SEC Info  
    Home      Search      My Interests      Help      Sign In      Please Sign In

Eidos PLC – ‘20-F’ for 6/30/03 – EX-14

On:  Tuesday, 12/23/03, at 12:21pm ET   ·   For:  6/30/03   ·   Accession #:  1021231-3-1064   ·   File #:  0-28994

Previous ‘20-F’:  ‘20-F’ on 9/30/02 for 3/31/02   ·   Next:  ‘20-F’ on 12/23/04 for 6/30/04   ·   Latest:  ‘20-F/A’ on 4/5/05 for 6/30/04

Find Words in Filings emoji
 
  in    Show  and   Hints

  As Of                Filer                Filing    For·On·As Docs:Size              Issuer               Agent

12/23/03  Eidos PLC                         20-F        6/30/03   26:3.6M                                   St Ives Burrups/FA

Annual Report of a Foreign Private Issuer   —   Form 20-F
Filing Table of Contents

Document/Exhibit                   Description                      Pages   Size 

 1: 20-F        Annual Report of a Foreign Private Issuer           HTML   1.16M 
 2: EX-4        Instrument Defining the Rights of Security Holders  HTML    171K 
 3: EX-4        Instrument Defining the Rights of Security Holders  HTML    181K 
 4: EX-4        Instrument Defining the Rights of Security Holders  HTML    204K 
 5: EX-4        Instrument Defining the Rights of Security Holders  HTML    168K 
 6: EX-4        Instrument Defining the Rights of Security Holders  HTML    118K 
 7: EX-4        Instrument Defining the Rights of Security Holders  HTML     73K 
 8: EX-4        Instrument Defining the Rights of Security Holders  HTML    102K 
 9: EX-4        Instrument Defining the Rights of Security Holders  HTML     24K 
10: EX-4        Instrument Defining the Rights of Security Holders  HTML     75K 
11: EX-4        Instrument Defining the Rights of Security Holders  HTML    100K 
12: EX-4        Instrument Defining the Rights of Security Holders  HTML     89K 
13: EX-4        Instrument Defining the Rights of Security Holders  HTML     48K 
14: EX-4        Instrument Defining the Rights of Security Holders  HTML     16K 
15: EX-12       Statement re: Computation of Ratios                 HTML     14K 
16: EX-12       Statement re: Computation of Ratios                 HTML     15K 
17: EX-13       Annual or Quarterly Report to Security Holders      HTML     11K 
18: EX-14       Material Foreign Patent                             HTML     37K 
19: EX-14       Material Foreign Patent                             HTML     17K 
20: EX-14       Material Foreign Patent                             HTML     15K 
21: EX-14       Material Foreign Patent                             HTML     15K 
22: EX-14       Material Foreign Patent                             HTML     13K 
23: EX-14       Material Foreign Patent                             HTML     10K 
24: EX-14       Material Foreign Patent                             HTML     17K 
25: EX-14       Material Foreign Patent                             HTML    169K 
26: EX-14       Material Foreign Patent                             HTML     14K 


EX-14   —   Material Foreign Patent

This exhibit is an HTML Document rendered as filed.  [ Alternative Formats ]

EX-141st Page of 3TOCTopPreviousNextBottomJust 1st
 

  Prepared and filed by St Ives Burrups  

Exhibit 14(3)


EX-142nd Page of 3TOC1stPreviousNextBottomJust 2nd

Eidos PLC – Release schedule update

Wednesday, 14 May 2003

E3 LINE-UP AND RELEASE SCHEDULE UPDATE

Eidos plc (LSE:EID.L, NASDAQ:EIDSY), one of the world’s leading publishers and developers of entertainment software, today confirms that it will be profiling its strong forthcoming games portfolio at the Electronics Entertainment Expo (E3) in Los Angeles, running from May 14 to May 16. Eidos also announces today the launch date for its eagerly awaited Tomb Raider: The Angel of Darkness and for The Italian Job.

Tomb Raider: The Angel of Darkness will be released on PS2 and PC formats on 20 June 2003. The launch of the Tomb Raider film sequel “The Cradle of Life”, is scheduled for US release by Paramount Pictures on 25 July.

With the US release by Paramount of the new Italian Job film on 30 May 2003, Eidos has taken the opportunity to bring forward the release date of its Italian Job title from July to June in order to maximise the game’s commercial potential alongside the film. The game will be published on PS2, Xbox and GameCube consoles.

In addition to the above two games, Eidos will showcase at E3 its strong portfolio of games scheduled for release during the remainder of calendar year 2003. These include Whiplash (PS2, Xbox), Commandos 3: Destination Berlin (PC), Legacy of Kain: Defiance (PS2, Xbox, PC), and Thief (Xbox, PC). By bringing forward the release date of The Italian Job game, Eidos has also taken the opportunity to reschedule the release dates for Backyard Wrestling and Deus Ex: Invisible War to the pre-Christmas sales period later this year. These games will also be showcased at E3.

Given the strong performance of pillar titles this year to date and the imminent release of Tomb Raider: The Angel of Darkness and The Italian Job, the Board remains confident that the Company will meet current market expectations for the financial year to 30 June 2003.

Chief Executive Officer, Mike McGarvey, said:

“The outstanding performance of our first-half releases of Hitman 2 and TimeSplitters 2, together with the recently released Championship Manager 4, the record breaking PC game, demonstrate the strength of Eidos’ games portfolio. Tomb Raider: The Angel of Darkness and The Italian Job games will complete the line-up for this financial year and give us a firm base from which we can continue to deliver improved performances going forward.”

Enquiries:  
   
Eidos plc 020 8636 3000
Mike McGarvey, CEO  
Stuart Cruickshank, CFO  
   
Brunswick 020 7404 5959
Jonathan Glass/James Crampton  
Nina Pawlak (001) 212-333-3810

1


EX-14Last Page of 3TOC1stPreviousNextBottomJust 3rd

Notes

1. Certain statements made in this announcement with respect to the Group’s plans, strategies and beliefs and other statements that are not historical facts are forward-looking statements (as that term is defined in the United States Private Securities Legislation Reform Act of 1995) that involve risks and uncertainties because they relate to events and depend on circumstances that will occur in the future. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied by these forward-looking statements including, without limitation, general economic conditions in the Group’s markets, particularly levels of consumer spending; exchange rates, particularly between the pound sterling and the U.S. dollar, in which the Group makes significant sales; and the Group’s ability to continue to win acceptance of its products, which are offered in highly competitive markets characterised by continual new product introductions, rapid developments in technology and subjective and changing consumer preferences (particularly in the entertainment business) and other risks described in reports and filings made by Eidos plc with the SEC. The Company undertakes no obligation to update any forward-looking statements contained in this announcement, whether as a result of new information, future events or otherwise.

2. The Company name and other brand and/or product names referred to in this statement are registered trademarks or trademarks pending registration in accordance with the relevant national laws worldwide. All rights reserved.

2


Top
Filing Submission 0001021231-03-001064   –   Alternative Formats (Word / Rich Text, HTML, Plain Text, et al.)

Copyright © 2024 Fran Finnegan & Company LLC – All Rights Reserved.
AboutPrivacyRedactionsHelp — Sun., Apr. 28, 12:57:54.1am ET