SEC Info  
    Home      Search      My Interests      Help      Sign In      Please Sign In

Ormat Technologies, Inc. – IPO: ‘S-1/A’ on 9/28/04 – EX-10.3.25

On:  Tuesday, 9/28/04, at 9:30am ET   ·   Accession #:  950136-4-3123   ·   File #:  333-117527

Previous ‘S-1’:  ‘S-1’ on 7/21/04   ·   Next:  ‘S-1/A’ on 10/22/04   ·   Latest:  ‘S-1/A’ on 11/10/04   ·   2 References:   

Find Words in Filings emoji
 
  in    Show  and   Hints

  As Of                Filer                Filing    For·On·As Docs:Size              Issuer               Agent

 9/28/04  Ormat Technologies, Inc.          S-1/A                 90:15M                                    Capital Systems 01/FA

Initial Public Offering (IPO):  Pre-Effective Amendment to Registration Statement (General Form)   —   Form S-1
Filing Table of Contents

Document/Exhibit                   Description                      Pages   Size 

 1: S-1/A       Amendment 1 to Form S-1                             HTML   3.29M 
 2: EX-1.1      Form of                                             HTML    194K 
11: EX-10.1.10  Amendment # 1 to Loan Agreement                     HTML     27K 
12: EX-10.1.11  Capital Note                                        HTML     22K 
13: EX-10.1.12  Amendment No. 1 to Capital Note                     HTML     22K 
14: EX-10.1.13  Guarantee Fee Agreement                             HTML     22K 
15: EX-10.1.14  Reimbursement Agreement                             HTML     25K 
16: EX-10.1.15  Services Agreement                                  HTML     40K 
 3: EX-10.1.2   Amended and Restated Bridge Loan Agreement          HTML    100K 
 4: EX-10.1.3   Bank Hapoalim Credit Facility Agreement             HTML    386K 
 5: EX-10.1.4   Credit Agreement Dtd 12/31/02                       HTML    730K 
 6: EX-10.1.5   Credit Agreement Dtd 12/18/03                       HTML   1.09M 
 7: EX-10.1.6   Eximbank Credit Agreement                           HTML    557K 
 8: EX-10.1.7   Indenture                                           HTML    703K 
 9: EX-10.1.8   First Supplemental Indenture                        HTML     39K 
10: EX-10.1.9   Loan Agreement                                      HTML     38K 
84: EX-10.10    Indemnification Agreement                           HTML     46K 
17: EX-10.2.1   Purchase and Sale Agreement                         HTML    360K 
18: EX-10.3.1   Power Purchase Contract                             HTML    121K 
23: EX-10.3.11  Amended and Restated Power Purchase and Sale Agmt   HTML    237K 
24: EX-10.3.13  Power Purchase Contract                             HTML    197K 
25: EX-10.3.14  Amendment No. 1 Power Purchase Contract             HTML     64K 
26: EX-10.3.16  Power Purchase Contract Dtd 4/16/85                 HTML    206K 
27: EX-10.3.17  Amend 1 to Power Purchase Contract Dtd 10/25/85     HTML     46K 
28: EX-10.3.18  Amend 2 to Power Purchase Contract Dtd 12/20/89     HTML     25K 
29: EX-10.3.19  Interconnections Facilities Agreement               HTML     77K 
30: EX-10.3.20  Interconnection Facilities Agreement                HTML     35K 
31: EX-10.3.21  Interconnection Facilities Agreement                HTML     58K 
32: EX-10.3.22  Interconnection Agreement                           HTML     31K 
33: EX-10.3.23  Plant Connection Agreement                          HTML     58K 
34: EX-10.3.24  Plant Connection Agreement                          HTML     96K 
35: EX-10.3.25  Transmission Service Agreement                      HTML     87K 
36: EX-10.3.26  Plant Connection Agreement                          HTML     53K 
37: EX-10.3.27  Plant Connection Agreement                          HTML     61K 
38: EX-10.3.28  Plant Connection Agreement                          HTML     64K 
39: EX-10.3.29  Plant Connection Agreement                          HTML    186K 
19: EX-10.3.3   Power Purchase Contract                             HTML    111K 
40: EX-10.3.30  Plant Connection Agreement                          HTML    187K 
41: EX-10.3.31  Transmission Service Agreement                      HTML     81K 
42: EX-10.3.32  Transmission Service Agreement                      HTML     83K 
43: EX-10.3.33  Transmission Service Agreement                      HTML     85K 
44: EX-10.3.34  Transmission Service Agreement                      HTML    100K 
45: EX-10.3.35  Plant Amendment No. 1                               HTML     28K 
46: EX-10.3.39  Agreement Addressing Renewable Energy Pricing       HTML     74K 
47: EX-10.3.40  Amnd No.1 to Agrt Address Renewable Energy Pricing  HTML     58K 
48: EX-10.3.41  Agreement Addressing Renewable Energy Pricing       HTML     72K 
49: EX-10.3.42  Amend No. 1 to Agrnt Addr Renewable Energy Pricing  HTML     64K 
50: EX-10.3.43  Energy Services Agreement                           HTML     79K 
51: EX-10.3.44  Purchase Power Contract, Dated March 24, 1986       HTML     92K 
52: EX-10.3.45  Firm Capacity Amendment                             HTML     78K 
53: EX-10.3.46  Amendment to Purchase Power Contract                HTML     32K 
54: EX-10.3.47  Third Amendment to Purchase Power Contract          HTML     76K 
55: EX-10.3.48  Performance Agreement                               HTML    167K 
56: EX-10.3.49  Agreement to Design 69 Kv Transmission Lines        HTML     79K 
20: EX-10.3.5   Amendment #1 to Power Purchase and Sales Agreement  HTML     49K 
21: EX-10.3.6   Settlement Agreement                                HTML     37K 
22: EX-10.3.7   Power Purchase Contract Dtd 4/16/85                 HTML    155K 
57: EX-10.4.1   Ormesa Blm Geothermal Resources Lease               HTML    160K 
63: EX-10.4.12  Lease Agreement, Dated 3/17/64                      HTML     89K 
64: EX-10.4.13  Lease Agreement, Dated 2/16/64                      HTML     72K 
65: EX-10.4.18  Geothermal Lease Agreement, Dated 7/18/79           HTML     79K 
66: EX-10.4.19  Lease Agreement                                     HTML     82K 
58: EX-10.4.2   Ormesa Blm License for Electric Power Plant         HTML     42K 
67: EX-10.4.20  Lease Agreement, Dated 6/14/71                      HTML     56K 
68: EX-10.4.21  Lease Agreement                                     HTML     63K 
69: EX-10.4.23  Geothermal Lease Agreement                          HTML     55K 
70: EX-10.4.24  Geothermal Lease Agreement, Dated 8/31/83           HTML    128K 
71: EX-10.4.26  Geothermal Resources Lease - Guisti                 HTML     55K 
72: EX-10.4.27  Amendment to Geothermal Lease                       HTML     27K 
73: EX-10.4.28  Second Amendment to Geothermal Lease                HTML     39K 
74: EX-10.4.29  Geothermal Resources Sublease                       HTML    144K 
59: EX-10.4.3   Geothermal Resources Mining Lease, Dated 2/20/81    HTML    126K 
75: EX-10.4.30  Klp Lease                                           HTML    265K 
76: EX-10.4.31  Klp Lease Amendment No. 1                           HTML    341K 
77: EX-10.4.32  Second Amendment to Klplease                        HTML     25K 
60: EX-10.4.4   Geothermal Lease Agreement, Dated 10/20/75          HTML     55K 
61: EX-10.4.5   Geothermal Lease Agreement                          HTML     78K 
62: EX-10.4.6   Geothermal Resources Lease, Dated 11/18/83          HTML     77K 
78: EX-10.5.1   Engineering, Procurement and Construction Contract  HTML    434K 
79: EX-10.5.3   Engineering, Procurement and Construction Contract  HTML   1.00M 
80: EX-10.5.4   Patent License Agreement                            HTML    144K 
81: EX-10.7     Executive Employment Agreement of Lucien Bronicki   HTML     70K 
82: EX-10.8     Exec Employment Agreement of Yehudit Bronicki       HTML     75K 
83: EX-10.9     Executive Employment Agreement of Yoram Bronicki    HTML     82K 
85: EX-23.1     Consent of Independent Accountants                  HTML     22K 
86: EX-23.3     Consent of Dani Falk                                HTML     21K 
87: EX-23.4     Consent of Edward Muller                            HTML     21K 
88: EX-23.5     Consent of Lester P. Silverman                      HTML     21K 
89: EX-23.6     Consent of Jacob Worenklein                         HTML     21K 
90: EX-99.3     Material Terms Deviations                           HTML     21K 


EX-10.3.25   —   Transmission Service Agreement

This exhibit is an HTML Document rendered as filed.  [ Alternative Formats ]

EX-10.3.251st Page of 37TOCTopPreviousNextBottomJust 1st
 


EX-10.3.252nd Page of 37TOC1stPreviousNextBottomJust 2nd
Exhibit 10.3.25 TRANSMISSION SERVICE AGREEMENT FOR ALTERNATIVE RESOURCES BETWEEN IMPERIAL IRRIGATION DISTRICT AND SECOND IMPERIAL GEOTHERMAL COMPANY AGREE/SIGC.TSA 10/20/92
EX-10.3.253rd Page of 37TOC1stPreviousNextBottomJust 3rd
TABLE OF CONTENTS SECTION TITLE PAGE ------- ----- ---- 1 PARTIES 1 2 RECITALS 1 3 AGREEMENT 1 4 DEFINITIONS 1 5 TERM 3 6 TRANSMISSION SERVICE 4 7 TRANSMISSION LOSSES 8 8 CHARGES 9 9 BILLING AND PAYMENT 10 10 LIABILITY 12 11 AUDITING 14 12 AUTHORIZED REPRESENTATIVES 14 13 NO DEDICATION OF FACILITIES 14 14 NON-WAIVER 15 15 NO THIRD PARTY RIGHTS 15 16 UNCONTROLLABLE FORCES 15 17 ASSIGNMENTS 16 18 GOVERNING LAW 17 19 NOTICES 17 20 SIGNATURE CLAUSE 17 EXHIBIT I - DEVELOPMENTS AND METHODOLOGIES FOR TRANSMISSION SERVICE CHARGES AND SCHEDULING FEE EXHIBIT II - TRANSMISSION SERVICE FOR THE SIGC POWER PLANT
EX-10.3.254th Page of 37TOC1stPreviousNextBottomJust 4th
1. PARTIES: The parties to this Agreement are IMPERIAL IRRIGATION DISTRICT ("IID"), organized under the Water Code of the State of California and SECOND IMPERIAL GEOTHERMAL COMPANY, a "Producer"), hereinafter referred to individually as "Party", and collectively as "Parties". 2. RECITALS: This Agreement is made with reference to the following facts, among others: 2.1 Producer has caused to be constructed or intends to construct an alternative energy resource facility located in IID's service area. 2.2 Producer and IID have entered into a Plant connection Agreement. 2.3 Producer desires to purchase, and IID desires to sell firm transmission service of power from the Plant to Edison's Mirage Substation subject to the terms and conditions specified herein. 2.4 Producer is in the process of arranging for an institutional lender to finance Producer's construction of the aforementioned alternative energy resource facility. Such financing is expected to occur pursuant to a closing on or prior to November 30, 1992 ("Closing"). Simultaneously with Closing, or immediately thereafter, Producer will execute documentation necessary to become a party to the Funding and Construction Agreement, dated June 29, 1987, providing for the funding and construction of transmission lines within IID's service area. It is agreed that this Agreement shall not become effective until the execution of such Funding and Construction Agreement. 3. AGREEMENT: The Parties agree as follows: 4. DEFINITIONS: The following terms when used herein with initial capitalization, whether in the singular or plural, shall have the meanings specified: 1
EX-10.3.255th Page of 37TOC1stPreviousNextBottomJust 5th
4.1 Agreement: This IID-SIGC Transmission Service Agreement for Alternative Resources between Second Imperial Geothermal Company and IID, and all Exhibits attached hereto, as such Agreement may subsequently be amended for firm transmission service between the Plant and Edison's Mirage Substation. 4.2 Authorized Representative: The representative of a Party designated in accordance with Section 12. 4.3 Date of Initial Service: The date when the output from the Plant is first available for delivery to Edison, as notified to IID pursuant to Section 5.2. 4.4 Edison: Southern California Edison Company. 4.5 Funding and Construction Agreement: The Funding and construction Agreement dated June 29, 1987 entered into by IID and others, to which a form of this Agreement is attached as Exhibit 2. 4.6 Maximum Transmission Service Entitlement: The Maximum Transmission Service Entitlement for the Plant, as specified in Exhibit II and in any subsequent Plant Amendments. 4.7 Normal Transmission Capacity: The maximum transfer capability, expressed in megawatts (MW), from the Point of Receipt to the Point of Delivery. Such transfer capability, as determined by IID, in its sole judgment shall be consistent with prudent operating procedures and with generally-accepted engineering and operating practices in the electrical utility industry. 4.8 Operating Transmission Capability: The maximum transfer capability, expressed in megawatts (MW), available to IID at any given time to transmit power from Point of Receipt to Point of Delivery. Such transfer capability shall be as determined by IID in its sole judgment, may vary from time-to-time depending on system conditions, and shall be consistent with 2
EX-10.3.256th Page of 37TOC1stPreviousNextBottomJust 6th
prudent operating procedures and generally-accepted engineering and operating practices in the electrical utility industry. 4.9 Plant: An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit II and in any subsequent Plant Amendments. 4.10 Plant Amendment: An agreement reached by the Parties, as an amendment to this Agreement, for transmission service to be provided by IID for the Plant added by Producer or for Producer's account subsequent to the execution of this Agreement. 4.11 Plant Connection Agreement: An agreement between IID and Producer providing for the connection of the Plant to IID's electrical system, as specified in Exhibit II and in any subsequent Plant Amendments. 4.12 Point(s) of Delivery: The 230 kV switchrack at the Mirage Substation site where Edison's 230 kV facilities are attached to IID's 230 kV Coachella-Mirage Line or other points as may be mutually agreed upon by the Authorized Representatives. 4.13 Point of Receipt: The point on the high voltage side of the Plant's transformer where IID's metering equipment measures the delivery of energy to the IID system. 4.14 Transmission Service Entitlement: The amount of transmission service, expressed in megawatts (MW), provided by IID for the Plant, from the applicable Point of Receipt to the applicable Point(s) of Delivery. 5. TERM: 5.1 Unless otherwise agreed to by the Parties, this Agreement shall be effective on the date on which it is executed and shall remain in effect until thirty years after the Plant achieves Firm Operation, as such term is defined in Section 2.17 of the Power Purchase Contract dated 3
EX-10.3.257th Page of 37TOC1stPreviousNextBottomJust 7th
April 16, 1985, between Second Imperial Geothermal Company and Southern California Edison Company. 5.2 The Transmission Service Entitlement to be provided by IID for the Plant shall be contingent on a Plant Connection Agreement being in effect. Transmission service for the Plant shall commence on the Date of Initial Service of such Plant. Producer's Authorized Representative shall give IID's Authorized Representative written notice of the Date of Initial Service at least thirty (30) days before the Date of Initial Service. 6. TRANSMISSION SERVICE: 6.1 Subject to the terms of this Agreement, IID shall provide to Producer and Producer shall purchase from IID transmission service over IID's transmission system for the Plant. IID shall make arrangements with Edison to provide, at Producer's or Edison's expense, for the transfer of the electrical power to be delivered to Edison hereunder from IID's transmission system to Edison's transmission system at the Point(s) of Delivery. 6.2 The Transmission Service Entitlement for the Plant shall be the Maximum Transmission Service Entitlement for such Plant specified in Exhibit II or any subsequent Plant Amendments, or such lesser amount as may be established as follows. Beginning on the Date of Initial Service for the Plant, Producer shall be entitled to specify a Transmission Service Entitlement by Advance written notice given to IID's Authorized Representative at least thirty (30) days prior to the Date of Initial Service. The Transmission Service Entitlement to be provided by IID subsequent to the Date of Initial Service may be adjusted at six (6) month intervals thereafter until two (2) years after the Date of Initial Service for such Plant (the "Trial Period"). Such adjustments shall be made by having Producers' Authorized Representative give IID's Authorized Representative a ninety (90) day advance written notice as to the adjustment 4
EX-10.3.258th Page of 37TOC1stPreviousNextBottomJust 8th
required. Beginning two (2) years after the Date of Initial Service for such Plant, Producer shall be entitled to specify a Transmission Service Entitlement for each successive 2-year period during the remaining term of this Agreement by written notice from Producer's Authorized Representative to IID's Authorized Representative given at least ninety (90) days prior to the beginning of each 2-year period. 6.3 The Transmission Service Entitlement selected by Producer for the Plant in accordance with Section 6.2 may be any amount which is less than or equal to the Maximum Transmission Service Entitlement for such Plant specified in Exhibit II or any subsequent Plant Amendments, provided, however, that the following shall apply to the Plant after the Trial Period for such Plant has elapsed. 6.3.1 If (i) the sum of the Transmission Service Entitlements for all Plants which are no longer in their Trial Periods is less than the sum of the Maximum Transmission Service Entitlements for such Plants, as shown in Exhibit II and in any subsequent Plant Amendments, (the "Aggregate Maximum Transmission Service Entitlement"), and (ii) provided that IID requires additional capacity for transmitting electric power to Edison's transmission system for another person (or, following the Credit Installment Period as defined in the Funding and Construction Agreement, for itself) and (iii) IID's use of such required capacity would be in conflict with Producer's right as provided herein to increase the sum of the Transmission Service Entitlements for such Plants to the Aggregate Maximum Transmission Service Entitlement, then IID shall so notify Producer in writing, specifying in such notice the portion, expressed in megawatts (MW), of the excess of the Maximum Transmission Service Entitlement over the Transmission Service Entitlement for each such Plant which it desires to use as stated above. Producer shall have ninety (90) days after receipt of IID's notice to notify IID in writing that it 5
EX-10.3.259th Page of 37TOC1stPreviousNextBottomJust 9th
desires to increase the Transmission Service Entitlements of such Plants. To the extent that Producer does not elect to increase the Transmission Service Entitlement of each such Plant up to the Maximum Transmission Service Entitlement for such Plant, IID shall be entitled to use such unclaimed capacity to satisfy the transmission requirements specified in its notice to Producer, and to the extent that IID does so, Producer shall thereafter be foreclosed from increasing the Transmission Service Entitlement for such Plant in a manner which would conflict with such usage by IID. 6.3.2 IID shall treat Producer and each other person who has entered into a transmission service agreement similar in substance to this Agreement in a fair and nondiscriminatory manner in requesting additional transmission capacity as provided in this Section 6.3. Without limiting the generality of the foregoing, IID shall request additional transmission capacity from Producer and such other persons on a pro rata basis, in proportion to the aggregate Maximum Transmission Service Entitlement for each person less the sum of the Transmission Service Entitlements for each of such persons' generating plants which is no longer in a Trial Period. 6.4 In the event that the Original Capacity Nomination designated by Producer (or the Participant associated with Producer) is adjusted pursuant to Section 3.07 of the Funding and Construction Agreement, the Parties agree to amend this Agreement in such a way that the sum of the Maximum Transmission Service Entitlements for all Plants hereunder is equal to such Original Capacity Nomination as so adjusted. As used in this Section 6.4, the terms Original capacity Nomination and participant shall have the meanings assigned to them in Article I of the funding and Construction Agreement. 6
EX-10.3.2510th Page of 37TOC1stPreviousNextBottomJust 10th
6.5 IID reserves the right to interrupt or curtail the transmission service provided hereunder as follows: 6.5.1 If the Operating Transmission Capability is reduced to less than Normal Transmission Capacity from a Point of Receipt to a Point of Delivery, and when continuity of service within IID's service area is not being jeopardized, IID may curtail the transmission service currently being provided from such Point of Receipt to such Point of Delivery, to an amount "A" determined by the following formula: Operating Transmission Capability A = --------------------------------- x Transmission Service Entitlement Normal Transmission Capacity The transmission service for each Plant affected shall be curtailed by multiplying the Transmission Service Entitlement in accordance with Exhibit II and in any subsequent Plant Amendments by the same percentage (expressed as a decimal as used in the determination of "A". However, any such curtailment shall occur only after IID has made all reasonable efforts to eliminate the cause of the reduction in Operating Transmission Capability, and IID shall then employ reasonable efforts to eliminate expeditiously the cause of said reduction. 6.5.2 If continuity of service within IID's control area is being jeopardized, as determined by IID in its sole judgment, IID may interrupt or curtail the transmission service provided hereunder to the extent necessary to avoid or eliminate such jeopardy; provided that (i) such interruptions or curtailments may be made so that IID may fully utilize all generating resources owned by it or available to it under contract in order to avoid damage to IID's electrical system caused by overloading, (ii) such interruption or curtailment shall occur only after IID has made all reasonable efforts to avoid or eliminate such jeopardy and (iii) to the extent feasible any curtailment of transmission service provided hereunder from a Point of Receipt to a Point of Delivery shall be made in accordance with the formula set forth in Section 6.5.1. 7
EX-10.3.2511th Page of 37TOC1stPreviousNextBottomJust 11th
6.6 If IID's efforts do not avoid or eliminate such jeopardy, the Parties shall endeavor to develop some other arrangement to avoid or eliminate such jeopardy and minimize the effects of IID's interruption or curtailment on both parties. 6.7 In the event of any curtailments or interruptions made pursuant to Section 6.5.1 or Section 6.5.2, Producer shall, immediately after being orally notified by IID, reduce the electrical output of the Plants by the amounts requested by IID. 6.8 The transmission service to be provided by IID and purchased by Producer for each Plant shall not exceed the Transmission Service Entitlement for that Plant. 6.9 Subject to Section 6.5, IID shall, during the periods that IID has agreed to provide the transmission service at the specified Transmission Service Entitlements, accept hourly scheduled energy deliveries at each Point of Receipt and simultaneously deliver the same amount of energy (less transmission losses as provided herein) at the Point(s) of Delivery mutually agreed upon by the Parties' dispatchers and/or schedulers. 6.10 Hourly scheduled energy deliveries at each Point of Receipt shall conform with the practices and procedures developed by the Parties dispatchers and schedulers and agreed to by the Authorized Representatives. 7. TRANSMISSION LOSSES: 7.1 IID shall determine, by transmission power flow analysis, the electrical losses (expressed as a percent amount of hourly scheduled energy deliveries) associated with the electrical output from each Plant. Such analysis shall be performed by IID at its sole expense. The initial percent amount, for each Plant, representing the electrical losses as determined herein shall be as specified in Exhibit II and in any subsequent Plant Amendments. 8
EX-10.3.2512th Page of 37TOC1stPreviousNextBottomJust 12th
7.2 Unless otherwise agreed to by Producer's and IID's schedulers and dispatchers, IID shall reduce the amount of all hourly scheduled energy deliveries for Producer or Producer's account by the percent amount of such hourly deliveries for each Plant in accordance with Exhibit II and in any subsequent Plant Amendments. 7.3 If either Party believes that there has been a significant change in IID's electrical system and the electrical losses associated with any Plant should be redetermined, either Party's Authorized Representative may submit a written request to the other Party's Authorized Representative that the electrical losses be redetermined. Following such request, a transmission flow analysis shall be performed by IID as approved by the Authorized Representatives and paid for by the requesting Party. Whenever the percent amount for electrical losses is redetermined, such percent amount shall become effective as of the first day of the month following the date of such redetermination; provided, that such a redetermination may be no sooner than twelve (12) months after the most recent redetermination. My redetermination of electrical losses made pursuant to this Section 7 shall be based on conditions in existence at the time of such redetermination. 7.4 Along with the monthly billing pursuant to Section 9.1, for the transmission service for each Plant, IID shall submit a monthly summary of hourly scheduled energy deliveries and of electrical losses for each Plant. 8. CHARGES: 8.1 For transmission service provided by IID, Producer shall pay IID at a rate to be determined by IID pursuant to the methodologies specified in Exhibit I. The initial rate is specified in Exhibit I-A and revisions thereto will be specified in any subsequent Plant Amendments. Any specific facility charge to Producer for connecting the Plant(s) to the IID 9
EX-10.3.2513th Page of 37TOC1stPreviousNextBottomJust 13th
transmission system shall be included only in the Plant Connection Agreement(s) between IID and Producer. 8.2 The transmission rate shall be reviewed annually and may be revised. Any revision of the rates shall be based on the methodologies in Exhibit I.A and on the conditions in existence at the time of the revision. Producer shall have the right to review any exhibits or work papers prepared by IID to revise the rates. 8.3 An initial monthly scheduling fee, as specified in Exhibit II and revisions thereto specified in any subsequent Plant Amendments, shall be paid by Producer to IID for those months in which there were scheduled energy deliveries from the Plant. The initial scheduling fee has been determined by IID pursuant to the methodology specified in Exhibit I.B. The scheduling fee shall be reviewed annually and may be revised. Any revision of the scheduling fee shall be based on the methodology in Exhibit I.B and on the conditions in existence at the time of the revision. Producer shall have the right to review any exhibits or work papers prepared by IID to revise the scheduling fee. 9. BILLING AND PAYMENT: 9.1 IID shall render bills to Producer, beginning in the month of the Date of Initial Service, on or before the fifteenth (15th) day of each month for the transmission service to be provided during the month. Producer shall pay such bills within twenty (20) days after receipt thereof. All payments by Producer shall be sent to: Imperial Irrigation District c/o Manager, Finance & Accounting P.O. Box 937 Imperial, CA 92251 All billings by IID shall be sent to 10
EX-10.3.2514th Page of 37TOC1stPreviousNextBottomJust 14th
Second Imperial Geothermal Company 343 Second Street, Suite N Los Altos, CA 94022 9.2 Either Party's Authorized Representative may at any time, by advance written notice to the other Party's Authorized Representative, change the address to which payments or billings shall be sent. 9.3 Bills which are not paid in full by said due date shall thereafter bear an additional charge of one and one-half percent (1-1/2%) per month, or the maximum legal rate of interest, whichever is less, compounded monthly on the unpaid amount prorated by days from the due date until payment is received by IID. 9.4 In the event any portion of any bill is disputed, the disputed amount shall be paid when due under protest. If the protested portion of the payment is found to be incorrect by the Authorized Representatives, the dispute amount shall be paid by IID to Producer, including interest at the rate of 1-1/2% per month, or the maximum legal rate, whichever is less, compounded monthly from the data of payment by Producer to the date the refund check or adjusted bill is received by Producer. 9.5 For a fractional part of a calendar month at the beginning or end of the period for which the transmission service is provided hereunder, the charge pursuant to Section 8.1 shall be proportionately adjusted by the ratio of days that service is furnished by IID to Producer during such month to the total number of days in such month. 9.6 The charge for the transmission service pursuant to Section 8.1 shall be proportionately reduced to the extent the duration of the interruptions or curtailments of the transmission service which may concur pursuant to Section 6.5.1 or Section 6.5.2 exceed a cumulative total of twenty-four (24) hours during any calendar month based on 730 hours per month representing the full transmission service charge. The amount of such pro rata reduction 11
EX-10.3.2515th Page of 37TOC1stPreviousNextBottomJust 15th
in any month shall reflect the duration and amount of such interruptions or curtailments which exceed said cumulative 24 hours. Such pro rata reduction shall be reflected as a credit to Producer as soon as possible in a subsequent monthly bill. 9.7 The charge for the transmission service shall not be reduced if IID can deliver, but Edison's transmission system cannot receive, the hourly scheduled energy deliveries independent of the duration of time this condition exists. 10. LIABILITY 10.1 Except for any loss, damage, claim, costs, charge or expanse resulting from Willful Action, neither Party (the "released Party"), its directors or other governing body, officers or employees shall be liable to the other Party for any loss, damage, claim, cost, charge, or expense of any kind or nature incurred by the other Party (including direct, indirect or consequential loss, damage, claim, cost, charge or expense; and whether or not resulting from the negligence of a Party, its directors or other governing body, officers, employees or any person or entity whose negligence would be imputed to a Party) from engineering, repair, supervision, inspection, testing, protection, operation, maintenance, replacement, reconstruction, use or ownership of the released Party's electrical system, Plant(s) or associated facilities in connection with the implementation of this Agreement. Except for any loss, damage, claim, cost, charge or expense resulting from Willful Action, each Party releases the other Party, its directors or other governing body, officers and employees from any such liability. 10.2 For the purpose of this Section 10, Willful Action shall be defined as action taken or not taken by a Party at the direction of its directors or other governing body, officers or employees having management or administrative responsibility affecting its performance under this Agreement, as follows: 12
EX-10.3.2516th Page of 37TOC1stPreviousNextBottomJust 16th
10.2.1 Action which is knowingly or intentionally taken or not taken with conscious indifference to the consequences thereof or with intent that injury or damage would result or would probably result therefrom. 10.2.2 Action which has been determined by final arbitration award or final judgment or judicial decree to be a material default under this Agreement and which occurs or continues beyond the time specified in such arbitration award or judgment or judicial decree for curing such default or, if no time to cure is specified therein, occurs or continues thereafter beyond a reasonable time to cure such default. 10.2.3 Action which is knowingly or intentionally taken or not taken with the knowledge that such action taken or not taken is a material default under this Agreement. 10.3 Willful Action does not include any act or failure to act which is merely involuntary, accidental or negligent. 10.4 The phrase "employees having management or administrative responsibility," as used in Section 10.2, means the employees of a Party who are responsible for one or more of the executive functions of planning, organizing, coordinating, directing, controlling and supervising such Party's performance under this Agreement with responsibility for results. 10.5 Subject to the foregoing provisions of this Section 16, each Party agrees to defend, indemnify and save harmless the other Party, its officers, agents, or employees against all losses, claims, demands, costs or expenses for loss of or damage to property, or injury or death of persons, which directly or indirectly arise out of the indemnifying Party's performance pursuant to this Agreement; provided, however, that a Party shall be solely responsible for any such losses, claims, demands, costs or expenses which result from its sole negligence or Willful Action. 13
EX-10.3.2517th Page of 37TOC1stPreviousNextBottomJust 17th
11. AUDITING: 11.1 IID shall make its books, records, and other supporting information, as requested, available to Producer or to Producer's designated contracted representative(s) with a CPA firm, for the purpose of auditing any charges or accounts to be kept by IID hereunder. All such audits shall be undertaken at reasonable times and in conformance with generally-accepted auditing standards. 11.2 If as a result of such audits Producer believes its charges or accounts should be adjusted, the findings shall be presented to the Authorized Representatives. If the Authorized Representatives agree that any audit finding should result in a revision of charges or accounts, such revisions shall be retroactive to the first billing for such charges and accounts and shall be made as soon as practical after determination. 11.3 The amount of any unresolved dispute shall accrue interest at the rate of one and one-half percent (1-1/2%) per month, or the maximum legal rate, whichever is less, compounded monthly for any amount of money ultimately refunded to Producer. 12. AUTHORIZED REPRESENTATIVES: Within thirty (30) calendar days after the Completion Date, as defined in Article I of the Funding and Construction Agreement, each Party shall designate by written notice to the other Party a representative who is authorized to act on its behalf in the implementation of this Agreement. Either Party may at any time change the designation of its Authorized Representative by written notice to the other Party. 13. NO DEDICATION OF FACILITIES: Any undertaking by one Party to the other Party under any provision of this Agreement shall not constitute the dedication of the system or any portion thereof by the Party to the public or to the other Party, and it is understood and agreed 14
EX-10.3.2518th Page of 37TOC1stPreviousNextBottomJust 18th
that any such undertaking under any provision of this Agreement by a Party shall cease upon the termination of its obligations hereunder. 14. NON-WAIVER: None of the provisions of this Agreement shall be considered waived by either Party except when such waiver is given in writing. The failure of either Party to insist in any one or more instances upon strict performance of any of the provisions of this Agreement or to take advantage of any of its rights hereunder shall not be construed as a waiver of any such provisions or the relinquishment of any such rights for the future; but the same shall continue and remain in full force and effect. 15. NO THIRD PARTY RIGHTS: The Parties do not intend to create rights in or to grant remedies to any Third Party or others as a beneficiary of this Agreement or of any duty, covenant, obligation or undertaking established hereunder. 16. UNCONTROLLABLE FORCES: Neither Party shall be considered to be in default in the performance of any of its obligations under this Agreement when a failure of performance shall be due to an uncontrollable force. The term "uncontrollable force" shall mean any cause beyond the control of the Party affected including, but not restricted to, failure of or threat of failure of facilities which have been maintained in accordance with generally-accepted engineering and operating practices in the electrical utility industry, flood, drought, earthquake, tornado, storm, fire, pestilence, lightning and other natural catastrophes, epidemic, war, riot, civil disturbance or disobedience, strike, labor dispute, labor or material shortage, sabotage, government priorities and restraint by court order or public authority (whether valid or invalid) and actions or nonaction by or inability to obtain or keep the necessary authorizations or approvals from any governmental agency or authority, the failure or inability of Edison to receive the electric power to be transmitted hereunder at the Point(s) of Delivery, which by exercise of due diligence such 15
EX-10.3.2519th Page of 37TOC1stPreviousNextBottomJust 19th
Party could not reasonably have been expected to avoid and which by exercise of due diligence it has been unable to overcome. Nothing contained herein shall be construed as to require a Party to settle any strike or labor dispute in which it may be involved. Either Party rendered unable to fulfill any of its obligations under this Agreement by reason of an uncontrollable force shall give prompt written notice of such fact to the other Party and shall exercise due diligence to remove such inability with all reasonable dispatch. 17. ASSIGNMENTS: 17.1 Any assignment by Producer of its interest in this Agreement which is made without the written consent of IID (which shall not be unreasonably withheld) shall not relieve Producer from its primary liability for any of its duties and obligations hereunder, and in the event of any such assignment Producer shall continue to remain primarily liable for payment of any and all money due IID hereunder and for the performance and observance of all other covenants, duties and obligations to be performed and observed hereunder by it to the same extent as though no assignment has been made. 17.2 Notwithstanding any provision of Section 17.1 to the contrary, prior to the end of the Credit Installment Period, as defined in Article I of the Funding and Construction Agreement, Producer's right to transmission service under this Agreement with respect to the Plant may be assigned only (i) to a purchaser or co-owner of such Plant or to a person who will operate such plants pursuant to a contract or other arrangement with such purchaser and in either case only with the prior written consent of IID (which shall not be unreasonably withheld) or (ii) for security purposes, to a bank or other entity which provides financing for such Plant or any electrical transmission facilities associated therewith. Producer and IID agree that nothing in this Section 17.2 may be amended, modified or waived without the prior written consent of each and 16
EX-10.3.2520th Page of 37TOC1stPreviousNextBottomJust 20th
every party to the Funding and Construction Agreement (except for any parties in default thereunder). 17.3 Whenever an assignment of Producer's interest in this Agreement is made with the written consent of IID, Producer's assignee shall expressly assume in writing the duties and obligations hereunder of Producer and, within thirty (30) days after any such assignment and assumption of duties and obligations, Producer shall furnish or cause to be furnished to IID a true and correct copy of such assignment and assumption of duties and obligations. 17.4 Subject to the foregoing restrictions on assignments, all of the terms of this Agreement shall be binding upon and inure to the benefit of both of the Parties and their respective successors, permitted assigns and legal representatives. 18. GOVERNING LAW: This Agreement shall be interpreted, governed by and construed under the laws of the State of California or the laws of the United States, as applicable. 19. NOTICES: Any notice, demand or request provided for in this Agreement, or served, given or made in connection with it, shall be in writing and shall be deemed properly served, given or made if delivered in person or sent by United States mail, postage prepaid, to the persons specified below unless otherwise provided for in this Agreement: IMPERIAL IRRIGATION DISTRICT c/o General Manager P.O. Box 937 Imperial, California 92251 SECOND IMPERIAL GEOTHERMAL PLANT 343 Second Street, Suite N Los Altos, CA 94022 Either Party may at any time, by notice to the other Party, change the designation or address of the person so specified as the one to receive notices pursuant to this Agreement. 20. SIGNATURE CLAUSE 17
EX-10.3.2521st Page of 37TOC1stPreviousNextBottomJust 21st
The Parties have caused this Agreement to be executed in their respective names, in duplicate, by their respective officers hereunto this 27th day of October, 1992. SECOND IMPERIAL GEOTHERMAL COMPANY By /s/ James W. Porter, Jr. ---------------------------------- ATTEST: By /s/ F. Neil Schmidt --------------------------- Secretary IMPERIAL IRRIGATION DISTRICT By /s/ Indecipherable ---------------------------------- ATTEST: By /s/ Indecipherable --------------------------- Secretary 18
EX-10.3.2522nd Page of 37TOC1stPreviousNextBottomJust 22nd
EXHIBIT I DEVELOPMENTS AND METHODOLOGIES FOR THE TRANSMISSION AND SUBTRANSMISSION SERVICE CHARGES AND SCHEDULING FEE EXHIBIT I.A DEVELOPMENT AND METHODOLOGY FOR THE 92-KV, 161-KV AND 230-KV TRANSMISSION SERVICE CHARGE EXHIBIT I.B METHODOLOGY FOR THE 34.5-KV SUBTRANSMISSION SERVICE CHARGE EXHIBIT I.C METHODOLOGY AND CALCULATION OF SCHEDULING FEE EI-1
EX-10.3.2523rd Page of 37TOC1stPreviousNextBottomJust 23rd
EXHIBIT I.A DEVELOPMENT AND METHODOLOGY FOR THE 92-161-230-KV TRANSMISSION SERVICE CHARGE EI.A-1 DEVELOPMENT Plant Investment Transmission @ 12-31-83: OC (2) .................................................... $ 20,700,415 RCN (3) ................................................... $ 88,300,000 Adjusted Investment Weighted Plant (4) ........................................... $ 40,980,291 Transmission Plant Additions (1984-1991) (9) ................. $ 86,825,654 Transmission Credit to Rate Base through 12-31-90 ............ $ 9,950,621 Transmission Credit to Rate Base During 1991 $5,645,726 x 600-40 ------ 600 ........................................... $ 5,269,344 General Plant (Allocated) (5) ................................ $ 3,937,700 M&S (Allocated) (6) .......................................... $ 4,160,284 ------------ Total Adjusted Investment (TAI) ........................... $151,123,894 Annual Cost Fixed Cost @ 9.694% x TAI (1) ................................ $ 14,649,950 Transmission O&M (Allocated) (7) ............................. $ 1,930,022 A&G (Allocated) (8) .......................................... $ 1,527,049 ------------ Total Annual Cost ......................................... $ 18,107,021 Annual Peak Load (KW) (Includes Wheeling of 492,000 KW) ...... 1,009,000 Cost per KW per Year ......................................... $ 17.95 Cost per KW per Month ........................................ $ 1.50 EI-2
EX-10.3.2524th Page of 37TOC1stPreviousNextBottomJust 24th
EI.A-2 METHODOLOGY (1) Fixed cost @ 9.694% based on 6.897% interest rate, 33-year amortization and 1.25 coverage. This rate is based on the average interest rate for the Year 1991 as obtained from the "Merrill Lynch 500 Municipal Bond Index Power." (2) OC = Original Cost; see under Total Original Cost, EI-7 (3) RCN = Reproduction Cost New; see under "Total RCN," EI-7 (4) Weighted Plant = 70% OC + 30% RCN (5) General Plant (Allocated) = General Plant x Transmission O&M (Allocated) + Dispatching -------------------------------------------------- (Production O&M Excluding Fuel) + (Distribution O&M) + (Transmission O&M) + (Customer Accounting & Services) + (Dispatching) = $27,736,022 x $1,930,022 + $714,354 ------------------------------------------------------------ $6,160,517 + $7,153,105 + $2,018,790 + $2,579,455 + $714,354 = $27,736,022 x $ 2,644,376 = $ 3,937,700 ----------- $18,626,221 (6) M&S (Allocated) = M&S x Transmission OC -------------------- Total Electric Plant = $11,638,051 x $165,436,326 ------------ $462,794,466 = $ 4,160,284 EI-3
EX-10.3.2525th Page of 37TOC1stPreviousNextBottomJust 25th
EI.A-2 (Continued) (7) Transmission O&M (Allocated) = Transmission O&M x Transmission OC ------------------------ Total Transmission Plant = $2,018,790 x $165,436,326 ------------ $173,045,273 = $1,930,022 (8) A&G (Allocated) = A&G x Transmission O&M (Allocated) + Dispatching ------------------------------------------------ (Production O&M Excluding Fuel) + (Distribution O&M) + (Transmission O&M) + (Dispatching) + (Customer Accounting and Services) = $10,756,097 x $ 2,644,376 ----------- $18,626,221 = $l,527,049 (9) IID Transmission Plant Additions: 1984: $ 4,430,251 1985: $ 1,613,927 1986: $30,826,399 1987: $ 2,925,708 1988: $ 3,090,073 1989: $13,835,199 1990: $20,272,548 1991: $ 9,831,549 ----- ----------- TOTAL: $86,825,654 EI-4
EX-10.3.2526th Page of 37TOC1stPreviousNextBottomJust 26th
-------------------- IID-EDISON Transmission Service Agreement for IMPERIAL IRRIGATION DISTRICT Alternative Energy ELECTRIC PLANT INVESTMENT Resources DECEMBER 31, 1991 -------------------- Original Reserved for Depreciated Cost Depreciation Value ------------ ------------ ------------ Production Plant: Steam $ 30,278,622 $ 23,851,041 $ 6,427,581 Hydro 51,246,414 20,741,676 30,504,738 Diesel 5,071 -- 5,071 Gas turbines 21,098,788 9,584,036 11,514,752 ------------ ------------ ------------ Total production plant 102,628,895 54,176,753 48,452,142 ------------ ------------ ------------ Transmission Plant: Transmission 165,436,326 31,203,205 134,233,121 Subtransmission 7,608,947 2,969,309 4,639,638 ------------ ------------ ------------ Total transmission plant 173,045,273 34,172,514 138,872,759 ------------ ------------ ------------ Distribution Plant: Land and land rights 589,504 589,504 Structures and improvements 4,736,127 872,005 3,864,122 Station equipment 40,863,687 9,506,020 31,357,667 Poles, towers and fixtures 23,625,121 6,834,162 16,790,959 Overhead conductors and devices 19,256,219 7,719,708 11,536,511 Underground conduit 1,161,303 229,200 932,103 Underground conductors and devices 22,138,225 3,028,074 19,110,151 Line transformers 27,274,739 10,176,621 17,098,118 Services 6,896,965 2,974,220 3,922,745 Meters 7,981,467 2,794,026 5,187,441 Street lighting and signal system 3,414,932 1,627,564 1,787,368 ------------ ------------ ------------ Total distribution plant 157,938,289 45,761,600 112,176,689 ------------ ------------ ------------ General plant 27,736,022 4,531,366 23,204,656 Intangible plant 49,379 49,379 Donations in aid of construction - P.W.A. Grant 2,080,920 (2,080,920) Contributions in aid of construction 1,590,228 (1,590,228) ------------ ------------ ------------ Total electric plant in service 461,397,858 142,313,381 319,084,477 ------------ ------------ ------------ Electric plant acquisition adjustment 719,334 719,334 Electric plant held for future use 677,274 371,130 306,144 ------------ ------------ ------------ Total electric plant $462,794,466 $143,403,845 $319,390,621 ============ ============ ============ Materials and supplies $ 11,638,051 ============ ( ) Deductions ELECTRIC.INV EI-5
EX-10.3.2527th Page of 37TOC1stPreviousNextBottomJust 27th
------------------------------- SUMMARY IID-EDISON POWER OPERATION AND MAINTENANCE EXPENSE Transmission Service Agreement 1991 for Alternate Energy Resources ------------------------------- Fuel and Purchased Other Power Operation Maintenance Other Total ----------- ---------- ----------- ------------ ------------ PRODUCTION Steam Generation El Centro Steam Plant $10,488,112 $1,560,070 $ 2,044,057 $ $ 14,092,239 Hydraulic Generation AAC Drops 887,469 1,094,339 = $ 6,160,517 1,981,808 Other 107,756 107,756 Other Generation 338,815 119,035 347,791 805,641 Purchased Power 61,059,300 61,059,300 Other Production Expense 739,354 739,354 ----------- ---------- ----------- ----------- ------------ Total Production Expense 71,886,227 3,305,928 3,593,943 78,786,098 Transmission Plant 554,279 1,464,511 2,018,790 Distribution 1,870,803 5,282,302 7,153,105 Customer Accounting 2,579,455 2,579,455 General & Administrative 10,756,097 10,756,097 ----------- ---------- ----------- ----------- ------------ Total Power 0 & M $71,886,227 $5,731,010 $10,340,756 $13,335,552 $101,293,545 =========== ========== =========== =========== ============ EI-6
EX-10.3.2528th Page of 37TOC1stPreviousNextBottomJust 28th
________________________________________ REPRODUCTION COST _____ _____ ____________ (Costs In Millions Of Dollars) IID-Edison Transmission Service Agreement for Alternative Resources ORIGINAL NET YEAR COST ADDITIONS HWI TRANSLATOR RCN ---- -------- --------- --- ---------- ----- 1938 0.15 0.15 22 11.__ 1.73 1939 0.24 0.09 22 11.__ 1.04 1940 0.24 0.02 22 11.33 0.23 1941 0.26 0.00 23 11.04 0.00 1942 0.55 0.29 2_ 10.1_ 2.__ 1943 1.78 1.23 2_ 10.16 1_.__ 1944 2.05 0.27 2_ 10.16 2.74 1945 1.91 -0.14 2_ 9.77 -1.27 1946 1.83 -0.06 29 8.76 -0.53 1947 2.13 0.28 34 7.47 2.09 1948 2.33 0.19 37 6.86 1.30 1949 3.45 1.13 38 6.68 7.33 1950 4.35 0.90 40 6.35 5.7_ 1951 4.49 0.14 45 5.64 0.79 1952 6.07 1.58 46 5.52 _.72 1953 6.23 0.16 49 5.18 0._3 1954 6.79 0.56 50 5.08 2._4 1955 7.83 1.04 52 4.__ 3.0_ 1956 8.36 0.53 56 4.54 2.40 1957 9.94 1.58 57 4.46 7.04 1958 10.16 0.22 59 4.31 0.95 1959 10.64 0.4_ 60 4.23 2.03 1960 10.95 0.31 60 4.23 1.31 1961 11.03 0.0_ 39 4.31 0.34 1962 11.76 0.73 39 4.31 3.14 1963 11._0 0.04 39 4.31 0.17 1964 12.00 0.20 61 4.16 0._3 1965 12.08 0.0_ 64 3.77 0.32 1966 12.36 0.20 67 3.79 1.06 1967 12.46 0.10 70 3.63 0.36 1968 13.10 0.__ 73 3.4_ 2.23 1969 13.33 0.23 78 3.26 0.75 1970 14.22 0.89 93 3.06 2.7_ 1971 14.43 0.21 39 2._5 0.60 1972 14.47 0.04 93 2.73 0.11 1973 14.59 0.12 100 2._4 0.30 1974 15.19 0.60 124 2.05 l.22 1975 15.21 0.02 145 1.75 0.0_ 1976 15.32 0.11 1__ 1.61 0.__ 1977 15.59 0.27 172 1.4_ 0.__ 1978 15.71 0.12 174 1.46 0.__ 1979 15.__ 0.14 190 1.24 0.__ 1980 16.14 0.27 211 1.20 0.__ 1981 18.18 2.04 230 1.10 0.__ 1982 20.08 1.90 245 1.04 1.9_ 1983 20.70 0.62 254 1.00 0.__ ----- ----- --- ---- ----- TOTAL 20.70 20.70 254 4.27 __._ (1) Original Cost As Of December 31 Of Each Year Was From IID Annual Reports And Includes __ __ And ___ __ Transmission Plant Investment. (2) _______________ _______ for Total Transmission Plant For ___ EI-7
EX-10.3.2529th Page of 37TOC1stPreviousNextBottomJust 29th
EXHIBIT I.B EI.B.A METHODOLOGY FOR 34.5-KV SUBTRANSMISSION SERVICE CHARGE 1. Original Cost (OC): OC = Current Cost ($/mile) x 1964 HW ------- 1991 HW Current cost/mile = $37,371 HW = Handy Whitman Index for Total Transmission Plant for the Pacific Region 1964 HW = 61 1991 HW = 314 OC = $37,371/mile x 61 = $7,260/mile --- 314 2. O&M = 3% of OC 3. A&G = 1% of OC 4. Annual Fixed Cost (AFC) = 10.21% of OC; 10.21% is as defined in EI.A - 2(I) 5. Transmission Loading (TL) = Absolute value of line loadings 6. $/KW - Year = $/year divided by TL 7. For mileage, see EI-ll
EX-10.3.2530th Page of 37TOC1stPreviousNextBottomJust 30th
EI.B-1 DEVELOPMENT OF SERVICE CHARGES FOR GEM GEOTHERMAL PLANT UNIT NO. 1 A. East Mesa to Magma (Tap) Miles x OC = 6.37 x $7,260/mile = $46,246 AFC = 0.1021 x $42,246 = $4,722 TL = 10,000 KW O&M = 0.03 x $42,246 = $1,387 $/KW - Year = $0.6571 A&G = .01 x $42,246 = $ 462 $/KW - Month = $0.0548 ------ $/Year = $6,571 B. Magma (Tap) to Maggio Miles x OC = 3.6 miles x $7,260/mile = $26,136 AFC = 0.1021 x $26,136 = $2,668 TL = 8,000 KW O&M = .03 x $26,136 = $ 784 $/KW - Year = $0.4642 A&G = .01 x $26,136 = $ 261 $/KW - Month = $0.0387 $/Year = $3,713 C. Maggio to Holtville Miles x OC = 0.73 x $7,260/mile = $5,300 AFC = 0.1021 x $5,300 = $541 TL = 6,400 KW O&M = .03 x $5,300 = $159 $/KW - Year = $0.1177 A&G = .01 x $5,300 = $ 53 $/KW - Month = $0.0098 $/Year = $753 Summary of Charges A + B + C = $(.0548 + .0387 + .0098) = $0.1033/KW - Month Rounded to $0.10/KW - Month
EX-10.3.2531st Page of 37TOC1stPreviousNextBottomJust 31st
EI.B-2 DEVELOPMENT OF SERVICE CHARGES EARTH ENERGY GEOTHERMAL PLANT UNIT NO. 1 A. Salton Sea to Calipatria: Miles x OC = 10.8 miles x $7,260/mile = $78408 AFC = 0.1021 x $78,408 = $ 8,005 TL = 10,000 KW O&M = .03 x $78,408 = $ 2,352 $/KW - Year = $1.1141 A&G = .01 x $78,408 = $ 784 $/KW - Month = $0.0928 ------- $/Year = $11,141 Charges = $0.0928/KW - Month Rounded to $0.09/KW - Month EI-10
EX-10.3.2532nd Page of 37TOC1stPreviousNextBottomJust 32nd
ONE LINE DIAGRAM OF SUBTRANSMISSION PATH FOR EXISTING GEOTHERMAL UNITS [Graphic: Simplified Switch Connection Diagram] NOTE: DIAGRAM DEPICTS SHORTEST 34.5KV PATH TO 92KV TRANSMISSION NETWORK EI-11
EX-10.3.2533rd Page of 37TOC1stPreviousNextBottomJust 33rd
EXHIBIT I.C METHODOLOGY AND CALCULATION OF SCHEDULING FEE ANNUAL DETERMINATION OF IID SCHEDULING FEES During the month of April each year, Imperial Irrigation District (IID) will calculate monthly fees for scheduling services related to Alternative Energy Resources and transactions with other utilities as follows: A. An appropriate number of scheduling units will be assigned to every IID resource, Alternative Energy Resource, and transaction with other utilities in operation during the preceeding year. The number of scheduling units assigned to each resource and/or transaction will depend upon the total daily number of functions and therefore, estimated time required to schedule the resource and/or transaction. This estimate will be directly related to the complexity of the scheduling service being provided. Table 1 shows how the total scheduling units were determined for the IID system. B. The expenses related to dispatching and scheduling service will be equal to the sum of the following: 1. IID FPC Account 556 for the year preceding the year of calculation. 2. A portion of the annual expenses related to the SCADA and AGC systems for the year preceeding the year of calculation, determined by multiplying one half of the levelized debt service payments for the systems by the percentage that FPC Account 556 is of the total of FPC Accounts 556, 561 and 581. Table 2 shows calculations involved with this step. C. The annual scheduling fee per scheduling unit will be determined by dividing the expenses related to scheduling found in Step B by the total scheduling units from Step A. The per unit fee will then be multiplied by the number of scheduling units assigned to each resource and/or transaction to develop an appropriate annual scheduling fee for that resource and/or transaction. The monthly scheduling fee will then be calculated by dividing the annual fee by 12. Table 3 shows the calculation. The revised scheduling fee will be effective on June 1 of the year in which they are calculated.
EX-10.3.2534th Page of 37TOC1stPreviousNextBottomJust 34th
----------------- IID-Edison Service Agreement for Alternative Energy Resources ----------------- TABLE 1 IMPERIAL IRRIGATION DISTRICT SCHEDULING FEE METHODOLOGY DETERMINATION OF TOTAL SCHEDULING UNITS Hours Payback/ Pre- On AGC Off Loss Energy Capacity Variable Banking Scheduling System System Accounting (X=2) (X=2) (X=l) (X=2) (X=l) (X=l) (X=l) (X=l) Total ------ -------- -------- -------- ---------- ------ ------ ---------- ----- IID'S Generating Units: Pilot Knob X X X X 6 Drop No. 1 X X X X 6 Drop No. 2 X X X X 6 Drop No. 3 X X X X 6 Drop No. 4 X X X X 6 Drop No. 5 X X X X 6 East Highline X X X X 6 Turnip and Double Weir X X X X 6 El Centro Unit No. 1 X X X X 6 El Centro Unit No. 2 X X X X 6 El Centro Unit No. 3 X X X X 6 El Centro Unit No. 4 X X X X 6 Coachella Units No. 1 and 2 X X X X 6 Coachella Units No. 3 and 4 X X X X 6 Rockwood X X X X 6 Brawley X X X X 6 --- Subtotal 96 Alternative Energy Resources: Earth Energy 1 X X X X X X X 10 Earth Energy 2 X X X X X X X 10 GEM 1 X X X X X X X 10 GEM 2 X X X X X X X 10 GEM 3 X X X X X X X 10 Heber HGC X X X X X X X 10 Vulcan Power X X X X X X X 10 Orm___ I X X X X X X X 10 Orm___ II X X X X X X X 10 Western _io__s I X X X X X X X 10 Western _io__s II X X X X X X X 10 Del R_nch X X X X X X X 10 J.J. Elmore X X X X X X X 10 Desert Power X X X X X X X 10 Leathers X X X X X X X 10 Colmac X X X X X X X 10 --- Subtotal 160 Transactions with Other Utilities: DOE (WAPA) X X X X X X 9 EPE X X X X X 7 SCE X X X X X 7 SDG&E X X X X X X 8 APS X X X X X 6 SCE GT's (Axis) X X X X X X 9 SCE (Axis) X X X X X X 9 YCWUA X X X 4 Division X X X 4 X X X 4 X X X X X X 8 --- Subtotal 75 Total Scheduling Units 331 --- EI-13
EX-10.3.2535th Page of 37TOC1stPreviousNextBottomJust 35th
TABLE 2 IMPERIAL IRRIGATION DISTRICT SCHEDULING FEE METHODOLOGY EXPENSES RELATED TO SCHEDULING IID 1991 Actual FPC Account 556 (3) $ 714,354 (60.28%) FPC Account 561 $ 332,729 (28.08%) FPC Account 581 $ 137,981 (ll.64%) ---------- ------- $1,185,064 (100.0%) SCADA and AGC Systems Investment (2) = $5,790,539 Annual Expense $5,790,539 x 0.10179116 (1) = $ 589,426 Expenses Related to Scheduling FPC Account 556 = $ 714,354 60.28% of SCADA and AGC Systems Annualized Expense ($589,426 x 0.6028) = $ 355,306 ---------- Total Expense Related to Scheduling = $1,069,660 (1) Capital Recovery Factor determined from the following levelized debt service payments: a. $7,611,000 for $ 65,000,000 - May, 1983 COP issue b. $9,572,875 for $103,815,000 - April, 1990 COP issue (2) Fifty percent of total investment for SCADA and AGC, $11,581,078, is assumed related to transmission service (3) Related to load dispatching for system control EI-14
EX-10.3.2536th Page of 37TOC1stPreviousNextBottomJust 36th
TABLE 3 IMPERIAL IRRIGATION DISTRICT SCHEDULING FEE METHODOLOGY CALCULATION OF SCHEDULING FEE Annual Charge per Scheduling Unit Total Expanses Related to Scheduling (from Table 2) = $1,069,660 Total Scheduling Units (from Table 1) 331 ---------- Annual Charge per Scheduling Unit ($1,069,660/331) = $ 3,232 Alternative Energy Resource Scheduling Fee All Plants: Annual Charge (10 Scheduling Units x $3,232) = $32,320/year (1) Monthly Charge ($32,320/12) = $ 2,693/month (1) Also applies to new plants to be on-line in 1992 EI-15
EX-10.3.25Last Page of 37TOC1stPreviousNextBottomJust 37th
EXHIBIT II The Maximum Transmission Service Entitlement for the Plant is 33 megawatts.

Dates Referenced Herein

Referenced-On Page
This ‘S-1/A’ Filing    Date First  Last      Other Filings
Filed on:9/28/04None on these Dates
11/30/924
 List all Filings 


2 Subsequent Filings that Reference this Filing

  As Of               Filer                 Filing    For·On·As Docs:Size             Issuer                      Filing Agent

 2/25/22  Ormat Technologies, Inc.          10-K       12/31/21  143:66M                                    RDG Filings/FA
 2/26/21  Ormat Technologies, Inc.          10-K       12/31/20  144:33M                                    RDG Filings/FA
Top
Filing Submission 0000950136-04-003123   –   Alternative Formats (Word / Rich Text, HTML, Plain Text, et al.)

Copyright © 2024 Fran Finnegan & Company LLC – All Rights Reserved.
AboutPrivacyRedactionsHelp — Fri., Apr. 26, 4:54:13.1am ET