet all PBA workload flowday requirements by the transition date. They propose to reduce flowdays for T56 2LM and Engine Overhauls to 20 days and T56-501K Engine Overhauls to 15 days by the fifth year of the PBA contract. These flowday objectives are 17 and 15 days, respectively, below the customer's requirement on the highest level assemblies. Figure COP-2-4 displays the flowday plan for 2LM and overhaul of the engine assembly in contract years 2003 and beyond. [CHART] FIGURE COP-2-4 FLOWDAY PLAN FOR T56 ENGINE IN FY03 AND BEYOND. Standard Aero will complete T56 2LM and overhaul engines in 20 flowdays by year 2003! [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 5
EX-10.21262nd Page of 414TOC1stPreviousNextBottomJust 262nd
Standard Aero has 30 years of experience in the overhaul of T56 engines and components for various militaries and commercial customers. Standard Aero will apply the experience of their 'World Best' T56 Program as currently operating in Winnipeg to achieve the PBA flowday objectives. Standard Aero will apply the following proven methodology: - Consolidate the majority of T56 operations into one facility--Bldg. 360 - Implement production documentation and routing packages, barcode labor and part tracking systems - Establish measures of performance for flowdays, labor and material requirements, process rejects, test rejects, warranties - Redesign operations into production cells to achieve optimum material flow - Implement electronic and visual production scheduling, tracking and capacity planning tools. - Re-engineer production processes to reduce non-value-added activities - Reduce production bottlenecks through equipment and tooling additions (i.e. GFP), dedicated workcenters, parallel operations, reduced machine set-up times, and reduced process times - Implement preventative maintenance and calibration schedules for all applicable equipment and tooling - Structured training for all T56 production personnel to increase product knowledge and job specific skills - Cross training for T56 production personnel in complimentary skills to improve production continuity and workforce flexibility - Recurrent skills training program to maintain and enhance workforce flexibility and product knowledge - Dedicated product, process, and performance engineering support resources for production cells. - Dedicated material planning, receiving, storage, issue and control for production cells. - Employ alternate qualified material sources as required - Manage rotable pools for parts with complex repairs - Employ extended component repair capabilities TF39 FLOWDAYS: LMKAC will reduce TF39 flowdays by 12 days from the RFP listed flowday requirements of 62 days. LMKAC will meet all PBA TF39 workload flowday requirements (62 days) by transition date, and we propose to reach 50 days by the fourth year of the PBA contract as shown in Figure COP-2-5. The following provides our approach to reduce the flow-days from 62 to 50. The TF39 is primarily constrained through the 2LM and Jet Engine Intermediate Maintenance (JEIM) facilities by module and component piece part shortages. The LMKAC plan includes a pre-positioned rotable pool of critical modules, components and piece parts to support daily demands when similar items are turned into Building 360 for repair. This approach will clearly improve upon engine throughput with the goal to have ready-available more than 95% of any needed item at all times, to support 2LM needs. The forward supply point collocated with 2LM will be aggressively managed by LMKAC to provide this function. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 6 Source Selection Sensitive
EX-10.21263rd Page of 414TOC1stPreviousNextBottomJust 263rd
[CHART] FIGURE COP-2-5: FLOWDAY PLAN FOR THE 50 DAY TF39 ENGINE IN FY02 AND BEYOND. LMKAC will reduce TF39 flowdays from 62 to 50 days by applying agile logistics tenets. The following initiatives highlight some of the TF39 process improvements we plan to incorporate: - Two shift operations with the second shift dedicated toward the most ready to ship engines to ensure timely delivery. - Consolidate TF39 maintenance and repair operations into the fewest number of facilities to improve piece part flow efficiency. - Develop a TF39 Forward Supply Point (FSP) with ready-to-use rotable serviceable hardware to support the day-to-day demands. This is a major element of Agile Logistics. - Implement production documentation and routing packages, together with barcode labor and part location-tracking systems. - Establish measures of performance for flowdays, labor and material requirements, in process rejects, test rejects, warranties and other key measures - Re-engineer production processes to reduce non-value-added activities - Reduce production bottlenecks through equipment and tooling additions (i.e. GFP), parallel operation, reduced machine set-up times, and reduced process times. REDUCE INVENTORIES Our inventory reduction approach recognizes a delicate balance between productivity and customer demand. We rely heavily on accurate material forecasting and a database of historical usage rates to establish sufficient inventory levels. The combination of fast contract vehicles and qualitative approaches to inventory waste reduction ensures the right part is in the right place at the right time. As an example of our inventory reduction success, we tailored our support processes for the TF33-102B engine with the Joint Surveillance Target Attack Radar System (STARS) program manager to obtain unique parts. These parts were not stocklisted and could not be readily obtained from normal supply channels. We developed a Memorandum of Agreement (MOA) with our customer that includes special support procedures to maintain the minimum inventory while ensuring parts were available when needed. All indicators (including schedule and cost) have been consistently within goals. Today, we continue to be the only source of repair for this engine program. Fast response contract vehicles allow us to order and receive material quickly by reducing administrative overhead and production lead [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 7
EX-10.21264th Page of 414TOC1stPreviousNextBottomJust 264th
times. This compresses the pipeline and minimizes the need for higher stock levels. The OC-LM Team's emphasis on process reengineering, Kaizen techniques, and employee training and certification ensure appropriate material usage and handling, thereby reducing the need for excessive buffer inventory. Combined with these efforts, LMKAC pursues high inventory turns through just-in-time efforts from qualified vendor to minimize in-house inventory. Continuous focus is placed on reducing vendor lead times. The material flexibility provided by these Government and commercial initiatives will help to improve Engines Not Mission Capable Supply (ENMCS) rates and WRE levels, enhancing Air Force readiness. REPAIR/PRIORITIZE ON DEMAND Our prioritized approach to weapon system support effectively converts the Air Force logistics system from a "push" to a "pull" system. We focus on rapid repair and movement of repaired parts through the pipeline in direct response to customer demands, thus putting the assets where they are needed most. To accomplish this objective, we centralize inventories at the depot with a slight reduction in levels at the bases. We employ fast transportation modes to speed response times. Using a combination of existing Depot Repair Enhancement Program (DREP), real-time schedules integrate with projected usage and capacities, we provide the process owners with the necessary tools to prioritize their workload. Innovative data systems such as Execution and Prioritization of Repair Support System (EXPRESS), and Inventory Tracking System (ITS) (fully described in COP-3.4) allow the OC-LM Team to prioritize work to increase throughput. REDUCE CONTRACT REPAIR COSTS The OC-LM Team's combined repair expertise allows us to immediately identify improvement targets that provide the best value. We will review existing SA-ALC issued repair contracts to see if they add value and are cost effective. COP-2.8 describes our plan for reviewing these contracts to make cost-for-value comparisons. Although SA-ALC issued repair contracts will be used during the transition to minimize impact on production, we will begin phasing out contracts that fail to meet our cost-for-value criteria and reroute repairs to OC-ALC or LMKAC or other qualified vendor certified sources. REDUCE REPAIR TIME The OC-LM approach to reducing repair time dovetails with our activities to reduce contract repair costs. The primary focus areas for our repair time reduction efforts are: - Integrating Common Processes - Consolidating and Reengineering Shop Layout at Kelly and Tinker to Facilitate Efficient Process flow - Cellularizing Product Repair Centers to Take Advantage of Compatible Equipment, Facilities, and Processes - Using Cross-trained Personnel to Fill Any Production Gaps or Surges Both OC-ALC and LMKAC members have an extensive history of driving down repair time to meet customer schedules and increase capacity for additional workload. To highlight one recent example, the F110/F101 Low Pressure Turbine (LPT) Stage 1 Nozzle became the leading field problem item for both F110 and F101 engines. This part has one of the most complex repair processes performed at OC-ALC. The process uses the latest technology in Activated Diffusion Healing (ADH) and Fluoride Ion Cleaning (FIC). Initially, the process flow took over 100 days. By pulling our team of experts together, performing a process [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 8 Source Selection Sensitive
EX-10.21265th Page of 414TOC1stPreviousNextBottomJust 265th
flow analysis, integrating common processes and streamlining procedures, we reduced the flowdays by 37% and the ENMCS rate by 75%. Interactive laser welding system (ILWS) is another example of the OC-LM team's efforts to provide Air Force benefits through reduced repair time. Patented by Chromalloy, the process is accomplished in a state-of-the-art fully integrated cell and uses computer profiling to consistently apply weld build-up to exact areas on HPT blade tips. The weld build-up is controlled to apply the minimum amount necessary for the grinding/blending operation; traditional TIG welding process results in excess weld build-up, requiring three times the amount of time for profile grinding and blending. ILWS results in: - Faster and Efficient Weld Process - Higher Quality and Less Recycling (Reduced Heat Affected Zone Precludes Damage to the Blade) - Reduced Material Usage - Reduced Time in Post-Weld Machining and Blending - Reduced Flowdays FAST TRANSPORTATION Fast transportation (processing of automated forms, overnight and air deliveries) is the key to successfully meet Air Force requirements. From part movement at task level (i.e. cellularization and process flow analysis) to rapid transportation between our network of industrial partners, the OC-LM team infuse real-time information systems with other Agile Logistics tenets and advanced technology to cut administrative time. For example, OC-ALC has achieved partnership status with the local DLA depot operation, ensuring access to the fastest transportation modes at Tinker AFB. The OC-LM Team's combined resources mitigate all transportation risks for the PBA. CONSOLIDATED SERVICEABLE Inventory/Consolidated Reparable Inventory Readiness Based Leveling (RBL-DQ35E) is the Air Force system designed to allocate pipeline requirements. RBL ensures that the worldwide sum of levels peace-time operating stock does not exceed computed pipeline requirements. It also allocates will fill all adjusted stock levels unless there are insufficient assets. It will keep us on track and properly size production material. It is in use today and we will incorporate PBA items quickly. Inventories will be reviewed and constantly monitored to ensure further accountability and prevent excess stock from building up on the floor. SHIPMENT ON DEMAND/DIRECT SHIPMENTS - SHIP CONTRACTOR TO USER/SHIP USER TO CONTRACTOR OC-ALC will continue the use of the EXPRESS Prioritation Processor (EPP) methods at OC-ALC. LMKAC's ERP system integrates accurate projections with material availability and production capacity to ensure shipment on demand of a particular product without disrupting the flow of another. REDUCE MILITARY SPECIFICATIONS AND STANDARDS Acquisition reform is reducing the requirement for many military specifications and standards and allowing the expanded use of commercial practices. The OC-ALC team with their industry partners will take full advantage of the use of commercial specifications and standards. All non-value added military specifications will be removed from contracts and any restrictive procedures will be evaluated and modified in a timely manner. MAXIMIZE COMMERCIAL PRACTICES OC-ALC and LMKAC members have always pursued best commercial practices to maintain a competitive edge over other aerospace companies. These practices will be [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 9
EX-10.21266th Page of 414TOC1stPreviousNextBottomJust 266th
implemented quickly to optimize support of PBA workloads. Examples of best commercial practices for PBA include: - ISO 9002 Based Practices - Point of Use Stock - Cellular Arrangement of Equipment/Tooling - Personnel Cross-training - Line-of-Sight Production Control - Process Flow Analysis - Real-Time Information System Tied to Scheduling and Inventory Control COP-2.2 CAPABILITY AND RESOURCES TO MEET BEQS AND FLOWDAY REQUIREMENTS (L-900 4.2.6, 4.3.1.2 M-900 6.1.2, TRD 3.1, 32.1) The OC-LM Industry Team has the capacity, capability, material support experience, and personnel to meet BEQ requirements and flowtimes. The demands of the PBA workload require that we provide the evaluators substantial evidence of our capacity and capability, ample resources, and proven processes to meet BEQ and flowday requirements. CAPACITY. Capacity is determined by available facility space, allocation of that space according to process or workload, and the amount of production equipment within it. Due to steadily decreasing workload over the last several years, OC-ALC backshops have sufficient capacity to absorb the PBA F100 workload with little or no additional equipment or facility modifications. Most OC-ALC backshop areas are dedicated to a particular process, such as cleaning, plating, and heat treat. These areas were designed and built to meet workload requirements, including surge, at that time. Over the years, older engines have been phased-out and gradually replaced with modern, more reliable designs. This has significantly reduced the OC-ALC workload. The result is that our major backshop process areas have sufficient capacity to absorb the PBA F100 workload and provide the required surge capacity (see FED). Similarly, frontshop floor space has been reallocated to reflect the reduction in the assembly of older engines and the corresponding increase in the newer engines (F101, Fl08, Fl10, and Fl18) as well as the F100 core workload. The equipment identified for transfer to OC-ALC will establish our capacity for the additional PBA workload. We recently reconfigured our engine shops located in the high bay area of Bldg. 3001 so all of the steel bays are in-line, with the same orientation and utilities, thereby creating generic engine bays. As workloads fluctuate, the engine shops can easily expand and contract without the usual major rearrangement time and expense. This flexible engine line is six bays deep and currently 1,200 feet long. LMKAC will be performing work on TF39 and T56 engines at Kelly, using the same facilities and equipment previously used for this work. LMKAC also provides additional capacity at their facilities for overflow and surge workloads. Existing space at Kelly, AFB, Tinker AFB and industry team plants at other locations provides sufficient production and surge capability with no risk to the production schedule. Surge capacity is detailed in COP-2.3. CAPABILITY. Capability is primarily determined by in-place processes and type/size of equipment currently in use. Our skilled work force will easily merge the PBA workload into current production operations. The majority of the processes and equipment required to produce PBA items are identical to those that we currently use on our [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 10 Source Selection Sensitive
EX-10.21267th Page of 414TOC1stPreviousNextBottomJust 267th
existing workloads. Only six pieces of equipment will be transferred from Kelly to OC-ALC to provide capability (other equipment will be transferred to increase capacity). Our teaming configuration, brings available capability to the PBA due to the large amount of equipment that is available between Kelly, OC-ALC, Standard Aero, Chromalloy, Woodward Governor, and Lockheed Martin Control Systems. Our team members currently perform repair overflow contracts for the PBA. This additional capability enhances our ability to meet PBA surge requirements. We will improve flowtimes on PBA components by implementing our current repair processes designed for similar items. For example, we will make use of unique processes such as the carbon dioxide pellet blasting system to eliminate time consuming recycles through chemical cleaning, cutting flowtime by up to 6 hours per occurrence. Potential reductions in process flowtimes will be identified using tools such as production process flowcharting, process modeling, and critical path analysis. Flowcharting and process modeling are tools used to meet production requirements and identify potential problems. In 1996, OC-ALC constructed 24 process flow-charts of our Blade and Vane Repair Facility in order to establish the framework for the construction of a computer model. This model was designed to establish the additional manpower and equipment needed to implement a four-fold increase in HPT blade workload. It was also used to determine the resources needed to integrate the TF39 low pressure turbine blade repair into our facility. OC-ALC is currently utilizing in-house engineering and contractor staff to construct computer models simulating additional engine processes within Bldg. 3001. These new computer models will include the additional workload transferred from SA-ALC. Details of our capability and experience in the repair and overhaul of engines and components are provided in Repair Operations, Section IIB-2. MATERIAL MANAGEMENT. The primary cost driver for engine maintenance is material. Therefore, it is critical to have a comprehensive material support plan. Section COP-2.8 details our plan to evaluate contract repairs for possible transition to organic repair. Section COP-3.4 describes our material management practices. PERSONNEL The OC-LM Team plans to recruit from the existing work force at Kelly to accomplish the PBA workload that will remain in place. OC-LM's personnel sustainment plans are flexible and responsive. Our Planned Labor Application (PLA) reports provide an effective management tool to provide the right number of skilled employees in the right Resource Control Center (RCC) at the right time. These reports allow our management to make key decisions concerning; - Establishing workload Personnel Equivalent (PE) requirements - Determining OC-ALC PE capability - Identifying PE variances by shop - Filling PE variances to meet BEQs - Allocating overtime - Hiring temporary personnel - Loaning in-house personnel to other shops - Hiring contract field teams The OC-LM Team has the capacity, capability, material management, and personnel resources to sustain full production for the PBA workload. COP-3.3 further details our manpower sustainment plan. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 11
EX-10.21268th Page of 414TOC1stPreviousNextBottomJust 268th
COP-2.3 SURGE REQUIREMENTS (L-900 4.3.1.3, M-900 6.2.1.2, TRD 3.6, Attachment 4) Our past performance demonstrates our ability to respond to any challenge. OC-LM has the experienced leadership, management commitment, technical skills, industrial resources, and physical capacity to meet all PBA surge requirements. Because surge requirement will inevitably arise, the Air Force requires that we demonstrate in the proposal that we have the capability and capacity (facilities, equipment, material, and personnel) to meet a 30% BEQ surge and stabilize production at this increased rate. Warfighters require a support organization staffed and equipped to meet every surge contingency. The OC-LM team is that organization. Both OC-ALC and the LM Industry Team have a long history of understanding and successfully meeting DoD requirements. The U.S. military is at the forefront of constantly changing worldwide missions ranging from peacekeeping operations and humanitarian relief to our nation's greatest challenge - major theater war. We meet this challenge by doing what it takes to get the job done today and anticipating what it will take to get it done in the future. We have the capability and resources to surge our operations to 24-hour days, 7 days a week if necessary. We have and will continue to support all of our military customers with engines and fuel accessories during routine operations as well as surges caused by: - War - Preparations for Imminent war - Urgent Damage repair - National Emergency - Peacekeeping/Humanitarian Missions All of the procedures we use for planning and implementing a surge are provided in OC-ALC Surge Contingency Plan 70. This document provides uniform guidance for supporting increased production requirements and incorporates lessons learned over the last 50 years. Examples of recent successful surge operations include: - In July 1996, increased global tasking for the E-3 Sentry required 15 TF33 engines in 14 days. This unanticipated demand drove the War Readiness Engine (WRE) levels to a low of 79% and grounded four critical aircraft. We immediately developed and executed a recovery plan to repair sufficient engines in only 15 days. This action brought WRE and base stock levels back to 100%. - In 1994, C-141 aircraft powered by TF33-7 engines were involved in airlifts to Somalia. The wing tanks were contaminated with blasting media. This contamination was passed to the engines, resulting in fuel control failures. While engineers from Warner Robins Air Logistics Center were working on the aircraft contamination, OC-ALC engineers worked to define the extent of the fuel control problems. This resulted in a command-wide replacement of fuel controls supported by a successful increase in production at Tinker. - Standard Aero was awarded the USAF T56- A-15 RGB Overhaul contract in 1991. Within 8 months, we implemented a production capacity plan to increase production volumes from 3 units to 32 units per month and successfully met surge requirements up to 50 units per month. - Chromalloy was awarded the TF39 1st and 2nd stage High Pressure Turbine (HPT) blade repair contract in 1992. Sufficient management and production personnel were assigned to the program. However, when requested to increase production to meet emergency surge requirements, Chromalloy expanded shifts and hired additional qualified personnel in relatively [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 12 Source Selection Sensitive
EX-10.21269th Page of 414TOC1stPreviousNextBottomJust 269th
short time. These measures were taken at no cost to Government and ensured a level of production matching SA-ALC's aggressive engine build schedule. Even during normal operations, our flexible capacity and personnel constantly respond to "mini-surges" created by workload fluctuations, in-service damage repairs, Time Compliance Technical Orders (TCTO), safety of flight concerns, ENMCS, environmental compliance issues, and incorporation of new technologies into the repair process. OC-ALC recently reconfigured engine shops located in the high bay area of Bldg. 3001 at Tinker to create a flexible engine line. As workloads fluctuate, the engine shops can easily expand and contract without major rearrangement time and expense. The LMKAC move to use Kaizen techniques, cellular parts flow management, and cross-trained personnel in the repair process at Kelly increases our responsiveness to surge requirements. Three key elements are required for successful surge response: - Material Support - Multi-Skilled Labor - Facility and Equipment Capacity COP-2.3.1 MATERIAL FOR SURGE SUPPORT (L-900 4.3.1.3, M-900 6.2.1.2, TRD 3.6, Attachment 4) The capability to obtain additional material is a critical element of surge support. The OC-LM plan provides a balance between maintaining sufficient stock levels to support a surge condition and avoiding storage of excess materials to reduce cost. OC-ALC's material support plan is fully described in Section COP-3.4. LMKAC will implement the following actions to obtain needed material: - Use supply expeditors who work closely with AFMC Item Managers and Lockheed Martin's Aeronautics Material Management Center, and seek additional outside sources - Request assistance from the Standard Base Supply System at user command bases - Local manufacture COP-2.3.2 LABOR FOR SURGE SUPPORT (L-900 4.3.1.3, M-900 6.2.1.2.1, TRD 3.6, Attachment 4) The OC-LM Team has a skilled, experienced, and highly motivated workforce that has demonstrated the ability to meet the most demanding challenges. Existing space will be allocated to enhance production by adding work stations as required. New work stations will be filled by personnel with secondary skills in engine maintenance from other non-surging areas. To facilitate this type of movement, we maintain a database of primary and secondary employee skills. Our commitment to "multi-skilling" (cross training and certification of our workforce) enables us to rapidly and smoothly shift manpower as needed. The OC-LM Team has the full resources of OC-ALC, Lockheed Martin, Chromalloy, Standard Aero, and Woodward Governor available to respond to, meet, and exceed the 30% surge requirement. Our extraordinary depth of multi-skilled personnel allow us to: - Operate multiple shifts - Move people from one engine or component line to another - Move people from one facility to another - Utilize LMKAC's Network of Shop Support/Contract Field Teams [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 13
EX-10.21270th Page of 414TOC1stPreviousNextBottomJust 270th
COP-2.3.3 FACILITIES AND EQUIPMENT SURGE CAPACITY (L-900 4.3.1.3, M-900 6.2.1.2.2, 6.2.1.2.3, TRD 3.6, Attachment 4) Since both SA-ALC and OC-ALC are primarily propulsion overhaul depots, the facilities and equipment used are very similar. OC-ALC's engine back shop facilities have 56% available capacity and will easily accommodate F1OO, F100 C&A, and airframe fuel accessories. A recent capacity analysis clearly shows that existing facilities will accommodate the F100 workload including the required 30% surge. Facility and Equipment Data describes in detail the facility, buildings, shops, processes, and equipment used to support PBA workload. Based upon our maximum potential capacity, Figure COP-2-6 displays our utilization at both OC-ALC and LMKAC facilities after incorporating the PBA workload. To increase the production output of facilities and equipment, we first look at methods to increase the time they are in use. For example, most of our shops are currently working one shift, 5 days per week. Going to a two-shift, 12 hour per shift operation results in a 50% increase in output of a facility and increases the productive utilization of equipment. In the event of a surge, we have the ability to add additional work positions within existing facilities. These new positions would be filled by personnel from other, non-surging areas or by new hires. Our approach to accommodate surge requirements on the TF39 and T56 at SA-ALC is based on using cell configurations for efficient product flow. The cell arrangement is designed to support both BEQ and unplanned surges with minimal facility space, thereby allowing us to expand as quantity requirements increase. Additionally, we can increase our facility and equipment capacity utilization by initiating two or three shift operations. In this situation, we recognize the increased equipment and facility demands necessitate increased maintenance support. Our maintenance program addresses this requirement in Section COP-4. [Download Table] OC-ALC PBA TOTAL MAXIMUM STANDARD STANDARD STANDARD POTENTIAL ORGANIZATION HOURS (1) HOURS (1) HOURS CAPACITY (2) % UTILIZATION ------------ --------- --------- --------- ------------ ------------- OC-ALC/LP 2,150,541 1,141,521 3,292,062 5,441,432 60% OC-ALC/LI 1,765,364 409,745 2,175,109 3,424,942 64% OC-ALC 3,915,905 1,551,266 5,467,171 8,866,374 62% LMKAC 1,632,735 1,632,735 6,905,843 24% (1) Based on OC-ALC Programmed Labor Application (PLA) and OC-ALC PBA labor standards for FY99. (2) Maximum Potential Capacity based on Joint Cross Service Group-Depot Maintenance (JCSG-DM) Data, Paragraph 1.3, 16 May 95. FIGURE COP-2-6 OC-LM FACILITY AND EQUIPMENT CAPACITY SUMMARY OC-LM facilities and equipment offer sufficient capacity to meet PBA workload. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 14 Source Selection Sensitive
EX-10.21271st Page of 414TOC1stPreviousNextBottomJust 271st
COP-2.4 TRACKING OVER AND ABOVE (O&A) (L-900 4.3.3, M-900 6.2.1.3.1, 6.2.1.3.1.1, 6.2.1.3.1.2, 6.2.1.6.l, TRD 3.11) The OC-LM team approach to tracking O&A repairs accurately distinguishes between work specification, O&A, and warranty items. Unique Program Control Numbers (PCNs) are used to identify both programmed and non-programmed O&A workload allowing us to successfully apply proven Air Force systems to accurately track all PBA O&A repairs. To avoid price escalation, we must have a plan to track O&A work, CWS specified work, and warranty work; and to provide the customer clear visibility and the opportunity for interaction. Our O&A approach includes tracking and visibility of all work accomplished that is not priced separately in the Exhibit Line Items by NSN and as directed by the Administrative Contracting Officer (ACO). Accurate tracking of non-programmed O&A workload is essential to controlling the cost of programmed PBA workload. Using existing Air Force systems, we will separate the labor and material costs associated with O&A work from programmed work to ensure O&A will not inflate the negotiated price of programmed repairs. There are two distinct types of O&A work: - End Items that were not Priced in the Proposal - Work Requirements that were not Specified in the Technical Data at the Time of Contract Award and thus not Included in the Bid Price OC-ALC controls permanent work specification items by establishing Program Control Numbers (PCN) for each component, based on technical order instructions and Contractor Work Specification (CWS) requirements. The PCN allows tracking of actual labor and material charges against the planned charges. Within that PCN, we generate a labor and material plan specific to that end item. Low or sporadic requirements for end items, which are not part of the permanent work specification, will be accomplished as O&A work. Items originally worked as O&A may later become part of the permanent workload if sufficient and stable requirements arise. For this repetitive workload, a firm fixed price will be negotiated with the ACO, the contract will be amended, and we will establish permanent PCNs for those items. OC-LM will establish unique PCNs for each of the following known O&A items to ensure accurate tracking. - Engineering Investigations - Technical Assistance for Modifications and Upgrades - Repair of Components or Engines with Sporadic, Low-Volume Demands Including Items Listed in TRD Attachment 1 - Removal of Items from Inactive Status to Return Them to Active Status - Servicing and Preservation of Engines or Components Prior to Placement in Inactive Status - Verification of New and/or Unpublished Technical Orders/Directives - TCTOs not Listed in the TRD or CWS - Fabrication of an Item From Raw Materials or Components - Repairs to Reusable Shipping Containers and Trailers - Authorized Processing of Components or Engines to Obtain (Reclaim) Parts or Components O&A work will also include non-programmed work discovered during the course of [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 15
EX-10.21272nd Page of 414TOC1stPreviousNextBottomJust 272nd
performing overhaul, maintenance, and repair that meets the following criteria: - Within the General Scope of the Contract - Necessary to Satisfactorily Complete the Contract - Not Covered by an ELIN in Exhibits B - E All O&A workload requirements will be negotiated with the ACO and written authorization to proceed will be received from the ACO prior to commencement of work whenever possible, but never later than completion of 40% of the work. Once written funding authorization is received from the ACO, a project order will be issued. Production Division personnel will initiate a Temporary Work Request, AFMC Form 206, annotated as O&A in Block 20, Special Instructions. Then a Temporary Job Record will be generated in the AFMC G004L system to track the associated labor and material cost of each AFMC Form 206. The ACO will have visibility of these costs through access to the G004L system. A 2-year history of all Temporary Work Requests will be maintained at our facility. Unique PCNs will also be established for non-programmed O&A work for each weapon system to accurately identify funding, establish workload projections, and accumulate historical data. Our approach will also ensure complete and accurate tracking through all pertinent funding and workloading systems. Warranty workload will be inducted under a warranty unique PCN. This allows us to perform repairs required by Product Quality Deficiency Reports (PQDR) without charging our customer. If the PQDR investigations reveal defects that are not covered by the applicable warranty, then the investigation, reporting, and corrective actions will be handled as O&A. Tracking O&A on TF39 and T56 PBA Engines and Components Repaired at Kelly AFB After PBA contract award and during the time when logistics management functions remain at Kelly, LMKAC will continue using the existing procedures developed by SA-ALC to manage and track O&A repair requirements as described previously: - To recover the value of the serviceable item, a repair approach/process will be developed by LMKAC production personnel and provided to the Government CEA. - The repair workscope will be evaluated and approved by the CEA, who will provide required documentation to the ACO for approval - The ACO will notify LMKAC in writing (via DoD Form 1155) when a discrepancy has been approved for repair as O&A and provide required funding documentation - O&A items awaiting disposition authority will be tagged as such and segregated from other workload items - Work will be accomplished using a Temporary Work Request, AFMC Form 206, annotated as O&A to ensure accurate funding and tracking Once the logistics management function moves to OC-ALC (by June 2001), the O&A process will remain the same. One exception is the technical agency for workscope and labor hour agreement will be the local Defense Contract Management Command (DCMC) representative, the maintenance liaison representative or the CEA as determined by the ACO. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 16 Source Selection Sensitive
EX-10.21273rd Page of 414TOC1stPreviousNextBottomJust 273rd
COP-2.5 RISK MANAGEMENT (L-900 4.3.4 and M-900 6.2.2, 6.2.3, 6.2.3.3, 6.2.4.3.3) The OC-LM Team provides the lowest risk for the continued successful overhaul, repair, and modification of the PBA workload. Our combined military experience, skills, and resources with extensive industrial capabilities, commercial practices, and the experience of the private sector partner provides the lowest risk possible to PBA customers. To ensure sustainment of the warfighter, we must identify risk areas associated with continuing operations, systematic improvements of processes, and any additional workloads. We must also provide a credible approach for managing those risks. Our Executive Risk Management Board, including senior leaders from OC-ALC and Lockheed Martin will continue to meet quarterly during continuing operations to review status of potential risks and update mitigation strategies. More frequent reviews will be conducted if it becomes necessary. This senior level group has the experience, resources, and the authority to ensure production related problems do not impact our customers. Risk analysis and management will continue to be a critical part of the OC-LM program management function throughout the life of the PBA contract. Our risk-management approach is a dynamic tool that is flexible, forward looking and readily adaptable to continuing repair operations. Our approach is tailored to the PBA workload and firmly based on the Air Force principles of good risk management and industry best practices. Our risk-management process identifies risk areas that may negatively affect program requirements and provides credible methods for mitigating those risks. Figure COP-2-7 illustrates our organized risk-management process. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 17
EX-10.21274th Page of 414TOC1stPreviousNextBottomJust 274th
[CHART] FIGURE COP-2-7 RISK-MANAGEMENT PROCESS. Our risk-management process continuously identifies, analyzes, tracks, and mitigates risks ensuring that we keep the PBA risks low. The OC-LM team conducted a program risk assessment paralleling the assessment San Antonio prepared in response to AFFARS Appendix AA-107 (e)(7). We analyzed the program risks by evaluating the probability and consequence of each risk and combining them in an organized and a consistent manner. We then classified the program risks using the required classifications (RFP L-900.3.1.c and M-900.4.5.2 (a)). For all program risks classified as Moderate or High, we developed mitigation plans to reduce those risks to Low. Our primary focus and mitigation efforts centered on potential risks impacting: - Customer Support - Facilities - Equipment and Tooling - Personnel - Material Support OC-ALC's production engineering branch is responsible for projecting facility, process, and equipment needs for the future. These engineers and planners are in daily contact with production personnel. This close working relationship promotes early identification of potential problems. They perform risk analysis to identify and prioritize these requirements and submit projects into our Five-Year Facility Plan and our Three-Year Capital Purchase Program. These forward-looking plans mitigate risk by ensuring that our production shops are ready for potential future changes, such as: workload fluctuations, new workloads, and changing environmental regulations. We have an excellent track record of anticipating potential future risks and taking prudent action in advance to ensure we are not caught unprepared. A few examples include: - High Pressure Water Jet Stripping to Reduce use of Hazardous Chemicals and Flowdays - Flexible Engine Line to More Readily Accommodate Fluctuating Workloads - Elimination of Cyanide and Cadmium in our Plating Facility to Reduce Environmental Risks [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 18 Source Selection Sensitive
EX-10.21275th Page of 414TOC1stPreviousNextBottomJust 275th
- Replacing Vapor Degreasers with Industrial - Part Washers Using Biodegradable Solvent to Reduce Dependence on Heavily Regulated Solvents - Establishment of Shop Service Centers (SSC) to Improve Material Support A Maintenance Planning Working Group (MPWG) reviews and directs the life management and maintenance planning and risk strategy for each engine. Plans are defined and based on direct interface and inputs from using commands. The MPWG then determines the objectives and content of an efficient, effective maintenance program as well as operational verification processes. Risk strategies and analysis center around: - A Maintenance Plan to Balance Calculated Life Cycles - Proposed Increases to Actual Durability Limits - Inspection Requirements with Economic Considerations - Inherent Safety and Reliability Levels of the Equipment - Restoration of Safety and Reliability when Deterioration has Occurred - Redesign of those Elements Whose Reliability is Inadequate - Actions Geared to Minimal Cost Each Shop Replaceable Unit (SRU) and engine is rated and monitored to ensure that a safe, supportable, cost effective plan stays on track. Monitoring the success of these risk elements is done through quarterly reviews of Unscheduled Engine Removal (UER) and G050 (flightline) reliability data. UER data are also reviewed monthly. Additionally, two component improvement conferences and one users conference are held annually. Risk analysis is also a critical part of our program managers' function. We will continue to use a template designed by the Propulsion Product Group Manager (PPGM) for Engine Life Management Plans (ELMP) for all propulsion weapon systems. OC-ALC's ELMP is a documented process, which continuously assesses the field performance of engine components to ensure best practices are used to achieve safety, performance, reliability, and total life cycle cost goals. Program level risk elements will be managed using these ELMPs, defined PMR criteria, and biweekly updates to the program director. Biweekly updates to the PPGM, OC-ALC Program Director, Production Division managers, and LMKAC managers provide an all encompassing look at each engine program and ensures that current major issues and future risks are being worked at the appropriate levels. The following are continuing operations risks we are tracking. Some are projected to continue from the transition phase and some are unique to continuing repair operations. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 19
EX-10.21276th Page of 414TOC1stPreviousNextBottomJust 276th
[Download Table] DESCRIPTION: CUSTOMER SUPPORT MITIGATION STRATEGY: Achieving throughout for all contract - Reduce flowtime and increase years throughput - Continue use of multiple repair Warfighter on ground awaiting sources engines or components. - Hire key skilled Kelly personnel - CFT augmentation - Facilities designed for increased efficiency PROGRAM RISK ASSESSMENT: HIGH MITIGATED RISK ASSESSMENT: LOW DESCRIPTION: FACILITIES, EQUIPMENT, MITIGATION STRATEGY: AND TOOLING - Second source capability - Commitment of OC-LM team members to Loss of access to critical prioritize use of all available facilities as a result of natural resources disasters, accidents, or sabotage PROGRAM RISK ASSESSMENT: MODERATE MITIGATED RISK ASSESSMENT: LOW DESCRIPTION: PERSONNEL (OC-ALC) MITIGATION STRATEGY: - Comprehensive recruiting and hiring Insufficient qualified personnel to plans sustain production and quality - Cross-utilization training requirements - CFT augmentation as required PROGRAM RISK ASSESSMENT: MODERATE MITIGATED RISK ASSESSMENT: LOW DESCRIPTION: PERSONNEL (LMKAC) MITIGATION STRATEGY: - Cross-utilization training within Insufficient qualified personnel to product lines sustain production and quality - Cross-flow between product lines requirements - "Grow your own" partnership with local Vocational Technical, A&P and other schools - Utilize Lockheed Martin CFT resources - Provide industry competitive wages and benefits PROGRAM RISK ASSESSMENT: MODERATE MITIGATED RISK ASSESSMENT: LOW [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 20 Source Selection Sensitive
EX-10.21277th Page of 414TOC1stPreviousNextBottomJust 277th
[Download Table] DESCRIPTION: MATERIAL MITIGATION STRATEGY: Insufficient material available to - Proactive partnering with DLA sustain required production. - Use in-place USAF material systems - Use existing material planning systems and replacement factor experience of industry team - Implement Repairability Forecast Model to automate parts forecasts - Use Lockheed Martin access to resources - Use local purchase/local manufacture PROGRAM RISK ASSESSMENT: HIGH MITIGATED RISK ASSESSMENT: LOW DESCRIPTION: MATERIAL MITIGATION STRATEGY: - Established liaison responsibility Disruption of production due to not with DLA and OC-ALC item managers maintaining piece part support from for piece parts forecasting DLA and USAF stock - Agile logistics tenets to meet customer needs on demand PROGRAM RISK ASSESSMENT: HIGH MITIGATED RISK ASSESSMENT: LOW DESCRIPTION: COST SAVINGS MITIGATION STRATEGY: Continuing operations cost objectives - Use DCAA approved cost system not met. - Capture direct and overhead savings - Exploit savings from additional work by industry team - Redesign operations to incorporate best industry practices PROGRAM RISK ASSESSMENT: MODERATE MITIGATED RISK ASSESSMENT: LOW DESCRIPTION: COMPUTER CONTROLLED MITIGATION STRATEGY: RESOURCES - All team members have on-going Y2K programs Year 2000 Compliance (Y2K) - Currently evaluating all systems, Disruption in management systems machines, and equipment. PROGRAM RISK ASSESSMENT: MODERATE MITIGATED RISK ASSESSMENT: LOW SCENARIO-BASED TESTING To aid our risk identification efforts and measure our performance, OC-ALC routinely performs base-wide "war games" that provide an opportunity to evaluate our plans and responses to threats such as wars, natural disasters, accidents, and terrorism. Scenarios are created to simulate these threats. We must [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 21
EX-10.21278th Page of 414TOC1stPreviousNextBottomJust 278th
respond to these scenarios in a timely manner with a plan to keep production going. Responses might include: - Moving the Workload to a Different Location within OC-ALC - Moving the Workload to a Lockheed Martin Team Member's Location - Quick, Short Term Contracts to Outside Vendors (Over $2,500.) - For Low Cost (Under $2,500.) we can use a Credit Card to Purchase Materials or Services Due to the extensive facilities and equipment available to the OC-LM Team, we have multiple options. These options can be exercised rapidly because they are directly under our control. This gives us the ability to provide a fix to problems with no impact to the customer. In addition, some of our processes use hazardous materials. Although every reasonable safety precaution is incorporated in the process, there is always the possibility that something could go wrong. To ensure that an accident is handled correctly, simulation exercises of equipment malfunctions and/or hazardous chemical spills are performed periodically. Our military police, fire department, environmental, and safety offices respond, and are evaluated on their performances during these exercises. A team from the Office of the Inspector General (IG) evaluates the exercise. This IG team determines the effectiveness of the response teams' reactions. The exercise is evaluated, recommendations for improvement are presented, and the approved recommendations are implemented. COP-2.6 SMALL BUSINESS PLAN (L-900 4.3.2, M-900 6.2.5, 6.2.5.1, 6.2.5.2) Oklahoma City Air Logistics Center has a strong commitment to Small Business, Small Disadvantaged Businesses, and Women-Owned Small Businesses. The Small Business contract awards we have made in the last few years are conclusive proof of our commitment. The OC-ALC small business approach involves the cooperative efforts of all organizations in the acquisition process. Small Business has continually demonstrated leadership and excellence in responding to the diverse contracting needs of this center and the nation as a whole. The OC-ALC small business program increases small business participation in all areas of the national defense industrial base. OC-ALC LPP Production Division personnel have proven their commitment to Small Business, Small Disadvantaged Business, and Women-Owned Small Business by purchasing equipment exceeding $5.6 million from small business concerns within the last 4 years (Figure COP-2-8). Much of the equipment purchased for use in our repair shops is bought from small businesses. Aerospace manufacturing and repair technology is a very specific market; many new technologies are developed by small businesses trying to find a niche in the market. Lockheed Martin also has a strong commitment to meeting Public Law 95-507 requirements as implemented by federal procurement regulations such as the Federal Acquisition Regulations (FARs). Their business practices and procedures conform to these federal laws and regulations. In support of this commitment, a Small, Small Disadvantaged and Women-Owned Small Business Administrator has been designated in the Company purchasing office to provide direction and monitor results on an overall corporate basis. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 22 Source Selection Sensitive
EX-10.21279th Page of 414TOC1stPreviousNextBottomJust 279th
[Download Table] 3 each Vacuum Furnaces in 1996 $1.402 million 3 each Braze Furnaces in l994 $1.794 million 2 each Fluoride Ion Cleaning Systems in 1994 $1.548 million 1 each Laser Cladder 1995 $0.941 million -------------- TOTAL $5.685 million FIGURE COP-2-8. SMALL BUSINESS EQUIPMENT PURCHASES A partial list of the equipment OC-ALC has purchased from small businesses over the past four years. PRO-ACTIVE APPROACH OC-ALC's Small Business Office ensures we act proactively to increase involvement of SB concerns in worldwide mission support (Figure COP-2-9). We have added at least one historically underutilized business (HUB) and one woman-owned business (WOB) to all competitive requirements except in those instances when no HUB or WOB had met specified qualification requirements. Our $50M simplified acquisition of base engineering requirements (SABER) contract was a competitive procurement under Section 8(a) of the Small Business Act. The source selection authority awarded this contract to Federal Constructors Inc., which is both HUB and WOB. The following is a description of the efforts Lockheed Martin will make to assure that Small, Small Disadvantaged and Women-Owned Small Business will have an equitable opportunity to compete for subcontracts: - Develop and Maintain Bidder's List of Business Concerns from All Possible Sources - Structure Procurement Packages to Permit Small Business Concerns Participation to the Maximum Extent - Include Small Business Concerns in all Solicitations for Products or Services - Review Solicitations to Remove Statements, Clauses, Etc., Which May Tend to Restrict or Prohibit Small Business Concerns Participation - Periodically, Rotate Potential Subcontractors on Bidder's Lists - Establish and Maintain Records of Solicitation and Subcontract Award Activity - Attend and or Arrange for Attendance of Company Counselors at Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, etc. - Conduct and Arrange for Motivation Training for Purchasing Personnel Regarding the Support of the Small Business Program Pursuant to the Intent of Public Law 95-507 - Monitor Attainment of Proposed Goals. - Prepare and Submit Subcontracting Reports as Required - Establish and Maintain Contact and Communications with other Lockheed Martin Companies Where Opportunities to Support, Implement, or Enhance the Program Activities Exist or may be Developed. RAPID ACCESS TO INFORMATION Contracting and Small Business Office home pages on the Internet provide Small Business rapid access to information about contracting opportunities, tools to improve their competitive position, and points of contact to obtain additional data. The OC-ALC Small Business Office conducted the third annual comprehensive contracting conference in April 1998. More than 300 businesses were on hand to learn how to better compete for contracts with the government. Lockheed Martin uses the Internet, company and corporate source list, which is enhanced by: [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 23
EX-10.21280th Page of 414TOC1stPreviousNextBottomJust 280th
- Attending and Hosting Small Business Trade Fairs - List of Contractors Identified in the Bidder's Library - National Minority Purchasing Council Vendor Information Service - Research and Information Division of the Minority Business development Agency in the Department of Commerce - Trade Associations - Other Data that identify small business concerns. SUCCESS IN NON-TRADITIONAL AREAS We have consistently met or exceeded our small business goals in our DoD contract. Average over all contacts, as reflected on our last Standard Form 295, was 79.0%. The Small Disadvantaged concerns averaged against these contracts was 8% A recent small business compliance review, performed by DCMC, rated our small business program highly successful. We are proactive in our approach to increasing involvement of Sma11 Business. An example of a successful initiative in an area we previously considered non-traditional (historically underutilized) for SB is a $17.1 million contract to King Aerospace, HUB, for contractor logistics support for E-9A aircraft. Another example of aggressive, cooperative initiatives involved manufacture of test program sets for B-2 aircraft. OC-ALC awarded a $1.5 million 8(a) contract to a HUB, Advanced Testing Technologies Inc., and two contracts to SB, $16.2 million to RJO Enterprises and $6.9 million to Comarco. Source development has resulted in several requirements being set-aside for SB ranging from $1 to $7 million. Examples are a $6.7 million contract awarded to Omega Inc. for manufacture of turbine blade sets and a $4.5 million contract to Electro-Methods Inc. (EMI) for a case and vane assembly. OC-ALC proactivism in establishing indefinite-delivery indefinite-quantity (IDIQ) contracts for SB is demonstrated in the following awards, estimated at $10M each to: - Associated Aerospace, WOB, to manufacture divergent seals for F110-100 and F110-129 engines - Columbia Manufacturing for seals for the #1 bearing for F101 and F110 engines. Other successful SB source development efforts in the overhaul/repair area include: - EMI for F101-GE-102 front frames - EC Technologies for 1st stage turbine blades for TF-33 - TQ Machining for F101 high-pressure shroud segments ($10.4M contract) - Keystone Engineering Company for E-3 antenna pedestal turntables (10-year contract estimated at $32.3M). These small business contractors utilize the same types of skills as are present in the DoD Maintenance Depots, from general laborers to highly skilled aerospace technicians. The OC-ALC Small Business office has worked toward the goals set by AFMC for small business contracts during FY97 and have met or exceeded those goals. We are well on the way to similar results for FY98 as shown in Figure COP-2-9. SMALL BUSINESS SUBCONTRACTOR WORKLOAD INTEGRATION Because much of DoD's contracting is for major weapon systems, great emphasis is placed on providing subcontracting opportunities for small businesses. Virtually every DoD contract over $10,000 contains a clause committing the contractor to allow qualified small businesses and small disadvantaged businesses to participate. Before a contract over $500,000 ($1 million for construction) can be awarded to a [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 24 Source Selection Sensitive
EX-10.21281st Page of 414TOC1stPreviousNextBottomJust 281st
large contractor, that contractor must submit a subcontracting plan which includes goals for the [CHART] FIGURE COP-2-9 SMALL BUSINESS CONTRACTS. OC-ALC Small Business Office distribution of contracts by percent. Note that all goals were met or exceeded OC-LM's PBA small business goal will be 10.5% of Depot Maintenance Area Group purchased services, materials, and equipment. utilization of small businesses and small disadvantaged businesses as subcontractors. All subcontracts over $10,000 have Federal Acquisition Regulation clause 52.219-8 flowed down to them in the procurement package. COP-2.7 ADDITIONAL WORKLOAD (L-900 4.3.5, M-900 6.2.4) OC-ALC is proactive in looking for additional workload to offer organic support to military customers. The introduction of additional organic workload is the result of our aggressive effort to improve our future posture and introduce new technology. Additional organic workload is directed to OC-ALC through Source of Repair (SOR) posturing decisions or development of new technology to bring work off contract repair, or workload awarded through competition. Our commitment to customer support is not diluted by the introduction of additional workloads. We maintained the highest level of support to all our customers. During transition of 2LM and the Navy F110-400 and TF30-414 engine workload transfers, customer support was maintained for all our customers. The introduction of additional workload benefits all our customers with lower sales prices for repair work. Reduced sales prices are achieved by spreading overhead costs across a larger workload baseline. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selective Sensitive 25
EX-10.21282nd Page of 414TOC1stPreviousNextBottomJust 282nd
During the last 50 years of operations, OC-ALC has demonstrated he ability to transition workloads successfully with minimum impact to the customer. Our organic depot infrastructure is common to Air Force customers and offers flexibility for other DoD and Foreign Military Sales (FMS) customers. One of the key reasons we decided to partner with the Lockheed Martin Industry Team was their ability to bring additional workload into the Kelly facilities. For example, Lockheed Martin is the current incumbent on the KC-10 CLS program. The KC-10 uses the CF6-6, which is a commercial derivative of the Air Force TF39 engine. Lockheed Martin will investigate the possibility of including this compatible workload with the other workload at Kelly in the future. The Lockheed Martin Industry Team intends to expand the operation at the Kelly facilities to include non-PBA engine parts and accessory work without interference to their core mission, the PBA teaming workload. All of the Lockheed Martin Team members are seeking to expand their business base and view the LMKAC activity as a low-cost facility to attract the expanding commercial market as well as non-PBA military work, both U.S. and FMS. Lockheed Martin Aircraft & Logistics Centers maintain aircraft for U.S., FMS, and commercial customers. For aircraft maintenance contracts that include responsibility for the engine as well, Lockheed Martin Aircraft & Logistic Centers intends to eventually subcontract the overhaul and repair of these engines to LMKAC instead of the various sources they currently use. Standard Aero provides overhaul and repair services for several models of engines from various manufacturers, and intends to develop Centers of Excellence and establish new capability at LMKAC for specific engine models. Standard Aero is currently bidding on two Navy T56 contracts (RFP # N00019-98-R-0007 & N00383-97-R-0092) with an estimated value of $790 million over a four year period. Scheduled for award in 1998, these contracts cover a wide range of T56 parts from major modules and power sections to piece parts. If either of these contracts are awarded to Standard Aero, San Antonio will be highly considered to perform some of the workload. Chromalloy Gas Turbine Corporation is continually expanding its parts repair business, especially in the commercial world. Chromalloy will also use the Kelly facility as a Center of Excellence plus expand its capability at Midwest City, OK and at other nationwide facilities. The Woodward Governor Company and LM Control Systems' rapid expansion, especially on the GE family of commercial engines, requires new facilities. The LMKAC facility will fill this requirement. All of these large industry service companies will provide a significant increase in the utilization of the LMKAC facility. This will allow the PBA Redeterminable Price provision to provide significant reductions of ELIN prices as this large, incremental work materializes at LMKAC. COP-2.8 PBA REQUIREMENTS UNDER SEPARATE CONTRACT (M-900 6.2.1, TRD 2.4, 3.1.1) Material supportability is enhanced through careful selection of components for transition from contract repair to organic repair. Through a systematic review of all repair contracts, our plan ensures that BEQ requirements are met. Transition of contract repair, to organic or LMKAC repair requires stringent material and process planning. With continued focus on customer support, our approach to managing contract items allows us to continue existing contracts, initiate new contract repairs, terminate existing contracts, and/or pursue organic repair. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 26 Source Selection Sensitive
EX-10.21283rd Page of 414TOC1stPreviousNextBottomJust 283rd
OC-ALC has developed a database of current PBA repair contracts. This database prioritizes transition of contract work, considers penalty and option clauses, and then incorporates them into a milestone chart. Figure COP-2-10 and Figure COP-2-ll detail our contract repair plan. INITIAL SCREENING - Penalties/How to Avoid Them - Options/When to Exercise Them - Fine Print/Surprises that could Create Bottlenecks - Questions/Clarification/Time Constraints CLASSIFICATION OF REPAIR - Simple - Complex - Similar - No Previous Capability - Other TOOLING AND EQUIPMENT - Identified - Provided MILESTONES - Options/When to Exercise Them - Termination/Timeline Established - Re-solicit Requirement - Dual Repair/Leave on Contract and Bring "In-House" - Other/Best Mix of Contract and Organic - Flexibility Built in for Quick Response FIGURE COP-2-10 CONTRACT REPAIR PLAN Our plan provides triggers to keep us on track. It provides flexibility and the ability to ramp-up and improve WRE levels and ENMCS rates. While OC-ALC retains PBA certified vendors and their existing contracts, our phased approach seeks to move most contract repair items to organic capability. We may continue contract repair, terminate the contract and begin organic repair, leave on contract and repair organically (dual repair), or initiate other new repair contracts. With the future transition of program management functions to OC-ALC, supply support plans are improved. On site item management functions ensure that not only will PBA requirements be met, but also worldwide support of the warfighter remains paramount. The "program" approach facilitates an interface with existing resources and adds flexibility that can only amplify PBA success. - Ramp-up Efforts are Eased - Transition Risk is Minimized - Full Production Occurs Faster - Surge Capability Becomes Possible. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 27
EX-10.21284th Page of 414TOC1stPreviousNextBottomJust 284th
[CHART] FIGURE COP-2-11 CONTRACT EVALUATION FLOWCHART. All existing contracts will be reviewed prior to expiration for possible transition to the OC-LM Team. Our primary goal is provide the lowest cost/best value components for the warfighter. Our review process ensures a month by month timeline of actions, to include exercise of an option, termination, or retention of the contract to augment dual repair efforts. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 28 Source Selection Sensitive
EX-10.21285th Page of 414TOC1stPreviousNextBottomJust 285th
COP-3 PRODUCTION MANAGEMENT (L-900 4.2.6.1) OC-LM Team has the production management experience to direct its technical experts and production workforce in the PBA repairs. Our team already successfully performs these repairs on the TF39, T56, F100, and associated accessories. We will ensure that all PBA requirements are met on time and within budget. To ensure support to the warfighter, the PBA Source Selection evaluators require evidence that the OC-LM Team has the management experience to direct the technical expertise necessary to perform in production quantities the repairs necessary to support the PBA workloads. The AFMC Commander and staff directly support OC-ALC's depot business operations. The Commander at OC-ALC manages depot operations through the propulsion and commodities directorates and has sole responsibility for the program management and maintenance support of weapon systems managed at this depot. A top-level organizational chart is shown in Figure COP-3-1, illustrating the structure of our OC-LM Team. Workload management during continuing operations will be handled by our LP-1 team - the hub of our PBA workload IPT. This dedicated team of individuals focuses on the PBA workload - its cost, schedule, and performance - to ensure commitments are attained. Our organization includes individuals with expertise from the following areas as well as representatives from DCMC and the Program Office depot maintenance liaison: [CHART] FIGURE COP-3-1 ORGANIZATIONAL CHART. The OC-LM Team is structured to bring together the best of the best in the engine and commodities overhaul/repair business. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 29
EX-10.21286th Page of 414TOC1stPreviousNextBottomJust 286th
- Product Management - Workloading - Subcontract Management (Depot Repair) - Data Management - Budget - Cost Analysis - Material - Quality - Industry Partner Liaison During continuing operations, we will operate in two locations - OC-ALC for the F100 engine, accessories, and the airframe accessories and Kelly for the TF39 and T56 engines and accessories. Organized as a separate entity under the management of Lockheed Martin Aircraft & Logistics Centers, LMKAC is the single Office of Prime Responsibility (OPR) to OC-ALC for accomplishing TF39 and T56 2LM, repair operations and related accessory repair at Kelly AFB. Each of LMKAC's associate subcontractors will apply their management, production, quality, and technical expertise to ensure that all of OC-ALC and DoD requirements are achieved. These management personnel will report to the Managing Director of LMKAC. For ease in management and monitoring, our organizations it each location are similar in structure. F100 PBA workload will be accomplished within the Propulsion Management Directorate at OC-ALC. Our various branches provide functional expertise in the overhaul and repair of the F100 engine and components. Our Commodities Management Directorate is responsible for the F100 C&A workload as well as the airframe fuel accessories. To ensure program execution stays within cost and schedule, our OC-LM team accomplishes crosschecks on a continuous basis. Our production management efforts are enhanced through various meetings occurring daily, weekly, quarterly, and annually. These meetings provide the forum for production scheduling, parts support, maintenance support, cost control, and many other issues impacting timely production of engines and components. These meetings provide management information for decisions to avoid or resolve problems that negatively affect production. Some of these meetings include: - Staff Meetings - Parts Reviews - Technical Reviews (for TCTOs, modifications, etc.) - Annual Work Specification Reviews - Quarterly Workload Negotiations - Quarterly CC Metric Indicators Review Lockheed Martin Production Management Lockheed Martin and its industry partners bring numerous strengths to meet PBA's production management and sustainment requirements. To highlight a few, they bring: - Key personnel with years of repair and overhaul experience who are knowledgeable in the areas of transitioning and managing DoD programs, optimizing repair processes, and realigning facilities/equipment without disrupting production - A lean, surge-responsive organization with low overhead and high direct labor applied to engine-dedicated business units and product cells - A computerized management information system that interfaces with current Air Force [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 30 Source Selection Sensitive
EX-10.21287th Page of 414TOC1stPreviousNextBottomJust 287th
systems, allowing us to effectively coordinate activities with OC-ALC. - Pre-planning and early coordination to identify major repairs and required material support to sustain production and improve WRE levels and ENMCS rates - Use of repair-oriented metrics that provide both LMKAC and Government managers real-time visibility of program status The Lockheed Martin industry team intends to fill key management, supervisory and overhead positions with a mix of incumbent personnel from Kelly and their respective companies (i.e., Lockheed Martin, Chromalloy, Standard Aero, and LMCS/Woodward Governor). This combination blends commercial best practices into our processes, while retaining the resident TF39 and T56 expertise. Lockheed Martin's matrix support departments (Business Operations, Human Resources, Logistics, and Quality) are sufficiently staffed to provide their employees with all technical, systems, information, and training resources required to meet every PBA requirements throughout contract life. The majority of LMKAC's direct labor employees will come from the current workforce. Lockheed Martin alone will have over 380 employees on its CFT payroll prior to contract award. Combined with their aggressive recruiting campaign and pay structure with highly competitive in benefits that mirrors the Civil Service, we are confident of their ability to attract highly qualified incumbents. In addition, they are transitioning all LMKAC employees to a total salary workforce. This benefits their workforce and PBA operations by: - Increasing Employee Ownership of LMKAC and PBA's Success - Simplifying Administrative Policy Issues - Improving Communication Through Removing "Us" Versus "Them" Mentality. We believe that the privatization process represents an ideal opportunity to apply the best available MIS capabilities to improve cost, schedule and quality effectiveness in PBA operations. Lockheed Martin is currently implementing the enterprise resource planning (ERP) system at its maintenance, overhaul, and repair center in Greenville, SC. ERP is a single integrated computer system using commercially available software that performs inventory/material control, MRP functions, shop floor control, quality management, cost management and financials. Expected to be on line in June 1999, ERP will: - Improve business processes - Reduce cycle time & inventory - Improve productivity - Improve quality of customer service Definitely a "best commercial practice", ERP is highly applicable and beneficial to the PBA operation. Figure COP-3-2 further describes ERP. LMKAC will incorporate a version of this system in the continuing operations phase to begin yielding benefits to the Air Force. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 31
EX-10.21288th Page of 414TOC1stPreviousNextBottomJust 288th
[CHART] FIGURE COP-3-2 ENTERPRISE RESOURCE PLANNING BENEFITS. LMKAC's scheduled ERP implementation demonstrates our commitment to continuously improve our PBA performance at Kelly. Our production-oriented metrics focuses on improving WRE levels and ENMCS rates, thereby ensuring PBA mission success. As depicted in Figure COP-3-3, the LMKAC management team uses established metrics to monitor progress at every level and assess the need for improvements and process changes that increases WRE levels and reduces ENMCS rates. NAVY PRODUCTION REQUIREMENTS Understanding that Navy engine parts are different from Air Force engines, OC-LM will track Navy engines and components separately. This tracking will ensure no mixing of Air Force and Navy components. OC-LM currently repairs engines for both Air Force and Navy with 100% of engines produced with each service's own parts. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 32 Source Selection Sensitive
EX-10.21289th Page of 414TOC1stPreviousNextBottomJust 289th
[Enlarge/Download Table] METRIC FREQUENCY PBA BENEFIT ------- --------- ----------- Turn-Around-Time Weekly Better control and improve flowdays Customer Delivery Compliance Weekly Ensure BEQs are met/improve WRE and ENMCS Internal Reject Rate Weekly Measure process capability and product quality, identifying areas for improvement Engine Test Pass Rate Weekly Improve pass rate/production capability Labor Hours Monthly Control/reduce labor costs over contract life Material Cost Monthly Monitor material content of modules and identify repair development opportunities FIGURE COP-3-3 PRODUCTION METRICS AND BENEFITS. Lockheed Martin's production-oriented metrics provide continuous assessment of our performance. COP-3.1 QUALITY SYSTEM (L-900 4.3.6.3, M-900 6.1.4.3, 6.2.1.6, TRD 2.3, 2.4, 3.12) OC-LM offers experience and expertise in all technical aspects of engine maintenance. With over 150 combined years of quality engine repair experience, we blend the latest technology with production performance to provide reliable, on-schedule engines for our customers. To ensure warfighter readiness is maintained, we must supply high-quality, warranted products. In this section of the proposal, we must show how we will achieve ISO 9002 compliance or its equivalent. We will provide evidence that we can plan, execute, and maintain effective process control to ensure the ongoing quality, of all significant processes, including those performed by our subcontractors/teaming partners. Our successful exit from transition requires OC-LM acceptance of total repair management responsibility for work in process completion and production improvements through the transition process. These requirements are incorporated into our Transition Integration Plan (TIP) and will be executed prior to the continuing operations phase. Our quality system is capable of planning, executing, documenting, and maintaining effective process control, ensuring ongoing quality of all significant processes to DCMC satisfaction. As a sub element of these requirements, we recognize that ISO 9002 compliance must be an integral part of our quality system. THE COMBINED ISO 9002 EXPERIENCE OF OC-ALC AND OUR INDUSTRY TEAM MITIGATES IMPLEMENTATION RISKS. OC-LM will provide evidence that ISO 9002 will be attained and sustained throughout the life of the PBA contract. COP-3.1.1 ISO 9002 COMPLIANCE. (L-900 4.3.6.3; M-900 6.1.4.3; TRD 2.3, 2.4, 3.12) OC-ALC fully complies with the USAF Quality System, which is an ISO 9002 equivalent system; however, OC-ALC is also quickly moving forward with ISO 9002 implementation. That process will be complete in October 1998. Similarly, Lockheed Martin and its industry team are either ISO9001/ISO9001 certified or in full compliance with the exception of Chromalloy. Chromalloy is well on its way toward full compliance by September 1998. OC-ALC Policy Directive 21-108, Quality Management, documents our quality system that [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 33
EX-10.21290th Page of 414TOC1stPreviousNextBottomJust 290th
is fully compliant with ISO 9002 in the production areas where PBA workload will be accomplished. The business plans for the Propulsion Management and Commodities Management Directorates at Tinker AFB and LMKAC at Kelly AFB define compliance procedures. The OC-ALC management representative for quality is the Technology and Industrial Support Directorate (OC-ALC/TI). They provide the direct link to the Center Commander for each of our product directorate and LMKAC quality focal points. Internal audits serve as management tools to ensure ISO 9002 compliance throughout the life of the PBA contract. Problem areas may drive more frequent audits as described in the OC-ALC Policy Directive. Quality audits within the propulsion areas where PBA items are repaired will be conducted following OC-ALC Policy Directive 21-108 and in accordance with AFMC Pamphlet 21-1, Organic Industrial Operations Internal Review Procedures. Any problem areas will drive more frequent audits as required by OC-ALC and LMKAC business plans. The OC-LM approach to sustain ISO 9002 compliance during continuing operations follows: [Download Table] ISO ELEMENT CONTINUING OPERATIONS PLAN ----------- -------------------------- 4.0 Quality System Requirements Continuous maintenance and improvement of business plans and quality policy manuals. 4.1 Management Responsibility Full support from OC-LM senior leadership through all program directors and support departments. Quarterly reviews. 4.2 Quality System Review and update policies, procedures, and work instructions to detail program specific requirements. 4.3 Contract Review Comprehensive contract reviews continuously performed by QA, program directors, and staff. 4.4 Design Control Does not apply to ISO 9002. 4.5 Document and Data Control List and maintain control of all documentation and plans. Ensure conformity to documentation. 4.6 Purchasing Review purchasing specifications and requirements to ensure only authorized materials are purchased through approved vendors. 4.7 Control of Customer Supplied Use of standard supply and accounting Product procedures with verification inspections. 4.8 Product Identification and Ensure procedures are in place and Traceability pertinent to manage all products from receipt to delivery by tagging, marking, and identifying at each stage of processing. 4.9 Process Control Monitored by internal audits to insure adequacy of environment, materials, equipment, training, and work instructions. 4.10 Inspection and Testing Ensure documented procedures describe inspection and testing requirements for materials, equipment, and end-items. 4.11 Control of Inspection. Maintain documentation to ensure identification, recall, and status in [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 34 Source Selection Sensitive
EX-10.21291st Page of 414TOC1stPreviousNextBottomJust 291st
[Download Table] ISO ELEMENT CONTINUING OPERATIONS PLAN ----------- -------------------------- Measuring, and Test Equipment accordance repair location directives. 4.12 Inspection and Test Status Identified by stamps on work instruction documents, visible tags, and clearly identified storage areas. 4.13 Control of Non-Conforming Controlled by identification, Product documentation, isolation, MRB review, and disposition. 4.14 Corrective and Preventative Continuous improvement methodologies which Action are proactive to identify potential problems and resolve them. 4.15 Handling, Storage, Packaging, Work instructions detailing requirements Preservation, and Delivery supported by internal audits to insure compliance with contractual requirements. 4.16 Control of Quality Records Controlled by a system that determines collecting, indexing, filing, accessing, storing (location/facilities and classification), maintaining, and retention period requirements. 4.17 Internal Quality Audits A systematic program based on OC-ALC Policy Directive 21-108, AFMC Pamphlet 21-1, and product directorate and LMKAC business plans for assessing all quality related operations, internal and external 4.18 Training A coordinated effort between supervisors and training specialists to assess and determine training requirements for employees at both repair locations. Training specialists will schedule training requirements based on skill level and certification requirements. 4.19 Servicing Compliance with published technical orders with records provided to the Government. 4.20 Statistical Techniques Implemented system applicable to specific operations such as inspection planning, quality history, inspections, audits, customer feedback and subcontractor performance. COP-3.1.2 PRODUCT QUALITY (L-900 4.3.6.3; M-900 6.1.4.3; TRD 2.3, 2.4, 3.12) OC-LM quality specialists conduct thorough systematic investigations of every Product Quality Deficiency Report (PQDR) received, following TO 00-35D-54, USAF Material Deficiency Reporting System, guidelines. Both internal and external customers initiate investigations by entering deficiency reports into the G021 (INFOCEN) system. OC-LM will review PQDR metrics monthly, accomplish trend analysis, develop preventive measures, and communicate pertinent information to appropriate production organizations for implementation. PQDR rates for workload currently accomplished at OC-ALC, shown in Figure COP-3-4, are already below the SA-ALC baseline rates for PBA items. Our quality approach ensures improvements by extending component use intervals, reducing labor hours, decreasing material quantities, and other factors. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 35
EX-10.21292nd Page of 414TOC1stPreviousNextBottomJust 292nd
[Download Table] Quality Related PQDRs/Units Product line Produced ------------ --------------- Fuel Accessories, Pneudraulics, 0.0016% Hydraulics FIGURE COP-3-4. OC-ALC PQDR RATES. Emphasis on individual empowerment and responsibility, coupled with providing the outstanding training and sufficient resources, consistently keeps our workmanship defects well below 1%. Using the baseline quality standards for workmanship provided in the RFP, LMKAC's prime objective is to achieve a workmanship defect rate below 1% or better. Efficiently applying all applicable elements of the ISO compliant quality system, Quality Assurance (QA), operations, and engineering personnel have the necessary data to develop and implement improved processes. Improved processes that utilize automated or robotic equipment (i.e. plasma spray processes) provide consistency in the operation and reduced material usage thus reducing possible rework or recycles that equate to labor hour savings. EXTENDING PRODUCT USE INTERVALS OC-ALC process and facility engineering staff in the Propulsion Production Division leads activities to extend product/component use intervals. Personnel in the Process Engineering Section have a variety of skills including mechanical, chemical, metallurgical, materials, electrical, and industrial engineering backgrounds combined with 10 to 30 years of experience in engine repair. Their support staff includes hands-on engineering technicians with extensive repair experience. The Engineering and Planning Branch works hand-in-hand with the production work force to provide immediate on-site engineering and technical support to disassembly, repair, assembly, and engine test shops every day. They provide the following critical functions to improve quality and enhance performance of the engines and components we currently repair and will provide the same support to PBA customers: - Process Support and Control - Repair Development - Immediate Process and Facility Problem Solving - Computer Numerical Control Programming Support - Tool Design and Manufacturing Support - Critical Consumable Material Management and Control - Pollution Prevention - Hazardous Material Management and Control - Facility and Equipment Management - New Repair Prototyping Goals of Engineering and Planning Branch personnel at OC-ALC include limiting or eliminating the use of proprietary processes or technologies that increase costs, limit selection of suppliers, and create risk over the long life cycles of military engines. They continually seek new technologies and process enhancements that are functional across a variety of engines. These technologies extend engine and component life cycles, provide the most economic benefits, and produce the highest quality products for our customers. For example, Axiam Smart Stack (TM) is one of our best processes for extending engine and component life cycles. OC-ALC teamed with private industry to find ways to reduce engine vibration during build rather than after engine test. Axiam Smart Stack (TM) systems optimize our method of stacking components using geometric measurements to make jet engine rotors straighter. This results in better balance, reducing the number of engine test rejects, and less vibration during operation. The Axiam system has already been applied to the TF33 N2 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 36 Source Selection Sensitive
EX-10.21293rd Page of 414TOC1stPreviousNextBottomJust 293rd
rotor and the High Pressure Compressor (HPC) on all GE engines repaired at OC-ALC. On TF33 engines, this process reduces engine test recycles by 5 to 7 engines per year. The GE system reduces test rejects and increases compressor rotor production from one every 2 to 3 days to two per day. The Axiam system also saves fuel while increasing the life of engine components by reducing vibration during operation. The LMKAC Industry Team also brings a "repair versus replacement" philosophy to the PBA workload. The education, experience, and expertise from the industry team provide innovative strategies to the development of repair processes. The companies within the team have product development engineers that continuously develop new technologies in protective coatings and airseal and blade-path materials. This equates to products that meet or exceed original equipment manufacturer and technical performance requirements thus providing extended product use intervals. Recent studies performed by Allison shows the Mean Time Between Removal (MTBR) for Canadian Air Force fleet of T56-A15 engines is currently 3,681 hours as compared to 1,500 hours for US Air Force T56-A15 fleet. Standard Aero is the largest non military T56 engine repair and overhaul company in the world and for the last 38 years Standard Aero has exclusively maintained the T56 engines for the Canadian Air Force. Standard Aero's proven T56 overhaul and repair processes and component repair methodology that will be implemented in San Antonio will significantly contribute to improvement in the US Air Force MBTR. Since 1991, Standard Aero has overhauled a total of 1,400 Reduction Gear Boxes (RGB) for-the United States. To date, 138 of the Standard Aero overhauled RGB's have returned for a second shop visit with an MTBR of 2,130 hours compared to the historic MTBR levels on SA-ALC repaired RGB's of 900 hours. Standard Aero's RGB repairs resulted in the improvements noted in Figure COP-3-5. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 37
EX-10.21294th Page of 414TOC1stPreviousNextBottomJust 294th
[CHART] FIGURE COP-3-5 T56 RGB FAILURES PER ENGINE FLIGHT HOURS (EFH) Since l992; USAF RGB failures per 1,000 engine flight hours has dropped 40%--from 0.21 to 0.l2. During transition, key Standard Aero T56 engineering and production personnel will be assigned temporarily to San Antonio to review all areas of difference between the procedures, repairs and process used at Standard Aero and those at SA-ALC. This Integrated Product Team approach will operate in the same way as joint AF and Navy IPT's has successfully operated in the past at OC-ALC. The T56 IPT's will bring together contributions, knowledge, and experience from Standard Aero, SA-ALC, US Air Force and US Navy. As an Allison Authorized Maintenance Center, Standard Aero will ensure appropriate engineering coordination with Allison on critical issues. The TIP includes the costs of implementing the Standard Aero cellular design, build processes and systems in the San Antonio facility. A key deliverable of the proposed T56 IPT is to expand the scope of engine management from a transaction cost orientation to overall cost of ownership or "life cycle cost." Recent initiatives in the commercial engine environment have shifted to more focus on pay by the hour type programs. While these programs add predictability and simplicity to the payment for propulsion, they do no always allow for clear links between costs and maintenance events for the operator. By taking a total cost of [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 38 Source Selection Sensitive
EX-10.21295th Page of 414TOC1stPreviousNextBottomJust 295th
ownership approach, the objective is to develop a strong link of the fiscal drivers to engineering and maintenance activities. Current US Air Force data showing Top Ten reasons for removal points to technical and material challenges in supporting the T56 that Standard Aero will immediately address. Standard Aero has grouped the activities into four categories to target reducing engine operating costs: LOWER THE SHOP VISIT RATE - Build-Standard Management to Ensure Maximum MTBR - 'Cooperative' Review of Operator Workscopes and Flight Line Maintenance Practices to Ensure. They are in 'Synch' with the Repair and Overhaul Shop Practice - Coordinated Field Service and Tech Support to Keep Engines on Wing MANAGE INVOICE COSTS - Focused Inventory Management Plan - Joint efforts on New Repair Development and Coatings ADD FLEXIBILITY TO THE WORKSCOPE - Pre-Induction Testing Makes Sense in Many Cases (and it Provides Inexpensive Data of Real Performance) - Flexible Workscoping at the Repair and Overhaul Shop - Appropriate Parts Strategies (New vs Serviceable vs Repaired) MAXIMIZE THE USE OF DATA - Manage and use "The Data" (Not "Ours" vs "Theirs") - MTBR Analysis & Benchmarking - Trend Monitoring (...and Actually use Data) - "What If" Analysis Tools for Cost Modeling/Spares Planning - Program Management Reviews (Integrated Discussion of Commercial, Technical and Logistical Issues) MTBR focus also delivers added benefits of future cost savings. Traditional transaction pricing does ensure lowest price at the ELIN level by including such costs as: new parts, serviceable material, repaired material, labor and test costs. What it does not take into account are other costs that are directly related to the quality and MTBR reliability of the item overhauled. Traditionally these costs are paid for out of different budgets and seldom rolled together. This type of focus expands accountability for overall US Air Force monetary investment in T56 assets (on-wing, serviceable, repairable and WIP). Better MTBR means less spare engines required in "total" system which leads to a reduction in overall asset investment and significant improvement in WRE levels. Examples of the source of these savings include: - Removal & Installation Costs - Troubleshooting and Travel Costs - Engineering Support Costs - Aircraft Downtime Costs - Working Capital Costs for Spare Engines and Inventory - Shipping and Logistics Costs One example of successful teamwork addressing problem areas is oil leaks on gearboxes. Working in conjunction with USAF Engineers, Standard Aero recommended a Hylomar Aero Grade sealant to be used on the splitlines. The Hylomar has been adopted by the USAF. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 39
EX-10.21296th Page of 414TOC1stPreviousNextBottomJust 296th
REDUCED LABOR HOURS OC-ALC certified industrial engineering technicians develop labor standards and maintain documentation, ensuring that standards accurately reflect the scope of labor required to perform technical tasks. They conduct work standard studies to evaluate task performance and adjust labor standards as applicable. Labor standards are routinely adjusted when any one of the following occurs: - Changes in Technical Requirements - Implementation of Improved Methods/Procedures - Changes in the Work Place - Changes in Equipment or Tooling Ongoing work measurement initiatives reduced OC-ALC labor standards by 30,000 workload hours during FY97 resulting in a cost avoidance of $2.0 million. Since 1994, $9.8 million has been saved by this initiative in our Propulsion Management and Commodities Management Directorates. PBA labor standards will be included in this review process during continuing operations and we project similar labor hour savings for those items. REDUCED MATERIAL QUANTITIES OC-ALC Shop Service Centers (SSCs) contain all necessary resources to successfully manage and reduce required material quantities. PBA material support will be provided by three fully staffed SSCs where personnel use the same material ordering processes now being employed at SA-ALC. The Air Force support systems such as D035, G402A, and D043 are in place and provide documented records of material consumption, lead times, inventory levels, and other logistical data required to ensure superior weapon system support. The Repairability Forecast Model (RFM) allows OC-ALC to calculate and forecast current and future material needs while the DLA Customer Account Tracking System (CATS) interfaces with RFM data to validate forecast quantities. These two new tools provide information that is realistic, responsive, and equitable to all material customers. OTHER FACTORS Flowdays for the PBA workload will be tracked using the OC-ALC Inventory Tracking System (ITS). This management tool allows us to track engine inductions by serial number and monitor progress through the repair cycle. By controlling engine inductions and removing non-value added activities, OC-ALC reduced average flowdays on repairs by 14% from October 1996 to September 1997. We expect similar flowday reductions for F100 engines. COP-3.13 PRODUCT WARRANTY PROGRAM (M-900 6.2.1.6). The RFP requires that a "warranty shall be provided for all items completely processed by the contractor and shall cover deficiencies in workmanship and material for a period equivalent to at least 3 months." The OC-LM team offers an extensive warranty to satisfy this requirement by covering all PBA end items, including whole engines, modules, and accessories, for an equivalent period based on Engine Operating Time (EOT) and cycles. (See Figure COP-3-6). In the event that a defect in material or workmanship causes a PBA end item to become unserviceable, OC-LM will repair that item on a priority basis to minimize impact to the customer. Details can be found in the CWS, Paragraph 3.3. The experience and expertise of our combined USAF and industry workforce will minimize these occurrences and, if they do occur, enable us to improve procedures to produce a better, more reliable product. Confidence in the quality of our work allows us to offer a warranty that will directly benefit the warfighter and the Government in terms of reduced downtime and cost. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 40 Source Selection Sensitive
EX-10.21297th Page of 414TOC1stPreviousNextBottomJust 297th
[Download Table] SYSTEM Period ------ ------------------ Engines: TF39 100 hours EOT T56 100 hours EOT Modules and Tracked Accessories: TF39 100 hours EOT T56 100 hours EOT Untracked 3 months operation Accessories FIGURE COP-3-6 PRODUCT WARRANTY The OC-LM team offers coverage periods tailored to each workload in order to satisfy the requirements of the RFP. [CHART] FIGURE COP-3-7. WARRANTY CLAIM PROCESS. Command customer initiate warranty claims by entering PQDRs into the G021 Deficiency Reporting and Tracking System. OC-LM quality management specialists conduct thorough investigations of each deficiency to expedite repairs and prevent recurrence. Warranty returns are processed using the Product Quality Deficiency Report (PQDR) system, an established Air Force system currently in use and familiar to all PBA customers. Procedures for processing warranty returns are defined in TO 00-35D-54, USAF Material Deficiency Reporting System. Figure COP-3-7 provides the PQDR process flow for warranty returns for engines, modules, and components. Warranty workload will be inducted under a "Warranty" unique PCN. This allows us to perform repairs required by PQDRs without charging our customer. If the PQDR investigations reveal defects that are not covered by the applicable warranty, then the investigation, reporting, and corrective actions will be handled as O&A. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 41
EX-10.21298th Page of 414TOC1stPreviousNextBottomJust 298th
COP-3.2 MANAGING CHANGES TO TECHNICAL ORDERS (TO) (L-900 4.3.3, M-900 6.2.1.3.2, TRD 3.2) To ensure best use of government funds, we must have a process for processing incremental improvements to the TOs that: - Properly considers substitution of commercial manuals - Provides technical instructions for process improvements - Affords clear visibility into cost, schedule, and risk for Government/contractor interaction and tracking - Incorporates approved changes into the TOs. Repair of PBA engines and components will be done in accordance with appropriate TOs. The OC-LM Team will continue reviewing the PBA workload TOs, as is done every day for our current engines and accessories. We will search for ways to simplify procedures and reduce cost while maintaining or improving reliability and ease of maintenance. Our review and approval process will use an innovative, automated AFTO Form 202, which facilitates the full incorporation of LMKAC into the process. Additionally, the approach provides the Cognizant Engineering Authority with ample visibility into cost, schedule, and risk before approval. This established, documented process ensures that appropriate personnel (such as logistics management specialists, propulsion system engineers, item managers, and equipment specialists) have clear visibility of the possible impacts of any proposed TO changes to cost, schedule, and risk. INCREMENTAL IMPROVEMENTS TO TECHNICAL ORDERS (TO) OC-ALC shops will initiate AFMC Forms 202 in compliance with AFMCI 21-301, TO System Implementing Policies, for the PBA workload that will improve reliability and/or ease of maintenance, OC-ALC proposes to submit these forms to the CEA for evaluation using an automated AFMC Form 202 created on the CEA's World Wide Web page. Time is always critical, often because the problem relates to engines being repaired where flowdays are being counted. The automated AFMC Form 202 process will greatly decrease turnaround times that can occur when paper copies are shipped or sent by facsimile. Presently, TO changes requested for the TF33-7 QEC kit by the OC-ALC engine maintenance shops are submitted via the automated AFMC Form 202 on the C-141 Technical and Engineering Services home page (Reference: Uniform Resource Locator address, http://cl41.robins.af.mil/auto202/) to the CEA at WR-ALC. This innovation results in decreased turnaround times and greater worker satisfaction in the shop due to timely processing. This same application will be in use by our LMKAC operation in San Antonio. Any authorized changes to the TO procedures are immediately made available to program managers. Collocation of maintenance shops, system engineering, and program management personnel at OC-ALC under one roof allows changes to be implemented faster. Discussions between these three groups can happen real-time and face-to-face. A recent example of this is a change made in the TF33 Gearbox Shop to a higher temperature epoxy that provides a better seal for a leaking oil pump. This change resulted in quickly eliminating leaks for failed epoxy, which lowers maintenance man-hours, associated with this pump and test cell rejects caused by high scavenge oil pressure. Our TO change process is provided in Figure COP-3-8. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 42 Source Selection Sensitive
EX-10.21299th Page of 414TOC1stPreviousNextBottomJust 299th
[CHART] FIGURE COP-3-8 OC-ALC TEAM APPROACH TO MANAGING TO CHANGES. Collocation of OC-ALC operations with PBA CEA coupled with our innovative AFMC Form 202 automation for LMKAC operations yields decreased costs and flowdays. Many new engine workloads are brought in without TO repairs (or with repairs that are grossly inadequate). In those situations, technicians and engineers work closely with our production personnel and the CEA to develop and document usable repair processes. One example of this action includes the total rewriting of the F101 and F110 engine cleaning TOs. We reviewed each individual part for material composition, coatings, condition (corrosion, wear, etc.), and subsequent inspection method. Decades of experience with the repair of engine-run hardware enabled maintenance personnel to accurately correct and complete these TOs. In addition to notifications of TO changes from the program office, the Technology and Industrial Support Directorate, OC-ALC/TI, monitors and distributes TO changes to all the production directorates at Tinker. This provides effective reaction time to accommodate and plan for changes and additional requirements. Our production planning organizations will review all TO changes to determine impact of material requirements, man-loading, labor standards, and scheduling to ensure sales prices accurately reflect work requirement. INCORPORATION OF COMMERCIAL PROCEDURES OC-ALC has also substituted commercial manuals for USAF TOs when it makes sense and incorporated commercial engine improvements in the military version of the same engine. F108 TOs in USAF format were, superseded by OC-ALC with CFM56 TOs in commercial format when the price quoted by the OEM to maintain these USAF TOs was too high. This enabled OC-ALC to save $5 million annually since 1992. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 43
EX-10.21300th Page of 414TOC1stPreviousNextBottomJust 300th
Service Bulletins for the commercial JT3D engine incorporate new parts that increase the reliability and maintainability at that engine. The military version of the JT3D engine is designated the TF33 and is managed by OC-ALC. These service Bulletins are reviewed continuously by OC-ALC technical personnel ensuring that we can incorporate commercial engine improvements that could increase reliability and/or ease of maintenance in the TF33 as well. PROCESS ORDERS (L-900 4.2.6.4) Process orders will also be used as a vehicle to provide additional information to the production personnel. In most cases, our existing process orders will be adequate, but they will be updated as necessary to meet any additional requirements of PBA components. We will negotiate TCTOs/Power Plant Changes (PPC)/Power Plant Bulletins (PPB) accomplishment through the ACO unless specifically cited as part of the basic effort. Aerospace engine/component repair is very dynamic. Repaid processes are refined or substituted as new techniques and materials are developed. In addition, many changes are required to keep ahead of environmental and safety regulations. OC-ALC is at the leading edge of the industry in terms of the incorporation of new processes and technology into the overhaul manuals. A few examples of OC-ALC successes include: - First production use of carbon dioxide (CO(2)) pellet blasting to clean critical components without damage or contamination. - First use of semi-automated high pressure water jetting to remove abradable plasma spray coatings quickly, without damage to the part, and without the generation of hazardous waste. These processes were initially approved locally on a part-by-part basis by each affected CEA and were later incorporated into our TOs through submittal of TO change requests (AFTO Form 22). Today, these processes are the standard in the industry. When developing new processes, close coordination between the CEA, process and facility engineers, and laboratory and production personnel is required. Collocation of these key individuals greatly enhances coordination efforts, allowing us to work together to ensure all issues were addressed. COP-3.3 MANPOWER SUSTAINMENT (L-900 4.2.6.1.3, M-900 6.1.2.1, 6.2.1.4) A multi-faceted approach to manpower sustainment and ongoing personnel training ensures the required skills will be available to sustain PBA continuing requirements. The RFP requires that we demonstrate how we plan to acquire, train, and retain sufficient manpower, with the proper skills mix, to sustain continuing operations. SOURCES OF PERSONNEL During continuing operations, a variety of sources are available to provide quality personnel for the PBA. These sources include: - Current Tinker AFB Employees - DoD Priority Placement Program - Air Force Central Skills Bank - Vocational Technical Schools - Worldwide Recruitment Programs - New Hires from WG-05 Helper Register - Contract Field Teams Ongoing realignment of DoD facilities and associated drawdowns will continue to generate skilled personnel from off-base recruitment programs. Other declining engine programs such as the Navy TF30-414 (F-14) and Air Force TF33-7 (C-141) will enable realignment of existing OC-ALC engine skills. We also have a permanent military enlisted presence, [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 44 Source Selection Sensitive
EX-10.21301st Page of 414TOC1stPreviousNextBottomJust 301st
authorized in support of 2LM, to continue providing the field perspective for all our engine programs. WORKLOAD REVIEW The workload review process, in use for many years for review of depot requirements versus capability, provides the basis for ongoing manpower support through continuing operations. The Planned Labor Application (PLA) provides the foundation for this workload and capability analysis using the PLA as a management tool, manpower requirements are identified to the lowest organizational level. Changing workloads frequently require changes to organizational staffing and shifting of personnel. The long-range PLA provides a five-year identification of organizational and skill requirements, and is an indicator of training requirements, multiple shift requirements, and surplus skills. Manpower requirements are closely monitored for trends in attrition rates. Attrition is measured and analyzed monthly by job series and organization. This information, along with other pertinent data, such as age of workforce by skill and organization, is then used to develop projected five-year attrition rates. These rates are incorporated in the Workload Review process, resulting in movement of existing personnel and development of hiring plans for current year and beyond. Additional manpower authorizations are identified and approved as required. PERSONNEL TRAINING As manpower resources are realigned to support changing workloads, training plans are in place through on-the-job and vocational technical programs. Existing personnel receive ongoing training as required by the Special Skills Qualification (SSQ) and Production Acceptance Certification (PAC) programs. For existing personnel and new hires, a well established partnership is in place among OC-ALC and quality area vocational technical schools. Fluctuating engine requirements and rapidly changing technologies have necessitated a close working relationship with these schools. The schools continually adjust their curricula in response to revised engine skill requirements. Current agreements are in place for continued vocational technical training to support PBA requirements. LARGE FLEXIBLE WORKFORCE Continuous review of all workloads by skill at organizational level provides a long range review of workload fluctuations and manpower availability. Our existing large, flexible workforce provides a strong base for continuing support of PBA mission readiness. LMKAC MANPOWER SUSTAINMENT APPROACH We must provide an experienced and qualified workforce from contract start through continuing operations. Lockheed Martin's ability to retain employees is reflected in our average turnover rate of less than 7% at our fixed sites. This is accomplished through competitive salaries, benefits, and on-going management-employee relations programs, as described earlier in Section IIA-6. LMKAC offers opportunities for advancement and we encourage all employees to enhance their level of professional skills. LMKAC is committed to providing a healthy workforce free from discrimination and harassment. LMKAC takes a proactive role in maintaining contact with each of our employees. Their main focus is to provide clear directives and guidelines through published LMKAC policies and listen seriously to employee concerns and suggestions. In addition, LMKAC encourages employees to use the company tuition assistance program to enhance their existing technical skills thus making them more promotable and productive within the LMKAC unit. The compensation and benefits program has been tailored to mirror the current program within civil service. They intend to hire at least 90% of our manpower requirements from the incumbent [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 45
EX-10.21302nd Page of 414TOC1stPreviousNextBottomJust 302nd
workforce made up primarily of civil service personnel and CFT contractor personnel. Manpower requirements are monitored by the LMKAC Managing Director to insure adequate manning on hand to support present and future manning requirements. Business unit managers will validate the ongoing manpower support through continuing operations by analyzing attrition rates by month and the use of job standards. Increasing or decreasing manpower authorizations are identified and carried out as appropriate. In some cases business unit managers using the services of QA validate manning authorizations by determining if the problem is training deficiencies versus an actual manpower related problem. The business unit manager adjusts the manning when projected workload warrants staffing changes. When changes in manpower exist additional authorizations are identified and approved and a hiring plan enacted to insure manpower is on board at the exact time of requirement. In the unlikely event that qualified engine technician applicants become difficult to find, LMKAC is prepared to implement a "GROW YOUR OWN" program that will target two different groups of prospective applicants. First, LMKAC will accept applicants possessing an A&P License with no actual experience and enter them into a formal Jet Engine Buildup Course for a specific engine conducted by their Instructor in a classroom environment. From that point the employee will be assigned to an MI for a prescribed period of time (usually 6-12 months) to learn the hands-on skills necessary to perform the minimum essential tasks identified in the workcenter Job Qualified Standard (JQS). The second group of prospective applicants will come from a high school Vocational Education program sponsored by FoxTech that will receive formal classroom instruction on curricula similar to that of an A&P school while attending high school. High school graduates will receive this training from Hallmark Aviation. COP-3.4 MATERIAL SUSTAINMENT (M-900 6.1.2.7, 6.1.2.8, 6.2.1.5) The integrated Government/industry material approach offers MAJCOM customers efficient parts control and material sustainment. Using the enhanced material support processes that were put in place by the OC-LM team during transition, PBA support will continue to improve during continuing operations. The key to material sustainment is timely and accurate requirements forecasting. In transition we implemented new and innovative forecasting techniques which combined the best practices of Government and industry. These techniques coupled with our DLA partnership arrangement will ensure that material support does not become a limiting factor. PBA support posture is never taken for granted by the OC-LM team. We track its status extensively using established metrics and milestones. This detailed monitoring program ensures that the right parts - in the right quantities - are in the right place - at the right time. Our team confidently predicts that we will not only be able to meet the contract requirements to sustain production operations and support surge but will exceed program requirements and provide significant improvements in PBA warfighter support including ENMCS rates. There are four key elements of our material sustainment approach: - Innovative forecasting techniques - Advance Release of Material - Integrated Government/industry certified vendor network - Proven commercial supply practices OC-ALC has implemented a single USAF engine community approach to focus on [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 46 Source Selection Sensitive
EX-10.21303rd Page of 414TOC1stPreviousNextBottomJust 303rd
readiness oriented depot asset supportability - the Engine Supportability Asset Management Plan (ESAMP). We have defined levels of priority and terms that link to an Agile Logistics approach to material sustainment. This approach interfaces DLA, base supply, and all propulsion communities in order to identify, prioritize, validate and implement actions necessary to improve engine asset supportability posture for consumables components. The ESAMP strives to continuously improve supportability by focusing on information, innovative database models, and key logistics areas. By working through a documented set of mutually agreed upon checklist actions and metrics, the ESAMP enables us to track and shift assets to high priority workload as well as other contingency operations. These sophisticated innovations allow simultaneous transmission of logistics data between the services ensuring that program managers have a complete picture of available assets. COP-3.4.1 MATERIAL REQUIREMENTS FORECASTING (M-900 6.1.2.7, 6.2.1.5) The ESAMP complements our forecasting efforts as well as current engine life management plans. Two innovative data base tools provide total asset visibility that is geared to a focused logistics approach. These tools are the Repairability Forecast Model (RFM) and the DLA Customer Account Tracking System (CATS). RFM provides a forward look at production material support and allows us to calculate and forecast current and future needs to DLA and other services. This is a key logistics area both from a program and a production standpoint. RFM has proven its reliability. AFMC endorses its use, and actions are currently underway to have RFM designated as a command system and added to the Depot Repair Enhancement Program (DREP) standard suite of systems. CATS interfaces RFM data, considers the Air Force fair market share of the total requirement and then validates the forecast quantity. Since the propulsion forecasts are predicated on a checklist of actions that DLA recognizes and prefers, prompt response is ensured. A checklist of required actions by DLA ensures that everything is being done to satisfy the requirement and minimize delays in supply support. The combination of RFM and our checklist ensures accuracy and preferred customer status. CATS and the DLA checklist promote rapid response, lower financial risk, and add emphasis to mission readiness. Unlike traditional forecasts, these new tools provide a cross feed of information that is more realistic, more responsive, and far more equitable to the users. Use of the ESAMP, RFM, and CATS will enable the PBA workload to transition smoothly with minimal risk because the focus is on supportability and forecasting. With consistent use, forecasts gain creditability, large fluctuations in demand can be minimized, and record keeping and accountability improve. LMKAC will augment these tools with commercial forecasting programs such as the Part Replacement Ordering System (PROS). LMKAC Team members have successfully used this program to determine requirements for current overhaul contract with SA-ALC. PROS is used to calculate replacement factors and order quantities which generates Government Furnished Material (GFM) requisitions through the G009/VOLTS system to the appropriate source of supply. COP-3.4.2 MATERIAL PROCUREMENT (M-900 6.1.4.7, TRD 2.3, 2.4). The OC-LM structure combines the best mix of resources to fully integrate maintenance, base supply, and procurement professionals into a rapid response team. Stringent edits are [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 47
EX-10.21304th Page of 414TOC1stPreviousNextBottomJust 304th
established to ensure that the right quantities and costs are passed to our existing data systems. With our ESAMP firmly established and in place at time of award, we can quickly accommodate transition of the PBA workload. Our plan is viable and the integrity of our data is monitored and documented. The ESAMP metrics will monitor all PBA procurements with a focus on total program production for mission readiness. With the added benefit of RFM and CATS, the OC-LM Team has all of the tools necessary to operate a supply support system for components used in support of PBA end items. When material is not available through normal supply channels, material personnel located in our Shop Service Centers (SSC) will initiate procurement actions. Only immediate needs will be procured, and the Prime Item Manager will be kept informed of the transaction so that all consumption data may be captured and entered into the supply system. Warranted procurement officers residing in the SSC will be the procurement agents. LMKAC's ordering and purchasing systems are linked with their planning function which forecasts requirements in advance of actual needs. As LMKAC phases into a cellular concept within each engine line, material planners are assigned and dedicated to support a specific product or process cell. The planners tailor bills of materials unique to each cell/product and are responsible for planning GFM and Contractor Furnished Material (CFM) to support the PBA workload. [CHART] FIGURE COP-3-9 GFM REQUISITION PROCESS We will use the MILSTRIP format for requisitioning GFM by LMKAC. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 48 Source Selection Sensitive
EX-10.21305th Page of 414TOC1stPreviousNextBottomJust 305th
GFM requirements are forwarded to logistics support for requisitioning action Figure COP-3-9. GFM is requisitioned in MILSTRIP format via the G009/VOLTS system. Materials are purchased through the Government approved purchasing systems and from a database of qualified vendors. COP-3.4.3 VENDOR SOURCE APPROVAL (L-4.3.3.1, M-6.1.2.7, TRD 2.3, 2.4). Supplier selection criteria ensures that we maintain a successful reliability and maintainability level on the items or processes we subcontract. As referenced earlier in IIA-4.6 and our CWS, contractor selection occurs only after all information clearly shows that the contractor can provide products or services that is the best overall value for the Government Sources must clearly demonstrate that qualification requirements levied by CEA can be met. All items must be equal to or exceed the quality specification of the original items. Traceability back to the specific repair source is mandated. Procurement actions are carefully developed and closely mirror procedures used at SA-ALC today. OC-LM plans to continue use of our existing network of vendors. Currently we subcontract the repair of items such as detailed engine components for the TF33 first and second stage fan blades as well as the entire J75 engine. DCMC representatives are involved with process control at suppliers' facilities and periodically review their quality systems to ensure that repairs follow our quality specifications. Retention of these certified vendors as well as any existing contracts with those vendors occurs only after a careful assessment of production reports and past performance reviews. If at some future date OC-LM must certify a new vendor, the cognizant Government engineer will conduct all required reviews and certifications, as well as adhere to any first article requirements. COP-3.4.4 MATERIAL STOCKING, STORING AND ISSUING (TRD 2.3, 2.4, 3.5) The Defense Distribution Depot Oklahoma (DDOO) provides a full range of distribution services for OC-ALC. We have developed a high level of trust and confidence between our organizations. During the Gulf War, through our coordinated efforts, 72,000 short tons of cargo, including over 10,000 repaired parts, were shipped. Today DDOO is responsible for an $8 billion inventory with over 394,000 storage locations and about 53,000 receipts and 93,000 shipments monthly. DDOO has 35 facilities on base with 14 main operating locations including a large new classified storage facility and a modern state-of-the-art receiving facility. Their classified facility currently has over 10,000 square feet of storage space available. Customer support is provided 24 hours a day, 7 days a week. The Emergency Support Operations Center (ESOC) operates during off-shifts, weekends, and holidays to ensure a 24 hour response. We have established a Memorandum of Agreement (MOA) with DDOO to ensure that support continues without disruption. This agreement formalizes our processes and establishes clear management roles for the PBA. Customer Support is provided 24 hours a day, 7 days a week. The Emergency Support Operations Center (ESOC) operates during off-shifts, weekends, and holidays to ensure 24-hour response. We have established a Memorandum of Agreements (MOA) with DDOO to ensure that support continues without disruption. This agreement formalizes our processes and establishes clear management roles for the PBA. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 49
EX-10.21306th Page of 414TOC1stPreviousNextBottomJust 306th
Projections for storage, increased process actions, and internal DLA restructuring of distribution centers are already in progress. DDOO has all the required receiving, packaging, handling and storage capabilities in place today to accommodate the additional workload. LMKAC has included in its lease with the GKDC facilities a centralized warehousing function for all levels of material support at Sa-ALC. Receiving, issuing, packaging and shipping functions are planned for this facility. Provisions to identify and separate GFM from CFM are required. We have extensive experience managing and controlling GFM from time of receipt through storage, issue, return and disposal. As part of the Agile Logistics tenants, we have allowed sufficient warehouse space to operate a Consolidated Serviceable Inventory (CSI) and a Consolidated Repairable Inventory (CRI). In addition to a LMKAC center warehouse facility, each engine line will strategically locate storerooms and material handling equipment within or near the production areas reducing wait time for materials. LMKAC's Government property control procedures are based on the industry team's current DCMC approved property systems and comply with FAR Part 45, Government Property. Property records contain the required data needed for submittal via the G009/Internet and provide program/item managers with inventory quantities and production activity. The LMKAC system provides: - Accurate, recording of property received - Up-to-date records of property on-hand - Precise records of material consumption - Documented parts movement - Records of property disposal COP-3.4.5 ADDITIONAL LMKAC MATERIAL SUPPLY INFORMATION LMKAC members have initiated preliminary planning with OC-ALC, identifying major repairs and material support requirements that quickly benefit WRE levels and ENMCS rates. The OC-LM team is not waiting until contract award to develop action plans that address PBA concerns. Some of our team member's exposure to the PBA workload on current or past contracts allow us to conduct extensive pre-planning, which in-turn, allows LMKAC to "hit the ground running". For example, they conducted detailed pre-planning on the TF39 and T56 supply system with a clear vision on improving WRE levels and reducing ENMCS rates. Figure COP-3-10 describes the supply system for the TF39 in particular. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 50 Source Selection Sensitive
EX-10.21307th Page of 414TOC1stPreviousNextBottomJust 307th
[CHART] FIGURE COP-3-10. TF39 SUPPLY SYSTEM FLOWCHART. This figure describes LMKAC's supply system for the TF39 at Kelly The Lockheed Martin approach relies heavily on the forward supply point and point of use benchstock, ensuring the right piece parts, minor assemblies and modules are ready when needed to support the overall production effort. The following outline details the activities supporting this system. The process begins by inputting an engine into the LMKAC repair system: (a) Engine is input to 2LM for repairs. The diagnostic phase is conducted to determine what needs to be repaired during this shop visit based on reason for removal, engine records, and diagnostic tools (borescope, inbound test cell performance run, etc.) used by the 2LM Workscope Planning Team (WPT). (b) Engine is then disassembled to the point necessary to gain access to the modules and components requiring repair as identified by the WPT. Unusual findings are identified and fed back to the WPT for further consideration and analysis as needed. In this way, the workscope is a living document throughout the engine's shop visit. (c) Reparable modules/components are routed to Building 360 for further disassembly to the piece part level so repairs can be accomplished. The routing does not impact the [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 51
EX-10.21308th Page of 414TOC1stPreviousNextBottomJust 308th
rebuilding of the engine since 2LM has its own Forward Supply Point (FSP). This ensures module/component stock levels are sufficient to support monthly production requirements. Additionally, this rotable pool of critical assets ensures surge capacities can be met at the whole engine and module level. (d) Reparable piece parts are then restored to serviceable condition and then routed back to the LMKAC supply system or the Forward Supply Points as stock levels warrant. The priority on routing serviceable items following repair are: - Shipped to fill customer demands/backorders - Routed to FSPs to restore established shelf-stock levels (base on production requirement modeling) - Routed to LMKAC supply as a ready-to-ship serviceable asset to meet future customer demands. (e) Management Items Subject to Repair (MISTR) such as modules, assemblies, and components will be routed to Building 360 (other locations for accessory items) as reparable items through the LMKAC supply system. These items will typically be routed to us from TF39 and T56 intermediate level repair customers. LMKAC will take advantage of RFP paragraph H-915 (b) that authorizes over induction of reparable assets into the repair process in advance of receipt of a modification to the delivery order. LMKAC will gradually induct additional items such as modules, accessories, and engines from condition 'F' (reparable) status for the purpose of building a surplus of serviceable items that are ready to use. LMKAC believes that building a one-month surplus of normal lead time items such as modules, compressors, HPTs, and accessories accompanied by a two month surplus of long lead time items and whole engines will enable them to provide finished products to the customer immediately when the delivery order is modified. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 52 Source Selection Sensitive
EX-10.21309th Page of 414TOC1stPreviousNextBottomJust 309th
COP-4 FACILITIES AND EQUIPMENT SUSTAINMENT (M-900 6.1.2.4, 6.1.2.5) OC-ALC CIVIL ENGINEERING AND PLANT MANAGEMENT PERSONNEL HAVE THE SKILLS AND EXPERIENCE TO SUPPORT PBA WORKLOAD SINCE THE VAST MAJORITY OF THE WORK WILL BE PERFORMED USING EXISTING FACILITIES AND EQUIPMENT. AT KELLY AFB, THE LOCKHEED MARTIN TEAM WILL USE ITS EXTENSIVE EXPERIENCE WITH COMPARABLE FACILITIES, ITS PROVEN PROCESSES, AND WILL HIRE LOCAL EXPERTS TO SUPPLEMENT SUSTAINMENT ACTIVITIES. Our Facilities and Equipment Data Volume describes in detail the facilities, buildings, shops, processor, and equipment used to support the PBA workload. OC-ALC facilities sustainment activities are divided into two major groups. Routine facility modifications and maintenance actions are categorized as Maintenance and Repair (M&R). The M&R program is capped at $300,000 per project. We maintain a 5-year facility plan which includes a prioritized list of planned M&R projects. These projects are added, reviewed and updated every year. Projects exceeding $300,000 are classified as Military Construction (MILCON) projects. M&R and MILCON projects, such as our recently completed plating shop renovation, are managed by Civil Engineering (CE). CE is located on base and is in charge of all real property (buildings and utilities), as well as MILCON projects. Whether implementing new processes, planning major renovations, or incorporating new workloads, OC-ALC has the advantage of collocated support organizations such as the fire department, bio-environmental engineering, ground safety, environmental management, and even the industrial waste treatment plant. These on-base organizations ensure that our production facilities meet or exceed all regulations from the start and continue to operate that way. Equipment sustainment is managed by our Plant Management Division. Plant management personnel have the experience and specialized knowledge to maintain our production equipment in peak operating condition, ensuring minimum downtime and maximum part quality. Contracts for repairs and services are also administered by plant management personnel. Plant management personnel maintain over 7,300 pieces of industrial equipment, in 95 different buildings, covering a total of 5 million square feet. They make over 20,000 service calls per year. Our predictive/preventive maintenance program uses the most modern techniques to detect problems early and avoid major failures of our production equipment. These techniques include vibration, oil, and ultrasonic analysis, and infrared inspection, laser alignment, and dynamic balancing. The Technology and Industrial Support Directorate also offers complete scientific, engineering, and industrial laboratory services for propulsion and commodities organizations. These laboratories provide immediate and expert support in almost every aspect of the overhaul and repair operation including: - Solution Analysis for Cleaning, Plating Shops, and Fuel Accessory Testing - Joint Oil Analysis Program for Engine Trending - Precision Measurement Laboratory for Calibrating Instruments - Metallurgical Analysis Laboratory for Production Support and Material Certification - Quality Verification Center for Precision Measurement The Lockheed Martin Industry Team will also have the expertise from locally hired personnel [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 53
EX-10.21310th Page of 414TOC1stPreviousNextBottomJust 310th
who, in many cases, help to sustain the Kelly "AFB facilities over the years. In addition, the industry team possesses vast experience with similar repair facilities located across the United States and Canada as well as world-wide. - Facility and equipment upkeep, repairs, modifications, and replacement, as needed, at the Kelly industrial facility will be proactively managed by the Lockheed Martin Industry Team to ensure the greatest US Government capital payback is realized. The LMKAC facilities and support plan is based on years of proven industrial facility management and involves inspection, monitoring, periodic maintenance, repair or replacement. - The equipment will be inspected and serviced at regular established intervals and the product output will be monitored to ensure process parameters are within specified tolerance. As periodic maintenance or repairs are required, backup equipment and processes will be established to ensure that process flowtimes and surge capabilities are not impacted. - Repairs that cannot be accomplished by in-house facility and equipment technicians will be contracted to qualified repair sources. The equipment will be reevaluated and certified following any maintenance that could affect specified tolerances. - Facility improvements at Kelly will be handled on an as-needed basis to enhance the overall business capabilities, efficiency, and quality of life. All changes will be coordinated with GKDC. Electrical power, lighting, environmental, pneumatic, special cleaning, hazardous waste, storage, and ' other facility enhancements will be accomplished to accommodate the efficient output of the propulsion items while exceeding environmental and industry established criteria Lockheed Martin Kelly Aircraft Center will use the same facilities, equipment, and processes that are performing the PBA workload at Kelly AFB today. All the available facilities will be used during transition. After transition, Lockheed Martin will do a complete performance analysis of the operations. They will then implement the appropriate shop consolidations and rearrangements for optimum production output during continuing operations. Figure COP-4-I shows LMKAC's planned road map for the continuing operations phase. Consolidation of TF39 and T56 repairs into 11 facilities reduces the required square footage by approximately 40%. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 54 Source Selection Sensitive
EX-10.21311th Page of 414TOC1stPreviousNextBottomJust 311th
[CHART] FIGURE COP-4-1 LMKAC ROAD MAP DURING CONTINUING OPERATIONS. Our plan to accomplish continuing operations of SA-ALC TF39 and T56 workload consolidates all the work into 11 facilities. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 55
EX-10.21312th Page of 414TOC1stPreviousNextBottomJust 312th
COP-5 CONDEMNATIONS AND SCRAP (TRD 3.2.4) THE OC-LM TEAM WILL MAKE EVERY EFFORT TO RETURN COMPONENTS TO SERVICEABLE STATUS. HOWEVER, WHEN COMPONENTS EXCEED APPLICABLE TO LIMITS AND ARE BEYOND ECONOMICAL REPAIR, WE WILL FOLLOW OUR PLAN TO PREVENT THEIR RE-ENTRY INTO THE MILITARY OR CIVILIAN INVENTORY. WE WILL PROPERLY RECLAIM CRITICAL ALLOYS AND PRECIOUS METALS. To ensure the safety of the warfighter, we must submit a formal joint Government and contractor process to identify and assess items beyond the TO reparable limit. This process must: - Be in accordance with commercial practices, with the applicable TO, and with FAR 45.6, "Reporting, Redistribution and Disposal of Contractor Inventory" - Make scrap items incapable of further use and keep them out of military or civilian inventories - Reclaim critical alloys and precious metals - Use contractor's inspectors qualified in accordance with ISO 9002 - Document the mutilation process. Our proven plan for the identification, handling, and control of condemned parts ensures compliance with PBA requirements and safety of the PBA inventory. End items that exceed applicable TO limits or are beyond economical repair will be condemned and permanently marked. Pertinent documents will indicate condemned status as described in AFPD23-5 (Reusing and Disposing of Material). Critical components, whether administratively condemned or condemned for cause (NDI, dimensional, or visual) will be mutilated to ensure items cannot be used. Process Order 88-1 describes our mutilation policy, including the following actions: - Notching of Blades and Vanes - Removal of Blade Slots on Disks and Spools - Cutting of Mating Flanges/Spline Ends of Shafts and Hubs - Cutting of Spacers, Sleeves, and Airseals - Cutting Holes in Cases Scrap material containing critical alloys or precious metals will be handled in accordance with: - TO 00-25-113 (Conservation, and Segregation of Critical Alloys and Precious Metal Bearing Parts and Scrap) - The Applicable Engine/End Item TO - Federal Acquisition Regulation (FAR) 45.6. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 56 Source Selection Sensitive
EX-10.21313th Page of 414TOC1stPreviousNextBottomJust 313th
COP-6 SAFETY. OC-ALC IS DEDICATED TO PROVIDING A SAFE AND HEALTHY WORKPLACE FOR ALL EMPLOYEES. OUR SAFETY PROGRAM PROVIDES RAPID AND KNOWLEDGEABLE RESPONSES TO SAFETY ISSUES. SAFETY PERSONNEL, MANAGERS, AND EMPLOYEES ARE RESPONSIBLE FOR ENSURING A SAFE WORK ENVIRONMENT FOR ALL PERSONNEL, PROPERTY, AND THE PRODUCTS WE PRODUCE. The OC-ALC Safety Office is responsible for the overall safety program. Management and staff supervision of safety functions cover planning, developing, organizing and implementing OC-ALC safety programs. The Safety Office provides technical advice and assistance concerning safety standards and criteria for repair processes for weapon systems, engines, commodities, and construction projects. The Safety Office staff includes 20 highly qualified safety specialists, engineers, managers, and administrative assistants who oversee four specific areas of responsibility: - Ground Safety - Flight Safety - Weapons Safety - Systems Safety The OC-ALC Safety Office follows the guidance in Air Force Instruction 91-202, The US Air Force Mishap Prevention Program and 91-301, Air Force Occupational and Environmental Safety, Fire Protection, and Health (AFOSH) Program, and reports directly to the OC-ALC Commander. Our Safety personnel have the authority to stop any practice that places personnel in imminent danger or could cause damage to property. LMKAC's safety program includes an organizational structure that embraces safety processes at all levels. Management and supervisors implement and enforce safety standards to ensure that each employee assumes personal responsibility for compliance of Environmental, Safety and Health (ESH) requirements. The LMKAC safety program is based on the premise that safety is a behavioral attitude that is influenced by: - Leadership Through Policy and Direction - Enforcement at the First line Supervisor LevelPeer Pressure by Empowerment of Each Employee to Recognize, Correct, and Halt Unsafe Practices The LMKAC safety program combines these behavioral elements, as shown in Figure COP-6-1, with a team approach to safety that promotes awareness and ownership. The LMKAC safety system meets or exceeds Federal Occupational, Safety and Health Administration (OSHA) and applicable Air Force occupational safety and health requirements. This safety program is a proactive system that concentrates on training and preventing rather than merely reacting to safety and occupational health issues or problems. LMKAC holds an ESH executive management review board meeting quarterly to review issues related to safety and health protection of personnel and the environment. The board is comprised of the following individuals: - Managing Director - Program Directors - Quality and Training Manager - ESH Manager - Business Operations Manager - Program Control Manager - Engineering and Facilities Manager - Logistics Manager [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 57
EX-10.21314th Page of 414TOC1stPreviousNextBottomJust 314th
[CHART] FIGURE COP-6-1 Four Tiers of Safety We drive responsibility and authority for safety to every level in our organization. MISHAP INVESTIGATING AND REPORTING: Our mishap/incident investigating and reporting procedures are accomplished in accordance with Air Force Instruction 91-204, Safety Investigations and Reports. Expeditious mishap investigations fulfill the following objectives: - Preserve Evidence to Enhance Identification of all Possible Causes of the Mishap - Discover Cause and Effect Relationships to Derive Corrective and Remedial Actions - Determine the Impact on Personnel and Production - Change or Improve Policies, Standards and Regulations - Comply Fully with our Customers' Requirements. The mishap/incident scene, pertinent equipment, and personnel records are immediately secured until released by the investigating authority. Technical assistance for major mishap investigation boards will be provided when required. All of the investigating and reporting requirements are contractually imposed on any subsequent subcontractors. LMALC's mishap investigation and reporting policy dovetails with OC-ALC's to ensure effective corrective actions are taken that preclude recurrences. LMKAC's government [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 58 Source Selection Sensitive
EX-10.21315th Page of 414TOC1stPreviousNextBottomJust 315th
approved procedures, detailed in our ESH policy, provide directions for required actions by on-site personnel from mishap occurrence to final report and after action. These events are investigated to determine their cause and to determine corrective actions to be taken. The overriding objective of investigations is the safeguarding of personnel and property from injury or damage by preventing future incidents. As shown on Figure COP-6-2, we use a systematic approach to investigating and reporting mishaps. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 59
EX-10.21316th Page of 414TOC1stPreviousNextBottomJust 316th
[CHART] FIGURE COP-6-2 INCIDENT INVESTIGATION SYSTEM. We use a systematic approach to ensure all incidents are properly investigated and reported. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 60 Source Selection Sensitive
EX-10.21317th Page of 414TOC1stPreviousNextBottomJust 317th
SUPERVISOR SAFETY SURVEILLANCE PROGRAM (SSSP) The SSSP establishes supervisory responsibility for the safety and health programs within each organization. Each supervisor develops an occupational safety and health training outline for the appropriate area of responsibility including identification of all hazardous processes or equipment and any known safety or health hazards that may be encountered in the area. Monthly safety meetings in each industrial area and quarterly meetings in administrative areas keep all employees informed of any potential danger. LMKAC supervisors are responsible for the safety of their employees. They ensure that all employees under their supervision are adequately trained and qualified to perform assigned duties safely and in accordance with applicable procedures. Supervisors are responsible for promoting ESH awareness and ensuring employees practice safely in the performance of their tasks. CIVILIAN INJURY TRENDS Tinker won the National Safety Council's Award of Honor for ground safety performance in FY96. Only organizations that have achieved a 10 percent or more reduction to the composite ground mishap rate are considered for the highest award presented by the council. Our industrial accident experience is 75 percent lower than the national average for the aviation industry as shown in Figure COP-6-3. Systematic and regular inspections of the workplace ensure a safe work environment for our people, property, and products. [CHART] FIGURE COP-6-3 CIVILIAN INJURY TRENDS Our lost time accident rate is 75% lower than the national average for aviation industry. Our safety initiatives reduce accidents and increase workforce availability to repair PBA items. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 61
EX-10.21318th Page of 414TOC1stPreviousNextBottomJust 318th
FOREIGN OBJECT DAMAGES (FOD) Propulsion Directorate employees at OC-ALC developed and implemented an aggressive Foreign Object Damage Elimination (FODE) program. FODE committees consisting of employee representatives from each production section, quality assurance specialists, and program managers, meet monthly to discuss FOD related issues and perform surprise FOD inspections of work areas. Findings of the committee are annotated on report cards and displayed in the applicable work area. An outgrowth of the program is FOD awareness week, usually held in March of each year to highlight our FOD prevention poster contest and other unique incentive programs designed to increase and maintain employee awareness. The success of our OC-ALC FODE committee program has been submitted as a "Best Practice" to Headquarters AFMC and Headquarters Air Force. All aspects of our FOD prevention activities, such as tool control, housekeeping, parts protection, and hardware control have improved as a result of the efforts of the FODE committees. The OC-ALC comprehensive training program for FOD prevention consists of a one-hour lecture with audiovisual aids, training films, physical examples of FOD, and tool control procedures. This annual training is mandatory for all shop supervisors and employees. To ensure our self-imposed standards are effective and complied with, LMKAC employees work to strict tool control procedures, practice good housekeeping, and comply with the LMKAC FOD prevention program. Our FOD prevention program starts with a receiving inspection when equipment, parts, materials, and engines are brought under control of LMKAC. It is integrated in each of our processes and continues until the equipment, parts, materials or engines are delivered to the government. Employees are provided training in FOD prevention during initial orientation. This training emphasizes that FOD prevention is everyone's job, and each individual accepts the responsibility for their actions that lead to the generation of the foreign objects. The LMKAC FOD prevention program includes procedures, management personnel dedicated to FOD prevention, and technical resources required, ensuring requirements are met. FIRE PREVENTION AND PROTECTION Our fully staffed and trained Tinker Air Force Base Fire Department works closely with our Safety Office to provide fire prevention and protection systems for the protection of government property and personnel. LMKAC has administrative, procedural, and educational programs in place, that minimizes the risk of fire. Fire suppression resources include company employees specifically trained in fire suppression as well as access to local community emergency fire fighting services trained in the management of industrial related fires. Fire suppression equipment and systems and personnel trained in their use are provided at a level that is capable of successfully containing or extinguishing any fire or ignition that may result from operations at the Kelly facility. Elements of these programs required by regulation are incorporated by reference. Fire prevention and suppression resources and programs meet all applicable regulatory and contractual requirements. General policy guidelines reinforce the importance of fire prevention in the work areas. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 62 Source Selection Sensitive
EX-10.21319th Page of 414TOC1stPreviousNextBottomJust 319th
COP-7 ENVIRONMENTAL PROGRAM. THE OC-LM TEAM IS DEDICATED TO PROVIDING TIMELY LOGISTICS SUPPORT FOR DEFENSE AEROSPACE WEAPON SYSTEMS WORLDWIDE WHILE AT THE SAME TIME PROTECTING AND ENHANCING OUR ENVIRONMENT. THE OC-ALC AGGRESSIVE ENVIRONMENTAL PROGRAM HAS SET THE STANDARD FOR DEFENSE INSTALLATIONS EVERYWHERE. The PBA work must be accomplished in accordance with the National Environmental Policy Act (NEPA) and AF Instruction 32-7061. Working closely with regulatory agencies at local and federal levels is of paramount importance. By including these officials in the decision-making process through face-to-face meetings and almost daily telephone contact, we smooth the process of regulatory approval and cut through the "red tape" that can slow down environmental efforts. Tinker AFB has won over 40 major environmental awards since 1990 including the following: - Secretary of Defense Environmental Quality Award - 1990 - Air Force Environmental Restoration Award - 1991 - AFMC Environmental Compliance Award - 1992 - Secretary of Defense Pollution Prevention Award - 1993 - Renew America Award for Outstanding Lead Program - 1994 - Department of Energy Award for Renewable Energy - 1994 - Air Force Award for Environmental Quality - 1996 Our commitment to the safety and health of Tinker Air Force Base residents, workers, and surrounding communities combines all environmental disciplines. Our integrated environmental team is the driving force behind our environmental pledge to be a "good neighbor" to our workers and surrounding communities. This major goal is accomplished though the following: - Minimization of Hazardous Chemicals and Wastes Associated with Industrial Operations - Restoration of Areas Affected by Past Industrial Practices - Full Compliance with all Applicable Local, State, and Federal Environmental and Occupational Safety and Health Laws - Safety and Protection of The Health Well-Being of Base Workers and Residents - Preservation and Enhancement of Tinker's Abundant Natural Resources - Open and Responsive Contact with the Community, Media, and Regulatory Agencies Through the unrelenting dedication of our Environmental Compliance Division, staffed with engineers, chemists, biologists, and environmental protection specialists, ensures compliance with Environmental Protection Agency (EPA) regulations in our day-to-day activities. At OC-ALC our goal is to handle and store materials providing optimum protection against accidents. Hazardous materials are strictly and precisely handled, tracked, and stored. Our hazardous waste reduction record provided in Figure COP-7-1 demonstrates our commitment to protect the environment. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 63
EX-10.21320th Page of 414TOC1stPreviousNextBottomJust 320th
[CHART] Figure COP-7-1 Hazardous Waste Reduction. With 57% at the end of 1997, OC-ALC has already exceeded the AFMC goal for hazardous waste reduction of 50% by the end of 1999. OC-ALC meets the requirements of the Clean Water Act, SARA Title III, and all pertinent Resource Conservation and Recovery Act regulations. Our pollution prevention program continually strives to minimize the use of hazardous chemicals and promotes use of safer alternatives. We have found that many times we can incorporate an alternative process that improves production quality and speed as well. Some examples of our environmentally friendly production processes follow: WATER JET CLEANING Use of high-pressure water for cleaning parts and stripping coatings began at OC-ALC in 1987. We save over $86,000 per year by avoiding chemical purchases and disposal costs of spent solutions. Water jet cleaning is used primarily to remove sealant, adhesives and rubberized coatings from engine components and we have the capability to strip abradable thermal spray coatings, fiberglass, paint, and aluminum vane wraps. Using water jet cleaning eliminates 2,360 gallons of methylene chloride based, rubber strip solution per year. The process also reduces process times from days to minutes and virtually eliminates the chance for part damage. CARBON DIOXIDE (CO(2)) BLAST SYSTEM The CO(2) blast system uses dry ice pellets to spot clean parts, remove carbon deposits, corrosion, and paint residue from engine components. This process has virtually eliminated labor intensive manual wiping and buffing. Since the solid CO(2) pellets vaporize upon impact there is no contaminated grit to dispose of and no possibility of abrasive grit being trapped in component cavities. This results in much quicker processing time and reduced hazardous waste generation. Use of CO(2) blasting saves approximately $125,000 per year. CONSOLIDATION OF ACID ETCH PROCESSES Acid etch-processes are required on GE engine components prior to NDI to reveal hidden cracks. We consolidated our acid etch processes into one location to control hazardous waste and minimize personnel exposure to hazardous materials. An acid etch facility was designed [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 64 Source Selection Sensitive
EX-10.21321st Page of 414TOC1stPreviousNextBottomJust 321st
and installed in Propulsion Production Division using environmental management funds. The facility provides a controlled environment for storage, use, and disposal of the solutions. The amount of solutions on hand is minimized reducing the amount of hazardous waste for disposal. The facility is designed to handle spill situations should they arise including automatic notification of emergency response personnel. ELIMINATION OF OZONE DEPLETING SUBSTANCES (ODS) OC-ALC has aggressively pursued material and process substitutions to improve production and minimum hazardous chemical usage. The Air Force ban on purchases of ODS mandates we cease all engine repair and overhaul processes using ODS. This could have produced a major negative impact on our mission. However, our goal to review all pertinent technical orders and remove requirements of ODS usage by 1999 is [ILLEGIBLE] track as depicted in Figure COP-7-2. Our [ILLEGIBLE] to substitute less hazardous engine and component repair processes, that are equally effective, provide the following benefits: - Eliminates Over 25 Tons of Hazardous Waste Each Year - Provides Cleaner Engine Components - Replaces Hazardous Solvents with High Pressure Water - Prevents Exposure of Personnel to ODS Solvents The LMKAC environmental policy manages operations to minimize adverse effects on the environment and the safety and health of our employees, customers, and the communities surrounding our facilities. LMKAC complies with federal, state, and local laws and regulations related to environment, safety, and health. Achieving and maintaining compliance with environmental laws and regulations require employee awareness and commitment. To meet our legal and ethical responsibilities to employees and the San Antonio community, we [CHART] Figure COP-7-2 OC-ALC Weapon System ODS Tech Data Reviewed/Clean. Ninety-three percent of all OC-ALC technical orders have been reviewed and revised to eliminate requirements for use of ODS chemicals. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Source Selection Sensitive 65
EX-10.21322nd Page of 414TOC1stPreviousNextBottomJust 322nd
have an established ESH administrative structure with responsibilities for environmental management. The ESH administration, through a coordinated effort with OC-ALC's Environmental Management Directorate, ensures compliance with the various regulatory agency requirements. The responsibility for administering these policies and procedures at the operating company level is assigned to the ESH function. Unless specifically prohibited by customer directives, it is our intent to use substitution products or processes that are less hazardous and still meet contractor work specifications per the technical order specifications as shown in Figure COP-7-3. LMKAC properly manages hazardous wastes generated at the site and segregates, collects, recycles and reuses, neutralizes, or disposes of hazardous waste as appropriate. Employees responsible for the handling, storage, and disposal of hazardous materials are certified as hazardous material handlers. Employees who use or handle hazardous materials are trained in associated procedures and controls through LMKAC's hazardous communication and hazardous materials/waste management program. [CHART] Figure COP-7-3. LMKAC Hazardous Materials Identification and Reduction. LMKAC will use a commercial, systematic process at San Antonio to identify and reduce the use of hazardous materials. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] 66 Source Selection Sensitive
EX-10.21323rd Page of 414TOC1stPreviousNextBottomJust 323rd
SASA, INC. PROPOSAL - EXHIBIT G CONTRACTOR WORK SPECIFICATION Type of Work: Repair/Overhaul Type of Equipment: USAF/US NAVY T56/501 engines, power sections, compressor modules, turbine modules, turbine rotors, reduction gearboxes, torquemeters, and associated components and accessories. - CONTENTS - [Download Table] Section I General 1.1 Scope 1.2 Terms Explained 2.0 Applicable Documents Section II Receipt and Induction of End item at Facility 3.1 Handling 3.2 Preservation 3.3 Inventory Section III Work Requirements 4.1 General 4.2 Management 4.3 Common USAF/US NAVY Work Requirements 4.4 Specific USAF T56-A7B/A15 Work Requirements 4.5 Specific US Navy T56-A14/A16/425 Requirements 4.6 Specific US Navy 501-K17 Work Requirements 4.7 Technical data 4.8 Reporting Requirements 4.9 Preparation for Shipment and Storage 4.10 Facilities, Equipment and Tooling 4.11 Personnel 4.12 Supply Support 4.13 Quality 4.14 Measuring and Test Equipment 4.15 Training and Certification 4.16 Depot Contract Repair 4.17 Customer Support 4.18 Safety 4.19 Warranty 4.20 Over and Above [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 1 of 61
EX-10.21324th Page of 414TOC1stPreviousNextBottomJust 324th
SECTION I - GENERAL 1.1 SCOPE 1.1.1 This work specification delineates the T56/501 management, technical, and logistics processes required to perform the overhaul, repair, and modification of the PBA workload (as defined by the end items listed in Exhibits B-E). Applicable engines, engine accessories and related parts shall be overhauled/repaired, modified, tested, prepared for storage, and shipped in accordance with the requirements in this Contractor Work Specification, and the terms of the contract. The work encompasses the transition of workload from Government to SASA control, the minimum work requirements to return PBA end items to a serviceable condition, and the collection and delivery of data in support of existing Government systems. 1.1.2 The work outlined for accomplishment is the Propulsion Business Area T56-A7B/15, T56-A-14/16/425, and 501K17 Workload (specifically the end items listed in Exhibits B-E) that has historical]y been accomplished by the Government at the San Antonio Air Logistics Center (SA-ALC). This work specification is based on the Statement of Objectives (SOO), and the Technical Requirements Document (TRD), contained in the Propulsion Business Area Public/Private Competition Request for Proposal (RFP) F41608-98-R-0084. 1.1.3 The maintenance concept for the T56/501 series engines, parts and related accessories is based on the principle of "On Condition Maintenance" (OCM). All maintenance, even overhaul, is based on the actual condition of the item as determined at dismantling through review of history logs, inspection, testing, occurrence of a specific event, or expiration of operating time limits, which themselves are based upon previously determined conditions. 1.2 TERMS EXPLAINED 1.2.1 The purpose of this section is to establish a mutual basis of order to prevent misinterpretation of engine terminology and processing requirements. Generally accepted descriptions of equipment and processing terminology expressed by using acronyms or colloquialisms are unacceptable unless in exact agreement with all parties involved. Terminology used and not defined elsewhere in this document shall be defined by OPNAVINST 4790.2, Vol. III, Appendix C or Naval Aviation Depot (NADEP), Alameda Local Engineering Specifications (LES) 61-0-0500 and 61-1-051A. ACCESSIBLE: Applied to area of equipment that may be inspected or worked without disassembly other than that required by this specification. ACCESSORIES: Accessories include the following: fuel control, fuel pump, temperature datum valve, speed sense control valve, enrichment valve, temperature datum amplifier, fuel nozzle, coolers, and gearboxes. Typically these accessories can be removed and replaced at all levels of maintenance. Accessories, which may have Scheduled Removal Component or Equipment History Record Cards, are removed from service by fleet maintenance activities for intermediate or depot level processing iaw the scheduled removal interval or for failure to function. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 2 of 61
EX-10.21325th Page of 414TOC1stPreviousNextBottomJust 325th
AESR (AERONAUTICAL EQUIPMENT SERVICE RECORD): A logbook required for U.S. Navy and Marine Corps Aircraft which accompanies the Power Section, Reduction Gearbox, or Torquemeter at all times and provides a history of maintenance, operation, and configuration control. AESR SUPPLEMENTAL FORMS: Forms which provide for the recording of complete maintenance history, installation, usage, and configuration data on turbine and compressor rotors, accessories, and designated items. AESR supplemental forms must accompany specified components at all times. AGILE LOGISTICS: A logistics approach to improve readiness, anticipate changing word scenerios, respond to daily customer demands and support ongoing operations. ASSEMBLY SERVICE RECORD (ASR): Aeronautical Equipment Record which denotes the configuration of an assembly by Part Number (P/N), Serial Number (S/N), Time Since New (TSN), Time Since Overhaul/Repair (TSO/TSR), and time remaining on it's life limit. ASR provides complete history of repair, installation, removal, modification, configuration and usage. The ASR accompanies the component throughout it's service life and is included in the Module Service Record (MSR). ATTRITION: A method of introducing an improved part or group of parts into an end item or component thereof, wherein the old parts are used until their supply is exhausted; at which time, the new part or group of parts are used whenever replacement of the installed part or group of parts is required. BENCH CHECK: Visual inspection, physical test, functional check using shop facilities, equipment, procedures, and test parameters as set forth in technical publications to determine the exact condition. BEYOND ECONOMICAL REPAIR: When the cost of repair exceeds 75 percent of the current stock list price. CALIBRATION: A comparison of two instruments or measuring devices, one of which is a standard of known accuracy to detect, correlate, or adjust any variation in the accuracy of the instrument being compared. CHECK AND TEST: A quantitative analysis of a component suspected of being defective. Analysis is accomplished by applicable shops to specified standards, typically 03 series accessory manuals or appropriate sections of the 6-2 series depot level repair manuals. Only minor repairs and adjustments are allowable under this process. If repairs required are substantial, reschedule the component and process for depot level repair as necessary. COMPRESSOR MODULE: The complete assembly of compressor section components as specified in the applicable illustrated parts breakdown listed in this work specification. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 3 of 61
EX-10.21326th Page of 414TOC1stPreviousNextBottomJust 326th
COGNIZANT ENGINEERING AUTHORITY: The government activity that has been assigned the authority and responsibility of engineering support. COGNIZANT FIELD ACTIVITY (CFA): A field activity that has been assigned the authority and responsibility of maintenance, engineering and basic design. CONDEMNED ITEM: Any item that is considered beyond TO reparable limits. The item either cannot be repaired or the estimated cost of repair, including material and labor, exceeds the maximum repair allowance established for the affected item. CONDEMNED TO SALVAGE: An item declared obsolete or beyond economical repair, and which has serviceable or reparable parts, which may be reclaimed for return to the supply system. CONDEMNED TO SCRAP: An item declared obsolete or beyond economical repair, and which has no parts to be returned to the supply system. COMPRESSOR ROTOR ASSEMBLY: The assembly of compressor wheel components and parts which include 1-14th stage wheels, pins, blades, tie bolts, and associated hardware used in the assembly of the Compressor Rotor. COMPRESSOR CASE ASSEMBLY: Compressor case, vanes, and bleed manifolds assembled as a replaceable unit at the Intermediate Maintenance Level. COMPRESSOR AIR INLET HOUSING ASSEMBLY: The compressor air inlet housing, compressor extension shaft housing (studding), compressor extension shaft/side gear assembly, compressor air inlet and anti-icing vane assembly, and compressor front labyrinth seal assembly. COMPONENT CLASSIFICATION (RELIABILITY CENTERED MAINTENANCE (RCM) ANALYSIS): a. HARD TIME LIMITED - These components that are identified as fracture critical have a safety inspection interval for performing a detailed inspection. b. ON-CONDITION - These components are time dependent but their condition can be assessed without removal from the engine. A repetitive test or inspection is used to determine their condition. c. CONDITION MONITORED - These components do not require detailed or repetitive inspections. Their condition is not flight safety related and remains in service until impending failure is detected by EMS, condition monitoring, or reported by a flight crew. DATA: Includes all management, scientific engineering, and logistic information, reports, and documentation which are contractually required. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 4 of 61
EX-10.21327th Page of 414TOC1stPreviousNextBottomJust 327th
DEPOT LEVEL MAINTENANCE FACILITY: An industrial type facility established to perform accessory overhaul functions or modifications and maintenance in support of field and using organizations. This includes AFMC assigned installations and commercial contractors who are engaged in performing depot level work on weapon systems for equipment under a contract issued and managed by AFMC. DISASSEMBLY: Teardown of the end item or component parts sufficient to permit the type and amount of inspection and rework required herein. END ITEM: A complete piece of equipment as listed in government supply catalogs. ENGINE: The complete basic engine as specified in applicable technical order handbooks listed in this work specification. ENGINE ACCESSORIES: All external items contained in the oil, fuel, ignition, and control systems that are normally removed for rework or replaced without disassembly of the engine. ENGINE ACCESSORY PARTS: All assemblies, sub-assemblies or components and detailed parts pertinent to engine accessories. ENGINE MINOR OVERHAUL: Maintenance which restores low time operated engines or engine accessories, when extensive damage is not indicated, to serviceable status without accomplishing complete disassembly. ENGINE PARTS: All items of the basic engine, excluding engine accessories and parts thereof. EQUIPMENT HISTORY RECORD (EHR): A record which denotes configuration, operation, and maintenance history for a designated item being tracked for age exploration under the Navy Reliability Centered Maintenance program by the CFA. Record accompanies component throughout its service life and is included in the MSR. EXAMINATION AND EVALUATION (E&E): Personnel that control the depth of rework. They are knowledgeable on the T56 engine, Reliability Centered Maintenance (RCM) principals shop procedures and capability. EXTERNAL ACCESSORIES: All components of the Power Section or Reduction Gearbox that are attached to the outside portion of the Power Section, and Reduction Gearbox. Includes fuel, lubrication, ignition, control, and bleed systems. External accessories may be routinely removed/replaced by organizational level maintenance activities to keep a unit in service. FLEET SUPPORT TEAM (FST): A field activity that has been assigned the authority and responsibility of maintenance, engineering, and basic design. The FST for this effort is: Naval Aviation Depot, Jacksonville, FL 32212. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 5 of 61
EX-10.21328th Page of 414TOC1stPreviousNextBottomJust 328th
INITIAL PRODUCTION EVALUATION (IPE): Initial Production Evaluation is an evaluation of one or more end items and their components first produced under the SOR's normal production plan designed to accomplish the requirements of the work specification and contract or project directive. SOR services, processes, systems and procedures required to accomplish specific statements of work shall also become subjects of the Initial Production Evaluation. IN-PROCESS INSPECTION: An inspection performed during the assembly of an end item or its components at those stages when further assembly would prevent inspection for compliance with applicable technical orders. INSPECT OR CHECK: An examination of an item to determine identity, condition, and proper installation. INTERMEDIATE MAINTENANCE ACTIVITIES (IMA): These activities are established by OPNAVINST 4790.2E and the T56 Maintenance Plan (PPMP 0002). The latest version of NAVAIR Note 4700 defines individual site capabilities MAJOR REPAIR: Any repair action that requires special equipment, methods, facilities and skills. Typically such repairs are welding requiring heat treat, replating, recoating, any repair of rotating parts requiring balancing, disassembly of rotors, etc. MATROC: The application of inspection and testing procedures and techniques without removal or disassembly that allows the condition of the equipment to dictate the need for maintenance or the extent of repair required to retore serviceability. MAXIMUM OPERATING TIME (MOT): The maximum allowable time a component or accessory is authorized to operate between overhaul internals. Maximum operating times are controlled by CFA and listed in the applicable specific Periodic Maintenance Information Card (PMIC) Publications by aircraft type. MINOR REPAIR: Any repair action that, in general, requires no specialized equipment, facilities, methods or skills. It includes, however, adjustments, removal and replacement of major parts, i.e., turbine or compressor rotors for example. MODIFICATION: A change in the physical configuration or in the functional characteristics of a system or equipment. Incorporation of a Power Plant Change (PPC) resulting in the physical modification of a component where no other process is required MODULE SERVICE RECORD (MSR): Equipment record for one of the three modules (Power Section, Torquemeter, and Reduction Gearbox) which denotes configuration of a module and its service history. MSR provides repair history, installation, modification, removal, and usage for a specific module. The MSR accompanies module throughout its service life and is included in the AESR when installed in a propulsion system. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 6 of 61
EX-10.21329th Page of 414TOC1stPreviousNextBottomJust 329th
NEW INSTALLATION: Installation of a new or RFI component as directed by an authoritative document. NON-DESTRUCTIVE INSPECTION (NDI): Methods for investigating the quality, integrity, properties and dimensions of material and components without damaging or impairing their serviceability. ON CONDITION MAINTENANCE: The application of inspection and testing procedures and techniques without removal or disassembly that allows the condition of the equipment to dictate the need for maintenance or the extent of repair/overhaul required to restore serviceability. OVERHAUL: The disassembly, cleaning, inspection, rework, or replacement of parts or components, reassembly and test of any item or accessory in accordance with applicable technical orders, directives, or authorized manufacturers publications to provide an operationally safe and serviceable item. OVERHAUL ACTIVITY: An agent or principal facility having capability to completely process al1 modules components, accessories, and parts as required in applicable maintenance plan, depot maintenance instructions or overhaul manuals. OPPORTUNISTIC SCREEN: A removal screen that allows for the early replacement of hard time limited components. It is applied to the SRUs and components whenever the engine makes a shop visit. POWER PLANT BULLETIN (PPB): Technical directive which directs a one time inspection of a Power Section, Torquemeter, or Reduction Gearbox. The PPB contains related instructions and disseminates administrative and management information as related to the maintenance of the power plant. POWER PLANT CHANGES (PPC): Technical directive containing instructions and directives to accomplish a material change, modification, repositioning, or alteration in the physical appearance or installation of different parts in subassemblies, assemblies, or components in a system or specific part of a Power Section, Reduction Gearbox, or Torquemeter. POWER SECTION: The complete assembly of a power section unit assembly as specified in the applicable IPB listed in this work specification. PRODUCT AUDIT: An inspection and evaluation of a repaired or modified item for the purpose of government verification that all work directed fully complies with contractual requirements. QUALITY AUDIT: an inspection and/or test of end products, detail parts, assemblies, or accessories identified as serviceable by the SOR combined with, or accomplished separately from the evaluation of an SOR's work instructions, systems, processes, or services, as related to a specific statement of work. Audits may be accomplished one or more times during the life of a contract project directive or project order. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 7 of 61
EX-10.21330th Page of 414TOC1stPreviousNextBottomJust 330th
QUALITY CONTROL DEFICIENCY (QCD): A deficiency attributable to sub-standard workmanship errors, or nonconformance to technical requirements. RECLAMATION: The process of disassembly of end items to recover serviceable or economically reparable spare parts. REDUCTION GEARBOX: The complete assembly of the reduction gear section and associated accessories as specified in the applicable illustrated parts breakdown technical orders listed in this work specification. The terms reduction gearbox and gearbox are used interchangeably in this specification. REMOVE FOR ACCESS: Temporary removal of an assembly/component from a module in order to gain access for examination of the engine or for the removal of other components to be processed. No processing of the "removed for access" component is required. Item shall be visually inspected to insure no failure is pending. REPAIR: The restoration to serviceable condition or replacement of parts or components of material IAW an end item's governing TO in order to maintain the specific item of material in efficient operating condition. REPAIRABLE: Pertains to condition. An unserviceable item that can by economically repaired and restored to a serviceable condition. REPARABLE: Pertains to status. An unserviceable item that can be economically repaired and restored to a serviceable condition. RETROFIT: A method by which an improved part or group of parts replaces old parts, or groups of parts, regardless of their condition. RECLAMATION: The process of disassembly of end items to recover serviceable or economically repairable spare parts. REWORK: The process of restoring an end item to a serviceable condition by a Depot Level Maintenance Facility. SAVE LIST: A listing of parts, accessories or accessory parts to be removed from reclamation Power Sections, Reduction Gearboxes, Torquemeters, and/or Power Section accessories. Power Section containers and other transportation devices are sometimes included on this list. SCHEDULED REMOVAL COMPONENT (SRC)CARD: Aeronautical record which signifies a specific item must be removed after a specified operating period. Provides for the recording of complete maintenance history, installation, usage and configuration data. SRC Card accompanies the component at all times when not installed and is made a part of the Aeronautical Equipment Service Record when installed. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 8 of 61
EX-10.21331st Page of 414TOC1stPreviousNextBottomJust 331st
SERVICEABLE: Capable of meeting the requirement and performing the function for which it was designed or modified, and meets all test requirements established by the work specification. SOURCE OF REPAIR (SOR): The maintenance facility at which repair is performed. SPECIFIC REPAIR: The remedial action performed on a component to correct a known and specific defect. A specific repair does not normally include: (1) incorporation of technical directives except where a technical directive would serve as the most simple expedient to correct the defect or (2) check and test except where this process is required to validate the specific repair or insure functional integrity of the component. Adjustment to the time since repair on a scheduled removal component is not permitted as a result of performing specific repair. STANDARD REPAIR: Engine Assembly requiring Repair/Rework level maintenance designed to restore a component(s) to serviceable condition by accomplishing only those maintenance actions deemed necessary by inspection or as specified by authoritative documents, and depot maintenance instructions. STANDARD REWORK: An optimized depth of rework using RCM concepts designed to restore a component to serviceable condition and to restore the inherent reliability characteristics by accomplishing only those depot processes deemed necessary by inspection or as specified by authoritative documents. STRUCTURAL MAINTENANCE INSPECTION INTERVAL: An inspection interval that has been established for the fracture critical components. THOROUGH INSPECTION: An external inspection and disassembly to the extent necessary to determine the exact physical condition of the item. TECHNICAL ORDER: A publication that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of given items and equipment. TIME COMPLIANCE TECHNICAL ORDER (TCTO): The authorized directives issued to provide instructions for accomplishing one time changes, modifications or inspections of equipment or installation of new equipment. TORQUEMETER: The complete assembly of the components in the torquemeter section as specified in the applicable illustrated parts breakdown technical manuals listed in this work specification. TURBINE MODULE: The complete assembly of turbine section components as specified in the applicable illustrated parts breakdown technical manuals listed in this work specification. TWO LEVEL/RELIABILITY CENTERED MAINTENANCE (RCM): Maintenance action required to produce a serviceable engine capable of reaching the next scheduled maintenance interval without adverse effect to the reliability of the engine which incorporates certain functions, QEC kit [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 9 of 61
EX-10.21332nd Page of 414TOC1stPreviousNextBottomJust 332nd
removal and installation, previously performed during Jet Engine Intermediate Maintenance (JEIM). ZERO TIMING OF TRACKED COMPONENTS: Specifically setting of MSR, ASR, SRC, HER, time since repair, or time since overhaul to zero upon completion of depot level repair processing. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 10 of 61
EX-10.21333rd Page of 414TOC1stPreviousNextBottomJust 333rd
ACRONYMS OR ABBREVIATIONS [Enlarge/Download Table] 2LM Two Level Maintenance 3LM Three Level Maintenance AC Alternating Current ACC Aircraft Controlling Custodian ACI Analytical Condition Inspection ACO Administrative Contracting Officer AEMS Aircraft Engine Management System AESR Aeronautical Equipment Service Record AF Air Force AFH Air Force Handbook AFI Air Force Instruction AFJI Air Force Joint Instruction AFM Air Force Manual AFMC Air Force Material Command AFMCI Air Force Materiel Command Instruction AFMCM Air Force Material Command Manual AFMETCAL Air Force Metrology and Calibration Program AFOSH Air Force Occupational and Environmental Safety, Fire Protection, and Health AFOSHSTD Air Force Occupational Safety and Health Standard AFPAM Air Force Pamphlet AFPD Air Force Policy Directive AFSC Air Force System Command AFTO Air Force Technical Order AIG Address Indicator Group AIMD Aircraft Intermediate Maintenance Department AIMSO Aircraft Intermediate Maintenance Support Office AIS Automated Induction System ALC Air Logistics Center AMS Aerospace Material Standard ASD Aircraft Statistical Data ASO Aviation Supply Office (Changed to NAVICP) ASR Assembly Service Record AWM Awaiting Maintenance AWP Awaiting Parts AYB Accessory Bulletin AYC Accessory Change BCM Beyond Capability Maintenance BEQ Best Estimated Quantity BOL Bill of Lading BOM Bill of Material Brng Bearing [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 11 of 61
EX-10.21334th Page of 414TOC1stPreviousNextBottomJust 334th
[Download Table] C & A Controls and Accessories CAGE Contractor and Government Entity Code CAMS Core Automated Maintenance System CCB Configuration Control Board CD1 Collateral Duty Inspector CDRL Control Data Requirements List CE Civil Engineering CEA Cognizant Engineering Authority CEMS Comprehensive Engine Management System CER Complete Engine Repair at Intermediate Maintenance Level CFA Cognizant Field Activity CFAE Contractor Furnished Aeronautical Equipment CFM Contractor Furnished Material CFR Code of Federal Regulations Chg Change CIT Compressor Inlet Temperature CITS Central Integrated Test System CREP Contract Repair enhancement Program DEEC Digital Electronic Engine Control DFARS Defense Federal Acquisition Regulations DID Data Item Description DIDR Dimensional Inspection/Dimensional Run DIR Disassembly Inspection Report DMI Depot Maintenance Instructions DMISA Depot Maintenance Interservice Support Agreement DoD Department of Defense DODD Department of Defense Directive DODISS Department of Defense Index of Specifications and Standards DREP Depot Repair Enhancement Program DRMO Defense Reutilization Marketing Office DS Directionally Solidified E&E Evaluation and Examination EAMP Engine Analytical Maintenance Program EB Engine Bulletin EDPA External Pressure Disconnect Assembly EDU Engine Diagnostics Unit EEC Electronic Engine Control EHM Engine Heavy Maintenance EHR Equipment History Record EIC Excellence in Competition EIH Engine Installation Hardware EIM Engine Item Manager ELIN Exhibit Line Item Number [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 12 of 61
EX-10.21335th Page of 414TOC1stPreviousNextBottomJust 335th
[Download Table] ENMCS Engines Not Mission Capable Supply EOT Engine Operating Time ESD Electrostatic Discharge ESDS Electrostatic Discharge Sensitive ESS Environmental Stress Screening ETD Electronic Temperature Datum ETR Engine Transaction Report EXPRESS Execution and Prioritization of Repair Support System FC Fuel Control FOB Freight on Board FOD Foreign Object Damage FPI Fluorescent Penetrant Inspection FPS Finished Parts Storage FRSM Fleet Readiness Support Meeting FST Fleet Support Team FTIT Forward Turbine Inlet Temperature GFE Government Furnished Equipment GFM Government Furnished Material GSE Ground Support Equipment HIS Handbook of Service Instructions HP High Pressure HPT High Pressure Turbine Hrs Hours HSI Hot Section Inspection HSM Hot Section Maintenance I & S Interchangeability & Standardization I&DMM Intermediate and Depot Maintenance Manual IAFB Interim Airframe Bulletin IAFC Interim Airframe Change IAW In Accordance With ICW In Compliance With IDEA Innovative Development Employee Awareness IGV Inlet Guide Vane I-Level Intermediate Level ILS Integrated Logistics Support IM Item Manager IMA Intermediate Maintenance Activities IMI Intermediate Maintenance Instructions IPB Illustrated Parts Breakdown IPE Initial Production Evaluation ISO International Organization for Standardization (Recognized short version) ITS Integrated Tracking System JEDMIC Joint Engineering Data Management Information Central System [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 13 of 61
EX-10.21336th Page of 414TOC1stPreviousNextBottomJust 336th
[Download Table] JEIM Jet Engine Intermediate Maintenance LCF Low Cycle Fatigue LES Local Engineering Specification LPOI Logistics Propulsion Directorate Operating Instruction LPS Local Process Specification LPT Low Pressure Turbine LRU Line Replacement Unit M&TE Measuring and Test Equipment MAF Maintenance Action Form MATROC Maintenance Accessory Test and Repair On Condition MCR Manual Change Release MDR Material Deficiency Report MFC Main Fuel Control MIL HDBK Military Handbook MIL STD Military Standard MMH/EFH Maintenance Man Hours/Engine Flying Hours MOP Main Oil Pump MOT Maximum Operating Time MPCAG Military Parts Control Advisory Group MRB Material Review Board MRC Maintenance Requirements Card MSR Module Service Record NADEP Naval Aviation Depot NAFPI National Aerospace Foreign Object Damage Prevention Incorporated NAMO Naval Aviation Maintenance Office NAMP Naval Aviation Maintenance NAS National Aerospace Standard NAVAIR Naval Air NAVICP Naval Inventory Control Point (ASO Previously) NAVSEASYS COM Naval Sea Systems Command NAVSUP Navy Supplement NAWC Naval Air Warfare Center NCMR Non Conforming Material Review NCW Not Complied With NDI Non Destructive Inspection NFPA National Fire Prevention Association NTS Negative Torque Signal OC-ALC Oklahoma City Air Logistics Center OC-LM Oklahoma City Air Logistics Center - Lockheed Martin Industry Team OCM On Condition Maintenance OEM Original Equipment Manufacturer OI or HOI Overhaul Instructions [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 14 of 61
EX-10.21337th Page of 414TOC1stPreviousNextBottomJust 337th
[Download Table] OPNAV Operational Navy OPNAVINST Operational Navy Instruction P&D Pressurizing & Dump P/N Part Number PAO Project Administrative Officer PBA Propulsion Business Area PCO Procuring Contracting Officer PCW Previously Complied With PDM Programmed Depot Maintenance PMEL Precision Measuring Equipment Laboratory PMIC Periodic Maintenance Information Card PMR Program Management Review PMS Production Management Specialist PPB Power Plant Bulletin PPC Power Plant Change PPSL Parts Program Selection List PQDR Product Quality Deficiency Report PS Process Specification PTO Power Take Off PWA Pratt-Whitney Aircraft QA Quality Assurance QAR Quality Assurance Representative QCD Quality Control Deficiency QDR Quality Deficiency Report QEC Quick Engine Change QECA Quick Engine Change Assembly R & M Reliability & Maintainability RA Reworks Activity RCM Reliability Centered Maintenance RCS Reports Control Symbol RFI Ready for Issue RGB Reduction Gearbox S/V Survivability/Vulnerability SA-ALC San Antonio Air Logistics Center SE Support Equipment SMR Source of Maintenance Reliability SOO Statement of Objectives SOR Source of Repair SRC Scheduled Removal Component SRU Shop Replacement Unit SSQ Special Skills Qualification TBD To Be Determined TCTO Time Compliance Tech Order TDR Teardown Deficiency Report [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 15 of 61
EX-10.21338th Page of 414TOC1stPreviousNextBottomJust 338th
[Download Table] TDSA Technical Directive Status Accounting TIM Technical Interchange Meeting TIT Turbine Inlet Temperature TM/CFA Technical Manual Cognizant Field Activity TMCR Technical Manual Contract Requirement TMF Turbine Mid Frame TMS Type, Model, Series TO Technical Order TRC Technology Repair Center TRD Technical Requirements Document TRF Turbine Rear Frame TSLO Total Service Life Operating TSN Time Since New TSO Time Since Overhaul TSR Time Since Rework/Repair UFC Unified Fuel Control VSV Variable Stator Vane WBS Work Breakdown Structure WCD Work Control Document WIP Work in Process WP Work Package WS Work Specification WRE War Readiness Engines WRT Wing Retained Task [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 16 of 61
EX-10.21339th Page of 414TOC1stPreviousNextBottomJust 339th
2.0 APPLICABLE DOCUMENTS The following documents, are common to all PBA T56 and 501 workloads. Supplements and changes to the Technical Orders (TO) listed, with a publication date prior to the release of the RFP, are considered to be applicable and within scope. 2.1 INDUSTRY DOCUMENTS [Download Table] REVISION NUMBER DATE TITLE ------------------ -------- ------------------------------------------------- ISO 9002 Jan 94 Quality Assurance NAFPI FOD Pamphlet May 97 FOD Prevention Guideline NAS 410 Jan 96 Certification & Qualification of Nondestructive Test Personnel NFPA 13 Jan 96 Sprinkler Systems NFPA 30 Jan 96 Flammable and Combustible Liquids Code NFPA 33 Jan 95 Standard for Spray Application Using Flammable or Combustible Materials Tentative Interim Amendment NFPA 410 Jan 94 Standard on Aircraft Maintenance NFPA 51 Feb 97 Welding Cutting and Allied Processes NFPA 70 Jan 96 National Electrical Code 1996 NFPA 72 Jan 96 National Fire Alarm Code 2.2 GOVERNMENT DOCUMENTS 2.2.1 TECHNICAL ORDERS [Enlarge/Download Table] BASIC LATEST CHANGE NUMBER DATE DATE TITLE ------------- --------- ----------------- --------------------------------------------------- 00-20-1 1 May 88 Chg 8 15 May 92 Preventative Maintenance Program General Policy Requirements and Procedures 00-20-2 15 Jan 98 Maintenance Data Documentation 00-20-3 l Sep 89 Chg 8 01 Oct 95 Maintenance Processing of Repairable Property and the Repair Cycle Asset Control System 00-20-5 1 Jun 96 Aircraft, Drone, Aircrew Training Devices, Engines, and Air-Launched Missile Inspections, Flight Reports and Supporting Maintenance Documents 00-20-5-1-9 Instr for Jet Engine Parts Tracking & Hist Records on T56 Series Engine 00-20-6 1 Jul 88 Chg 2 01 Sep 90 Inspection System, Documentation and Status Reporting for Ground-Launched Missiles and their Trainers, SE, and Group CE Equipment 00-25-113 30 Apr 95 Conservation, Segregation & Disposal of Critical Alloys and Precious Metals 00-25-115 1 Apr 89 Chg 9 01 May 93 Logistics/Maintenance Engineering Management Assignments [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 17 of 61
EX-10.21340th Page of 414TOC1stPreviousNextBottomJust 340th
[Enlarge/Download Table] BASIC LATEST CHANGE NUMBER DATE DATE TITLE ------------- --------- ----------------- --------------------------------------------------- 00-25-195 15 Apr 93 Chg 5 01 Apr 97 AF TO System Source, Maintenance, and Recovery Coding of AF Weapons Systems, and Equipment 00-25-200 1 Jan 89 Use of Parts Kit 00-25-203 1 Dec 72 Chg 15 24 Oct 92 Contamination Control of Aerospace Facilities, US Air Force 00-25-234 1 Aug 88 Chg 22 28 Jan 98 General Shop Practice Requirements for the Repair, Maintenance, and Test of Electrical Equipment 00-25-254-1 1 Oct 92 Chg 5 01 Apr 97 Comprehensive Engine Management System (User Manual) 00-25-254-2 15 Feb 93 Chg 2 01 Apr 97 System Manual Comprehensive Engine Management System for D042 00-35D-54 16 Jan 98 USAF Materiel Deficiency Reporting and Investigating System 00-5-1 30 Apr 97 AF Technical Order System 00-5-15 l May 97 AF Time Compliance Technical Order System 00-5-2 15 Apr 96 Chg l 01 Jun 97 TO System Distribution 00-85-20 15 Jun 89 Chg 16 01 Dec 96 Engine Shipping Instructions 00-110N-2 1 Mar 91 Radioactive Waste Disposal 00-110N-3 15 Aug 86 Chg 3 01 Jun 92 Handling, Storage 00-110N-4 1 Nov 90 Acquisition, Use, Storage, and Disposition of Nuclear Source Material 00-110N-7 1 Jan 90 Handling & Disposition of Radioactive Electron Tubes & Spark Gaps 1-1A-14 15 Feb 82 Chg 42 15 Jun 97 Installation Practices - Aircraft Electric & Electronic Wiring 1-1A-8 1 Sep 80 Chg 36 15 May 97 Aircraft Repair Structural Hardware 2-1-11 31 Oct 84 General Corrosion Control of Engine Parts During Overhaul & Field Maintenance 2-1-16 15 Aug 83 Reidentification by Serial Number of Aircraft Engines 2-1-18 1 Apr 92 Chg ll 01 Sep 97 Aircraft Engine & Module Management by Operating Limit & Pipeline Times 2-l-lll 15 Feb 90 Chg l5 15 Jun 97 Standard Maintenance Procedures 2J-1-13 31 Oct 60 Chg 31 15 Dec 93 Cleaning of Gas Turbine Aircraft Engines & Parts 2J-1-18 15 Feb 93 Chg 6 01 Jan 97 Preparation for Shipment & Storage of Gas Turbine Engine 2J-1-19 24 Jan 83 Inspection & Disposition of Gas Turbine Engines After Aircraft Accidents or Engine Dropped During Handling 2J-1-24 1 Jul 66 Chg 45 15 Oct 95 Equipment Comprising a Complete Basic Gas Turbine Engine 2J-1-27 1 Mar 82 Chg 2 01 Jan 83 Minor Overhaul of Gas Turbine Engines 2J-1-105 30 Mar 97 Calibration/Measurement Summary 33-1-37-1 1 Sep 90 Chg 3, 31 Sep 96 Joint Oil Analysis Program 33B-1-1 1 Mar 90 Chg 2, 1 Jun 92 Non Destructive Inspection [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 18 of 61
EX-10.21341st Page of 414TOC1stPreviousNextBottomJust 341st
[Enlarge/Download Table] BASIC LATEST CHANGE NUMBER DATE DATE TITLE ------------- --------- ----------------- --------------------------------------------------- 35AA4-6-4-1 Operation & Maintenance Instr 35B-1-12 1 Jul 76 Chg 2, 15 Dec 85 General Desiccant Activated For Dynamic and Static 33B1-2-2-1 2 Jul 48 Chg 4, 1 Aug 94 Fluorescent Penetrant Inspection 33B1-2-2-4 4 May 51 Fluorescent Penetrant Inspection 35D3-3-26-1 Operation, Service and Repair Model 3000 35D3-3-26-4 IPB 35D3-3-26-11 Operation, Service and Repair Model 3010 35D3-3-26-14 IPB 35D3-3-26-21 Instruction & IPB, Aircraft & Missile Engine Trailer, Model 3030 35D3-3-64-1 Operation, Service and Repair with IPB 35D3-3-65-l Operation, Service and Repair Model 3000E 35D3-3-65-4 IPB 35D3-3-74-1 Operation, Service and Repair, Model ETU-91/F 35D3-3-74-4 IPB 35E20-3-1-103 15 Aug 91 Chg 1 31 Mar 94 Overhaul Instructions, Reusable Metal Engine & Accessory Shipping Containers 42B-1-1 15 Sep 87 Chg 11, 13 Oct 96 Quality Control Fuel and Lubricants 42B-1-6 3 Oct 80 Chg l, 1 May 94 Corrosion Prevention Lubricant and Antiseize Compounds 42B2-1-1 1 Nov 82 Chg 9, 15 Oct 96 Use and Grades of Aircraft Engine Lubrication Oils 42B5-1-2 30 Dec 87 Chg 6, 15 Apr 96 Use & Handling Gas Cylinders 42C-1-1 1 Jul 76 Chg 2, 15 Dec 85 Desiccant for Dynamic & Static Dehumidification & Packing 42C2-1-7 15 Mar 79 Chg 23, 15 Apr 95 Process Instruction Metal Treatments 42E1-1-1 6 Jan 75 Chg 36, 15 May 96 Aerospace Hose Assemblies 42E2-1-2 1 Jul 91 Identification, Use & Disposal Hydraulic Packing & Gaskets 44B-1-102 3 Oct 74 Chg 20, 23 Oct 95 Anti-Friction Bearing Maintenance Instr 44B-1-122 31 Dec 88 Chg 1, 1 Jul 91 Maintenance of Aeronautical Anti-Friction Bearings 44H1-1-117 1 Oct 72 Chg 6, 1 Apr 95 General Installation-Heli-Coil Inserts 44H1-1-13 15 Nov 63 Chg 2, 30 Apr 81 Gen Use Rosan Fasteners 44H3-1-3 15 Mar 73 Chg 2, 15 Jul 75 Gen Use Boss, Cap & Tubing Seals [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 19 of 61
EX-10.21342nd Page of 414TOC1stPreviousNextBottomJust 342nd
2.2.2 REGULATIONS, POLICY DIRECTIVES, & Instructions [Download Table] NUMBER DATE TITLE ------------ -------- ------------------------------------------------------ AFI 10-602 Jun 94 Determining Logistics Support and Readiness Requirements AFI 16-201 Oct 94 Disclosure of Military Information to Foreign Governments and International Organizations AFI 21-102 Jul 94 Depot Maintenance Management AFI 21-103 Sep 97 Equipment Inventory, Status, and Utilization Reporting AFI 21-104 Jun 94 Selective Management of Selected Gas Turbine Engines AFI 21-105 Aug 94 Aerospace Equipment Structural Maintenance AFI 21-110 Aug 94 Engineering and Technical Services AFI 21-113 May 94 Air Force Metrology and Calibration (AFMETCAL) Program AFI 21-118 Jul 94 Improving Aerospace Equipment Reliability and Maintainability AFI 21-124 Feb 96 Air Force Oil Analysis AFI 21-129 May 98 Two Level Maintenance and Regional Repair of Air Force Weapon Systems and Equipment AFI 21-401 Jan 94 Engineering Data Storage, Distribution, and Control AFI 21-402 Mar 94 Engineering Drawing System AFI 23-105 Jun 94 Spares Breakout Program AFI 25-201 Dec 96 Support Agreements Procedures AFI 31-601 Apr 96 Industrial Security Program Management AFI 32-1054 May 94 Corrosion Control AFI 32-7020 May 94 Environmental Restoration Program AFI 32-7040 May 94 Air Quality Compliance AFI 32-7041 May 94 Water Quality Compliance AFI 32-7042 May 94 Solid and Hazardous Waste Compliance AFI 32-7044 Apr 94 Storage Tank Compliance AFI 32-7045 Apr 94 Environmental Compliance Assessment and Management Program AFI 32-7047 Mar 94 Compliance Tracking and Reporting AFI 32-7062 Apr 94 Air Force Comprehensive Planning AFI 32-7063 Mar 94 Air Installation Compatible Use Zone Program AFI 32-7064 Aug 97 Integrated Natural Resources Management AFI 32-7065 Jun 94 Cultural Resources Management AFI 32-7066 Apr 94 Environmental Baseline Surveys in Real Estate Transactions AFI 32-7080 May 94 Pollution Prevention Program AFI 34-127 Jul 94 Excellence in Competition (EIC) AFI 36-102 Feb 94 Basic Authority and Responsibility for Civilian Personnel Management AFI 36-2024 Feb 96 Staffing Civilian Positions AFI 36-2623 May 98 Occupational Analysis AFI 36-502 Mar 94 Managing Civilian Personnel Resources AFI 37-121 Feb 94 Authentication of Air Force Records AFI 37-160V6 Mar 94 The Air Force Publications and Forms Management Programs - Numbering Publications AFI 37-160V7 Nov 93 The Air Force Publications and Forms Management Programs - Publication Libraries and Sets AFI 37-160V8 Nov 93 The Air Force Publications and Forms Management Programs - Developing and Processing Forms [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 20 of 61
EX-10.21343rd Page of 414TOC1stPreviousNextBottomJust 343rd
[Download Table] NUMBER DATE TITLE ------------ -------- ------------------------------------------------------ AFI 38-201 May 94 Determining Manpower Requirements AFI 38-401 Feb 94 The Air Force Innovative Development Employee Awareness (IDEA) Program AFI 44-120 Apr 97 Drug Abuse Testing Program AFI 44-121 Aug 94 Alcoholism Rehabilitation Program AFI 51-301 Jul 94 Civil Litigation AFI 61-202 Jul 94 United States Air Force Technical Publications Program AFI 61-203 Jul 94 The Work Unit Information System AFI 63-101 May 94 Acquisition System AFI 63-201 Jul 94 Automatic Test Systems and Equipment Acquisition AFI 63-701 Jun 94 Managing Industrial Facilities AFI 63-801 Jul 94 Value Engineering Program AFI 65-503 Feb 94 US Air Force Cost and Planning Factors AFI 90-301 Feb 97 Inspector General Complaints AFI 91-202 Jun 96 The US Air Force Mishap Prevention Program AFI 91-204 Dec 96 Safety Investigations and Reports AFI 91-301 Jun 96 Air Force Occupational and Environmental Safety, Fire Prevention and Health (AFOSH) Program AFI 91-302 Apr 94 Air Force Occupational and Environmental Safety, Fire Protection, and Health (AFOSH) Standards AFI 24-210 Jul 96 Packaging of Hazardous Material AFMCI 21-107 Nov 94 Tool Control and Accountability Program AFMCI 21-108 Feb 98 Organic Depot Maintenance Quality Assurance (QA) and Product Quality Acceptance Certification (PAC) AFMCI 21-109 Feb 98 Support and Industrial Operations Depot Facilities AFMCI 21-110 Mar 95 Use of Technical Data in Organic Depot Maintenance AFMCI 21-112 Jun 95 Repair of Engine Critical Parts AFMCI 21-113 Jun 95 Contact Maintenance Programs for Depot Maintenance Business Areas AFMCI 21-122 Aug 96 Foreign Object Damage Prevention Program AFMCI 21-127 Sep 97 Depot Maintenance Plant Management AFMCI 21-129 Apr 98 Depot Maintenance Management, Depot Repair Enhancement Program (DREP) AFMCI 21-301 Jan 97 AFMC TO System Implementing Policies AFMCI 24-201 Oct 95 AFMC Packaging and Material Handling Policies and Procedures AFPD 16-2 Sep 93 Disclosure of Military Information to Foreign Governments and International Organizations AFPD 20-1 Apr 93 Logistics Strategic Planning AFPD 21-1 Aug 93 Managing Aerospace Equipment Maintenance AFPD 21-3 Mar 93 Technical Orders AFPD 21-4 Jun 96 Engineering Data AFPD 23-2 Mar 93 Supplies and Material Management AFPD 23-5 Apr 93 Reusing and Disposing of Material AFPD 24-2 Apr 93 Preparation and Movement of Air Force Material AFPD 24-3 Oct 93 Operation, Maintenance, and Use of Transportation Vehicles and Equipment [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 21 of 61
EX-10.21344th Page of 414TOC1stPreviousNextBottomJust 344th
[Download Table] NUMBER DATE TITLE ------------ -------- ------------------------------------------------------ AFPD 25-2 Mar 93 Support Agreements AFPD 31-4 Aug 97 Information Security AFPD 31-6 Jul 95 Industrial Security AFPD 31-7 Mar 93 Acquisition Security AFPD 35-1 Sep 93 Public Affairs Management AFPD 36-1 Mar 95 General Civilian Personnel Provisions and Authorities AFPD 36-14 Feb 96 Position Management AFPD 36-2 Oct 96 Employment and Affirmative Action AFPD 36-4 Jul 94 AF Civilian Training and Education AFPD 38-3 Jan 94 Productivity Enhancing Capital Investment Programs AFPD 38-4 Mar 93 Suggestion Program AFPD 90-5 Aug 95 Command Policy, Quality Air Force AFPD 91-2 Sep 93 Safety Programs AFPD 91-3 Sep 93 Occupational Safety and Health DoD 4140.25 Jan 93 Petroleum Management Policy DoD 4160.21 Oct 91 Defense Demilitarization Program DoD 4245.8 Mar 86 Value Engineering Program LPOI 66-01 March 97 Foreign Object Damage Prevention Program 2.2.3 MANUALS [Download Table] NUMBER DATE TITLE ---------- ------ ---------------------------------------------------------- AFM 23-110 May 98 Standard Base Supply Procedures AFM 36-203 Feb 96 Staffing Civilian Positions AFM 36-505 Aug 96 Skill Coding AFMCM 21-1 Jan 97 AFMC Technical Order System Procedures 2.2.4 PAMPHLETS AND HANDBOOKS [Download Table] NUMBER DATE TITLE ------------- ------ ------------------------------------------------------ AFH 38-402 Aug 94 Suggestors and Evaluators Handbook AFH 38-403 Aug 94 Suggestion Program Managers Handbook AFMCP 63-101 Jul 97 Acquisition Risk Management Guide AMPAM 21-1 Dec 95 Organic Industrial Operations Internal Review Procedures AFPAM 36-106 Dec 93 Supervisor's Records MIL-HDBK-263B Jul 94 Electrostatic Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment MIL-HDBK-773 May 90 Electrostatic Discharge Protective Packaging Notice 1 MIL-HDBK-965 Sep 96 Acquisition Practices for Parts Management [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 22 of 61
EX-10.21345th Page of 414TOC1stPreviousNextBottomJust 345th
2.2.5 STANDARDS [Download Table] NUMBER DATE TITLE -------------- ------- ----------------------------------------------------- AFOSHSTD 91-17 Sep 97 Interior Spray Finishing AFOSHSTD 91-2 Sep 93 Safety Programs AFOSHSTD 91-31 Oct 97 Personal Protective Equipment AFOSHSTD 91-43 Oct 97 Flammable and Combustible Liquids AFOSHSTD 91-46 Feb 97 Materials Handling and Storage Equipment AFOSHSTD 91-5 May 97 Welding, Cutting and Brazing AFOSHSTD 91-66 Oct 97 General Industrial Operations MIL-STD-129N May 97 Standard Practice for Military Marking MIL-STD-1686C Oct 95 Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts 2.2.6 USAF APPLICABLE DOCUMENTS The following documents, apply to the USAF T56-A7B/15 workload. Supplements and changes to the TOs listed, with a publication date prior to the release of the RFP, are considered to be applicable and within scope. 2.2.6.1 Technical Orders [Enlarge/Download Table] BASIC TO NUMBER DATE CHANGE, DATE TITLE ------------------- --------- ----------------- ------------------------------------------- 00-25-113-T56 31-May-88 Critical Alloy & Precious Metals Parts List 00-25-5-1-9 1 Apr 89 Chg 3, 30 Jun 92 Instructions for Jet Engine Parts Tracking and Historical Records on T56 Engines 1C-130A-06 l-Feb-89 Chg 2, 15 Mar 97 Aircraft Maintenance Work Unit Code Manual C130 1C-130A-10 20-Feb-86 Chg 6, 17 Oct 94 Build up Instructions 1C-130A-2-4 30-Mar-90 Chg 3, 3 Jan 94 Maintenance Instruction Power Plant C130 1C-130A-3 15-Oct-83 Chg 45, 29 Oct 96 Structural Repair Instruction 1C-130A-6WC-12 15-May-96 Chg 2, 1 Apr 97 Work Cards Preflight 1C-130A-6WC-13 15-May-96 Chg 2, 1 Apr 97 Work Cards thru Flight Basic Post Flight Pre Post Flight Inspection. 1C-130A-6WC-14 15-May-96 Chg 2, 1 Apr 97 Structural Repair Instructions 1C-130A-6WC-15 15-May-96 Chg 3, 1 Apr 97 Structural Repair Instruction 1C-130B-10 10-Jun-91 Chg 14, 27 Nov 96 Build up Instruction 1C-130H-10 6-Sep-79 Chg 52, 5 Apr 96 Build up Instruction 1C-130H-2-4 l-Feb-79 Chg 69, 12 Jun 96 Maintenance Instruction 1C-130H-2-61JG-10-1 10-Dec-90 Chg 4, 27 Jul 95 C130 Prop Assembly Job Guide Maintenance 1C-130H-2-70GS-00-1 20-Sep-93 Chg 3, 12 Mar 96 Power Plant General System 1C-130H-2-70JG-00-1 10-Aug-93 Chg 7, 31 Dec 96 Job Guide, Power Plant, Standard Practices & Inspection 1C-130H-2-71JG-00-1 10-Aug-93 Chg 9, 31 Mar 97 Job Guide, Power Plant, Operating Limits & Checklists 1C-130H-2-71JG-00-2 10-Aug-93 Chg 7, 19 Aug 96 Job Guide, Power Plant, General Maintenance 1C-130H-2-73JG-00-1 10-Aug-93 Chg 6, 26 Jun 96 Job Guide, Power Plant, Engine Fuel [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 23 of 61
EX-10.21346th Page of 414TOC1stPreviousNextBottomJust 346th
[Enlarge/Download Table] BASIC TO NUMBER DATE CHANGE, DATE TITLE ------------------- --------- ----------------- ----------------------------------------- 1C-130H-2-73JG-00-2 10-Aug-93 Chg 4, 30 Oct 95 Job Guide, Power Plant, Temperature Datum Control System 1C-130H-2-75JG-00-1 10-Aug-93 Chg 2, 26 Jul 95 Job Guide, Power Plant, Engine Air 1C-130H-2-76JG-00-1 10-Aug-93 Chg 6, 26 Jun 96 Job Guide, Power Plant, Engine Controls 1C-130H-2-77JG-00-1 10-Aug-93 Chg 4, 12 Mar 96 Job Guide, Power Plant, Engine Indicating 1C-130H-2-79JG-00-1 10-Aug-93 Chg 8, 12 Jun 96 Job Guide, Power Plant, Engine Oil 1C-130H-2-80JG-00-1 10-Aug-93 Chg 4, 16 Aug 96 Job Guide, Power Plant, Engine Starting & Ignition 2J-T1-10 1-May-63 Chg 45, 15 Oct 95 General Block Test Instruction Turboprop 2J-T56-101 22-Oct-96 General Instruction Corrosion Control 2J-T56-24 1-Jul-92 Chg 1, 30 Nov 93 Illustrated Parts Breakdown (IPB) 2J-T56-44 1-Nov-75 Chg 23, 15 Sep 97 IPB. 2J-T56-53 15-Dec-92 Chg 01, 15 May 94 Overhaul Instructions 2J-T56-54 UNPUBLIS Parts Catalog, T56-A-15LFE (Allison HED Commercial Manual) 2J-T56-56 1-Dec-89 Chg 4, 15 Apr 95 Intermediate Maintenance 33D4-6-25-41 15-May-57 Chg 2, 15 Nov 78 T56 Instruction & IPB Relay Box Tester 35D3-3-53-1 15-Jul-61 Chg 12, 30-Apr 94 Operation, Service and Maintenance 35D3-3-53-4 1-Apr-63 Chg 12, 1-Nov-87 IPB 35D3-3-71-1 2-Oct-72 Chg 4, 15-Jul-94 Operation and Maintenance with IPB, P/N 200-000-101 5E3-15-3 15-Dec-91 Chg 2, 15 Dec 94 Depot Maintenance Instruction w/IPB Temp Datum Amp 6J10-4-27-3 15-Jun-80 Chg 6, 15 Sep 94 Dual Gear & Booster Fuel Pump Overhaul 6J10-4-27-4 15-Jun-80 Chg 5, 15 Sep 94 Dual Gear & Booster Fuel Pump IPB 6J11-12-3 31-Jul-74 Chg 1, 15 Jun 82 Speed Sensing Control Overhaul 6J11-12-4 1-Sep-74 Chg 2, 15 Jun 96 Speed Sensing Control IPB 6J1-2-11-33 15-Sep-59 Chg 7, 01 Oct 95 Electronic Temperature Datum Control Overhaul 6J1-2-11-34 1-Apr-69 Chg 3, 03 Nov 84 Electronic Temperature Datum Control IPB 6J1-2-11-43 1-Oct-61 Chg 7, 01 May 92 Electronic Temperature Datum Control Overhaul 6J1-2-11-44 1-Apr-69 Chg 5, 31 Jul 84 Electronic Temperature Datum Control IPB 6J1-2-22-4 1 May 69 Chg 3, 1 Apr 81 IPB-Amplifier Magnetic Temperature Control, F104 6J1-2-24-3 1-Jun-66 Chg 4, 01 Mar 83 ETD Control-Overhaul 6J1-2-24-4 15 May 79 Chg 1, 1 Sept 81 IPB-Electronic Temperature Datum Control 6J15-10-120-3 15-Jun-87 Overhaul Instruction w/IPB - Manually Operated Rotary Shutoff Valve 6J15-10-128-3 30-Oct-87 Overhaul Instruction with IPB Paralleling Valve 6J15-10-201-3 1 Jul 83 Chg 1, 1 Jul 84 Overhaul Instruction-HP Fuel Shutoff Valve 6J15-10-64-13 30-Jul-95 Solenoid Operated Shut Overhaul & IPB 6J15-3-34-3 1-May-86 Chg 2, 30 Jan 91 Temp Datum Valve Overhaul 6J15-3-34-4 1-May-86 Chg 1, 01 May 94 Temp Datum Valve IPB [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 24 of 61
EX-10.21347th Page of 414TOC1stPreviousNextBottomJust 347th
[Enlarge/Download Table] BASIC TO NUMBER DATE CHANGE, DATE TITLE ------------------- --------- ----------------- ----------------------------------------- 6J15-3-38-13 15-Sep-92 Chg 1, 15 Jan 97 Paralleling Valve Overhaul & IPB 6J15-3-76-3 1-Aug-81 Solenoid Actuated Valve Overhaul & IPB 6J15-3-87-3 1-May-86 Chg 3, 01 May 94 Temp Datum Valve Overhaul & IPB 6J15-3-87-4 1-May-86 Chg 1, 01 May 94 IPB Temp Datum Assembly 6J15-4-19-3 15-Aug-80 Drain Valve Assembly & Overhaul IPB 6J15-4-28-3 15-Oct-86 Drain Valve Assembly & Overhaul IPB 6J15-6-3-3 1 May 87 Chg 3, 30 Nov 96 Overhaul Instruction w/IPB- Fuel Enrichment Solenoid Valve for Starting 6J15-6-3-4 6J3-4-24-13 15-Sep-68 Chg 11, 15 Jan 97 Overhaul Instruction Turbine Engine Main Fuel Control 6J3-4-24-14 15-May-93 IPB Turbine Engine Main Fuel Control 6J3-4-24-3 1-Dec-69 Chg 6, 01 May 94 Overhaul Instruction Turbine Engine Main Fuel Control 6J3-4-32-3 15-Jan-97 Overhaul & IPB High Temp Geneva Lock 6J7-7-3 1-Dec-71 Chg 7, 31 Jan 97 Speed Sensitive Valve Overhaul & IPB 8A7-2-4-3 1-May-86 Overhaul Instruction IPB Motor General 8D1-61-2-3 15-Oct-83 Chg 3, 15 Oct 93 Rotary Actuator Assembly Overhaul & IPB 8E1-2-14-3 1-Aug-60 Chg 4, 15 Aug 83 Overhaul Instruction Ignition Unit Type TCN-18 8E1-2-14-4 1-Aug-60 IPB Ignition Unit Type TCN-18 8E1-2-22-53 1-Mar-80 Chg 2, 30 Dec 90 Ignition Units Overhaul 8E1-2-22-54 1-Mar-80 Ignition Units IPB 8E1-8-21-4 31-Aug-80 Chg 1, 30 Sep 93 IPB Ignition Exciter Type TFN-12 8E1-9-2-3 1-May-83 Overhaul Instruction with P/B Cable And Junction 8R3-38-13 31-Dec-83 Solenoid Elec Feather Overhaul & IPB 8R3-38-23 31-Oct-83 Solenoid Elec NTS Overhaul & IPB 2.2.6.2 Time Compliance Technical Order [Download Table] TCTO Recission Data Code Sup Title ---------- --------- --------- --- ------------------------------------- 2J-T56-671 18-Aug-99 215496 D T-56-A7B Turbine Rotor Replacement Campaign 2J-T56-673 18-Jan-99 216980 C Turbine Rotor Replacement Over 18000 Hours 2.2.6.3 Other Documents [Download Table] Number Date Title --------- ------ ------------------------------------- AMS 2427B Jan 95 Aluminum Coating Ion Vapor Deposition PS 13143G Jun 92 Aluminum Coating Ion Vapor Deposition [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 25 of 61
EX-10.21348th Page of 414TOC1stPreviousNextBottomJust 348th
2.2.7 US NAVY APPLICABLE DOCUMENTS The following documents, apply to the US Navy T56-14/16/425 workload. Supplements and changes to the TOs listed, with a publication date prior to the release of the RFP, are considered to be applicable and within scope. 2.2.7.1 Technical Orders [Enlarge/Download Table] NUMBER BASIC DATE TITLE ------------ ---------- ------------------------------------------------------------- 01-1A-1 1-Sep-91 General Manual for Structure Repair 01-1A-16 1-Mar-90 Nondestructive Inspection Methods 01-1A-20 1-Jul-83 Aviation Hose & Tube Manual Organ Inter & Depot Maintenance 01-1A-503 31-Dec-88 Maintenance of Aeronautical Anti-friction bearings 01-1A-509 1-May-96 Aircraft Weapons Systems Cleaning & Corrosion 01-1A-8 1-Jan-91 Aircraft and Missile Structures 01-75GAA-6 15-Jun-91 Periodic Maintenance Information Cards 01-75PAA-6 1-Nov-95 Periodic Maintenance Information Cards 01-C2AHA-6 1-Feb-86 C2, Phase Maintenance Cards 01-E2AAA-6 1-Apr-97 Periodic Maintenance Information Cards E2C 02-1-19 1-Oct-72 Heli-coil Inserts-General Installation 02-1-517 15-Mar-97 Standard Maintenance Procedures Aircraft Engines 02B-5DD-4 15-Dec-85 Turboprop Engines T56-A-10W/-10WA/-14 IPB 02B-5DD-6-1 1-Apr-90 Turboprop Engine Model T56-A-10/-10WA/-14 Intermediate 02B-5DD-6-2 1-Dec-93 Turboprop Engine T56-A-10W/-10WA/-14 P-3 02B-5DD-6-3 1-Sep-77 Quick Engine Change Assembly Maintenance Requirement Cards 02B-5DE-4 1-Mar-92 Turboprop Engines T56-A-16/-423 IPB 02B-5DE-6-1 1-Aug-90 Turbo Prop Engines T56-A-7A/-16/-423 Inter Maintenance manual 02B-5DE-6-2 1-Dec-69 Depot Maintenance Instruction Allison T56 ENG-A-16, -423 02B-5DF-4 1-Nov-94 Turbo Prop Engine with IPB 02B-5DF-6-1 15-Dec-90 Allison Gas Turbines T-56-A425/426 & 427 Turboprop Engines Inter Maintenance Manual 02B-5DF-6-2 15-Jun-91 Depot Maintenance Manual 03-110-14 1-Apr-79 Speed sensing Control Assembly, 6873465 AC/PN (6404486) 6871121 (Detroit Diesel) Overhaul Instructions with IPB 03-110-18 1-Aug-71 Control Assembly, Speed Sensitive, Overhaul Instructions 03-110-20 1-Sep-62 Amplifier Assembly Electronic Temperature Control Operation and Service Instructions with IPB Basic Dated 03-110AAV-1 15-Dec-70 Control, Turbine Engine Main Fuel (Bendix) Overhaul Instructions 03-110AAX-1 15-Feb-72 Fuel Controls Gas Turbine 03-110DAA-14 15-Jun-80 Pump Dual Gear and Booster Type Fuel (Sundstrand) Overhaul Instructions 03-110FG-7 1-May-87 Starting Fuel Enrichment Solenoid Valve Assembly 03-110FK-14 15-Sep-69 Drain Valve Assembly with parts Breakdown 03-110FM-2 1-May-94 Overhaul Instructions 03-110FM-3 1-May-94 Turboprop Engine 03-110FR-2 1-Mar-73 Valve Assembly, Solenoid Operated Shutoff (Hydro-Aire) Overhaul Instructions with Parts Breakdown [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 26 of 61
EX-10.21349th Page of 414TOC1stPreviousNextBottomJust 349th
[Enlarge/Download Table] NUMBER BASIC DATE TITLE ----------- ---------- ------------------------------------------------------------------------- 03-110FT-1 15-Sep-92 Valve, Paralleling Parts List Number 190772-2 Overhaul Instructions with IPB 03-110KD-l 15-Jul-67 Electronic Temperature Datum Control Overhaul Instruction Bendix ET- B4 03-110KD-19 l-Oct-76 Datum Control, Electronic Temperature, Model ET-B6(Bendix) Overhaul Instructions 03-110KD-5 15-Jun-76 Electronic Temperature Datum Control 03-110LA-1 15-Aug-79 Valve Assembly, Water-Methanol Regulator (Hydro-Aire) Overhaul Instructions 03-5AA-128 l-Feb-87 Motor-Generator P/N 181419 (Allied Corp) Overhaul Instructions with IPB 03-5CHX-24 l-Jul-87 Actuator Assembly Rotary (Bendix-Pacific) Overhaul Instructions-Actuator Rotary Aim with IPB 03-5CHX-515 15-Oct-83 Overhaul Instructions Parts Breakdown - Rotary Actuator Assembly (AF TO 8D1-61-2-3 Chg 3, 15 Oct 93) 03-5NA-32 1-Mar-80 Ignition Unit Type TCN-24 10-111160-1, -3, -6 Used on Allison T56 Engines (Bendix) Overhaul Instructions 03-5NA-33 l-Mar-80 Ignition Unit Type TCN-24 Used on Allison T56 Engines, IPB 11-75A-54 l-May-93 Aircraft Guided Missile Launcher 15-02-500 l-Apr-96 Preservation of Naval Aircraft Engines. 17-15-50.1 l-Sep-90 Joint Oil Analysis Program Manual AG-830SC- l-Mar-89 ASO Cognizant Reusable Shipping and Storage Containers Steel MEB-000 I&DMM W/IPB 2.2.7.2. Local Engineering Specifications [Download Table] NUMBER DATE TITLE --------- ------ -------------------------------- 61-0-500 Apr 90 Depot Level Repair Specification 61-1-051A Apr 92 Reduction Gear Assembly Rework 2.2.7.3 Instruction [Download Table] NUMBER REVISON DATE TITLE --------- ------- ------ --------------------------------------------- OPNAVINST G 2/1/98 The Naval Aviation Maintenance Program (NAMP) 4790.2 2.2.7.4 Other Documents [Download Table] NUMBER DATE TITLE --------- ------ ------------------------------------- AMS 2427B Jan 95 Aluminum Coating Ion Vapor Deposition PS 13143G Jun 92 Aluminum Coating Ion Vapor Deposition 2.2.8 US NAVY 501 APPLICABLE DOCUMENTS The following documents, as cited elsewhere in this work specification, apply to the 501K17 workload. Supplements and changes to the TOs listed, with a publication date prior to the release of the RFP, are considered to be applicable and within scope. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 27 of 61
EX-10.21350th Page of 414TOC1stPreviousNextBottomJust 350th
2.2.8.1 Technical Orders [Download Table] REVISION & NUMBER DATE NOMENCLATURE --------------------- ------------- ---------------------------------------- S9234-BD-MMD-010/MOD 1, 30 Sept 97 Overhaul Instruction, Depot Level 104GTGS VOL 1 Maintenance Gas Turbine Generator Set Model 104. S9234-BD-MMD-020/MOD 1, 30 Sept 97 Overhaul Instruction, Depot Level 104GTGS VOL 2 Maintenance Gas Turbine Generator Set Model 104. S9234-BD-MMD-030/MOD 1, 30 Sept 97 Overhaul Instruction, Depot Level 104GTGS VOL 3 Maintenance Gas Turbine Generator Set Model 104. S9234-BD-MMD-040/MOD 1, 30 Sept 97 IPB 104GTGS VOL 4 DMISA SA-ALC95 01ANHA 1 Aug 96 Depot Maintenance Interservice Support Agreement (DMISA) 2.2.9 FUEL ACCESSORIES APPLICABLE DOCUMENTS The following documents, as cited elsewhere in this work specification, apply to the PBA accessories workload and include the documents required for the T56 Fuel Accessories workload. Supplements and changes to the TOs listed, with a publication date prior to the release of the RFP, are considered to be applicable and within scope. [Enlarge/Download Table] ISSUE TO NUMBER DATE CHANGE DATE TITLE ------------ --------- ---------------- ------------------------------------------ 02B-5DD-6-2 l-Dec-93 Turboprop Engine T56-A-10W/-10WA/-14 P-3 02B-5DE-6-2 l-Dec-69 Depot Maintenance Instruction, Allison T56 ENG-A-16, -423 02B-5DF-6-2 15-Jun-91 Depot Maintenance Manual 03-110-14 1-Apr-79 Speed Sensing Control Assembly 6873465 AC/PN (6404486) 6871121 (Detroit Diesel) Overhaul Instruction with IPB 03-110-18 1-Aug-71 Chg 3, 1 Jun 82 Overhaul Instruction-Control Accessory, Speed Sensitive 03-110AAX-1 15-Feb-72 Fuel Control Gas Turbine 03-110AAX-2 15-Feb-72 Chg 5, 15 May 93 Main Fuel Control 03-110DAA-14 15-Jun-80 Pump Dual Gear and Booster Type Fuel (Sundstrand Overhaul Instruction) 03-110FK-14 l5-Sep-69 Drain Valve Assembly with Parts Breakdown 03-110FM-2 l-May-94 Overhaul Instruction 03-110FM-3 l-May-94 Turboprop Engine 03-110FS-2 15-Aug-64 Valve, Speed Sensitive [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 28 of 61
EX-10.21351st Page of 414TOC1stPreviousNextBottomJust 351st
[Enlarge/Download Table] ISSUE CHANGE TO NUMBER DATE DATE TITLE ------------ ----------- ----------------- ------------------------------------------------- 03-110KD-1 15-Jul-67 Elec Temperature Datum Control Overhaul Instruction (Bendix ET-B4) 03-5CHX-24 1-Jul-87 Actuator Assembly Rotary (Bendix-Pacific) Overhaul Instruction - Actuator Assembly Rotary Aim with IPB 03-5CHX-25 l-Oct-65 Actuator Assembly, Overhaul Instruction with IPB 12S5-4-42-3 15-Jun-83 Chg 6, 15 Aug 93 Overhaul Instruction EHR 12S5-4-42-4 l-Nov-83 Chg 2, 15 Jul 88 IPB EHR 15A2-3-61-3 30-Jun-92 Engine Bleed Air Check Shutoff Valve Overhaul 15E2-2-3-13 1-Sep-80 Chg 1, 1 Aug 82 Anti-icing Valve Overhaul w/IPB 15E2-2-49-3 15-May-62 Chg 4, 1 Aug 83 Anti-icing Shutoff Valve Overhaul 15E2-4-20-3 15-Jan-91 Chg 3, 1 Aug 94 Overhaul with IPB, Engine Inlet Anti-Icing Valve 15E2-5-33-3 20-Feb-78 Chg 6, 15 Dec 90 Overhaul Instruction, Valve Anti-Icing Air 15E2-5-36-3 6-May-69 Chg 20, 15 Jul 96 3 1/2" Diameter Shutoff Fluid Pressure Regulator Valve Overhaul w/IPB 15E2-5-45-3 15-Dec-76 Chg 6, 1 Jun 93 Overhaul with IPB, Engine Inlet Anti-Icing Valve 16A1-14-43-3 1-Jun-94 Chg 1, 1 Oct 95 Overhaul Instruction with IPB-Primary, Secondary Actuator 1F-16C-4-28 10-Aug-84 Chg 34, 26 Jul 96 IPB Fuel System F16 2JA12-7-2 l5-Apr-92 Intermediate Maintenance Instruction., Pneumatics Boost Assembly 2JA12-8-3 15-Jun-91 Chg 2 - 15 Jun 96 Engine Throttle Box & Torque Shaft Assembly 2JA8-20-3 30-Jun-93 Chg 5, 15 Jan 97 Qdrnt Assembly Engine Throttle Control 2JA8-20-4 15-Feb-97 Qdrnt Assembly Engine Throttle Control 2J-T56-13 1-Jun-93 Chg 1, 15 Jan 95 Overhaul Instruction 2J-T56-54 Unpublished Parts Catalog, T56-A-I5LFE (Allison Commercial Manual) 2J-T56-56 1-Dec-89 Chg 4, 15 Apr 95 Intermediate Maintenance 37A12-13-3 15-Jan-76 Chg 2, 15 Dec 86 Oil Tank Overhaul & IPB 5E1-2-15-3 15-Apr-96 - Overhaul Instruction - Engine Diagnostics Unit 5E1-2-15-4 1-Oct-95 Chg 1, 1 May 96 IPB - EDU 5E12-26-3 15-Dec-86 Chg 1, 15 Jan 95 OH Instruction w/IPB-Transmitter, Nozzle Position 6A10-2-2-3 3l-Aug-61 Chg 8, 1 Mar 91 Fuel Transfer Pump 6A10-2-7-3 15-Jun-65 Chg 7, 31 May 95 Overhaul Instruction, Fuel Transfer Pump 6A10-2-8-3 1-Feb-83 Fuel Dump Pump 6A10-2-9-3 25-Jul-74 Chg 1, 30 Jun 94 Centrifugal Refuel Drain, Transfer Pump [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 29 of 61
EX-10.21352nd Page of 414TOC1stPreviousNextBottomJust 352nd
[Enlarge/Download Table] ISSUE CHANGE TO NUMBER DATE DATE TITLE ------------- --------- ----------------- --------------------------------------------- 6A1-2-I4-3 1-Apr-95 Overhaul Instruction W/Parts Breakdown- Actuator-Motor Driven 6A15-6-3 1-Oct-76 Chg 3, 31 Mar 85 Coupling Overhaul w/IPB 6A15-7-3 30-Aug-76 Chg 2, 30 Jun 95 Aerial Refueling Couplings OH 6A15-8-3 20-Sep-83 Chg 3, 1 May 94 Aerial Pressure Refueling Reg Coupling OH w/IPB 6A6-13-3 26-Jan-68 Chg 9, 1 Oct 91 Aerial Refuel Receptacle 6A6-16-3 27-Jan-76 Chg 17, 15 Nov 95 Aerial Refueling Receptacle 6A6-19-3 5-Apr-90 Chg 3, 8 Jan 96 Receptacle, Aerial Refueling 6A6-20-3 1-Jun-90 Chg 2, 15 Mar 95 Universal Aerial Refueling Receptacle Slipway 6A6-20-3 1-Jun-90 Chg 2, 15 Mar 95 Overhaul Instruction Universal Aerial Refueling Receptacle 6A6-3-3 1-Sep-77 Chg 4, 15 Aug 95 Aerial Refueling Receptacle Assembly 6A9-2-15-3 15-Oct-82 Chg 3, 1 May 94 Pressure Control Valve 6A9-2-4-3 1-Jan-85 Chg 3, 15 Aug 93 Refueling Level Control Valve 6A9-8-8-3 15-Jun-92 Chg 1, 15 Aug 94 Fuel Shut Off Valve 6J11-12-3 31-Ju1-74 Chg 1, 15 Jun 82 Speed Sensing Control Overhaul 6J11-12-4 1-Sep-74 Chg 2, 15 Jun 96 Speed Sensing Control IPB 6J11-30-3 1-Dec-77 Chg 9, 15 Nov 94 Overhaul Instruction with IPB-Air Regulator 6J1-2-11-43 1-Oct-61 Chg 7, 01 May 92 ETD Control-Overhaul 6J1-2-11-44 1-Apr-69 Chg 5, 31 Jul 84 Electronic Temperature Datum Control IPB 6J1-2-24-3 1-Jun-66 Chg 4, 01 Mar 83 ETD Control-Overhaul 6J1-2-24-4 15-May-79 Chg 1, 1 Sept 81 IPB-Electronic Temp Datum Control 6J15-10-159-3 1-Mar-94 Motor Operated Gate Valve Assembly Overhaul w/IPB 6J15-10-166-3 1-Oct-60 Motor Operated Shutoff Valve Overhaul w/IPB 6J15-10-171-3 15-Jan-79 Motor Actuated Gate Shutoff Valve 6J15-10-173-3 30-Mar-93 Motor Operated Gate Valve Assembly Overhaul w/IPB 6J15-10-176-3 15-Feb-86 Motor Operated Fuel Shutoff Valve Overhaul w/IPB 6J15-10-177-3 30-Dec-93 Motor Operated Fuel Shutoff Valve Overhaul w/IPB 6J15-10-180-3 7-Oct-96 Wing Fuel Transfer Low Level Shutoff Valve Overhaul w/IPB 6J15-10-185-3 1-Nov-65 Chg 3, 1 Feb 80 Motor-Operated Gate Valve Overhaul 6J15-10-187-3 15 May 80 Chg 1, 15 Sep 91 Motor Operated Fuel Shutoff Valve Overhaul w/IPB 6J15-10-188-3 5-Nov-90 Chg 3, 7 Oct 96 Motor Operated Butterfly Valve Overhaul w/IPB [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 30 of 61
EX-10.21353rd Page of 414TOC1stPreviousNextBottomJust 353rd
[Enlarge/Download Table] ISSUE TO NUMBER DATE CHANGE DATE TITLE -------------- --------- ----------------- ---------------------------------------------- 6J15-10-192-3 1-May-91 Shutoff Valves Overhaul w/IPB 6J15-10-194-3 13-Nov-70 Chg 10, 30 Apr 96 Motor Operated, Fuel Shutoff Valve Assembly Overhaul w/IPB 6J15-10-197-3 28-Jun-68 Chg 4, 15 Feb 88 Motor Actuated Slide Shutoff Valve Assembly Overhaul w/IPB 6J15-10-198-3 2-Jan-79 Chg 2, 15 Feb 88 Motor Actuated Gate Valves Overhaul w/IPB 6J15-10-199-3 20-Aug-70 Chg 4, 1 Feb 88 Depot Overhaul w/IPB, Motor Actuated Slide Shutoff 6J15-10-201-3 1-Ju1-83 Chg 1, 1 Jul 84 Overhaul Instruction-HP Fuel Shutoff Valve 6J15-10-202-3 15-May-72 Chg 5, 1 Dec 85 Depot Overhaul Instruction, Electro Mechanical Linear Actuator 6J15-10-202-4 15-Jan-74 Chg 5, 1 Dec 85 Mechanical Linear Actuator IPB 6J15-10-206-3 15-Jun-70 Chg 2, 15 Apr 85 Motor Operated Gate Valve Overhaul w/IPB 6J15-10-225-3 15-Jun-78 Manual Fuel Shutoff Valve Overhaul 6J15-10-232-3 15-Oct-90 Chg 1, 15 May 91 Shutoff Valve Overhaul Instruction w/IPB 6115-10-233-3 5-Sep-75 Chg 12, 1 Dec 91 Intermediate/Depot w/IPB, Motor Actuated Butterfly Shutoff Valve 6J15-10-234-3 10-May-82 Chg 5, 1 Feb 89 Motor Actuated Fuel Shutoff Valve Overhaul w/IPB 6J15-10-238-3 15-Oct-75 Chg 11, 15 Nov 94 Solenoid Shutoff Valve Assembly Overhaul w/IPB 6JI5-10-246-3 15-Aug-86 Chg 1, 15 Aug 88 Depot Overhaul Instruction w/IPB, Conv. Exhaust Nozzle Shutoff Valve 6J15-10-257-3 15-May-90 Chg 1, 1 Sep 93 Valve, Butterfly Overhaul w/IPB 6J15-10-261-3 30-Sep-95 Shut-Off, Fuel Overhaul w/IPB 6J15-10-262-3 31-May-93 Valve Body, Fuel Shut-Off Overhaul w/IPB 6JI5-10-64-13 30-Ju1-95 Solenoid Operated Shut Overhaul & IPB 6J15-10-66-143 15-Oct-91 Motor Rotary Shut-Off Valve Assembly Overhaul w/IPB 6J15-10-66-153 2-May-77 Chg 8, 15 Sep 94 Motor Actuated Slide Shutoff Valve Overhaul w/IPB 6J15-10-66-163 15-Jan-79 Motor Actuated Slide Shutoff Valve Overhaul w/IPB 6J15-10-66-173 15-Dec-87 Depot Overhaul Instruction w/IPB, Pressure Actuated Shutoff Valve 6J15-10-76-23 15-Aug-90 Motor Actuated Slide Shutoff Valve Overhaul w/IPB 6J15-10-76-3 15-May-85 Manually Operated Slide Shutoff Valve Assembly Overhaul w/IPB 6J15-10-76-33 15-Jun-78 Depot OH Instruction w/IPB, Motor Actuated Shutoff Valve [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 31 of 61
EX-10.21354th Page of 414TOC1stPreviousNextBottomJust 354th
[Enlarge/Download Table] ISSUE CHANGE TO NUMBER DATE DATE TITLE -------------- --------- ---------------- ---------------------------------------------- 6J15-10-79-103 17-Jul-96 Motor Operated Gate Valve Assembly Overhaul w/IPB 6J15-10-79-83 15-Jan-83 Motor Operated Gate Valve Overhaul w/IPB 6J15-10-79-93 10-Ju1-87 Motor Operated Gate Valve Overhaul w/IPB 6J15-12-13-3 11-Jun-90 Chg 1, 1 Jul 91 Fuel Flow Divider Valve Overhaul w/IPB 6J15-13-11-3 18-Apr-88 Chg 8, 30 May 97 Fuel Flow Proportioner Overhaul w/IPB 6J15-14-16-3 15-Oct-77 Chg 9, 15 Jul 93 Overhaul Instruction/IPB-Fuel P&D Valve 6J15-14-17-3 1-Aug-81 Chg 8, 15 Nov 92 Overhaul Instruction/IPB-Breather Press Valve 6J15-15-7-4 15-Jun-90 Chg 2, 15 May 92 IPB, Fuel Bypass Valve 6J15-18-4-3 15-Aug-75 Chg 7, 30 Dec 94 Fuel Tank Interconnect Valve Overhaul w/IPB 6J15-2-126-23 30-Dec-89 Water Check And Drain Pressure Actuated Valve Overhaul w/IPB 6J15-2-160-3 1-Nov-90 Auto Crossfeed Check Valve Overhaul w/IPB 6J15-3-103-3 22-May-87 Dual Level Control Valve Assembly Overhaul w/IPB 6J15-3-116-3 8-Sep-97 Overhaul Instruction W/IPB, Dual Level Control Valve 6J15-3-117-3 1-Jun-67 Chg 6, 15 Mar 93 Dual Level Control Shutoff Valves Overhaul w/IPB 6J15-3-118-3 19-Feb-93 Two-Way Thermal Relief Fuel Shutoff Valve Overhaul w/IPB 6J15-3-121-3 22-May-87 Dual Level Control Valve Overhaul w/IPB 6J15-3-123-3 13-Jun-69 Chg 5, 31 Mar 85 Dual Level Control Valve Overhaul w/IPB 6J15-3-131-3 15-May-87 Level Sense Nonmodulating Valve Overhaul w/IPB 6J15-3-132-3 1-Jan-83 Chg 2, 30 May 95 Fuel Tank Pressurization, Vent Ctrl Overhaul w/IPB 6J15-3-138-3 1-Oct-90 Refueling Valve Overhaul w/IPB 6J15-3-138-3 1-Oct-90 Overhaul Instruction w/IPB, Refueling Valve 6J15-3-140-3 28-Feb-86 Chg 8, 31 Jan 97 Level Control Cartridge Valve Overhaul w/IPB 6J15-3-143-3 15-Sep-93 External Stores Refuel Fuel Transfer Control Valve Overhaul w/IPB 6J15-3-145-3 31-Mar-85 Aircraft Fuel Tank Poppet Valve Overhaul w/IPB 6J15-3-146-3 15-Dec-76 Chg 11, 1 Sep 89 Pilot Valve Overhaul w/IPB 6J15-3-147-3 1-Ju1-76 Chg 6, 1 Jul 91 Overhaul Instruction/IPB-Fuel Derichment Valve 6J15-3-151-3 1-Dec-85 Chg 1, 1 Sept 88 Overhaul Instruction w/IPB, Variable Geometry Transfer Valve 6J15-3-153-3 8-Aug-83 Chg 4, 12 Mar 96 Shuttle Valve Overhaul w/IPB [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 32 of 61
EX-10.21355th Page of 414TOC1stPreviousNextBottomJust 355th
[Enlarge/Download Table] ISSUE CHANGE TO NUMBER DATE DATE TITLE ------------- --------- ---------------- ----------------------------------------------------------------- 6J15-3-156-3 15-Oct-84 Chg 2, 15 Oct 87 Fuel Level Control Shutoff Valve Overhaul w/IPB 6JI5-3-165-3 15-Jun-92 Chg 3, 28 Feb 97 Valve, Shut-Off2 Inch Butterfly Overhaul w/IPB 6J15-3-174-3 15-Jun-95 Body, Mixing Valve Overhaul w/IPB 6J15-3-38-13 15-Sep-92 Chg 1, 15 Jan 97 Paralleling Valve Overhaul & IPB 6J15-3-44-63 l5-May-81 Chg 7, 15 Jan 96 Dual Flotation Precheck Opr Fuel Level Control Valves OH w/IPB 6J15-3-62-3 30-Jun-78 Dual Pilot Solenoid Checkout Valve Overhaul w/IPB 6J15-3-87-3 l-May-86 Chg 3, 01 May 94 Temp Datum Valve Overhaul & IPB 6J15-3-87-4 l-May-86 Chg 1, 01 May 94 IPB Temp Datum Assembly 6J15-3-90-3 l-Nov-90 Tank Mounted Fuel Shutoff Valves Overhaul w/IPB 6J15-4-28-3 15-Oct-86 Drain Valve Assembly Overhaul & IPB 6J15-5-36-3 l-May-92 Aircraft Fuel Tank Float Valve Overhaul w/IPB 6J15-5-38-3 l-Sep-95 Aircraft Fuel Tank Non-Modulating Pilot Value Overhaul w/IPB 6J15-5-39-3 15-Nov-93 Valve Level Control Pilot Overhaul w/IPB 6J15-6-3-3 l-May-87 Chg 3, 30 Nov 96 Solenoid Valve Assembly Overhaul & IPB 6J15-7-18-13 15-Jan-79 Pressure Refueling Regulator And Check Valve Overhaul w/IPB 6J15-7-54-3 12-Jua-90 Chg 1, 6 Jan 95 Fuel And Air Solenoid Valve Overhaul w/IPB 6J15-8-103-13 31-Aug-84 Float Valve Assembly Overhaul w/IPB 6J15-8-103-3 24-Apr-80 Float Valve Assembly Overhaul w/IPB 6J15-8-105-3 l-Jan-69 Chg 13, 7 Oct 96 Wing Tank Vent Valves Overhaul w/IPB 6J15-8-120-3 15-Feb-89 Valve Assembly, Pneu Actuated Regulator And Relief Overhaul w/IPB 6J15-8-122-3 30-Apr-85 External Fuel Tank Safety Relief Valve Overhaul w/IPB 6J15-8-123-3 31-Aug-95 Fuel Pressure Safety Relief Valve Overhaul w/IPB 6J15-9-30-3 29 Feb 75 Chg 1, 15 May 75 Fuel Selector Valve Overhaul Instruction w/IPB 6J22-3-3 15-Jul-91 Chg 2, 15 Jul 94 Fuel/Oil Heat Exchanger Overhaul w/IPB 6J24-7-3 l-May-92 Heater Strainer Assembly, Engine Fuel Overhaul w/IPB 6J24-8-3 25-Oct-68 Chg 8, 30 Sep 85 Overhaul Instruction w/IPB-Fuel Heater 6J27-2-3 l-Oct-94 Chg 1, 1 Oct 95 Overhaul Instruction-CIVV Control 6J27-2-4 15-Aug-94 IPB-CIVV Control 6J27-3-3 1-Sep-94 Overhaul Instruction/IPB-CIVV/RCVV Actuator [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 33 of 61
EX-10.21356th Page of 414TOC1stPreviousNextBottomJust 356th
[Enlarge/Download Table] ISSUE CHANGE TO NUMBER DATE DATE TITLE ----------- --------- ----------------- ------------------------------------------------------------------ 6J27-4-3 l-Sep-94 Chg 1, 15 Feb 97 Overhaul Instruction/IPB-Comp Bleed Actuator 6J27-6-3 15-Nov-92 Chg 4, 15 Feb 97 Overhaul Instruction, Compressor Actuating Cylinder 6J27-7-3 15-Nov-92 Chg 6, 15 Feb 97 Overhaul Instruction - CIVVC and C 6J27-7-4 l-Jun-92 Chg 3, 15 Feb 97 IPB - CIVVC and C 6J27-8-3 15-Nov-93 Chg 4, 15 Feb 97 Overhaul Instruction - Rear Compressor Variable Vane Actuating Cyl 6J28-2-3 15-Jun-86 Chg 10, 15 Dec 95 Overhaul Instruction with IPB-Aug Fuel Manifold 6J28-5-3 l-Ang-92 Chg 4, 15 Jan 97 Overhaul Instruction w/IPB-Augmentor Spray Manifold 6J28-5-3 l-Aug-93 Chg 4, 15 Jan 97 Overhaul Instruction w/IPB, Augmentor Spray Manifold 6J4-13-3 18-Sep-70 Chg 2, 30 Nov 83 Interconnect Assembly Fuel Air Line, Wing Pivot 6J4-16-3 15-Oct-75 Chg 9, 15 Nov 94 Pylon Fuel Disconnect Assembly 6J4-18-3 30-Sep-76 Chg 6, 15 Jul 82 Wing External Pressure Disconnect Assembly 6J5-56-3 30-May-95 Fuel Heater And Strainer Assembly 6J5-71-3 15-Apr-77 Fuel Filter Overhaul w/IPB 6J5-74-3 21-Sep-71 Chg 1, 2 May 77 Fuel Filter OH Overhaul w/IPB 6J5-79-3 7-Sep-82 Chg, l Jul 95 Fuel line Quick Disconnect Strainer Assembly 6J7-7-3 l-Dec-71 Chg 7, 31 Jan 97 Speed Sensitive Valve Overhaul & IPB 6J8-31-3 l-Jul-94 Overhaul Instruction/IPB-Fuel Nozzle 6J8-34-3 15-Oct-91 Fuel Nozzle Cluster "B" Model Overhaul, & IPB 6R9-10-25-3 15-Mar-72 Chg 3, 31 Aug 84 Motor OPR Gate Valve Overhaul w/IPB 6R9-8-17-3 1-Aug-89 Fuel Vent Valves Overhaul w/IPB 6R9-9-44-3 3l-Jan-89 Actuator, Motor Operated, Fuel Valve Overhaul Instruction w/IPB 7J2-27-3 1-Mar-94 Chg 1, 1 Apr 96 Overhaul Instruction/IPB-Lube Oil Filter 7J4-2-41-3 1-Mar-79 Hand Pump, OH Instruction w/IPB 7J4-2-50-3 15-Jun-76 Chg l3, 15 Nov 91 Overhaul Instruction with IPB-Scavenge Pump 7J4-2-51-3 15-Jul-76 Chg 21, 15 Dec 96 Overhaul Instruction with IPB-Main Oil Pump 7J6-5-10-3 1-Nov-86 Motor Actuated Slide Shutoff Valve Overhaul Instruction w/IPB 7J6-5-6-3 1-Nov-86 Motor Actuated Gate Shutoff Valve Overhaul Instruction w/IPB 7J6-5-9-23 15-Feb-94 Motor Operated Gate Shutoff Valve Overhaul Instruction w/IPB [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 34 of 61
EX-10.21357th Page of 414TOC1stPreviousNextBottomJust 357th
[Enlarge/Download Table] ISSUE CHANGE TO NUMBER DATE DATE TITLE ------------- --------- ----------------- --------------------------------------------------------------------- 8A1-14-28-3 l-Sep-68 Chg 10, 1 Jun 91 Manually Override Actuator Assembly Overhaul Instruction w/IPB 8D1-14-113-3 15-Oct-77 Vapor Proof Actuator Assembly Overhaul Instruction w/IPB 8D1-14-128-13 18-May-67 Chg 4, 15 Dec 87 Position Indicator Actuator Assembly Overhaul Instruction w/IPB 8D1-14-162-3 16-May-67 Chg 2, 31 Jan 86 Vapor Proof Actuator Assembly Overhaul Instruction w/IPB 8D1-14-163-3 l-Jan-88 Overhaul Instruction w/IPB, Actuator Assembly 8D1-14-164-3 30-DeC-94 Electric Actuator Assembly Overhaul Instruction w/IPB 8D1-14-166-3 l-Sep-68 Chg 8, 30 Sep 93 Manual Override Actuator Assembly Overhaul Instruction w/IPB 8D1-14-52-343 15-Jun-81 Chg 3, 15 May 91 Overhaul Instruction, Actuator Assembly 8D1-14-77-133 15-Mar-89 Overhaul Instruction w/IPB, Actuator Assembly 8D1-14-77-203 31-Dec-94 Overhaul Instruction w/IPB, Series Motor Actuator Assembly 8D1-14-77-23 30-May-95 Vapor Proof Series Motor Actuator Assembly Overhaul Instruction w/IPB 8D13-3-5-3 15-May-71 Chg 9, 30 Sep 93 Starter Generator Overhaul Instruction w/IPB 8D1-61-19-3 l-Nov-72 Chg 1, 15 Mar 83 Electro Mechanical Actuator Overhaul Instruction w/IPB 8D1-61-2-3 15-Oct-83 Chg 3, 15 Oct 93 Rotary Actuator Assembly Overhaul & IPB 8D1-61-27-3 31-May-93 Actuator-Electric Motor Driven Overhaul Instruction w/IPB 8D6-6-10-34 15-May-69 Chg 2, 1 Mar 73 Starter Generator Overhaul Instruction w/IPB 8E1-11-1-103 15-Jun-94 Overhaul Instruction/IPB-Ignition Generator 8E1-11-3-3 15-Feb-90 Chg l, 15 Jul 93 Overhaul Instruction w/IPB, Stator and Rotor Assembly 8E1-2-22-53 l-Mar-80 Chg 2, 30 Dec 90 Ignition Units Overhaul 8E1-2-22-54 l-Mar-80 Ignition Units IPB 8E1-6-1-103 15-Jul-76 Chg 20, 15 Jan 96 Overhaul Instruction/IPB-Electrical Cables 8E1-6-1-103 15-Jul-76 Chg 20, 15 Jan 96 Overhaul Instruction w/IPB, Special Purpose Cables 8E1-6-1-113 l-Jul-92 Chg 3, 15 Mar 94 Overhaul Instruction w/IPB, Special Purpose Cables 8E1-7-1-133 1-Feb-90 Chg 2, 15 Dec 95 Overhaul Instruction w/IPB, High Tension Ignition Lead 8E1-8-25-3 15-Feb-82 Chg 7, 15 Aug 93 Overhaul Instruction-Ignition Exciter 8E1-8-25-4 15-Feb-82 Chg 4, 15 Aug 93 IPB-Ignition Exciter [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 35 of 61
EX-10.21358th Page of 414TOC1stPreviousNextBottomJust 358th
[Enlarge/Download Table] ISSUE CHANGE TO NUMBER DATE DATE TITLE ------------- --------- ----------------- --------------------------------------------------- 9H3-4-3-2 15-Mar-93 Chg 2, 30 Sep 94 Wing Pivot Fuel Transfer and Vent Line Assembly Overhaul w/IPB 9H8-30-121-3 30-Sep-76 Chg 8, 1 Jun 92 Press OPR Ram Air Control Valve Overhaul w/IPB 9H8-30-179-13 15-Nov-95 Overhaul Instruction w/IPB, Control Value 9H8-30-180-3 l-May-95 Air Turbine Starter Control Valve Overhaul w/IPB 9H8-3-97-3 30-Apr-92 Chg 1, 1 Nov 93 Air Pressure Regulating Value Overhaul 9H8-4-220-3 15-Feb-92 Chg 1, 1 Jul 92 Sol Actuated Value Overhaul w/IPB 9H8-4-222-3 30-Jun-95 Valve-Solenoid actuated (Pilot) sleeve regulator and shutoff Overhaul w/IPB 9P10-4-25-3 l-Sep-75 Chg 7, 14 Apr 95 Ext Fuel TK Press Regulator Overhaul w/IPB 9P10-4-9-3 15-Jul-92 Two-In Diameter Shutoff Diff Press Regulator Overhaul w/IPB 9P5-14-23-3 l-May-93 1 1/2" Diameter Modulating Elec Air Shutoff Value Overhaul w/IPB 9P5-14-29-3 15-Jun-92 Chg 1, 15 May 96 Overhaul Instruction w/IPB-Shut Off Value 9P5-18-7-3 l-Nov-95 Chg 1, 1 Feb 97 Starter Control Value Overhaul w/IPB 9P5-3-103-3 15-Jul-91 Starter Pressure Regulating Valve Overhaul w/IPB 9P5-3-104-3 l5-Jul-92 Chg 1, 15 Feb 97 4" Diameter Diff & Shutoff Press Regulator Overhaul 9P5-3-104-4 15-Oct-94 Chg 2, 15 Feb 97 4" Diameter Diff & Shutoff Press Regulator IPB 9P5-3-17-3 15-Jan-92 Chg 1, 15 Jun 96 Press Regulator & Shutoff Valve Overhaul 9P5-3-17-4 l-May-66 Chg 3, 15 Apr 91 Press Regulator & Shutoff Valve IPB 9P5-3-74-23 1-Jan-84 Oil Reservoir Air Press Regulator Overhaul w/IPB 9P5-3-98-3 31-Jan-92 Chg 1, 1 May 96 Pressure Regulator Valve Overhaul w/IPB 9P5-5-108-3 15-Jul-91 Chg 1, 1 May 96 Pressure Differential Shutoff Valve Overhaul w/IPB 9P5-5-116-3 l-Nov-76 Chg 12, 30 Dec 94 Air Shutoff Solenoid Valve Overhaul w/IPB 9P5-5-80-3 31-May-93 Shutoff Differential Press Regulator Overhaul w/IPB 9P5-5-98-3 30-Jun-92 Chg 2, 1 Feb 97 3" Pneumatic Solenoid Shutoff Valve Overhaul w/IPB [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 36 of 61
EX-10.21359th Page of 414TOC1stPreviousNextBottomJust 359th
SECTION II - RECEIPT AND INDUCTION AT FACILITY 3.1 HANDLING 3.1.1 SASA shall be responsible for the receipt, storage, and induction of all reparable T56 PBA end items. 3.1.2 SASA shall handle all end items received at the overhaul site in accordance with the applicable technical data, and shall maintain constant care over these items while in their possession. SASA shall protect all parts from damage as they are processed through the shop. SASA shall assure that all shipping container attachments and accessories remain with the shipping container while in storage or when in process of being repaired. Serviceable containers in storage shall be maintained in a manner to prevent damage or deterioration in accordance with TO 2J-1-18. 3.1.3 The applicable engine/component historical records received with the reparable engine/module/exchangeable shall be reviewed for agreement of identification, serial number, completeness of forms, reasons for removal, so that corrective actions can be programmed. The forms shall be protected from damage or loss. 3.1.4 Electrostatic Discharge (ESD) Control: All electrical and electronic items containing components in Federal Stock Classes 5905, 5955, 5961, 5962, 5963, and 7042 are classified ESDs. (Reference MIL-HDBK-773, Electrostatic Discharge Protective Packaging, paragraph 5.1.) These items shall be handled, replaced, and packaged in accordance with MIL-STD-1686, ESD program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (excluding Electrically Initiated Explosive Devices), and MIL-HDBK-263, ESD Control Handbook for Protection of Electrical or Electronic Parts, Assemblies and Equipment (excluding Electrically Initiated Explosive Devices). See Table 1 of MIL-STD-1686 for ESD maintenance and repair requirements. 3.1.5 Engines mounted in trucks, stands or dollies shall be protected from the elements and foreign matter by a cover or shroud in accordance with TO 2J-1-18. The cover or shroud shall be designed and/or installed in such a manner that it shall also serve as a leakage receptacle which shall trap any residual fluid leakage from the engine. 3.1.6 All bearings, shims, spacers, bolts, studs, bearing journals, mating surfaces, gears, and shafts removed or exposed in disassembly shall be adequately protected from corrosion and damage. 3.2 PRESERVATION 3.2.1 SASA shall inspect all end items received no later than the third workday after the day of receipt to determine the adequacy of preservation. End items with inadequate preservation shall be inducted or represerved in accordance with the applicable technical data within ten (10) working days after inspection. 3.3 INVENTORY 3.3.1 SASA shall inventory end items for completeness before induction. Missing accessories/components shall form the basis of an equitable adjustment to the price for that end item. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 37 of 61
EX-10.21360th Page of 414TOC1stPreviousNextBottomJust 360th
SECTION III - WORK REQUIREMENTS 4.1 GENERAL 4.1.1 SASA shall maintain and enhance readiness of the T56/501PBA workload through the accomplishment of overhaul, repair, and modification of the end items listed in Exhibits B-E. SASA shall improve the current War Readiness Engine (WRE) levels and actual Engine Not Mission Capable Supply (ENMCS) rates by meeting the proposed flow times and Best Estimated Quantities (BEQs). 4.1.2 SASA shall incorporate Agile Logistics tenets into every aspect of the T56/501 PBA workload. 4.2 MANAGEMENT 4.2.1 SASA shall establish and implement all necessary controls, practices, and procedures required to accomplish the overhaul, repair, or modification of the T56 and 501 PBA workload. SASA shall establish and maintain a T56 PBA Management Office whose responsiblilty is to manage all aspects of the T56 PBA workload. SASA shall designate a single management focal point for all required program activities. The name of this person and an alternate who shall act for SASA when the manager is absent shall be designated in writing to the LMKAC General Manager within 10 days after contract award. 4.2.2 SASA shall plan for and execute a smooth, integrated transition of the overhaul, repair, and modifications of the PBA end items (as defined by Exhibits B-E) to be completed by 8 August 1999. The personnel portion of this transition shall be complete by March 1999. The transition period is complete when the exit criteria and demonstrations established by TRD paragraphs 2.3 and 2.4 are satisfied. In conjuction with the overall management effort, the following transition unique requirements shall be accomplished. Other aspects of transition are addressed in their respective subject areas. 4.2.3 SASA shall establish a transition management team responsible for the coordination and accomplishment of transitioning the T56/501 PBA workload. The team composition shall include functional experts from personnel, material management, transportation and production management. This team shall begin operations at Kelly AFB within 10 days of contract award. 4.2.4 SASA shall demonstrate the ability to perform the T56/501 processes listed in Attachment 2 of the TRD. Each demonstration shall be substantiated consistent with the level/categories indicated in Attachment 2 of the TRD. 4.2.5 SASA shall provide sufficient labor to complete all T56/501 PBA end items previously inducted by the government that need further processing to be made serviceable. Material required to complete WIP shall be supplied by the Government. 4.2.6 SASA in conjuction with LMKAC shall accomplish a joint physical inventory of all WIP within 120 days of contract award. 4.2.7 SASA shall maintain Surge Capabilities (flexibility) in all operations to ensure the ability to respond to crisis, national emergency and significant fluctuations in demand. SASA shall plan for interim actions to achieve a 30% production increase above the established BEQ within the lead times specified for the items listed in Attachment 4 of the RFP. SASA shall plan sustaining actions to stabilize production at [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 38 of 61
EX-10.21361st Page of 414TOC1stPreviousNextBottomJust 361st
the increased rate. These actions include multi-shifts, overtime, contractor support, realignment of personnel, streamlined contracting procedures, accelerated delivery of spares and subcontracted repairs, etc. The Execution and Prioritization of Repair Support System (EXPRESS) and Automated Induction System (AIS) will help SASA to make these critical management decisions in a constrained depot environment. SASA shall plan to substantiate timely access to resources sufficient to achieve and sustain this production increase. Surge rates above 30% for the items listed in Attachment 4 of the RFP, and for items not listed in Attachment 4 of the RFP shall be handled as Over and Above. 4.2.8 SASA shall provide required backshop support necessary to accomplish the T56/501PBA workload. Procedures and processes shall comply with the applicable technical data for that workload. This shall include but is not limited to welding, heat treat, plating, NDI, various coatings, machining, shot peening, etc. 4.2.9 SASA shall develop and maintain a formal Risk Management Program based on the principles found in AFMC Pamphlet 63-101, Acquisition Risk Management Guide, and "Risk Management Concepts and Guidance," Defense Systems Management College. 4.3 COMMON USAF/USNAVY WORK INSTRUCTIONS 4.3.1 SASA shall be responsible for the accomplishment of all tasks necessary for the overhaul, repair, and modification of T56/501 PBA end items (as defined by Exhibits B-E) in accordance with the applicable technical data in Section 2 of this work specification. SASA shall be responsible for the accomplishment of all proprietary repair processes/tasks listed in Attachment 5 of the TRD. SASA shall deliver repaired ELIN item units within flow days after receipt of a funded order, reparable items, and a delivery order modification which sets forth the specific ELIN quantity required. The Government shall provide an annual best estimated quantity and a quarterly projected delivery schedule to convey its forecast of funded delivery order modifications to LMKAC. The Government shall maintain the projected delivery order modification schedule current up to the delivery order modification date. A delivery order modification for an ELIN item unit shall be provided to LMKAC by the contracting officer or designee. LMKAC will directly forward the forecast and delivery order modifications to SASA as guidance for SASA to allocate resources. 4.3.2 SASA shall determine the depth and scope of work required from a workscope screening, which shall provide the maintenance items, Time Compliance Technical Orders (TCTOs), items requiring specialized inspection/replacement because of hard time/on-condition limits, and the maintenance tasks to be performed. Consideration shall be given to both deficiency repair and preventive maintenance to optimize end item life. At a minimum, the workscope planning team shall consist of representatives from Production Management, Engineering, Planning, and Quality. 4.3.3 The workscope team shall screen each engine/module against the appropriate engine maintenance data system (CEMS/CAMS/AEMS), accompanying historical record, the reason for removal, and a complete external visual inspection as applicable. The status of Time and Cycle-Limited parts shall be evaluated. All engines/modules shall be inspected to the extent necessary to determine the amount of work to be performed to return the end item to serviceable status. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 39 of 6l
EX-10.21362nd Page of 414TOC1stPreviousNextBottomJust 362nd
4.3.4 Disassembly 4.3.4.1 End items received at LMKAC that have been damaged through internal failure, accident, or other causes may require other than routine procedure for disassembly. Since it is impractical to issue instructions to cover all variables encountered in such situations, SASA shall employ any method, tooling, or equipment that shall not damage either serviceable or reparable material. Disassembly procedures other than routine shall be handled as Over and Above. 4.3.4.2 Fluids, oil, and lubricants removed from end items being disassembled will be discarded in a manner compatible with existing environmental regulations. 4.3.5 Cleaning & Corrosion Control 4.3.5.1 Parts removed during disassembly shall be cleaned prior to inspection in accordance with TO 2J-1-13. Cleaning prior to disassembly is not required. 4.3.5.2 SASA will ensure that cleaning and preserving materials meet the requirements specified in the applicable T.O.s and specifications and that such materials are properly used during application. SASA will use alternative cleaning materials, considering the environment and health of the work force, to those specified in applicable technical directives subject to evaluation and approval by Engineering. 4.3.5.3 SASA shall be responsible for maintaining corrosion control of Engines, Power Sections, Reduction Gears, Modules, Accessories and their components, in accordance with applicable USAF/USNAVY Corrosion Control Technical Orders, from receipt through the overhaul or repair process to shipping. 4.3.6 Inspection 4.3.6.1 SASA shall inspect all T56/501 PBA end items (as defined by Exhibits B-E) in accordance with the applicable technical data. End items and components shall not be repaired if determined to be beyond economical repair or overhaul. The 75% cost criteria in accordance with TO 00-20-3 shall be used to determine economical repair unless modified by the ACO. Reparable end items and components that exceed the serviceable limits of the applicable technical data shall be sent to the appropriate shop for repair/overhaul. These end items and components that exceed the reparable limits of the applicable technical data shall be sent to the Material Review Board (MRB) for disposition. Non-repairable components that exceed serviceable limits shall be routed to the MRB for disposition (common hardware, brackets, fasteners, etc. and 100% replacement items; e.g. seals, packings, O-rings, etc. are exempt). 4.3.6.2 Nondestructive Inspection (NDI) methods will be accomplished in accordance with the applicable general Tech Orders, TO 33B-1-1 and NAVAIR 01-1A-16. Procedures in the general Tech Orders will not supersede those of the specific Overhaul Manual unless so stipulated. Personnel making the inspection shall be qualified in accordance with NAS 410. 4.3.6.3 Reuse & Replacement When an item can be economically repaired and subsequently reused, job-routed repair shall be accomplished. When job-routed repair will not support the required flow days for the item, non job-routed repair shall be accomplished and the item will be replaced. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 40 of 61
EX-10.21363rd Page of 414TOC1stPreviousNextBottomJust 363rd
4.3.6.4 SASA shall establish and maintain a Material Review Board (MRB) for the disposition of all T56/501 PBA end items and their components that exceed the applicable TO limits. The MRB shall consist of the Government's Cognizant Engineering Authority (CEA) as the Administrative Contracting Officer's (ACO) representative and the appropriate maintenance production inspector in accordance with TO 00-20-3 Paragraph 4-1. Approval of the Government CEA is required for all disposition actions. Accordingly, the Government CEA shall be collocated at each major work site and readily available on a daily basis. OC-ALC shall establish and maintain a holding area for material awaiting disposition. On-Site review of items may be conducted in the shop areas at the discretion of the MRB. Parts disposition shall include the following: 4.3.6.4.1 Use As-Is: The Government CEA may waive applicable TO limits to reclassify the part as serviceable (including select fit conditions). 4.3.6.4.2 New Repair: Restoration of T56/501 PBA end items to a serviceable condition through repair/overhaul procedures or processes that are beyond those in applicable TOs or drawings shall be accomplished in accordance with AFMCI 21-301 and AFMCM 21-1. These restoration efforts shall be accomplished as Over and Above. (DI-TCSP-80235A/T) 4.3.6.4.3 Condemn: End items that exceed the applicable TO limits that cannot be used as is and new repair is not feasible shall be condemned based upon a joint SASA and Government CEA review. All condemned parts shall be permanently marked as such and pertinent documents shall indicate condemned status. Condemned material shall be scrapped. Items condemned as a result of NDI shall be mutilated or otherwise made incapable for further use. All documents pertinent to such defective parts shall indicate condemned status and that the required mutilation has been accomplished. 4.3.7 Scrap Procedures SASA shall dispose of scrap material in accordance with DoD 4160.21-M-l AFPD 23-5 Reusing and Disposing of Material and AFM 23-110v2, part 2, chapter 15 Organization Transfer to Defense Reutilization Marketing Office (DRMO). All reparable components shall be salvaged. Scrap material containing critical alloys and precious metals shall be handled in accordance with TO 00-25-113, the applicable engine/end item TO, and FAR 45.6. Transportation of scrap material to the DRMO shall be the responsibility of the SASA. 4.3.7.1 SASA shall comply with instructions for the identification, conservation, segregation and/or reclamation of components containing critical alloys or precious metals in accordance with DoD 4160.21-M, Chapter XVII, Precious Metals Recovery Program and DoD 4160.229 (D), Recovery and Utilization of Precious Metals. 4.3.8 Accessories The depth and scope of work shall be in accordance with the applicable technical data. For those items which the TO allows On Condition Maintenance (OCM) / Maintenance Accessory Test and Repair On Condition (MATROC) the workscope team shall determine the depth of repair based on factors such as the operating time since last overhaul, reason for removal, and a complete external visual inspection as applicable. Accessories on which any one of the following conditions exist shall be overhauled: (a) Accessories received with an engine involved in an accident. (b) Evidence of internal failure. (c) Evidence of contamination or internal corrosion. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 41 of 6l
EX-10.21364th Page of 414TOC1stPreviousNextBottomJust 364th
(d) Evidence of unauthorized disassembly or tampering, wherein equipment condition cannot be determined without extensive/complete disassembly of the accessory. 4.3.9 Assembly SASA shall assemble all T56/501 PBA engines, modules, accessories, and their component parts in accordance with the applicable technical data. All installed parts shall be capable of meeting the designed fuctional capabilities as specified in the applicable maintenance manuals prior to installation. This includes all engine, accessory, and Quick Engine Change (QEC) kit components. SASA shall determine the serviceable status of all parts before installation. Parts shall not be installed until serviceable condition is confirmed. 4.3.9.1 Configuration Compliance/Parts Management Program SASA shall establish and maintain a Parts Management Program using MIL-HDBK-965 for guidance. The current configuration of end items as defined by the applicable TO Illustrated Parts Breakdown shall serve as the Program Parts Selection List (PPSL) for required parts. SASA shall comply with the configuration for T56/501 PBA end items, component parts and support equipment provided as Government Furnished Equipment (GFE). Actions which may impact the form, fit or function of PBA [ILLEGIBLE] items, component parts and GFE, as defined by the part number, shall be submitted to the Government Cognizant Engineering Authority (CEA) for approval. Configuration changes that do not affect form, fit or function, as determined by the Government, may be implemented by SASA with no additional approval required. a. SASA shall use the USAF Interchangeability and Sandardization (I&S) Grouping Stock List to determine usability of items. b. SASA shall modify parts received from serviceable supply that are not in a serviceable configuration in accordance with the applicable TCTOs/PPCs as Over and Above. 4.3.10 Special Processing Instructions US Navy / USAF Power Sections, Reduction Gearboxes, Torquemeters, and Accessories subjected to the following conditions require special processing: Crash, Fire, Fire fighting Chemicals, Water Immersion, Dropping, Oil Contamination, Overspeed, and Contamination. Other than routine processing in accordance with the technical directives listed in Section I shall be handled as Over and Above. 4.3.10.1 Crash Power Sections, Reaction Gearboxes, and Torquemeters: SASA shall process crash damaged components in accordance with Accident Investigation Board instructions. Crash components shall not be mixed with other engine components during the investigation. No cash engine components may be used in other engines unless specifically released by US Navy or USAF Engineering authority. Crash components released for production shall generally receive full processing, regardless of component's time or condition. 4.3.10.2 Power Sections Involved in Fire: For Power Sections involved in fire, SASA shall: a. Disassemble to remove all components damaged by heat, oxidation, or chemicals. b. Discard and scrap all components obviously unreparable due to fire and heat damage. c. Clean all components exposed to fire that were not discarded. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 42 of 61
EX-10.21365th Page of 414TOC1stPreviousNextBottomJust 365th
d. inspect components in accordance with the respective Technical Orders and additional US Navy or USAF Engineering Instructions. 4.3.10.3 Power Sections Subjected to Fire Fighting Chemicals: For Power Sections subjected to fire fighting chemicals, SASA shall: a. Drain and replace oil for dry and wet motoring. SASA shall take an oil sample for analysis after the second motoring. Motor engine for 30 seconds to blow as much of the chemical out as possible (Engine motoring and Wash cycle shall not exceed 60 seconds time period or damage to starter may occur.) b. Water wash compressor in accordance with procedures outlined by Intermediate Maintenance Instructions. c. Disassemble Power Section as necessary to inspect for corrosion on all components exposed to chemicals. d. Inspect and process all components with indication of corrosion in accordance with the Depot Maintenance Manual. e. Clean Power Sections subjected to PKP fire fighting chemicals in accordance with US Navy or USAF Engineering Instructions and NA 01-1A-509 and NA 15-01-500 as required. 4.3.10.4 Components and Accessories Subjected to Water Immersion For components and accessories subjected to water immersion, SASA shall: a. Disassemble immediately, clean, and preserve all components. b. Examine all components exposed to water. c Process all components in accordance with the applicable Technical Orders. 4.3.10.5 Dropped Power Sections, Reduction Gearboxes, or Torquemeters a. Power Section For Power Sections that have been dropped, SASA shall examine the Power Section for pre-induction run capability. If the Power Section is capable, SASA shall motor the Power Section using starter and monitor for excessive vibration and noise. If noise and vibrations are normal, SASA shall perform full depot level acceptance run and monitor for excessive vibration. If vibration is below Technical order Limits for vibration and no other discrepancies are noted, SASA shall preserve and issue Power Section as RFI. If vibration is above allowable limits, SASA shall disassemble and inspect bearing and rotating components of Power Section. If damaged, SASA shall inspect all structural members using depot level Nondestructive Inspection (NDI) and measurement techniques. SASA shall repair Power Section as required, perform test run, and return Power Section to service in accordance with applicable Technical Orders. b. Reduction Gearbox or Torquemeter SASA shall remove the end item the container and visually inspect by personnel from Quality Assurance, E&E, and Engineering. SASA shall determine processing requirement based on this inspection. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 43 of 61
EX-10.21366th Page of 414TOC1stPreviousNextBottomJust 366th
4.3.10.6 Power Sections/Gearboxes Suspected of Oil Contamination SASA shall disassemble all oil wetted components, flush or clean all passage nozzles, pumps, and tubes to insure all contaminates are removed. SASA shall inspect oil wetted components; bearings shall be cleaned and inspected iaw the applicable TO. SASA shall flow/size/test pumps, jets, nozzles as required in the TOs. SASA shall then process all components in accordance with the respective Technical Orders. During test cell operation after repair, SASA shall impose oil analysis penalty run to insure contaminates are removed. 4.3.10.7 Power Section Overspeed SASA shall: a. Process power sections experiencing overspeeds less than 120% in the normal manner. b. Disassemble Power Sections experiencing overspeeds greater than 120% sufficiently to remove the compressor and turbine rotor assemblies. SASA shall then quarantine all compressor and turbine wheels, blades and spacers. 4.3.11 Test SASA shall prepare and test T56/501 PBA end items in accordance with the applicable technical data, and the instructions contained in this work specification. 4.4 Specific Work Instructions USAF T56-A7B/A15 4.4.1 All Engines, Power sections, Modules, Reduction Gearboxes and Accessories shall be inspected in accordance with 2J-T56-53, 2J-T56-44, 2J-T56-24 and respective accessory manuals to the extent necessary to determine the amount of work to be performed to return them to serviceable status based on the OCM/MATROC concept. Each Power Section, Reduction Gear and Module shall be screened for OCM candidate with the criteria established in T.0.2J-1-27. 4.4.2 Life Limited Items SASA shall remove from service those T56-A-7B and T56-A-15 components identified below with less than 6,000 hours life remaining. T56-A7B Engine Turbine Component Life Limits [Download Table] Component P/N Life Limit (Hrs) ------------- ------- ---------------- Stage 1 Wheel 6892371 17,300 6859201 1-2 Spacer 6887614 22,500 Stage 2 Wheel 6842872 22,500 2-3 Spacer 6859202 10,000 Stage 3 Wheel 6855083 22,500 3-4 Spacer 6791633 22,500 Stage 4 Wheel 6855084 22,500 T56-A15 Engine Turbine Component Life Limits: [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 44 of 61
EX-10.21367th Page of 414TOC1stPreviousNextBottomJust 367th
[Download Table] Component P/N Life Limit (Hrs) ------------- -------- ---------------- Stage 1 Wheel 6875431 22,500 1-2 Spacer 6844632 22,500 23033463 Stage 2 Wheel 6845592 22,500 2-3 Spacer 6842683 22,500 23033464 Stage 3 Wheel 6845593 22,500 3-4 Spacer 6844794 22,500 Stage 4 Wheel 6870434 22,500 4.4.3 Special Plating/Coating Requirements T56-A7B/15 SASA shall strip and replate compressor wheels and vanes that incorporate nickel cadmium plating (see table below), either new parts from stock or installed in modules/power sections. SASA shall replate the first stage wheel (carburized) with electroless nickel per TO 2J-T56-53 WP 012 00. SASA shall coat all remaining wheels and vanes with ivadized aluminum in accordance with AMS 2427 and McDonnel Douglas Process Specification (PS) 13143. After coating, SASA shall re-identify wheels and vanes in accordance with the applicable Allison drawing. After assembly of compressor module, SASA shall reidentify module by adding the suffix "I" to existing part number. SASA shall annotate Comprehensive Engine Management System (CEMS) records with re-identified part number. (DI-MGMT-81324) [Download Table] Vane Assemblies Compressor Wheels Stage- Stage-Part Number Part Number ----------------- ------------------------ 1- 23064891 2- 23064892 2- 23055552 3- 23064893 3- 23055553 4- 23064894 4- 23055554 5- 23064895 5- 23055555 6- 23064896 6- 23055556 7- 23064897 7- 23055557 8- 23064898 8- 23055558 9- 23064899 9- 23055559 10- 23064880 10- 23055560 11- 23064881 11- 23055561 12- 23064882 12- 23055562 13- 23064883 13- 23055563 14- 23064884 4.4.4 Component Useability T56-A7B/15 T56-A15 compressor modules and reduction gearboxes may contain components not listed in TO 2J-T56-44. These components shall be reused if serviceable or reparable, provided they are listed in TO 2J-T56-24 and are traceable on a "use until exhausted" basis to the current authorized component listed in TO 2J-T56-44, by following the superseded parts trail from TO 2J-T56-24 to TO 2J-T56-44. The component shall not be reused if it is not listed in TO 2J-T56-24 or the parts trail to TO 2J-T56-44 indicates this part has been otherwise superseded or replaced. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 45 of 61
EX-10.21368th Page of 414TOC1stPreviousNextBottomJust 368th
4.4.5 Engine Performance Log Sheet T56-A7B/15 SASA shall complete an Engine Performance Log Sheet in accordance with TO 2J-T56-53. A duplicate and one copy will be placed with the engine historical records prior to return of the engine to supply. (DI-MGMT-80628/T) (DI-NDTI-80809B/T) 4.4.6 Maintenance Data Collection T56-A7B/15 SASA shall update and maintain the historical records for all T56-A-7B/15 engines and modules received for repair/overhaul in accordance with the following TOs: TO 00-20-2, TO 00-20-5, TO 00-20-5-1-1, TO 00-20-5-1-9 and TO 00-25-254-1 (&-2). (DI-MGMT-81324, DI-MGMT-81325, DI-MGMT-81327, DI-NDTI-80809B/T) 4.4.7 Engine Operating Time T56-A7B/15 Engines and modules that are repaired (versus overhauled) shall not have their operating time returned to zero on the AFTO Form 95/E407 parts I & II. 4.5 Specific Work Instructions US Navy T56-A14/A16/425 4.5.1 SASA shall perform reviews of logbooks for non-RFI Power Sections, Reduction Gearboxes, Torquemeters, and components backlogged for depot induction to determine the level of depot processing required. SASA shall maintain a log of this information, which shall be updated at least every two weeks. 4.5.2 SASA shall screen all MSRs, ASRs, and SRCs for inducted modules and accessories to determine power plant changes and modifications necessary for incorporation during rework to provide the latest configuration engine/controls and accessories/assemblies possible upon completion. SASA shall prepare and submit a technical directive listing for those items inducted and using the logbook and/or appropriate records, shall verify and update the Technical Directive Status Accounting (TDSA) data base as necessary. (DI-MNTY-81067/T, DI-MGMT-80596, DI-ILSS-80223/T) 4.5.2.1 Deficient records SASA shall not depot process Major Basic Power Section, Reduction Gearbox, and Torquemeters components and accessories with missing, incomplete, or illegible records. SASA shall make every effort to restore records in accordance with OPNAVINST 4790.2 to avoid unnecessary and costly processing. The procedures for restoring records consist of the following. a. Attempt to locate records by contacting Naval Aviation Maintenance Office (NAMO) Code 350, (301) 757-8883, or 4454 or www.naldd.com, previous custodian, FST, and supply activities. b. Search various in-house documents and reports to reconstruct missing or illegible records. c. When required, SASA shall task the NAMO (Code 3.6.2.3) (SRC Repository), for a duplicate copy of lost records IAW OPNAVINST 4790.2. Include in the correspondence the accessory's or component's part number, stock number, nomenclature, and serial number along with the Power Section, Reduction Gearbox, and Torquemeter type/model. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 46 of 61
EX-10.21369th Page of 414TOC1stPreviousNextBottomJust 369th
d. After all efforts to restore records have been exhausted, a new record may be created by following specific FST Engineering Instructions. (DI-MNTY-81067/T) 4.5.3 Life Limited Items T56-A-14/16/425 SASA shall remove from service those T56-A-14/16/425 components identified below with less than 6,000 hours life remaining. T56-A-14/16/425 Engine Turbine Component life Limits [Download Table] Component P/N Life Limit (HRS) ------------- -------- ---------------- Stage 1 Wheel 6875431 35,000 6846932 7,500 1-2 Spacer 6844632 35,000 23033463 Stage 2 Wheel 6845592 35,000 2-3 Spacer 6842683 35,000 23033464 Stage 3 Wheel 6845593 35,000 3-4 Spacer 6844794 35,000 Stage 4 Wheel 6870434 35,000 4.5.4 Special Plating/Coating Requirements SASA shall be strip and replate compressor wheels and vanes that incorporate nickel cadmium plating (see table below), either new parts from stock or installed in modules/power sections. SASA shall replate the first stage wheel (carburized) with electroless nickel per NA-02B-5DD-6-2, paragraph 6-183, NA-02B-5DE-6-2, paragraph 6-l78A, and NA-02B-5DF-6-2, paragraph WP 08700. SASA shall coat all remaining wheels and vanes with ivadized aluminum in accordance with AMS 2427 and McDonnel Douglas Process Specification (PS) 13143. After coating, SASA shall re-identify wheels and vanes in accordance with the applicable Allison drawing. [Download Table] Vane Assemblies Compressor Wheels Stage- Stage-Part Number Part Number ----------------- ------------------------ 1- 23064891 2- 23064892 2- 23055552 3- 23064893 3- 23055553 4- 23064894 4- 23055554 5- 23064895 5- 23055555 6- 23064896 6- 23055556 7- 23064897 7- 23055557 8- 23064898 8- 23055558 9- 23064899 9- 23055559 10- 23064880 10- 23055560 11- 23064881 11- 23055561 12- 23064882 12- 23055562 13- 23064883 13- 23055563 14- 23064884 4.5.5 Accessories T56-A-14/16/425 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 47 of 61
EX-10.21370th Page of 414TOC1stPreviousNextBottomJust 370th
SASA shall replace external engine accessories with an established Periodic Maintenance Information Card (PMIC) removal interval, if the respective removal interval will be reached prior to the next scheduled aircraft phase inspection as specified MRC deck. SASA shall process these accessories for rework and update to the latest released configuration and zero timed (since repair). 4.5.6 Technical Directives and Publications T56-A-14/16/425 4.5.6.1 Technical Directives T56-A-14/16/425 a. Compliance SASA shall comply with all urgent action technical directives on all T56-A-14/16/425 Series III and IV Power Sections, Reduction Gearboxes, Torquemeters, components and accessories (as defined by Exhibits B-E) processed for specific repair. Routine action technical directives listed shall be accomplished if in the area. SASA shall submit a technical directive compliance report for all technical directives. SASA shall notify NADEP Jacksonville (T56 FST) through the ACO when a kit is required. b. Verification of new Power Plant Technical Directives SASA shall verify new Power Plant Technical Directives as directed by Naval Air Warfare Center (NAWC) and Navy Air (NAVAIR). Upon completion of the verification, SASA shall forward comments to the Field Support Team (FST) and NAWC for review and to NAVAIR for the formal publication of the directive. (DI-MGMT-80596) 4.5.6.2 Technical Publications T56-A-14/16/425 SASA shall immediately upon receipt of the first delivery order under this document, and subsequently upon receipt of each change issue of Navy Supplement 2002 Navy Stock list of Publications and Forms, DoD Index of Specifications (DODISS), and such other material directed to SASA from Government sources or from the manufacturer of the engine, promptly review the latest issue. As a result of such review, SASA shall provide written notice to the ACO of needed changes to any Technical Manual, directive, specification, or publication pertinent to the work required under this work specification. In addition, SASA shall inform the principal through the ACO of any impact to this work specification resulting from Technical Manual, directive, specification or publication changes. (DI-MGMT-80596) 4.5.7 Maintenance Data T56-A-14/16/425 SASA shall be responsible for ensuring all tracked Power Sections, Reduction Gearboxes, Torquemeters, accessories, and component records are accurate and Aircraft Engine Management Systems (AEMS) data files are updated to current configuration and operating hours. These tasks are performed on each component processed. T56 components which require tracking are those items specified in NADEP Alameda LES 61-0-500. (DI-ILSS-80223/T) 4.5.8 Logbooks/Records T56-A-14/16/425 SASA shall maintain the logbooks/records of components undergoing repair in an up-to-date status. All major repairs, inspections, tests, technical directive compliance and required configuration information shall be recorded. Specific repair documentation and data gathering requirements for components undergoing repair are defined in OPNAVINST 4790.2, Volume IV, Chapter 7, Section 7.1.3. Logbooks/records, maintenance procedures and documentation requirements shall be in accordance with OPNAVINST 4790.2, Volume IV, Chapter 9. (DI-MNTY-81067/T) 4.5.8.1 Life Management Components T56-A-14/16/425 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 48 of 61
EX-10.21371st Page of 414TOC1stPreviousNextBottomJust 371st
All items listed in NADEP Alameda LES 61-0-500 are also considered Life Management Components which, when removed, require an updated entry on applicable record cards. Definitions for Meter Codes "C" (Scheduled Removal Component (SRC Item) and "E" (MSR Items) are listed in OPNAVINST 4790.2, Volume IV, Appendix G under the title of "Time/Cycle Prefix Codes". Procedures for calculating the meter reading entry for "C" and "E" meter codes are listed in OPNAVINST 4790.2, Volume IV, Section 9.1.18 and 9.1.22, respectively. Any items listed in NADEP Alameda LES 61-0-500 that were removed for high time on the incoming documents or as determined by logbook screening, induction inspection, or for failure, shall require an incoming condition code report on the same card. (DI-MNTY-81067/T) 4.5.8.2 Technical Directive T56-A-14/16/425 SASA shall properly record all Power Plant Changes (PPC), other directives and modifications incorporated during processing in the ASR and MSR Technical Directives Sections, and on my specified SRC card. Documentation shall be in accordance with the affected paragraph of applicable technical directives and in accordance with OPNAVINST 4790.2. (DI-MNTY-81607/T) 4.5.9 Failed Parts Record T56-A-14/16/425 SASA shall complete a failed parts record for any item removed from a reportable item and considered to have contributed to the failure of the component (DI-QCIC-80736) 4.5.10 Status Report T56-A-14/16/425 SASA is responsible for submitting status reports for all tracked Power Sections, Reduction Gearboxes, Torquemeters and accessories. These tasks shall be performed via message on each component processed per OPNAVINST 4790.2, Volume IV (in all references to OPNAVINST 4790.2 the latest edition must be used). (DI-ILSS-80620/T) 4.6 Specific Work Instructions US Navy 501-K17 4.6.1 SASA shall accomplish a minimum incoming inspection. 4.6.2 SASA shall disassemble and aspect as necessary to determine the extent of failures requiring repairs 4.6.3 SASA shall perform a workscope evaluation of the inducted engine, to determine the cause(s) of the symptoms which precipitated the removal and of other conditions not meeting acceptance criteria. The evaluation shall result in a Disassembly Inspection Report (DIR) of the inducted engine and its components which shall be reported on Form NAVAIR 4730/8 (REV. 4 - 74). Failure data for 501K17 PBA end items (as defined by Exhibits B-E) that are specified in DMISA SA-ALC95 01ANHA currently dated 1 Aug 1996 shall be reported annually, unless otherwise directed by the NAVSEASYSCOM, Code 03Z34 via the ACO. (DI-ALSS-81534/T, DI-RELI-80255/T) 4.7 Technical Data SASA shall comply with AFMCI 21-110, Use of Technical Data in Organic Depot Maintenance for processing, using, and controlling technical data by personnel performing depot maintenance functions. SASA shall control and maintain all technical orders, directives, manuals, and associated documents applicable to the work requirements, in an updated and current status in accordance with TO 00-5-1. 4.7.1 Compliance. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 49 of 61
EX-10.21372nd Page of 414TOC1stPreviousNextBottomJust 372nd
Compliance with all Technical Orders (including subtier tool, fixtures, and stand TOs), regulatory directives, Technical Order Supplements, specification, drawings etc., listed herein is mandatory when: a. They have not been specifically waived, rescinded, or replaced by updating revisions or after documented instruction issued by competent government authority. b. They are pertinent to the item that SASA is authorized to accomplish work on under the provision of this specification. c. They prescribe the Air Force policies, use of materials, procedure for inspection, rework process, and other pertinent data associated with accomplishment of work under the provision of this specification. 4.7.2 Order of Precedence Instruction spelled out in this work specification that conflict with applicable regulatory and technical directives shall be superseding instruction. Non-conflicting instruction shall be used in conjunction with applicable technical directives. 4.7.3 New Revisions/TCTOs Supplements and changes to the technical data listed, with a publication date prior to the release of the RFP, are considered to be applicable and within scope. SASA shall accomplish a timely review of all updating revisions, new directives, and new authorized technical order applicable to the work requirements. This review shall consider the impact on work requirements, cost, schedules, and any other pertinent factors. Written evaluation for those changes which impact the performance of this specification shall be provided to the ACO within ten (10) working days of receipt. SASA shall not implement changes prior to approval of the ACO. 4.7.4 Engineering Data SASA shall utilize the OC-ALC Engineering Data Repository and the JEDMICs System to obtain access to all drawings that are required to perform the work listed herein. For those dimensions material etc., not cited in the Technical Order or this Work Specification, the applicable drawing (of the revision in effect on the data of the RFP release) shall be adhered to. a. Limited Rights Data: SASA shall be responsible for obtaining any limited rights or "proprietary" data required for repair operations. Such data is subject to disclosure restrictions and shall be marked with an appropriate legend. SASA shall abide by the restrictions appearing on such data and shall not reproduce such data in whole or in part without responding such restrictions and providing appropriate safeguards to preclude unauthorized disclosure. 4.7.5 Technical Orders SASA shall obtain access to all Technical Orders/Directives that are required to perform the work listed herein. Redundant or duplicate requisitioning of publications shall be avoided whenever possible. SASA shall submit incremental improvements to the TOs (including existing commercial manuals and procedures where applicable and cost effective) in accordance with AFMCM 21-1 AFMC Technical Order System Procedures and AFMCI 21-301, AFMC Technical Order Systems Implementation Policies. Approval and incorporation of the proposed changes shall be the responsibility of the Government (DI-TCSP-80235A/T) 4.7.6 Existing AFMC Form 202 SASA may utilize existing unexpired AFMC Form 202s applicable to the T56/501 PBA workload. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 50 of 61
EX-10.21373rd Page of 414TOC1stPreviousNextBottomJust 373rd
4.8 Reporting Requirements 4.8.1 PBA Data Reporting Requirements For the CWS paragraphs in the workload appendices, a prefix "A" and the number of the appendix precede the paragraph number. For example, paragraph 3.3 of appendix 1 is listed as A-1 3.3. Paragraphs from the common section of the CWS are listed without any prefix. [Download Table] Workload CWS TRD Title DID Applicability CDRL References Requirement ---------------- --------------- --------------- ---- ------------- ----------- CEMS DI-MGMT-81324 T56-A-7/15 A001 A-l 3.3, 3.5 3.13.2 A-2 3.6 3.l4.15.1.3 A-3 3.6 4.2.3 CEMS TCTO DI-MGMT-81325 T56-A-7/15 A003 A-1 3.5 3.14.15.1.3 Reporting A-2 3.6 4.2.3 A-3 3.6 Certificate of DI-MGMT-81327 T56-A-7/15 A004 A-l 3.5 Deletion A-2 3.6 A-3 3.6 Alert/Safe Alert DI-QCIC-80125 PBA A006 3.1.7.3 Response to DI-QCIC-80126 PBA A007 3.1.7.3 Alert/Safe Alert Teardown DI-ALSS-81534 PBA A009 3.1.7.3 Deficiency Report Quality DI-QCIC-80736 PBA A00A 3.1.7.3 Deficiency Report Logbooks DI-MNTY-81067/T T56-A-14/16/425 A00B A-4 3.6.3 3.16.3.1 & Records A-4 3.6.3.1 3.16.3.2.3 A-4 3.2.1.1.d 3.16.7.2.5 A-4 3.6.3.2 3.16.8.1.2 A-4 3.2.1 3.16.8.1.3 Engine/Module DI-ILSS-80620/T T56-A-14/16/425 A00C A-4 3.6.5 3.16.5.2 Status Report AEMS DI-ILSS-80223/T T56-A-14/16/425 A00D A-4 3.2.1 3.16.3.2.5 A-4 3.6.2 3.16.5.1 3.16.8.1.3 Tech Prod DI-MGMT-80596 T56-A-14/16/425 A00E A-4 3.2.1 3.16.8.1.3 Deficiency A-4 3.6.1.1.b 3.16.8.1.4 Report A-4 3.6.1.2 3.16.8.2 Failure Trend DI-RELI-80255/T T56-A-501K17 A00F A-5 3.1.3 3.17.1.3 Data Report Disassembly DI-ALSS-81534/T T56-A-501K17 A00G A-5 3.1.3 3.17.1.3 Inspection Report Records DI-MGMT-80628/T PBA A00H 3.1.3.2.b 4.2.2 Retention A-l 3.4 4.2.4 A-2 3.5.1 A-3 3.3.2.3 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 51 of 61
EX-10.21374th Page of 414TOC1stPreviousNextBottomJust 374th
[Enlarge/Download Table] Workload CWS TRD Title DID Applicability CDRL References Requirement ---------------- ---------------- ---------------- ---- ----------- ----------- AFMC Form 202 DI-TCSP-80235A/T PBA A00J 3.1.3.1.e 3.3 3.1.2.4.c(2) Contractor's DI-MGMT-80227 PBA A00K 3.1.10 Progress Status & Mgmt Report Conference DI-ADMIN-81249 All conferences A00L 3.1.10 Agenda PMR Workload Reviews Conference DI-ADMIN-81250 All conferences A00M 3.1.10 Minutes PMR Workload Reviews Cost/ Schedule DI-MGMT-81467 All A00N 3.1.10 Status Report Test/ Inspection DI-NDTI-80809B/T T56-A-7/15 A00P A-l 3.4 3.13.4 Report A-2 3.5.1 3.14.14 A-3 3.3.2.3 4.2.2 4.8.2 SASA shall provide data in accordance with the tasks specified elsewhere in the CWS and the specified Data Item Description (DID) and Contract Data Requirements List (CDRL) from Exhibit A of the RFP. The requirements from Exhibit A of the RFP are listed in the PBA Data Reporting Requirements table above. 4.8.3 SASA shall interface with the following Government information systems or their successor system. SASA shall ensure that all data systems that interface with these Government systems shall be Year 2000 and leap year compliant. (1) D042: Comprehensive Engine Management System (CEMS) (2) G081: Core Automated Maintenance System (CAMS) for Mobility (3) Aircraft Engine Management System (AEMS) 4.8.4 SASA shall retain all maintenance/inspection records generated during overhaul or repair of the end item for the duration of the contract. (DI-MGMT-80628/T) 4.9 PREPARATION FOR SHIPMENT & STORAGE SASA shall be responsible for the packaging, storage, and transportation of serviceable end items. SASA shall ensure that all preservation and packaging is in accordance with AFMCI 24-201, applicable AFMC Form 158 Packaging Requirements, and the applicable technical data. Preservation of the engine fuel system shall be as outlined in TO2J-1-18. End item and material charges for handling, storage, and packaging shall be borne SASA. Transportation charges shall be borne by the Government. SASA shall mark all material and containers ready for shipment and storage in accordance with MIL-STD-129. SASA shall comply with NA 11-75A-54 for protection levels. SASA shall provide a covered warehouse environment, both for Power Sections, Reduction Gearboxes, Torquemeters, and components awaiting repair and/or repaired and awaiting shipment. 4.9.1 All drain openings, open lines, and fittings shall be sealed with the appropriate pressure seal type metal or plastic plugs and/or caps as specified in TO 2J-1-18 Tables 8-1, 8-2, 8-3. All plugs and caps shall be tightened securely to prevent leakage. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 52 of 61
EX-10.21375th Page of 414TOC1stPreviousNextBottomJust 375th
4.9.2 Prior to installing an end item in the shipping and/or storage device, the device shall be thoroughly inspected to insure that the container, trailer, stand, engine and adapters, and other equipment are clean complete and free from structural and mechanical damage and all attaching points are complete and secure. Only serviceable and complete shipping devices, as applicable, shall be used for storage and/or shipment of both serviceable and reparable engines. Engines shall be prepared for 90-365 days storage in accordance with TO 2J-1-18. 4.9.3 Serviceable end items shall be shipped within 24 hours from receipt of shipping instructions. Transportation of engines shall comply with TO 00-85-20 and applicable supplements. All necessary precautions shall be taken to prevent damage during towing or transportation operations. 4.10 FACILITIES, EQUIPMENT, AND TOOLING SASA shall review and satisfy facilities and equipment needs on a continuing basis and provide for economical depot maintenance support while minimizing ownership of industrial facilities and equipment in accordance with AFMCI 21-109 Support and Industrial Operations Depot Facilities and Equipment, and AFMCI 21-127 Depot Maintenance Plant Management. 4.10.1 SUPPORT EQUIPMENT AND TOOLING The support equipment and tooling required during repair are identified in the applicable overhaul manuals. The Government shall provide the equipment and tooling listed in Section 3 of the Facilities Volume. Failure to provide this equipment shall constitute an excusable delay and form the basis of an equitable adjustment. SASA may utilize equivalent tooling, including locally designed and manufactured tooling as long as safety of operation and quality of product are not impaired. SASA shall gain CEA approval of all equivalent tooling. A. REMOVAL & RELOCATION SASA shall be responsible for the removal and relocation of applicable required support equipment and tooling. B. INSTALLATION & MAINTENANCE SASA shall be responsible for the installation and maintenance of all required support equipment & tooling. 4.11 PERSONNEL SASA shall provide sufficient personnel with the requisite skills to accomplish the T56/501 PBA workload in accordance with this work specification. During transition, SASA shall provide and train sufficient personnel to perform the T56/501 PBA workload in accordance with this work specification. SASA shall offer current SA-ALC employees, who possess requisite skills and T56/501 PBA workload experience, the opportunity to be employed by SASA. 4.12 SUPPLY SUPPORT SASA shall be responsible for obtaining sufficient material to perform the T56/501 PBA workload with no delays in flow times due to parts shortages. Government property management shall be performed in accordance with AFMAN 23-110, Vol.2. USAF Standard Base Supply System. 4.12.1 TRANSITION [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 53 of 61
EX-10.21376th Page of 414TOC1stPreviousNextBottomJust 376th
a. Inventory SASA shall perform a Joint Inventory Walk Through within 120 days of contract award in accordance with the RFP to identify T56/501 PBA parts and materials in stock and available on the shop floor (to include benchstock, and other shop floor or bin levels). b. Relocation & Storage SASA shall relocate, and store applicable reparable and serviceable T56/501 PBA parts and materials identified in the Joint Inventory Walk Through prior to July 2001. 4.12.2 Source Controlled Items SASA shall obtain the items listed in Attachment 4a of the TRD from Government approved vendors. Current approved vendors are listed therein. SASA shall obtain repair parts for all engine and aircraft fuel accessories from the Original Equipment Manufacturer (OEM) or Government approved alternate sources. Government approval is required for changes in the plant location for the manufacture of these items. a. Source Qualification SASA shall obtain Government CEA approval of new sources for the items listed in Attachment 4a of the TRD in accordance with DFARs Appendix E and AFI 23-105 Spares Breakout Program. When new sources become available, SASA will submit a source approval request to the Government CEA for evaluation and approval. These source approval requests will fully document the capabilities, quality system, past performance, and facilities of the potential source as necessary to specifically address the requirements of the subject item. 4.12.3 Use of Government Property / Material When material is furnished by the government, the SASA procedures shall include at least the following: a. Examination upon receipt, consistent with practicality, to detect damage in transit; b. Inspection for completeness and proper type; c. Periodic inspection and precautions to assure adequate storage conditions to guard against damage from handling and deterioration during storage; d. Functional testing, either prior to or after installation, or both, as required by contract to determine satisfactory operation; e. Identification and protection from improper use or disposition; and verification of quantity. SASA shall report in accordance with TO 00-35D-54 any Government Furnished Material (GFM) found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction, during or after installation, SASA shall determine and record probable cause and necessity for withholding from use. 4.13 Quality SASA shall establish and maintain a quality system that as a minimum, adheres to the requirements or ISO 9002, and supplemental requirements imposed by this work specification. The quality system procedures, planning and other documentation and data that comprise the quality system shall be made available to the Government for review. Existing quality documents that meet the requirements of the contract may continue to be used. The Government may perform any necessary inspections, verifications and evaluations to ascertain conformance to requirements and the adequacy of implementing procedures. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 54 of 61
EX-10.21377th Page of 414TOC1stPreviousNextBottomJust 377th
4.13.1 Work Control Documents The quality system include a clear and complete set of work control document (WCD), in accordance with AFMCI 21-110 for all maintenance required by the work specification. The WCDs shall assure specific and uniform step-by-step directions for accomplishing work accurately, economically, and safely. WCDs shall specify component removals, inspection, and reinstallation's which affect quality and shall include caution and warning notes where failure to follow prescribed procedures could result in damage to Air Force property or injury to personnel. Removal and reinstallation of items (including lines, fittings, components, etc.) when required to gain access to another component shall be listed as separate entries on the work document. Quantitative criteria (dimensions and tolerances) shall be included in the WCD. The document shall also include criteria essential for determining the acceptability of work performed. WCDs shall be maintained and reviewed on a systematic basis for accuracy, completeness compliance, and revisions essential in preventing recurring deficiencies reported by USAF activities. Inspection and test records shall as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be completed and accurate, and shall be used for trend analysis and to assess corrective action effectiveness. 4.13.2 Deficiency Reporting SASA's quality program shall be designed to promptly detect and correct assignable conditions adverse to quality. SASA shall respond to user initiated Product Quality Deficiency Reports (PQDRs) submitted against reportedly defective T56/501 PBA end items manufactured, repaired, or overhauled. Each deficiency report shall be processed in accordance with TO 00-35D-54, USAF Material Deficiency Reporting System. (DI-QCIC-80736) If required by the ACO, the contractor shall submit a report. (DI-ALSS-81534). SASA shall submit an ALERT/SAFE ALERT upon discovery of defective parts or material (DI-QCIC-80125A). SASA shall submit a Response to an ALERT/SAFE ALERT when ALERT/SAFE ALERTs impact the T56/501 PBA workload (DI-QCIC-80126A). Corrective actions taken shall include as a minimum: a. Analysis of data and, examination of exhibits (when appropriate) to determine extent and cause of deficiencies. b. Analysis of trends in processes or performance of work to prevent recurrence. c. Introduction of required improvement. d. Corrections and monitoring of the effectiveness of corrective action taken. 4.13.3 Quality Audits SASA shall support the Quality Audits accomplished by the Government team when and to the extent required by the acquiring activity. One or more of the repaired/modified articles may be removed from the production line and subjected to such testing/disassembly/reassembly as necessary to ascertain that standards of performance and technical conformance required by this work specification are being met. Upon completion of the quality audit, SASA shall incorporate into the repair process corrective action as necessary to eliminate cause of defective articles. 4.13.4 Process Improvement SASA shall plan for and implement systemic improvements of processes with the goal of reducing product flow days and improving product quality. 4.13.5 New Repair Development [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 55 of 61
EX-10.21378th Page of 414TOC1stPreviousNextBottomJust 378th
SASA shall promote the development of new repairs when cost effective. Submittal of proposed repair procedures shall comply with AFMCM 21-1 and AFMCI 21-301. 4.14 Measuring and Test Equipment (M&TE) All operations performed by SASA shall be subject to Government verification at unscheduled intervals. Verification shall include but not be limited to the following: a. Review of SASA documented calibration system. b. Surveillance of calibration operations for conformance to the SASA documented calibration system. c. Review of calibration results to verify adequacy of SASA calibration process. SASA's M&TE and measurement standards shall be made available for use by the acquiring activity, as required. M&TE and measurement standards shall be labeled to indicate calibration status. The label shall identify, as a minimum, specific date calibrated (day, month, and year, Julian date or equivalent) and the specific calibration due date. Tamper resistant seals shall be affixed to operator accessible control or adjustments on M&TE and measurement stands which, if moved, shall affect the calibration. SASA shall establish a recall system for the mandatory recall of M&TE and measurement standards to assure timely recalibrations. 4.14.1 Use of SASA Inspection/Test Equipment SASA gages and measuring and testing devices shall be made available for use by the Government when required to determine conformance with contract requirements. If conditions warrant, SASA personnel shall be made available for operations of such, devices and for verification of their accuracy and condition. 4.15 Training & Certification SASA shall ensure that all personnel are trained and certified as appropriate for the work performed. SASA shall establish and maintain a structured training and certification program in accordance with AFMCI 21-108. 4.15.1 Special Skills Qualification SASA shall establish and maintain a Special Skills Qualification program in accordance with AFMCI 21-108. The covered skills are so critical or specialized they require extensive technical knowledge and proficiency. Most of these skills are governed by higher level regulatory guidance because they are safety related or have a significant impact on cost. Each skill shall be controlled by one or more center qualification officials who are appointed by the applicable product directorate. These personnel are experts in their skill and can grant qualification based on demonstrated proficiency and passing a written test, when applicable. Special skills may require a periodic requalification. SSQ is a prerequisite to PAC. Individuals must first be SSQ qualified if the PAC task requires one of the designated skills before they can be certified for the task. 4.16 Depot Contract Repair SASA shall manage subcontracted repair efforts in accordance with AFMCI 21-113 Contract Maintenance Programs for Depot Maintenance Business Areas. SASA shall ensure that the requirements of this work specification are addressed in applicable subcontracts. SASA shall establish and maintain a Contract Repair Enhancement Program (CREP) to institute a contract repair process that responds directly [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 56 of 61
EX-10.21379th Page of 414TOC1stPreviousNextBottomJust 379th
to validated customer (user) demands while simultaneously minimizing inventory requirements, process steps, and queue time with as few resources as possible. This process shall incorporate the tenets of Aglie Logistics and other DOD acquisition reform initiatives with the goal of providing warfighter support "better, faster, cheaper, and smoother." CREP is a focused effort to mirror DREP organic repair process changes in the contract repair environment wherever possible. 4.16.1 Transition SASA shall establish a process to assume responsibility for T56/501 PBA requirements previously accomplished under separate contracts that ensures no delay in flow time due to parts shortages. 4.16.2 Source Controlled Repairs/Processes SASA shall utilize the services of only Government approved vendors for the critical Repair/Processes listed in Attachment 4b of the TRD. Attachment 4b identifies the current Government approved vendors. Government approval is required for changes in the plant location for these repair services. a. Qualification of New Sources SASA shall obtain Government CEA approval of new sources for the repairs listed in Attachment 4b of the TRD in accordance with DFARs Appendix E Spares Breakout Program and AFMCI21-113 Para 2.15 Minimum Source Qualifications. When new sources become available, SASA will submit a source approval request to the Government CEA for evaluation and approval. These source approval requests will fully document the capabilities, quality system, past performance, and facilities of the potential source as necessary to specifically address the requirements of the subject repair. 4.17 Customer Support SASA shall provide information on the progress and status of the program and of the assigned tasks, costs, and existing or potential problem areas (DI-MGMT-80227). SASA shall provide summarized contract cost and schedule performance information for program management purposes (DI-MGMT-81467). SASA shall support and participate in reviews and meetings to coordinate T56/501 PBA requirements determinations and accomplishment (DI-ADMN-81249, DI-ADMN-81250) 4.17.1 Post Award Conference SASA shall attend a post award conference no later than 30 calendar days after contract award. 4.17.2 Program Management Review (PMR) SASA shall support and participate in PMRs to be held every 6 months for the duration of the contract. 4.17.3 Workload Review SASA shall support and participate in quarterly workload reviews for the duration of the contract. This government shall provide updated workload estimates. 4.17.4 Technical Interchange Meeting (TIM) SASA shall support and participate in TIMs as required to coordinate T56/501 PBA requirements determinations and accomplishment. 4.18 Safety [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 57 of 61
EX-10.21380th Page of 414TOC1stPreviousNextBottomJust 380th
SASA shall implement and maintain a safety program that ensures protection of personnel and property in accordance with AFPD 91-2 Safety Programs, AFPD 91-3 Occupational Safety and Health, AFI 9l-202 Mishap Prevention Program, and AFI 91-301 Air Force Occupational and Environmental Safety Program, AFI 91-302 Air Force Occupational and Environmental Safety, Fire Protection, and Health (AFOSH) Standards, AFOSHSTD 91-66 General Industrial Operations. This program shall comply with the following: 4.18.1 Mishap Reporting and Investigation SASA shall comply with the procedures of AFI 91-204 Safety Investigations and Reports, for all mishaps or incidents resulting in damage to DoD property entrusted by this contract. SASA shall immediately secure the mishap scene and damaged property until released by the ACO. If the government decides to investigate the mishap SASA shall cooperate fully and assist the government personnel until the investigation is completed. 4.18.2 Handling SASA shall load, handle, and transport government property in accordance with AFOSHSTD 91-46 Materials Handling and Storage Equipment. a. All mechanical material handling equipment, including trucks, forklifts and conveyors shall be maintained in good operating condition. b. All vehicle operators shall be trained and certified as operators for each type of vehicle they operate. This training shall be the responsibility of SASA. c. Loaded vehicles shall not be put into motion until the load is properly stacked and secured. d. Side stakes, straps, or lashing material shall be used in high, unbalanced, or irregular shaped loads. e. Vehicles shall have the parking brake set and the motor turned off when unattended. 4.18.3 Fire Prevention and Protection SASA shall provide fire prevention and protection systems for the protection of government property in accordance with NFPA 13, NFPA 70, and NFPA 72. a. Trash and litter shall not be allowed to accumulate on the floor. Oily rags, paint or thinner cloth, rubber bushings, rubber cement containers, magnesium grindings and any other similar hazardous waste shall be placed in metal containers with self-closing lids, appropriately labeled. b. No smoking or open flame shall be permitted inside or within 50 feet of paint and dope shops, gasoline storage and dispensing areas, flammable liquids, flammable compressed gases or other hazardous locations. "No Smoking" signs shall be posted in the areas where smoking is prohibited. c. All electrical installations shall comply with the provisions of the current National Electric Code. d. Sufficient natural or supplied ventilation shall be provided where flammable or explosive materials, fuels, or gases create explosion or fire hazards. e. Portable fire extinguishers shall be provided of sufficient capacity and type to adequately control the types of fires most likely to occur in the areas where they are to be located. All fire extinguishers shall be maintained in a readily visible and accessible location. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 58 of 61
EX-10.21381st Page of 414TOC1stPreviousNextBottomJust 381st
4.18.4 Storage Government property shall be stored in such a manner as to prevent damage. a. All engine parts and aircraft parts shall be protected from damage during storage. Parts shall not be stacked directly on the floor. Parts shall not be stored in direct contact with each other. All parts shall be palletized or separated by aluminum, wood, cardboard, or other suitable material. b. Broken or damaged pallets shall not be used for storage of government property. c. SASA shall provide sufficient aisles between storage areas for mechanical handling equipment. Aisles shall be kept clear and dry at all times. 4.18.5 Spray Applications SASA shall perform spray applications in accordance with AFOSHSTD 91-17 Interior Spray Finishing. 4.18.6 Flammable Liquids SASA shall handle flammable liquids in the vicinity of government property in accordance with NFPA 30, NFPA 33, AFOSHSTD 91-43 Flammable and Combustible Liquids, and DOD4140.25 (for Petroleum Liquid Storage). 4.18.7 Compressed Gas Compressed gas from cylinders in the vicinity of government property shall be handled and stored in accordance with the following: a. Compressed gas from cylinders shall not be used without reducing the pressure through a regulator. b. When cylinders are not in use, the valve shall be closed tightly. c. During use or storage, cylinders shall be restrained to prevent accidental upsetting or falling. d. Smoking shall not be permitted within 50 feet of compressed gas storage areas. "No smoking" signs shall be posted in the area. e. Oxidizing gases shall not be stored within 50 feet of flammable liquids unless separated by a wall with a one hour fire rating. f. All compressed gas cylinders shall be labeled as to contents. g. Valve protector caps shall be installed on all compressed gas bottles in storage. 4.18.8 Foreign Object Damage (FOD) Prevention SASA shall implement and maintain procedures for the prevention of FOD. These procedure shall comply with NAFPI Pamphlet FOD Prevention Guideline, AFMCI 21-122 Foreign Object Damage Prevention Program, and LPOI 66-01 Foreign Object Damage Prevention Program. 4.18.9 Miscellaneous Safety Requirements a. Welding procedures shall comply with AFOSHSTD 91-5 Welding Cutting and Brazing, NFPA 410, and NFPA 51B [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 59 of 61
EX-10.21382nd Page of 414TOC1stPreviousNextBottomJust 382nd
b. Work Stands/Platforms shall be maintained in accordance with AFOSHSTD 91-2 and 35 series c. Personal protective equipment shall be utilized in accordance with AFOSHSTD 91-31 Personal Protective Equipment. 4.19 Warranty SASA shall warrant all inducted end items for deficiencies in workmanship. SASA warrants all T56/501 PBA end items (as listed in Exhibits B-E) inducted and processed by SASA to be free from defects in workmanship for the periods specified in Paragraph 4. Exclusions to this coverage are specified in Paragraph 3. SASA, after a reasonable investigation and in consideration of the coverage period and exclusions, shall make a determination to the validity of any claim and applicability of this warranty. If it is determined that the subject end item exhibits a covered defect, SASA shall (at it's discretion and limited to the work previously performed) repair or replace the nonconforming work without charge to LMKAC. All work required under this warranty shall be performed at the SASA's facility, unless otherwise agreed to by SASA. Transportation of items returned under this warrranty shall be the responsibility of LMKAC. The warranty period for any item repaired under this warranty shall be the unexpired portion of the original item's warranty period. The remedies available to LMKAC for warranty claims determined to be valid by SASA shall be exclusively limited to repair or replacement of the nonconforming work. In no event shall SASA be liable for special, indirect, consequential, or incidental damages, whether based on theories of contract or [ILLEGIBLE], including, without limitation, additional costs of any kind whatsoever, loss of revenue, or loss of use of property. The foregoing warranties are given in lieu of any other warranties, expressed or implied, including without limitation, any implied warranties of merchantability or fitness for purpose, such other warranties being entirely disclaimed by SASA. 4.19.1 Processing Warranty Items: LMKAC shall notify SASA within 14 days of any suspected failure covered by this warranty. End items shall be reported and processed in accordance with TO 00-35D-54. Enter "2LM OWP" or "3LM OWP" as applicable in Field I20 of INFOCEN G021 database. SASA will provide deposition instructions within three (3) workdays of notification. 4.19.2 Exclusions: The following will be excluded from coverage under the warranty: a. Foreign Object Damage (FOD), armed conflict, acts of God, or the public enemy. b. Improper or negligent installation, operation, or maintenance. c. Failure as a result of an aircraft accident. d. Experimental test or exposure to erosion and/or corrosion environments in excess of item specification requirements. e. End Items subjected to unauthorized cannibalization or alteration. f. Items not submitted under TO 00-35D-54, Table 3-1, and Chapter 6. g. Design defects. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 60 of 61
EX-10.21383rd Page of 414TOC1stPreviousNextBottomJust 383rd
h. End items not inducted and completely processed by SASA. 4.19.3 Coverage Period [Download Table] SYSTEM Period ------ ------ Engines: T56/501 500 hours EOT Modules and Tracked Accessories: TS6/501 500 hours EOT Untracked Accessories 3 months operation * Engine Operating Time 4.20 Over and Above The following tasks shall be accomplished as directed by the Government ACO and negotiated in accordance with the Over and Above clause of the contract. a. TRD Attachment 1 Items The repair, overhaul, or modification of the items listed in Attachment 1 of the TRD. b. Dropped/Mishap Engines Disposition of engines that were dropped by the Government during handling or were installed in an aircraft involved in an accident. c. Verification of Technical Orders/Directives Verification of new and/or unpublished Technical Orders/Directives. d. Serviceable Supply Modification Modification of parts received from serviceable supply necessary to obtain a serviceable configuration. e. New/Undefined Repair Restoration of damaged or worn parts and components to a serviceable condition through repair/overhaul procedures or processes that are beyond those in the listed TOs or drawings. Including the development of such repair procedures. f. Non Warranty PQDR Investigation Investigation, reporting, and corrective actions associated with deficiencies that are not covered by the applicable warranty. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] September 23, 1998 SASA, INC. T56 Contractor Work Specification Page 61 of 61
EX-10.21384th Page of 414TOC1stPreviousNextBottomJust 384th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT H LETTER OF INTENT Between LOCKHEED MARTIN CORPORATION and STANDARD AERO SAN ANTONIO, INC. ("SASA") FOR LEASE OF PBA FACILITIES ATKELLY AFB, TEXAS This Letter of Intent is entered into effective the 28th day of August, 1998, by and between Lockheed Martin Corporation ("Lockheed Martin") and Standard Aero San Antonio, Inc. ("SASA"). Recitals 1. The Secretary of the Air Force on behalf of the United States of America (the "Government"), pursuant to its authority under the Defense Base Closure and Realignment Act of 1990, as amended. (10 U.S.C. Section 2687 note) ("DBCRA") entered into an Economic Development Conveyance ("EDC") with Greater Kelly Development Corporation ("GKDC") on July 24, 1997, a fully executed copy of which GKDC has provided to Lockheed Martin and which Lockheed Martin has provided to SASA. 2. Pursuant to a certain Department of Air Force Lease of Real Property on the non-realigned portions of Kelly AFB, Texas, dated July 24, 1997 ("Master Lease"), a fully executed copy of which GKDC has provided to Lockheed Martin and which Lockheed Martin has provided to SASA between the Government as Lessor and GKDC as Lessee, GKDC has leased certain lands, certain improvements and certain personal property thereon, comprising a portion of the Non-Realigned Portions of Kelly AFB in the County of Bexar, State of Texas, which lands, improvements and personal property are more particularly described in such Master Lease and are collectively known as the "Master Lease Premises." GKDC desires to sublease to Lockheed Martin and Lockheed Martin desires to further sublease to SASA certain land, improvements and personal property covered by the Master Lease Premises and more specifically described in drafts of the Sublease previously delivered by SASA to Lockheed Martin. 3. Lockheed Martin, as a subcontractor of Oklahoma City-ALC ("OC-ALC"), and SASA, as subcontractor to Lockheed Martin, are participating together in a bid to provide the Government with certain aircraft engine repair, maintenance, modification and/or overhaul services ("PBA Contract"). [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 60 of 81
EX-10.21385th Page of 414TOC1stPreviousNextBottomJust 385th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 4. In order for Lockheed Martin and SASA to participate together in the bid on the PBA Contract, they must prove to the satisfaction of the Government that they can lease the facilities necessary to delivery the services required of them under the PBA Contract. NOW, THEREFORE, in consideration of the premises herein set out, and other valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Lockheed Martin agrees that if OC-ALC is successful in being awarded the PBA Contract and Lockheed Martin is successful in being named subcontractor, then Lockheed Martin will lease to SASA the land, improvements and personal property described herein, substantially on the terms following which will be subsequently embodied in a written lease and incorporated in the SASA subcontract: Premises To Be Leased: Lockheed Martin agrees to lease to SASA and SASA agrees to lease from Lockheed Martin the following land, including all buildings, improvements and personal property located at such facilities: [Download Table] Leased Facilities Square Footage ----------------- -------------- Building 360 335,000 Building 535 14,400 Building 652/655 46,895 Annual Rent and Other Costs: At SASA's option and election Lockheed Martin shall lease the above described Leased Facilities to SASA for the Term hereinafter described for total rent and all other costs as described in Exhibit J-Occupancy Expense. Term: The lease term for these facilities shall be for an initial 5(five) years commencing on the latest of October 1,1999, the date of execution and delivery of the written lease contemplated hereunder or on the date of contract award of the PBA, with renewal options as provided under the SASA subcontract. Landlord Services, Utilities and Repairs: Lockheed Martin, pursuant to Subcontract paragraph 21.1, Relationship of the Parties, shall provide SASA with all facilities, services, maintenance and utilities deemed necessary by SASA to carry out the intended purposes of the SASA subcontract to be carried out at the facilities to [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 61 of 81
EX-10.21386th Page of 414TOC1stPreviousNextBottomJust 386th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 be leased hereunder including full service landlord fractions described and defined as Essential Services, Utilities, Repairs and Maintenance, Taxes (or its equivalent) and Common Area Maintenance. The services, utilities, repairs and maintenance are more particularly described in Exhibit J of the SASA subcontract. The cost of such services, repairs, maintenance and taxes, if any, are deemed to be included in the aggregate facility lease costs and SASA shall not be required to make any payments other than those specified in EXHIBIT J, OCCUPANCY EXPENSE. In the event GKDC incorporates incentives provisions in a final lease to Lockheed Martin which have the possibility to reduce rental costs, that incentive(s) will be incorporated in the lease with SASA. SASA's obligation to enter into the Lease pursuant to this Letter of Intent is expressly contingent upon: 1. the award by the Air Force of the PBA contract to OCALC; 2. the award of a subcontract by OCALC to Lockheed Martin; 3. Lockheed Martin entering into a sublease for the subject Premises Binding Effect: The parties hereto hereby agree to negotiate a legally binding and effective lease in accordance with the terms hereof. The parties hereto hereby further agree that such efforts shall be commercially reasonable and that all efforts shall be taken in good faith. Further, a legally binding contract to lease shall only exist upon the exchange of fully executed lease documents, between Lockheed Martin and SASA containing mutually acceptable lease language expressing the terms and conditions contained herein and such other terms as the parties may agree upon, which shall be subject to executive management approval of both parties. Except otherwise provided herein, this Letter of Intent does not constitute a legally binding contract. Confidential Data: Notwithstanding any language to the contrary, Lockheed Martin hereby acknowledges and agrees that it has received confidential technical data and information from SASA and its affiliates and that it shall not use any such data or information except in conjunction with SASA or its affiliates as contemplated by the parties hereto. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 62 of 81
EX-10.21387th Page of 414TOC1stPreviousNextBottomJust 387th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 facilities to be leased hereunder including full service landlord functions described and defined as Essential Services, Utilities, Repairs and Maintenance, Taxes (or its equivalent) and Common Area Maintenance. The services, utilities, repairs and maintenance are more particularly described in Exhibit J of the SASA subcontract. The cost of such services, repairs, maintenance and taxes, if any, are deemed to be included in the aggregate facility lease costs and SASA shall not be required to make any payments other than those specified in EXHIBIT J, OCCUPANCY EXPENSE. These amounts are estimates that are subject to revision based on actual costs. In the event GKDC incorporates incentives provisions in a final lease to Lockheed Martin which have the possibility to reduce rental costs, that incentive(s) will be incorporated in the lease with SASA. SASA's obligation to enter into the Lease pursuant to this Letter of Intent is expressly contingent upon: 1. the award by the Air Force of the PBA contract to OCALC; 2. the award of a subcontract by OCALC to Lockheed Martin; 3. Lockheed Martin entering into a sublease for the subject Premises Binding Effect: The parties hereto hereby agree to negotiate a legally binding and effective lease in accordance with the terms hereof. The parties hereto hereby further agree that such efforts shall be commercially reasonable and that all efforts shall be taken in good faith. Further, a legally binding contract to lease shall only exist upon the exchange of fully executed lease documents, between Lockheed Martin and SASA containing mutually acceptable lease language expressing the terms and conditions contained herein and such other terms as the parties may agree upon, which shall be subject to executive management approval of both parties. Except otherwise provided herein, this Letter of Intent does not constitute a legally binding contract. Confidential Data: Notwithstanding any language to the contrary, Lockheed Martin hereby acknowledges and agrees that it has received confidential technical data and information from SASA and its affiliates and that it shall not use any such data or information except in conjunction with SASA or its affiliates as contemplated by the parties hereto. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 63 of 82
EX-10.21388th Page of 414TOC1stPreviousNextBottomJust 388th
SUBCONTRACT NO LMKAC 98-0001 23 September 1998 EXHIBIT I-LIST OF SURGE ITEMS The following surge items are applicable to this subcontract. [Download Table] Leadtime National Stock Number Part Number Nomenclature Days --------------------- ----------- ----------------------- -------- 2840-00-491-5767RW 6859680 Case, Turbine Aircraft 30 2840-00-426-2571RW 6871561 Nozzle Assy., Turbine 12 2840-01-338-2990RW 23039743 Cold Section Module 28 2915-01-113-3252RW 440978-2 Fuel Control 14 2840-00-225-0950RW 6847260 Unit Assy, Reduction 28 2840-01-338-0539RW 23002758 Cold Section Module 25 2840-01-337-2608RW 23002760 Cold Section Module 25 2840-01-294-7878RW 23006858 Rotor, Turbine Aircraft 18 2840-00-015-8540RW 440970-214 Housing Anti-Friction 16 2840-01-253-9193RW 23031736 Nozzle Assembly 5 2915-01-113-8557RW 440970-2 Fuel Control, Main 14 [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 63 of 81
EX-10.21389th Page of 414TOC1stPreviousNextBottomJust 389th
SUBCONTRACT NO LMKAC 98-0001 23 September 1998 EXHIBIT J OCCUPANCY EXPENSE BY FISCAL YEAR Standard Aero Lockheed Martin Kelly Aircraft Center Propulsion Business Area Public/Private Competition F41608-98-R-0084 Schedule F - Occupancy Expense by Fiscal Year CLIN 0001 & 0002 [Download Table] FY 99 FY 00 FY 01 FY 02 FY 03 ----- ----- ----- ----- ----- LABOR Indirect Labor - Regular FRINGE BENEFITS OTHER INDIRECT COSTS Base Rent Fixed Base Rent Essential Services (Fire, Police, Public [/\] Roads, Ind Security, Schools) Common Area Maintenance Insurance (Structural Replacement) Metering Expense Services Custodial (Office and [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 64 of 81
EX-10.21390th Page of 414TOC1stPreviousNextBottomJust 390th
SUBCONTRACT NO LMKAC 98-0001 23 September 1998 [Download Table] Common Areas) Refuse Removal Pest Control Facility Patrol Facility Maintenance and Repair Routine Maintenance Other Maintenance Utilities - Industrial Steam (Mbtu) Chilled Water (100 Gal.) [/\] Compressed Air (MCF @ 120PSI) Wastewater Treatment (1,000 Gal.) Utilities - Basic Electricity Water Sewage Natural Gas Communications (Lines) EPA Insurance HAZMAT Disposal Administrative Travel Training Relocation Costs [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 65 of 81
EX-10.21391st Page of 414TOC1stPreviousNextBottomJust 391st
SUBCONTRACT NO LMKAC 98-0001 23 September 1998 [Download Table] Management Information System (ERP) Depreciation Telephone Service Outside Services & Corporate [/\] Audits Office Supplies Reproduction Low Value Furniture & Equipment Subscriptions Equipment Rental Totals Charges to Subcontractors and Allocations Standard Aero Schedule F - Occupancy Expense by Fiscal Year - CLIN 0003 [Download Table] FY 99 FY 00 FY 01 FY 02 FY 03 ----- ----- ----- ----- ----- LABOR Indirect Labor - Regular FRINGE BENEFITS OTHER INDIRECT COSTS [/\] Base Rent [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21392nd Page of 414TOC1stPreviousNextBottomJust 392nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] Fixed Base Rent Essential Services (Fire, Police, Public Roads, Ind Security, Schools) Common Area Maintenance Insurance (Structural Replacement) Metering Expense Services Custodial (Office and Common Areas) Refuse Removal Pest Control Facility Patrol [/\] Facility Maintenance and Repair Routine Maintenance Other Maintenance Utilities - Industrial Steam (Mbtu) Chilled Water (100 Gal.) Compressed Air (MCF @ 12OPSI) Wastewater Treatment (1,000Gal.) Utilities - Basic Electricity Water Sewage [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 67 of 81
EX-10.21393rd Page of 414TOC1stPreviousNextBottomJust 393rd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] Natural Gas Communications (Lines) EPA Insurance HAZMAT Disposal Administrative Travel Training Relocation Costs Management Information System (ERP) Depreciation [/\] Telephone Service Outside Services & Corporate Audits Office Supplies Reproduction Low Value Furniture & Equipment Subscriptions Equipment Rental Totals Charges to Subcontractors and Allocations Standard Aero [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 68 of 81
EX-10.21394th Page of 414TOC1stPreviousNextBottomJust 394th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 Schedule F - Occupancy Expense by Fiscal Year CLIN 0004 [Download Table] FY 99 FY 00 FY 01 FY 02 FY 03 ----- ----- ----- ----- ----- LABOR Indirect Labor - Regular FRINGE BENEFITS OTHER INDIRECT COSTS Base Rent Fixed Base Rent Essential Services (Fire, Police, Public Roads, Ind Security, Schools) Common Area Maintenance Insurance (Structural [/\] Replacement) Metering Expense Services Custodial (Office and Common Areas) Refuse Removal Pest Control Facility Patrol Facility Maintenance and Repair Routine Maintenance Other Maintenance Utilities - Industrial Steam (Mbtu) [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 69 of 81
EX-10.21395th Page of 414TOC1stPreviousNextBottomJust 395th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] Chilled Water (100 Gal.) Compressed Air (MCF @ 120PSI) Wastewater Treatment (1.000 Gal.) Utilities - Basic Electricity Water Sewage Natural Gas Communications (Lines) EPA Insurance [/\] HAZMAT Disposal Administrative Travel Training Relocation Costs Management Information System (ERP) Depreciation Telephone Service Outside Services & Corporate Audits Office Supplies Reproduction Low Value Furniture & Equipment Subscriptions [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 70 of 81
EX-10.21396th Page of 414TOC1stPreviousNextBottomJust 396th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] Equipment Rental [/\] [/\] [/\] [/\] [/\] Totals [/\] [/\] [/\] [/\] [/\] Charges to Subcontractors and Allocations Standard Aero [/\] [/\] [/\] [/\] [/\] Note: The methodology to allocate occupancy costs were based on each subcontractor's square footage for their operations at Kelly divided by the total square footage of the planned final layout of the PBA facility which LMKAC leases from GKDC. The percentage was then allocated to the four team members multiplied against total occupancy costs for the facility. [/\] square feet [/\] square feet results in a percentage of [/\] to be applied to SASA. *Base Rent applies to cost based on square footage of facilities utilized by SASA. **Fixed Base Rent applies as accommodation for GKDC equipment surcharge. [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 71 of 81
EX-10.21397th Page of 414TOC1stPreviousNextBottomJust 397th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT K-HUMAN RESOURCES/MEDICAL SERVICES EXPENSE BY FISCAL YEAR Schedule G - Human Resources/Medical Services Expense by Fiscal Year CLIN 0001 & 0002 [Download Table] FY 99 FY 00 FY 01 FY 02 FY 03 ----- ----- ----- ----- ----- LABOR Indirect Labor - Regular FRINGE BENEFITS OTHER INDIRECT COSTS Medical Services Administrative Travel Training Relocation Costs Recruiting Advertising [/\] Management Information System Telephone Service Outside Services Depreciation Office Supplies Reproduction Postage/Freight Low Value Furniture & Equipment Subscriptions Equipment Rental Totals Charges to subcontractors Standard Aero Schedule G - Human Resources/Medical Services Expense by Fiscal Year - CLIN 0003 [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 72 of 81
EX-10.21398th Page of 414TOC1stPreviousNextBottomJust 398th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 [Download Table] FY 99 FY 00 FY 01 FY 02 FY 03 ----- ----- ----- ----- ----- LABOR Indirect Labor - Regular FRINGE BENEFITS OTHER INDIRECT COSTS Medical Services Administrative Travel Training Relocation Costs Recruiting Advertising [/\] Management Information System Telephone Service Outside Services Depreciation Office Supplies Reproduction Postage/Freight Low Value Furniture & Equipment Subscriptions Equipment Rental Totals Charges to subcontractors Standard Aero [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 73 of 81
EX-10.21399th Page of 414TOC1stPreviousNextBottomJust 399th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 Schedule G - Human Resources/Medical Services Expense by Fiscal Year CLIN 0004 [Download Table] FY 99 FY 00 FY 01 FY 02 FY 03 ----- ----- ----- ----- ----- LABOR Indirect Labor - Regular FRINGE BENEFITS OTHER INDIRECT COSTS Medical Services Administrative Travel Training Relocation Costs Recruiting Advertising [/\] Management Information System Telephone Service Outside Services Depreciation Office Supplies Reproduction Postage/Freight Low Value Furniture & Equipment Subscriptions Equipment Rental Totals Charges to subcontractors Standard Aero NOTE: The methodology to allocate these costs are based on the offeror's direct labor cost as a percentage of total PBA direct labor cost. [ /\ CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS TABLE; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 74 of 81
EX-10.21400th Page of 414TOC1stPreviousNextBottomJust 400th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 THIS AGREEMENT is made and entered into as of the 28th day of August, 1998, by and between Standard Aero San Antonio, Inc. and Lockheed Martin Kelly Aircraft Center, Inc. 1. From time to time Either Party may wish to disclose to each other certain information, some of which may be Proprietary Information, as defined below, relating to The Privatization of the Kelly AFB Propulsion Business Area (hereinafter referred to as the "Program"). 2. This Agreement sets forth the conditions and obligations which will govern the use, duplication or disclosure of any Propriety Information, that may be disclosed by Either Party to Each Other. When used hereafter, references to Each Party shall include, individually and collectively, the officers, directors, consultants, and employees. 3. Each Party has developed, will continue to develop, and owns certain valuable information which it deems proprietary relating to the Program. All of such information owned by Either Party is referred to hereinafter as "Proprietary information". 4. The Parties hereto undertakes to hold in confidence and withhold from third parties any and all Proprietary Information disclosed by one party to the other, and to use Proprietary Information only for the purpose stated hereinabove and for no other purpose unless the originating party shall agree herein or hereinafter in writing. Each Party agrees to take reasonable and appropriate measures to safeguard any Proprietary Information received from the other party from theft, loss and negligent disclosure to others, and to limit access to Proprietary Information to those officers, directors, consultants, and employees within the receiving party's organization who reasonably require such access in order to accomplish the aforesaid purpose in connection with the Program. 5. In order to be protected hereunder, each party agrees that the Proprietary Informat disclosed by one party to the other shall be in writing or other permanent form, and prominently identified as proprietary using an appropriate legend, marking stamp, or other clear and conspicuous written identification which unambiguously indicates the information being provided is the originating party's Proprietary Information. Any such information other than in written or other permanent form when disclosed shall be considered Proprietary Information hereunder, but only to the extent identified as the originating party's Proprietary Information at the time of original disclosure and thereafter summarized in written form which clearly and conspicuously identifies the Proprietary Information. Such summary shall be transmitted by the receiving party within thirty (30) calendar days of the non-written disclosure. Neither party shall be liable for use or disclosure of any such Proprietary Information if it can be established by contemporaneous, clear, and convincing written evidence that the same: [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 75 of 81
EX-10.21401st Page of 414TOC1stPreviousNextBottomJust 401st
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 a. is or becomes part of the public knowledge or literature without breach of this Agreement by the receiving party; or b. is known to the receiving party without restriction as to further disclosure when received; or c. is independently developed by the receiving party prior to receipt and was not acquired directly or indirectly under any secrecy obligation from the originating party; or d. becomes known to the receiving party from a third party who had a lawful right to disclose it and without breach of this Agreement; or e. is disclosed by the originating party to a third party, without breach of this Agreement by the receiving party. Specific Proprietary Information shall not be deemed to be available to the public or in the possession of the receiving party merely because it is embraced by more general information so available or in the receiving party's possession. 6. Should the receiving party be faced with judicial or U.S. Governmental action to disclose Proprietary Information received hereunder, said receiving party must legally resist disclosing the originating party's Proprietary Information, and forthwith notify the originating party. The originating party, at its option, may join in contesting such disclosure. Should the originating party decline to join in contesting such disclosure, the receiving party may proceed to disclose this information at its option. 7. The exclusive points of contact with respect to the transmission and control of Proprietary Information disclosed hereunder are designated by the respective parties as follows: For SASA: Standard Aero San Antonio, Inc. Eden 100 Building 5100 Eden Avenue, Suite 105 Minneapolis, MN 55436 Attn: Paul Soubry Jr. Telephone: 204 778-2754 Fax: 204 778-2227 For LMKAC: Lockheed Martin Kelly Aircraft Center [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 76 of 81
EX-10.21402nd Page of 414TOC1stPreviousNextBottomJust 402nd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 4335 Piedras W. San Antonio, TX 78228 Attention: Harold B. Chaitmann Telephone: (210)738 9580 Fax: (210)738 0316 Either party may change its designee by written notice to the other. 8. Both parties agree to promptly notify the other party of the loss of any Proprietary Information; and upon request of the originating party, shall surrender any part of all of the Proprietary Information to the originating party. 9. Proprietary Information shall remain the property of the originating party. Neither this Agreement nor the disclosure of Proprietary Information hereunder shall be construed as granting any right or license under any invention or patent now or hereafter owned or controlled by Either party, nor shall any such disclosure constitute any representation, warranty, assurance, guaranty or inducement with respect to the infringement of any patent or other rights of others. No warranty as to the accuracy or completeness of any Proprietary Information is provided herein. 10. Each party shall bear its own costs and expenses incurred under or in connection with the Agreement. Nothing in this Agreement shall be construed as an obligation by either party to enter into a contract, subcontract or other business relationship with the other party in connection with the Program. 11. The rights and obligations provided by this Agreement shall take precedence over specific legends or statements associated with Proprietary Information when received. 12. This Agreement supercedes any prior proprietary agreements between the parties and shall remain in full force and effect for two the duration of the subcontract and any exercised options, or may be terminated by either party upon thirty (30) calendar days' written notice to the other. Termination of this Agreement shall not relieve either party of an obligation to preserve any Proprietary Information furnished hereunder in confidence for as long as the furnishing party continues to protect its proprietary rights in the data. 13. Upon termination of this Agreement, each party shall cease use of all Proprietary Information furnished hereunder and shall, upon written direction of the originating party, utilize its good faith efforts to return to the originating party or destroy all such Proprietary Information, together with all copies made thereof by the receiving party. Upon request, the receiving party shall send the furnishing party a destruction certificate. 14. Notwithstanding the other provisions of this paragraph, each party may make and retain one copy of such Proprietary Information, but only for archival purposes. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 77 of 81
EX-10.21403rd Page of 414TOC1stPreviousNextBottomJust 403rd
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 15. Each party represents and warrants that no technical data furnished to it by the originating party shall be disclosed to any foreign national, firm, or country, including foreign nationals employed by or associated with the receiving party, nor shall any technical data be exported from the United States without first complying with all requirements of the International Traffic in Arms Regulations and the Export Administration Act, including the requirements for obtaining any export license, if applicable. The receiving party shall first obtain the written consent of the originating party prior to submitting any request for authority to export any such technical data. The receiving party shall indemnify and hold the originating party harmless for all claims, demands, damages, costs, fines, penalties, attorney's fees, and all other expenses arising from the failure of the receiving party to comply with this clause or the International Traffic in Arms Regulations and the Export Administration Act. 16. The validity, interpretation, and effect of this Proprietary Information Agreement shall be governed by the laws of the State of Texas. 17. This is the entire Agreement between the parties concerning the disclosure of Proprietary Information, superceding any prior or contemporaneous written or oral agreements as to the disclosure and protection of Proprietary Information in connection with the Program and may not be amended or modified except by subsequent agreement in writing by duly authorized representatives of the parties. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 78 of 81
EX-10.21404th Page of 414TOC1stPreviousNextBottomJust 404th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT M-OFFEROR REPRESENTATIONS AND CERTIFICATIONS-COMMERCIAL ITEMS [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 79 of 81
EX-10.21405th Page of 414TOC1stPreviousNextBottomJust 405th
12 August 1998 8 Pages PART IV - REPRESENTATIONS AND INSTRUCTIONS SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS OR QUOTERS 5352315-9000 REPRESENTATIONS AND CERTIFICATIONS JUL 1997 (LAW AFMC FAR SUP 5314.201-5(90), and 5315.407(90)(a)) Annually, this AFMC activity provides contractors with a full-text Representations, Certifications, and other Statements of Offerors or Quoters (Section K) package; therefore, when appropriate, only the title, regulation reference number, date, and fill-in-portion (if any) of provisions applicable to this solicitation will be provided. Using the full-text Representations, Certifications, & Other Statements of Offerors or Quoters previously provided, please complete all the provisions included in this solicitation and return with your bid/proposal. Completion of this section represents certification that the responses are current, accurate, and complete as of the date of this bid/proposal. If you have not obtained a copy of the full-text Representations, Certifications, & Other Statements of Offerors or Quoters package, a copy may be obtained from: Solicitations issued by Central Contracting Divisions OC-ALC/PKC TINKER AFB, OK 73135-3032 (AC 405-734-5135) (The full-text Representations, Certifications, and other Statement of Offerors or Quoters (Section K) package can be accessed on the AFMC Contracting Laboratory's Web Site, "FARSite" at "http://farsite.hill.af.mil/" or a paper copy may be obtained from the issuing office.) K-17H. 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATION-- COMMERCIAL ITEMS JAN 1997 (LAW FAR 12.301(b)(2)) (a) Definitions. As used in this provision: "Emerging small business" means a small business concern whose size is no greater than 50 percent of the numerical size standard for the standard industrial classification code designated. "Small business concern" means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and size standards in this solicitation. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21406th Page of 414TOC1stPreviousNextBottomJust 406th
"Small disadvantaged business concern" means a small business concern that-- (1) Is at least 51 percent unconditionally owned by one or more individuals who are both socially and economically disadvantaged, or a publicly owned business, having at least 51 percent of its stock unconditionally owned by one or more socially and economically disadvantaged individuals, and (2) Has its management and daily business controlled by one or more such individuals. This term also means a small business concern that is at least 51 percent unconditionally owned by an economically disadvantaged Indian tribe or Native Hawaiian organization, or a publicly owned business having at least 51 percent of its stock unconditionally owned by one or more of these entities, which has its management and daily business controlled by members of an economically disadvantaged Indian tribe or Native Hawaiian organization and which meets the requirements of 13 CER Part 124. "Women-owned small business concern" means a small business concern (1) Which is at least 51 percent owned by one or more women or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and (2) Whose management and daily business operations are controlled by one or more women. "Women-owned business concern" means a concern which is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and whose management and daily business operations are controlled by one or more women. (b) Taxpayer identification number (TIN) (26 U.S.C. 6050M). (1) Taxpayer Identification Number (TIN) [ ] TIN:__________________________ [ ] TIN has been applied for. [X] TIN is not required because: [X] Offeror is a nonresident alien, foreign corporation, or foreign partnership that U.S. and does not have an office or place of business or a fiscal paying agent in the U.S.; [ ] Offeror is an agency or instrumentality of a foreign Government; [ ] Offeror is an agency or instrumentality of a Federal, state, or local Government; [ ] Other. State basis. (2) Corporate Status. [ ] Corporation providing medical and health care services, or engaged in the billing and collecting of payments for such services; [X] Other corporate entity; [ ] Not a corporate entity: [ ] Sole proprietorship [ ] Partnership [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21407th Page of 414TOC1stPreviousNextBottomJust 407th
\ [ ] Hospital or extended care facility described in 26 CFR 501(c)(3) that is exempt from taxation under 26 CFR 501(a). (3) Common Parent. [X] Offeror is not owned or controlled by a common parent. [ ] Name and TIN of common parent: Name TIN (c) Offerors must complete the following representations when the resulting contract is to be performed inside the United States, its territories or possessions, Puerto Rico, the Trust Territory of the Pacific Islands, or the District of Columbia. Check all that apply, (1) Small business concern. The offeror represents as part of its offer that it [ ] is, [X] is not a small business concern. (2) Small disadvantaged business concern. The offeror represents that it [ ] is, [X] is not a small disadvantaged business concern. (3) Women-owned small business concern. The offeror represents that it [ ] is, [X] is not a women-owned small business concern. Note: Complete paragraphs (c)(4) and (c)(5) only if this solicitation is expected to exceed the simplified acquisition threshold. (4) Women-owned business concern. The offeror represents that it [ ] is, [X] is not, a women-owned business concern. (5) Tie bid priority for labor surplus area concerns. If this is an invitation for bid small business offerors may identify the labor surplus areas in which costs to be incurred on account of manufacturing or production (by offeror or first-tier subcontractor/teaming partners) amount to more than 50 percent of the contract price: (6) Small Business Size for the Small Business Competitiveness Demonstration Program and for the Targeted Industry Categories under the Small Business Competitiveness Demonstration Program. Complete only if the offeror has represented itself to be a small business concern under the size standards for this solicitation. (i) (Complete only for solicitations indicated in an addendum as being set-aside for emerging small businesses in one of the four designated industry groups (DIGs).) The offeror represents as part of its offer that it [ ] is, [X] is not an emerging small business. (ii) (Complete only for solicitations indicated in an addendum as being for of one of the targeted industry categories (TICs) or four designated industry groups (DIGs).) Offeror represents as follows: (A) Offeror's number of employees for the past 12 months (check the Employees column if size standard stated in the solicitations expressed in terms of number of employees); or (B) Offeror's average annual gross revenue for the last 3 fiscal years (check the Average Annual Gross Number of Revenues column if size standard stated in the solicitation is expressed in terms of annual receipts). (Check one of the following): N/A [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21408th Page of 414TOC1stPreviousNextBottomJust 408th
[Download Table] Average Annual Number of Employees Gross Revenues ------------------- ------------------------- 50 of fewer $1 million or less 51-100 $1,000,001 - $2 million 101-250 $2,000,001 - $3.5 million 251-500 $3,500,001 - $5 million 501-750 $5,000,001 - $10 million 751-1,000 $10,000,001 - $17 million Over 1,000 Over $17 million (d) Certifications and representations required to implement provisions of Executive Order 11246. (1) Certification of non-segregated facilities. (Applies only if the contract amount is expected to exceed $10,000)- By submission of this offer, the offeror certifies that it does not and will not maintain or provide for its employees, any facilities that are segregated on the basis of race, color, religion, or national origin because of habit, local custom, or otherwise and that it does not and will not permit its employees to perform their services at any location where segregated facilities are maintained. The offeror agrees that a breach of this certification is a violation of the Equal Opportunity clause in the contract. (2) Previous Contracts and Compliance. The offeror represents that- (i) It [ ] has, [X] has not, participated in a previous contract or subcontract subject either to the Equal Opportunity clause of this solicitation, the clause originally contained in Section 310 of Executive Order 10925, or the clause contained in Section 201 of Executive Order 11114; and (ii) It [ ] has, [X] has not, filed all required compliance reports. (3) Affirmative Action Compliance. The offeror represents that- (i) It [ ] has developed and has on file, [X] has not developed and does not have on file, at each establishment, affirmative action programs required by rules and regulations of the Secretary of Labor (41 CFR Subparts 60-1 and 60-2), or (ii) It [X] has not previously had contracts subject to the written affirmative action programs requirement of the rules and regulations of the Secretary of Labor. (e) Certification Regarding Payments to Influence Federal Transactions (31 U.S.C. 1352). (Applies only if the contract is expected to exceed $100,000.). By submission of its offer, the offeror certifies to the best of its knowledge and belief that no Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress or an employee of a Member of Congress on his or her behalf in connection with the award of any resultant contract. (f) Buy American Act-Trade Agreements-Balance of Payments Program Certificate. (Applies only if FAR clause 52.225-9, Buy American Act-Trade Agreement -Balance of Payments Program, is included in this solicitation.) [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21409th Page of 414TOC1stPreviousNextBottomJust 409th
(1) The offeror hereby certifies that each end product, except those listed in paragraph (f)(2) of this provision, is a domestic end product (as defined in the clause entitled Buy American Act-Trade Agreements-Balance of Payments Program) and that components of unknown origin have been considered to have been mined, produced, or manufactured outside the United States, a designated country, a North American Free Trade Agreement (NAFTA) country, or a Caribbean Basin country, as defined in section 25.401 of the Federal Acquisition Regulation. (2) Excluded End Products: LINE ITEM NO. COUNTRY OF ORIGIN N/A _________________ _________________ _________________ (List as necessary) (3) Offers will be evaluated by giving certain preferences to domestic end products, designated country end products, NAFTA country end products, and Caribbean Basin country end products over other end products. In order to obtain these preferences in the evaluation of each excluded end product listed in paragraph (f)(2) of this provision, offerors must identify and certify below those excluded end products that are designated or NAFTA country end products, or Caribbean Basin country end products. Products that are not identified and certified below will not be deemed designated country end products, NAFTA country end products, or Caribbean Basin country end products. Offerors must certify by inserting the applicable line item numbers in the following: (i) The offeror certifies that the following supplies qualify as "designated or NAFTA country end products" as those terms are defined in the clause entitled "Buy American Act-Trade Agreements-Balance of Payments Program:" N/A___________________________________ ______________________________________ ______________________________________ (Insert line item numbers) (ii) The offeror certifies that the following supplies qualify as "Caribbean Basin country end products" as that term is defined in the clause entitled "Buy American Act-Trade Agreements-Balance of Payments Program: N/A___________________________________ ______________________________________ ______________________________________ (Insert line item numbers) (4) Offers will be evaluated in accordance with FAR Part 25. (g)(1) Buy American Act-North American Free Trade Agreements Implementation Act-Balance of Payments Program. (Applies only if FAR clause 52.225-21, Buy American Act- [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21410th Page of 414TOC1stPreviousNextBottomJust 410th
North American Free Trade Agreements Implementation Act-Balance of Payments Program, is included in this solicitation.) (i) The offeror certifies that each end product being offered, except those listed in paragraph (g)(1)(ii) of this provision, is a domestic end product (as defined in the clause entitled "Buy American Act-North American Free Trade Agreement Implementation Act-Balance of Payments Program," and that components of unknown origin have been considered to have been mined, produced, or manufactured outside the United States. (ii) Excluded End Products: LINE ITEM NO. COUNTRY OF ORIGIN N/A___________________________________ ______________________________________ (List as necessary) (iii) Offers will be evaluated by giving certain preferences to domestic end products or NAFTA country end products over other end products. In order to obtain these preferences in the evaluation of each excluded end product listed in paragraph (g)(1)(ii) of this provision, offerors must identify and certify below those excluded end products that are NAFTA country end products. Products that are not identified below will not be deemed NAFTA country end products. The offeror certifies that the following supplies qualify as "NAFTA country end products" as that term is defined in the clause entitled "Buy American Act-North American Free Trade Agreement Implementation Act-Balance of Payments Program" N/A_____________________________ ________________________________ ________________________________ (Insert line item numbers) (iv) Offers will be evaluated in accordance with Part 25 of the Federal Acquisition Regulation. In addition, if this solicitation is for supplies for use outside the United States, and evaluation factor of 50 percent will be applied to offers of end products that are not domestic or NAFTA end products. (2) Alternate I. If Alternate I to the clause at 52.225-21 is included in this solicitation, substitute the following paragraph (g)(1)(iii) of this provision: (g)(1)(iii) Offers will be evaluated by giving certain preferences to domestic end products or Canadian end products over other end products. In order to obtain these preferences in the evaluation of each excluded end product listed in paragraph (b) of this provision, offerors must identify and certify below those excluded end products that are Canadian end products. Products that are not identified and certified below will not be deemed Canadian end products. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21411th Page of 414TOC1stPreviousNextBottomJust 411th
The offeror certifies that the following supplies qualify as "Canadian end products" as that term is defined in the clause entitled "Buy American Act-North American Free Trade Agreement Implementation Act-Balance of Payments Program": N/A (Insert line item numbers) (h) Certification Regarding Debarment, Suspension or Ineligibi1ity for Award (Executive Order 12549). The offeror certifies, to the best of its knowledge and belief, that- (1) The offeror and/or any of its principals [ ] are, [X] are not presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency, and (2)[ ] Have, [X] have not, within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a Federal, state or local Government contract or subcontract; violation of Federal or state antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, or receiving stolen property; and [ ] are, [X] are not presently indicted for, or otherwise criminally or civilly charged by a Government entity with, commission of any of these offenses. K-233 252.212-7000 OFFEROR REPRESENTATIONS AND CERTIFICATIONS COMMERCIAL ITEMS. NOV 1995 (IAW DFARS 212.30l(f)(ii)) (a) Definitions. As used in this clause-- (1) Foreign person means any person other than a United States person as defined in Section 16(2) of the Export Administration Act of 1979 (50 U.S.C. App. Sec. 2415). (2) United States person is defined in Section 16(2) of the Export Administration Act of 1979 and means any United States resident or national (other than an individual resident outside the United States and employed by other than a United States person), any domestic concern (including any permanent domestic establishment of any foreign concern), and any foreign subsidiary or affiliate (including any permanent foreign establishment) of any domestic concern, which is controlled in fact by such domestic concern, as determined under regulations of the President (b) Certification. By submitting this offer, the Offeror, if a foreign person, company or entity, certifies that it-- (1) Does not comply with the Secondary Arab Boycott of Israel; and (2) Is not taking or knowingly agreeing to take any action, with respect to the Secondary Boycott of Israel by Arab countries, which 50 U.S.C. App. Sec. 2407(a) prohibits a United States person from taking.
EX-10.21412th Page of 414TOC1stPreviousNextBottomJust 412th
(c) Representation of Extent of Transportation by Sea. (This representation does not apply to solicitations for the direct purchase of ocean transportation services). (1) The Offeror shall indicate by checking the appropriate blank in paragraph(c)(2) of this provision whether transportation of supplies by sea is anticipated under the resultant contract. The term "supplies" is defined in the Transportation of Supplies by Sea clause of this solicitation. (2) Representation. The Offeror represents that it-- [ ] Does anticipate that supplies will be transported by sea in the performance of any contract or subcontract resulting from this solicitation. [X] Does not anticipate that supplies will be transported by sea in the performance of any contract or subcontract resulting from this solicitation. (3) Any contract resulting from this solicitation will include the Transportation of Supplies by Sea clause. If the Offeror represents that it will not use ocean transportation, the resulting contract will also include the Defense Federal Acquisition Regulation Supplement clause at 252.247-7024; Notification of Transportation of Supplies by Sea. [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED AND THE HIGHLIGHTED INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.]
EX-10.21413th Page of 414TOC1stPreviousNextBottomJust 413th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 EXHIBIT N-BENEFIT PLAN COSTS FOR PBA [Enlarge/Download Table] 1998 1999 2000 2001 2002 2003 2004 2005 Cost/hr Cost/hr Cost/hr Cost/hr Cost/hr Cost/hr Cost/hr Cost/hr ------- ------- ------- ------- ------- ------- ------- ------- Composite Medical Cost Delta Dental-Comprehensive Plus Plan Vision Service Plan (VSP)- Vision 24 Plan Basic Group Life Insurance [/\] Plan Short Term Disability Employee Recognition/Tuition Reimbursement GRAND TOTAL-Employee Benefits 2006 2007 2008 2009 2010 2011 2012 Cost/hr Cost/hr Cost/hr Cost/hr Cost/hr Cost/hr Cost/hr ------- ------- ------- ------- ------- ------- ------- Composite Medical Cost Delta Dental-Comprehensive Plus Plan Vision Service Plan (VSP)- Vision 24 Plan Basic Group Life Insurance [/\] Plan Short Term Disability Employee Recognition/Tuition Reimbursement GRAND TOTAL-Employee Benefits [ /\ INDICATES THAT CONFIDENTIAL TREATMENT HAS BEEN REQUESTED FOR THE DATA IN THIS CHART; IT HAS BEEN OMITTED AND FILED SEPARATELY WITH THE COMMISSION.] Page 80 of 81
EX-10.21Last Page of 414TOC1stPreviousNextBottomJust 414th
SUBCONTRACT 23 September 1998 NO LMKAC 98-0001 SIGNATURE PAGE This constitutes the complete understanding and agreement between the parties and IN WITNESS WHEREOF, the parties have caused this subcontract to be executed as the day and year first above written: STANDARD AERO SAN ANTONIO, INC. LOCKHEED MARTIN KELLY AIRCRAFT CENTER ("Seller") ("Buyer") By: /s/ Paul Soubry By: /s/ Cornelius McElveen --------------------------------- ------------------------------------ Paul Soubry Jr. Cornelius McElveen Title: EVP Marketing and Business Title: Assistant Secretary Development By: /s/ David W. Shaw By: /s/ Geary W. Wallace --------------------------------- ------------------------------------ David W. Shaw Geary W. Wallace Title: President Title: Vice President and General Manager Page 81 of 81

Dates Referenced Herein   and   Documents Incorporated by Reference

Referenced-On Page
This ‘S-4/A’ Filing    Date First  Last      Other Filings
Filed on:7/1/05None on these Dates
8/8/9996
9/23/98323383
7/24/97384
5/12/9641
 List all Filings 
Top
Filing Submission 0000950133-05-002948   –   Alternative Formats (Word / Rich Text, HTML, Plain Text, et al.)

Copyright © 2024 Fran Finnegan & Company LLC – All Rights Reserved.
AboutPrivacyRedactionsHelp — Fri., Apr. 26, 11:18:04.3am ET