SEC Info  
    Home      Search      My Interests      Help      Sign In      Please Sign In

Formation Metals Inc – ‘40FR12B’ on 5/27/05 – ‘EX-99’

On:  Friday, 5/27/05, at 5:35pm ET   ·   Accession #:  1176256-5-199   ·   File #:  1-32517

Previous ‘40FR12B’:  None   ·   Next:  ‘40FR12B/A’ on 6/8/05   ·   Latest:  ‘40FR12B/A’ on 10/18/05

Find Words in Filings emoji
 
  in    Show  and   Hints

  As Of                Filer                Filing    For·On·As Docs:Size              Issuer               Agent

 5/27/05  Formation Metals Inc              40FR12B               57:14M                                    e3 Fil… Computershare/FA

Registration of Securities of a Canadian Issuer — SEA’34 §12(b)   —   Form 40-F
Filing Table of Contents

Document/Exhibit                   Description                      Pages   Size 

 1: 40FR12B     Registration of Securities of a Canadian Issuer --  HTML     61K 
                          SEA'34 §12(b)                                          
 2: EX-99       Miscellaneous Exhibit                               HTML    206K 
 3: EX-99       Miscellaneous Exhibit                               HTML     80K 
 4: EX-99       Miscellaneous Exhibit                               HTML    234K 
 5: EX-99       Miscellaneous Exhibit                               HTML    381K 
 6: EX-99       Miscellaneous Exhibit                               HTML    455K 
 7: EX-99       Miscellaneous Exhibit                               HTML     56K 
 8: EX-99       Miscellaneous Exhibit                               HTML     63K 
 9: EX-99       Miscellaneous Exhibit                               HTML     61K 
10: EX-99       Miscellaneous Exhibit                               HTML    125K 
11: EX-99       Miscellaneous Exhibit                               HTML     58K 
12: EX-99       Miscellaneous Exhibit                               HTML     48K 
13: EX-99       Miscellaneous Exhibit                               HTML     27K 
14: EX-99       Miscellaneous Exhibit                               HTML    133K 
15: EX-99       Miscellaneous Exhibit                               HTML     18K 
16: EX-99       Miscellaneous Exhibit                               HTML     30K 
17: EX-99       Miscellaneous Exhibit                               HTML     19K 
18: EX-99       Miscellaneous Exhibit                               HTML     32K 
19: EX-99       Miscellaneous Exhibit                               HTML    229K 
20: EX-99       Miscellaneous Exhibit                               HTML     23K 
21: EX-99       Miscellaneous Exhibit                               HTML     22K 
22: EX-99       Miscellaneous Exhibit                               HTML     18K 
23: EX-99       Miscellaneous Exhibit                               HTML     30K 
24: EX-99       Miscellaneous Exhibit                               HTML     40K 
25: EX-99       Miscellaneous Exhibit                               HTML     23K 
26: EX-99       Miscellaneous Exhibit                               HTML     22K 
27: EX-99       Miscellaneous Exhibit                               HTML     22K 
28: EX-99       Miscellaneous Exhibit                               HTML     28K 
29: EX-99       Miscellaneous Exhibit                               HTML     22K 
30: EX-99       Miscellaneous Exhibit                               HTML     54K 
31: EX-99       Miscellaneous Exhibit                               HTML     23K 
32: EX-99       Miscellaneous Exhibit                               HTML     22K 
33: EX-99       Miscellaneous Exhibit                               HTML     46K 
34: EX-99       Miscellaneous Exhibit                               HTML     26K 
35: EX-99       Miscellaneous Exhibit                               HTML     37K 
36: EX-99       Miscellaneous Exhibit                               HTML     18K 
37: EX-99       Miscellaneous Exhibit                               HTML     39K 
38: EX-99       Miscellaneous Exhibit                               HTML     18K 
39: EX-99       Miscellaneous Exhibit                               HTML     21K 
40: EX-99       Miscellaneous Exhibit                               HTML     30K 
41: EX-99       Miscellaneous Exhibit                               HTML     21K 
42: EX-99       Miscellaneous Exhibit                               HTML     21K 
43: EX-99       Miscellaneous Exhibit                               HTML     21K 
44: EX-99       Miscellaneous Exhibit                               HTML     21K 
45: EX-99       Miscellaneous Exhibit                               HTML     22K 
46: EX-99       Miscellaneous Exhibit                               HTML    161K 
47: EX-99       Miscellaneous Exhibit                               HTML     23K 
48: EX-99       Miscellaneous Exhibit                               HTML    153K 
49: EX-99       Miscellaneous Exhibit                               HTML     16K 
50: EX-99       Miscellaneous Exhibit                               HTML     16K 
51: EX-99       Miscellaneous Exhibit                               HTML     16K 
52: EX-99       Miscellaneous Exhibit                               HTML   1.91M 
53: EX-99       Miscellaneous Exhibit                               HTML     16K 
54: EX-99       Miscellaneous Exhibit                               HTML    389K 
55: EX-99       Miscellaneous Exhibit                               HTML    493K 
56: EX-99       Miscellaneous Exhibit                               HTML    137K 
57: EX-99       Miscellaneous Exhibit                               HTML    134K 


EX-99   —   Miscellaneous Exhibit


This Exhibit is an HTML Document rendered as filed.  [ Alternative Formats ]



 <! 
  Filed by EDF Electronic Data Filing Inc. 604-879-9956  
 <> 

Exhibit 99.25

MINE DEVELOPMENT ASSOCIATES

MINE ENGINEERING SERVICES

National Instrument 43-101 Technical Report Idaho Cobalt Project Lemhi County, Idaho USA

Prepared for

Neil Prenn, P.E.
Allan V. Moran C.P.G.
775-856-5700
210 South Rock Blvd.
Reno, Nevada 89502
FAX: 775-856-6053


MINE DEVELOPMENT ASSOCIATES     
MINE ENGINEERING SERVICES     
 
TABLE OF CONTENTS
Section            Page 
1.0    SUMMARY        1 
    1.1    Introduction    1 
    1.2    Property, Mining Rights and Location    2 
    1.3    Geology and Mineralization    2 
    1.4    Exploration    3 
    1.5    Deposit Resources    3 
    1.6    Reserves    5 
    1.7    Summary and Recommendations    5 
 
2.0    INTRODUCTION AND TERMS OF REFERENCE    6 
    2.1    Terms of Reference and Purpose of Report    6 
    2.2    Sources of Information and Data    7 
    2.3    Field Involvement by Report Authors    7 
        2.3.1    Neil B. Prenn, P.E    7 
        2.3.2    Allan V. Moran, C.P.G    7 
    2.4    Definitions of Terms    7 
        2.4.1    Units of Measure    7 
        2.4.2    Acronyms    8 
        2.4.3    Glossary of Mining, Geological and Other Technical Terms    9 
 
3.0    DISCLAIMER        11 
 
4.0    PROPERTY DESCRIPTION AND LOCATION    12 
    4.1    Documentation of the Status of the Mineral Claims    12 
    4.2    Exceptions to Title Opinion    19 
    4.3    Requirements to Maintain the Claims in Good Standing    21 
    4.4    Environmental Liabilities    21 
    4.5    Permits and Licenses    21 
 
5.0    ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND     
    PHYSIOGRAPHY    23 
    5.1    Access        23 
    5.2    Physiography and Climate    23 
        5.2.1    Physiography    23 
        5.2.2    Climate    23 
        5.2.3    Vegetation    26 
    5.3    Local Resources and Infrastructure    27 




        Technical Report, Idaho Cobalt Project     
                                                                                                             Formation Capital Corporation    Page ii 
 
Section                Page 
6.0    HISTORY            28 
    6.1             Historical Mineral Resource and Mineral Reserve Estimates    29 
                 6.1.1    1997 Estimate for Formation Capital Corporation    29 
            6.1.1.1    Reconciliation of Terms    30 
            6.1.1.2    Summary of 1997 Estimates    31 
    6.2             Summary of MDA Historic Resource Estimates    31 
    6.3             Historic Reserve Estimates    33 
    6.4             Infrastructure (2001 pre-feasibility)    49 
                 6.4.1    Site Access    49 
                 6.4.2    Housing/Employee Transportation    49 
                 6.4.3    Power        49 
                 6.4.4    Communications    49 
                 6.4.5    Sewage        49 
                 6.4.6    Fuel Storage    50 
                 6.4.7    Water        50 
                 6.4.8    Water Management Pond    50 
                 6.4.9    Site Safety and Security    50 
                 6.4.10    Buildings        50 
                 6.4.11    Laboratory    50 
                 6.4.12    Solid Waste Disposal    51 
                 6.4.13    Liquid Waste Disposal    51 
                 6.4.14    Vehicles        51 
                 6.4.15    Concentrate Hauling    51 
                 6.4.16    General and Administrative Labor    51 
    6.5             Historic Capital Cost Estimate (2001 pre-feasibility)    52 
                 6.5.1    Summary        52 
                 6.5.2    Site and General    54 
                 6.5.3    Mine Development    55 
                 6.5.4    Mine Infrastructure Estimates    56 
                 6.5.5    Mine Equipment    57 
            6.5.5.1    Freight    58 
            6.5.5.2    Equipment Replacement and Residual Value of Equipment    58 
            6.5.5.3    Mine Capital Expenditures by Year    59 
                 6.5.6    Pre-production Mining    59 
                 6.5.7    Mill        59 
            6.5.7.1    Mill Facilities and Equipment Estimates    59 
            6.5.7.2    Residual Value of Equipment    60 
            6.5.7.3    Tailings and Water Management Facilities    60 
                 6.5.8    Infrastructure and Support Equipment    61 
                 6.5.9    Hydrometallurgical Cobalt Plant    62 
            6.5.9.1    Owner’s Costs    63 
                 6.5.10    Closure        64 
    6.6             Historic Operating Cost Estimate (2001 pre-feasibility)    65 
                 6.6.1    Introduction    65 
Section                Page 
 
Mine Development Associates    \\neil\projects\formaton\43_101\43-101_draft_4-26\idaho cobalt vmda-7.doc 
April 29, 2005        Neil Prenn 5/2/05 1:56 PM 



           Technical Report, Idaho Cobalt Project         
                                                                               Formation Capital Corporation    Page iii 
 
        6.6.2    Labor Requirements        65 
        6.6.3    Historic Mine Operating Cost Estimate        69 
            6.6.3.1 Mining            69 
                                     6.6.3.1.1    Aerial Tram Operation and Road Maintenance        72 
                                     6.6.3.1.2    Filtered Tailings Placement        72 
                                     6.6.3.1.3    Electrical Power        73 
                                     6.6.3.1.4    Diesel Fuel        73 
                                     6.6.3.1.5    Mill        73 
                                     6.6.3.1.6     Hydrometallurgical Plant        73 
                                     6.6.3.1.7     General and Administrative        74 
        6.6.4    Total Operating Cost        75 
    6.7    Historic Project Economics (2001 pre-feasibility)        76 
        6.7.1    Project Economics Summary        77 
 
7.0    GEOLOGICAL SETTING            82 
    7.1    Regional Geology            82 
    7.2    Local Geology            85 
        7.2.1    Lithology and Stratigraphy        85 
        7.2.2    Structural Geology of the Deposits        85 
        7.2.3    Alteration            86 
    7.3    Mineralization            86 
        7.3.1    Sunshine Deposit            88 
        7.3.2    Ram Deposit            93 
        7.3.3    Other Deposits            96 
    7.4    Geochemistry            98 
 
8.0    DEPOSIT TYPES            100 
 
9.0    MINERALIZATION            101 
 
10.0    EXPLORATION            102 
 
11.0    DRILLING                105 
    11.1    Drilling Done for Blackbird Mining Company (Noranda Exploration Inc.)        105 
        11.1.1    Core Logging            105 
        11.1.2    Geotechnical Logging        105 
    11.2    Drilling Done for Formation Capital Corporation        107 
 
12.0    SAMPLING METHOD AND APPROACH        109 
    12.1    Core Recovery            109 
 
13.0    SAMPLE PREPARATION, ANALYSES AND SECURITY        110 
    13.1    Quality Control Procedures (QA/QC)        110 
    13.2    Sample Security            112 
    13.3    ISO 9000 Certification            112 
Section                    Page 
14.0    DATA VERIFICATION            113 
Mine Development Associates    \\neil\projects\formaton\43_101\43-101_draft_4-26\idaho cobalt vmda-7.doc 
April 29, 2005                Neil Prenn 5/2/05 1:56 PM 



           Technical Report, Idaho Cobalt Project         
                                                                                                           Formation Capital Corporation    Page iv 
 
15.0    ADJACENT PROPERTIES        116 
    15.1    Blackbird Mine            116 
        15.1.1    Blackbird Reserve Estimate, 1982        116 
            15.1.1.1    Reconciliation of Terms        118 
            15.1.1.2    Summary of BMC Estimates        118 
        15.1.2    Blackbird Mine Site Cleanup        119 
 
16.0    MINERAL PROCESSING AND METALLURGICAL TESTING        122 
    16.1    Introduction            122 
    16.2    Mineralogy            122 
    16.3    Prior Testwork            123 
    16.4    Pre-Feasibility Metallurgical Testing and Process Optimization        123 
    16.5    Feasibility Metallurgical Testwork        125 
        16.5.1    Introduction        126 
        16.5.2    Sample Receipt and Preparation        126 
        16.5.3    Grind Index Determinations        127 
            16.5.3.1    Abrasion Index        127 
            16.5.3.2    Bond Ball Mill Work Index        127 
        16.5.4    Laboratory Flotation Procedures        128 
        16.5.5    Sample Fineness versus Grind Time Determination        128 
        16.5.6    Flotation Testing        129 
            16.5.6.1    Flowsheet and Reagent Scheme Development        129 
            16.5.6.2    Rougher Flotation Reagent Addition        130 
            16.5.6.3    Cleaner Flotation        131 
        16.5.7    Locked Cycle Testing        132 
    16.6    Hydrometallurgical Testing:        132 
        16.6.1    Hydrometallurgical Plant – Concentrate Treatment        133 
 
17.0    MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES        134 
    17.1    Mineral Resource Estimates        134 
        17.1.1    Data Acquisition        134 
        17.1.2    Sunshine Deposit        134 
            17.1.2.1    Sunshine Data Base and Assay Statistics        135 
            17.1.2.2    Geochemistry of the Sunshine Deposit        135 
            17.1.2.3    Specific Gravity        136 
            17.1.2.4    Sunshine Resource Method        136 
            17.1.2.5    Sunshine Resource Estimate - 2005        139 
        17.1.3    Ram Deposit        142 
            17.1.3.1    Geochemistry of the Ram Deposit        143 
            17.1.3.2    Specific Gravity        144 
            17.1.3.3    Ram Resource Method        144 
            17.1.3.4    Ram Resource Estimate - 2005        149 
Section                    Page 
18.0    INTERPRETATION AND CONCLUSIONS        157 
    18.1    Opportunity            157 
    18.2    Project Risks            157 
 
Mine Development Associates    \\neil\projects\formaton\43_101\43-101_draft_4-26\idaho cobalt vmda-7.doc 
April 29, 2005                Neil Prenn 5/2/05 1:56 PM 



    Technical Report, Idaho Cobalt Project     
                                                                                                                                     Formation Capital Corporation    Page v 
 
        18.2.1    Price Fluctuation    157 
        18.2.2    Resource and Reserve Definition    158 
        18.2.3    Unforeseen Problems    158 
        18.2.4    Geotechnical Conditions    158 
        18.2.5    Metallurgical Characteristics    158 
        18.2.6    Environmental Considerations    159 
 
19.0    OTHER RELEVANT DATA AND INFORMATION    160 
    19.1    Permitting and Environmental    160 
        19.1.1    General    160 
        19.1.2    Issues    160 
        19.1.3    Permits Required    161 
        19.1.4    Mining and Milling Operation    161 
        19.1.5    Hydrometallurgical Processing Operation    162 
        19.1.6    Permitting Process (General)    162 
        19.1.7    Environmental    166 
    19.2    Sunshine Silver-Gold Refinery and Hydrometallurgical Plant    166 
 
20.0    RECOMMENDATIONS    167 
    20.1    Feasibility Program    167 
    20.2    Exploration Drilling    167 
    20.3    Other Geological Work    168 
    20.4    Budget        168 
 
21.0    REFERENCES        169 
 
22.0    CERTIFICATE OF AUTHORS    172 

Mine Development Associates    \\neil\projects\formaton\43_101\43-101_draft_4-26\idaho cobalt vmda-7.doc 
April 29, 2005    Neil Prenn 5/2/05 1:56 PM 



               Technical Report, Idaho Cobalt Project         
            Formation Capital Corporation    Page vi 
 
LIST OF TABLES
Table                Page 
Table    1.1    Idaho Cobalt Project Deposit Resources @ 0.20 and 0.30% Co Cutoff    4 
Table    4.1    Claims Comprising the Idaho Cobalt Project        14 
Table    4.2    Idaho Cobalt Project Bonding for Exploration        22 
Table    6.1    Summary of 1997 Historic Sunshine Reserve Estimates    31 
Table    6.2    1998 Historic ICP Deposit Resource Estimate – Formation Capital    31 
Table    6.3    Idaho Cobalt Project Drill Summary-(2001 Historic Resource Estimate)    32 
Table    6.4    Historic Measured and Indicated Ram Resources Estimate at 0.3% Co Cutoff – 2001    32 
Table    6.5    Historic Inferred Ram Deposit Resource Estimate at 0.30% Co Cutoff – 2001    33 
Table    6.6    Tonnage Factor Summary - Idaho Cobalt Project    33 
Table    6.7    Historic Idaho Cobalt Project Diluted Measured and Indicated Resources - 2001    35 
Table    6.8    Historic Idaho Cobalt Project Diluted Inferred Resources - 2001    35 
Table    6.9    1998 Historic Idaho Cobalt Project Proven and Probable Reserve Estimate    37 
Table    6.10    Historic Idaho Cobalt Project Reserves (Case 1A material)    38 
Table    6.11    Historic General and Administrative Labor Estimate    51 
Table    6.12    Idaho Cobalt Project Historic Capital Estimate Case 1B    53 
Table    6.13    Idaho Cobalt Project Historic Capital Estimate Case 2B    54 
Table    6.14    Historic Capital Cost Summary (US $000’s)        54 
Table    6.15    Historic Site and General Capital Cost (US $000’s)    55 
Table    6.16    Idaho Cobalt Project – Historic Mine Development Capital Case 1B –     
        Proven and Probable Only (US $000’s)        56 
Table    6.17    Idaho Cobalt Project – Historic Mine Development Capital Case 2B –     
        With Inferred Material (US $000’s)        56 
Table    6.18    Mine Facilities Historic Capital Cost Estimate by Year (US $000’s)    57 
Table    6.19    Historic Mine Equipment Capital Cost Estimate by Year (US $000’s)    58 
Table    6.20    Historic Mine Capital Expenditure by Year Case 1B (US $000’s)    59 
Table    6.21    Historic Pre-production Mining Cost (US $000’s)    59 
Table    6.22    Historic Mill Facilities and Equipment (US $000)    60 
Table    6.23    Historic Filtered Tailings Facility and Water Management Reservoir Estimate    61 
Table    6.24    Historic Infrastructure Facilities and Equipment Capital Cost (US $000)    62 
Table    6.25    Historic Cobalt Hydromet Plant (US $000)        63 
Table    6.26    Historic Construction Period Owner’s Costs (US $000’s)    64 
Table    6.27    Historic Closure Costs (US $000’s)        64 
Table    6.28    Historic Idaho Cobalt Project Estimate Operating Cost Per Ton Ore (US $)    65 
Table    6.29    Historic Project Labor Requirements        66 
Table    6.30    Historic Idaho Cobalt Project On-Site Staff Estimate    67 
Table    6.31    Historic Idaho Cobalt Project On-Site Hourly Labor Estimate    68 
Table    6.32    Historic Hydrometallurgical Plant Manpower Estimate    69 
Table    6.33    Summary of Historic Mining Cost Estimate        70 
Table    6.34    Historic Mine General and Administrative Cost Estimate    70 
Table    6.35    Historic Mine Maintenance General and Administrative Cost Estimate    71 
Table    6.36    Historic Plant Operating Cost Estimate        73 
Table    6.37    Historic Hydrometallurgical Plant Operating Cost    74 
Table    6.38    Historic General and Administrative Labor Estimate (US $000’s)    75 
Table                Page 
 
Mine Development Associates    \\neil\projects\formaton\43_101\43-101_draft_4-26\idaho cobalt vmda-7.doc 
April 29, 2005        Neil Prenn 5/2/05 1:56 PM 



    Technical Report, Idaho Cobalt Project         
               Formation Capital Corporation    Page vii 
 
Table    6.39    Historic General and Administrative Cost Estimate    75 
Table    6.40    Historic Idaho Cobalt Project Estimated Operating Cost Per Ton Ore (US $/ton)    76 
Table    6.41    Historic Idaho Cobalt Project Estimated Operating Cost per Pound of Cobalt    76 
Table    6.42    Idaho Cobalt Project – Historic Pretax Net Present Value (8%)    77 
Table    6.43    Idaho Cobalt Project – Historic Pretax Internal Rate of Return    77 
Table    7.1    Stratigraphy of the Sunshine Deposit        90 
Table    7.2    Stratigraphy of the Ram Deposit        95 
Table    7.3    2004 Ram Drilling – Anomalous Geochemistry        99 
Table    7.4    2004 Ram Drilling – Correlation Coefficients        99 
Table    11.1    ICP Drilling Summary        105 
Table    13.1    Check Samples, Blanks and Standards Pre-1999        111 
Table    13.2    Standard and Blank Samples, 1999 Ram Drilling Program    111 
Table    13.3    Metallurgical Composites Grades - 2004        112 
Table    14.1    Ram Assay Database – Summary Statistics by Horizon (Main & FW zones)    114 
Table    15.1    Summary of 1982 Blackbird Mine Insitu Ore Reserve Estimate    119 
Table    16.1    Comparative Flotation Results        125 
Table    16.2.    Composite and Variability Samples Received        126 
Table    16.3.    Chemical Head Analyses        127 
Table    16.4.    Summary of Abrasion Indices        127 
Table    16.5.    Comparison of Size Analyses of Bond Work Index Feeds    128 
Table    16.6.    Bond Ball Mill Work Index Summary        128 
Table    16.8.    Baseline Flotation Conditions        129 
Table    16.9.    The Effect of Primary Grind Time on Metallurgical Response    130 
Table    16.11.    The Effect of 50g/t Collector Addition to The Regrind    131 
Table    16.12. Batch and Locked Cycle Tests - Metallurgical Results, Projected Balance    132 
Table    17.1    Descriptive Statistics of the Sunshine Sample Database    135 
Table    17.2    Tonnage Factor Summary for Sunshine Deposits    136 
Table    17.3    Sunshine Samples Cut Prior to Compositing        139 
Table    17.4    Sunshine Horizon 1001 Resource Estimate (Hanging Wall Zone    139 
Table    17.5    Sunshine Horizon 1003 Resource Estimate (Main Zone)    140 
Table    17.6    Sunshine Horizon 1007 Resource Estimate        140 
Table    17.7    Sunshine Horizons 1001; 1003; and 1007 Resource Estimate    141 
Table    17.8    Sunshine Horizon 1001, 1003 and 1007 Measured and Indicated Resources    141 
Table    17.9    Sunshine Historic Resource Estimate (0.20% Co Cutoff)    142 
Table    17.10    Ram Main & Footwall Horizon Orientations        143 
Table    17.11    Tonnage Factor Summary for Ram Deposit        144 
Table    17.12    Ram 3010 Horizon Resources        150 
Table    17.13    Ram 3012 Horizon Resources        150 
Table    17.14    Ram 3013 Horizon Resources        151 
Table    17.15    Ram 3021 Horizon Resources        151 
Table    17.16    Ram 3022 Horizon Resources        152 
Table    17.17    Ram 3023 Horizon Resources        152 
Table    17.18    Ram Resources        153 
Table    17.19    Historic 2001 Pre-feasibility Measured and Indicated Ram Resource Estimate    153 
Table                Page 
Table    17.20    2005 Measured and Indicated Ram Resource Estimate @ 0.30% Co Cutoff    154 
 
Mine Development Associates    \\neil\projects\formaton\43_101\43-101_draft_4-26\idaho cobalt vmda-7.doc 
April 29, 2005        Neil Prenn 5/2/05 1:56 PM 



    Technical Report, Idaho Cobalt Project     
                                                                                                                                                             Formation Capital Corporation    Page viii 
 
Table 17.21    2005 Measured and Indicated Project Resource Estimate @ 0.20 and 0.30% Co Cutoff 155 
Table 17.22 2005 Inferred Project Resource Estimate @ 0.30% Co Cutoff    156 
Table 19.1     Permitting Related Backup Documents    165 
 
LIST OF FIGURES
Figure            Page 
Figure    4.1    Project Location Map    17 
Figure    4.2    Idaho Cobalt Project - Claims Map    18 
Figure    5.1    Idaho Cobalt Project – Access Map    25 
Figure    6.1    General Project Map –Idaho Cobalt Project    38 
Figure    6.2    Historic Distribution of Stope Width    72 
Figure    6.3    Idaho Cobalt Project – Historic Net Present Value Estimate    78 
Figure    6.4    Idaho Cobalt Project – Historic Pretax Internal Rate of Return Estimate    79 
Figure    6.5    Idaho Cobalt Project Case 1B    80 
Figure    6.6    Idaho Cobalt Project Case 1B (>$100NSR-PP) Sensitivity – IRR    80 
Figure    6.7    Idaho Cobalt Project Case 2B    80 
Figure    6.8    Idaho Cobalt Project Case 2B    81 
Figure    7.1    Regional Geology    84 
Figure    7.2    Local Geology    87 
Figure    7.3    Sunshine Deposit Cross Section    91 
Figure    7.4    East Sunshine Deposit Cross Section    92 
Figure    7.5    Ram Deposit Cross Section    97 
Figure    11.1 Sunshine Deposit Drill Hole Locations    106 
Figure    11.2 Ram Deposit Drill Hole Locations    106 
Figure    14.1 Co Grade Distribution in Drilling    115 
Figure    17.2 QQ Plot of Assay Data in Sunshine Zones 1001; 1003; and 1007    137 
Figure    17.3 Sunshine 1003 Horizon    138 
Figure    17.4 Ram Cobalt QQ Plot    146 
Figure    17.5 Ram Copper QQ Plot    147 
Figure    17.6 Ram Gold QQ Plot    148 
Figure    17.7 Ram 1023 Horizon    149 
 
 
LIST OF APPENDICES
 
Appendix A: The Cobalt Market     

Mine Development Associates    \\neil\projects\formaton\43_101\43-101_draft_4-26\idaho cobalt vmda-7.doc 
April 29, 2005    Neil Prenn 5/2/05 1:56 PM 



MINE DEVELOPMENT ASSOCIATES

MINE ENGINEERING SERVICES

1.0 SUMMARY

The Idaho Cobalt Project is an advanced stage development property with established cobalt-copper-gold mineral resources. A pre-feasibility study was completed on the project during 2001 with positive results. A final bankable feasibility study is in progress and is projected to be completed during the third quarter 2005. The operation envisioned is an 800 tpd underground mine with onsite processing plant and offsite cobalt hydrometallurgical facility. The Idaho Cobalt Project is 100% owned by Formation Capital Corporation US, a Nevada Corporation with offices in Salmon. The Hydrometallurgical facility and precious metal refinery are 100% owned by Formation Chemicals Inc., an Idaho company with offices in Kellogg, Idaho. These two corporations are 100% owned by Formation Capital Corporation, a Toronto Stock Exchange listed company based in Vancouver, B. C., Canada.

The Idaho Cobalt Project consists of approximately 2500 acres of unpatented mining claims in the historic Blackbird Co-Cu district of east-central Idaho. Drilling by Formation Capital Corporation since 1995 has defined cobalt-copper-gold (Co-Cu-Au) mineralization in several sub-parallel tabular moderately dipping horizons in two deposits, the Sunshine and Ram deposits. Measured and Indicated mineral resources for both deposits, at a 0.20% Co cutoff total 2.282 million tons grading 0.596% Co, 0.56% Cu, and 0.014 oz Au/ton; based on 163 drill holes totaling 104,798 feet. There have been two pre-feasibility level studies of the Idaho Cobalt Project, most recently in 2001. This Technical Report is a summary of past and recent work on the Idaho Cobalt Project.

1.1 Introduction

Formation Capital Corporation (Formation Capital) has asked Mine Development Associates (MDA) to prepare a NI 43-101 compliant technical report of Formation Capital’s Idaho Cobalt Project located in Lemhi County, Idaho, U.S.A.

The purpose of this report is to present the known information about the Idaho Cobalt Project in a format suitable for release to the public according to the requirements of Canadian National Instrument 43-101 and its companion policy. This report incorporates a summary of historical information, aspects of the MDA 2001 pre-feasibility engineering report, drilling completed by Formation Capital in 2004, and an updated resource estimate for the property, completed in March, 2005. The 2001 report was an update and expansion of Idaho Cobalt Project work done by MDA in 1998 (resource estimate and pre-feasibility study), and in 1999 (review of alternative mining strategies). The metal price and production cost assumptions built into the conversion of the resource estimates to reserve estimates in 2001 are in the process of being updated with a feasibility study, and as such, reserves are not stated for the Idaho Cobalt Project in this report except from an historical perspective in Section 6.0 (History). Progress made by Formation Capital on other fronts since 2001 is updated in this report. These include progress

775-856-5700
210 South Rock Blvd.
Reno, Nevada 89502
FAX: 775-856-6053


  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 2

with permitting, the acquisition of a hydrometallurgical plant, the drilling in 2004 of 28 core holes for 24,869 feet, and a 2005 updated resource estimate for the Sunshine and Ram deposits. A bankable feasibility study for the project is expected to be completed during the third quarter of 2005.

1.2 Property, Mining Rights and Location

The Idaho Cobalt Project consists of 145 unpatented lode mining claims located in east-central Idaho, approximately 26 miles west of the town of Salmon, as shown on the location map in Figure 4.1. The property covers about 2,524 acres centered upon 45° 07' 50" North latitude 114° 21' 42" West longitude. It is within the Gant Mountain 7.5 minute quadrangle of the USGS Topographic Map Series.

Table 4.1 lists the claims that comprise the Idaho Cobalt property and Figure 4.2 shows the claim location. Details of the property holdings and requirements for maintenance of Formation Capital’s mineral rights are provided in Section 4.0. The claims comprising the property are ordinary unpatented mining claims, subject to those federal, state and local regulations that normally apply to such claims in the United States. Property holding costs were some $18,200 in 2004.

1.3 Geology and Mineralization

The Idaho Cobalt Project is situated in the Idaho Cobalt Belt, a 30 – 35 mile long metallogenic district characterized by stratiform copper-cobalt deposits (Staargaard, 1996). The deposits are hosted by a thick, dominantly clastic sequence of Middle Proterozoic age rocks sandwiched between late Proterozoic quartz monzonitic intrusions. The clastic sediments were deposited in a large fault-bounded basin, probably as large submarine fan complexes and/or deltaic aprons that were frequently “drowned” by continuing subsidence within the basin. All significant copper-cobalt deposits and occurrences are found in the Proterozoic age Yellowjacket Formation, which constitutes the base of this marine sedimentary sequence.

The structure of the Yellowjacket Formation is dominated by a regional rift structure. Cobalt-copper-gold mineralization lies adjacent to a northwest-southeast trending structure parallel to and west of the central axis of the rift. The district has also been affected by major northeasterly trending faults.

A number of significant stratiform cobalt-copper-gold deposits and prospects define the Idaho Cobalt Belt. They are associated with two or more distinctive, regional stratigraphic horizons within the Yellowjacket Formation.

Mineralization at the Idaho Cobalt Project is characterized as syngenetic, stratiform, exhalative deposits within, or closely associated with, the mafic sequences of the middle unit of the Yellowjacket Formation. The deposits range from nearly massive to disseminated. Some cross-cutting mineralization is present that may be in feeder zones to the stratiform mineralization. Dominant ore minerals include cobaltite (CoAsS) and chalcopyrite (CuFeS2), with lesser, variable occurrences of gold (Au). Other minerals present in small quantities are pyrite (FeS2), pyrrhotite (Fe1-xS), arsenopyrite (FeAsS), linnaeite ((CoNi)3S4), loellingite (FeAs2), safflorite (CoFeAs2), enargite (Cu3AsS4) and marcasite (FeS2).

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 3

Alteration minerals or types associated with the mineralization include tourmaline, ankerite, biotite, chlorite, muscovite and silicification. The alteration is mostly stratabound and coextensive with the mineralization, though tourmaline and ankerite alteration may extend several thousands of feet beyond the mineralization.

The deposits comprising the Idaho Cobalt Project belong to a class of deposits variably described as “Blackbird Co-Cu” (Evans et. al., 1986) or “Blackbird Sediment-hosted Cu-Co” (Hőy, 1995). The Idaho Cobalt Project lies in the type locality for these deposits and includes some of these type deposits.

1.4 Exploration

Formation Capital has defined through drilling since 1995, two areas of Co-Cu-Au mineralization, referred to as the Sunshine and Ram. A total of 139 holes for 88,606 total feet of core drilling by Formation Capital (163 holes totaling 106,432 feet for the entire database), has defined mineralization in multiple sub-parallel zones of Co-Cu-Au mineralization that are stratiform in nature. The multiple sub-parallel zones, or horizons, comprise the Sunshine and Ram deposits as further described in Sections 7.0 (Geologic Setting) and 17.0 (Mineral Resource Estimates). The larger Ram Deposit consists of five hangingwall horizons, a main zone comprised of three horizons, and three footwall horizons. The Ram main zone horizons, which are the most extensive, typically have mineralized dimensions of 2000-3000 feet in strike extent, by 500-900 feet in vertical extent, and true widths that average about 8 feet (true widths ranges of less than 3 feet to greater than 20 feet for horizon 3023). These sub-parallel horizons generally strike N15W and dip 50-60 degrees to the northeast, and have been drill tested to depths of 1,200 feet vertically. The Sunshine deposit consists of three horizons which have similar strike and dips, but are generally thinner and somewhat less extensive than the Ram main zone.

1.5 Deposit Resources

The most recent drilling to expand the resources was conducted in 2004, and MDA has completed (Prenn, 2005) an updated resource estimate for the Idaho Cobalt Project. The results are a nearly doubling of the 1998 Measured and Indicated Resources, the bulk of those resource additions coming from the Ram deposit. MDA’s methodology and parameters used for the resource estimations are further detailed in Section 17.0 (Mineral Resource and Mineral Reserve Estimates) of this report. Resources have been estimated for multiple mineralized horizons in two mineralized deposits, the Sunshine and Ram deposits. Table 1.1 lists the current combined Measured and Indicated Resources for the Sunshine and Ram deposits. Individual tabulations of Measured, Indicated, as well as Inferred resources are also tabulated and presented in Section 17 of this report.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 4

Table 1.1 Idaho Cobalt Project Deposit Resources @ 0.20 and 0.30% Co Cutoff Measured and Indicated Undiluted Resources (2005)




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 5

Mineralized horizons have not been confined by drilling, as many of the more continuous mineralized horizons are open at depth, beyond most current drilling, and along strike.

1.6 Reserves

Prior work by MDA and Formation Capital staff resulted in the estimation of reserves; most recently as part of an MDA pre-feasibility study in 2001(Prenn, 2001). Those historic reserve estimates are listed in Section 6.0 (History), for documentation purposes only. Updated reserves for the project will be available after completion of the feasibility study likely to occur in September, 2005. Formation Capital has continued with permitting efforts for the Idaho Cobalt Project, and has submitted to the USFS (February 2005) a proposed Plan of Operations to allow for development and mining at the Idaho Cobalt Project. The Plan of Operations is currently in the review process. Mining dilution and recovery of the resources and development and mining costs will be evaluated during the feasibility study.

1.7 Summary and Recommendations

The Idaho Cobalt Project is an advanced stage Co-Cu-Au development property with defined resource in two deposits, in an area of historical mining. Previous work has defined many of the parameters that would allow for development and mining. A full bankable feasibility study is in progress, and Formation Capital anticipates it will be completed during the third quarter of 2005. A program of permitting is underway, as outlined in 19.0 of this report. A permit application has been submitted to complete an underground decline to investigate the rock quality and mineralization.

In support of Formation Capital’s plan to complete a feasibility study, the following are suggested to be completed in parallel with the feasibility study:

This recommended program is described in Section 20.0. It is estimated that it will cost $3.5 to $4.5 million dollars to complete, most of which will be expenditures for engineering aspects of the feasibility study now in progress.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 6

2.0      INTRODUCTION AND TERMS OF REFERENCE
 
2.1      Terms of Reference and Purpose of Report
 

Formation Capital Corporation (Formation Capital) has asked Mine Development Associates (MDA) to prepare a technical report based on MDA’s 2001 pre-feasibility study of Formation Capital’s Idaho Cobalt Project in Lemhi County, Idaho, U.S.A., and to include an updated resource based on 2004 drilling.

In 1998 the technical staff of Formation Capital completed a resource estimate (Formation Capital Corporation, US Field Staff, 1998). MDA audited Formation Capital’s estimate of the Idaho Cobalt Project (then Sunshine project) resources in June, 1998. For the audit, MDA visited the Formation Capital field office in Salmon, Idaho, reviewed all the data, reviewed and checked original assays and the digital database, reviewed and sampled some of the core, and visited both Formation Capital’s property and the adjacent Blackbird Mine property. The audited resources were incorporated into a pre-feasibility study (Prenn, October 1998).

In October 1999 Formation Capital proposed some alternative mining and operating strategies that might reduce costs, and MDA responded with a memo showing how the alternative strategies might affect costs (Prenn, 1999a). In December 1999 Mine Development Associates issued an update to the reserve and economic estimates (Prenn, 1999b).

In May of 2001 Mine Development Associates updated the pre-feasibility study (Prenn, 2001), with new information, including 11 exploration drill holes completed in 1999, and 8 holes drilled in 2000 to obtain samples for metallurgical testing. MDA prepared resource and reserve estimates for the Ram main and footwall zones, based on a pre-feasibility study completed during 2001.

This report incorporates much of the 2001 pre-feasibility report (see Section 6.3 through 6.9 of the History section of this report). The information and assumptions incorporated into the 2001 resource estimates are in need of updating. Metal prices have improved since 2001, and the resource estimates have changed. These and other factors will be evaluated in a feasibility study planed for completion in the second half of 2005.

Progress made by Formation Capital on other fronts since 2001 is updated in this report. These include progress with permitting, the acquisition of a hydrometallurgical plant, and 24,864 feet of drilling in 28 holes at the Ram deposit in 2004. The resource has been updated by MDA as a result of the 2004 drilling (Prenn, 2005).

The purpose of this report is to present a summary of the new project resources and summarize historical project information for the Idaho Cobalt Project, in a format suitable for release to the public according to the requirements of Canadian National Instrument 43-101 and its companion policy.

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 7

2.2 Sources of Information and Data

This report relies heavily on information provided to MDA by Formation Capital. It also makes use of technical information provided by other professionals, as described:

Input to the 1998 pre-feasibility study was provided by Dr. Corby Anderson of The Center for Advanced Mineral and Metallurgical Processing (mill and hydrometallurgical plant design), David Drips of Mineral Resources Engineering (mine plan review), Steve Thomas (capital and operating cost review), Brent Bailey (permitting time and cost estimates), Dave Stone of MineFill Services (geotechnical and tailings dam cost estimates) and Patrick Fadyshen of NiCo Metal Sales Inc. (cobalt market evaluation).

In the 2001 pre-feasibility report, input was provided by Dr. Corby Anderson of The Center for Advanced Mineral and Metallurgical Processing (mill and hydrometallurgical plant design and contribution to operating costs), Brent Bailey (permitting time and costs estimates), Dave Stone of MineFill Services (geotechnical and tailings dam cost estimates) and staff of Formation Capital Corporation (all aspects of the study).

The report also makes use of information from commercial suppliers of equipment and services, information available in the public domain, and to a minor degree, other sources. All information obtained from parties other than MDA is identified where it appears in the text and the sources are acknowledged. An extensive reference list is provided in Section 21.

Figures and Tables in this report are numbered in reference to the Section in which they occur, with the last digit representing the sequential numbering for those figures and tables.

2.3      Field Involvement by Report Authors
 
2.3.1      Neil B. Prenn, P.E.
 

Neil Prenn completed a number of site visits between 1997 and 2005; and is a “Qualified Person” for the purpose of this report.

2.3.2 Allan V. Moran, C.P.G.

Allan Moran has not participated in any of the field work incorporated into this report, nor has he visited the Idaho Cobalt Project in the field; and he is a “Qualified Person” for the purpose of this report.

2.4      Definitions of Terms
 
2.4.1      Units of Measure
 

Throughout this report, the units of measure used are those commonly employed in the United States for mineral engineering work. The metric system is not used. The following list of conversions is provided for the convenience of readers more familiar with the metric system.

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project             
                 Formation Capital Corporation    Page 8 
 
Linear Measure                 
1 inch (in.)                           = 2.54 centimeters         
1 foot (ft)                           = 0.3048 meter         
1 yard (yd)                           = 0.9144 meter         
1 mile (mi)                           = 1.6093 kilometers         
Area Measure                 
1 acre                           = 0.4047 hectare         
1 square mile                           = 640 acres                       = 259 hectares         
Weight                     
1 short ton                           = 2000 pounds                       = 0.9072 tonne (metric ton)     
1 pound                           = 16 oz                       = 0.454 kg    = 14.583 troy ounces 
Analytical Values    percent    grams per    troy ounces per     
            metric tonne    short ton     
1%        1%    10,000    291.667     
1 gm/tonne (g/t)    0.0001%    1    0.0291667     
1 oz troy/short ton    0.003429%    34.2857    1     
 
2.4.2 Acronyms                 
 
Frequently used acronyms are listed below.             
 
AA    Atomic absorption spectroscopy         
BMC    Blackbird Mining Company, jointly owned by Noranda Inc. and Hanna Mining 
    Company, formed for the purpose of operating the Blackbird Mine     
BTE    Biotite-rich tuffaceous exhalative rock (see also STE)     
CSB    Carbonate-stable bedrock             
CLB    Carbonate-leached bedrock             
CN    Cyanide             
CNS    Cyanide soluble             
CNSCu    Cyanide soluble copper             
CV    Coefficient of variation (CV)             
cy    Cubic yard             
Formation Capital:    Formation Capital Corporation, and/or Formation Capital Corporation U.S. 
g/t    Grams per tonne             
LHD    Load-haul-dump vehicle             
MDA    Mine Development Associates         
NSR    Net Smelter Return (usually given as $/ton)         

NPDES    As authorized by the Clean Water Act, the National Pollutant Discharge Elimination 
    System (NPDES) permit program controls water pollution by regulating point sources 
    that discharge pollutants into waters of the United States. Point sources are discrete 
    conveyances such as pipes or man-made ditches. In most cases, the NPDES permit 

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 9

program is administered by authorized states. As of 08 January 2004, Idaho is not an authorized state (source: http://cfpub.epa.gov/npdes/statestats.cfm).

opt    Ounces troy per short ton 
OVB    Overburden 
ppm    Parts per million 
QQ    Quantile-Quantile Plot; plot defining and portraying sample populations 
RQD    Rock Quality Designation (see Glossary, below) 
STE    Siliceous tuffaceous exhalative rock (see also BTE) 

2.4.3 Glossary of Mining, Geological and Other Technical Terms

adamellite    A medium- to coarse-grained igneous rock containing major plagioclase, 
    orthoclase, and quartz, with minor biotite, hornblende, and accessory 
    apatite, zircon, and opaque oxides. 
anadromous fish    Anadromous fish spend most of their adult lives in salt water, and migrate 
to freshwater rivers and lakes to reproduce.
diamond drilling    In the mineral industry, “diamond drilling” is synonymous with “core 
    drilling” and refers to drilling methods designed to produce a cylinder of 
    rock cut from the sub-surface. It does not mean drilling done for the 
    purpose of finding diamonds. 
diaper    A spherical, elliptical, or teardrop-shaped body of flowing (ductile) solid 
    rock which rises toward the surface due to its low density compared to that 
    of the enclosing rocks. 
diatreme    A breccia-filled (ie fragment-filled) volcanic pipe that was formed by a 
    gaseous explosion. 
dore    A mixture of gold and silver poured into molds when molten to form 
    buttons or bars. Further refining is necessary to separate the gold and 
    silver. 
electrowinning    An electrochemical process in which a metal dissolved within an 
    electrolyte solution is plated onto an electrode. A metallurgical process 
    used to recover metals such as cobalt, copper, gold, and nickel from 
    solution in the leaching of ores, concentrates, precipitates, matte, etc. 
exhalite    A term used to describe the geologic process of fluid “exhalations” (also 
    volcanic rock exhalations) from the sea-floor that become chemical 
    precipitates such as sulfides, and silica (and tuffaceous volcanic rocks). It 
    is also used to describe the resulting rock derived from those exhalations 
    that forms on the sea-floor and becomes part of the layered sedimentary 
    strata. 
lamproite    A group name for dark-colored shallow intrusive or extrusive rocks rich in 
    potassium and magnesium. 

Mine Development Associates April 30, 2005



                             Technical Report, Idaho Cobalt Project     
                                                                                                         Formation Capital Corporation    Page 10 
 
Laramide    A time of large-scale geological deformation, typically recorded in the 
eastern Rocky Mountains of the United States.
raffinate    In hydrometallurgy, an aqueous solution remaining after the metal has 
    been extracted by the solvent; the tailing of the solvent extraction system. 
Rock Quality Designation    As used at the Idaho Cobalt Project, the percentage of NQ-sized core four 
    inches in length or longer in a drill run. NQ core is 1.875 inches (47.6 
    millimeters) in diameter.     
slusher    A machine used for loading coal or rock by pulling an open-bottomed 
    scoop back and forth between the face and the loading point by means of 
    ropes, sheaves, and a multiple drum hoist. The filled scoop is pulled on the 
    bottom to an apron or ramp where the load is discharged onto a car or 
    conveyor.     
stope    Any excavation in a mine, other than development workings, made for the 
    purpose of extracting ore. The outlines of the orebody determine the 
    outlines of the stope. The word is also used as a verb to describe breaking 
    ground by drilling and blasting or other methods for the purpose of 
    creating a stope.     

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 11

3.0 DISCLAIMER

MDA has relied on data and information provided by Formation Capital and many of the conclusions made in this report are based entirely on this data. Though MDA has reviewed much of the available data and visited the project site, these tasks are dwarfed by the amount of data that exists. That said, MDA believes the data presented by Formation Capital are generally an accurate and reasonable representation of the Idaho Cobalt Project.

Formation Capital has provided copies of legal documentation regarding the land position and unpatented mining claims covering the Idaho Cobalt Project. Although MDA is not a “Qualified Person” for assessing the validity of unpatented claims, Formation Capital has completed a due diligence review of the claims and has stamped copies of the payment of claim holding fees for 2004-2005 from the BLM and Lemhi County. The documentation provided by Formation Capital is referenced or included in Section 4.0 (Property Description and Location) of this report.

MDA did not investigate the environmental or social-economic issues associated with the Idaho Cobalt Project and the authors are not “Qualified Persons” for these issues. These issues are being addressed by the current permitting program of Formation Capital.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 12

4.0 PROPERTY DESCRIPTION AND LOCATION

The Idaho Cobalt Property consists of 145 unpatented lode mining claims located in east-central Idaho, approximately 25.8 miles west of the town of Salmon, as shown on the location map of Figure 4.1. The property covers 2,5241 acres centered upon 45° 07' 50" North latitude 114° 21' 42" West longitude. It is within the Gant Mountain 7.5 minute quadrangle of the USGS Topographic Map Series. (Pegg, 1997). More specifically the Idaho Cobalt Project unpatented mining claims are located in Sections 8, 9, 15, 16, 17, 20, 21, and 22, Township 21 North, Range 16 East. The claim block is within the Salmon-Cobalt Ranger District of the Salmon-Challis National Forest (Formation Capital, 2005); lands under surface-use administration by the United States Forest Service (USFS). Table 4.1 Lists the claims that comprise the Idaho Cobalt Project, and Figure 4.2 is a map showing location of the claims.

4.1 Documentation of the Status of the Mineral Claims

Ownership of unpatented mining claims in the U.S. is in the name of the holder (locator), with ownership of the minerals belonging to the United States of America, under the administration of the U.S. Bureau of Land Management (BLM). Under the Mining Law of 1872 which governs the location of unpatented mining claims on Federal lands, the locator has the right to explore, develop, and mine minerals on unpatented mining claims without payments of production royalties to the Federal government. It should also be noted that in recent years there have been U.S. Congressional efforts to change the 1872 mining law, to include the provision of federal production royalties; however, currently annual claim maintenance and filing fees are the only federal encumbrances to unpatented mining claims. Idaho BLM records of mining claims can be searched on-line at www.blm.gov/lr2000

Copies of individual unpatented mining claim notices and the detailed map showing their locations are on file with the BLM office in Salmon, Idaho, and with the Lemhi County Recorder’s office in Salmon, Idaho. The claim notices and maps on file with the BLM and Lemhi County constitute the legal descriptions of the unpatented mining claims; and the claim locations in the field take precedence should there be a discrepancy with descriptions or maps. The BLM serial numbers (IMC numbers) for each claim or claim group are listed in Table 4.1, and are sufficient information to identify specific claims and their detailed description and map which are on file.

The present Idaho Cobalt Project property position consists of 145 unpatented claims. Evidence of the current status of the claims has been obtained from the following documents:

A receipt for $20,375 issued by the United States Bureau of Land Management (BLM), acknowledging payment of the annual filing fees for 163 claims, with an attached list of claims, “Appendix A”. The receipt is dated August 26, 2004. The list of claims, prepared by Formation Capital, is date-stamped as having been received August 26, 2004 by the BLM. 145 of the claims comprise the Idaho Cobalt Property as listed in Table 4.1. The other 18 claims are in another area, are not part of the Idaho Cobalt Project. The total BLM fee for the Idaho Cobalt Project claims is $18,125.

1 ( area stated in Formation Capital’s BLM Plan of Operation dated Feb. 2005)

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 13

An “Affidavit of Payment of Claim Maintenance Fees and Notice of intention to Hold unpatented Mining Claims”, prepared by Formation Capital and bearing a date-stamp by Lemhi County indicating that it was received September 17, 2004, with filing fees payment of $85.00. Appendix A to this document is identical to Appendix A of the document described above. A total of $76 is for the Idaho Cobalt Claims.

An electronic copy of a letter dated February 18, 2005 from the law firm of Marcus, Merrick, Christian & Hardee, LLP captioned “Re: Title opinion update for Lemhi County mining claims”. Item II of the title opinion states that “Based upon our examination of these sources, it is our opinion that the Claims have been recorded with the BLM and in Lemhi County, Idaho, and that record title to the Claims is vested as shown on Exhibit A hereto, subject to the exceptions stated herein.” (The exceptions are described in Section 4.2 of this report - MDA)

An electronic copy of a table prepared by Formation Capital labeled “Exhibit A”. The Table contains a listing of 163 claims, 145 of which are part of the Idaho Cobalt Project. This electronic copy of “Exhibit A” is presumed by MDA to correspond to Exhibit A of the title opinion described above.

An electronic copy of a Quitclaim Deed dated February 27, 2004, between Northwest Minerals Inc. (a Nevada Corporation), and Formation Capital Corporation U.S. (a Nevada Corporation), in consideration of the sum of $19,880.00; deeding 136 claims from Northwest Minerals Inc. to Formation Capital Corporation U.S.; date stamped as received by the Lehmi County Recorder on March 9, 2004 with filing fees paid of $15.00; and date stamped as received by the BLM on March 11, 2004 with filing fees paid of $680.00. MDA noted that 118 of the claims in “Exhibit A” to the Quitclaim Deed are with the same names and BLM serial numbers (IMC#) as the group of 145 claims which are part of the Idaho Cobalt Project. The 136 claims are denoted by MDA in Table 4.1 as “FCC” in the ownership column.

Mine Development Associates April 30, 2005



    Technical Report, Idaho Cobalt Project                 
                                           Formation Capital Corporation         Page 14 
 
 
Table 4.1 Claims Comprising the Idaho Cobalt Project
 
 
            BLM/IMC                BLM/IMC     
Owner    Claim Name    #    County #    Owner    Claim Name    #    County # 
FCC    SUN 1        174156    222991    FCC    LDC-1    174579    224140 
FCC    SUN 2        174157    222992    FCC    LDC-2    174580    224141 
FCC    SUN    3    174158    245690    FCC    LDC-3    174581    224142 
    Amended                             
FCC    SUN 4        174159    222994    FCC    LDC-4    174582    224143 
FCC    SUN 5        174160    222995    FCC    LDC-5    174583    224144 
FCC    SUN 6        174161    222996    FCC    LDC-6    174584    224145 
FCC    SUN 7        174628    224162    FCC    LDC-7    174585    224146 
FCC    SUN 8        174629    224163    FCC    LDC-8    174586    224147 
FCC    SUN 9        174630    224164    FCC    LDC-9    174587    224148 
FCC    SUN    16    177247    245691    FCC    LDC-10    174588    224149 
    Amended                             
FCC    SUN    18    177249    245692    FCC    LDC-11    174589    224150 
    Amended                             
                    FCC    LDC-12    174590    224151 
FCC    SUN FRAC 1    176755    228059    FCC    LDC-13 Amended    174591    248718 
FCC    SUN FRAC 2    176756    228060    FCC    LDC-14 Amended    174592    248719 
                    FCC    LDC-16    174594    224155 
FCC    TOGO 1        176769    228049    FCC    LDC-18    174596    224157 
FCC    TOGO 2        176770    228050    FCC    LDC-20    174598    224159 
FCC    TOGO 3        176771    228051    FCC    LDC-22    174600    224161 
 
                    FCC    LDC FRAC 1 Amended    175880    248720 
                    FCC    LDC FRAC 2 Amended    175881    248721 
 
                    FCC    LDC FRAC 3 Amended    175882    248722 
                    FCC    LDC FRAC 4 Amended    175883    248723 
                    FCC    LDC FRAC 5 Amended    175884    248724 
FCC    RAM 1        176757    228501    FCC    HZ 6    174644    224414 
FCC    RAM 2        176758    228502    FCC    HZ 7    174645    224415 
FCC    RAM 3        176759    228503    FCC    HZ 8    174646    224416 
FCC    RAM 4        176760    228504    FCC    HZ 9    174647    224417 
FCC    RAM 5        176761    228505    FCC    HZ 10    174648    224418 
FCC    RAM 6        176762    228506    FCC    HZ 11    174649    224419 
FCC    RAM 7        176763    228507    FCC    HZ 12    174650    224420 
FCC    RAM 8        176764    228508    FCC    HZ 13    174651    224421 
FCC    RAM 9        176765    228509    FCC    HZ 14    174652    224422 
FCC    RAM 10        176766    228510    FCC    HZ 15    178085    231338 
FCC    RAM 11        176767    228511    FCC    HZ 16    178086    231339 
FCC    RAM 12        176768    228512    FCC    HZ 18    178087    231340 
                    FCC    HZ 19    174657    224427 
FCC    RAM    13    181276    245700    FCC    HZ 20    174658    224428 
    Amended                             

Mine Development Associates April 30, 2005



    Technical Report, Idaho Cobalt Project                 
                                           Formation Capital Corporation         Page 15 
 
            BLM/IMC                BLM/IMC     
Owner    Claim Name    #    County #    Owner    Claim Name    #    County # 
FCC    RAM    14    181277    245699    FCC    HZ 21    174659    224193 
    Amended                             
FCC    RAM    15    181278    245698    FCC    HZ 22    174660    224194 
    Amended                             
FCC    RAM    16    181279    245697    FCC    HZ 23    174661    224195 
    Amended                             
                    FCC    HZ 24    174662    224196 
FCC    RAM FRAC 1    178081    245696    FCC    HZ 25    174663    224197 
    Amended                             
FCC    RAM FRAC 2    178082    245695    FCC    HZ 26    174664    224198 
    Amended                             
FCC    RAM FRAC 3    178083    245694    FCC    HZ 27    174665    224199 
    Amended                             
FCC    RAM FRAC 4    178084    245693    FCC    HZ 28    174666    224200 
    Amended                             
FCC    DEWEY FRAC    177253    248739    FCC    HZ 29    174667    224201 
    Amended                             
FCC    HZ 1        174639    224173    FCC    HZ 30    174668    224202 
FCC    HZ 2        174640    224174    FCC    HZ 31    174669    224203 
FCC    HZ 3        174641    224175    FCC    HZ 32    174670    224204 
FCC    HZ 4        174642    224176                 
FCC    HZ 5        174643    224413    FCC    HZ FRAC    177254    228967 
FCC    JC 1        174631    224165    FCC    TINK 1    177010    228721 
FCC    JC 2        174632    224166    FCC    TINK 2    177011    228721 
FCC    JC 3        174633    224167    FCC    TINK 3    177012    228719 
FCC    JC 4        174634    224168    FCC    TINK 4    177013    228718 
FCC    JC 5 Amended    174635    245689    FCC    TINK 5    177014    228717 
FCC    JC 6        174636    224170    FCC    TINK 6    177015    228716 
FCC    JC FR 7        174637    224171    FCC    TINK 7    177016    228715 
FCC    JC FR 8        174638    224172    FCC    TINK 8    177017    228714 
FCC    JC 9        176750    228054    FCC    TINK 9    177018    228713 
FCC    JC 10        176751    228055    FCC    TINK 10    177019    228712 
FCC    JC 11        176752    228056    FCC    TINK 11    177020    228711 
FCC    JC 12        176753    228057    FCC    TINK 12    177021    228710 
FCC    JC 13        176754    228058    FCC    TINK 13    177022    228709 
FCC    JC 14        177250    228971    FCC    TINK 14    177023    228708 
FCC    JC 15        177251    228970    FCC    TINK 15    177024    228707 
FCC    JC 16        177252    228969    FCC    TINK 16    177025    228706 
                    FCC    TINK 17    177026    228705 
                    FCC    TINK 18    177027    228704 
FCC    GOOSE 2        175863    227302    FCC    SOUTH ID 1 Amended    175874    248725 
FCC    GOOSE 3        175864    227285    FCC    SOUTH ID 2 Amended    175875    248726 
FCC    GOOSE 4        175865    227286    FCC    SOUTH ID 3 Amended    175876    248727 
FCC    GOOSE 6        175867    227282    FCC    SOUTH ID 4 Amended    175877    248717 
FCC    GOOSE 7        175868    227283    FCC    SOUTH ID 5 Amended    176743    248715 
FCC    GOOSE 8        175869    227284    FCC    SOUTH ID 6 Amended    176744    248716 
FCC    GOOSE 10        175871    227279                 
 
Mine Development Associates                         
April 30, 2005                             



    Technical Report, Idaho Cobalt Project                     
                                       Formation Capital Corporation         Page 16 
 
        BLM/IMC                    BLM/IMC     
Owner    Claim Name    #    County #    Owner    Claim Name    #    County # 
FCC    GOOSE 11    175872    227280    FCC    CHELAN    NO.    1 175861    248345 
                    Amended             
FCC    GOOSE 12    175873    227281                     
                FCC    Chip 1        184883    248956 
FCC    GOOSE 13    176729    228028    FCC    Chip 2        184884    248957 
FCC    GOOSE 14    176730    228029                     
FCC    GOOSE 15    176731    228030    FCC    JC 17        187091    259006 
FCC    GOOSE 16    176732    228031    FCC    JC 18        187092    259007 
FCC    GOOSE 17    176733    228032    FCC    JC 19        187093    259008 
FCC    GOOSE 18    176734    228033    FCC    JC 20        187094    259009 
FCC    GOOSE 19    176735    228034    FCC    JC 21        187095    259010 
FCC    GOOSE 20    176736    228035    FCC    JC 22        187096    259011 
FCC    GOOSE 21    176737    228036                     
FCC    GOOSE 22    176738    228037                     
FCC    GOOSE 23    176739    228038                     
FCC    GOOSE 24    176740    228039                     
FCC    GOOSE 25    176741    228040                     

Notes:    Table copied, with minor re-formatting, from the electronic document “Claims (2004).doc” received from 
    Formation Capital Corporation in April 2005. 
    The Tink claims were included in all claim documents received by MDA from Formation Capital in April. They 
    are not, however, part of the Idaho Cobalt Project; but belong to another project. They are shown thus to indicate 
    a deletion by MDA. 
    “FCC” = Formation Capital Corporation; “FCC” = Quitclaim deeded from Northwest Minerals Inc. to 
    Formation Capital Corporation U.S. Feb. 27, 2004 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 17

Figure 4.1 Project Location Map




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 18

Figure 4.2 Idaho Cobalt Project - Claims Map




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 19

4.2 Exceptions to Title Opinion

In their February 18, 2005 title opinion, Marcus, Merrick, Christian & Hardee noted what they referred to as Exceptions to Title Opinion, which they listed as follow:

Our opinion regarding title to the Claims is subject to the following exceptions:

  a. Paramount title of the United States
.

b. The right of the United States Department of Agriculture (National Forest Service) to manage the surface resources and protect the National Forest from depredation. This right is coextensive with the claimants’ rights to use their claims for mining purposes.

c. The effect of state and federal regulations pertaining to mining, including the requirement of an approved operating plan and reclamation bond, water quality requirements, and other requirements for mitigation of environmental impact from mining and related activities. We do not believe that these regulations impose an unusual risk to claim owners, although specific reclamation, mitigation or protective measures which may be requested or required may add to the cost of operation. d. Any conflicting unpatented mining claims (including extralateral rights associated with other mining claims). We found no active mining claims in conflict with the area of Claims reflected in the geographic index maintained by the BLM.

e. Defects in the descriptions of the Claims contained in original location notices and any amendments thereto and BLM records.

f. Documents affecting title recorded in Lemhi County or with the BLM but not indexed or improperly indexed.

g. Restrictions relating to water rights and ingress and egress to and from the claims. Use of water from established streams requires filing with the Idaho Department of Water Resources

h. Encumbrances or conveyances of title recorded after November 19, 2003.

i. Rights, claims of persons in possession, or other unrecorded interests, not shown in public records.

j. Easements or rights of way not shown by public records.

k. Any lien, or right to a lien for services, labor or materials heretofore or hereafter furnished, imposed by law and not shown by public records.

l. Taxes or special assessments not shown as existing liens by public records.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 20

m.      Discrepancies, conflicts in boundary lines, shortage in area, encroachments and any facts which a correct survey and inspection of the Claims would disclose.
 
n.      The validity of the Claims as to the discovery of valuable minerals thereon.
 
o.      The correct and timely posting of the discovery pit and corners and the maintenance thereof, as required by state and federal law.
 
p.      The location of any of the Claims on property not open to mineral location.
 
r.      As we noted in our 1997 title opinion, no affidavits of assessment work were filed or recorded with respect to the Claims, and no proof of payment of claim maintenance fees for certain of the Claims was recorded in Lemhi County, in 1994. Idaho law requires the recording of an affidavit of assessment work within sixty days of the time set for the
 

performance of such work unless “the performance of annual labor is suspended, extended or waived by act of Congress of the United States, and the provision is therein made for filing or recording a notice, affidavit or statement by the claimant . . . accepting the provisions of said act,” in which event such substitute notice is to be recorded as an affidavit of assessment work would otherwise be recorded. Idaho Code § 47-606. The General Mining Law was amended in 1993 to provide for payment of a claim maintenance fee for unpatented mining claims “in lieu of” performance of assessment work and filing of an affidavit attesting to such work. 30 U.S.C. § 28f(a). This amendment likely constituted a “waiver” of the requirement for annual assessment work. The required maintenance fee was paid for all of the claims for each year since 1994. However, the federal law as amended made no specific provision “for filing or recording a notice, affidavit or statement by the claimant . . . accepting the provisions of said act.” A strict reading would result in the conclusion, therefore, that the recording of affidavits of assessment work in the county is still required under Idaho law, even though annual assessment work is not required under federal law upon payment of the claim maintenance fee. However, Idaho law provides that failure to make the required recording constitutes only “prima facie evidence” (i.e., a rebuttable presumption) that annual labor has not been performed. Since the federal law expressly waives the requirement of performing annual assessment work if a claim maintenance fee is paid, and proof of actual payment of the claim maintenance fee is still possible, no adverse result is likely from the failure to file affidavits of assessment work or proof of payment of claim maintenance fees. A related federal law, the Federal Land Policy and Management Act (“FLPMA”), requires a claimant to file and record a notice of intent to hold a claim each calendar year following the year in which the claim was located, where the requirement of annual assessment work has been “deferred or suspended.” 43 U.S.C. § 1744. This requirement was satisfied for each of the Claims.”

Note: Item “q” was not listed in the Title Opinion. MDA notes that Item “q” was in previous title opinions and stated . . .”The effect, if any, of that Agreement between Formation Capital Corporation and Northwest Minerals, dated July 1, 1994, regarding some or all of the Claims.” Section 4.4 of this report notes the agreement between Northwest Minerals Inc. and Formation Capital Corporation U.S. for 71 of the original claims at the Idaho Cobalt Project; and that Section 4.1, item 5, describes a

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 21

transfer of 118 Idaho Cobalt Project claims from Northwest Mineral Inc. to Formation Capital Corporation U.S. In addition, the list of claims shown in Table 4.1 indicates that all claims for the Idaho Cobalt Project are now owned by Formation Capital.

4.3 Requirements to Maintain the Claims in Good Standing

In order to maintain the claims in good standing, Formation Capital must pay annual claim maintenance and filing fees to the U.S. Bureau of Land Management (BLM) before September 1st of each calendar year. In 2004 those fees were approximately $125.00 per claim, for a total of $18,125.00. The company must also file a notice of their intention to hold unpatented mining claims with the Lemhi County recorder before October 1st of each year. In 2004 the cost to file that notice was $76.00.

4.4 Environmental Liabilities

The Idaho Cobalt Project is located in an area which is environmentally sensitive (Formation Capital staff, 1998 resource report). Adjacent to the Idaho Cobalt Project, on the Blackbird property, Noranda Inc. and U.S. federal agencies worked together on a remediation program. Formation has received legal advice regarding environmental matters and has been advised that, should it make a decision to put the Idaho Cobalt Project into production, it should be able to acquire the necessary permits providing it follows the required permitting procedures. See Section 6.6 of this report for a discussion of permitting, as detailed in the 2001 pre-feasibility report (Prenn, 2001), and Section 19.1 for an update on the current status of permitting.

Current Plan of Operations filed with the USFS (Section 4.6 Permits and Licenses) specify operating and reclamation procedures; however, the activities to date have been deemed by the USFS to be of minimal impact, and did not require the need for an Environmental Impact Statement (EIS) or Environmental Assessment (EA). Drilling programs conducted by Formation Capital since 1997 have been deemed to have no effects upon anadromous or resident fish or their habitat, no effect upon threatened, endangered or sensitive wildlife or plants, and no effects to heritage resources.

4.5 Permits and Licenses

Surface ownership of the unpatented mining claims is US Forest Service (USFS) administered federal public lands; designated as “multiple use” public lands in the Salmon-Challis National Forest. Surface use activities are regulated by the permitting process through the USFS. Current operating permits are related to surface disturbances resulting from drilling activities of Formation Capital. Prior to 1997 the activities of Formation Capital were on existing roads and/or consisted of non-surface disturbing work such as mapping and sampling. Drilling activities by Formation Capital since 1997 have been approved by USFS permits as listed below. Each Plan is covered by a bond in the amount stated, to cover costs of reclamation of newly constructed drill roads and sites. Drill sites were reclaimed annually, such that all drill sites have been reclaimed, and all drill roads are still in place for possible future use which are permitted under the Plan of Operation, listed in Table 4.2, with the USFS. To date there have been 9.0 acres of disturbance which is covered by the Formation Capital listed bonds in place with the USFS.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 22

Table 4.2 Idaho Cobalt Project Bonding for Exploration

A comprehensive Plan of Operations was submitted to the USFS by Formation Capital in February, 2005 (Formation, 2005), and is currently in the review process. This Plan of Operation, when approved, will allow for development and mining at the Idaho Cobalt Project. Many of the baseline studies were completed in 2004 (see Table 19.1), and the results incorporated into Formation Capital’s 2005 Plan of Operations.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 23

5.0      ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY
 
5.1      Access
 

Vehicle access to the Idaho Cobalt Project (ICP) is via a series of well-maintained public-access gravel roads which lead west from a point on paved Highway 93, six miles south of Salmon, Idaho (Figure 5.1) . This gravel road leading to Noranda’s closed Blackbird Mine, which the Idaho Cobalt Project surrounds, is kept drivable year round. The total distance from Salmon, Idaho to the ICP proposed mill site is a distance of about 48 miles. Numerous gravel roads, passable during most snow-free periods, extend out from the minesite and provide good access to most of the project area. (Pegg, 1997)

5.2      Physiography and Climate
 
5.2.1      Physiography
 
According to Noranda’s 1982 Feasibility report;

The terrain in the mine area is made up of slopes approaching 35° , cut by narrow valleys. The orebody2 outcrops between the 7400 and 7800 ft. elevations with most facilities located at the 6850 ft. elevation.

“Soils in the area are generally comprised of sandy loam averaging five feet in depth, with frequent rock outcroppings.”

Bedrock exposure amounts to only about 1 to 3 percent of the property area. Large areas of felsenmeer (synonym: boulder field) are found in many places along the higher mountain ridges. (Pegg, 1997)

5.2.2 Climate

A “final” Environmental Impact Statement produced for Noranda in 1982 stated that;

“ the closest community is Cobalt, located 6 miles east-southeast of the mine site on Panther Creek, nearly 2,000 feet lower in elevation than the mine. The climatology of the Blackbird Mine site has been assessed by analyzing data from on-site meteorological measurements at the mine and from the national Weather Service data collected at Cobalt and at Salmon, Idaho.

“During the summer season, the region experiences a cool and dry climate with occasional thunderstorms. The summer months are characterized by low relative humidity, less than 25 percent, and frequent sunshine. The mountainous terrain surrounding the site diminishes the

2 “orebody” in this instance refers to the Blackbird deposit, which is not part of the Idaho Cobalt Project but which is surrounded by the Idaho Cobalt Project.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 24

strength of winter storms in the valley. Elevation, topography, vegetation, and available moisture all influence the micro-climate of the mine site area.

“The prevailing westerly winds which flow over the mine site area are considerably altered near the ground by the local topographic features. The sharp canyon and ridge type topography of the area causes local channeling of winds and daily … wind flow patterns. The valley formed around Blackbird Creek is oriented northwest-southeast and thus tends to channel winds into these two directions. The combined effects of direct channeling caused by physical barriers to wind flow and the upslope and downslope flows created by diurnal heating and cooling … create a complex wind flow pattern.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 25

Figure 5.1 Idaho Cobalt Project – Access Map




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 26

“The data record indicates that relatively light winds, less than 11 mph, occur 64 percent of the time. This demonstrates the sheltering effect of the mountainous terrain from the upper level gradient winds. Strong winds, greater than 30 mph, were recorded only two percent of the time and were always from the north. These instances of high winds are probably associated with outbreaks of cold air during periods of frontal activity.”

“The annual average temperature at the mine site is 36° F (based on nine years of data). Average maximum temperature ranges from 75° F in July to 25° F in January. The average minimum temperatures range from 5° F in January to 42° F in July. The most extreme temperatures observed at the site during the period 1951 to 1960 range from -26° F to 91° F (U.S. forest Service 1980).”

A 1943 report by Anderson described the precipitation of the area:

“Rainfall records are not available (in 1943) but there is probably considerable variation in precipitation in the higher and lower parts of the district. The precipitation may not exceed 20 inches along Panther Creek, but may total more than 25 inches on the higher ridges and peaks. The first six months of the year are generally the wettest, and August, the driest. From late June to late August or early September, much of the precipitation falls during heavy showers of short duration, storms of several days length being rare; but during much of the remainder of the year storms are likely to be prolonged for several days. There is rarely more than 2 or 3 feet of snow along Blackbird Creek and much of it is gone by April or May.”

According to the 1982 Environmental Impact Statement;

Precipitation in the area varies with topography. Mean annual precipitation for Cobalt, Idaho at altitude 5600’ is 18.4 inches … . Limited data indicate that annual precipitation near the mine at altitude 6800’ is approximately 5.3 inches greater (23.7 inches) … . Most of the precipitation in the Blackbird area occurs as snow. Snow course data from two locations near Blackbird Creek indicate average expected snow accumulation of 50 inches in the upper parts of the drainage, with an average water content of 16 inches.

“Early spring runoff is variable depending on temperature fluctuations. Heavy snowmelt runoff occurs during late spring, tapering off through June. Peaks from snowmelt runoff can occur from mid May to mid June. June runoff is also supplemented by precipitation events. Intense summer thunderstorms may occur causing discharge peaks of short duration. Low stream flow periods occur during the summer, fall, and winter.

5.2.3 Vegetation

Lodgepole pine, Douglas fir, Englemann spruce, juniper and deciduous trees grow on the higher parts of the property. Grasses and sage bushes cover the valleys and lower slopes. (Pegg, 1997)

During the summer of 2000 a fire in the area burned over 200,000 acres including the area of the Idaho Cobalt Project. As a consequence, the area now contains unburned stands, areas of burned ground fuels

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 27

where the canopy closure was relatively low and ladder fuels were not present, and areas completely burned where the combination of vegetation favored fire.

5.3 Local Resources and Infrastructure

The town of Salmon, about 26 miles (air miles) east of the property, had, in 2000, a population of about 3,120 people (www.city-data.com, 2005). It is a local supply and transportation center, with a small airport. In 1997 there were daily scheduled flights to Idaho Falls and semi-weekly flights to Boise, the state capital (Pegg, 1997). MDA has not determined whether current air service to Salmon is similar to what it was in 1997. The nearest railroad is at Dubois, a smaller town 100 miles to the southeast of Salmon.

A 4 MW power line extends from the town of Cobalt to BMC’s Blackbird Mine site.

Although the town of Salmon is not a community that currently provides services for mining activities, it has functioned in that way for past mining activities at Noranda’s former Blackbird mine, and at Meridian Gold’s former Beartrack gold mine; as a location for personnel housing and a staging point for mine support services.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 28

6.0 HISTORY

Much of sections 6.0 and 6.1 are summarized from Report on the Reserve/Resource Estimates for Sunshine Lode, East Sunshine and Ram Prospects, Sunshine Property, Idaho U.S.A. by Formation Capital Corporation US Field Staff, April 1998 (Formation 1998). Sections 6.2 through 6.9 are summarized from Pre-feasibility Study of the Idaho Cobalt Project, Lemhi County, Idaho, by MDA, May 22, 2001(Prenn, 2001). The latter sections are presented here as they represent a significant amount of pre-feasibility engineering and scoping work that has been done, and will be the basis for a full feasibility study that has been initiated by Formation Capital. While the 2001 data is not current with respect to metal prices, the current mineral resources, the status of the permitting process, and perhaps other economic considerations, it provides the reader with a framework of the Idaho Cobalt Project in terms of potential reserves, proposed mine plans, plant, infrastructure, and anticipated capital and operating costs. Sections 6.2 through 6.9 are abridged; the reader is referred to the full report for more detailed information. It is re-stated here that for the purposes of this 43-101 technical report, the Idaho Cobalt Project has established Measured, Indicated, and Inferred mineral resources only. Mineral reserves mentioned in this section are historical estimates. Mineral reserves and the mining and processing parameters are to be established with the completion of a feasibility study that has been initiated by Formation Capital.

The Blackbird cobalt district, in which the Idaho Cobalt Project is located, was discovered in 1893. Early work concentrated on gold. Copper was located in workable quantities in 1896 and by 1899 Blackbird Copper-Gold Mining Company held 29 claims. That company carried out 1,400 feet of development between 1899 and 1901, patented the property, and then suspended operations. The presence of cobalt had been recognized by 1901 but the metal was not of value at the time (Gow, 1995).

Copper mineralization in the Blackbird Creek area was discovered in 1892 and the area was soon explored as both a copper and gold prospect. The area was first mined for cobalt by Union Carbide at the Haynes-Stellite Mine, located south of the present Formation claim block, during World War I. Union Carbide mined approximately 4,000 tons of cobalt-bearing ore before ceasing operations, reportedly due to excessive operating costs. From 1938 to 1941, the Uncle Sam Mining and Milling Company operated a mine at the south end of the present Blackbird mine and reportedly mined about 3,600 tons of ore. Calera Mining Company, a division of Howe Sound Company, developed and mined the Blackbird deposit during the period 1943 to 1959 under a contract to supply cobalt to the U.S. government. Calera mined approximately 1.74 million tons of ore grading 0.63% cobalt, 1.65% copper, and 0.03 oz gold/ton during this period, accounting for the majority of production from the district. Calera stopped mining when the government contract was terminated in 1960. According to Formation Capital, poor payment for cobalt from smelters hindered continued development of the district since 1960, with minor exceptions. Machinery Center Inc. mined 343,000 tons grading 0.36 % Co and 0.64% Cu from the district during the period 1963 to 1966, when Idaho Mining Company (owned by Hanna Mining Company) purchased the property. Noranda optioned the property from Hanna in 1977 and carried out extensive exploration, mine rehabilitation and metallurgical testing. In 1979 Noranda and Hanna formed the Blackbird Mining Company (BMC) to develop the property. BMC completed an internal feasibility study of their property in 1982. At that time, BMC’s property holdings included the Sunshine deposit. BMC allowed perimeter claims to lapse in 1994 and Formation Capital re-staked much of that ground, including the Sunshine deposit.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 29

Exploration on the property currently controlled by Formation Capital commenced in the 1950’s when Calera and Northfield Mines Inc. conducted soil sampling, trenching, and limited diamond drilling on the Sunshine and other zones. One of Calera’s three holes in the Sunshine zone intersected 10 ft of mineralization grading 1.78% Co and 0.61% Cu. Under a contract with the Defense Minerals Exploration Agency, Northfield completed underground exploration in addition to diamond drilling on the Northfield zone. BMC’s exploration of the Sunshine deposit area included drilling 29 core holes, totaling 17,826 ft between 1979 and 1981, and driving two adits to establish underground drill platforms, in 1982. The adits were stopped short of the mineralization when BMC stopped exploration in the district due to lack of funds. Formation Capital has been actively exploring the district since 1995 and has completed 48 diamond drill holes, totaling 29,144 ft, in the Sunshine deposit; 24 diamond drill holes, totaling 14,723 ft, in the East Sunshine deposit; and 67 holes (59 core and 8 RC/core), totaling 44,738 ft, in the Ram Deposit.

6.1 Historical Mineral Resource and Mineral Reserve Estimates

Resource and reserve estimates discussed in this section are of a historical perspective and not considered to be current; or represent bodies of mineralization that are not owned by Formation or are not part of Formation’s current project plan (i.e.: Sunshine East deposit regarding the latter).

6.1.1 1997 Estimate for Formation Capital Corporation

Prior to Formation Capital’s work on the Idaho Cobalt Project, Noranda in 1981 estimated resources for the Sunshine deposit at 400,000 tons @ 1.10% Co, 0.26% Cu, and without any gold values due to lack of complete gold assays.(MDA, 1998)

In 1997, consultant R. Pegg prepared a reserve/resource estimate for the Sunshine Deposit. Pegg’s reserves would be considered resources under the current CIM Standards.

The 1997 estimate utilized core drill holes from Calera Mining in 1959 (1 hole), Noranda in 1979-1980 (29 holes), and drilling by Formation Capital at the Sunshine and Sunshine East deposits in 1995 and 1996 (71 holes).

The following is a brief summary of the parameters and procedures used in the 1997 estimate. Extensive details are available in Pegg (1997). Note that the terms “reserve”, “proven”, “probable”, “possible” and “potential geologic resource” are used as they were in the 1997 report and do not conform to the current CIM Standards. A reconciliation of terms follows the summary:

A geological interpretation was done, and mineralized blocks laid out, on vertical drill hole cross sections spaced 50 feet apart.

Only mineralized blocks having a minimum true width of 6 feet and a minimum grade of 0.333% cobalt or its equivalent in other metals, were included in the estimate.

A total mining, milling and refining cost of $100 per ton was assumed.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 30

Assumed prices were: cobalt $15.00 per pound; copper $1.00 per pound; gold $380.00 per ounce.

  Mineralized volumes are undiluted and uncut.

Proven reserve blocks were extended a maximum of 25 feet up and down dip, and along strike, from a drill intercept, along the projected mineralized horizon. If the mineralized horizon was not encountered on the adjacent section, or if there was no adjacent drill information, proven blocks were only extended 12.5 feet along strike.

Probable reserve blocks were extended a maximum of 25 feet up/down dip and along strike beyond proven reserve blocks. If the mineralized horizon was not encountered on the adjacent section, or if there was no adjacent drill information, probable blocks were only extended 12.5 feet along strike.

Possible reserve blocks were extended a maximum of 50 feet up/down dip and 25 feet along strike beyond probable reserve blocks. In cases where proven and possible blocks were only extended for 12.5 feet along strike due to a lack of drill hole information, the additional 12.5 feet of strike length for those blocks was included in the possible category.

  Geological boundaries were taken into account.

The Potential Geological Resource includes interpreted mineralized horizons that did not fall within reserve blocks, that is, they are not drill tested.

For the Sunshine Deposit a tonnage factor of 10.45 cubic feet per ton was used. For the East Sunshine Deposit, a factor of 10.71 cubic feet per ton was used.

6.1.1.1 Reconciliation of Terms

The differences and similarities amongst the terms used by Pegg in the 1997 estimate, and the current standards, are discussed below:

    Nearest Equivalent     
1997 Term    CIM Term    Discussion 
Calculation    none    The use of the term calculation is now discouraged as it implies a degree of 
        exactness that is not achievable. 
Reserve    Resource    As Pegg pointed out, the 1997 “reserves” were not “mineable reserves”, 
        which by the current standards makes them resources 
Proven Reserve    Measured Resource    See above. 
Probable Reserve    Indicated Resource    See above. 
Possible Reserve    Inferred Resource    See above. 
Potential Geologic    None    The Potential Geologic Resource is described as including “interpreted 
Resource        mineralized horizons” and therefore probably does not correspond to a 
        resource category. 

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 31

6.1.1.2 Summary of 1997 Estimates

Table 6.1 summarizes the results of the 1997 reserve estimate. The “Potential Geologic Resource” is omitted:

Table 6.1 Summary of 1997 Historic Sunshine Reserve Estimates


Resource estimation for the Idaho Cobalt Project was first completed by the staff of Formation Capital in 1998, based on 92 drill holes for 55,912 feet, including historic holes and Formation Capital drill campaigns in 1995, 1996, and 1997; this includes new resources for the Ram deposit. Formation Capital performed the estimation by means of long-sectional polygonal methods for the various stratiform mineralized horizons in each target area, and resulted in the resources listed in Table 6.2 at a 0.20% Co Cutoff grade. This resource estimate was based on CIM standards of defined resource categories.

Table 6.2 1998 Historic ICP Deposit Resource Estimate – Formation Capital

Formation Capital’s Resource estimates were independently audited by MDA in 1998, 1999, and again as part of the 2001 MDA pre-feasibility study.

Additional drilling by Formation Capital in 1999 was included in the revised resource estimates in the MDA 2001, pre-feasibility study. The source of drill hole information in this 2001 resource estimate is listed in Table 6.3

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 32

Table 6.3 Idaho Cobalt Project Drill Summary-(2001 Historic Resource Estimate)

Deposit           Company    Number of Holes    Footage     Year 
    Calera    3 (core)    982    1959 
Sunshine    BMC    29 (core)    17,825    1979-1981 
    Formation    48 (core)    29,144    1995-1996 
East Sunshine    Formation    24 (core)    14,723    1995-1996 
Ram    Formation (expl)    31 (core)    17,256    1997-1999 
    Formation (met)    8 (RC/core)    2,613    2000 
Total    All    143    82,543    1959-2000 

Historic resource estimates for the Sunshine and East Sunshine deposits remained unchanged from the 1998 estimate (see Table 6.2) as the drilling by Formation Capital since 1997 has been focused on the Ram deposit.

The Measured and Indicated resources for the Ram deposit, including the previous polygonal estimate of the hanging wall zones, at 0.30% Co are summarized in, Table 6.4, and Inferred resources are shown in Table 6.5.

Table 6.4 Historic Measured and Indicated Ram Resources Estimate at 0.3% Co Cutoff – 2001

    Tons                Avg Width    lbs Co    lbs Cu     
Horizon        % Co    % Cu    oz Au/t                oz Au 
    (000’s)                (ft)*    (000’s)    (000’s)     
hanging wall    82    0.509    0.49    0.016    1.3    835    807    1,310 
3021    95    0.510    0.87    0.019    5.8    967    1,642    1,830 
3022    162    0.584    0.63    0.019    4.3    1,897    2,050    3,150 
3023    488    0.825    0.54    0.019    7.0    8,052    5,226    9,330 
3031    27    0.541    0.34    0.010    2.4    299    187    270 
3032    52    0.483    0.79    0.007    3.1    500    823    380 
3035    39    0.631    0.11    0.011    7.3    493    89    430 
Total    945    0.690    0.57    0.018    5.6    13,043    10,824    16,700 
*calculated true width                             

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 33

Table 6.5 Historic Inferred Ram Deposit Resource Estimate at 0.30% Co Cutoff – 2001

    Tons            Oz    Avg Width    lbs Co    lbs Cu     
Horizon        % Co    % Cu                    oz Au 
    (000’s)            Au/t    (ft)*    (000’s)    (000’s)     
hanging wall    56    0.585    0.54    0.018    1.3    655    603    1,010 
3021    89    0.371    0.60    0.016    5.8    659    1,073    1,380 
3022    400    0.483    0.59    0.018    4.3    3,874    4,759    7,100 
3023    1,030    0.777    0.40    0.027    7.6    16,011    8,315    27,460 
3031    95    0.412    0.25    0.006    2.7    781    467    600 
3032    89    0.398    1.01    0.005    2.7    708    1,799    480 
3035    48    0.631    0.12    0.011    7.8    610    112    530 
Total    1,807    0.644    0.47    0.021    6.1    23,298    17,128    38,560 
*calculated true width                             

Formation Capital took samples for density measurements from uncrushed core. Specific gravity was measured by standard Jolly balance methods. The results of specific gravity determinations, and tonnage factors used in the resource models, are presented in Table 6.6.

Table 6.6 Tonnage Factor Summary - Idaho Cobalt Project

    Number of        Tonnage Factor 
               Area        Specific Gravity     
    Samples        (cu. ft/ton) 
Sunshine    321    2.95    10.86 
Ram    199    2.85    11.24 
East Sunshine    147    2.85    11.24 

Updated current (2005) resources are defined in Section 17.0 of this report.

6.3 Historic Reserve Estimates

Discussions presented in Sections 6.3 through 6.9 are summarized from the MDA 2001 pre-feasibility report. They are presented to provide documentation of the historic estimate.

Statistical distributions of cobalt, copper, and gold data from the Ram deposit were reviewed in order to help determine different populations, or domains, of each metal. The statistical populations are subtle but can be broken down as follows for cobalt:

Cobalt:    less than 0.2 %         
    from    0.2%    to    1% 
    from    1%    to    2% 
    greater than 2%         

The domain containing material grading greater than 0.20% cobalt correlates well to the visually identified boundaries of significant mineralization and alteration within the overall mineralized horizons.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 34

Because of this correlation, a cobalt grade of 0.20% was used as a lower grade boundary for selecting composite intervals within the individual horizons. There are three samples from the Ram deposit containing more than 4% cobalt that are considered as outliers and were capped to 4% for estimation. Likewise, based on the metal distribution analyses, eight copper and eight gold assays were also considered outliers and were capped at 4% copper and 0.09 oz Au/ton, respectively.

Estimates of diluted resources for the Sunshine and Ram deposits envisioned underground mining and were based on an $86.50 NSR cutoff grade. Preliminary cash flow projections indicated that an average grade of 0.60% Co should be maintained to ensure good economics at low cobalt prices. The cutoff grade for the Ram (only) was increased to maintain this grade. New mineralized horizons were drawn on Ram cross sections to approximate a 0.40% Co cutoff grade. Measured and Indicated resources were based on extending drill hole intercepts a maximum of 100 ft up and down dip. At least two drill hole intercepts above a grade of 0.30% Co on each section were required to classify narrow horizon material as Measured and Indicated. Some material that was classified as Inferred in the June 1998 resource calculation audited by MDA was upgraded to Indicated since the above definition was met. All horizons were increased to a minimum true thickness of 3 ft. At least 1 ft of dilution was included in all Ram mineralized horizons, while Sunshine horizons included a minimum 15% dilution. The grade of the dilutant for the Sunshine was estimated to be 0.050% Co, while the average grade of the dilutant was calculated for each block of the Ram deposit. The resources were divided into cut-and-fill, which is less than 10 ft wide, and drift-and-fill, which is in excess of 10 ft wide. Average dilution for the project was 55%, due mainly to narrow horizons diluted to 3 ft.

For updated resources in the 2001 pre-feasibility study, the estimate of dilution is based on the following rules for diluting mineralized blocks:

Minimum mining width of 3 ft;

Minimum dilution of 0.75 ft on either side of a mineralized horizon; and Minimum dilution of 1.00 ft on either side of mineralization less than 1.5 ft wide.

Dilution added by these rules resulted in an average dilution of approximately 30% to the Ram deposit when no cutoff grade was used. The grade of the dilutant was calculated by averaging all material within 5 ft of a mineralized horizon. This estimate resulted in an average grade of 0.053% Co; 0.17% Cu; and 0.002 oz Au/ton to be used for dilution added to a mineralized Ram horizon. The historic diluted resource estimate for Measured and Indicated material is shown in Table 6.7, while Table 6.8 lists the historic Inferred estimate.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 35

Table 6.7 Historic Idaho Cobalt Project Diluted Measured and Indicated Resources - 2001 (greater than $65 NSR for Ram Deposit; $86.50 for Sunshine)

             Zone       Tons    %Co    %Cu    oz Au/ton    Zone Width (Ft) 
Ram Hw    83,900    0.496    0.46    0.015     
Ram    Main-3021    108,310    0.439    0.78    0.017    9.19 
Ram    Main-3022    212,051    0.454    0.55    0.018    7.57 
Ram    Main-3023    594,892    0.686    0.47    0.016    8.57 
Ram    Fw-3031    27,293    0.449    0.34    0.007    5.11 
Ram    Fw-3032    68,337    0.353    0.64    0.006    4.96 
Ram    Fw-3035    47,075    0.533    0.12    0.010    8.82 
Sunshine-Main    232,394    0.799    0.45    0.026    7.04 
Sunshine-Hw    26,777    0.806    0.25    0.011    4.01 
 
Totals w/o Ram Hw    1,317,129    0.623    0.49    0.017    7.85 
Totals w Ram Hw    1,401,029    0.615    0.49    0.017     

Table 6.8 Historic Idaho Cobalt Project Diluted Inferred Resources - 2001 (>$65 NSR)

             Zone    Tons    %Co    %Cu    oz Au/ton    Zone Width (Ft) 
Ram Hw    70,178    0.554    0.52    0.017     
Ram    Main-3021    107,384    0.308    0.52    0.013    7.43 
Ram    Main-3022    474,803    0.391    0.52    0.015    5.93 
Ram    Main-3023    1,234,588    0.657    0.37    0.023    9.07 
Ram    Fw-3031    78,841    0.328    0.27    0.005    4.49 
Ram    Fw-3032    99,774    0.289    0.84    0.004    4.72 
Ram    Fw-3035    57,704    0.537    0.13    0.010    9.27 
Sunshine-Main    93,962    0.415    1.21    0.039    3.93 
Sunshine-Hw    14,805    0.782    0.30    0.004    4.58 
 
Totals w/o Ram Hw    2,161,861    0.539    0.45    0.019    7.68 
Totals w Ram Hw    2,232,039    0.540    0.46    0.019     

Mineral reserves for the Idaho Cobalt Project were developed by applying relevant economic criteria in order to define the economically extractable portions of the MDA resource model. MDA developed the 2001 historic reserve estimate for Idaho Cobalt Project to meet the NI 43-101 standards set for mineral reserves. The NI 43-101 standard uses the Canadian Institute of Mining, Metallurgy and Petroleum reserve definitions, which are:

  Probable Mineral Reserve

A 'Probable Mineral Reserve' is the economically mineable part of an Indicated, and in some circumstances a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical,

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 36

economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.

  Proven Mineral Reserve

A 'Proven Mineral Reserve' is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.

1998 Historic Reserve Estimate

The 1998 minable reserves were calculated by plotting mineralization on 50 ft interval level plans and planning access to mineralized horizons. Net smelter return (NSR) values of diluted resources were calculated using the following parameters:

    Metal Prices:    Cobalt    $ 25.00 per pound (less refining @ $3.00/lbs) 
        Copper    $ 0.80 per pound (less refining charges $0.118/lbs) 
        Gold    $300.00 per ounce 
 
 
    Metal Recovery:    Cobalt     90%    Mill;    95% Hydromet Plant 
        Copper     77%    for Copper Concentrate; 94% Smelter 
             19%    for Cobalt Concentrate; 65% Hydromet Plant 
        Gold     45%    for Copper Concentrate; 88.8% Smelter 
             45% for Cobalt Concentrate; 80% Hydromet Plant 
             Metal Recovery 

Assumptions for operating costs were $63.00/ton mining cost, $15.00/ton milling cost, and $8.50 per ton general and administrative cost. Diluted material meeting an $86.50/ton mined NSR and with horizontal extent that can be mined for a profit was ore by definition. The $86.50 NSR cutoff was approximately equivalent to a 0.20% Cobalt cutoff. The cutoff at the Ram was increased to approximately 0.40% Co to maintain a 0.60% cobalt grade. Measured and Indicated diluted resources became the Proven and Probable ore reserves respectively, with the exception of the Ram deposit, where all reserves were classified as Probable due to the absence of metallurgical testing. The Ram deposit, however, does appear to be the extension of the main Blackbird mineralized zone which has been extensively tested by BMC. Table 6.9 summarizes the 1998 Historic Proven and Probable reserves.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 37

Table 6.9 1998 Historic Idaho Cobalt Project Proven and Probable Reserve Estimate

Idaho Cobalt – Diluted Proven and Probable reserves
       Deposit    Mining    Tons    % Co    % Cu    oz Au/Ton    % Dilution    Dilutant    Average 
    Method                        % Co    Thickness (ft) 
Ram    drift & fill    432,640    0.646    0.84    0.016    14.4    0.104    14.39 
Ram    cut & fill    282,923    0.646    0.69    0.022    129.2    0.137    4.47 
Sun – Main    cut & fill    232,394    0.799    0.45    0.026    43.0    0.050    7.04 
Sun – HW    cut & fill    26,777    0.806    0.25    0.011    15.0    0.050    4.01 
 
Total Project        974,734    0.687    0.69    0.020    54.6    0.099    9.47 

Mining by open pit methods was considered as part of the 1998 pre-feasibility study to determine if the open pit alternative should be studied. The results of the pit optimization indicated that fairly large open pits with a high stripping ratio would result. The Ram pit alone, at a $25 cobalt price, would require stripping about 128 million tons of waste to recover 2.8 million tons of “ore” (including inferred materials). This option was eliminated due to the size and high stripping ratio of the pits in favor of underground mining that appears to be environmentally more desirable and less challenging to permit. It should also be noted that at low cobalt prices, the underground operation would recover more cobalt and operate over a longer period than the open pit option.

2001 Historic Reserve Estimate

In 2001 Mineable reserves were updated for the Ram deposit main and footwall zones. Mineable reserves were calculated by first plotting mineralization on long sections for each of the main and footwall horizons. A total of six long sections were used to define the main and footwall zones. Additional hanging wall horizons exist but were not evaluated due to the spotty nature of ore grade mineralization. Mining the hanging wall horizons should be re-evaluated during the final feasibility. Development requirements for each stope were determined. Net smelter return (NSR) values of diluted resources were calculated using the following parameters:

    Metal Prices:    Cobalt    US    $    15. 00 per pound (less refining @ $2.00/lbs) 
        Copper    US    $    0.80 per pound (less refining    @ $0.118/lb) 
        Gold    US    $    275.00 per ounce     
 
 
    Metal Recovery    Cobalt        92.7% Mill;    95%    Hydromet Plant     
        Copper        92.8% Mill;    90%    Hydromet Plant     
        Gold        79.2%    Mill;    90%    Hydromet Plant     

It should be noted that additional metallurgical testing of gravity concentration of the tailings improved these mill recoveries, however, the reserve calculation used the above parameters. Initial assumptions for operating costs were US $48.00/ton average mining cost, US $12.50/ton milling cost, and US $5.50 per ton general and administrative cost. Material meeting a US $65.00 NSR that can be accessed and mined for a profit is ore by definition. The US $65.00 NSR cutoff is approximately equivalent to a

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 38

0.20% Cobalt cutoff. In addition, two cases for material meeting a US $100 NSR cutoff were evaluated, approximately equivalent to a 0.30% Co cutoff.

Historic Measured and Indicated diluted resources become the Historic Proven and Probable reserves respectively if they can be mined for a profit. Inferred material requires additional information even if economic to be included in reserves. Table 6.10 summarizes the 2001 Historic Proven and Probable reserves for the Idaho Cobalt Project, based on a US $65 NSR cutoff. Mining losses are shown in the Table and are assumed to be 5% in mechanized stopes and 13% in slusher stopes. An 8 ft sill pillar is left in slusher stopes.

     Table 6.10 Historic Idaho Cobalt Project Reserves (Case 1A material) (NSR greater than $65/ton ore mined for Ram, $86.50/ton ore mined for Sunshine)

Figure 6.1 General Project Map –Idaho Cobalt Project

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project
Formation Capital Corporation Page 39

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 40

Historic Design Parameters – 2001 Pre-feasibility Study - Idaho Cobalt Project

Location     
                   Country:    U.S.A. 
                   State:    Idaho 
                   Nearest Town:    Salmon (50 miles) 
                   Nearest Major Town:    Idaho Falls (2.5 hours by car from Salmon) 
    Butte (2.5 hours by car from Salmon) 
 
Elevation     
                   Mine: Sunshine    7,000 – 8,100 ft 
                                       East Sunshine    6,750 – 7,800 ft 
                                       Ram    6,050 – 6,970 ft 
 
                   Plant:    7,700 ft 
 
Climate     
                   Climate    Semi-Arid to Humid 
                   Wet Season    December through March 
                   Precipitation    23.7 inches 
                   Pan Evaporation    30 inches 
                   Average Annual Temperature    36o F 
                   Average Low Temperature     
                   December    -5o F 
                   July    42o F 
                   Minimum Temperature    -26o F 
                   Maximum Temperature    91o F 
                   Average Snowpack    30 to 80 inches 
                   Average Water Content of Snow-pack    16 inches 
                   Gusty Winds (>30 mph)     2% of the year 
                   Calm conditions (<11 mph)    64% of the year 
 
Infrastructure     
                   Utilities     
                   Electric Power    Extend from BMC Water Treatment 
                                       Quantity    4 mw 
                   Water    Wells (2), Mine, and Water Management 
    Facility 
                                       Quantity    200 gpm 
 
                   Communications     
                                       External    Local phone system 
                                       Internal – Underground    Underground phone system 
                                       Internal – Surface    FM Radio 
Characteristics of Materials     
                   Ore Density     

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 41

                                       Sunshine                                                               10.67    cu    ft/ton         
                                       Ram                                                               11.25    cu    ft/ton         
                                       East Sunshine                                                               10.87    cu    ft/ton         
 
                   Waste Density                     
                                       Sunshine                                                               11.13    cu    ft/ton         
                                       Ram                                                               11.32    cu    ft/ton         
                                       East Sunshine                                                               11.59    cu    ft/ton         
Geotechnical Parameters                     
                                       RQD values                     
                                       Rock Type            Ram    Sunshine 
                                                           BTE    Biotite tuffaceous exhalite (ore)    39    26 
                                                           MDS    Mafic dikes and sills            24    25 
                                                           MUD    Mudstone (footwall)            17    - 
                                                           QTV    Quartz Vein            21    27 
                                                           QTZ    Quartzite (hanging wall)            29    27 
                                                           QTZB    Quartzite, Biotite tuffaceous exhalite    36    - 
                                                           STE    Siliceous tuffaceous exhalite (hg ore)    77    - 
                                                           TBS    Thin bedded metasediment (footwall)    13    12 

Rock Mass Rating Designation (Based on 9/22/99 visit to BMC’s workings by Dave Stone)

    Rock Type    RMR    Max Span (ft) 
QTZ       60    30     
       BTE    40    12 
MUD       35    10     
QTZ/BTE       50    20     
STE       70    40     
TBS       35    10     

Note: this RMR data was supplemented with additional testing in 2000 that show generally higher values as illustrated in the table below:

Rock Type    Number    Minimum    Maximum    Averag e 
BT E    15    47.0    69.0    58.0 
CGQ    15    42.0    68.0    59.0 
M DS    7    59.0    73.0    64.0 
M FQ    334    42.0    76.0    59.0 
QT V    7    42.0    71.0    57.0 
T BO    8    42.0    64.0    57.0 

Suggested Ground Support:
Rock Type
Ground Support

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project                     
                                 Formation Capital Corporation    Page 42 
 
 
                             QTZ    5    ft split sets on    5    ft centers        chain link as required     
                             BTE    5    ft split sets on    3    ft centers        10mm non-reinforced shotcrete     
                             MUD    5    ft split sets on    3    ft centers        25mm fiber reinforced shotcrete     
QTZ/BTE 4 ft split sets on 3 ft centers – shotcrete, chain link as required
                             STE    7    ft split sets on    5    ft centers when required – mesh as required     
                             TBS    5    ft split sets on    3    ft centers    – 25mm fibber reinforced shotcrete     

Mining         
                   Operating Schedule    10    hours/shift 
       2 shifts/day 
    250    days/year 
 
                   Production Rate    600    tons per day start-up 
    800    tons per day final capacity 

Mining Methods and Operating Characteristics

Sunshine    Underground (slusher cut-and-fill; mechanized cut- and-fill) 
East Sunshine    Not Mined 

Ram Underground (slusher cut-and-fill; mechanized cut-and-fill; and ramp-and-fill)

                   Investigate open pit     
Dilution    Dilute narrow horizons (<1.5 ft) with 1 ft of dilution on each side of the 
horizon.    Dilute wider horizons with 0.75 ft    of dilution on each side of horizon. 

Minimum mining width is 3 ft.

Mining losses 5% (Note that an additional 8% of slusher stopes is left as a pillar)

Development Dimensions    11 x 13 ft. 
    127.2    tons per 10 ft round 
Development Production    First Crew 300 ft/month 
    Additional Crews – 200 ft/months 
Stope Dimensions (Max)    100 x    400 x mining width – slusher stopes 

  100 x 800 x mining width – mechanized stopes
  Stope Rounds
3-7 ft wide    4 x 6 x 5 ft round 
    10.7 tons per round 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 43

                                       7-8 ft wide                       7 x 10 x 8 ft round 
                       49.8    tons per round 
                                       8-10 ft wide                       9 x 11 x 9 ft round 
                       79.3    tons per round 
                                       >10 ft wide                       12 x    14 x 10 ft round 
                       149.5 tons per round 
Underground Fill    Development Waste + filtered tailing 

Leave 8 ft pillar in slusher stopes

Production Schedules

Case 1A Proven

  and Probable Material only $65 NSR cutoff

Case 1B Proven and Probable Material only $100 NSR cutoff

Mineral Processing     
                   Mill Recovery     
                                       Metal    Bulk Conc. 
                                       Co    94.1% 
                                       Cu    92.9% 
                                       Au    78.2% 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 44

Concentrate Grade     
                                       Metal    Bulk Conc 
                                       Co    14.4% 
                                       Cu    7.2% 
                                       Au    0.42 opt 
                                       As    20.0% 
                                       Total Sulfur    19.0% 
 
                   Total Power Consumption                       25 kwh/ton ore 
 
                   Total Water Consumption                       360 gal/ton ore 
                       200 gal/minute 
                   Reagent Consumption     
                                       Soda ash                       0.3 lb/Ton 
                                       AX343                       2.00 lb/Ton 
                                       AX350                       2.20 lb/Ton 
                                       Superfloc 330                       0.03 lb/Ton 
                                       Copper sulfate                       2.00 lb/Ton 
                                       Aerofroth 65                       0.30 lb/Ton 
 
                   Crushing     
                                       Crusher Design     
                                                           Number of Stages                           2 
                                                           Primary                       Jaw 
                                                           Secondary                       Cone 
                                                           Feed Method                       Loader 
 
                                       Operating Schedule                       8 hours/shift 
                       3 shifts/day 
                       250 days/year 
 
                                       Crushing Rate    1,120 tons/day (dry) 
                         50 tons/hour (dry) 
 
                                       Maximum Feed Size                       36 inches 
                                       Plant feed Size                       80% <1/2 in 
 
                                       Crusher Feed Bulk Density                       15 cu ft/ton 
                                       Mechanical Availability                           99% 
                                       Utilization                       100% 
                                       Total Availability                           99% 
                                       Work Index (kwh/ton)                       13.5 
                                       Abrasion Index                       0.3-0.5 
                                       Grinding     

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 45

                   Grinding Circuit Design     
 
                                       Number of Stages     1 
                                       Primary    Ball 
                                       Number of Mills     2 
                                       Type of Circuit    Closed 
                                       Type of Classification    Cyclone 
                                       Recirculating Load    100% 
                                       Feed Size    80% <1/2 inch 
                                       Product Size    80% <200 mesh 
 
                   Operating Schedule    8 hours/shift 
    3 shifts/day 
    350 days/year 
 
                   Grinding Rate    800 tons/day (dry) 
     50 tons/hour (dry) 
 
                   Mechanical Availability    99% 
                   Utilization    100% 
                   Total Availability    99% 
 
Flotation     
                   Circuit Design    40% solids 
                   Size    80% < 200 mesh 
 
                   Bulk Circuit     
                                       Rougher residence    10 minutes 
                                       Scavenger residence    10 minutes 
                                       Cleaner residence     5 minutes 
 
                   Knelson Concentration     
                                       Type    Automated stainless steel 
                                       Capacity    50 tons/hr 
 
                   Thickener     
                                       Tails    800 tons/day 
                                       Type    Conventional 
                                       Settling Rate    1.4 sq ft/ton/day 
                                       Thickener Underflow    60% solids 
 
 
                   Bulk Concentrate    30-45 tons/day (dependent on head grade) 
                                       Type    Conventional 

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project         
                       Formation Capital Corporation    Page 46 
 
                                                   Settling Rate    4 sq. ft/ton/day     
                                                   Thickener Underflow    60% solids     
 
                             Bulk Concentrate Filter    Drum type     
                             Bulk Concentrate Capacity    80 tons/day     
                             Bulk Concentrate Moisture    10%     
 
                             Tailings Filter    Drum     
 
                             Tailings         
                                                   Daily Capacity    768 tons per day (dependent on head grade) 
                                                   Tailings Type    Filtered     
                                                   Filtered Tailings         
                                                   Moisture Content    10-15%     
 
         Hydrometallurgical Plant         
 
         Operating Schedule    8 hours/shift     
    3 shifts/day     
    350 days/year     
 
         Total Availability    99%     
 
         Capacity    1,800 Ton/yr Co as oxide     
 
         Bulk Conc. Feed Rate    1.333 tons/hr     
 
         % Solids Feed to Autoclave    12%     
 
         Feed Slurry Temperature    100o C     
 
         Sulfuric Acid Usage         
                             Type of Acid Storage    Bulk tank     
                             Acid Storage Capacity    5 day supply     
                             Acid Consumption    0.75 ton/ton con     
 
         Oxygen Usage         
                             Type of Supply    Bulk     
                             Storage Capacity    5 day supply     
                             Oxygen Utilization    95%     
         Pressure Leaching         
                             Operating Temperature    55-160o C     
                             Operating Pressure    90 psig     
                             Mode of Operation    Batch     
                             Equipment    Vertical autoclave     
                             Retention Time    2 hrs     

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project         
                       Formation Capital Corporation    Page 47 
 
 
         Metal Recovery         
                                                   Co    95 %     
                                                   Cu    90 %     
                                                   Au    90 %     
 
         Thickener System         
                             Type    Conventional     
                             Number    1     
                             Capacity    50 ton/day     
                             Solids Content Thickener Feed    5%     
                             Solids Content in Overflow    30 ppm     
                             Solids Content Underflow    60%     
                             Specific Settling Rate    8 sq ft/ton/day     
 
         Gold Recovery         
                             Method    Merrill Crow     
                             Recovery    90.0%     
 
         Copper SX Neutralization         
                             Method    pH 1.9 Adjustment with Na2CO3     
 
         Copper Solvent Extraction         
                             Extraction Stages    3     
                             Strip Stages    2     
                             Copper Extractant         
                                                   Type    ACORGA M5640     
                                                   Strength    30 v%     
                                                   Diluent    Phillips     
 
         Copper Extract Solution Purification         
                             Method    Carbon/Ion Exchange Columns     
 
         Copper Electrowinning         
                             Design Plant Capacity    2,800 tons/yr     
                             Anodes    Pb/Sr/Sn     
                             Cathodes    Starter sheets     
                             Cells    Lined concrete     
                             Electrolyte Bleed    5%     
 
 
         Copper Sulfate Production         
                             Method    Evaporative Crystallization     

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project         
                       Formation Capital Corporation    Page 48 
 
         Copper Scavenger Cementation         
                             Method    Iron powder     
 
         Jarosite Circuit         
                             Method    Na2CO3 pH adjust with aeration     
                             Fe Removal    99.0 %     
                             As Removal    99.0 %     
 
         Cobalt Circuit Impurity Removal         
                             Method    pH Adjust/Ion Exchange     
 
         Cobalt Oxide Production         
                             Method    Evaporation, Na2CO3 pH Adjustment and 
    calcination     
         Cobalt Electrowinning         
                             Design Plant Capacity    1,800 tons/yr     
                             Cobalt Extraction    95%     
                             Type    Non-diaphragm     
                             Current Density    350 A/m2     
                             Current Efficiency    75%     
                             Temperature    75o     
                             Cell Voltage    4 volts     
                             Anodes    Pb/Sr/Sn     
                             Cathodes    Stainless Steel     
                             Cathode Production Cycle    5 Days     
                             Cells    Lined concrete     
                             Electrolyte Feed pH    6.3     
                             Electrolyte Co    30-45 g/l     
                             Cobalt Tenor Drop    5 g/l     
                             Spent Electrolyte pH    1.9     
                             Spent Electrolyte    25-40 g/l     
                             Electrolyte Bleed    5%     
 
         Zero Discharge Water Treatment         
                             Method    pH/Nanofiltration/IX/RO     

(note: Current 2005 plans are for treated water discharge by means of land application and natural groundwater recharge)

Total Water Recycle Capacity 250 gallons/minute

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 49

6.4      Infrastructure (2001 pre-feasibility)
 
6.4.1      Site Access
 

The project site is easily accessed. Vehicle access is by paved road on state Highway 93 from Salmon to a well-maintained gravel road 6 miles south of town which heads west to the project site. The gravel portion of the access road is about 40 miles long. The nearest rail access is at the town of Dubois, some 100 miles southeast of Salmon. The hydrometallurgy plant purchased in September of 2002 is located within 300 miles of the mine and mill. The existing plant needs to be refurbished and designed for Idaho Cobalt Project concentrates. This study assumes the plant will remain at its current location.

6.4.2 Housing/Employee Transportation

It is anticipated that most of the project employees will live in the Salmon area. The employees will be transported to the project site by bus or large vans assigned to personnel. This will enhance the safety of the employees by limiting the number of vehicles on the road to the project.

6.4.3 Power

Power will be supplied by Idaho Power Company from a 69kv line to the project substation. The existing power line will be extended from the BMC water plant to the project substation near the mill. There are only three relatively small customers using power from this line at this time. The power line is rated at 4mw.

From the substation, power will be distributed around the site via overhead lines at 4,160 volts. The underground power distribution will be designed as mine design progresses. At the individual working areas the power will be transformed to the required working voltages.

An allowance has been provided for backup generators for maintaining essential services in the event that line power is lost. Two 500kw generators have been included in the project costs, one located at the mill and administrative office area and one at the mine.

6.4.4 Communications

The project will use microwave communications to connect the project with the public phone system at Salmon. On-site communications will be by FM radios.

6.4.5 Sewage

Sewage will be treated in a leach field/septic tank system. The septic tank sludge will be hauled off site to an approved county disposal facility.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 50

6.4.6 Fuel Storage

Fuel, diesel, gasoline and propane will be obtained from local vendors. Adequate storage facilities will be constructed at the project site to hold a two-week supply of the various fuels.

6.4.7 Water

Process water will be supplied from the tailings reclaim system, the mine, wells, and contained water management facility. Potable water will be provided by bottled water.

6.4.8 Water Management Pond

A water management pond will be constructed to store process water. Process water will be obtained from underground workings, tailings filtration, and wells. Excess water will be evaporated. No water is planned to be discharged.

6.4.9 Site Safety and Security

Access to the operations will be controlled at a security gate, which will be manned on day shift and will be controlled by a card or code access system at night. As the project is in an area where tourist and forest recreation traffic can be expected, site security is required for the facilities and to insure the safety of non-project area visitors.

At all times there will be a person on site with the responsibility of insuring that the project is being operated in a safe manner, meeting all requisite health and safety standards governing the project. Personnel will be trained to respond to emergencies and an ambulance will be on site at all times.

6.4.10 Buildings

Several buildings will be constructed for the project operating facilities. The main buildings will be for the mine office, mine maintenance facility and warehouse, mine dry/lamp room, mine air compressor and backup generator, explosives magazines, processing plant, assay lab, and administrative offices. All buildings will be constructed in a manner that meets all applicable design codes and regulations. The exterior of the buildings will be painted to blend in with the surrounding environment.

6.4.11 Laboratory

A laboratory will be constructed on site to perform assays and metallurgical testwork. The lab will support both the mine and mill. All solid and liquid wastes generated by the lab will be disposed of in an acceptable manner.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 51

6.4.12 Solid Waste Disposal

All non-hazardous solid waste will be disposed of in an approved landfill located near the project facilities.

6.4.13 Liquid Waste Disposal

All liquid wastes will be stored on site in approved barrels or other containers. Periodically, a contractor will haul the wastes from the site for disposal at an approved facility.

6.4.14 Vehicles

To support the project, several light vehicles will be required. For employee transportation a fleet of vans or small buses will be utilized. Site vehicles will include pickup trucks; maintenance vehicles such as utility trucks, welding trucks and flatbed/boom trucks; and road/site maintenance equipment such as graders and dozers.

6.4.15 Concentrate Hauling

Haulage of concentrates from the mill to the hydrometallurgical plant will be contracted to a hauling contractor.

6.4.16 General and Administrative Labor

Personnel required for general and administrative labor is summarized in Table 6.11.

Table 6.11 Historic General and Administrative Labor

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 52

6.5      Historic Capital Cost Estimate (2001 pre-feasibility)
 
6.5.1      Summary
 

All cost estimates are made in first quarter 2001 U.S. dollars. Inflation for the period 2001 to 2003 was about 4% in total, according to an inflation calculator provided by the Federal Reserve Bank of Minneapolis on its Internet site. Thus, price changes that may have occurred since 2001 would be negligible considering the accuracy of the estimates. Updating prices for this report was determined to be unnecessary.

Total accuracy of the estimates is considered to be ± 25%. Most of the estimates are based on vendor quotes for equipment or cost estimates generated from experience at other underground mining operations. CAMP provided the capital cost estimate for the mill and hydrometallurgical facility. MineFill Services provided the capital cost estimate for the tailings and water management facilities. The expenditures presented in this section follow the project development schedule, which can be summarized as:

Year    Activities 
-    3:    Permitting; drill inferred material 
-    2:    Complete feasibility study by end of 7th month 
        Complete permitting; complete feasibility study by end of 9th month 
Start development and detail design by start of tenth month
-    1:    Complete mill construction, infrastructure, stockpile ore. 
    0:    Commence cobalt production 
+1:    First year of cobalt production 

Capital costs were developed for the four scenarios:

Case One: Process only Proven and Probable reserves (about a 5 year operation): Case 1A used a $65 NSR cutoff for production scheduling, Case 1B used a $100 NSR cutoff for production scheduling.

    Case    2A used a $65 NSR cutoff for production scheduling, 
    Case    2B used a $100 NSR cutoff for production scheduling. 
Note:    Cases    2A & 2B are preliminary assessments. They include inferred mineral resources that are 
    considered too speculative geologically to have the economic considerations applied to them that 
    would enable them to be categorized as mineral reserves, and there is no certainty that the 
    preliminary assessment will be realized. 

The overall project capital for the first three years is summarized by area for Case 1B in Table 6.12, and in Table 6.13 for Case 2B. Table 6.14 summarizes the total capital cost of all of the options. All of the items contain a 20% contingency except for the mine items, which contain a 15% contingency. Preproduction owner’s costs for feasibility and permitting prior to the decision to construct and develop the

Mine Development Associates April 30, 2005



                             Technical Report, Idaho Cobalt Project         
                                                           Formation Capital Corporation    Page 53 
 
mine and mill are not included in the tables.    These costs are expended prior to the decision to develop 
the mine and are considered sunk costs.         

Table 6.12 Idaho Cobalt Project Historic Capital Estimate Case 1B With Proven and Probable Only (US $000’s)

Capital Cost Summary    Year -2    Year -1    Year 1    Totals 
Item                 
Site and General        $532        $532 
Mine Development    $487    $3,374    $2,483    $6,343 
Mine Infrastructure        $4,249        $4,249 
Mine Equipment    $1,310    $4,703    $3,942    $9,955 
Mine Pre-Production Mining        $1,203        $1,203 
Mill - Flotation Plant    $720    $7,158        $7,878 
Tailings and Water Management        $1,108        $1,108 
Infrastructure        $3,433    $491    $3,925 
Hydrometallurgical Plant    $500    $8,788    $1,988    $11,276 
Start-up Supplies        $0    $240    $240 
Owner's Costs    $438    $1,302        $1,740 
Sustaining Capital                $0 
Closure                $0 
 
Total Capital    $3,454    $35,850    $9,144    $48,449 

Mine Development Associates April 30, 2005



                   Technical Report, Idaho Cobalt Project                     
        Formation Capital Corporation    Page 54 
 
Table 6.13 Idaho Cobalt Project Historic Capital Estimate Case 2B         
With Inferred Material (US $000’s)             
 
                                 Capital Cost Summary    Year -2    Year -1    Year 1    Totals 
Item                     
Site and General        $532            $532 
Mine Development    $487    $3,149    $2,346        $5,982 
Mine Infrastructure        $4,249            $4,249 
Mine Equipment    $1,310    $4,703    $3,942        $9,955 
Mine Pre-Production Mining        $1,354            $1,354 
Mill - Flotation Plant    $720    $7,158            $7,878 
Tailings and Water Management        $1,108            $1,108 
Infrastructure        $3,433    $491        $3,925 
Hydrometallurgical Plant    $500    $8,788    $1,988    $11,276 
Start-up Supplies        $0    $240        $240 
Owner's Costs    $438    $1,302            $1,740 
Sustaining Capital                    $0 
Mine Equipment Replacement                    $0 
Closure                    $0 
 
Total Capital    $3,454    $35,777    $9,007    $48,238 
 
                                                     Table 6.14 Historic Capital Cost Summary (US $000’s)         

Note:    The information in Table 6.14 relating to cases 2A and 2B is preliminary in nature. It includes inferred 
    mineral resources that are considered too speculative geologically to have the economic considerations applied 
    to them that would enable them to be categorized as mineral reserves, and there is no certainty that the 
    preliminary assessment will be realized. 

Working capital is not included in these totals. Working capital is estimated to total three months operating cost. Engineering, Procurement, and Construction Management (EPCM) is included for items that require detailed design in the mine, mill, hydrometallurgical plant and infrastructure. EPCM costs range from 15-20% of the item cost. Pre-production mining expenses occur in year –1 and total between $1.1 and $1.3 million depending on case.

6.5.2 Site and General

Initial site and general expense includes access road improvement from the BMC water treatment plant to the plant site, and road improvement from the mill to the Ram decline and waste dumps. Site and general expenses near the end of the operation are for road improvements from the Sunshine deposit to

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 55

the mill. Also included in site and general are expenses related to drainage control of the area and for fencing the plant, tailings facility and water management facility. Table 6.15 summarizes the historic site and general expenses. The site and general cost will occur during year -1.

Table 6.15 Historic Site and General Capital Cost (US $000’s)

Item           Source        Unit Cost     Quantity    Cost 
 
Common Fill    Local    $15    (per yd placed)    7,000    $105 
Road Surface    Screen    $30    (per yd placed)    5,850 (3 miles)    $176 
Culverts    Amcor    $60    (per ft installed)    50    $3 
Surface Binder    SLC    $4,000    (per mi placed)    8    $32 
Drainage Control    Dozer; Grader    $5,000    (per mi)    10    $50 
Guard Shack    Local    $10,000    (installed w/fence)    1    $10 
Site Fencing    Local           2.5 per ft    20,000    $50 
Jersey Barrier    Amcor    $60    (per ft installed)    300    $18 
Subtotal                    $444 
Contingency        20%            $89 
 
Totals                    $532 

6.5.3 Mine Development

The mine development necessary for Cases One and Two was estimated by designing the workings necessary to access and develop the Ram deposit. The development required for the Sunshine deposit is based on the 1998 pre-feasibility study estimates. The development is shown in Table 6.16 for Case 1B and Table 6.17 for case 2B.

Mine development costs cover the expenditures for opening the mine, establishing ventilation, and driving the access drifts, raises, etc. to the stopes. Detailed drilling is also a necessary part of the provision for stope design and access, however, it is included in mine operating cost. The costs for a feasibility study, exploration drilling, and management of permits, etc. are not included in the capital, and are considered sunk costs. These historic costs can be found in the pre-production Owner Costs estimate in Section 6.7.9.1.

The decline is developed at a rate of 300 ft per month for the first five months. Development of stope access drifts is added starting during the sixth month at a rate of 200 ft per month. After about two and one half years of ramp, stope access, muckbay, and drill station development the rate of development needs to be increased. It is assumed that a contractor would be used to develop an additional 200 ft per month for a period of about one year. At these rates a 15-month period of development is required prior to production. All of the underground workings (adits, declines, muck bays, and cross-cuts) are driven at 11 ft by 13 ft. The cost is estimated to be $470 per foot development during pre-production, and $340 per foot during production. During production the mine general costs of about $130/ft are included in stope production costs.

Development at the Ram includes a decline (11 ft x 13 ft) starting at the 7,080 ft elevation and three 8 ft diameter ventilation raises.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 56

Table 6.16 Idaho Cobalt Project – Historic Mine Development Capital Case 1B – Proven and Probable Only (US $000’s)

Item - Annual Footages    Size    Units    Year -2    Year -1    Year 1    Year 2    Year 3    Year 4    Totals 
Ram Decline    11 x 13 Ft    Annual Ft    850    3,536    3,629    2,149    0    0    10,164 
Ram Stope Access    11 x 13 Ft    Annual Ft    50    1,925    2,260    1,740    0    0    5,975 
Ram Muck Bay/Drill Station    11 x 13 Ft    Annual Ft    0    354    461    525    0    0    1,340 
Sunshine Decline;Access,etc    11 x 13 Ft    Annual Ft    0    0    0    2,564    5,191    3,372    11,127 
Ram and Sunshine Ore Pass/Vent    8 Ft Dia.    Annual Ft    0    501    0    532    1,181    744    2,959 
 
Item - Annual Cost    Pre-Prod.    Production        $ 000's    $ 000's    $ 000's    $ 000's    $ 000's    $ 000's 
Ram Decline    $470    $340    $400    $1,662    $1,234    $731    $0    $0    $4,026 
Ram Stope Access    $470    $340    $24    $905    $768    $591    $0    $0    $2,288 
Ram Muck Bay/Drill Station    $470    $340    $0    $166    $157    $178    $0    $0    $502 
Sunshine Decline, Access    $470    $340    $0    $0    $0    $872    $1,765    $1,146    $3,783 
Ram and Sunshine Ore Pass/Vent    $400    $400    $0    $201    $0    $213    $472    $298    $1,183 
 
Subtotal            $423    $2,934    $2,159    $2,585    $2,237    $1,444    $11,782 
Contingency    15%        $63    $440    $324    $388    $336    $217    $1,767 
Total Mine Development            $487    $3,374    $2,483    $2,973    $2,573    $1,661    $13,550 

Table 6.17 Idaho Cobalt Project – Historic Mine Development Capital Case 2B – With Inferred Material (US $000’s)

Ite m - An n u al Footage s    S i z e    Un its    Ye ar -2    Ye ar -1    Ye ar 1    Ye ar 2    Ye ar 3    Ye ar 4    Ye ar 5    Ye ar 6    Ye ar 7    Ye ar 8    Ye ar 9    Ye ar 10    Totals 
Ram Decline    11 x 13 Ft    Annual Ft    850    3,220    3,105    4,776    5,769    999    265    0    0    0    0    0    18,984 
Ram St ope Access    11 x 13 Ft    Annual Ft    50    1,725    2,375    2,375    2,154    5,248    962    0    0    0    0    0    14,890 
Ram M uck Bay/Drill Stat ion    11 x 13 Ft    Annual Ft    0    455    520    449    477    960    0    0    0    0    0    0    2,860 
Sunshine Decline;Access,et c    11 x 13 Ft    Annual Ft    0    0    0    0    0    0    0    1,282    4,342    3,787    1,716    0    11,127 
Ram and Sunshine Ore P ass/Vent    8 Ft Dia.    Annual Ft    0    501    0    0    0    480    0    0    534    647    744    0    2,906 
 
It em - Annual Cost    P re-prod.    P roduct ion        $ 000's    $ 000's    $ 000's    $ 000's    $ 000's    $ 000's    $ 000's    $ 000's    $ 000's    $ 000's    $ 000's    $ 000's 
Ram Decline    $470    $340    $400    $1,513    $1,056    $1,624    $1,962    $340    $90    $0    $0    $0    $0    $0    $6,984 
Ram St ope Access    $470    $340    $24    $811    $808    $808    $732    $1,784    $327    $0    $0    $0    $0    $0    $5,293 
Ram M uck Bay/Drill Stat ion    $470    $340    $0    $214    $177    $153    $162    $326    $0    $0    $0    $0    $0    $0    $1,032 
Sunshine Decline, Access    $470    $340    $0    $0    $0    $0    $0    $0    $0    $436    $1,476    $1,288    $583    $0    $3,783 
Ram and Sunshine Ore P ass/Vent    $400    $400    $0    $201    $0    $0    $0    $192    $0    $0    $214    $259    $298    $0    $1,162 
 
Subt otal            $423    $2,739    $2,040    $2,584    $2,856    $2,642    $417    $436    $1,690    $1,546    $881    $0    $18,254 
Contingency    15%        $63    $411    $306    $388    $428    $396    $63    $65    $253    $232    $132    $0    $2,738 
Total Mi n e De ve lopm e n t            $487    $3,149    $2,346    $2,972    $3,284    $3,039    $480    $501    $1,943    $1,778    $1,013    $0    $20,992 

Note:    The information in Table 6.17 is preliminary in nature. It includes inferred mineral resources that are considered too 
    speculative geologically to have the economic considerations applied to them that would enable them to be categorized 
    as mineral reserves, and there is no certainty that the preliminary assessment will be realized. 
 
 
6.5.4    Mine Infrastructure Estimates 

The mine facilities will consist of the mine office/dry/maintenance/warehouse building, mine substation, air compressor building, explosives magazines and a backup generator. Also included in mine infrastructure is the cost of installing the aerial tramway from the mine portal to the flotation plant crusher stockpile. The cost is the same for either Case One or Case Two. The cost of the mine facilities is summarized in Table 6.18.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 57

Table 6.18 Mine Facilities Historic Capital Cost Estimate by Year (US $000’s)

     Item        Year –1 
            (year preceding production) 
     Mine support building        $500 
     Aerial tramway        $2,070 
     Electrical-substations and distribution        $150 
     Main fan installation        $15 
     Underground shop        $65 
     Underground lamp room        $5 
     Cement addition facilities        $150 
     Mine rescue facilities        $10 
     Explosives magazine        $20 
     Underground communication        $20 
     Spare generator        $250 
     Sanitary facilities        $5 
     Misc. installation and materials    13%    $435 
 
     Subtotal Mine Infrastructure        $3,695 
     Contingency    15%    $554 
     Total Mine Infrastructure        $4,249 
                     * Note: Mine support building includes offices, dry, warehouse, and shop. 
 
6.5.5    Mine Equipment         

As all the major mining equipment is small and mobile and can be shipped in one piece, no erection or assembly costs are added. The haul trucks for carrying ore to the mill may require some assembly but it will be minor. Equipment costs are from recent quotations for similar projects, estimated from experience, or from phone calls to suppliers. Generally mine equipment should be ordered about 4-6 months prior to the need, to ensure on time delivery.

Spare major components have been included in these estimates. Smaller spare parts have been estimated at 10% of the total base costs. In addition, a contingency of 15% has been included.

Table 6.19 itemizes the base cost of most of the mining capital equipment, including freight. Light vehicles for surface use are included in the infrastructure equipment list in Table 6.24.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 58

Table 6.19 Historic Mine Equipment Capital Cost Estimate by Year (US $000’s)

                           Item    Units    Unit Cost    2002    2003    2004    2005    Totals 
Two boom jumbo    2    $350    $350        $350        $700 
Single boom jumbo    4    $300        $600    $600        $1,200 
Narrow single boom jumbo    2    $100        $100    $100        $200 
Longhole drill    2    $300        $300        $300    $600 
0.5 CY LHD    1    $120        $120            $120 
1.0 CY LHD    2    $170        $170    $170        $340 
2.0 CY LHD    2    $210        $210    $210        $420 
3.5 CY LHD    5    $290    $290    $290    $290    $580    $1,450 
20 ton truck    5    $375    $375    $375    $750    $375    $1,875 
Bolter    1    $400            $400        $400 
Grader    1    $90        $90            $90 
Compressor    1    $35        $35            $35 
Portable compressor    2    $35        $35    $35        $70 
UG flatbed    2    $65        $65            $65 
Lube/service truck    1    $80        $80            $80 
Powder truck    1    $80        $80            $80 
Scissor truck    1    $120        $120            $120 
UG vechiles    8    $45        $180    $90    $90    $360 
Elec. transformers    3    $30        $60    $30        $90 
Slusher 30HP    6    $5        $30            $30 
Stope fans 20HP    12    $3        $15    $15    $6    $36 
Slusher stope equipment    Lot    $75        $75            $75 
Aux and main fan    Lot    $100        $80        $20    $100 
Pumps    Lot    $50        $35    $15        $50 
Shop equipment    Lot    $150        $150            $150 
Engineering & geological equip.    Lot    $50        $50            $50 
Office equipment    Lot    $150        $150            $150 
Rescue, lamps, etc    Lot    $150        $150            $150 
 
Subtotal Mine Equipment            $1,015    $3,645    $3,055    $1,371    $9,086 
Misc. and spares    10.00%        $102    $365    $306    $137    $909 
Subtotal Mine Equipment            $1,117    $4,010    $3,361    $1,508    $9,995 
Freight       2.00%        $22    $80    $67    $30    $200 
Subtotal Mine Equipment            $1,139    $4,090    $3,428    $1,538    $10,194 
Contingency    15.00%        $171    $613    $514    $231    $1,529 
Total            $1,310    $4,703    $3,942    $1,769    $11,724 

6.5.5.1 Freight

For this report, the average cost of freight was assumed to be 2% of the base price of the goods.

6.5.5.2 Equipment Replacement and Residual Value of Equipment

Mine equipment is replaced during year 7 of the Case 2A and 2B operation. No equipment replacement is assumed for Case 1A or 1B since the mine life is 5 years. It has been assumed that the salvage value of capital investment will be 5% of the capital investment.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 59

6.5.5.3 Mine Capital Expenditures by Year

The cost estimates from all the sub-sections for the mine have been collected and placed in a table summarizing mine expenses, Table 6.20. The estimates of expenditures necessary to bring the project into production are shown in the table. The estimates include freight and a contingency.

Table 6.20 Historic Mine Capital Expenditure by Year Case 1B (US $000’s)

Capital Cost Summary    Year -2    Year -1    Year 1    Year 2    Year 3    Year 4    Year 5    Totals 
Item                                 
Mine Development    $487    $3,374    $2,483    $2,973     $2,573     $1,661    $0    $13,550 
Mine Infrastructure        $4,249                        $4,249 
Mine Equipment    $1,310    $4,703    $3,942    $1,769                $11,724 
 
Totals    $1,796    $12,326    $6,425    $4,742     $2,573     $1,661               $0    $29,523 
 
6.5.6 Pre-production Mining                             

Pre production mining expenses are included as a capital expenditure. These expenses are for the ore grade material mined prior to mill start-up. The tons of material mined prior to mill start-up vary between 18,600 and 22,500 depending on case. Table 6.21 summarizes pre-production mining expenses for each case.

Table 6.21 Historic Pre-production Mining Cost (US $000’s)

6.5.7 Mill

All of the capital for the milling facilities will be spent in the pre-production period.

6.5.7.1 Mill Facilities and Equipment Estimates

The mill facilities costs, including the processing equipment, are presented in Table 6.22. The costs exclude the cost of the tailings facility, water management facility and the cost of bringing power, water and any other utilities to the mill, which are included in Section 6.7.8.

Mine Development Associates April 30, 2005



                       Technical Report, Idaho Cobalt Project                     
        Formation Capital Corporation    Page 60 
 
Table 6.22 Historic Mill Facilities and Equipment (US $000)
 
Item        2002    2003    Totals     
Crushing        $60    $590    $650     
Grinding        $60    $540    $600     
Flotation            $450    $450     
Concentrate Handling            $200    $200     
Knelson Concentration            $100    $100     
Tailings            $600    $600     
Building            $1,250    $1,250     
Subtotal        $120    $3,730    $3,850     
Installation    43.00%        $1,118    $1,118     
Piping and Instramentation    20.00%        $729    $729     
EPCM    20.00%    $600    $268    $868     
Subtotal        $720    $5,845    $6,565     
Contingency    20.00%        $1,313    $1,313     
Mill Total        $720    $7,158    $7,878     

Note: Building not included in installation, piping and instrumentation, and EPCM percentages.

6.5.7.2 Residual Value of Equipment

It has been assumed that the salvage value of the mill equipment will be 5% of the installed cost.

6.5.7.3 Tailings and Water Management Facilities

Tailings Facility costs have been developed for filtered tailings, based on the assumption that 50% of the tailings material will be used as backfill for the underground workings. The excavation costs were provided by MineFill services, based on 10 ft of till covering rock. Some preliminary excavations have been completed at this site to a depth of 11 ft indicating the depth of the till is at least 10 ft. The estimated cost for the tailings facility is shown in Table 6.23.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 61

Table 6.23 Historic Filtered Tailings Facility and Water Management Reservoir Estimate (US $000’s)

                                                     Item    Unit    Quantity    Unit Price    Total Cost 
            units    $/unit    2003 
               Clear, Grub, Strip soil and till    Acres    50    $2,000.00    $100 
               Tailings Facility Berm    Cubic Yard    44,680    $3.78    $169 
               Excavate Rock (Pond)    Cubic Yard    80,980    $4.50    $364 
               Pond Enbackment    Cubic Yard    95,840    $1.78    $171 
               Diversion Ditches    Feet    2,600    $6.50    $17 
 
               Subtotal                $821 
               ECPM        15.00%        $123 
               Contingency        20.00%        $164 
 
               Totals                $1,108 
 
6.5.8    Infrastructure and Support Equipment             

In addition to the mining equipment described above, there will be general service equipment required for the surface operations. This equipment will be used for ore stockpile rehandle, rubbish removal, snow removal, surface transportation of filtered tailings and general site earthwork. Infrastructure facilities include the administrative offices, power and water supply, surface loading equipment. This study assumed that personnel would be transported from Salmon.

A general services equipment list is presented in Table 6.24.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 62

Table 6.24 Historic Infrastructure Facilities and Equipment Capital Cost (US $000)

                                     Item        Year -1    Year 1    Totals 
                                     Power line extension        $260        $260 
                                     Main substation        $350        $350 
                                     Communications        $30        $30 
                                     Water supply        $150        $150 
                                     D-6 dozer        $125        $125 
                                     Backhoe        $45        $45 
                                     Service truck        $85        $85 
                                     Pickups        $100    $50    $150 
                                     Man vans        $315    $315    $630 
                                     Ambulance        $55        $55 
                                     Fork lift        $25        $25 
                                     980 loader        $500        $500 
                                     Grader        $125        $125 
                                     Mobile crane        $135        $135 
                                     25 Ton surface trucks        $150        $150 
                                     Light plant        $32        $32 
 
                                     Subtotal Infrastructure        $2,482    $365    $2,847 
                                     Misc and Spares    10%    $248    $37    $285 
                                     Subtotal Infrastructure        $2,730    $402    $3,132 
                                     Freight    2%    $55    $8    $63 
                                     Subtotal Infrastructure        $2,785    $410    $3,194 
                                     EPCM (Power)    15%    $92        $92 
                                     Contingency    20%    $557    $82    $639 
 
                                     Total Infrastructure        $3,433    $491    $3,925 
 
6.5.9    Hydrometallurgical Cobalt Plant                 

The cost estimate to revise and recondition the existing hydrometallurgical facility to process the cobalt, copper and gold concentrate from the mill is shown in Table 6.25. Formation Capital completed the acquisition of the hydrometallurgical facility in September 2002 for a total purchase cost of $1.575 million. The purchase cost is considered to be a sunk cost.

Mine Development Associates April 30, 2005



                           Technical Report, Idaho Cobalt Project                 
                     Formation Capital Corporation    Page 63 
 
 
Table 6.25 Historic Cobalt Hydromet Plant (US $000)
 
                                     Ite m        ye ar -3    ye ar -2    ye ar -1    Totals 
Leaching            $100    $25    $125 
Liquid/Solid            $225    $50    $275 
Gold recovery            $325    $50    $375 
C opper SX            $125    $25    $150 
C opper Sulfate            $250    $50    $300 
C o/C u Ew            $150    $25    $175 
SX/EW First Fills                $275    $275 
Jarosite Precipitation            $425    $75    $500 
C obalt O xide            $1,100    $200    $1,300 
W ater Treatment            $800    $200    $1,000 
Subtotal            $3,500    $975    $4,475 
Installation    43.00%        $1,505    $301    $1,806 
Piping and Inst.    20.00%        $1,001    $200    $1,201 
EPC M    15.00%    $500    $401    $180    $1,081 
Subtotal Hydromet        $500    $6,407    $1,656    $8,563 
C ontingency    20.00%        $1,381    $331    $1,713 
Purchase Plant (Remaining Payment)        $1,000        $1,000 
Total Hydrome t        $500    $8,788    $1,988    $11,276 

The products from the plant include cobalt oxide, copper metal, copper sulfate, and gold. The hydrometallurgical plant will also have the built-in flexibility to make cobalt hydroxide, cobalt carbonate, and cobalt metal. Solid waste products from the hydromet plant will be treated and disposed of in a facility near the plant.

6.5.9.1 Owner’s Costs

Pre-production owner’s costs expended prior to starting mill construction and mine development are considered sunk. This includes all feasibility and permitting expenses and purchase payment for the existing hydrometallurgical facility. To avoid confusion, the only costs that are summarized in this section are the owner’s costs that occur after the decision to proceed with construction of the project. Owner’s costs after starting construction are shown in Table 6.26. General and Administrative labor includes a manager, mine superintendent, mine engineer, geologist, environmental manager, human resources personnel including safety, controller, accounting and warehouse personnel.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 64

Table 6.26 Historic Construction Period Owner’s Costs (US $000’s)

Item    2002    2003    Totals 
Insurance    $25    $100    $125 
Financing fees and interest *            $0 
Working capital **            $0 
Consultants to the owner    $25    $100    $125 
Travel expenses    $50    $50    $100 
Recruiting and relocation    $75    $75    $150 
Training and operators manuals    $25    $100    $125 
General and administrative labor    $165    $660    $825 
 Sub-total    $365    $1,085    $1,450 
 20% Contingency    $73    $217    $290 
 Total    $438    $1,302    $1,740 

*      Financing interest during construction is considered a corporate cost and is not charged against the project.
 
**      Working Capital, which totals three months operating cost, is not included in this table
 
6.5.10 Closure

The mine closure costs were estimated to total $0.87 million. These funds will be used to reclaim roads, mill, tailings facility, and the water management facility. All mine wastes that are potentially acid generating will be used as mine backfill. Mine openings will be sealed. The site will be monitored during the reclamation period. Table 6.27 summarizes the closure costs.

        Table 6.27 Historic Closure Costs (US $000’s)         
 
Facility    Area (acres)Shaping, GradingTopsoil ReplacemenHydroseeding    Sealing Openings    Other    Cost 
        ($1500/Acre)    ($800/Acre)    ($300/Acre) $50,000/portal; $12,000/vent         
Roads    19    $29        $6            $34 
Inert Waste Dumps    8    $12    $6    $2            $21 
Adits and PAG Waste Dumps    3    $5    $2    $1            $8 
Mill and Power Lines    3    $5    $2    $1            $8 
Tailings Facility    20    $30    $16    $6            $52 
Portals    2    $3    $2    $1    $250        $255 
Air Vents    1    $2    $1    $0    $36        $39 
Water Management Facility    13    $20    $10    $4            $34 
Site General    10    $15    $8    $3            $26 
Site Monitoring                             $250    $250 
Contingency    20%                         $145    $145 
 
Totals    79    $119    $48    $24    $286         $395    $871 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 65

6.6      Historic Operating Cost Estimate (2001 pre-feasibility)
 
6.6.1      Introduction
 

All costs in this section are reported in first quarter 2001 US dollars. The operating costs have been divided into three broad sub-sections.

The average life-of-mine cost ranges between US $67.66 and US $69.31 per ton of ore for the four cases studied. Including cobalt-refining costs increases the cost per ton to between $94.72 and $98.23 per ton of ore. The cost per ton including refining is shown as an operating cost for informational purposes as normally the cobalt refining cost including concentrate transportation is reported as a cost of selling the product and not as an operating cost. Table 6.28 shows a breakdown of the operating cost by cost-center.

Table 6.28 Historic Idaho Cobalt Project Estimate Operating Cost Per Ton Ore (US $)

    Case 1A    Case 1B    Case 2A    Case 2B 
                                     Item    >$65 NSR PP    >$100 NSR PP    >$65 NSR PPI    >$100 NSR PPI 
Mining    $47.37    $46.67    $47.38    $46.05 
Milling    $12.12    $12.12    $12.12    $12.12 
G & A    $6.22    $6.36    $5.82    $5.87 
Other    $3.59    $3.58    $3.62    $3.62 
Concentrate transportation    $1.28    $1.35    $1.18    $1.27 
Concentrate treatment    $23.42    $24.78    $21.65    $23.35 
Solid waste disposal    $3.19    $3.38    $2.95    $3.18 
 
Total mine and mill operating cost    $69.31    $68.73    $68.93    $67.66 
Total cost including refining    $97.20    $98.23    $94.72    $95.47 

Notes:    PP indicates Proven and Probable material and PPI also includes Inferred material 
    Other includes backfilling, aerial tram, surface transportation of filtered tailings, and water evaporation. 
    Cases 2A and 2B are preliminary in nature. They include inferred mineral resources that are considered too 
    speculative geologically to have the economic considerations applied to them that would enable them to be 
    categorized as mineral reserves, and there is no certainty that the preliminary assessment will be realized. 

6.6.2 Labor Requirements

The daily manning requirements are summarized below. The working schedule varies between departments as follows:

Days/Week
Shifts/Day
Hours/Shift

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 66

Mine    5    2    10 
Mill    7    3    8 
Infrastructure    5    3    8 
Hydromet    7    3    8 

Attendance losses due to accident, illness and absenteeism have been allowed for in the annual labor requirement calculations. A 2% allowance has been included. The manpower requirements at full capacity for each area are summarized below in Table 6.29. Three trainers in the mine, mill, and hydromet plant are required at start-up for a six month period.

Table 6.29 Historic Project Labor Requirements

    Staff    Operations    Total 
Mine    16    93    109 
Mill    6    25    31 
Infrastructure    9    8    17 
Hydrometallurgical Plant    5    28    33 
 
Total    36    154    190 

Tables 6.30 and 6.31 show on-site project staff and labor requirements, respectively. Table 6.32 shows the hydrometallurgical plant requirements.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 67

Table 6.30 Historic Idaho Cobalt Project On-Site Staff Estimate

Item    Start-up    Full Production 
    Totals    Totals 
Mine Staff         
 
Mine Superintendent    1    1 
Maintenance Superintendent    1    1 
Chief Engineer    1    1 
Surveyor/Rodman    2    2 
Mine Planner    1    1 
Chief Geologist    1    1 
Ore Control Geologist    1    2 
Sampler    2    4 
Warehouseman    2    2 
Clerk    1    1 
 
Subtotal Mine Staff    13    16 
 
Mill Staff         
 
Mill Superintendent    1    1 
Metallurgist    1    1 
Assayer    1    1 
Assay Technician    1    3 
 
Subtotal Mill Staff    4    6 
 
General and Administrative Staff         
 
General Manager    1    1 
HR Manager    1    1 
Environmental Manager    1    1 
Purchasing Manager    1    1 
Purchasing Agents    2    2 
Controller    1    1 
Accountants    2    2 
 
Subtotal General and Administrative Staff    9    9 
 
Total Staff    26    31 

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 68

Table 6.31 Historic Idaho Cobalt Project On-Site Hourly Labor Estimate

Item    Start-up    Full Production 
    Totals    Totals 
Mine Labor         
 
Mine Shift Foreman    2    4 
Skilled Miners and Equipment Op.    36    58 
Unskilled Mine Helpers    6    10 
Maintenance Foreman    2    2 
Mine Mechanics, Electricians, Welders    10    19 
 
Subtotal Mining Labor    56    93 
 
Mill Labor         
 
Mill Foreman    4    4 
Mill Ore Haul and Load Crusher    4    6 
Mill Crusher Operators and Helpers    2    3 
Mill Float Operator    4    4 
Mill Float Helper    4    4 
Mill Mechanic    4    4 
 
Subtotal Mill Labor    22    25 
 
General and Administrative Labor         
 
Janitors    4    4 
Security    4    4 
 
Subtotal General & Administrative Labor    8    8 
 
Subtotal Labor    86    126 
 
Total Project On-Site Staff and Labor    112    157 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 69

Table 6.32 Historic Hydrometallurgical Plant Manpower Estimate

Item    Start-up    Full Production 
    Totals    Totals 
Hydromet Plant Staff         
 
Plant Manager    1    1 
Metallurgist    2    2 
Assayer/Chemist    2    2 
Subtotal Hydromet Staff    5    5 
 
Hydromet Plant Labor         
 
Plant Foremen    4    4 
Leach operators    4    4 
Reagent operators    2    2 
Neutralization and SX operators    4    4 
Gold Recovery    2    2 
Copper Recovery    2    2 
Cobalt Electrowinning    4    4 
Water Treatment Operator    2    2 
Mechanics    2    2 
Instrument Technicians/Electricians    2    2 
Subtotal Hydromet Plant Labor    28    28 
 
Total Hydromet Manpower    33    33 

6.6.3      Historic Mine Operating Cost Estimate
 
6.6.3.1      Mining
 

The total cost per ton of ore mined for operating and maintenance varies according to mining width. Mining costs were developed from detailed estimates for stope mining and experience at nearby operations. A summary of the mining costs is shown in Table 6.33

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 70

Table 6.33 Summary of Historic Mining Cost Estimate

    Cost per ore ton (US $/ton)        Development 
Stope Width    3-7 ft.    7-8 ft.    8-10 ft.    >10 ft.        11 x 13 ft 
Item    Stope    Stope    Stope    Stope    per ton     per ft. 
Materials    $15.26    $9.64    $8.70    $7.72    $11.34    $144.28 
Labor    $30.98    $19.17    $16.08    $14.00    $9.47    $120.46 
Equip. operation    $1.52    $2.98    $2.43    $1.58    $1.50    $19.13 
Equip maintenance    $5.69    $8.14    $5.76    $3.29    $3.59    $45.64 
Mine G&A    $10.80    $10.80    $10.80    $10.80    $10.80    $137.40 
Total    $64.26    $50.73    $43.76    $37.40    $36.70    $466.90 
Use    $64.50    $51.00    $44.00    $37.50        $470.00 

Mine general and administrative costs are summarized in Table 6.34, while mine maintenance general and administrative costs are shown in Table 6.35.

Table 6.34 Historic Mine General and Administrative Cost Estimate

(Annual Costs in Terms of US $000’s)

Item    Number    Salary        Burden    Labor    Labor 
                30%    Total/person    Total 
Mine Staff                         
Mine Superintendent    1        $65    $20    $85    $85 
Maintenance Superintendent    1        $65    $20    $85    $85 
Chief Engineer    1        $60    $18    $78    $78 
Surveyor/Rodman    2        $33    $10    $43    $87 
Mine Planner    1        $50    $15    $65    $65 
Chief Geologist    1        $60    $18    $78    $78 
Ore Control Geologist    2        $42    $13    $55    $109 
Sampler    4        $31    $9    $41    $162 
Warehouseman    2        $29    $9    $38    $76 
Clerk    1        $27    $8    $35    $35 
Mine Shift Foreman    4        $60    $18    $78    $312 
Subtotal Labor    20                    $1,171 
Mine Supplies                        $150 
Definition Drilling                        $200 
Totals per ton ore                        $5.43 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 71

Table 6.35 Historic Mine Maintenance General and Administrative Cost Estimate (Annual Costs in Terms of US $000’s)

    Mine Maintenance General and Administrative Costs             
Item    Number    Hourly Rate    Burden    Labor    Total Loaded    Annual    Labor 
            30%    Bonus    Rate    Rate    Total 
Mantenance Hourly Staff        $/hr    $/hr    $/hr    $/hr    $/person     
Mine Maintenance Foreman    2    $23.00    $6.90    $7.59    $37.49    $78    $156 
Mine Mechanics    8    $21.00    $6.30    $6.93    $34.23    $71    $570 
Mine Mechanics helpers    4    $17.00    $5.10    $5.61    $27.71    $58    $231 
Mine Electrictians    3    $21.00    $6.30    $6.93    $34.23    $71    $214 
Mine Welders    4    $19.00    $5.70    $6.27    $30.97    $64    $258 
Maintenance Supplies                            $75 
Annual Totals    21                        $1,502 
Totals per ton of ore                            $5.37 

Mine general and administrative costs were estimated to total $10.80 per ton of ore. Mining cost estimates for 4 different stope widths are summarized below:

3-7 ft – jackleg and slusher mining - - - - - - $64.50/ton 7-8 ft – mechanized – 0.5 cy LHD - - - - - - $51.00/ton 8-10 ft – mechanized – 1.0 to 2.0 cy LHD - $44.00/ton + 10 ft – mechanized – 3.5 cy LHD - - - - - $37.50/ton

This mining cost includes sill development, raises, and normal ground support. Geotechnical investigations may help improve mining costs by determining if longhole methods and roadheaders could be applied to the deposits.

The true mining width was calculated for each horizon in each stope. The distribution of stope width is shown in Figure 6.2. This figure illustrates graphically that the percentage of slusher stoping is reduced as the cutoff grade increases and also that the inferred materials contain a lower percentage of slusher stope material than proven and probable material. The average mining cost was estimated to vary between $46 and $49 per ton of material depending on case.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 72

Figure 6.2 Historic Distribution of Stope Width


Note: PP indicates Proven and Probable reserves and PPI adds inferred materials.

Cases 2A and 2B are preliminary in nature. They include inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary assessment will be realized.

6.6.3.1.1 Aerial Tram Operation and Road Maintenance

A cost of $0.55 per ton has been used for surface aerial tram operation and surface road maintenance. The cost of the tram was developed from vendor estimates. MDA estimates that the cost of the tram will be slightly higher than the vendor estimate of about $0.15 per ton of material transported. A surface road maintenance cost of about $60,000 per year is included in the estimate, for surface roads between the Ram or Sunshine deposits and the plant.

6.6.3.1.2 Filtered Tailings Placement

Filtered tailings will either be transported to the mine via aerial tramway, or transported to the tailings facility by surface trucks. About 50% of the material will be transported to the Tailings facility and about 50% will be used for backfilling stopes in the mine. Backfilling costs are estimated at $2.50 per ton of filtered tailings material placed in the mine. Adding cement is expected to cost $2.00 per ton of material backfilled. The remaining filtered tailings will be transported to the tailings facility at a cost of $0.80 per ton. Averaging the 50% that is used for backfill and the 50% that is placed in the surface facility, the average cost of handling filtered tailings is estimated to be $2.65 per ton of ore.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 73

In addition, 10-20% of the waste taken out of the mine will need to be transported back into the mine and used as backfill. This material will cost about $0.35 per ton of ore, assuming 15% of the waste material will be transported and backfilled.

6.6.3.1.3 Electrical Power

The drill jumbos, pumps, longhole drills, diamond drills, fans, etc. will be electric powered. Mine power requirements are estimated to be 1,300 kilowatts, based on BMC’s feasibility study. Electricity will be supplied by line power at an estimated cost of $0.055/kwh.

6.6.3.1.4 Diesel Fuel

The cost of diesel fuel is included in mining equipment operating cost estimates.

6.6.3.1.5 Mill

The mill will start up processing 400 tons per day and build up to an 800 ton per day operation. The mill will produce a cobalt-copper-gold concentrate. The cost of operating the mill is estimated to be $12.12 per ton of material. A reagent credit of $0.40 per ton of ore has been taken to utilize the copper sulfate that will be produced at the hydrometallurgical facility. Costs included start from feeding the crusher and end depositing filtering tailings at the tailings facility. CAMP provided operating cost estimates for the mill. Table 6.36 shows the detail of the estimated plant costs.

Table 6.36 Historic Plant Operating Cost Estimate

                                                                     Area    Cost 
        US $/ton ore 
                                 Crushing and Grinding    $5.00 
                                 Flotation    $4.60 
                                 Liquid/Solid Separation    $1.00 
                                 Power    $1.25 
                                 Sampling and Assaying    $0.25 
                                 Knelson Concentration    $0.02 
                                 Water    $0.15 
                                 Concentrate Loading    $0.10 
 
                                 Total Mill Cost/ ton ore    $12.12 
 
6.6.3.1.6    Hydrometallurgical Plant     

The hydrometallurgical plant will treat 30-40 tons of bulk concentrate per day depending on mill feed grade. CAMP estimated the cost of processing the cobalt concentrate to be $550 per ton of concentrate. Additional testwork is required to improve the definition of hydrometallurgical plant operating cost. In addition the cost for disposal of waste products is estimated to be $75 per ton of concentrate, based on processing the solid wastes by the Ecobond process. This process utilizes a phosphate chain that sequesters metal ions to form insoluble phosphate metal complexes. Wastes treated by this process will

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 74

be deposited in a solid facility near the hydrometallurgical plant. Ecobond estimated the cost to process waste material to be $100 per ton of waste however additional testing is required. Project economics will be evaluated using a cost of $625 per ton of concentrate. The costs after a concentrate has been produced are treated as deductions against sales in the economic evaluation in Section 6.9. The estimated operating cost of the hydrometallurgical plant is shown in Table 6.37.

               Table 6.37 Historic Hydrometallurgical Plant Operating Cost 
 
               Area    Cost 
        US $/ton concentrate 
               Leaching    $225.00 
               Liquid/Solid Separations    $50.00 
               Cobalt Recovery    $150.00 
               Copper Recovery    $25.00 
               Gold Recovery    $50.00 
               Solid Waste Treatment and Disposal    $75.00 
               Zero Discharge Wastewater Treatment    $50.00 
 
               Total Hydrometallurgical Plant/ton concentrate    $625.00 
 
6.6.3.1.7    General and Administrative     

General and Administrative (G & A) costs include staff costs, property taxes and insurance, legal cost, consultants, etc. This portion of G & A labor cost is expected to total $0.95 million per year or $3.40 per ton of ore at full production, while the total cost is estimated to be $1.568 million per year or $5.60 per ton of ore. Table 6.38 shows the General and Administrative labor costs. Table 6.39 shows the total general and administrative costs for the project.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 75

Table 6.38 Historic General and Administrative Labor Estimate (US $000’s)

        Annual    Burden    Annual    Annual 
General and Administrative Staff    Number    Salary    30%    Cost    Total 
General Manager    1    $100    $30    $130    $130 
HR Manager    1    $70    $21    $91    $91 
Environmental Manager    1    $60    $18    $78    $78 
Purchasing Manager    1    $55    $17    $72    $72 
Purchasing Agents    2    $45    $14    $59    $117 
Controller    1    $60    $18    $78    $78 
Accountants    2    $40    $12    $52    $104 
Subtotal Staff    9                $670 
General and Administrative Labor                     
Janitors    4    $27    $8    $35    $141 
Security    4    $27    $8    $35    $141 
Subtotal Labor    8                $281 
 
Total General and Administrative    17                $951 

Table 6.39 Historic General and Administrative Cost Estimate (Annual Totals in US $000’s)

                                         Item    Totals    $/ton ore 
General and Administrative Labor    $951    $3.40 
Insurance    $100    $0.36 
Employee Transportation    $240    $0.86 
Communications    $72    $0.26 
Safety Supplies    $30    $0.11 
Office Supplies    $25    $0.09 
Legal    $30    $0.11 
Consultants    $30    $0.11 
Subscriptions, Fees and Donations    $15    $0.05 
Property Tax    $25    $0.09 
Travel    $20    $0.07 
Recruiting    $10    $0.04 
Bank fees    $5    $0.02 
Equipment Lease and rentals    $15    $0.05 
 
Totals    $1,568    $5.60 

6.6.4 Total Operating Cost

The average operating cost per ton of ore for the four cases is shown below in Table 6.40, and in Table 6.41 in terms of cost per pound of cobalt. Mine and mill operating costs for the four cases range between $67.66 and $69.31 per ton of ore, or between $4.65 and $5.34 per pound of cobalt produced,

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 76

including a credit of about $1 per pound for other metals produced. Concentrate transportation and refining costs are shown in the cash flow statements as a reduction in revenue.

Table 6.40 Historic Idaho Cobalt Project Estimated Operating Cost Per Ton Ore (US $/ton)

               Item    >$65 NSR PP    >$100 NSR PP    >$65 NSR PPI    >$100 NSR PPI 
Mining    $47.37    $46.67    $47.38    $46.05 
Milling    $12.12    $12.12    $12.12    $12.12 
G & A    $6.22    $6.36    $5.82    $5.87 
Other    $3.59    $3.58    $3.62    $3.62 
 
Total Cost    $69.31    $68.73    $68.93    $67.66 
Note:    PP indicates Proven and Probable material while PPI also includes Inferred 
    material. Inferred mineral resources are considered too speculative geologically 
    to have the economic considerations applied to them that would enable them to 
    be categorized as mineral reserves. Cases 2A and 2B are preliminary assessments 
    and there is no certainty that they will be realized.         

Other costs include backfilling, surface transportation of filtered tailings, aerial tram, and water evaporation.

Table 6.41 Historic Idaho Cobalt Project Estimated Operating Cost per Pound of Cobalt

        Case 1A    Case 1B    Case 2A    Case 2B 
    Item    >$65 NSR PP    >$100 NSR PP    >$65 NSR PPI    >$100 NSR PPI 
Mine    $4.07    $3.79    $4.40    $3.96 
Backfill & Other    $0.30    $0.28    $0.33    $0.30 
Mill        $1.05    $0.99    $1.13    $1.05 
G & A    $0.53    $0.52    $0.54    $0.50 
Metal Credits    ($0.99)    ($0.92)    ($1.03)    ($0.95) 
 
Totals    $4.96    $4.65    $5.37    $4.88 
    Note:    PP indicates Proven and Probable material while PPI also includes Inferred 
        material. See note to Table 6.41, above.         
 
6.7    Historic Project Economics (2001 pre-feasibility)         

It is important for the reader to note that this Section as with previous Sections 6.3 through 6.9 are from the 2001 pre-feasibility study by MDA; which is not current. Proven and Probable reserves are thus from a historical context and are not equivalent to current Measured and Indicated Resources. In addition the Inferred resources stated here are also not current, and are a category considered too speculative to be of economic interest. Therefore, the following discussion regarding project economics is also of a historical and speculative nature, but is presented here as stated in the pre-feasibility study, for completeness and for a general understanding of the possible scope and magnitude of the Idaho Cobalt Project.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 77

6.7.1 Project Economics Summary

A cash flow evaluation of the project was completed based on first quarter 2001 US dollars. This evaluation indicated that the project does have a pretax internal rate of return of 64.9% at a cobalt price of $15/lbs, assuming a $100 NSR cutoff and mining only proven and probable materials (Case 1B). If most of the currently estimated inferred material can be developed to proven and probable class, the net present value and internal rate of return will increase substantially.

Additional test work is required to estimate the operating cost and recoveries of the hydrometallurgical plant with more certainty, however the project does appear to be economic based on pre-feasibility estimates.

Table 6.42 illustrates the pretax net present value of the four cases at different cobalt prices. In cases 2A and 2B, a $3/lbs change in cobalt price is approximately equivalent to a change of over $60 million in net present value. Cobalt sales are in the form of cobalt oxide, which carries a premium over the cobalt metal price. Table 6.43 illustrates the pretax internal rate of return of the project. These results are shown graphically in Figures 6.3 and 6.4.

Table 6.42 Idaho Cobalt Project – Historic Pretax Net Present Value (8%)

($000’s)

Cobalt Price    Case 1A    Case 1B    Case 2A    Case 2B 
$/lb Co    >$65 NSR PP    >$100 NSR PP    >$65 NSR PPI    >$100 NSR PPI 
$9    $10,740    $11,350    $56,743    $62,604 
$12    $36,939    $36,662    $110,296    $114,925 
$15    $73,183    $71,676    $184,378    $187,303 
$18    $110,125    $107,365    $259,887    $261,076 
$21    $147,067    $143,055    $335,397    $334,848 
$24    $184,024    $178,744    $410,907    $408,621 

Note:    PP indicates Proven and Probable reserves, PPI indicates Proven, Probable, and Inferred material. Inferred 
    mineral resources are considered too speculative geologically to have the economic considerations applied 
    to them that would enable them to be categorized as mineral reserves. Cases 2A and 2B are preliminary 
    assessments and there is no certainty that they will be realized. 

Table 6.43 Idaho Cobalt Project – Historic Pretax Internal Rate of Return

Cobalt Price    Case 1A    Case 1B    Case 2A    Case 2B 
$/lb Co    >$65 NSR PP    >$100 NSR PP    >$65 NSR PPI    >$100 NSR PPI 
$9    17.21%    18.44%    34.90%    39.91% 
$12    37.47%    39.37%    57.09%    62.49% 
$15    62.26%    64.93%    85.81%    91.55% 
$18    85.19%    88.50%    113.62%    119.57% 
$21    106.57%    110.41%    140.26%    146.38% 
$24    126.82%    131.12%    165.89%    172.16% 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 78

Figure 6.3 Idaho Cobalt Project – Historic Net Present Value Estimate


Note:    PP indicates Proven and Probable reserves, PPI indicates Proven, Probable, and Inferred material. Inferred 
    mineral resources are considered too speculative geologically to have the economic considerations applied 
    to them that would enable them to be categorized as mineral reserves. Cases 2A and 2B are preliminary 
    assessments and there is no certainty that they will be realized. 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 79

Figure 6.4 Idaho Cobalt Project – Historic Pretax Internal Rate of Return Estimate


Note:    PP indicates Proven and Probable reserves, PPI indicates Proven, Probable, and Inferred material. Inferred mineral 
    resources are considered too speculative geologically to have the economic considerations applied to them that 
    would enable them to be categorized as mineral reserves. Cases 2A and 2B are preliminary assessments and there is 
    no certainty that they will be realized. 

Project sensitivity indicates that the net present value of the project is most sensitive to price. Grade and recovery are equivalent to the price relationship. That is, a 10% drop in price will produce the same cash flow as a 10% drop in grade or recovery. Figure 6.5 illustrates the net present value sensitivity, while Figure 6.6 illustrates the internal rate of return sensitivity for case 1B. Figures 6.7 and 6.8 illustrate the sensitivity to net present value and internal rate of return respectively for case 2B. Figures 6.5 through 6.8 are based on a $15/lb cobalt metal price.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 80

     Figure 6.5 Idaho Cobalt Project Case 1B (>$100NSR-PP) Sensitivity - Net Present Value (8%)

Figure 6.6 Idaho Cobalt Project Case 1B (>$100NSR-PP) Sensitivity – IRR




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 81

     Figure 6.7 Idaho Cobalt Project Case 2B (>$100 NSR – Include Inferred) Sensitivity – NPV 8%

Note:    PP indicates Proven and Probable reserves, PPI indicates Proven, Probable, and Inferred material. Inferred mineral 
    resources are considered too speculative geologically to have the economic considerations applied to them that 
    would enable them to be categorized as mineral reserves. Cases 2A and 2B are preliminary assessments and there is 
    no certainty that they will be realized. 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 82

7.0 GEOLOGICAL SETTING

The Idaho Cobalt Project is located on the east side of the central Idaho Batholith granitic-to-granodioritic rocks (Tertiary-Cretaceous in age), hosted in Proterozoic age sedimentary rock. The host sedimentary rocks are on the southern flank of, and perhaps were part of, a large Proterozoic age marine sedimentary basin in which dominantly clastic sediments were deposited; now the Belt supergroup of dominantly quartzite and argillite metasedimentary rock.

Unique to the Proterozoic rocks in this region, are cobalt-copper (Co-Cu) occurrences in the Proterozoic age Yellowjacket formation of east-central Idaho. The (Co-Cu) mineralization at the Blackbird mine has been described as a type locality for this occurrence of stratiform Co-Cu mineralization. The Idaho Cobalt Project is located adjacent to the former Co-Cu producing Blackbird Mine.

Recent work by the USGS (PP 1601) to correlate the rocks of the Lemhi Range with the rocks of the Salmon River Range has led to the recommended nomenclature of Apple Creek Formation for the middle Yellowjacket which includes the cobalt bearing strata. Usage of Yellowjacket is continued due to historical usage.

7.1 Regional Geology

The description of the regional geology that follows is copied from Staargaard (1996):

“The Idaho Cobalt Project is situated in the Idaho cobalt Belt, a 30 – 35 mile long metallogenic district characterized by stratiform copper-cobalt deposits (Staargaard, 1996). The deposits are hosted by a thick, dominantly clastic sequence of Middle Proterozoic age sandwiched between late Proterozoic quartz monzonitic intrusions. The clastic sediments were deposited in a large fault-bounded basin, probably as large submarine fan complexes and/or deltaic aprons that were frequently “drowned” by continuing subsidence within the basin. All significant copper-cobalt deposits and occurrences are found in the Proterozoic Yellowjacket Formation, which constitutes the base of this sequence. This formation was originally correlated with Pritchard Formation metasediments of the Belt supergroup to the north, its age being constrained by dates of 1.37 Ga for adamellites intruding the sequence and 1.7 Ga3 from mafic dykes and sills emplaced along the basin margin faults (Hughes, 1983).

The structure of the Yellowjacket Formation is dominated by the regional rift structure. Cobalt-copper-gold mineralization lies along a northwest-southeast trending structure parallel to and west of the central axis of the rift. There is a series of northerly trending faults that are considered to represent initial growth faults, re-activated by Laramide(?) and younger events. The district has also been affected by northeasterly structures of the Trans-Challis Fault Zone. (Gow, 1995) Staargaard described the regional mineralization as follows:

“A number of significant stratiform cobalt-copper-gold deposits and prospects define the Idaho Cobalt belts. As far as can be determined at this point, they are associated with two or more distinctive, regional stratigraphic horizons within the Yellowjacket Formation that are distinguished by diagnostic Fe minerals. In the Blackbird area, the mineralized sequence is characterized by the presence of biotite-rich beds often referred to as “biotitite” within a sequence of up to 3,000 feet of interbedded quartzite, siltite and argillite.

3 Ga = 1,000,000,000 years
Mine Development Associates
April 30, 2005


  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 83

… Approximately ten miles to the southeast, probably within the same stratigraphic sequence, Formation Capital has been exploring stratiform copper-cobalt mineralization at their Blackpine project.

Three types of cobalt-copper-gold occurrences have been reported in the Idaho Cobalt Belt (Nash, 1989, reported in Pegg, 1997). Significant ore deposits have been mined and/or delineated in two of the styles of mineralization described below (descriptions copied from Pegg, 1997, with minor editing4):

Type 1:    Cobalt-copper-arsenic rich deposits of the Blackbird Mine type. Generally, these contain 
    approximately equal amounts of cobalt and copper, with variable amounts of gold and pyrite. 
    the dominant ore minerals include cobaltite (CoAsS) and chalcopyrite (CuFeS2). The cobaltite 
    accounts for nearly all of the arsenic content in these occurrences. This syngenetic and 
    stratabound mineralization is closely associated with mafic sequences of the middle unit of the 
    Yellowjacket Formation. The deposits are found in tabular form. Examples of these types of 
    deposits include the Blackbird Mine and the mineralized zones found within Formation 
    Capital’s Sunshine and Ram deposits. 
Type 2:    Cobaltiferous-pyrite-magnetite deposits with a variable chalcopyrite and low arsenic content. 
    These occurrences are hosted by fine grained metasediments from the lower unit of the 
    Yellowjacket Formation. Mineralization is stratabound, locally stratiform and is found within 
    synsedimentary soft-sediment structures. The deposits are found in the area of Iron Creek, 
    approximately 17 miles southeast of the Blackbird Mine. An example of this is the Siskon 
    Gold Corporation’s5 Iron Creek property, which is under option to Cominco American 
    Resources. This deposit contains some higher grade cobalt values within the 1,000 foot 
    stratigraphic section. 
Type 3:    Cobaltiferous tourmaline-cemented breccias. These are relatively common in the lower unit of 
    the Yellowjacket Formation, especially south and east of the Blackbird Mine. Only a few of 
    these, apparently, contain in excess of 0.1% cobalt. 

Regional geology is shown in Figure 7.1.

4 Editing consisted of deleting certain quoted quantities of mineralized material, that may not have been in compliance with NI 43-101.

5 Owned by Siskon at the time of the 1997 report; MDA is unaware of the current (2005) status of Siskon Gold or the current ownership of the Iron Creek property

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 84

Figure 7.1 Regional Geology




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 85

7.2 Local Geology

The majority of the following geologic discussion, except where otherwise indicated, is summarized from Report on the Reserve/Resource Estimates for Sunshine Lode, East Sunshine, and Ram Prospects, Sunshine Property, Idaho, USA by Formation Capital Corporation US Field Staff, April 1998.

7.2.1 Lithology and Stratigraphy

The Idaho Cobalt Belt represents a distinct district dominated by stratabound cobalt + copper ± gold mineralization, with a remobilized constituent. The district is underlain by strata of the middle Proterozoic age Yellowjacket Formation, which is an upward-thickening, upward-coarsening clastic sequence at least 49,000 ft thick (Nash, 1989) that represents a major basin-filling episode (Connor, 1990).

Detailed work by Noranda geologists and the USGS has shown that the Yellowjacket can be divided into three units (Staargaard, 1996). The lower unit of the Yellowjacket Formation is over 15,000 ft thick and consists mainly of argillite and siltite, with lesser occurrences of fine-grained quartzite and carbonates. Graded bedding and planar to wavy laminae are common in the lower unit, which is locally metamorphosed to phyllite. The middle unit of the Yellowjacket Formation is up to 3,600 ft thick and comprises several coarsening-upward sequences of argillite, siltite, and quartzite, with distinctive biotite-rich interbeds (Nash, 1989) that generally have a direct correlation to mineralization. The middle unit hosts the majority of the known cobalt, copper, and gold occurrences in the Idaho Cobalt Belt. The upper unit exceeds 9,800 ft in thickness and is predominantly composed of thin- to thick-bedded, very fine- to fine-grained quartzite (Connor, 1990).

Mafic tuffs within the middle unit of the Yellowjacket Formation are the oldest igneous rocks exposed in the Sunshine-Blackpine district. They are accompanied by felsic tuffs and carbonatitic (?) tuffs. Some mafic dikes and sills intrude the middle unit of the Yellowjacket Formation and may be comagmatic with the mafic tuff beds. Several small lamproitic diatremes may also be coeval with mafic volcanism (Gow, 1995).

The Yellowjacket Formation has undergone varying degrees of regional metamorphism, ranging from greenschist facies in the southern part of the district to amphibolite grade facies in the northern part of the district. Several types of mafic dikes and sills, ranging from 3 to 100 feet thick, intrude the Yellowjacket Formation and have been interpreted as feeders to the exhalative mafic tuffs, which are most abundant in areas of intrusive activity (Staargaard, 1996).

7.2.2 Structural Geology of the Deposits

The dominant structures in the area are steep, north- to northwest-trending normal faults and shear zones. The prominent White Ledge Shear, which displays substantial apparent strike-slip movement, marks the western extent of the mafic strata and associated stratiform mineralization in the project area (Nash, 1989).

Noranda Exploration Inc. interpreted the Sunshine stratigraphy as having been folded into a tight syncline about a northerly plunging axis (Dagget and Baer, 1981). Small-scale fold hinges and transposed bedding visible in the Sunshine Trench evidence parasitic folding and locally severe deformation. Large-scale transposition faults roughly parallel the axial plane of the Sunshine syncline.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 86

7.2.3 Alteration

Much of this discussion is adapted from Hughes (1993). Hughes was describing the Blackbird mineralized system, of which the Idaho Cobalt Project mineralization is part.

Some of the broadest mineralogical indicators of the mineralizing system are tourmaline and ankerite, which can be found up to several thousands of feet from the nearest known sulfide occurrences. Though they probably do not provide any reliable indications of proximity to ore targets, their presence does appear to be confined only to that portion of the Middle Yellowjacket that hosts the mineralized zones. Ankerite changes to disseminated siderite and occasional siderite veinlets in rocks that are several hundreds of feet from ore zones. The relative amounts and coarseness of the siderite appear to increase toward individual bodies of mineralization.

Outside the high grade metamorphic aureole at Blackbird, chlorite and siderite are found within the same stratigraphic intervals that contain mineralization. Chlorite-rich rocks may be found as much as several hundreds of feet from known mineralization, but are more typically found within tens of feet of high grade, semi-massive sulfides6.

Silicification is commonly associated with chloritization at Blackbird. It is especially common near chlorite accumulations that are interpreted to be near feeder zones. Barite is found in some quartz-siderite veins in feeder zones.

The following brief description of alteration at Blackbird-like deposits is copied from Evans et. al. (1986). The alteration at the Idaho Cobalt Project is substantially similar:

“Alteration is stratabound and coextensive with ore (Nash and Hahn, 1989). The transition from altered to unaltered rock is abrupt (less than 1 meter) in many places. Altered rock in the Merle ore zone ... at Blackbird is coincident with biotite and intercalated rocks and contains elevated abundances of cobalt and arsenic. Alteration zoning consists of pyrite-siderite-quartz-muscovite in the core zone and grades outward into quartz-muscovite-(with lesser) pyrite. Potassic alteration has enhanced biotite crystallization across the entire ore zone.”

7.3 Mineralization

Mineralization at the Idaho Cobalt Project is characterized as syngenetic, stratiform, exhalative deposits within, or closely associated with, the mafic sequences of the middle unit of the Yellowjacket Formation. The deposits range from nearly massive to disseminated. Some cross-cutting mineralization is present that may be in feeder zones to the stratiform mineralization. Dominant ore minerals include cobaltite (CoAsS) and chalcopyrite (CuFeS2), with lesser, variable occurrences of gold. Other minerals present in small quantities are pyrite (FeS2), pyrrhotite (Fe1-xS), arsenopyrite (FeAsS), linnaeite ((Co,Ni)3S4), loellingite (FeAs2), safflorite (CoFeAs2), enargite (Cu3AsS4) and marcasite (FeS2).

Local geology is shown in Figure 7.2

6 The high grade, semi-massive mineralization described by Hughes is more characteristic of the Blackbird Mine mineralization than of the Idaho Cobalt Project.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 87

Figure 7.2 Local Geology




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 88

7.3.1 Sunshine Deposit

Mineralized zones in the Sunshine Deposit are typically multiple, stacked, sulfide-bearing beds. Individual mineralized beds or horizons range in thickness from inches to several feet and are intimately associated with biotite-rich tuffaceous exhalative (BTE) horizons. An increase in silica content generally indicates an increase in cobalt, copper, and gold grades. Stratigraphy, including the BTE horizons, strikes north-northwest and dips moderately to steeply to the east-northeast. Individual sulfide-bearing beds may not be continuous over a distance of a few hundred feet, but generally, the overall mineralized zones within the BTE horizons can be traced along strike for over 1,500 feet. The description that follows is copied from the 1998 resource report by Formation Capital staff:

“The Sunshine Lode’s Main Zone is comprised of fine to medium grained metaquartzite interbedded with siltite and mafic sequences. The mafic sequences, comprised of green biotite and lesser chlorite, have been interpreted to be metamorphosed tuffs or exhalites (BTE) (Clark, L.A., 1995). Portions of the mafic sequence contain significant amounts of chert of exhalative origin (STE) (Clark, L.A., 1995).

“The hanging wall stratigraphy is dominated by upward coarsening and thickening quartzite. In the lower hanging wall quartzite is intercalated with local siltite and minor mafic sequences (BTE), while in the upper hanging wall quartzite contains little siltite and no mafic sequences.

“The footwall stratigraphy is dominated by a thick sequence of monotonous siltite or pelite with minor interbedded sandy units. Mafic sequences are rare and can not be correlated except locally. Shearing is prevalent within this package. The boundary between the footwall and the main zone is defined by a sedimentary interface based on grain size, indicating a change between shallow and deeper water.

“Concordant to subconcordant discontinuous quartz veins are found throughout the Sunshine Lode’s stratigraphy. These are diagenetic in origin and while they occasionally carry grade they are not traceable for any appreciable distance along strike or down dip.

“Folding, at least locally and on the bedding scale, has been noted within the (drill) core from changes in bedding attitudes and fold noses. This may lend support to the idea that the horizons are folded repetitions. However, no definitive evidence of over turning could be documented in the core.

“The Sunshine Lode mineralization appears to be cut by a number of discontinuous, shallow to moderate, west dipping, dip-slip faults/shears. In addition, drilling has revealed a number of discontinuous, cross cutting tectonic breccias, which may affect the continuity of the Sunshine Lode, at least locally.

“The north trending, steeply west dipping, Green Dyke fault which parallels the Sunshine Lode for much of its strike length may truncate the mineralization down dip and to the south. Drilling below the fault has been limited and some of the holes may not have reached the mineralized horizons. Two Noranda drill holes, 80-03A and 80-13A, which do penetrate below the fault, intersected a core length of 2.30 feet of 0.320% cobalt, 0.08% copper and 0.003 oz gold/ton and 4.00 feet of 0.217% cobalt, 0.21% copper 0.003 oz gold/ton respectively. These holes suggest that higher grade pods of mineralization may remain undiscovered below the fault. Neither a sense of movement nor a displacement has been determined for this fault.”

… text abridged …

“The Sunshine Lode’s mineralized zone is found within a confined stratigraphic section which contains a main mineralized horizon (1003), a lower footwall horizon (1001) and an upper hanging wall horizon (1007). Although the mineralized zone is continuous along strike, the individual horizons do not always display good continuity along strike or down dip. The footwall and hanging wall horizons attenuate rapidly

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 89

both along strike and down dip. However, within the main horizon and hanging wall horizon tabular deposits of mineralization with sufficient grade and size exist which should be mineable. These ore deposits appear to have their long axis down plunge towards north.

“The stratabound mineralization revealed by the drilling consists of fine to medium grained disseminations, blebs and stringers of cobaltite and minor chalcopyrite and pyrite. Two types of (mineralization) occur within the Sunshine Lode, fine to coarse grained cobaltite within siliceous gangue and fine grained cobaltite within micaceous gangue. The micas are black biotite, green biotite and chlorite. The horizons are typically composed of both ore types and are hosted by medium grained biotite rich quartzites. This mineralization is dominantly bedding concordant but, locally, has been remobilized into fracture quartz veins and/or cross cutting structures.”

Table 7.1 summarizes the stratigraphy of the Sunshine Deposit.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 90


Notes:    This table was copied with minor alteration from Table 2 of the 1998 resource report by Formation staff 
    BTE is biotite-rich tuffaceous exhalative 
    STE is siliceous tuffaceous exhalative 

Figure 7.3 is an example of a cross section through the Sunshine deposit, and Figure 7.4 is a cross section through the East Sunshine deposit.

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 91

Figure 7.3 Sunshine Deposit Cross Section

Drawing by Formation Capital; modified size by A.V. Moran




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 92

Figure 7.4 East Sunshine Deposit Cross Section

Drawing by Formation Capital; modified size by A.V. Moran




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 93

7.3.2 Ram Deposit

Stratigraphy in the Ram deposit area is predominantly medium- to fine-grained quartzite metamorphosed to upper greenschist to amphibolite facies. Stratigraphically, the Ram deposit has been subdivided into three zones: hanging wall, main, and footwall, with each zone containing distinct mineralized horizons. An example Ram cross-section is shown as Figure 7.5.

Formation Capital has subdivided the Ram hanging wall zone into three lithologic packages. The upper hanging wall contains medium- to coarse-grained, locally poorly-bedded to well-bedded quartzite. Occurrences of biotitic tuffaceous exhalite are generally restricted to discontinuous, irregular, coarse-grained garnetiferous pods (interpreted locally as diapirs). The middle hanging wall is dominated by medium-grained, generally well-bedded quartzite that is locally conformably interbedded with chloritic/biotitic cobaltiferous tuffaceous exhalites. The lower hanging wall includes medium- to coarse-grained quartzite with poorly defined, chaotic bedding. BTE material is restricted to sporadic, irregular diapirs.

The main zone is dominated by fine- to medium-grained, thin- to medium-bedded quartzites that are interbedded with biotitic and chloritic tuffaceous exhalites and local siliceous tuffaceous exhalites (STE). Mineralization in the Ram main zone is generally found within a confined stratigraphic package containing three closely-spaced stratiform horizons, of variable thickness and continuity, which strike between 340° and 355° and dip between 50° and 55° to the northeast. These horizons contain fine- to coarse-grained disseminations, bands, blebs, and stringers of cobaltite, chalcopyrite, and minor pyrite. This mineralization is dominantly concordant with bedding, but locally has been remobilized into thin quartz veins (i.e., ‘sweat veins’) and/or cross-cutting structures. The main zone represents the bulk of the potentially economic mineralization identified in the Ram deposit to date. The 3023 horizon is the lowest member of the main zone and is the thickest and most continuous horizon. The main zone is up to 21 feet in true thickness.

The footwall zone has been subdivided into two rock packages. The upper footwall is characterized by poorly- to well-bedded silty quartzite, often intercalated with chloritic and biotitic tuffaceous exhalite. Frequently distorted bedding (soft sediment deformation) and a lack of tuffaceous exhalite differentiate the lower footwall from the upper.

A north trending vertical to steeply east dipping normal fault is evident in drill core. The fault cuts the main mineralized zone in the south on section 2+00 North and diverges to the north. The mineralized horizons have been found in drill holes R97-02 and R97-03 west of the fault. The down dropped side appears to be around 40 feet lower. Shearing is locally common in the footwall as well as in the upper hanging wall. As at the Sunshine Lode, small scale folds are evident in drill core (Formation Staff in 1998 resource report).

According to the 1998 resource report by Formation Capital Staff:

“The Ram’s main mineralization is found within a confined stratigraphic package containing three closely spaced stratabound horizons. They have been coded from upper to lower as 3021, 3022 and 3023 horizons. …text abridged … Additional mineralized horizons have been encountered in the upper unit of the footwall package and in the middle unit of the hanging wall package. The stratabound mineralization consists of fine to coarse grained disseminations, bands, blebs and stringers of cobaltite, chalcopyrite and minor pyrite.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 94

Minor pyrrhotite, noted only in the upper footwall horizon, and the pyrite occurrences in the Ram appear to be local concentrations. This mineralization is dominantly bedding concordant but, locally has been remobilized into fractured quartz veins and/or cross cutting structures. The mineralized zone is typically hosted by siliceous and/or biotitic tuffaceous exhalites and fine to medium grained quartzites. The biotitic tuffaceous exhalites commonly contain a chloritic component.

Table 7.2 summarizes the stratigraphy of the Ram Deposit.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 95

Table 7.2 Stratigraphy of the Ram Deposit
 
Component    Description 
Upper Hanging    - medium to coarse grained quartzites, locally poorly bedded to well bedded. 
Wall    - BTE is restricted to irregular, coarsely garnetiferous diapirs. 
Middle Hanging    - medium grained quartzites interbedded with locally conformable cobaltiferous chloritic/biotitic 
Wall    exhalites, generally well bedded 
Lower Hanging    medium to coarse grained quartzite, poorly defined locally chaotic bedding 
Wall    local clastics 
    sporadic, irregular diapirs of biotitic exhalite, often cobaltiferous 
Mineralization    - fine to medium grained, poorly bedded but with locally well developed thin to medium 
    bedding 
    - generally three conformable cobaltiferous horizons, best developed down dip 
3021 horizon    - not always well defined 
    - often comprised of clastic horizon with biotitic matrix and considerable chalcopyrite and 
    minor pyrite, on section 0+00 comprised of fine grained cobaltite fracture fill associated with 
    minor chloritic to biotitic BTE in STE matrix. 

3022 horizon
-not always well defined

- often comprised of disseminated cobaltite in biotitic gangue

  -best developed down dip
3023 horizon    -variably comprised of disseminated and/or banded cobaltite in chloritic BTE, or fracture filling 
    cobaltite in STE with attendant chloritic or biotitic BTE 
    - in general chloritic component increases up dip and biotite increases down dip 
    - STE increases down dip 
    - chalcopyrite and pyrite appear to increase down dip 
    - foot wall contact is best developed down dip 
    - a distinct, black, biotitic MDS is encountered near the lower horizon in all intersections 
Upper Footwall    - silty quartzite, intercalated with BTE, thin to medium bedded, poorly to well defined 
    - chloritic BTE component absent or restricted to horizons down dip 
footwall horizons    - commonly characterized by biotitic matrix with chloritic overprint 
    - locally contains STE 
- commonly contains chalcopyrite and locally pyrite and minor pyrrhotite.
    - in general chloritic component increase up dip. 
    - in general biotitic component and sulfides increase down dip and to the north. 
Lower Footwall    - silty quartzite, thin to medium bedded, poorly to well defined, often distorted. 
    - frequently soft sediment textures. 
    -locally abundant MDS, frequently calcareous. 
    -occasional biotitic garnetiferous bands 

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 96

Component Description

Notes: This table was copied with minor alteration from Table 9 of the 1998 resource report by Formation staff BTE is biotite-rich tuffaceous exhalative STE is siliceous tuffaceous exhalative MDS is mafic dike/sill

7.3.3 Other Deposits

Aside from the Sunshine and Ram deposits, which are the focus of this report, there are a number of other known mineral occurrences in the Blackbird area, some of which are partly or entirely on Formation Capital’s claims. These include the Merle-Northfield, Iowa, Toronto and H.W. Toronto zones. The locations of these zones are shown in Figure 7.2. The brief descriptions that follow are from Gow (1995):

“There are four zones with variations of the name Merle, all located near the southeast corner of the Noranda Blackbird patented claim block and the LDC claims of Formation. These are Merle, Upper Merle, H.W. Merle and the Merle-5 Zones. These zones extend outside the Noranda property and, as a result, form targets on the Formation Sunshine property.

“The Merle Zone was extensively explored by Noranda, as discussed by Loos (1982). Some 26 diamond drill holes (aggregating 14,888 feet) were completed by Noranda and a further 3 holes were drilled by Northfield in the period 1954 to 1956. Noranda estimated in-situ reserves for the Merle Zone7 … This zone straddles the Noranda-Formation boundary.

“The Upper Merle was tested by three diamond drill holes. A number of low values of cobalt and copper have been intersected but no continuity of potentially economic mineralization has been demonstrated to date.

  “Little data are available for the H.W. Merle Zone.

“The Merle-5 Zone was not tested by Noranda. An underground program of work completed by Northfield tested parts of this zone by drifting and underground drilling. An old report shows mineralization was intersected on one level over a length of about 27 feet, with exposures in two drifts and four underground diamond drill holes. This testing was part of a larger program which included underground drifting, 8 surface diamond drill holes and 8 underground diamond drill holes.

“A number of other zones have been identified during a soil geochemical survey completed by Noranda and discussed by Toth and Hahn (1982). Of interest to Formation are the Iowa Zone, the up-dip part of the Toronto Zone and the down-dip projection of the H.W. Toronto Zone.”

7 Gow quoted Noranda’s in-situ reserve. However, since the amount of that reserve, if any, that may be on Formation’s ground is indeterminate, MDA has elected not to quote the Merle reserve in this report.

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 97

Figure 7.5 Ram Deposit Cross Section

Drawing by Formation Capital; modified size by A.V.Moran




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 98

7.4 Geochemistry

The following is an abridged discussion of geochemistry from Gordon Hughes, 1993; A Deposit Model and Exploration Guidelines for the Blackpine Cu-Au-Co Sulfide System, Lemhi County, Idaho:

“The systematic changes through space and time with respect to sulfide formation and distribution in clastic-hosted metalliferous systems, such as those at Blackbird and Blackpine, provide some predictive qualities that can be used to identify relative positions within the systems. Thus certain elements and element ratios have been found to be excellent guides for locating high-grade portions of a system, which are nearly always contained in lodes located closest to the original feeder structures. Both lithogeochemical and soil geochemical prospecting were successful at Blackbird to delineate ore targets.

Lithogeochemical data were found to be more sensitive, and therefore more reliable guides for identifying high-grade feeder-zone styles of mineralization. The most useful indicator elements for vectoring in on high-grade proximal-type ores are rare earth elements, bismuth, As:Cu, and Au:Cu ratios. Rare earth elements (especially Ce, Eu, La, and Nd) and bismuth are both present in feeder-proximal sulfide ores at levels that are in the range of at least 4X than in surrounding, more distal sulfides. This relationship appears to be consistent for both tuffite-hosted and exhalite-hosted ores. Likewise, As:Cu and Au:Cu ratios increase significantly both within and immediately (tens of feet) surrounding the inferred feeder-vents at Blackbird.”

Important systematic variations are observed in the hangingwall rocks and footwall rocks. They include higher concentrations in the hangingwall versus the footwall of Co, As, Y, Ba, and possibly Na2O. As well, there are higher concentrations in the footwall versus the hangingwall of Cu, Ag, Cr, and TiO2. Hughes continued with the following:

“Soil geochemical surveys were effectively used at Blackbird to a) locate buried target zones, b) follow known mineralized intervals, and c) identify areas of stronger mineralization within a broader anomaly. By far the most definitive, and ultimately the most reliable, ore indicator element for these types of systems is arsenic. Copper was shown to be more readily concentrated by supergene processes; whereas, cobalt was significantly leached. Both copper and cobalt (in soils) could be used to determine the presence (or absence) of mineralized stratigraphy in an exploration area at Blackbird. However, they could not discriminate between high-grade ore zones, low-grade zones, or simply geochemically anomalous mafic tuff horizons in the stratigraphy.”

Surface geochemistry has been used by Formation Capital to trace and extend the near surface projections of drill intercepted mineralized horizons.

Drill hole geochemistry shows similar element associations as surface geochemistry, noting that partly oxidized rocks near surface may have some leaching and or concentrations of some elements as a result of supergene processes. A look at elemental associations of 2004 core drilling samples for the Ram deposit shows Co-Cu-Au-As-Bi-Ag to be anomalous (without segregation of oxidized versus non-

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 99

oxidized core). The mean and high values for each are listed in Table 7.3. Similar associations are noted for the Sunshine deposit as well.

Table 7.3 2004 Ram Drilling – Anomalous Geochemistry

    Co(%)    Cu(%)    Au (opt)    Ag (ppm)    As (ppm)*    Bi (ppm) 
Maximum             6.11               9.04               0.212    1,083    226,818    58,884 
Mean (1)             0.18               0.23               0.004    0.35    1,494    38 
Mean (2)             0.20               0.27               0.006    4.13    1,732    161 
           * excludes 61 samples that are overlimit @ +300,000 ppm As         
           (1) Including values of 0.0    (2) including only values greater than 0.0         

Correlation coefficients for the above elements show the association Co-As, Co-Au, Cu-Au and Au-As to be quite strong (highest positive number in Table 7.4) . Although silver has strong associations as well, the level of Ag anomalism is rather low; as shown in Table 7.3.

Table 7.4 2004 Ram Drilling – Correlation Coefficients

    Cu    Au    Ag    As    Bi 
Co    .296    .688    .315    .791    .191 
Cu        .585    .910    .313    .258 
Au            .607    .593    .437 
Ag                .360    .353 
As                    .210 

These geochemical associations for Ram drilling data are similar for the Sunshine deposit as well. Coupled with grade distribution plots for each element and for each mineralized horizon, it may be possible to define geochemical and/or grade zoning patterns in the Ram and Sunshine deposits. MDA recommends that geochemical associations and/or grade zoning patterns be investigated for the Ram deposit in particular, to determine if any zonations can be used in deposit modeling and mine planning. Drill hole density at the Ram deposit may not be sufficient at this stage to determine such patterns; however, preliminary indications could be useful in determining, for instance, a trend to high-grade Co values that should receive in-fill drilling as part of ongoing activities by Formation Capital.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 100

8.0 DEPOSIT TYPES

The deposits comprising the Idaho Cobalt Project belong to a class of deposits variably described as “Blackbird Co-Cu” (Evans et. al., 1986) or “Blackbird Sediment-hosted Cu-Co” (Hőy, 1995). The Idaho Cobalt Project lies in the type locality for these deposits and includes some of the type deposits. According to Evans et. al., “These deposits are stratabound iron-, cobalt-, copper-, and arsenic-rich sulfide mineral accumulations in nearly carbonate-free argillite/siltite couplets and quartzites … ” The summary that follows is extracted from Hőy (1995):

“CAPSULE DESCRIPTION: Pyrite and minor pyrrhotite, cobaltite, chalcopyrite, arsenopyrite and magnetite occur as disseminations, small veins and tabular to pod-like lenses in sedimentary rocks. Chloritic alteration and tourmaline breccias are locally associated with mineralization.

“TECTONIC SETTINGS: Near continental margins or in intracratonic basins. Within the Belt-Purcell basin, which may have formed in a large inland sea, extensional tectonics are suggested by possible turbidite deposition, growth faulting, gabbroic sills and (?)tuff deposition. Alternative setting is marine, in an incipient or failed rift along a continental margin.

“DEPOSITIONAL ENVIRONMENT / GEOLOGICAL SETTING: These deposits are not well understood. Possible turbidite deposition in marine or inland sea, associated with basaltic pyroclastic volcanics or mafic synsedimentary gabbroic sills; alternatively, tidal flat environment.

“AGE OF MINERALIZATION: Can be of any age. The Blackbird deposits at the type locality are assumed to be approximately 1460 Ma, the age of the host rocks.

“HOST/ASSOCIATED ROCK TYPES: Fine-grained metasedimentary rocks; thin-bedded siltstone, fine-grained quartzite, black argillite and calcareous siltstone; garnet schist, phyllite, quartz-mica schist. In the Blackbird district synaeresis cracks (subaqueous shrinkage cracks) occur within immediate host rocks, sedimentary structures indicative of shallow water, and locally subaerial exposure in overlying rocks, suggest shallow water environment. Numerous biotite-rich beds within the host succession may be mafic tuff units (or diorite sills ?). Sheep Creek8 deposits are within correlative Newland Formation dolomitized shales and conglomerates.

“DEPOSIT FORM: Irregular, tabular to pod-like deposits, from approximately 2 to 10 m thick.”

“ASSOCIATED DEPOSIT TYPES: Possibly Besshi volcanogenic massive sulphide deposits, Fe formations, base metal veins, tourmaline breccias.

8 The Sheep Creek deposits are in Montana. Hoy mentioned them as examples of deposits that may have some geologic similarities to the Idaho Cobalt deposits.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 101

9.0 MINERALIZATION

Mineralization at the Idaho Cobalt Project is characterized as syngenetic, stratiform, exhalative deposits within, or closely associated with, the mafic sequences of the middle unit of the Yellowjacket Formation. The deposits range from nearly massive to disseminated. Some cross-cutting mineralization is present that may be in feeder zones to the stratiform mineralization. Dominant ore minerals include cobaltite (CoAsS) and chalcopyrite (CuFeS2), with lesser, variable occurrences of gold. Other minerals present in small quantities are pyrite (FeS2), pyrrhotite (Fe1-xS), arsenopyrite (FeAsS), linnaeite ((CoNi)3S4), loellingite (FeAs2), safflorite (CoFeAs2), enargite (Cu3AsS4) and marcasite (FeS2).

Additional description of the mineralization at the Idaho Cobalt Project is inseparable from descriptions of the geology, and is covered in more detail in Section 7.3 of this report (Geological Setting –Mineralization). Extent of mineralization is discussed in Section 10.0 (Exploration).

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 102

10.0 EXPLORATION

Since 1995, Formation Capital has defined through exploration drilling, two areas of Blackbird Co-Cu type mineralization, referred to as the Sunshine and Ram deposits. Formation Capital completed a total of 139 drill holes for 88,606 total feet of core drilling, and has defined mineralization in multiple sub-parallel zones of Co-Cu mineralization that are stratiform in nature. The multiple sub-parallel zones, or horizons, which comprise the Sunshine and Ram deposits are further described in Section 7.0 (Geological Setting) and Section 17.0 (Resources and Reserves). The larger Ram deposit consists of five hangingwall horizons, a main zone comprising three horizons, and three footwall horizons. The main zone horizons, which are the most extensive, typically have mineralized dimensions of 2,000-3,000 feet in strike extent, by 500-900 feet in vertical extent, and true widths that average about 8 feet (true widths ranges of less than 3 feet to greater than 20 feet for horizon 3023). These sub-parallel horizons generally strike N15W and dip 50-60 degrees to the northeast, and have been drill tested to depths of 1,200 feet vertically. The Sunshine deposit consists of three horizons which have similar strike and dips, but are generally thinner and somewhat less extensive than the Ram main zone. While exploration opportunities are present to expand upon the two resource areas, and at other targets within the Formation Capital claim block, this discussion is primarily directed at the two resource areas; Ram and Sunshine.

The Formation Capital U.S. Field Staff report of 1998 described exploration work that included:

1995 and 1996

In 1995, soil sampling of selected areas on lines spaced 200 and 400 feet apart, with samples collected at intervals of 100 feet along the lines. This program discovered the southern end of the previously unknown Ram target.

In 1996 the soil grid was extended north and soil samples were collected on lines spaced 200 feet apart with samples collected at 25 foot intervals along the lines. Some infill samples were collected from the 1995 soil grid. Other parts of the grid were also extended and sampled on 25 foot intervals where warranted.

1997

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 103

For a topographic base, Formation Capital contracted for and now has a 5-foot contour map of the project area, produced photogrammetrically, using aerial photography.

Formation Capital field staff, or contractors working under the direct supervision of Formation Capital staff, carried out all of the field work described.

1998-2001
2002-2005

According to Daggett (1981) “The Sunshine deposit possesses no geophysical expression, produces only a faint geochemical anomaly, and is inconspicuous in surface outcrop. Exploration for Sunshine-like deposits must therefore proceed by model formulation and testing, rather than by prospecting.”

The present report is focused on resource estimates using drill hole information. MDA acknowledges that the surface geological and geochemical work were important contributors to the discovery of the Ram deposit, but the results of the surface exploration are not discussed in detail in this report.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 104

The resource estimates in this report incorporate and are the culmination of the interpretation of the exploration data. For an interpretation of the exploration data the reader is referred to the resource estimates, described in Section 17.0 of this report.

The reliability of the exploration data is discussed in Section 17.0 (Mineral Resource and Mineral Reserve Estimates), and in Section 12.0 (Sampling Method and Approach), Section 13.1, (Quality Control Procedures), and Section 14.0 (Data Verification).

Total expenditures by Formation Capital at the Idaho Cobalt Project from 1995 through February, 2005 was $14,510,352.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 105

11.0 DRILLING

The drilling database that defines the Ram and Sunshine deposits consists of 169 core holes for 106,432 feet, of which 139 holes for 88,606 feet were holes drilled by Formation Capital (Table 11.1) . The historical drilling by Noranda is part of the resource database. All holes have been core holes. Figure 11.1 shows locations of drill collars and the surface projection of drill-hole traces of the angle holes drilled into the Ram and Sunshine deposits.

Table 11.1 ICP Drilling Summary

   Year        Operator    Deposit    No of Holes    Feet 
   Drilled                 
   1959        Calera Mining Company    Sunshine    1    unknown, sample data from one 10 
                    foot interval available 
   1979             Blackbird Mining Company    Sunshine    29    17,826 
   1981        (Noranda)             
   1995             Formation Capital    Sunshine    48    29,144 
   1996                     
   1995             Formation Capital    East Sunshine    24    14,723.5 
   1996                     
   1997        Formation Capital    Ram    20    12,045 
 
   1999        Formation Capital    Ram    11 (exploration)    5,211 
   2000                8 (metallurgy)    2,613 (not in resource database) 
   2004        Formation Capital    Ram    28    24,869 
 
 
 
11.1    Drilling Done for Blackbird Mining Company (Noranda Exploration Inc.) 

Twenty-nine core holes drilled by Blackbird Mining Company into the Sunshine Deposit were used by Formation Capital in its estimate of the Sunshine resources.

11.1.1 Core Logging

Noranda logged all drill core at a scale of 1 inch equals 10 feet, according to a system outlined by Hughes (1979). MDA has not obtained the 1979 Hughes report and thus is not able to describe the core logging system in detail.

11.1.2 Geotechnical Logging

Noranda routinely recorded core recovery and Rock Quality Designation (RQD) (Baer and Daggett, 1981). Their definition of RQD was the percentage of NX-sized core four inches in length or longer, usually over a 10 foot run. Drill penetration rates were calculated from drillers’ shift reports. Noranda photographed core samples representative of the various rock units.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 106

Figure 11.1 Sunshine Deposit Drill Hole Locations




  Technical Report, Idaho Cobalt Project

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 108

Drilling Done for Formation Capital Corporation

Formation Capital’s project database contains a total of 169 holes, which were drilled by Formation Capital, BMC, or Calera Mining. BMC’s drilling was limited to the Sunshine deposit, though the upper portions of a few holes did intersect the East Sunshine mineralization. As shown in Table 11.1, the majority of the drilling at the Idaho Cobalt Project has been by Formation Capital, 139 holes. With the exception of reverse circulation pre-collars for metallurgical holes completed by Formation in 2000, all drill data was obtained by core drilling. Exploration holes were drilled with either NQ- or HQ-size core; the metallurgical holes were drilled with PQ-size core. NQ, HQ and PQ core have diameters of 1.875"(47.6mm), 2.500"(63.5mm) and 3.345"(85.0mm), respectively.

Formation routinely logged the drill core in considerable detail, with particular attention to mineralized sections.

The collars of all drill holes were located by tight chain and compass from the nearest known point. Most of the pre-1998 drill hole collar locations were re-surveyed by Harper-Leavitt Engineering Inc. using a transit (1998 report by Formation Staff).

With the exception of the first six holes of the 1995 drill campaign, a single shot Sperry Sun instrument was used for down-hole surveys of the drill hole orientations. For most of the 1995 drill holes less than 300 feet long, a single reading was taken at the bottom of the hole. For longer holes, a reading was taken approximately half way down the hole, and another at the bottom. In the 1996 drilling campaign down-hole surveys were done every 100 feet up the hole, whereas in the 1997 Ram drilling campaign they were done every 150 feet.

Drilling has been as angle holes oriented to be approximately normal to the strike of the mineralized horizons, and cross-cutting mineralized horizons at appropriate angles such that true thicknesses of mineralization could be determined. It is MDA’s opinion that the drilling methods used at the Idaho Cobalt Project follow industry standard procedures, and are appropriate methods to adequately interpret the mineralized zones defined by that drilling.

The interpretation of the drilling results is incorporated into the descriptions of the resource estimates for the Sunshine and Ram deposits, in Section 17.0 of this report.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 109

12.0 SAMPLING METHOD AND APPROACH

Until 1996, Formation Capital sampled the core by hand-splitting the drill core into halves, with one-half retained and the other half sent for assay. Since then, the drill core was sawn to obtain the splits. Soft material that did not lend itself to sawing was split by hand.

Throughout the drill campaigns, Formation Capital diligently sampled the core at intervals that corresponded to geologic, mineralogic, and alteration features. During the 1995 program on the Sunshine and East Sunshine, sample intervals ranged from 0.60 feet to 16 feet. During the 1996 and 1997 programs, sample lengths ranged from 0.50 feet to 5.00 feet. No sample longer than 6 feet was used in the 1998 resource estimates. Subsequent drilling campaigns have been sampled at similar 0.50 to 5.00 foot intervals. Typically, several sample intervals define the mineralization for any single intercept of the various mineralized horizons.

12.1 Core Recovery

For drilling done prior to 1999, MDA checked 20 intervals of mineralized material and the mean core recovery was 94.4% . Formation recorded core recovery for all of the 1999 Ram exploration drill holes; the mean core recovery for sample intervals containing greater than 0.1% cobalt was 85.3% . There does not appear to be a relationship between cobalt grades and core recovery, so the impact on grades from core with poorer recovery should not impart a bias.

Sampling methods utilized for core have been according to standard industry practices.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 110

13.0 SAMPLE PREPARATION, ANALYSES AND SECURITY

All of the persons involved in the field aspects of sampling the drill core, including selecting intervals for sampling, doing the sampling, packaging and shipping the samples, were employees of Formation Capital.

The majority of sample analyses prior to 1995 were for cobalt and copper, with occasional assaying for gold. Beginning in 1995, Formation Capital included gold assaying as part of their routine analytical procedure. In addition, multi-element geochemistry analyses have been completed on nearly all of Formation Capital’s drill holes at the Idaho Cobalt Project.

Formation Capital’s sample analyses were performed by Chemex Labs, Inc., of Sparks, Nevada and Vancouver, B.C., and Bondar Clegg Laboratories, Inc. (USA), of Reno, Nevada and Bondar Clegg Laboratories, Inc. (Canada), of Vancouver, B.C. EcoTech Laboratories Ltd. of Kamloops, B.C. completed additional check sample analyses in 1996. Cobalt and copper analyses were done by 4-acid (HNO3-HClO4-HF-HCl) digestion with an atomic absorption (AA) finish; gold was analyzed by 30-gram fire assay followed by an AA finish. Multi-element geochemical analyses were performed by induction-coupled plasma methods. These are all industry standard analytical techniques.

13.1 Quality Control Procedures (QA/QC)

Starting in 1996, Formation Capital completed check assays and submitted blanks and standards with each assay batch. Formation Capital made up two standards for evaluating potential biases in cobalt analyses. At the time of the evaluation, Bondar Clegg (Canada) had a consistently higher grade than Chemex. The fact that Formation Capital used Chemex, whose mean grades were lower than Bondar Clegg (Canada) suggests there may be a built-in level of conservatism to the cobalt assay database.

MDA examined this data in 1998 and found the assays of the check samples, blanks, and standards to be in good agreement with expected values. The exception is one blank sample, which returned low cobalt, but high copper values. These checks are summarized in Table 13.1.

Mine Development Associates April 30, 2005



       Technical Report, Idaho Cobalt Project                             
                       Formation Capital Corporation    Page 111 
 
    Table 13.1 Check Samples, Blanks and Standards Pre-1999         
 
             Item    Number of        Original Assays            Check Assays     
    Samples    %Co    %Cu    oz Au/t    %Co             Cu    oz Au/t     
Sunshine                                     
BMC core    54    0.11    0.43        0.008    0.10             0.39    0.002     
FCC core    140    0.55    0.74        0.018    0.56             0.66    0.017     
Blanks    56    0.00                 0.00*        0.000                 
Standard 1    81    0.84    n/a        n/a    0.81             0.08    0.061     
Standard 2    23    0.26    n/a        n/a    0.25             0.03    0.030     
Ram                                     
FCC core    13    1.05    0.38        0.021    1.11             0.51    0.025     
Blanks    30    0.01    0.00        0.000                 
Standard 1    81    0.84    n/a        n/a    0.80             0.07    0.061     
Standard 2    6    0.26    n/a        n/a    0.24             0.04    0.029     
*excluding one high copper assay                                 

In the 1999 Ram drilling program Formation Capital submitted standards and blanks into the sample stream for each drill hole, except R99-09, which did not intersect significant mineralization. Blanks were inserted immediately after samples were seen or suspected to contain high-grade cobalt. Results of the1999 Ram standard and blank sample program are summarized in Table 13.2.

Table 13.2 Standard and Blank Samples, 1999 Ram Drilling Program

             Item    Standard / Blanks    Number of    Mean Assayed Values 
    %Co    %Cu    oz Au/t    Submittals    %Co    %Cu    oz Au/t 
Blank Sample    ---    ---    ---    10    0.008    0.00    0.0002 
Standard 1    0.836    n/a    n/a    3    0.818    0.07    0.0626 
Standard 2    0.255    n/a    n/a    10    0.254    0.03    0.0302 

The use of standard reference material verifies and enhances the confidence in the laboratory procedures used by Chemex, as the difference between the original standard values and the average values reported for standards 1 and 2 inserted into the sample stream are only 2% and 0.4%, respectively. Each of the ten sample blanks returned trace levels of cobalt.

A further check of assay data is shown in Table 13.3, which is a comparison of the weighted average analyses of original core sample results with the composite grade of coarse rejects used to prepare three metallurgical samples in 2004. The composites were each prepared from approximately 40 individual samples which aggregate 50-60 kg for each composite sample. The original assays were done by Chemex or Bondar Clegg (now ALS Chemex), and the composite metallurgical head grade was determined by Lakefield Research, of Ontario, Canada. Close comparison is demonstrated for Cu, Co, and Au. Although not designed as an outside laboratory check assay procedure, the end result is an acceptable comparison of two lab procedures on replicate samples.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 112

Table 13.3 Metallurgical Composites Grades – 2004

Overall, Formation Capital has demonstrated diligence in monitoring check assays and standard and blank results, which is critical to the maintenance of an accurate and fair database.

13.2 Sample Security

Formation Capital’s core and sample security measures were typical for exploration projects in the United States at the time the work was done. The core was received at the drill by an employee of Formation Capital, and taken to the company’s facility in Salmon for processing. That facility is a warehouse-like building with lockable doors. Split core was placed in a labeled sample bag closed with a wire tie. An employee of the analytical laboratory picked up the samples at Formation Capital’s facility. Thus the core has been under Formation Capital’s control from receipt at the drill, and those parts of core not included in samples remain under Formation Capital’s control. The samples were under Formation Capital’s control from the drill to the core splitting facility, and under the laboratory’s control after leaving Formation Capital’s facility.

13.3 ISO 9000 Certification

ALS Chemex, at its North American and Peruvian laboratories, holds ISO 9002:1994 certification and, for North America, ISO 9001:2000. ALS Chemex is the successor to Chemex and Bondar Clegg, the laboratories that did most of Formation Capital’s analyses. MDA has not determined the date that ALS Chemex or its predecessors first obtained ISO 9002 certification, but it is probable that much of the work for Formation was done before that date.

The purpose of the ISO 9002:1994 standard is described in this quote from Praxiom Research Group’s internet site at http://www.connect.ab.ca/~praxiom/9002.htm. The quote applies to ISO 9002, but the intent of ISO 9001:2000 is similar.

“ ISO 9002 is a quality assurance model made up of quality system requirements. This model applies to organizations that produce, install, and service products. ISO expects organizations to apply this model, and to meet these requirements, by developing a quality system.”

Overall, Formation Capital’s sample security and quality control procedures, and the sample preparation and analytical procedures used by the independent laboratory of ALS Chemex, are sufficient to have maintained consistency, integrity, and accuracy in the drill hole database of the Idaho Cobalt Project.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 113

14.0 DATA VERIFICATION

MDA has visited Formation Capital’s field office in Salmon, Idaho on several occasions, with field visits to both the Idaho Cobalt Project and the adjacent BMC (Blackbird Mine) property. MDA reviewed all the project data generated to date, including drill logs, cross sections, and long sections. MDA also examined drill core and can state that geological and mineralogical data documented and presented by Formation Capital was, in fact, found in the core. Overall, visual identification of mineralized intervals relates well to the stated assays. MDA found that in general, the geologic documentation and interpretation fairly represent the Sunshine, East Sunshine, and Ram deposits.

MDA has reviewed and checked original assays, check assays, and QA/QC procedures and results, reviewed and audited the digital database, examined geologic data and interpretations, and reviewed and re-sampled representative core intervals.

Prior to the 1999 Ram drilling program, MDA checked about 5% of the sample intervals in the project database for data entry errors. No errors existed for entries of cobalt, copper, or gold values; however, the footage for one interval was entered incorrectly. Approximately 10% of the 1999 Ram drill data was audited and no errors were found.

As an extension of the quality control procedures employed by Formation Capital, MDA took seven samples from previously sampled core from the Sunshine deposit. MDA split the existing core halves to make new samples representing a quarter of the original core, and submitted them to Bondar Clegg (U.S.A) for 32-element geochemical analysis (aqua regia digestion; ICP analysis). MDA found that the results verified the original geochemical analyses for four of the samples. Comparisons to the remaining three samples were invalid, as the original analyses were done by assay methods only, rather than geochemical procedures. Ore-grade assay procedures use much higher concentrations of acid and longer digestion times, as compared to aqua regia digestion methods, that result in more complete digestion of the sample. This provides for a more quantitative analysis of the sample. Only assay values are used in the Sunshine, East Sunshine, and Ram resource estimates.

For drilling done prior to 1999, MDA checked 20 intervals of mineralized material and the mean core recovery was 94.4% . Formation recorded core recovery for all of the 1999 Ram exploration drill holes; the mean core recovery for sample intervals >0.10% Co was 85.3% . There does not appear to be a relationship between cobalt grades and core recovery, so the impact on grades from core with poorer recovery should not impart a bias.

Table 14.1 shows the summary statistics for the RAM mineralization by horizon, from the 2001 pre-feasibility study (Prenn, 2001). Figure 14.1 is a cumulative frequency plot of all previous drilling at the Ram, with separate graphs for 2004 drilling and for pre-2004 drilling. Both Table 14.1 and Figure 14.1 provide insights to the distribution of Cobalt assays for the Ram deposit.

Table 14.1 shows the effects of capping grades on the mean grade for each horizon; the results showing that capping high grades has little effect on the mean grade; verification that the mean grades are not inappropriately skewed by a few extraordinarily high values. Similarly, figure 14.1 verifies that the percentage of very high-grade assays for cobalt (above 4.0%) is quite small (less than 1%).

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 114

Table 14.1 Ram Assay Database – Summary Statistics by Horizon (Main & FW zones)

    Mineralized        %Co        %Cu        oz Au/t 
        %Co        %Cu        oz Au/t     
    Interval (ft)*        Capped        Capped        Capped 
All Zones                             
No. of Samples    333    333    333    333    333    333    333 
Minimum    0.41    0.002    0.002    0.00    0.00    0.000    0.000 
Maximum    4.26    10.650    4.000    10.20    4.00    0.230    0.090 
Mean    1.33    0.676    0.640    0.62    0.56    0.018    0.016 
Std. Dev.    0.70    1.053    0.831    1.15    0.86    0.027    0.021 
C.V.**    0.53    1.558    1.298    1.87    1.53    1.528    1.276 
Horizon 3021                             
No. of Samples    41    41    41    41    41    41    41 
Minimum    0.46    0.007    0.007    0.04    0.04    0.000    0.000 
Maximum    4.26    2.551    2.551    5.71    4.00    0.111    0.090 
Mean    1.30    0.454    0.454    0.81    0.76    0.018    0.017 
Std. Dev.    0.68    0.614    0.614    1.30    1.14    0.023    0.020 
C.V.**    0.52    1.353    1.353    1.61    1.50    1.257    1.178 
Horizon 3022                             
No. of Samples    66    66    66    66    66    66    66 
Minimum    0.41    0.014    0.014    0.00    0.00    0.000    0.000 
Maximum    3.36    10.650    4.000    7.82    4.00    0.198    0.090 
Mean    1.26    0.874    0.716    0.69    0.63    0.028    0.026 
Std. Dev.    0.74    1.683    0.957    1.19    0.89    0.034    0.026 
C.V.**    0.59    1.926    1.336    1.71    1.40    1.216    1.006 
Horizon 3023                             
No. of Samples    138    138    138    138    138    138    138 
Minimum    0.44    0.016    0.016    0.01    0.01    0.000    0.000 
Maximum    3.47    5.411    4.000    7.46    4.00    0.230    0.090 
Mean    1.25    0.869    0.858    0.65    0.61    0.020    0.018 
Std. Dev.    0.62    0.925    0.882    1.07    0.87    0.029    0.021 
C.V.**    0.50    1.065    1.027    1.66    1.44    1.483    1.167 
Horizon 3031                             
No. of Samples    47    47    47    47    47    47    47 
Minimum    0.47    0.002    0.002    0.00    0.00    0.000    0.000 
Maximum    3.42    3.872    3.872    1.75    1.75    0.051    0.051 
Mean    1.34    0.254    0.254    0.32    0.32    0.006    0.006 
Std. Dev.    0.75    0.583    0.583    0.39    0.39    0.011    0.011 
C.V.**    0.56    2.300    2.300    1.22    1.22    1.847    1.847 
Horizon 3032                             
No. of Samples    28    28    28    28    28    28    28 
Minimum    0.65    0.008    0.008    0.00    0.00    0.000    0.000 
Maximum    3.62    1.398    1.398    10.20    4.00    0.035    0.035 
Mean    1.86    0.261    0.261    0.75    0.53    0.005    0.005 
Std. Dev.    0.82    0.301    0.301    1.99    0.99    0.007    0.007 
C.V.**    0.44    1.156    1.156    2.66    1.88    1.610    1.610 
Horizon 3035                             
No. of Samples    13    13    13    13    13    13    13 
Minimum    0.83    0.035    0.035    0.01    0.01    0.001    0.001 
Maximum    2.46    2.700    2.700    0.37    0.37    0.051    0.051 
Mean    1.44    0.747    0.747    0.12    0.12    0.013    0.013 
Std. Dev.    0.59    0.937    0.937    0.10    0.10    0.016    0.016 
C.V.**    0.41    1.255    1.255    0.88    0.88    1.189    1.189 

*      calculated true width
 
**      CV = coefficient of variation = standard deviation/mean
 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 115

Figure 14.1 also shows that the population of assays for cobalt in 2004 drilling plots nearly identical to that for previous drilling; verification that the various drill campaigns and sampling programs are indeed sampling the same population of values – no indicated bias in any particular drilling program.

Figure 14.1 Co Grade Distribution in Drilling
Cumulative Frequency Plot of Grade


The data verification procedures including visual correlations, spot re-sampling by MDA, database and data entry audits, Formation Capital’s QA/QC analytical procedures including checks, standards, and blanks, and database statistical evaluation have all shown that the Idaho Cobalt Project database is reliable and verifiable, and a reasonable representation of the mineral resources.

(Note: cumulative frequency plots are similar to Q-Q plots and provide a graphical-statistical view of assay data distributions.)

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 116

15.0 ADJACENT PROPERTIES

The only mineral property adjacent to the Idaho Cobalt Project is the Blackbird Mine. At present the mine is not producing, nor are Formation Capital or MDA aware of any plans by the owners to put the mine into production.

15.1 Blackbird Mine

The Blackbird Mine property is on patented mining claims geographically internal to Formation Capital’s claim block (see Figure 4.2), but it is not part of Formation Capital’s property holdings. Formation Capital does not have any ownership, beneficial interest in or liability for the Blackbird Mine property at present. The information herein concerning the mineral deposit at the Blackbird Mine is derived from reports that have been given to Formation Capital by the owners of the Blackbird Mine or other sources believed to be reliable. MDA has visited the Blackbird Mine, but has not verified the information concerning it. This information about mineralization at the Blackbird Mine is not necessarily indicative of the character or grade of the mineralization on the Idaho Cobalt Project.

15.1.1 Blackbird Reserve Estimate, 1982

The Blackbird reserve estimate is described in this report because the quantity and quality of mineralized material present at the Blackbird provides insight into local mineralization. The Blackbird reserve estimate was done using terms and parameters considerably different than those mandated by the current CIM standards, so it is necessary to describe the reserve/resource categories and procedures used by the Blackbird estimators in some detail, in order to present the results in a current perspective.

As part of a 1982 feasibility study, BMC estimated reserves at the Blackbird Mine (Blackbird Mining Company, 1982). BMC estimated and categorized the reserves according to the system then in use by Noranda Mining Inc. and Noranda Exploration Inc. BMC stated that its classification system was similar to that used by the U.S. Geological Survey and the U.S. Bureau of Mines. The following description of the categories and procedures is slightly abridged from the 1982 report. Note that the terms used do not correspond to those required by the current CIM Standards on Mineral Resources and Reserves. An explanation of the differences and correspondences of BMC’s system and the current CIM standard follows the description of BMC’s system.

Insitu Ore Reserves (BMC)

Insitu ore reserves are a composite of all proven, probable and possible reserves. Reserves are based on grades determined from cost and recovery factors developed in the April 1980 Blackbird Feasibility Report. The sliding scale insitu cutoff grade ranges from 0.465% Co with zero Cu to 0.245% Co with 6.10% Cu. Material above 6.10% Cu is classified as ore. A minimum true width of seven feet was used. Ore grade intercepts of less than seven feet were expanded to that width using actual subgrade assays, or zero values where assays were not available.

Note by MDA: the above statement under the heading “Insitu Ore Reserves” that “Reserves are based on grades determined from cost and recovery factors developed in the April 1980 Blackbird Feasibility

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 117

Report” seems at odds with BMC’s subsequent application of recovery factors to the total Insitu Ore Reserves in order to estimate the Recoverable Reserves. It implies that recovery factors were applied twice to the same material. MDA speculates that the Insitu Ore Reserves were estimated before the application of any recovery factors.

Prior to calculation, areas of insitu reserves were geologically investigated in the field using drill hole information.

Mineralized intercepts were compiled from drill hole logs and chip sample assays. Sludge sample results were used very sparingly and with caution in areas deficient in more credible samples. This data was compiled primarily on cross-sectional maps for the Idaho zone and on plan maps for the other zones. Longitudinal projections were used for portrayal of reserve data, rather than for volume calculations. Old pillars and awkwardly placed blocks near old stopes were not included in the reserve calculations. In general, a pillar measuring from 15 to 50 feet thick has been left around all existing stopes.

Proven Reserves (BMC)

Proven reserves are classified as ore which has been projected no more than 25 feet up or down dip from a sample point, and usually less than 100 feet along strike. Strike extensions are not carried across known structural discontinuities.

Probable Reserves (BMC)

Probable ore reserves are classified as the ore which has been projected an additional 25 feet beyond proven ore or between proven reserves where sound geologic data allows.

Possible Reserves (BMC)

Possible ore reserves are classified as ore which has been projected an additional 50 feet from probable ore, or between two data levels on the same geologic unit.

Geologic Reserves (BMC)

Geologic ore reserves are projected along a geologically continuous unit based on sample points 200 feet or more apart. Reserves calculated by Noranda Exploration Inc. are based on a minimum true width of 6 feet.

Recoverable Reserves (BMC)

BMC applied mineability, mine dilution and mine recovery factors to the entirety of its Insitu Ore Reserves, including the Proven, Probable, Possible and Geologic components. The result was considered to be the Recoverable Reserves.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 118

15.1.1.1 Reconciliation of Terms

The differences and similarities amongst the terms used by BMC in its reserve estimate, and the current standards, are discussed below:

    Nearest Equivalent     
BMC Term    CIM Term    Discussion 
Calculation    none    The use of the term calculation is now discouraged as it implies a degree of 
        exactness that is not achievable. 
 
Insitu Ore Reserve    Mineral Resource    BMC’s Insitu Ore Reserve is estimated before applying any mining 
        considerations such as mineability, mining recovery, or dilution. Applying 
        the CIM standard, it is similar to a Mineral Resource. 
 
Recoverable    none    BMC’s Recoverable Reserve is similar in concept to a Mineral Reserve, as 
Reserve        it takes into account mineability, mining recovery and dilution. However, it 
        includes material from the Possible and Geologic components of the Insitu 
        Reserve, and therefore does not correspond well with the current term 
        Mineral Reserve. 
 
Proven Reserve    Measured Resource    When applied to BMC’s Insitu Ore Reserve, this term is equivalent to a 
        Measured Resource. When applied to BMC’s Recoverable Reserve, it is 
similar to a Proven Reserve.
 
Probable Reserve    Indicated Resource    When applied to BMC’s Insitu Ore Reserve, this term is equivalent to an 
        Indicated Resource. When applied to BMC’s Recoverable Reserve, it is 
        similar to a Probable Reserve. 
 
Possible Reserve    none    The CIM standard does not allow for a Possible Reserve category. Material 
        that earlier workers might have included in such a category probably should 
        be considered an Inferred Resource. 
 
Geologic Reserve    Inferred Resource    As the lowest confidence level of BMC’s Insitu Ore Reserve, the Geologic 
        Reserve is similar in concept to an Inferred Resource. 

15.1.1.2 Summary of BMC Estimates

Table 15.1 summarizes Blackbird Mining Company’s estimates of its Insitu Ore Reserve.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 119

Table 15.1 Summary of 1982 Blackbird Mine Insitu Ore Reserve Estimate

Category    Tons    % Cobalt    % Copper 
Proven Reserve    1,829,507    0.72    1.38 
Probable Reserve    1,825,211    0.70    1.32 
Total Proven + Probable    3,654,718    0.71    1.35 
Possible Reserve    1,739,403    0.72    1.01 
Geologic Reserve    2,304,820    0.80    1.73 

Notes:    The Possible Reserve is listed separately from the Proven & Probable in deference to the CIM 
    Standard, which does not recognize the Possible category and which does not permit Inferred 
    Resources to be included in totals with other categories. 
 
    The Geologic Reserve includes 400,000 tons of material from the Sunshine deposit. That 
    deposit is also included in the reserve estimate of the present report. 

The proven, probable and possible reserves in Table 15.1 are contained in the Idaho, Chicago, Brown Bear, Blacktail and Dandy zones. The geologic reserve is contained within the Sunshine, Merle, Burl and Horseshoe zones. These zones are identified on the local geology map in Figure 7.2.

BMC applied mining considerations to the Insitu Ore Reserve Estimate and arrived at a final Recoverable Reserve Estimate of 7,600,320 tons grading 0.62% cobalt and 1.15% copper. However, this Recoverable Reserve includes material from the Possible and Geologic components of the Insitu Reserve. The recoverability of the material was based on economic conditions and metal markets in 1982. Therefore the Recoverable Reserve Estimate does not comply with or approximate any of the categories of the CIM Standard for resources or reserves, nor is it current. It is reported here as a matter of historical record only and should not be relied upon in any investment, economic or engineering evaluations.

15.1.2 Blackbird Mine Site Cleanup

The following text is taken from the EPA website on the Blackbird Mine and can be found at: http://yosemite.epa.gov/r10/cleanup.nsf/0/d3327818f7f16e738825664e00812324?OpenDocument According to the EPA website, this text was updated in October 2004.

Site Description

The Blackbird Mine site encompasses approximately 830 acres of private patented mining claims and 10,000 acres of unpatented claims within the Salmon National Forest. The site is located 20 miles west of Salmon, Idaho and is in the Panther Creek drainage basin, which drains into the Salmon River. Big Deer Creek and Blackbird Creek drain into Panther Creek. Since the late 1800s, several companies

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 120

have mined cobalt and copper on the site with both mine tunnels and open-pit methods. The current owner, the Noranda Mining Company, ceased operations in 1982. Mine tunnels, waste rock piles, and the open pit are located at the headwaters of Meadow and Bucktail Creeks which drain into Big Deer and Blackbird Creeks. There is a tailings impoundment located on the West Fork of Blackbird Creek and tailing deposits located along Blackbird Creek from transport of tailings to the West Fork tailings impoundment or direct discharges of tailings into the creek. The waste rock piles alone are approximately 4 million cubic yards. Investigations have shown that acid rock drainage and leachate from the tunnels, waste piles and tailings have contributed to the poor water quality in local creeks. High levels of heavy metals such as copper, cobalt, and arsenic are present in surface water and/or sediments downstream from the site. The copper levels exceeded EPA's Fresh Water Ambient Water Quality Criteria. Arsenic in soils located along the banks of Blackbird Creek and Panther Creek downstream of the mine may pose a potential risk to humans. The Snake River Sockeye spring/summer Chinook Salmon, Snake River Steelhead and Bull trout, listed as threatened or endangered under the Endangered Species Act, are threatened by the poor water quality.

Media Affected: Groundwater, Soil & Surface Water

Surface water and sediments are contaminated with high levels of heavy metals such as copper, cobalt and arsenic. Groundwater and surface water are primarily contaminated with copper and cobalt. Sediments and soils are primarily contaminated with copper, cobalt and arsenic. Site studies have shown that acid rock drainage from tunnels and waste piles have contributed to the poor water quality of local creeks. This water quality affects local aquatic life, including the Snake River spring/summer Chinook Salmon and other endangered or threatened species. People who come into direct contact with or ingest contaminated sediments or soils could be at risk.

Cleanup Progress

This site is being addressed by early actions and a long-term remedial phase focusing on the cleanup of the entire site.

In 1983, the Idaho Attorney General filed a natural resources damage suit against current and two previous site owners/operators for alleged damages to State surface water and groundwater. The suit was settled in 1995. In 1993, the potentially responsible parties (PRPs) initiated early actions to stabilize the West Fork Tailings Dam by diverting the West Fork of Blackbird Creek to prevent failure of the tailings impoundment. In late 1994, the PRPs, under EPA supervision, began an investigation to determine the nature and extent of site contamination. Results of this investigation, scheduled to be completed in 2002, will be evaluated to determine the most effective remedy for final site cleanup.

In late 1994, the PRPs began investigations and analysis of alternatives for an early removal action on major sources at the mine that release metals to surface water. In 1995, the PRPs began a removal action to address the waste rock piles, underground mine tunnels, the open pit and impacted groundwater and surface water at the mine. The action includes relocating some of the waste rock piles, capping waste rock, construction of a water storage dam and a water diversion dam, expansion of the existing water treatment plant and interception of ground water and surface water for treatment, and were completed in November 1998.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 121

The West Fork of Blackbird Creek diversion channel and the early removal action on sources at the mine have helped to support restoration of water quality downstream of the Blackbird Mine site while site studies are being conducted.

Another removal action was conducted at the Panther Creek Inn (PCI) property, located about 7 miles east of the Blackbird Mine where Blackbird Creek and Panther Creek meet.

The PCI property is comprised of an inn, a cabin and adjacent campgrounds. Investigations conducted in the past identified elevated concentrations of arsenic in soils which pose a potential risk to humans. The soils were removed to a minimum depth of one foot and replaced with clean fill. The removal action also included construction of three sediment ponds along Blackbird Creek and removal of contaminated overbank deposits (sediments and soils) that are susceptible to erosion along Blackbird Creek. This will reduce the potential for recontamination of the PCI property. This removal action was completed in August 1999.

Another removal action was completed in October 2001 to address potential risks to humans from arsenic found in soils along the bank (overbank deposits) in some locations along Panther Creek. Contaminated soils were removed to cleanup levels or the water table, whichever comes first, and then replaced with clean fill.

A remedial action is underway to address potential risks to aquatic life from remaining releases of metals into surface water from the mine site. Construction activities to address releases of metals to surface water have been underway since 2003 and are ongoing. Soils contaminated with arsenic on residential properties along the banks of Panther Creek are also being removed to address potential human health risks. Removal of contaminated soils along the banks of Panther Creek began in 2004 and are ongoing. Soils contaminated with arsenic along the banks of Blackbird Creek were also removed as part of the remedial action. This part of the remedial action was completed in 2003.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 122

16.0      MINERAL PROCESSING AND METALLURGICAL TESTING
 
16.1      Introduction
 

Initial information on the milling characteristics of the ores from the Sunshine deposit comes mainly from testwork on bulk samples and drill composites performed by BMC. However, the milling and flotation of the mineralized material is not overly complex and a bulk concentrate could readily be produced. This is based on mineral processing work conducted by The Center for Advanced Mineral and Metallurgical Processing (CAMP) on a composite from the Ram deposit, and confirmed by 2005 feasibility metallurgical testwork completed by SGS Lakefield on several composites. Some additional information is available from the processing of ores from the nearby Blackbird Mine, which was operated from 1951 to 1959 and again, from 1963 to 1966.

Three types of ore (mineralized material) have been recognized in the district: high-sulfide complex ores such as those mined and processed at the Blackbird Mine, siliceous ores, and chloritic ores. No high-sulfide mineralization has been seen in the Ram or Sunshine deposits. All of the mineralization is of the siliceous and chloritic types with low total sulfide contents. In general, the low-sulfide mineralization produced better recoveries and higher-grade concentrates than the high-sulfide material and has significantly lower environmental and processing concerns.

Past testwork focused on producing two concentrates, cobalt and copper. The copper concentrate would go directly to a copper smelter while the cobalt concentrate, due to its high arsenic content, would go to a hydrometallurgical or bio-oxidation treatment facility for further processing. Current plans call for the production of one bulk cobalt, copper, gold sulfide concentrate with recovery via a hydrometallurgical treatment plant. The details of the pressure leach plant and disposition of arsenic-bearing wastes from the process are being defined by metallurgical testing, as part of the ongoing feasibility study.

In September of 2002 Formation Capital completed the purchase of the Big Creek Hydrometallurgical Complex in northern Idaho. The plant, as purchased, is equipped to refine 10 million ounces of silver and 350,000 ounces of gold annually and recover copper. It consists of auto-claves, a copper solution-extraction plus electro-winning circuit, a silver-gold refinery and hydrometallurgical plant including a tailings disposal basin. Formation Capital is currently operating the gold-silver refinery and intends to retro-fit the hydrometallurgical plant to process cobalt concentrate.

16.2 Mineralogy

The main cobalt mineral is cobaltite, while the main copper mineral is chalcopyrite. The cobaltite grains are generally small, ranging from less than 10 microns to 1 mm. BMC geologists also reportedly noted the cobalt minerals safflorite (CoAs2) and linnaeite ((CoNi)3S4), though Formation Capital suspects these minerals were often postulated to be present based on the cobalt to arsenic ratios of the ore. The mineralization in the Sunshine and Ram deposits is low in sulfides. Oxidation is prevalent near surface especially where pyrite is present. Gold and silver is present in most of the mineralization in the area.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 123

16.3 Prior Testwork

There is much information on the metallurgy of the Blackbird ores based on past operations and laboratory testwork through 1981. Mineral processing work for the pre-feasibility study was conducted by CAMP on mineralized material obtained from large diameter core drill holes in the Ram deposit. Feasibility testwork by SGS Lakefield is discussed in section 16.5. Additional metallurgical work is being completed at Mintek in South Africa.

Metallurgical testwork on material from the Sunshine deposit appears to have started in 1980 by BMC. The initial testing by BMC, on drill hole composites of siliceous and chloritic mineralization types indicated that, for a 60%-siliceous/40%-chloritic blend, recoveries of over 80% could be achieved, producing a concentrate grading over 13% cobalt. The results were from bench flotation tests performed on feed with an average grade of about 1.05% Co. The only problem encountered by BMC in the early testing was related to oxidized, near-surface, chloritic material, where recoveries dropped to around 50%. The problem appeared to be related to the fine-grained minerals and the relatively coarse grind being used in the pilot plant. These previous test results should not be considered representative of future operations.

The initial work by BMC produced two concentrates; a copper concentrate, which would go to a smelter and a cobalt concentrate for shipment to a hydrometallurgical treatment facility. BMC also did some preliminary testing on a bulk concentrate where the concentrate would go to a hydrometallurgy plant where the copper would be recovered as a cathode product or as a copper-rich slime, depending on plant design. Cobalt would be produced as a cathode product following jarosite precipitation. Gold would be recovered in this circuit in the copper slimes and the jarosite.

In addition to the work on conventional metallurgical processes, BMC contracted Idaho National Engineering Labs to test bio-oxidation of the mineralization. This work was started in 1981 but was never completed; however, some additional bio-oxidation work was performed under contract to Formation Capital in 1995. Results of this work suggest that it could be effective on Sunshine concentrates. The Kasese cobalt plant in Uganda was recently using bio-oxidation technology to recover cobalt from tailings. It shut down in 2002 due to low cobalt prices (American Metal Market, 05 September 2002), but may resume shipments in late February 2004 (Mail and Guardian online, 13 January 2004).

BMC’s test work indicated that high recoveries and high-grade concentrates could be achieved from low-sulfide material. Almost all of the Sunshine and Ram deposit resources can be classed as low-sulfide material. Testing has not been completed for oxidized material, however, BMC indicated problems with oxidized material containing high iron and clay. Metallurgical test work remains to be completed to fine tune recovery, reagent consumption, and operational conditions of the hydrometallurgical plant.

16.4 Pre-Feasibility Metallurgical Testing and Process Optimization

CAMP completed additional flotation and pressure leaching testwork on core from the 1999-2000 Ram drilling program and about one ton of large diameter PQ (3.345 inch diameter) core. The testwork

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 124

included comprehensive milling and flotation optimization testing programs on the bulk material from the Ram samples provided by Formation Capital.

The highlights are summarized below:
  The PQ core drilling yielded the following samples:
Hole    Section    Horizon    Ft.    CO%    CU%    AU OZ/T AG OZ/T 
MH00-02    1400 N    3023    6.5       0.104       0.308           0.016    0.06 
MH00-03    200 N    3022    24.7       0.162       0.028           0.014    0.14 
MH00-03    200 N    3023    7.1       0.851       0.037           0.038    0.12 
MH00-04    200 N    3021    7.9       0.482       0.074           0.018    0.08 
MH00-04    200 N    3022    5.5       2.130       0.050           0.032    0.13 
MH00-04    200 N    3023    8.6       0.284       0.074           0.016    0.10 
MH00-05    200 N    3021    16.2       0.364       0.360           0.018    0.14 
MH00-05    200 N    3022    9.6       0.109       0.366           0.016    0.18 
MH00-05    200 N    3023    23.2       0.834       0.389           0.018    0.14 
MH00-06    200 N    3022    9.5       0.932       0.286           0.044    0.16 
MH00-06    200 N    3023    6.5       0.494       1.630           0.012    0.16 
MH00-07    200 N    3022    21.2       0.123       0.123           0.046    0.12 
MH00-07    200 N    3023    18.3       1.010       0.285           0.048    0.12 
Average            164.8       0.535       0.267           0.027    0.13 

A statistically valid test matrix was set up and testing was carried out on a composite sample that is shown on the following table:

Composite Head Grade

0.574% Co, 0.294% Cu, 0.02 oz Au/t

The material was crushed and ground to approximately 80% passing 200 mesh. This results in a high degree of mineral liberation. This was a viable and effective methodology since the objective was to produce a bulk concentrate rather than differential concentrates.

The liberated mineralized material was activated with copper sulfate.

No pH adjustment was necessary as insitu pH was 8.0.

  AF 65 was used as the frother.

Bulk sulfide rougher flotation was performed with potassium amyl xanthate (PAX) as a collector followed by scavenger flotation with SIX as a collector. The final concentrates are produced through a cleaner circuit using SIX as a collector.

The test results were statistically modeled and optimized with the aid of Stat-Ease software.

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project                 
            Formation Capital Corporation    Page 125 
 
 
Locked cycle flotation testing produced good recoveries and grades. The results are: 
 
                                                       Item    Cobalt    Copper    Gold     
                             Concentrate Grade    14.40%    7.41%    0.396 oz Au/ton     
                             Recovery    92.70%    92.80%    72.90%     

                       Item    Cobalt    Copper    Gold 
Concentrate Grade    14.40%    7.18%    0.417 oz Au/ton 
Recovery    94.10%    92.90%    78.20% 

In order to account for variations in metallurgical response due to the mineralogical composition, several horizons were set aside for flotation testing. This was completed after the circuit had been optimized, and the locked cycle test completed on the composite. These tests indicate similar recoveries to the bulk composite, even in areas with moderate oxidation. Comparative flotation tests results are summarized in Table 16.1 below:

             Table 16.1 Comparative Flotation Results 
 
Test    % Co    % Cu    oz Au/t    Co Recov. Cu Recov. Au Recov.                               Remarks 
 
Composite    0.574    0.29         0.020    91.99%    91.56%    72.99%     
4-3021    0.482    0.07         0.018    88.15%    92.40%    56.56% cobaltite, trace oxidation 
4-3022    2.130    0.05         0.032    92.47%    80.60%    86.01% cobaltite, local silicification 
2-3023    0.104    0.31         0.016    91.44%    92.24%    69.10%    moderate oxidation 
3-3023    0.851    0.04         0.038    89.71%    77.02%    85.92%    cobaltite, tr oxidation, tr FeCO3 
6-3023    0.493    1.63         0.012    96.88%    96.38%    67.64% fine grained cobaltite 
7-3023    1.010    0.28         0.048    94.34%    94.69%    89.49% cobaltite, moderate silicification 
 
Average    0.845    0.40         0.027    92.17%    88.89%    75.79%     

Note: all drill holes used in the composite were from section 200N except MH-000-02, which was on section 1400N. These tests do not include Knelson upgrading. Average of tests does not include the composite results.

From metallurgical studies it has been established that approximately 360 gallons of water per ton of ore will be required for the operation.

16.5 Feasibility Metallurgical Testwork

The following was extracted from SGS Lakefield Research Limited’s draft copy of “The Recovery of Copper and Cobalt by Laboratory Flotation” completed during April, 2005. Formation Capital’s Manager of metallurgy, Mike Irish, is also continuing to advance all aspects of the Metallurgical testing to complete the feasibility study. Additional testing is planned by SGS Lakefield and Mintek in South Africa.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 126

16.5.1 Introduction

A laboratory scale flotation program was conducted on Ram and Sunshine samples submitted by Formation Capital Corporation. The objectives of the program were to develop a flotation circuit and reagent scheme for the recovery of cobalt in a bulk sulphide concentrate; investigate the flotation response of several samples to this flowsheet and reagent scheme; perform locked cycle testing with the developed flowsheet; and perform standard tests to determine the abrasiveness and grindability of several samples.

The developed flotation flowsheet and reagent scheme was then applied to three variability samples. T he results of this work are currently pending.

16.5.2 Sample Receipt and Preparation

Samples for the laboratory program were received on January 19, 2005 and given the receipt number LR2500120. The list of samples and their received weights are shown Table 16.2. Three overall composites composed of varying proportions of Cu and Co were received as well as three variability composites representing the micaceous, silaceous and quartzite mineralogies. While composites were received crushed to nominal Ľ”, the variability samples were received as sections of Ľ drill core.

                                         Table 16.2. Composite and Variability Samples Received     
 
Weight (Kg)
Item    Identification Estimated Weight                   Deposit             Origin 
Flotation Composite    Sample 1    56    54    Ram    sample rejects 
Flotation Composite    Sample 2    70    65    Ram    sample rejects 
Flotation Composite    Sample 3    51    47    Ram    sample rejects 
Variability Composite    Sample SR    28    26    Siliceous Ram    Ľ core 
Variability Composite    Sample SS    27    25    Siliceous Sunshine    Trench 
Variability Composite    Sample M    47    47    M icaceous Ram    Ľ core 
Variability Composite    Sample Q    52    50    Quartzite Ram    Ľ core 

While determination of abrasion indices had been requested on the overall composites, the samples as received were too fine to perform this testwork. The standard Bond abrasion index determination requires 1.6 kg of minus ľ” plus ˝” ore. Sub-samples were split out for determination of the Bond ball mill work index. The remainder from each composite was stage crushed using a roll crusher in closed circuit with a 10 mesh screen to 100% -10 mesh. The samples were blended and split into 2-kg charges using a rotary splitter. Charges were placed in freezer storage. A head sample from each was submitted for Cu, Co, Fe, As, S, Au and Ag. The results are summarized in Table 16.3.

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project                         
                    Formation Capital Corporation    Page 127 
 
 
    Table 16.3. Chemical Head Analyses             
     Composite    % Cu    % Co    % Fe    % As    % S    g Au/ton    g Ag/ton     
 Comp 1    0.44    0.59    12.00    0.75    0.99    0.35    <0.05     
 Comp 2    1.10    0.72    13.00    0.98    2.07    0.69    1.40     
 Comp 3    0.45    1.20    15.80    1.48    1.24    0.67    <0.05     
 Sample M    0.33    0.92    18.70    1.25    0.73    0.64    <0.05     
 Sample Q    0.70    0.41    11.90    0.57    1.40    0.60    0.60     
 Sample S    1.20    1.14    8.76    2.46    2.09    1.57    2.00     

A comparison to the core assays shows good agreement of the composites (Table 13.3)

16.5.3      Grind Index Determinations
 
16.5.3.1      Abrasion Index
 

Samples SR, SS, Q and M were submitted for the standard Bond abrasion index determination procedure. The results are summarized in Table 16.4.

Table 16.4. Summary of Abrasion Indices

                 Sample    SR    SS    M    Q 
Abrasion Index, Ai     0.158     0.302    0.022    0.099 

16.5.3.2 Bond Ball Mill Work Index

All six samples were submitted to the standard Bond ball mill procedure for determination of the work index. The overall composites had been received at nominal Ľ” and it was suspected that they might be too fine for this standard test. A comparison of the size analyses of the minus 6 mesh work index feeds of the overall composites and variability samples is shown in Table 16.5. While the overall composites were received crushed, variability samples were received as Ľ core. The overall composites were generally finer than the variability composites, but Sample Q presented a similar size distribution to the overall composites. It was therefore decided to submit all samples for determination of the work indices. The results are summarized in Table 16.6.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 128

Table 16.5. Comparison of Size Analyses of Bond Work Index Feeds

Size    Cumulative                % Passing             
Mesh    µm    Comp 1    Comp 2    Comp 3 Sample M Sample Q Sample SS Sample SR 
6    3,350    100    100    100    100    100    100    100 
7    2,800    97.9    97.2    98.1    99.0    99.0    98.5    97.9 
8    2,360    94.3    92.3    94.4    94.7    95.3    94.1    92.3 
10    1,700    86.7    83.3    86.0    81.7    85.6    82.2    80.9 
14    1,180    79.6    74.7    76.7    67.6    75.7    68.5    69.3 
20    850    74.4    69.1    69.4    58.1    69.3    58.5    61.0 
28    600    69.9    64.3    62.7    50.1    64.2    50.5    54.0 
35    425    66.1    60.4    57.3    44.2    60.5    44.5    49.1 
48    300    61.7    55.8    51.4    38.5    56.3    37.8    43.7 
65    212    56.4    50.5    45.6    33.4    50.7    31.0    37.7 
100    150    46.6    41.8    37.9    27.8    40.0    23.8    29.6 
K80    µm    1206    1486    1351    1641    1422    1618    1659 

Table 16.6. Bond Ball Mill Work Index Summary

             K80 µm    Grams per    Bond Work Index 
     Sample    Feed    Product    Revolution    Metric    Imperial 
Sample SR         1659               131    3.24    9.4    8.6 
Sample SS         1618               128    2.42    11.8    10.7 
Sample M         1641               116    2.75    9.9    9.0 
Sample Q         1422               131    3.09    10.1    9.2 
Comp 1         1211               129    2.76    11.4    10.3 
Comp 2         1511               128    2.78    10.7    9.7 
Comp 3         1358               124    2.22    12.8    11.7 

16.5.4 Laboratory Flotation Procedures

The following procedure was followed for all tests, except where expressly noted. All grinding for this test program was conducted in a Denver ball mill with mild steel shell and balls. The mill was cleaned with silica each morning prior to use. A 2-kg ore charge was used for each flotation test. Grinding was conducted at 65% solids with Lakefield river water, and this same water was used to maintain cell levels during flotation. Regrinding was conducted in a ceramic pebble mill at 50% solids.

16.5.5 Sample Fineness versus Grind Time Determination

Due to the limited amount of sample available for testing, grind-time determinations were only conducted on one of the three overall composites, Comp 2. The results are presented in Table 16.7. The grind efficiency drops precipitously at a P80 of approximately 70 µm. An increase in the power applied to the mill of 7 kWh/tonne resulted in only a 5 µm decrease in the P80. This is most likely due to the relatively high abundance of micaceous gangue in the sample. The P80 may, therefore, not be a good

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 129

indication of sulphide liberation, and the effect of grind fineness on recovery was therefore examined in the flotation section using grind time, and by inference power, instead of P80.

Table 16.7. Composite 2: Grind Fineness versus Grind Time

Item    Test 1    Test 2    Test 2 
Grinding Time (min)    30    45    60 
Product (P80 µm)    92    71    66 
Power, KWh/t    14.7    22.0    29.4 
Operating Work Index    22.2    27.3    34.5 

16.5.6      Flotation Testing
 
16.5.6.1      Flowsheet and Reagent Scheme Development
 

Flowsheet and reagent scheme development was conducted on the composites: Comp 1, Comp 2 and Comp 3. SGSLR was informed by the client that these three composites were of a similar mineralogical constitution with varying grade ratios of Co/Cu. Previous flotation testwork had been performed on samples from the same deposit by The Center of Advanced Mineral and Metallurgical Processing (Montana Tech of the University of Montana). Based on the results of this testwork, a baseline set of conditions for the flotation circuit was provided to Lakefield Research. These are shown in Table 16.8. It was the objective of the flowsheet development program to attempt to determine the effect of primary grind fineness, reduce reagent addition rates, determine the effect of copper sulphate, and determine the effect of a regrind. After flowsheet development, the metallurgical response of the samples with the newly developed flowsheet would be determined through locked cycle tests.

        Table 16.8. Baseline Flotation Conditions 
                       Item             Condition/Dose                                                     Time 
    Grind    Ball Mill at 50% Solids    75 minutes 
    Copper Sulphate    Sulphate 1000g/t    10 minutes conditioning 
    PAX - Rougher    Rougher 1000g/t    5 minutes conditioning; 5 minutes flotation 
    SIX - Scavenger    Scavenger 1000 g/t    1 minute conditioning 5 minutes floation 
 
 
16.5.4.1    Effect of Primary Grind Fineness or Grind Time 

Two grind times were conducted on each of the three composites: 45 and 60 minutes. A summary of the results is shown in Table 16.9. Both copper and cobalt kinetics of Comp 1 were affected by the finer grind, while flotation kinetics of Comp 2 and Comp 3 showed little effect of the varying grind times. As mentioned in the preceding section, the abundance of mica in the overall composites made it difficult to correlate grind time and grind fineness. While the size analysis of the mill discharge yielded very similar P80’s for the two times tested, the kinetics of copper and cobalt flotation of Comp 1 increased with a finer grind. Interestingly, while Comp 1 showed an improvement in the cobalt grade/recovery relationship upon finer grinding, indicating an increase in cobalt liberation, this is the sample which

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 130

showed no response to grind based on grind fineness. The P80 of the mill discharge was 67 µm at 60 minutes and 65 µm at 45 minutes. This suggests that while the overall grind fineness was not significantly affected by the increase in grind time, the grind fineness of the sulphide minerals was. An analysis for copper and cobalt by size fraction on mill discharge of these two grind times would quantify the change in the P80 of copper and cobalt. As overall recovery was not adversely affected by the coarser grind time, the forty-five minute grind time was chosen for subsequent tests.

Table 16.9. The Effect of Primary Grind Time on Metallurgical Response

Test             Grind           Dose g/t            Grade %             % Distribution           Rougher Tail (%)         Calculated Head (%) 
No    Comp    Time    µm        PAX    CuSO4 Weight %    % Cu    % Co    % S    Cu    Co    S    Cu    Co    S    Cu    Co    S 
F1           1        60    67       100         400    9       4.76    5.99    10.6    96.3    92.2    95.4     0.02     0.05     0.05     0.44     0.58     0.99 
F4           1        45    65       200         400    11.6       3.66    4.52    7.9    97.2    91.2    95.8     0.01     0.06     0.05     0.44     0.57    0.96 
F2           2        60    66       100         400    14.6       7.38    4.73    13.9    96.7    92    97.1     0.04     0.07     0.07     1.11     0.75    2.08 
F5           2        45    72       100         400    14.4       7.58    4.75    14.1    97.3    95.2    97.5     0.04     0.04     0.06     1.12     0.72    2.08 
F3           3        60    66       100         400    12.5       3.45    8.27    8.8    95.7    93.7    96.2     0.02     0.08     0.05     0.45     1.10    1.14 
F6           3        45    82       200         400    12       3.45    8.02    9.53    96    89.9    95     0.02     0.12     0.07     0.43     1.07     1.20 
 
ą Based on 9 minutes of flotation                                                         

After investigations into the reagent scheme, the effect of primary grind fineness on Comp 1 and Comp 2 was re-examined to determine the losses that would be sustained upon a coarsening of the grind to approximately 110 µm. The results indicate that for Comp 1, sulphur recovery dropped 2% as the P80 of the grind increased from 67 to 115 µm. Cobalt recovery at the coarser grind was 80.3% versus 90.3 at the grind of 67 µm. There was no difference in copper or cobalt recovery between 67 µm and 93 µm. For Comp 2, there was no significant effect on sulphur recovery, or copper recovery within the ranges of grind tested. Cobalt recovery, however, dropped 3% when the P80 was coarsened from 72 µm to 94 µm, and dropped a further 3% at a grind of 105 µm.

16.5.6.2 Rougher Flotation Reagent Addition

The reagent additions used in the first series of tests (F1-F6) were substantially reduced from those of the baseline flotation conditions. The fifth rougher stage of flotation was used as a diagnostic tool (tests F4 and F6 only) to determine if there was a lack of collector in the system. For the composites tested, the fifth rougher concentrate grade was higher than head grade, and also showed better upgrading than the 4th stage rougher concentrate. This indicated that cobalt was responding to an increase in collector addition.

It was hoped that collector additions could be reduced by placing a substantial portion of the collector into the primary grind and thereby improving its efficiency. This was done in tests F28 and F29 on Comp 1 and Comp 2, respectively. The collector addition to the rougher was decreased by 20% to 200 g/t, and 100 g/t was added directly to the primary grind. Comparisons for Comp 3 are drawn from later tests. Copper recovery remained unaffected by the change in collector addition. Cobalt recovery increased by approximately 3% from Comp 1, but decreased 2% in Comp 2. Cobalt recovery in Comp 3 remained unchanged. The collector additions required to achieve adequate cobalt recovery were quite high, at 100-200 g/t per %S. This is unusual and there may be opportunities to reduce collector addition. It may be possible that by combining collectors such as thiophosphates or thiocarbamates with

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 131

PAX an overall reduction in collector dose can be achieved. The addition of small amounts of copper sulphate, may increase the kinetics of cobalt and reduce the need for high collector dosages. The use of a finer grind may also reduce collector requirements. It was observed visually during flotation tests that cobalt losses were primarily present as coarse, liberated cobaltite.

16.5.6.3 Cleaner Flotation

Prior to investigation of the rougher flotation which resulted in the elimination of copper sulphate from the rougher reagent scheme, two sets of cleaner tests were conducted with and without a 10 minute regrind (F13-F18). The results of these tests are summarised in Table 16.10. These tests were conducted with kinetics on the first cleaner. 10 g/t PAX was added to the 4th cleaner.

Table 16.10 The Effect of Regrind – 10g/t PAX in Cleaner

Test             Grind       Dose g/t            Grade %        % Distribution        Rougher Tail (%)    Calculated Head (%) 
No    Comp    Time    µm    PAX    CuSO4 Weight % % Cu    % Co    % S    Cu    Co    S    Cu    Co    S    Cu    Co    S 
F13    1    0             10             -    4.0    9.69    9.94     21.7    95.8     81.9    93.7    0.011     0.07    0.04     0.41     0.49    0.94 
F16    1    10       21         10             -    3.6    10.40    9.08     20.7    90.8     57.9    77.3    0.013     0.06    0.05     0.41     0.56    0.97 
F14    2    0             10             -    8.5    12.40    7.65     24.3    96.9     89.2    96.2    0.029     0.07    0.06     1.09     0.73    2.15 
F17    2    10       24         10             -    6.3    15.70    6.78     26.9    93.4     58.6    81.5    0.038     0.08    0.09     1.07     0.73    2.09 
F15    3    0             10             -    4.9    7.80    15.4     20.9    93.4     74.8    86.7    0.021     0.24    0.14     0.41     1.01    1.18 
F18    3    10       25         10             -    4.3    8.57    13.6     20.0    91.3     57.0    73.4    0.021     0.13    0.10     0.41     1.03    1.18 

While there was some upgrading of the rougher concentrate, there were high losses of cobalt in the cleaner stages when regrinding was performed. The grade/recovery relationships for copper and cobalt are shown in Figure 8and Figure 9. When 50g/t copper sulphate was added to the regrind in test F19 (Comp 2), the kinetics of cobalt flotation remained unaffected. Losses were as high as 30%Co.

A re-evaluation of the reagent scheme after the elimination of copper sulphate from the rougher in test F20 led to a new series of cleaner tests testing the effect of regrind and using PAX to increase cobalt kinetics. The results are summarized in Table 16.11. The results indicate that overall cobalt recovery increased by 0-15% when compared to the tests with no regrind. However, there was little upgrading of sulphur content of the concentrate.

Table 16.11. The Effect of 50g/t Collector Addition to The Regrind
 
Test    Regrind       Dose g/t            Cleaner Concentrate        % Distribution        Rougher Tail (%)         Calculated Head (%) 
No    Time    PAX    CuSO4 Weight %    Cu    Co    Cu+Co    S    Cu    Co    S    Cu    Co    S    Cu    Co    S 
F13    0         10    400    4    9.69    9.94    19.63    21.7     95.8     81.9     93.7    0.011     0.07    0.04     0.41    0.49     0.94 
F16    10         10    400    3.6    10.40    9.08    19.48    20.7     90.8     57.9     77.3    0.013     0.06    0.05     0.41    0.56     0.97 
F21    10         60    0    3.9    10.40    11.70    22.10    23.0     97.7     84.6     92.1    0.008     0.05    0.05     0.42    0.54     0.98 
F14    0         10    400    8.5    12.40    7.65    20.05    24.3     96.9     89.2     96.2    0.029     0.07    0.06     1.09    0.73     2.15 
F17    10         10    400    6.3    15.70    6.78    22.48    26.9     93.4     58.6     81.5    0.038     0.08    0.09     1.07    0.73     2.09 
F22    10         60    0    7.7    13.70    8.36    22.06    26.1     97.5     89.2     95.1    0.023     0.06    0.05     1.08    0.72     2.10 
F15    0         10    400    4.9    7.80    15.40    23.20    20.9     93.4     74.8     86.7    0.021     0.24    0.14     0.41    1.01     1.18 
F18    10         10    400    4.3    8.57    13.60    22.17    20.0     91.3     57.0     73.4    0.021     0.13    0.10     0.41    1.03     1.18 
F23    10         60    0    5.9    6.83    16.20    23.03    18.2     96.5     91.4     94.4    0.013     0.06    0.04     0.42    1.05     1.14 

Finally with rougher conditions set with no copper sulphate and PAX additions in the grind, two tests were conducted on each composite with and without regrind. These tests, F30-F35, used identical rougher conditions. The results indicate that very little upgrading took place with regrinding. Cobalt

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 132

recovery losses were 2-7% higher with a regrind, while copper recovery was not affected by regrinding. Due to the cobalt losses and minimal upgrading, regrinding was not part of the final flowsheet.

16.5.7 Locked Cycle Testing

A six cycle locked cycle test was conducted on each composite. As well as product recycle, these locked cycle tests used water supplied by Formation Capital and prepared according to their instructions. The rougher and cleaner scavenger tailings from each test were filtered separately. Opposite eighths of the filter cake were cut out and submitted for chemical analysis. The remaining ľ’s of the filter was stored wet in the freezer. The results of the locked cycle tests are shown in Table 16.12. Copper recoveries ranged from 96 to 97%. Cobalt recovery ranged from 91 to 95%. Sulphur grade in the overall tailing was 0.05 to 0.08% .

Table 16.12. Batch and Locked Cycle Tests - Metallurgical Results, Projected Balance

                        Grade                    % Distribution         
Composite Test                 Product    Weight % % Cu    % Co    % S    g Au/t g Ag/t    % As    Cu    Co    S    Au    Agą    As 
Comp 1    F30    Cleaner 2 Concentrate    3.80    10.60    14.00    25.0    -    -    -    96.5    93.4    95.5    -    -    - 
Comp 1    LCT1    Projected Cl Concentrate    4.18    9.70    13.30    21.7    7.020    16.0    15.30    96.0    93.0    95.4    90.3    -    94.2 
 
Comp 1    F30    Combined Tails    96.15    0.01    0.04    0.0    -    -    -    3.3    6.3    4.1    -    -    - 
Comp 1    LCT1    Projected Combined Tails    95.80    0.02    0.03    0.1    0.033    <0.9    0.04    4.0    7.0    4.6    9.7    -    5.8 
 
Comp 2    F31    Cleaner 2 Concentrate    7.44    13.50    8.88    27.6    -    -    -    95.1    89.4    95.5    -    -    - 
Comp 2    LCT    Projected Cl Concentrate    8.00    12.90    8.28    24.8    6.750    20.5    9.94    96.5    90.7    94.3    84.5    71.6    90.1 
 
Comp 2    F31    Combined Tails    92.43    0.05    0.08    0.1    -    -    -    4.5    10.1    4.1    -    -    - 
Comp 2    LCT    Projected Combined Tails    92.00    0.04    0.04    0.1    0.120    0.7    0.10    3.5    9.3    5.7    15.5    28.4    9.9 
 
Comp 3    F32    Cleaner 2 Concentrate    5.86    6.66    17.20    19.3    -    -    -    94.8    93.3    94.6    -    -    - 
Comp 3    LCT3    Projected Cl Concentrate    5.86    7.09    17.90    20.0    10.000    11.2    21.00    97.1    95.1    96.4    92.0    -    95.2 
 
Comp 3    F32    Combined Tails    94.01    0.02    0.07    0.1    -    -    -    4.5    6.1    4.7    -    -    - 
Comp 3    LCT3    Projected Combined Tails    94.10    0.01    0.03    0.1    0.050    <0.5    0.07    2.9    4.9    3.6    8.0    -    4.8 

ą Silver Recoveries were not calculated for LCT 1 (Comp 1) or LCT 3 (Comp 3) due to assays of less than detection limit on both heads and tails for these samples

16.6 Hydrometallurgical Testing:

As described, an applied hydrometallurgical testing program was undertaken by CAMP to determine the viability of using an existing hydrometallurgical plant, which was subsequently purchased by Formation Capital in September of 2002. This has included:

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 133

To date, all of the testing and studies appear to be successful. It is envisioned that the hydrometallurgical facility can successfully be retrofitted to treat the bulk cobalt concentrate.

16.6.1 Hydrometallurgical Plant – Concentrate Treatment

The cobalt, copper, gold concentrate will be acid pressure leached in a batch reactor to oxidize the sulfide host minerals. This will make cobalt, copper, arsenic and iron soluble while leaving behind gold-bearing solids. Conventional thickening followed by filtration will be used to separate the pressure leach solution from the solids. The gold will be recovered from the solids by the Merrill Crowe process. Then the pregnant leach solution will be neutralized with liquid soda ash to raise the pH. After liquid/solid separation, solvent extraction for copper will be performed. The produced copper solution will be processed to make copper sulfate crystals. Alternatively, the copper can be electrowon to cathode metal.

The cobalt-bearing raffinate from copper solvent extraction will be purified by organic removal, cementation, jarosite precipitation and ion exchange. Further liquid solid separations will be done and the arsenic-bearing solids will be transported to an environmentally safe containment site. The purified solution then undergoes treatment for cobalt oxide recovery via pH adjustment and calcination. The cobalt oxide will then be sold. The production of cobalt hydroxide, cobalt carbonate, and cobalt metal is also possible in the hydrometallurgical facility. All wastewater will be processed and recycled via a zero discharge treatment facility.

Metallurgical testing is continuing for the hydrometallurgical plant concentrate treatment

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 134

17.0 MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES

Formation Capital performed all of the resource estimates cited in this report, other than the 2001 update of the Ram main, and Ram footwall and hangingwall zones, and the 2005 resource estimate which was done by MDA. MDA has reviewed or audited all of Formation’s resource estimates. The most recent resource estimates/updates were completed in March 2005, based on additional Ram deposit drilling in 2004. Sections 6.1 and 6.2 (History) contain information on previous resource estimates. The basis for those earlier MDA audited resources is essentially the same as for the updated 2005 resource estimates, with only new drilling being added; therefore, details of the resource modeling, previous and current, are presented in this section. Figure 17.1 illustrates the location of the Ram and Sunshine mineralized horizons in plan view.

17.1      Mineral Resource Estimates
 
17.1.1      Data Acquisition
 

Analytical data for the Idaho Cobalt Project were obtained from core drilling and trench sampling. Due to the inherent problems that can occur when trench samples are used in grade estimation, trench sample assays have been omitted from the grade estimations, but were used to help define the location and geometry of the mineralized horizons.

Formation Capital’s project database contains a total of 169 holes, which were drilled by Formation Capital, BMC, or Calera Mining (Table 11.1) . BMC’s drilling was limited to the Sunshine deposit, though the upper portions of a few holes did intersect the East Sunshine mineralization. With the exception of reverse circulation pre-collars for metallurgical core holes completed by Formation Capital in 2000, all drill data was obtained by core drilling. Exploration holes were drilled with either NQ- or HQ-size core; the metallurgical holes were drilled with PQ-size core. NQ, HQ and PQ core have diameters of 1.875"(47.6mm), 2.500"(63.5mm) and 3.345"(85.0mm), respectively.

The majority of sample analyses prior to 1995 were for cobalt and copper, with occasional assaying for gold. Beginning in 1995, Formation Capital included gold assaying as part of their routine analytical procedure. In addition, multi-element geochemistry analyses have been completed on nearly all of Formation Capital’s drill holes at the Idaho Cobalt Project.

17.1.2 Sunshine Deposit

The Sunshine deposit is made up of three main horizons, termed the Sunshine, and several parallel horizons in the East Sunshine deposit. The main Sunshine deposit was updated for the 1001 (FW), 1003 (main) and 1007 (HW) horizons. There is no new information relating to the East Sunshine resource, so the 1998 estimate is current for that deposit.

The following three sub-sections were taken from the October, 1998 MDA pre-feasibility study of the Idaho Cobalt Project. MDA believes that the methods and categories employed in the 1998 estimate are consistent with the requirements of the current CIM Standard

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 135

17.1.2.1 Sunshine Data Base and Assay Statistics

As part of the review of Formation Capital’s 1998 resource estimate, MDA performed preliminary statistics of the raw assay data in order to evaluate the integrity of the database, the grade distributions, and the applicability of the method of resource estimation. Table 17.1 gives a brief summary of the descriptive statistics of the Sunshine database, which also includes the East Sunshine drill holes.

Table 17.1 Descriptive Statistics of the Sunshine Sample Database (weighted averages)

    All Assay Data from Sunshine and East Sunshine     
    No. of    Mean    Min    Max    Std. Dev.    CV* 
    Samples                     
                                           Co%    5,013    0.09    0.00    14.00    0.49    5.19 
                                           Cu%    5,007    0.34    0.00    19.90    1.04    3.02 
                                           oz Au/t    4,637    0.004    0.000    0.583    0.022    5.366 
                                             *CV = coefficient of variation = standard deviation/mean             
17.1.2.2 Geochemistry of the Sunshine Deposit                 

The Sunshine deposit (excluding East Sunshine) multi-element geochemical database includes approximately 2,100 samples from 19 BMC drill holes and 47 Formation Capital drill holes. Of these, there is multi-element geochemistry data for 214 samples that contained more than 0.05% Co, including 77 samples exceeding 0.20% Co. MDA focused its analysis on silver, arsenic, gallium, gold, bismuth, cobalt, copper, mercury, and nickel because of either significant levels of concentration or good correlation with cobalt and/or copper. As with the Ram geochemical review, some elements were included in the examination of the Sunshine deposit data, in spite of their low grades or poor association with cobalt, because of their potential economic or metallurgical impact. Evident relationships include the following:

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 136

MDA concluded that none of the subtle spatial changes in geochemistry within the Ram and Sunshine deposits appear to occur in such a manner that they would impact metallurgy.

17.1.2.3 Specific Gravity

Formation Capital took samples for density measurements from uncrushed core. Specific gravity was measured by standard Jolly balance methods. The results of specific gravity determinations, and tonnage factors used in the resource models, are presented in Table 17.2.

Table 17.2 Tonnage Factor Summary for Sunshine Deposits

    Number of        Tonnage Factor 
                                                           Area        Specific Gravity     
    Samples        (cu. ft/ton) 
                                           Sunshine    321    2.95    10.86 
                                           Ram    199    2.85    11.24 
                                           East Sunshine    147    2.85    11.24 
 
17.1.2.4 Sunshine Resource Method             

The 2005 Sunshine model update is discussed in this sub-section. The drill hole database was checked against the original logs and assay sheets to verify the data. Cross sections were developed on 100 ft intervals over the 2,400 ft strike length of the deposit. A 300 ft portion of this strike length was developed on 50 ft intervals. Mineralized horizons were developed on the sections. These horizons were developed by utilizing both the favorable geologic unit (BTE) and mineralization above 0.03% Co. Where higher grade mineralization was present the zone was drawn to a minimum 3 ft true thickness with a grade in excess of 0.20% Co. Mineralized horizons were developed for horizons 1001; 1003; 1007; 1009; 1500; and numerous zones in East Sunshine. After reviewing both the plans and sections, there were a few places where the horizon numbering could be interpreted in a number of manors. To complicate the interpretation, folding is present. The final MDA sections were reviewed by Formation Capital, along with several sets of prior interpretations. The conclusion of the review was that a number of interpretations for the mineralized horizons are valid at this time and that prior to mining, additional drilling will be required to further define the horizons. Closer spaced drilling for stope development and design will be required as mining proceeds.

The East Sunshine horizons were developed from mostly widely spaced drill holes. MDA determined that the East Sunshine would contain mostly inferred materials, and that additional drilling would be necessary to develop mineable material from the East Sunshine deposit. The East Sunshine deposit resource was not estimated since additional drilling would be required to develop significant measured and indicated materials.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 137

These mineralized horizons were sliced on 25 ft intervals and plotted on plan view maps. Horizons 1001; 1003; 1007; and 1009 were drawn on the plan views on 50 ft intervals. The intervening 25 ft plans were developed on computer screens by interpolation.

Assays were coded in the database from the cross sections and corrected to the plans. Several holes intersected the mineralized horizons but were not assayed. For the resource calculation these holes were assumed to intersect un-mineralized material (i.e. 0.00% Co, Cu, and 0.0 oz Au/t). A statistical study was completed on the drill hole data from these horizons. This study indicated that several populations were evident in the horizons as shown in Figure 17.2 [each individual population is defined by the segment of the plotted line that has a distinct slope; therefore, separated by inflections in the curve]

Figure 17.2 QQ Plot of Assay Data in Sunshine Zones 1001; 1003; and 1007

MDA prepared long-section views of the drill hole intercepts to outline these populations. A low-grade zone was outlined containing assay data between 0.03 % Co and about 0.30 % Co, a medium-grade zone between 0.3% Co and about 1% Co and a high-grade zone over 1% Co. Assays over 6% Co were cut to 6%.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 138

These zones were used to interpolate grades onto very wide blocks of 25 ft by 25 ft for each horizon. The wide blocks were then clipped by the plan view horizon shapes to obtain a block with the correct thickness (horizontal) by 25 ft by 25 ft. The block grades were interpolated by using the inverse distance squared method, with additional runs completed by inverse distance cubed and nearest neighbor as checks. Composites within the high-grade zone and medium-grade zone were used to estimate block grades within the high-grade zone. Composites within the medium-grade and low-grade zones were used to estimate the grade of blocks within the medium-grade zone. Composites within the low-grade zone were used to estimate the grade of the low-grade zone. Surface trench samples were used as a guide to draw the zones, but were not used to estimate block grades. Figure 17.3 shows a long-section view of the 1003 horizon showing the high-grade zones (red: +1.0% Co), medium-grade (green; 0.30 -1.0% Co), and low-grade (blue; 0.03 -.30% Co) zones and color coded block grades within the horizon.

Figure 17.3 Sunshine 1003 Horizon


The following discussion was taken from the 1998 study for the Sunshine deposit, and is still relevant information regarding assay compositing statistics. Sample assays capped prior to compositing are given in Table 17.3. Assays were composited by rock code across the entire mineralized widths. Drilled mineralized thickness, lens strike and dip, and drill hole azimuth and dip were recorded in order to

Mine Development Associates April 30, 2005



                             Technical Report, Idaho Cobalt Project             
                Formation Capital Corporation    Page 139 
 
calculate a true    thickness for the mineralized horizon. These composite samples were    used for 
estimating the resource.                 
 
Table 17.3 Sunshine Samples Cut Prior to Compositing
 
    Drill Hole    Interval    Assay    Cut Assay     
    80-09A    198 – 200    14% Co    9.4% Co     
    81-17B    668 – 672.75    0.583 oz Au/t    0.330 oz Au/t     
    95-29A    593 – 594    12.9% Cu    7.5% Cu     
    ES96-02    164.2 – 164.7    13.8% Cu    11.4% Cu     
    ES-96-11    330.9 – 334.4    19.9% Cu    11.4% Cu     
    EX-96-17    521.8 – 522.5    13.3% Cu    11.4% Cu     
 
17.1.2.5 Sunshine Resource Estimate - 2005             

The Sunshine Measured and Indicated resource is shown in Tables 17.4, 17.5, and 17.6 for horizons 1001, 1003 and 1007 at various cutoff grades, and in Table 17.7 for all three horizons. Measured material was defined by the distance to the closest drill hole and the number of drill holes influencing block grades. A block was defined as measured if the closest hole was within 50 ft, or if the closest hole was within 100 ft and at least two drill holes were used to compute the block grade. Indicated materials were defined as grade estimates with one hole within 100 ft of the block estimate. Material defined by drill holes in excess of 100 ft was classed as inferred. Material with a grade of 0.30% Co, contains 6 pounds of cobalt, which at a price of $15 per pound cobalt, has a value of $90 per ton. MDA suggests that the deposit resource be reported at a cutoff grade between 0.20% Co and 0.30% Co.

Table 17.4 Sunshine Horizon 1001 Resource Estimate (Hanging Wall Zone)

1001           Measured:               Indicated:            Inferred:     
Cutoff    000's Tons    % Co    % Cu    oz Au/ton    000's Tons    % Co    % Cu    oz Au/ton    000's Tons    % Co    % Cu    oz Au/ton 
     0.00    166.6    0.146    0.359    0.004    12.6    0.013    0.19    0    38.0    0.024    0.262    0 
     0.05    64.9    0.342    0.496    0.01    0.0    0.483    1.399    0.056    1.3    0.181    0.153    0.002 
     0.10    63.0    0.35    0.501    0.01    0.0    0.483    1.399    0.056    1.3    0.181    0.153    0.002 
     0.15    60.0    0.361    0.514    0.01    0.0    0.483    1.399    0.056    0.5    0.273    0.077    0.002 
     0.20    46.4    0.416    0.613    0.013    0.0    0.483    1.399    0.056    0.5    0.282    0.074    0.002 
     0.25    40.9    0.442    0.653    0.014    0.0    0.483    1.399    0.056    0.3    0.309    0.019    0.002 
     0.30    35.5    0.467    0.64    0.015    0.0    0.483    1.399    0.056    0.1    0.335    0.02    0.002 
     0.35    27.8    0.508    0.596    0.017    0.0    0.483    1.399    0.056    0.0    0    0    0 
     0.40    20.1    0.559    0.626    0.02    0.0    0.483    1.399    0.056    0.0    0    0    0 
     0.45    16.2    0.595    0.698    0.022    0.0    0.483    1.399    0.056    0.0    0    0    0 
     0.50    10.8    0.657    0.752    0.023    0.0    0    0    0    0.0    0    0    0 
     0.75    2.2    0.921    1.074    0.041    0.0    0    0    0    0.0    0    0    0 
     1.00    0.0    0    0    0    0.0    0    0    0    0.0    0    0    0 
     1.25    0.0    0    0    0    0.0    0    0    0    0.0    0    0    0 
     1.50    0.0    0    0    0    0.0    0    0    0    0.0    0    0    0 
     2.00    0.0    0    0    0    0.0    0    0    0    0.0    0    0    0 

Mine Development Associates April 30, 2005



    Technical Report, Idaho Cobalt Project                             
                                Formation Capital Corporation    Page 140 
 
 
 
Table 17.5 Sunshine Horizon 1003 Resource Estimate (Main Zone)
1003                 Measured:            Indicated:             Inferred:     
Cutoff    000's       % Co    % Cu    oz Au/    000's    % Co    % Cu    oz Au/    000's    % Co    % Cu    oz Au/ 
    Tons            ton    Tons            ton    Tons            ton 
     0.00    369.3           0.374    0.32    0.008    38.0    0.042    0.125    0.004    101.6    0.105    0.255    0.004 
     0.05    302.0           0.453    0.357    0.01    3.6    0.333    0.092    0.037    36.6    0.27    0.483    0.008 
     0.10    245.5           0.541    0.293    0.011    3.6    0.333    0.092    0.037    32.8    0.294    0.515    0.009 
     0.15    217.0           0.596    0.279    0.012    3.6    0.334    0.093    0.037    28.5    0.318    0.464    0.009 
     0.20    198.3           0.636    0.27    0.013    3.6    0.334    0.093    0.037    23.2    0.351    0.414    0.008 
     0.25    180.7           0.676    0.254    0.014    3.6    0.334    0.093    0.037    18.3    0.386    0.345    0.008 
     0.30    163.5           0.719    0.238    0.015    3.6    0.334    0.093    0.037    13.3    0.426    0.232    0.006 
     0.35    140.6           0.783    0.231    0.015    0.0    0    0    0    9.9    0.464    0.157    0.005 
     0.40    124.7           0.835    0.215    0.016    0.0    0    0    0    7.4    0.495    0.135    0.005 
     0.45    116.7           0.863    0.195    0.017    0.0    0    0    0    4.5    0.544    0.121    0.005 
     0.50    107.8           0.895    0.182    0.017    0.0    0    0    0    2.8    0.595    0.133    0.005 
     0.75    69.8           1.046    0.192    0.022    0.0    0    0    0    0.1    0.818    0.227    0.024 
     1.00    27.0           1.373    0.199    0.028    0.0    0    0    0    0.0    0    0    0 
     1.25    14.0           1.603    0.196    0.032    0.0    0    0    0    0.0    0    0    0 
     1.50    7.3           1.813    0.134    0.032    0.0    0    0    0    0.0    0    0    0 
     2.00    1.7           2.221    0.007    0.028    0.0    0    0    0    0.0    0    0    0 

Table 17.6 Sunshine Horizon 1007 Resource Estimate
 
1007             Measured:            Indicated:                Inferred:     
Cutoff    000's    % Co    % Cu    oz Au/    000's    % Co    % Cu    oz Au/    000's    % Co    % Cu    oz Au/ 
    Tons            ton    Tons             ton    Tons            ton 
     0.00    265.6       0.079    0.211    0.001    19.9    0.055    0.375    0.002    110.1    0.067    0.309    0.003 
     0.05    85.2       0.207    0.25    0.003    8.8    0.09    0.462    0.005    59.6    0.108    0.391    0.004 
     0.10    37.1       0.387    0.189    0.006    2.0    0.179    0.16    0.017    31.7    0.140    0.295    0.006 
     0.15    22.2       0.562    0.198    0.009    2.0    0.179    0.16    0.017    9.2    0.184    0.193    0.007 
     0.20    12.4       0.872    0.235    0.013    0.0    0    0    0    0.3    0.350    0.237    0.002 
     0.25    8.5       1.172    0.263    0.018    0.0    0    0    0    0.3    0.350    0.237    0.002 
     0.30    8.1       1.224    0.265    0.019    0.0    0    0    0    0.0    1.041    0.355    0.007 
     0.35    8.1       1.224    0.265    0.019    0.0    0    0    0    0.0    1.041    0.355    0.007 
     0.40    8.1       1.224    0.265    0.019    0.0    0    0    0    0.0    1.041    0.355    0.007 
     0.45    8.0       1.229    0.266    0.019    0.0    0    0    0    0.0    1.041    0.355    0.007 
     0.50    7.9       1.237    0.268    0.019    0.0    0    0    0    0.0    1.041    0.355    0.007 
     0.75    7.7       1.256    0.268    0.02    0.0    0    0    0    0.0    1.041    0.355    0.007 
     1.00    6.5       1.312    0.274    0.02    0.0    0    0    0    0.0    1.041    0.355    0.007 
     1.25    2.0       1.706    0.255    0.027    0.0    0    0    0    0.0    0    0    0 
     1.50    1.4       1.843    0.172    0.036    0.0    0    0    0    0.0    0    0    0 
     2.00    0.5       2.205    0.158    0.042    0.0    0    0    0    0.0    0    0    0 

Mine Development Associates April 30, 2005



    Technical Report, Idaho Cobalt Project                             
                                Formation Capital Corporation    Page 141 
 
 
Table 17.7 Sunshine Horizons 1001; 1003; and 1007 Resource Estimate
 
1; 3; 7         Measured:             Indicated:             Inferred:     
Cutoff    000's    % Co    % Cu    oz Au/    000's    % Co    % Cu oz Au/    000's    % Co    % Cu oz Au/ 
    Tons            ton    Tons            ton    Tons                 ton 
0.00    801.4     0.229    0.292       0.005    70.5     0.040     0.207     0.003    249.7     0.076     0.280    0.003 
0.05    452.1     0.391    0.357       0.009    12.4     0.161     0.354     0.014    97.6     0.170     0.422    0.005 
0.10    345.6     0.490    0.320       0.010    5.7     0.278     0.117     0.030    65.7     0.218     0.402    0.007 
0.15    299.2     0.546    0.320       0.011    5.6     0.278     0.118     0.030    38.2     0.285     0.394    0.008 
0.20    257.1     0.608    0.330       0.013    3.6     0.334     0.094     0.037    23.9     0.350     0.405    0.008 
0.25    230.2     0.653    0.325       0.014    3.6     0.334     0.094     0.037    18.9     0.384     0.338    0.008 
0.30    207.1     0.695    0.308       0.015    3.6     0.334     0.094     0.037    13.4     0.427     0.231    0.006 
0.35    176.5     0.760    0.290       0.015    0.0     0.483     1.399     0.056    10.0     0.466     0.158    0.005 
0.40    152.8     0.819    0.272       0.017    0.0     0.483     1.399     0.056    7.4     0.497     0.136    0.005 
0.45    140.9     0.853    0.257       0.018    0.0     0.483     1.399     0.056    4.5     0.547     0.122    0.005 
0.50    126.5     0.896    0.236       0.018    0.0                2.8     0.599     0.135    0.005 
0.75    79.7     1.063    0.224       0.022    0.0                0.1     0.864     0.253    0.021 
1.00    33.5     1.361    0.214       0.026    0.0                0.0             
1.25    16.0     1.616    0.204       0.031    0.0                0.0             
1.50    8.7     1.818    0.140       0.033    0.0                0.0             
2.00    2.1     2.218    0.040       0.031    0.0                0.0             

The measured and indicated resources for zones 1001, 1003, and 1007 are shown in Table 17.8.

Table 17.8 Sunshine Horizon 1001, 1003 and 1007 Measured and Indicated Resources

1; 3; 7    Measured & Indicated     
Cutoff    000's Tons    % Co    % Cu    oz Au/ton 
         0.00    871.9         0.214    0.285    0.005 
         0.05    464.5         0.385    0.357    0.009 
         0.10    351.2         0.486    0.316    0.011 
         0.15    304.8         0.541    0.316    0.012 
         0.20    260.7         0.604    0.327    0.013 
         0.25    233.8         0.648    0.322    0.014 
         0.30    210.7         0.689    0.304    0.016 
         0.35    176.5         0.760    0.290    0.015 
         0.40    152.8         0.819    0.272    0.017 
         0.45    140.9         0.853    0.257    0.018 
         0.50    126.5         0.896    0.236    0.018 
         0.75    79.7         1.063    0.224    0.022 
         1.00    33.5         1.361    0.214    0.026 
         1.25    16.0         1.616    0.204    0.031 
         1.50    8.7         1.818    0.140    0.033 
         2.00    2.1         2.218    0.040    0.031 

The most recent historic resource estimates for the Sunshine deposit were based on a long-section polygonal method. The prior resources are summarized in Table 17.9 at a 0.20% Cobalt cutoff grade.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 142

Table 17.9 Sunshine Historic Resource Estimate (0.20% Co Cutoff)

    000's    Grade    Grade    Grade    Width 
                   Deposit    Tons    %Co    %Cu    oz Au/t    (ft) 
Sunshine Main Zone    218.8    0.980    0.54    0.023    6.09 
Sunshine HW Zone    26.8    0.843    0.25    0.012    3.87 
East Sunshine    100.5    0.422    0.94    0.014    n/a 
 
Total Sunshine    346.0    0.807    0.63    0.020    n/a 

The prior East Sunshine estimate should be included with the present estimate since it was not updated during 2005. The East Sunshine deposit requires additional drilling to be considered for mining. MDA believes that a 0.20% to 0.30% cobalt cutoff grade is appropriate for the current resource estimate.

The present Sunshine resource estimate is considerably lower in grade than the historic calculations. There are two reasons for this difference. First, a number of drill holes that intersect the mineralized horizons have not been assayed within one or more of the horizons. These intercepts were given 0.00 assays for cobalt, copper, and gold, and in many cases influenced the grade of blocks above the cutoff grade. This was not the case in the prior estimates.

Second, MDA used a method that allowed many holes to interact to estimate block grades. In the past, a long-section polygonal estimate was used which essentially allowed equal weighting of high-grade and low-grade composites. MDA limited the influence of high-grade to high-grade zones with medium-grade composites also influencing the block grades within the high-grade zone. This is a conservative and realistic method of computing block grades where the boundary between high-grade and medium-grade zones is not well defined. A similar method was used within the medium-grade zone that allowed low-grade samples to influence the estimation of block grades with the medium-grade zones.

17.1.3 Ram Deposit

This section includes a summary of resource modeling criteria incorporated into the MDA historic 2001 pre-feasibility study, which was updated to include drill data for 2004 (28 core holes) for this estimate. The resources stated are the current March, 2005 resource estimates. Interpretations for the Ram deposit have not changed; rather, the latest drilling has allowed for increased confidence of interpretations, while adding to the resource base.

The Ram main zone consists of three mineralized horizons, all occurring within the BTE units. From hanging wall to footwall, these horizons have been labeled as 3021, 3022, and 3023. Zone 3023 appears to be the most persistently mineralized of the three zones. The vertical distance between the three horizons within the main zone ranges from a few feet to, locally, tens of feet.

The Ram footwall zone is also divided into three horizons, though they appear less distinct than the main zone horizons. These horizons have been labeled as 3031, 3032, and 3035, and are separated by a few feet to tens of feet (locally nearly 100 ft separates 3032 and 3035).

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 143

There are five Ram hangingwall zones and resources have been estimated for three, which are labeled as 3010, 3012, and 3013. Table 17.10 shows the average strike and dip of the main horizons taken on plan and cross sections prepared during the 2001 pre-feasibility study.

Correlation of horizons between drill holes and between cross sections were made based on a combination of lithology, structure, style of mineralization, and grade. For the most part, MDA relied on Formation Capital’s geologic interpretations of geologic and mineral continuity, with recognition that, in some locations, it is difficult to identify individual horizons, particularly when one or two of the horizons either coalesce or pinch out. The potential to correlate discontinuous mineralized zones within BTE units and treat them as a continuous mineralized horizon is also recognized.

Table 17.10 Ram Main & Footwall Horizon Orientations

Horizon    Number of    Average    Average 
    Observations    Strike    Dip 
3021    8    344°    52° 
3022    8    341°    51° 
3023    10    342°    51° 
3031    10    339°    51° 
3032    8    339°    50° 
3035    4    333°    46° 

17.1.3.1 Geochemistry of the Ram Deposit

In the first half of 2000, MDA statistically analyzed approximately 1,700 multi-element geochemistry sample data obtained from 18 holes drilled in the Ram deposit in 1997. Of these, 610 samples averaged >0.05% Co, and 253 samples averaged >0.20% Co. MDA focused its analysis on silver, arsenic, gold, bismuth, cobalt, iron, copper, mercury, and nickel because of either significant levels of concentration or good correlation with cobalt and/or copper. Some of the elements were included in the review in spite of their low grades or poor association with cobalt because of their potential economic or metallurgical impact.

Most of the elements considered tend to have higher values in the same parts of the deposit where cobalt does, though rarely was there a good sample-for-sample correlation with cobalt. The only correlations of significance were Co and As, Co and Au, Cu and Ag, and Au and As. Spatial grade changes of these metals are not significant, though some subtle trends do exist, as summarized below:

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 144

17.1.3.2 Specific Gravity

Formation Capital took samples for density measurements from uncrushed core. Specific gravity was measured by standard Jolly balance methods. The results of specific gravity determinations, and tonnage factors used in the resource models, are presented in Table 17.11.

                                       Table 17.11 Tonnage Factor Summary for Ram Deposit 
        Number of        Tonnage Factor 
                                     Area        Specific Gravity     
        Samples        (cu. ft/ton) 
                     Sunshine    321    2.95    10.86 
                     Ram    199    2.85    11.24 
                     East Sunshine    147    2.85    11.24 
 
17.1.3.3    Ram Resource Method             

Cross sections were developed on 200 ft intervals over a 2,600 ft strike length for the Ram deposit. A total of 28 core holes totaling 24,869 ft were drilled in the deposit during 2004. The database shows a total of 67 core holes drilled in the deposit totaling 44,737.5 ft. Eight of these holes (2,613 ft) were drilled for metallurgical testing and were not used in the resource estimate since only one interval in each hole was assayed. Mineralized horizons were developed on the sections. These horizons were developed by utilizing both the favorable geologic unit (BTE) and mineralization above 0.03% Co. Where higher grade mineralization was present the zone was drawn to a minimum 3 ft true thickness with a grade in excess of 0.20% Co. Mineralized horizons were developed for horizons 3010, 3011; 3012; 3013; 3015; 3021; 3022; 3023; 3025; 3029; 3030; 3032; and 3035, however resources were not calculated for 3015; 3025; 3029; and 3030 due to continuity and grade issues.

The same methodology was used to compute the Ram resource as the Sunshine deposit. These mineralized horizons were sliced on 25 ft intervals and plotted on plan view maps. The horizons were

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project         
                                                       Formation Capital Corporation    Page 145 
 
drawn on the plan views on 50 ft intervals.    The intervening 25 ft plans were developed on computer 
screens by interpolation.         

Assays were coded in the database from the cross sections and corrected to the plans. Several holes intersected the mineralized horizons but were not assayed. For the resource calculation these holes were assumed to intersect un-mineralized material (i.e. 0.00% Co, Cu, and 0.0 oz Au/t). A statistical study was completed on the drill hole data from these horizons. This study indicated that several populations were evident in the horizons as shown in Figure 17.4 from about 0.03% Co to 0.20% Co, from 0.20 to a little over 1% Co, and from a little over 1% to 4%, where the cobalt assays were capped. Figures 17.4, 17.5, and 17.6 show the QQ plots for cobalt, copper, and gold respectively. The QQ plot for copper shows a population break at about 1% copper, while the gold QQ plot shows one at about 0.03 oz Au/t. Figure 17.7 shows a long-section view of the 1023 horizon showing the high-grade zones (red: +1.0% Co), medium-grade (green; 0.30 -1.0% Co), and low-grade (blue; 0.03 -.30% Co) zones and color coded block grades within the horizon.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 146

Figure 17.4 Ram Cobalt QQ Plot




Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 147

Figure 17.5 Ram Copper QQ Plot


Mine Development Associates
April 30, 2005


  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 148

Figure 17.6 Ram Gold QQ Plot




  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 149

Figure 17.7 Ram 1023 Horizon


(high-grade zones (red: +1.0% Co), medium-grade (green; 0.3 -1.0% Co), and low-grade (blue; 0.03 -.30% Co) zones and color coded block grades within the horizon).

17.1.3.4 Ram Resource Estimate - 2005

The resource calculated for the Ram deposit is shown in Tables 17.12 through 17.17 for horizons 3010, 3012, 3013, 3021, 3022, and 3023, the larger horizons in the Ram deposit respectively. The 3022 and 3023 are the most significant horizons at the Ram deposit.

Measured material was defined by the distance to the closest drill hole and the number of drill holes influencing block grades. A block was defined as measured if the closest hole was within 50 ft, or if the closest hole was within 100 ft and at least two drill holes were used to compute the block grade. Indicated materials were defined as grade estimates with one hole within 100 ft of the block estimate, except for the 3022 and 3023 horizons with good continuity, where indicated material was also defined by at least two drill holes within 200 ft of the block. Material defined by drill holes in excess of 100 ft was classed as inferred in the horizons, except for 3022 and 3023 where inferred material was defined

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 150

by one hole in excess of 100 ft or more than one hole in excess of 200 ft. Inferred materials were extended by about 300 ft to the south where drilling has indicated thick horizons with good continuity, or to depth where drilling has not found the bottom of the deposit, as is the case for the Blackbird group of deposits. Inferred materials were also extended down dip by 300-350 ft in horizons 3010, 3022 and 3023. The bottom of the deposit has not been found.

Table 17.12 Ram 3010 Horizon Resources
3010            Measured:                    Indicated:                    Inferred:         
Cutoff    000's    % Co % Cu oz Au/     Avg.    000's % Co % Cu oz Au/    Avg.    000's    % Co % Cu oz Au/    Avg. 
    Tons            ton    True Thk Tons            ton True Thk Tons            ton    True Thk 
     0.00    108.4     0.320    0.05    0.004    5.7    29.8    0.206    0.03    0.002    5.4    62.6     0.436    0.03    0.005    5.7 
     0.05    102.2     0.337    0.04    0.004    5.6    29.8    0.206    0.03    0.002    5.4    62.6     0.436    0.03    0.005    5.7 
     0.10    94.0     0.360    0.04    0.004    5.5    29.8    0.206    0.03    0.002    5.4    62.6     0.436    0.03    0.005    5.7 
     0.15    86.1     0.382    0.04    0.004    5.5    18.5    0.252    0.04    0.003    5.3    56.2     0.471    0.03    0.005    5.8 
     0.20    69.2     0.434    0.04    0.005    5.7    10.7    0.323    0.07    0.004    6.0    52.3     0.494    0.03    0.006    5.9 
     0.25    49.4     0.520    0.01    0.005    6.0    5.4    0.422    0.01    0.004    6.2    47.0     0.523    0.02    0.006    5.9 
     0.30    40.2     0.576    0.01    0.006    6.4    5.4    0.422    0.01    0.004    6.2    36.3     0.597    0.01    0.006    6.1 
     0.35    37.3     0.597    0.01    0.006    6.5    5.4    0.422    0.01    0.004    6.2    30.8     0.646    0.01    0.007    6.2 
     0.40    33.9     0.619    0.01    0.006    6.7    5.4    0.422    0.01    0.004    6.2    24.9     0.709    0.00    0.007    6.2 
     0.45    24.6     0.697    0.00    0.008    6.6    0.5    0.531    0.01    0.004    4.0    21.1     0.762    0.00    0.008    6.3 
     0.50    18.1     0.776    0.00    0.009    6.5    0.5    0.531    0.01    0.004    4.0    18.5     0.800    0.00    0.009    6.2 
     0.75    10.8     0.914    0.00    0.011    6.4    0.0    0    0.00    0    0.0    10.9     0.985    0.00    0.012    6.4 
     1.00    0.8     1.030    0.00    0.013    5.8    0.0    0    0.00    0    0.0    6.2     1.050    0.00    0.013    6.4 
     1.25    0.0     0.000    0.00    0.000    0.0    0.0    0    0.00    0    0.0    0.0     0.000    0.00    0.000    0.0 
     1.50    0.0     0.000    0.00    0.000    0.0    0.0    0    0.00    0    0.0    0.0     0.000    0.00    0.000    0.0 
     2.00    0.0     0.000    0.00    0.000    0.0    0.0    0    0.00    0    0.0    0.0     0.000    0.00    0.000    0.0 

Table 17.13 Ram 3012 Horizon Resources
 
 
3012            Measured:                    Indicated:                    Inferred:         
Cutoff 000's    % Co % Cu oz Au/       Avg.    000's    % Co % Cu oz Au    Avg.    000's    % Co % Cu oz Au/    Avg. 
    Tons            ton    True Thk Tons            /ton True Thk Tons            ton    True Thk 
     0.00    171.8     0.395    0.36    0.008    5.2    32.9     0.160    1.25     0.020           6.2    82.2     0.169         0.38    0.008    5.5 
     0.05    164.7     0.410    0.37    0.008    5.3    30.3     0.170    1.35     0.020           6.2    82.0     0.170         0.39    0.008    5.5 
     0.10    151.9     0.440    0.40    0.009    5.3    24.9     0.195    1.63     0.023           6.6    73.8     0.181         0.42    0.009    5.6 
     0.15    118.9     0.526    0.41    0.008    5.4    9.8     0.276    2.30     0.012           5.1    23.8     0.287         0.58    0.007    5.4 
     0.20    91.7     0.630    0.51    0.010    5.2    9.8     0.276    2.30     0.012           5.1    13.9     0.366         0.86    0.008    5.3 
     0.25    68.7     0.766    0.66    0.011    5.1    9.4     0.278    2.39     0.012           5.1    8.3     0.461         1.41    0.011    5.3 
     0.30    64.1     0.801    0.58    0.011    5.2    0.0     0.000    0.00     0.000           0.0    4.2     0.640         0.45    0.009    5.2 
     0.35    63.2     0.808    0.59    0.011    5.2    0.0     0.000    0.00     0.000           0.0    4.0     0.656         0.47    0.009    5.1 
     0.40    62.3     0.815    0.59    0.011    5.2    0.0     0.000    0.00     0.000           0.0    4.0     0.656         0.47    0.009    5.1 
     0.45    61.7     0.818    0.59    0.011    5.2    0.0     0.000    0.00     0.000           0.0    3.4     0.696         0.53    0.009    5.0 
     0.50    60.9     0.823    0.60    0.011    5.2    0.0     0.000    0.00     0.000           0.0    3.3     0.704         0.54    0.008    5.1 
     0.75    26.3     1.062    0.58    0.010    5.5    0.0     0.000    0.00     0.000           0.0    0.6     1.143         0.03    0.009    5.1 
     1.00    14.0     1.246    0.42    0.011    5.7    0.0     0.000    0.00     0.000           0.0    0.6     1.143         0.03    0.009    5.1 
     1.25    7.0     1.386    0.20    0.011    6.0    0.0     0.000    0.00     0.000           0.0    0.0     0.000         0.00    0.000    0.0 
     1.50    0.4     1.555    0.02    0.010    6.2    0.0     0.000    0.00     0.000           0.0    0.0     0.000         0.00    0.000    0.0 
     2.00    0.0     0.000    0.00    0.000    0.0    0.0     0.000    0.00     0.000           0.0    0.0     0.000         0.00    0.000    0.0 

Mine Development Associates April 30, 2005



    Technical Report, Idaho Cobalt Project                                     
                                        Formation Capital Corporation    Page 151 
 
 
Table 17.14 Ram 3013 Horizon Resources
3013            Measured:                    Indicated:                    Inferred:         
Cutoff    000's    % Co % Cu oz Au/       Avg.    000's    % Co % Cu    oz Au/         Avg.    000's    % Co % Cu oz Au/    Avg. 
    Tons            ton    True Thk Tons             ton    True Thk Tons        ton    True Thk 
     0.00    106.6       0.392    0.43     0.011    5.1    39.5       0.654    0.26     0.012    5.2    25.3       0.204    0.51    0.010    4.9 
     0.05    98.9       0.420    0.46     0.012    5.1    37.4       0.689    0.27     0.013    5.1    25.3       0.204    0.51    0.010    4.9 
     0.10    83.6       0.484    0.49     0.013    5.1    26.7       0.932    0.27     0.016    5.0    21.6       0.226    0.55    0.011    4.8 
     0.15    57.2       0.650    0.41     0.014    4.8    24.5       1.006    0.25     0.016    4.9    18.0       0.245    0.51    0.011    4.9 
     0.20    36.8       0.915    0.35     0.017    4.5    17.3       1.345    0.15     0.019    5.0    4.6       0.435    0.50    0.013    4.8 
     0.25    34.8       0.954    0.33     0.018    4.5    17.3       1.345    0.15     0.019    5.0    2.7       0.580    0.41    0.015    4.6 
     0.30    29.6       1.073    0.31     0.019    4.6    13.0       1.693    0.02     0.022    5.0    2.1       0.658    0.38    0.016    4.6 
     0.35    29.2       1.083    0.31     0.019    4.6    13.0       1.693    0.02     0.022    5.0    1.4       0.811    0.44    0.018    4.3 
     0.40    27.7       1.121    0.32     0.020    4.5    13.0       1.693    0.02     0.022    5.0    1.1       0.951    0.45    0.020    4.1 
     0.45    23.7       1.241    0.36     0.022    4.6    9.0       2.265    0.01     0.029    5.3    0.8       1.166    0.58    0.024    4.1 
     0.50    21.7       1.310    0.38     0.023    4.6    9.0       2.265    0.01     0.029    5.3    0.8       1.166    0.58    0.024    4.1 
     0.75    17.7       1.481    0.45     0.026    4.5    9.0       2.265    0.01     0.029    5.3    0.8       1.166    0.58    0.024    4.1 
     1.00    16.9       1.509    0.44     0.026    4.5    9.0       2.265    0.01     0.029    5.3    0.7       1.183    0.57    0.024    3.9 
     1.25    12.1       1.652    0.42     0.027    4.4    9.0       2.265    0.01     0.029    5.3    0.0       2.265    0.01    0.029    2.2 
     1.50    5.5       1.977    0.21     0.028    4.4    9.0       2.265    0.01     0.029    5.3    0.0       2.265    0.01    0.029    2.2 
     2.00    3.2       2.265    0.01     0.029    4.6    9.0       2.265    0.01     0.029    5.3    0.0       2.265    0.01    0.029    2.2 
 
 
 
 
Table 17.15 Ram 3021 Horizon Resources
 
3021            Measured:                    Indicated:                    Inferred:         
Cutoff    000's    % Co % Cu oz Au/     Avg.    000's    % Co % Cu oz Au/     Avg.    000's    % Co    % Cu oz Au/    Avg. 
    Tons            ton    True Thk Tons            ton    True Thk Tons        ton    True Thk 
     0.00    353.7     0.252    0.44    0.010    6.2    49.0     0.149    0.61    0.006    6.7    134.3       0.205    0.45    0.008    6.4 
     0.05    340.8     0.260    0.45    0.010    6.2    43.5     0.163    0.66    0.006    6.6    #REF! #REF!    #REF! #REF!    #REF! 
     0.10    238.1     0.339    0.57    0.013    6.5    29.1     0.202    0.84    0.007    6.1    87.3       0.273    0.57    0.011    6.6 
     0.15    187.7     0.398    0.56    0.015    6.7    11.9     0.317    0.52    0.008    6.0    50.7       0.383    0.52    0.015    6.9 
     0.20    175.9     0.413    0.58    0.016    6.8    8.3     0.388    0.63    0.010    4.9    50.3       0.385    0.52    0.015    7.0 
     0.25    150.1     0.445    0.61    0.017    7.1    4.0     0.542    0.77    0.018    5.9    48.9       0.389    0.52    0.015    7.1 
     0.30    135.0     0.464    0.63    0.018    7.1    4.0     0.542    0.77    0.018    5.9    43.1       0.404    0.53    0.016    7.1 
     0.35    119.0     0.483    0.65    0.018    7.1    4.0     0.542    0.77    0.018    5.9    30.9       0.435    0.59    0.018    6.9 
     0.40    87.8     0.521    0.72    0.020    7.0    1.5     0.795    1.48    0.030    5.7    21.0       0.462    0.68    0.019    6.7 
     0.45    56.1     0.577    0.86    0.021    6.7    1.5     0.795    1.48    0.030    5.7    8.6       0.524    0.90    0.018    5.6 
     0.50    34.4     0.641    1.05    0.022    6.2    1.5     0.795    1.48    0.030    5.7    4.9       0.564    1.02    0.020    5.4 
     0.75    8.5     0.831    2.11    0.018    5.7    0.9     0.925    2.37    0.020    6.6    0.0       0.934    2.39    0.020    3.4 
     1.00    0.0     0.000    0.00    0.000    0.0    0.0     0.000    0.00    0.000    0.0    0.0       0.000    0.00    0.000    0.0 
     1.25    0.0     0.000    0.00    0.000    0.0    0.0     0.000    0.00    0.000    0.0    0.0       0.000    0.00    0.000    0.0 
     1.50    0.0     0.000    0.00    0.000    0.0    0.0     0.000    0.00    0.000    0.0    0.0       0.000    0.00    0.000    0.0 
     2.00    0.0     0.000    0.00    0.000    0.0    0.0     0.000    0.00    0.000    0.0    0.0       0.000    0.00    0.000    0.0 

Mine Development Associates April 30, 2005



    Technical Report, Idaho Cobalt Project                                     
                                         Formation Capital Corporation    Page 152 
 
 
Table 17.16 Ram 3022 Horizon Resources
3022            Measured:                    Indicated:                    Inferred:         
Cutoff    000's    % Co % Cu oz Au/       Avg.    000's    % Co % Cu oz Au/     Avg.    000's    % Co % Cu oz Au/    Avg. 
    Tons            ton    True Thk Tons            ton True Thk Tons                           ton    True Thk 
     0.00    391.1       0.471    0.46     0.012    6.5    190.8       0.488         0.38    0.011    6.5    281.5     0.330         0.26    0.007    7.6 
     0.05    380.8       0.483    0.47     0.012    6.6    183.8       0.505         0.39    0.011    6.7    256.5     0.360         0.28    0.008    7.9 
     0.10    352.7       0.516    0.49     0.012    6.8    173.0       0.532         0.40    0.011    6.9    228.0     0.396         0.30    0.008    8.3 
     0.15    308.8       0.571    0.54     0.014    6.9    146.1       0.608         0.46    0.013    7.0    124.3     0.623         0.49    0.013    8.1 
     0.20    299.5       0.584    0.55     0.014    7.0    137.8       0.635         0.46    0.013    7.0    97.7     0.752         0.47    0.015    8.1 
     0.25    283.1       0.605    0.56     0.015    7.1    131.1       0.656         0.47    0.014    7.1    88.9     0.805         0.50    0.017    8.2 
     0.30    258.7       0.636    0.57     0.015    7.3    111.9       0.721         0.48    0.014    7.2    87.5     0.813         0.50    0.017    8.3 
     0.35    213.6       0.701    0.52     0.016    7.5    92.3       0.806         0.47    0.015    7.3    79.6     0.862         0.52    0.018    8.5 
     0.40    187.4       0.747    0.52     0.017    7.6    87.9       0.828         0.48    0.015    7.3    79.6     0.862         0.52    0.018    8.5 
     0.45    146.9       0.836    0.53     0.017    7.7    80.2       0.866         0.47    0.015    7.4    73.7     0.897         0.51    0.016    8.5 
     0.50    123.7       0.904    0.54     0.018    7.7    69.3       0.929         0.49    0.015    7.3    72.3     0.906         0.52    0.017    8.6 
     0.75    95.9       0.984    0.63     0.018    8.0    55.1       1.010         0.55    0.016    7.4    50.1     1.053         0.60    0.018    7.9 
     1.00    41.9       1.096    0.81     0.019    7.3    37.1       1.086         0.60    0.015    7.0    40.0     1.104         0.65    0.018    8.3 
     1.25    3.1       1.433    0.27     0.039    7.6    0.0       0.000         0.00    0.000    0.0    0.0     0.000         0.00    0.000    0.0 
     1.50    1.1       1.581    0.17     0.041    7.9    0.0       0.000         0.00    0.000    0.0    0.0     0.000         0.00    0.000    0.0 
     2.00    0.0       0.000    0.00     0.000    0.0    0.0       0.000         0.00    0.000    0.0    0.0     0.000         0.00    0.000    0.0 
 
 
 
Table 17.17 Ram 3023 Horizon Resources
 
3023            Measured:                    Indicated:                    Inferred:         
Cutoff    000's    % Co % Cu oz Au/     Avg.    000's    % Co % Cu oz Au/     Avg.    000's    % Co % Cu oz Au/    Avg. 
    Tons            ton    True Thk Tons            ton    True Thk Tons                           ton    True Thk 
     0.00    590.7     0.615    0.63     0.015    7.5    417.7     0.580         0.69    0.015    8.2    708.8     0.726         0.93    0.018    9.8 
     0.05    571.8     0.634    0.64     0.015    7.6    403.8     0.598         0.70    0.015    8.4    701.7     0.732         0.94    0.018    9.9 
     0.10    558.8     0.647    0.65     0.015    7.7    399.1     0.604         0.71    0.015    8.5    701.3     0.733         0.94    0.018    9.9 
     0.15    550.2     0.655    0.66     0.016    7.8    392.0     0.613         0.71    0.016    8.6    694.9     0.738         0.94    0.018    10.0 
     0.20    532.3     0.671    0.66     0.016    7.9    372.5     0.636         0.70    0.016    8.7    681.8     0.749         0.93    0.018    10.1 
     0.25    514.2     0.687    0.67     0.016    8.1    344.1     0.670         0.73    0.017    8.9    661.2     0.765         0.96    0.018    10.3 
     0.30    488.8     0.708    0.70     0.017    8.2    324.6     0.693         0.75    0.017    9.1    644.6     0.778         0.98    0.018    10.6 
     0.35    459.5     0.732    0.73     0.017    8.3    303.0     0.720         0.78    0.018    9.2    629.9     0.788         1.00    0.018    10.6 
     0.40    436.7     0.751    0.75     0.017    8.4    279.4     0.749         0.82    0.018    9.3    604.5     0.806         1.02    0.018    10.7 
     0.45    413.5     0.769    0.78     0.018    8.4    258.1     0.775         0.86    0.019    9.5    597.1     0.810         1.03    0.018    10.8 
     0.50    384.3     0.791    0.81     0.018    8.4    227.2     0.816         0.94    0.020    9.7    582.1     0.819         1.05    0.019    10.9 
     0.75    175.8     0.993    0.92     0.022    8.4    114.6     1.025         1.25    0.025    10.7    270.3     1.027         1.28    0.024    10.9 
     1.00    64.1     1.216    0.56     0.025    7.5    46.3     1.274         0.68    0.029    9.3    92.9     1.338         1.21    0.028    9.6 
     1.25    27.3     1.390    0.74     0.031    7.0    25.9     1.403         0.78    0.033    8.5    74.8     1.386         1.30    0.029    9.5 
     1.50    4.0     1.581    0.54     0.038    4.8    2.2     1.617         0.55    0.039    4.4    12.1     1.605         0.54    0.039    6.0 
     2.00    0.0     0.000    0.00     0.000    0.0    0.0     0.000         0.00    0.000    0.0    0.0     0.000         0.00    0.000    0.0 

Table 17.18 summarizes the Ram deposit resources at different cobalt cutoff grades. MDA believes that a cutoff grade between 0.20% and 0.30% Co is appropriate for reporting resources for the project.

Mine Development Associates April 30, 2005



    Technical Report, Idaho Cobalt Project                                     
                                    Formation Capital Corporation    Page 153 
 
 
 
Table 17.18 Ram Resources
 
Ram            Measured:                Indicated:                    Inferred:         
Cutoff    000's    % Co % Cu oz Au/    Avg.    000's    % Co % Cu oz Au/ Avg.    000's % Co % Cu oz Au/ Avg. 
    Tons            ton    True Thk    Tons            ton True Thk Tons            ton True Thk 
0.00    2,055.2     0.421    0.46    0.011    6.3    842.2     0.473    0.55    0.012    7.2    1,404.0    0.495    0.63    0.012    8.1 
0.05    1,964.3     0.439    0.47    0.011    6.4    798.8     0.496    0.57    0.012    7.4    1,364.0    0.509    0.65    0.013    8.2 
0.10    1,717.4     0.491    0.51    0.012    6.6    737.9     0.531    0.60    0.013    7.5    1,256.3    0.546    0.68    0.013    8.4 
0.15    1,486.5     0.548    0.53    0.013    6.8    632.9     0.599    0.62    0.015    7.8    1,028.1    0.640    0.78    0.016    8.8 
0.20    1,344.4     0.588    0.55    0.014    6.9    572.0     0.645    0.63    0.015    7.9    952.2    0.678    0.79    0.016    9.0 
0.25    1,219.3     0.625    0.58    0.014    7.2    525.6     0.682    0.66    0.016    8.1    894.8    0.706    0.83    0.017    9.3 
0.30    1,109.3     0.660    0.60    0.015    7.3    473.1     0.726    0.64    0.016    8.4    844.5    0.732    0.86    0.017    9.6 
0.35    992.8     0.699    0.62    0.016    7.5    427.4     0.770    0.67    0.017    8.5    799.1    0.755    0.89    0.017    9.7 
0.40    902.8     0.732    0.64    0.016    7.5    397.0     0.800    0.70    0.017    8.6    754.6    0.777    0.92    0.017    9.9 
0.45    790.6     0.776    0.67    0.017    7.6    358.9     0.839    0.75    0.018    8.8    722.2    0.793    0.94    0.017    10.1 
0.50    701.5     0.814    0.69    0.017    7.5    317.1     0.888    0.80    0.019    8.9    697.3    0.805    0.96    0.018    10.2 
0.75    343.6     1.018    0.78    0.020    7.7    186.0     1.087    0.95    0.022    9.3    338.5    1.000    1.12    0.022    10.0 
1.00    145.1     1.215    0.59    0.022    6.8    98.9     1.290    0.55    0.023    7.8    144.5    1.209    0.97    0.024    8.7 
1.25    49.5     1.456    0.55    0.028    6.3    34.9     1.625    0.58    0.032    7.7    74.8    1.386    1.30    0.029    9.5 
1.50    11.0     1.778    0.32    0.032    5.0    11.2     2.135    0.12    0.031    5.1    12.1    1.606    0.54    0.039    6.0 
2.00    3.2     2.265    0.01    0.029    4.6    9.0     2.265    0.01    0.029    5.3    0.0    2.265    0.01    0.029    2.2 

The tonnage of Measured and Indicated Ram resources has increased 67%, while the contained pounds of cobalt has increased 65% at a cutoff grade of 0.30% Co over the prior calculations. The average thickness of the horizons has increased by 36.6% to a true width of 7.7 ft. Drilling in the northern portions of the deposit was generally indicating narrow mineralized horizons, while drilling in section 400 and south of this section are indicating wide mineralized horizons. The deposit is open down dip and to the south and to the north, but much thinner than in the south. Table 17.19 illustrates the historic Measured and Indicated Ram resources calculated for the 2001 pre-feasibility study, while Table 17.20 show the 2005 updated resource estimate. Both estimates shown in Tables 17.19 and 17.20 used a 0.30% Co cutoff grade.

Table 17.19 Historic 2001 Pre-feasibility Measured and Indicated Ram Resource Estimate @ 0.30% Co Cutoff

    Tons                Avg True 
Horizon    (000’s)    % Co    % Cu    oz Au/t    Width (ft) 
HW    82    0.509    0.49    0.016    1.3 
3021    95    0.51    0.87    0.019    5.8 
3022    162    0.584    0.63    0.019    4.3 
3023    488    0.825    0.54    0.019    7 
3031    27    0.541    0.34    0.01    2.4 
3032    52    0.483    0.79    0.007    3.1 
3035    39    0.631    0.11    0.011    7.3 
Total    945    0.69    0.57    0.018    5.6 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 154

Table 17.20 2005 Measured and Indicated Ram Resource Estimate @ 0.30% Co Cutoff

 Horizon            Measured & Indicated     
    000's Tons    % Co    % Cu    oz Au/ton    Avg. Width    Avg. True Thk 
           3010    45.6    0.558    0.01    0.006    7.8    6.4 
           3011    29.0    0.471    0.22    0.010    8.7    7.1 
           3012    64.1    0.801    0.58    0.011    6.3    5.2 
           3013    42.6    1.262    0.22    0.020    5.8    4.7 
 
HW    181.4    0.795    0.29    0.012    6.9    5.7 
           3021    138.9    0.466    0.63    0.018    8.7    7.1 
           3022    370.6    0.662    0.54    0.015    8.9    7.3 
           3023    813.4    0.702    0.72    0.017    10.4    8.6 
           3032    53.7    0.660    0.84    0.010    6.4    5.2 
           3035    24.3    0.607    0.12    0.011    7.9    6.4 
 
Total    1,582.3    0.680    0.62    0.016    9.3    7.7 

Table 17.21 summarizes the total Idaho Cobalt Project Measured and Indicated resources at a 0.20 and 0.30% Co cutoff grade, while Table 17.22 illustrates the Inferred resources of the entire project.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 155

Table 17.21 2005 Measured and Indicated Project Resource Estimate @ 0.20 and 0.30% Co Cutoff

0.3% Co Cutoff                     
Horizon            Measured & Indicated     
    000's Tons    % Co    % Cu    oz Au/ton    Avg. Horizontal Thk    Avg. True Thk 
E. Sunshine    100.5             0.422    0.94                 0.014         
1001    35.5             0.467    0.64                 0.015    5.1                                 4.2 
1003    169.1             0.710    0.23                 0.016    4.7                                 3.8 
1007    8.0             1.155    0.26                 0.024    3.2                                 2.6 
 
Sunshine    313.1             0.007    0.00                 0.000         
3010    45.6             0.558    0.01                 0.006    7.8                                 6.4 
3011    29.0             0.471    0.22                 0.010    8.7                                 7.1 
3012    64.1             0.801    0.58                 0.011    6.3                                 5.2 
3013    42.6             1.262    0.22                 0.020    5.8                                 4.7 
 
HW    181.4             0.795    0.29                 0.012    6.9                                 5.7 
3021    138.9             0.466    0.63                 0.018    8.7                                 7.1 
3022    370.6             0.662    0.54                 0.015    8.9                                 7.3 
3023    813.4             0.702    0.72                 0.017    10.4                                 8.6 
3032    53.7             0.660    0.84                 0.010    6.4                                 5.2 
3035    24.3             0.607    0.12                 0.011    7.9                                 6.4 
 
Total    1,895.4             0.667    0.598                 0.016    9.3                                 7.7 
0.2% Co Cutoff                     
Horizon            Measured & Indicated     
    000's Tons    % Co    % Cu    oz Au/ton    Avg. Length    Avg. True Thk 
E. Sunshine    100.5             0.422    0.94                 0.014         
1001    46.4             0.416    0.61                 0.013    4.6                                 3.8 
1003    205.8             0.628    0.27                 0.014    4.7                                 3.9 
1007    13.1             0.786    0.22                 0.016    3.6                                 3.0 
 
Sunshine    365.8             0.005    0.00                 0.000         
3010    79.8             0.419    0.05                 0.005    7.0                                 5.7 
3011    51.8             0.374    0.14                 0.007    7.4                                 6.1 
3012    101.5             0.596    0.68                 0.010    6.4                                 5.2 
3013    54.1             1.052    0.28                 0.018    5.7                                 4.7 
 
HW    287.2             0.593    0.33                 0.010    6.6                                 5.4 
3021    184.2             0.412    0.58                 0.016    8.2                                 6.7 
3022    437.4             0.600    0.52                 0.014    8.6                                 7.0 
3023    904.8             0.657    0.67                 0.016    10.1                                 8.2 
3032    78.6             0.529    0.72                 0.008    6.5                                 5.3 
3035    24.3             0.607    0.12                 0.011    7.9                                 6.4 
 
Total    2,282.3             0.596    0.561                 0.014    7.4                                 6.1 

Note: Widths based on Ram only. E. Sunshine based on 0.20% Co Cutoff

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 156

Table 17.22 2005 Inferred Project Resource Estimate @ 0.30% Co Cutoff

             Horizon                Inferred:         
    000's Tons    % Co    % Cu    oz Au/ton    Avg. Length    Avg. True Thk 
     E. Sunshine    430.8         0.404    1.06    0.017         
                             1001    0.1         0.335    0.02    0.002         
                             1003    12.9         0.416    0.24    0.012         
                             1007    0.0         0.000    0.00    0.000         
 
     Sunshine    443.7         0.404    1.04    0.017         
                             3010    36.3         0.597    0.01    0.006    7.5    6.1 
                             3011    1.3         0.314    0.06    0.004    7.9    6.5 
                             3012    4.2         0.640    0.45    0.009    6.3    5.2 
                             3013    2.1         0.658    0.38    0.016    5.6    4.6 
 
     HW    43.9         0.596    0.07    0.007    7.3    6.0 
                             3021    43.1         0.404    0.53    0.016    8.6    7.1 
                             3022    87.5         0.813    0.50    0.017    10.1    8.3 
                             3023    644.6         0.778    0.98    0.018    12.9    10.6 
                             3032    20.7         0.661    0.99    0.010    5.9    4.8 
                             3035    4.6         0.507    0.12    0.009    7.3    6.0 
 
     Total    1,288.2         0.630    0.918    0.017    11.9    9.7 
 
Note: Widths based on Ram only. E. Sunshine based on 0.20% Co Cutoff     

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 157

18.0 INTERPRETATION AND CONCLUSIONS

The Idaho Cobalt Project is an advanced stage development level project with Measured, Indicated, and Inferred resources that are based on over 100,000 feet of drilling in 163 drill holes (core). A final feasibility study is in the process of being completed during 2005. Geologic interpretations by Formation Capital are valid, representing multiple stratiform tabular Co-Cu-Au mineralized horizons in two deposits, Ram and Sunshine. Exploration data generated by Formation Capital are extensive, comprehensive, verifiable in the field, and are sufficient to warrant the estimation of resources that meet CIM standards. The Idaho Cobalt Project has advanced to the point of detailed project permitting and feasibility level engineering is being completed. There is both opportunity and risk, which Formation Capital should consider as the project progresses, as outlined in this section.

18.1 Opportunity

Recent drilling in 2004 at the Ram deposit resulted in increased total Measured and Indicated resources. There is considerable opportunity to increase total project Measured and Indicated resources by in-fill drilling of Inferred resources. Total project Inferred resources now total about 1.3 million tons with about half contained in the Ram. Additional drilling, both as in-fill drilling, and as extensions to horizons, has the potential to improve the total project resource, as well as the potential to convert Inferred resources to Measured and Indicated. The opportunity to extend the potential life of Formation Capital’s proposed mining project at Idaho Cobalt Project is therefore also likely. Completion of the feasibility study, additional drilling in the area of the initial stopes and an exploration adit is suggested prior to making a “go/no go” decision on the project.

Cobalt does appear to have the potential of a rapidly expanding market if electric cars gain acceptance. Cobalt oxides are expected to carry a premium over cobalt metal. The ICP will have the ability to produce cobalt oxide.

The opportunity to enter the cobalt market at a time when other sources (defense stockpile sales) are being depleted appears to be real.

18.2 Project Risks

Project risks include price fluctuation, geotechnical conditions, mine dilution, metallurgical characteristics, permit conditions, and reserve definition.

18.2.1 Price Fluctuation

Formation Capital has completed sufficient market research to have a reasonable understanding of expected cobalt pricing. During periods of copper and nickel oversupply it is unlikely new cobalt sources will be put into production. It would appear that, at least for the short term, cobalt will remain in the $15 to $18 per pound price range.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 158

18.2.2 Resource and Reserve Definition

Resource definition is very good on the Sunshine deposit, where drilling has been completed on fence lines every 50 ft, and the continuity of the deposit appears to be good. However, the majority of the resources for the project are contained in the Ram deposit, which has only been drilled along fences spaced 200 ft apart, for the most part. While the continuity of the Ram mineralization also appears to be good, the data spacing may be too far apart to accurately predict local occurrences of grade and thickness. Stope definition drilling is planned on 50 ft centers. Additional surface and underground drilling should shift resources from Inferred and Indicated to Indicated and Measured, respectively, reduce resource to reserve conversion risk and improve proposed mine development and production scheduling.

18.2.3 Unforeseen Problems

MDA believes completing an exploration decline and establishing test-mining areas would minimize potential project risks attributed to unforeseen problems. In addition to determining actual development advance rates and ground support requirements, this program would also help to establish mining methods, dilution, and actual cost information. Underground bulk sampling and drilling will help provide a comparison of the underground samples to projected reserves. Drifting on the mineralized horizons will also aid in the understanding of variances in geology and grade. Test mining could provide a bulk sample to compare with drill hole intercepts and additional samples for metallurgical testing.

18.2.4 Geotechnical Conditions

The geotechnical conditions have been evaluated on a preliminary basis. The rock conditions may present opportunities as well as risk. The risk is that areas may require more expensive support than assumed, or that more dilution may be encountered than planned. According to BMC’s project manager, about 10% of the workings in the Blackbird Mine required timber, and an additional 25% required bolting. MDA believes that shotcrete will prevent air slacking, which appears to be the most apparent support problem, based on review of available underground workings and core. As more information is gathered about conditions (ie, core) the geotechnical assessment should be updated. An underground exploration decline will gather a tremendous amount of geotechnical information.

18.2.5 Metallurgical Characteristics

Metallurgical testing has defined plant design parameters and is ongoing but not complete for the hydrometallurgical facility. The bulk sample obtained from the Ram by drilling yielded metallurgical test results. The testing for the hydrometallurgical plant is not complete. Further metallurgical testing of some unit operations as well as lab scale closed cycle testing will optimize the proposed flowsheets and improve assumptions. This is likely a risk and opportunity to improve on pre-feasibility assumptions.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 159

18.2.6 Environmental Considerations

The environmental risks of proposed mining operations may be minimized by limiting the amount of surface disturbance, limiting waste rock left on the surface to non-acid generating material, and sealing underground workings when completed. Shotcrete placed on underground workings will limit oxidation. These actions will limit environmental risk. Identifying and quantifying permit requirements will help reduce project risk at the time the project will require financing.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 160

19.0 OTHER RELEVANT DATA AND INFORMATION

Additional relevant information that have importance to the Idaho Cobalt Project are the current status of Permitting, and the Sunshine silver-gold refinery and hydrometallurgical plant, which was purchased by Formation Capital in 2002.

19.1      Permitting and Environmental
 
19.1.1      General
 

Formation Capital is pursuing permits for the ICP. Baseline data has been collected and submitted to the USDA Forest Service and other reviewing agencies. Formation Capital has submitted a Plan of Operations to the Forest Service to initiate the Environmental Impact Statement (EIS) process.

The baseline data collection has proceeded over several years, beginning in 2000 and continuing through the present, and all reports have been submitted to the reviewing agencies. In addition to baseline data collection reports, several reports analyzing the data and the impacts of the mine have also been submitted. The agencies have reviewed and commented on the reports, and in some cases requested additional information. These information requests have been filled in the reports listed on Table 19.1. The process of agency review and information requests, with responses by Formation Capital is ongoing at this time and is expected to continue through issuance of the permits.

The Forest Service must complete the EIS before any federal permits can be issued for the project. The EIS process includes: (1) scoping, (2) preparation of a Draft EIS, (3) public comment on the Draft EIS, (4) preparation of a Final EIS, and (5) execution of a Record of Decision. The Forest Service has completed scoping and is preparing a Draft EIS. Formation Capital is funding a third-party contractor, under a Memorandum of Understanding executed with the Forest Service, to assist the Forest Service in preparing the Draft EIS.

The following discussion represents a preliminary evaluation of the environmental and permitting issues for the Idaho Cobalt Project, provided during 2001 by Brent Bailey, formerly with Noranda and now with Formation Capital. The following discussion represents an evaluation of the environmental and permitting issues for the Idaho Cobalt Project. An updated plan of operations was submitted to the United States Forest Service on during February, 2005, and the Idaho and Federal regulatory processes. It identifies the salient issues that will most overtly affect the permitting process.

19.1.2 Issues
The major issues affecting project permitting are:

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 161

possible impacts on Chinook and Steelhead salmon, the Bull Trout, and any other “Threatened and Endangered Species”;

protecting the Blackbird Mine remediation facilities;

  transportation:

Reclamation and Closure of the site to restore the land-use to pre-mining conditions.

19.1.3 Permits Required

The permitting requirements are based on the determination that there will be separate locations for the mining/milling operations and the hydrometallurgical operation. It is expected that permitting the mine and mill will require considerably more effort than permitting the hydrometallurgical facility.

19.1.4 Mining and Milling Operation

A focal point of the permitting of the Idaho Cobalt Project is the approval of the Plan of Operation by the U.S. Forest Service. It has been determined that an Environmental Impact Statement (EIS) is required for approval of the project as prescribed by the National Environmental Policy Act. Whereas, the Salmon-Challis National Forest will be the lead agency, other agencies, such as the National Marine Fisheries, Environmental Protection Agency, and the U.S. Army Corps. of Engineers, and the Idaho Department of Environmental Quality, will participate or serve as co-leads or cooperating agencies. Essentially permitting and permit requirements include:

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 162

19.1.5 Hydrometallurgical Processing Operation

Permitting of the Processing Operation (Cobalt Beneficiation Plant) will be impacted by the location of the facility.

Essentially permitting and permit requirements include:

19.1.6 Permitting Process (General)

Formation Capital notes that the following steps in the permitting process have been accomplished.

Baseline Data – Draft reports have been completed for all disciplines:

  Water Quality and Hydrology

Twenty-two surface water monitoring sites have been established at which stream flow measurements, field parameters and samples for chemical analysis have been collected 4 times per year. Twenty-two groundwater monitoring wells have been established and aquifer testing has been completed. Water levels, field parameters and samples for chemical analysis have been collected 4 times per year.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 163

Geochemistry

Waste rock samples were collected from core for both the Ram and Sunshine deposits. ABA tests were conducted and humidity cells established. The cells were run for 18 months. Tailings were collected from the lock cycle tests and ABA tests were conducted as well as humidity cells established. The cells were run for 18 months.

Geotechnical

Soil pits and geotechnical holes were drilled to define material properties beneath the proposed tailings disposal area, the water reservoirs and the waste dumps. In addition rheological test of the tailings has been completed.

Aquatic Biology

Fish counts have been conducted and riparian areas surveyed for the streams within the area. In addition samples of the biota have been collected and a benthic invertebrate study is being conducted.

Cultural Resources

A cultural resources inventory has been completed and accepted by the SHPO.

Air Quality

A weather station was established to monitor wind, precipitation and evaporation. Three years of data has been collected. In addition a site to monitor airborne particulate matter was also established and was run for two years.

Wildlife Biology

Wildlife surveys were conducted in 2001 and 2002, as the habitat is changing due to the Clear Creek Fire. An additional survey was conducted in 2004.

Soil

A soil type survey has been completed for the entire project area. The types have been defined and delineated.

Vegetation (Including Sensitive Species and Wetlands Delineation)

A vegetation survey has been conducted for the entire project area. The vegetation survey included sensitive and endangered plants. In addition a wetlands delineation was conducted for the project area.

Others

Surveys for noise, land use and visual impacts have been conducted.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 164

Technical Memoranda
  Water/Mass Balance

A dynamics systems model (DSM) has been developed for the water balance of the project area. The model utilizes hydrological and climatological data for the area as well as descriptions of the operation. Mass loading of the water is being added from data derived from geochemical and water quality studies.

  Transportation Plan

The transportation plan describes the type and numbers of vehicles which will be required to travel over Forest Service roads to access the property. WEP models have been developed as well as road logs describing the lines of sight at curves etc. The Spill Prevention and Response Plan, Snow Removal Plan and Conceptual Road Design have been incorporated into this document. A separate document has been prepared for and submitted to Noranda outlining methods which will be utilized to insure the protection of their facilities as access will be through the Blackbird Mine site.

  Storm Water Management Plan

A draft Storm Water Management Plan has been completed and will be used as the basis for application for a multi-sector Storm Water NPDES permit.

  Land Application

Sorption and desorption studies are completed on the Big Flat soils to assess the Feasibility of land applying excess water.

  Mine Closure Analysis

Mine closure analysis is being conducted to assess the long term effects, if any, to the environment.

  Aerial Mapping

A 5-foot contour map was produced for the project area using aerial photography.

In addition to the work described above, modifications to the initial Plan of Operations have been agreed to by Formation to address concerns raised during the Joint Revue Process. These changes have been reflected in the proposed Plan of Operations submitted February, 2005.

A summary list of the work completed as of February, 2005 is listed in Table 19.1.

Mine Development Associates April 30, 2005



             Technical Report, Idaho Cobalt Project             
                                               Formation Capital Corporation    Page 165 
Table 19.1 Permitting Related Backup Documents         
Title    Author    Date     
Aquatic Baseline Condition, Technical Report       Karen Kuzis    October 2004 
Comprehensive Air Quality Baseline and       James Gelhaus    October 2004 
Emission Inventory of the Idaho Cobalt Project             
Conceptual Design of the Tailing/Waste Rock       Telesto Solutions    August 2004 
Facility and Water Management Ponds             
Consolidated Baseline Hydrology Report       Shaw Environmental    December 2004 
Environmental Response to Mining at the Idaho       Telesto Solutions    February 2005 
Cobalt Project             
Geochemical Baseline Report for the Idaho       Telesto Solutions    September 2004 
Cobalt Project: Waste Rock, Ore, and Tailing             
Geology and Mineral Resources Technical       Pegg Geological Consultants    October 2001 
Report for the Idaho Cobalt Project             
Geotechnical Data Report       MineFill Services    November 2000 
Land Application Analysis Report for the Idaho       Cascade Earth Sciences    February 2005 
Cobalt Project             
Quality Assurance Project Plan, Surface Water       Shaw Environmental    August 2004 
and Groundwater Monitoring Data Acquisition             
Soils Technical Report for the Idaho Cobalt       Intermountain Resources    January 2002 
Project             
Storm Water Management Plan for the Idaho       Telesto Solutions    January 2005 
Cobalt Project             
Surface Water and Groundwater Monitoring       Shaw Environmental    August 2004 
Plan             
Threatened or Endangered and Sensitive Plant       Intermountain Resources    September 2004 
Species Survey             
Transportation Baseline Report and       Turkey Tracks Enterprises    December 2004 
Transportation Plan             
Vegetation Report       Intermountain Resources    September 2004 
Wetlands and Other Waters of the U.S.       Intermountain Resources    September 2004 
Inventory, 2000-2004 Wetland Delineation             
Air Quality analysis       James Gelhaus    October 2004 
Data Validation Report 2004       Shaw Environmental    March 2005     

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 166

19.1.7 Environmental

From 1995 to 1998, the U.S. Environmental Protection Agency, in conjunction with BMC and other governmental agencies, has been involved with clean-up and removal of Co-Cu waste rock piles at the Blackbird Mine; and is continuing environmental monitoring. However, these clean-up activities will need to be addressed in the permitting process for any future mining activities. The exploration by Formation Capital since 1995 at the Idaho Cobalt Project has been in compliance with USFS permits, and Formation Capital has an active dialog with the USFS as the permitting process moves forward. The current conceptual planning for mining and processing at the Idaho Cobalt Project is for the operation to discharge (land application) treated water due to the natural water balance in the area.

19.2 Sunshine Silver-Gold Refinery and Hydrometallurgical Plant

In September of 2002, Formation Capital purchased the Sunshine silver-gold refinery and hydrometallurgical plant located near Kellogg, Idaho, about 250 miles distant from the Idaho Cobalt Project. The intent is to convert a portion of the refinery to be able to process Co-Cu-Au concentrates that would be derived from the Idaho Cobalt Project. As contemplated, the Sunshine plant will provide Formation Capital significant opportunity to be a fully integrated cobalt producer; with the goal of producing cobalt metal products for direct sale into the market, thus eliminating contract smelter charges. The gold-silver refinery is currently in operation, as a custom silver refinery, and was considered as part of the 2001 pre-feasibility processing/refining flow sheets. While additional metallurgical testing and process design is being completed, with modification, the hydrometallurgical plant will provide the opportunity for Formation Capital to produce cobalt oxide/hydroxide/carbonate products at a premium to the market price for cobalt metal. Details of the process will be in the feasibility study which Formation Capital has initiated.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 167

20.0 RECOMMENDATIONS

Recommendations for the Idaho Cobalt Project consist of specific activities to be implemented in order to advance the project to a stage at which a production decision can be made. Those recommendations are summarized in this section. The definition of reserves, mine design and operational details, and more accurate cost estimates must be determined in a feasibility study and Formation Capital has initiated this feasibility study process.

20.1 Feasibility Program

The feasibility study and permitting program will cost an estimated $3.5 -4.5 million to complete. The feasibility program costs are considered sunk costs, as they are expended prior to a decision to proceed with the project. The feasibility program work includes the following:

Preparation for development should begin as soon as it appears that project permitting will be finalized, following a favorable final feasibility study and the completion of the exploration decline. Long lead time equipment should be ordered, pending results of the feasibility and exploration decline.

20.2 Exploration Drilling

Additional core drilling is suggested to better define existing resources, to improve the knowledge of the ore zones, and to minimize risk in the area where mining is projected to start. The Ram deposit resource increased in size as a result of the 2004 drilling; however, the deposit is currently defined by fences of drill holes on 200 foot spacing. While additional exploration drilling at depth and along strike has the potential to add resource tons, it is recommended that additional in-fill drilling be done to improve confidence of grade continuity within Ram main zone horizons that will initially be mined. A program of five to eight drill holes is suggested for a portion of the Ram, as in-fill to provide added confidence the areas mined initially in the south portion of the ram.

The proposed drilling is estimated to cost about $35 per foot, for a total cost of approximately $400,000.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 168

20.3 Other Geological Work

Formation Capital has assembled a substantial multi-element geochemical database of the Ram deposit for use in identifying potentially deleterious constituents in the ore-grade material for metallurgical purposes. In addition, fine tuning the oxide/sulfide interface could be beneficial in future modeling. While it appears that none of the subtle spatial changes in geochemistry are significant enough to impact the metallurgy, MDA believes that additional information could be gleaned from the data. We suggest that, as part of Formation Capital’s ongoing efforts to increase their understanding of the Ram deposit, Formation Capital construct interpretive geochemical cross sections and long sections to better characterize the deposit.

MDA believes that these other geologic studies will be done using information already in hand or arising out of the drill program proposed in Section 20.2. The cost to complete the studies is estimated to be in the order of $100,000.

20.4 Budget

The recommendations stated above require expenditures totaling $3.5 -$4.5 million. As listed below:

    Program of Infill drilling            $400,000 
    Additional Geological/Geochemical work            $100,000 
    Project Feasibility Study and Permitting    $3,000,000    to    $4,000,000 
                       TOTAL    $3,500,000    to    $4,500,000 

The time frame to complete the above (excluding project permitting) is estimated at six months, with the exception of the exploration decline, which could add six to nine months, depending on when the permit to complete an exploration decline is completed.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 169

21.0 REFERENCES

Anderson, Corby G.

2000a: Metallurgical Testing of RAM Ore. Consultant’s report for Formation Capital Corporation by The Center for Advanced Mineral & Metallurgical Processing.

Anderson, Corby G.

2000b: Task V Technical Assistance for Determination of Smelter Acceptance and Terms for Concentrate Processing. Consultant’s report for Formation Capital Corporation by The Center for Advanced Mineral & Metallurgical Processing.

Baer, Roger and Daggett, DeWitt

1981: An Exploration and Preliminary Engineering Evaluation of the Sunshine Prospect, Blackbird Mining District, Lemhi County, Idaho. Part 2: Geotechnical Evaluation. In-house report for

     Noranda Exploration Inc. Balwin, David

2001: Correspondence with Neil Prenn regarding groundwater levels and hydraulic head in the vicinity of the proposed portal for a spiral decline into the Ram deposit.

Banning, Steven W.
1982:    Metallurgical Investigations of Blackbird Cobalt-Copper Ores.    Report prepared for Noranda 
    Mining Inc.     

Banning, Steven W.

1986: Flotation Testing of Blackbird “Satellite” Ores. Report prepared for Noranda Mining Inc.

Daggett, M. DeWitt

1981: An Exploration and Preliminary Engineering Evaluation of the Sunshine Prospect, Blackbird Mining District, Lemhi County, Idaho. Part 3: Geology. In-house report for Noranda

Exploration Inc

Daggett, M. DeWitt and Baer, Roger L.

1981: An Exploration and Preliminary Engineering Evaluation of the Sunshine Prospect, Blackbird Mining District, Lemhi County, Idaho. In-house report for Noranda Exploration Inc.

Evans, Karl V., Nash, J. Thomas, Miller, William R., Kleinkopf, M. Dean, and Campbell David L. 1986: Blackbird Co-Cu Deposits in Preliminary compilation of descriptive geoenvironmental mineral deposit models, U.S. Geological Survey Open-File Report 95-0831, du Bray Edward A., ed. Formation Capital Corporation, U.S.

1996: Summary and Progress Report on Formation Capital Corporation’s Cobalt Properties in the State of Idaho, U.S.A. In-house report.

Formation Capital Corporation U.S. Field Staff

1998: Report on the Reserve/Resource Estimates for Sunshine Lode, East Sunshine and Ram Prospects. In-house report for Formation Capital Corporation.

Mine Development Associates April 30, 2005



Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 170

Formation Capital Corporation, U.S.

2005 : Idaho Cobalt Project Plan of Operations. Submitted by Formation Capital Corp. to United States Forest Service, Salmon-Challis National Forest.

Gow, Neil N.

1995: A Report on the Blackpine and Sunshine Properties, Lemhi County, Idaho. Consultant’s report by Roscoe, Postle Associates Inc.

Hőy, Trygve

1995: Blackbird Sediment-hosted Cu-Co, in Selected British Columbia Mineral Deposit Profiles, Volume 1 - Metallics and Coal, Lefebure, D.V. and Ray, G.E., Editors, British Columbia Ministry of Energy of Employment and Investment, Open File 1995-20, pages 41-44.

Hughes, Gordon J.

1993: A Deposit Model and Exploration Guidelines for the Blackpine Cu-Au-Co Sulfide System, Lemhi County, Idaho. Consultant’s report prepared for Formation Capital Corporation.

MacFarlane, Ross

2002: Letter to Clubb Capital Ltd. summarizing a review of the Idaho Cobalt Project by Watts, Griffis and McOuat Limited.

McLoren, Heather and Anderson, Corby G.

1999: Ram Core Sample Strength Testing. Consultant’s report for Formation Capital Corporation by The Center for Advanced Mineral & Metallurgical Processing.

Pegg, Rex

1997: Report on the Reserve/Resource Calculations for the Sunshine and East Sunshine Lodes, Sunshine Property, Idaho, U.S.A. Consultant’s report for Formation Capital Corporation.

Prenn, Neil B

     1998: Pre-Feasibility Study of the Cobalt, Copper, and Gold, at the Sunshine Project, Lemhi County, Idaho Prenn, Neil B.

1999a: Sunshine Deposit cash flow studies with “optimized capital”. Memo from Mine Development Associates to Formation Capital Corp.

Prenn, Neil B.

1999b: Reserve and Economic Updates of the Cobalt, Copper, and Gold Deposit at the Sunshine Project, Lemhi County, Idaho. Consultant’s report by Mine Development Associates for

Formation Capital Corporation.

Prenn, Neil B, Muerhoff, Charles and Blattman, Matt     
   2001:    Pre-Feasibility Study of the Idaho Cobalt Project, Lemhi County, Idaho.    Consultant’s report 
    by Mine Development Associates for Formation Capital Corporation.     

Prenn, Neil B.

2005 : Resource Update for the Idaho Cobalt Project. Report from Mine Development Associates to Formation Capital Corp.

Mine Development Associates April 30, 2005



       Technical Report, Idaho Cobalt Project     
                                                                                                                                                               Formation Capital Corporation    Page 171 
 
Staff of Noranda Mining Inc.     
   1982:    Blackbird Project Feasibility Study, Detailed Calculations, Book 1 of 2. In-house report. 
   1982:    Blackbird Project Feasibility Study, Detailed Calculations and Support Data, Book 2 of 2. In- 
    house report.     
   1984:    Blackbird Project, Cobalt, Idaho, Property Description. In-house report.     

Tysdal, R. G.

2002: Revision of Middle Proterozoic Yellowjacket Formation, Central Idaho, USGS Professional Paper 1601A

United States Environmental Protection Agency (EPA)

1997: Blackbird Mine site Cleanup; EPA Fact Sheet, September 8, 1997.

United States Environmental Protection Agency (EPA)

1998: Blackbird Mine, Idaho; Superfund Fact Sheet, June 1998.

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 172

22.0 CERTIFICATE OF AUTHORS

I, Neil B. Prenn, of Reno, Nevada, do hereby certify:

1. I am currently employed as Principal Engineer by: Mine Development Associates, Inc. 210 South Rock Blvd. Reno, Nevada 89502.

2.      I graduated with an Engineer of Mines degree from the Colorado School of Mines in 1967.
 
3.      I am a Registered Professional Mining Engineer in the state of Nevada (#7844) and a member of the Society of Mining Engineers and councilor-at-large for the Mining and Metallurgical Society of America.
 
4.      I have worked as an engineer for a total of 35 years.
 
5.      I have read the definition of “Qualified Person” set out in National Instrument 43-101 (“NI 43- 101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “Qualified Person” for the purposes of NI 43-101.
 
6.      I am responsible for the preparation of the technical report titled National Instrument 43-101 Technical Report, Idaho Cobalt Project, Lemhi County, Idaho USA dated April 30, 2005 (the “Technical Report”) relating to the Idaho Cobalt Property. I visited the Idaho Cobalt property on a number of occasions, with the most recent during February 18 and 19, 2005.
 
7.      I have had the following involvement with the Idaho Cobalt Project: 1998: Pre-Feasibility Study of the Cobalt, Copper, and Gold, at the Sunshine Project, Lemhi County, Idaho; 1999:Sunshine Deposit cash flow studies with “optimized capital”. 1999: Reserve and Economic Updates of the Cobalt, Copper, and Gold Deposit at the Sunshine Project, Lemhi County, Idaho; 2001: Pre- Feasibility Study of the Idaho Cobalt Project, Lemhi County, Idaho. I am not aware of any material fact or material change with respect to the subject matter of the Technical Report that is not reflected in the Technical Report, the omission to disclose which makes the Technical Report misleading.
 
8.      That I have read National Instrument 43-101 and Form 43-101 and that this technical report was prepared in compliance with National Instrument 43-101.
 
9.      I am independent of the issuer applying all of the tests in Section 1.5 of National Instrument 43- 101.
 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 173

10.      I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.
 
Dated this 30th day of April 2005.
“Neil B Prenn”
Signature of Qualified Person
Neil B. Prenn
Print Name of Qualified Person

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 174

Allan V. Moran
Geologist
62463 E. Northwood Rd.
Tucson, Arizona, U.S.A. 85739
Phone: 520-825-0244
Email: allanvmoran@cs.com

CERTIFICATE of AUTHOR

I, Allan V. Moran, a Registered Geologist and a Certified Professional Geologist, do hereby certify that:

1.      I am currently self-employed, as a consulting geologist to the mining and mineral exploration industry, working out of my personal residence of 62463 E. Northwood Rd., Tucson, Arizona, U.S.A., 85739.
 
2.      I graduated with a Bachelors of Science Degree in Geological Engineering from the Colorado School of Mines, Golden, Colorado, USA; May 1970.
 
3.      I am a Registered Geologist in the State of Oregon, USA, # G-313, and have been since 1978.
 
4.      I am a Certified Professional Geologist through membership in the American Institute of Professional Geologists, CPG - 09565, and have been since 1995.
 
5.      I have been employed as a geologist in the mining and mineral exploration business, continuously, for the past 33 years, since my graduation from university.
 
6.      I have read the definition of “qualified person” set out in National Instrument 43-101 (“NI 43- 101”) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a “qualified person” for the purposes of NI 43-101.
 
7.      I am responsible for the compilation and editing of all sections of the technical report titled Idaho Cobalt Project, Lemhi County, Idaho, U.S.A., and dated April 30, 2005 (the “Technical Report”) relating to the Idaho Cobalt Project. I have not personally visited the Idaho Cobalt Project.
 
8.      I have not had prior involvement with the property that is the subject of the Technical Report.
 
9.      I am not aware of any material fact or material change with respect to the subject matter of the Technical Report that is not reflected in the Technical Report, the omission to disclose which makes the Technical Report misleading.
 

Mine Development Associates April 30, 2005



  Technical Report, Idaho Cobalt Project

Formation Capital Corporation Page 175

10.      I am independent of the issuer applying all of the tests in section 1.5 of National Instrument 43- 101.
 
11.      I have read National Instrument 43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form.
 
12.      I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them, including electronic publication in the public company files on their websites accessible to the public, of the Technical Report.
 
Dated in Tucson, Arizona, April 30, 2005.
“Allan V Moran”
Signature of Qualified Person
Allan V. Moran
Printed name of Qualified Person

Mine Development Associates April 30, 2005



Certificate of Author

I, Hannelie de Beer, of Randburg, South Africa, do hereby certify that:

1      This certificate applies to the “Cobalt Chemicals Market Review” prepared for Formation Capital Corporation, dated March 31, 2005;
 
2      I am a graduate of the Rand Afrikaans University is South Africa, with a Doctorate of Philosophy in Chemistry (1994);
 
3      I have further been awarded a Masters Degree in Business Management by the Henley Management College in England (2003);
 
4      I am a registered and full member of the South African Chemical Institute (1989) and the Geological Society of South Africa (2003);
 
5      I am self-employed as a technical and commercial consultant to the minerals and mining industry;
 
6      I have worked as a minerals and process chemist within the Southern African Mining Industry since 1989, with companies such as Mintek and Anglovaal Mining Limited;
 
7      I have been involved in technical, commercial and marketing activities within the cobalt industry since 1997, both with Anglovaal and as an independent consultant;
 
8      I believe that this report accurately reflects the subject matter;
 
9      I am not a qualified person as defined in National Instrument 43-101;
 
10      I am independent of Formation Capital Corporation and hold no shares or other compensation outside of consulting on the cobalt market;
 
11      I consent to the filing of the Market Review, in whole or part, with any securities regulatory authority, stock exchange and other regulatory authority and any publication by them, as required by the company.
 
12      I understand and authorize that this report may be included and used as part of a larger Definitive Feasibility Study being completed on Formation Capital Corporation’s Idaho Cobalt Project.
 

Dated at Randburg, South Africa, this 31st day of March, 2005

HANNELIE DE BEER M.Sc. Ph.D. MBA

+27 11 478 3961 hannelie@global.co.za

Address: 18 Gillard Drive, Cresta, Randburg, 2194, South Africa












APPENDIX A

THE COBALT MARKET














Appendix A: Recent Cobalt Prices, April 2005

In early April, 2005, a check of public-domain sources for information on cobalt prices yielded the following information, obtained from http://wmc-cobalt.com.

Table A-2: Recent Cobalt Sales by WMC

Sale Date    Quantity Delivery Date Price (US$/lb)    Location 
5 Apr 2005       5    MT    Apr 2005    $17.95    Europe 
1 Apr 2005    >10 MT    May 2005    $17.95    North America 
24    Mar    2005     10 MT    May 2005    $17.75    North America 
23    Mar    2005       5    MT    May 2005    $16.75    North America 
23    Mar    2005       5    MT    Apr 2005    $16.75    Europe 
23    Mar    2005     10 MT    Apr 2005    $15.75    Europe 
22    Mar    2005     10 MT    May 2005    $15.20    North America 
18    Mar    2005       5    MT    Apr 2005    $15.20    North America 
16    Mar    2005     10 MT    Mar    2005    $14.85    Asia 
10    Mar    2005       5    MT    Mar    2005    $15.35    Europe 
10    Mar    2005       5    MT    Mar    2005    $15.35    Europe 
9 Mar 2005       5    MT    Apr 2005    $15.35    North America 
9 Mar 2005       5    MT    Apr 2005    $15.35    North America 
9 Mar 2005       5    MT    Apr 2005    $15.35    North America 
4 Mar 2005       5    MT    Apr 2005    $16.00    North America 
24    Feb    2005       5    MT    Mar    2005    $17.15    Europe 
22    Feb    2005     10 MT    Feb    2005    $17.15    Europe 
18    Feb    2005       5    MT    Feb    2005    $17.80    Europe 
16    Feb    2005       5    MT    Feb    2005    $17.80    Europe 
4 Feb 2005       5    MT    Mar    2005    $19.25    North America 
4 Feb 2005       5    MT    Mar    2005    $19.25    North America 
2 Feb 2005       5    MT    Mar    2005    $19.25    North America 
24 Jan 2005       5    MT    Jan 2005    $19.25    Europe 
24 Jan 2005       5    MT    Feb    2005    $19.25    North America 
17 Jan 2005       5    MT    Jan 2005    $19.10    Europe 
17 Jan 2005       5    MT    Jan 2005    $19.10    Europe 
4 Jan 2005     10 MT    Feb    2005    $19.14    Europe 
4 Jan 2005     10 MT    Feb    2005    $19.14    Europe 
    MT=metric tons (tonnes)         

Appendix A
Page 1 of 3


Figure A-1: Chart of Cobalt Prices, 2003
 
 
 
 
Notes:    COSS refers to WMC’s Cobalt Open Sales System             
    MB refers to Metal Bulleting                         
    99.8 and 99.3 refer to percent purity of cobalt metal             
 
 
Figure A-2: Chart of Cobalt Prices, March 2004-February 2005
 
 
 
 
             Table A-3: Commodity Price Data for Copper and Gold         
 
        Annual averages        Quarterly averages        Monthly averages 
        Jan-    Jan-    Jan-    Oct-    Jan- Apr- Jul-    Oct-         
        Dec    Dec    Feb    Dec    Mar Jun Sep    Dec    Dec Jan    Feb 
 Commodity Unit    2003    2004    2005    2003    2004 2004 2004    2004    2004 2005    2005 
Metals    and                                 
Minerals                                     
Copper             $/mt    1,779    2,866    3,212    2,059    2,731 2,790 2,850    3,093    3,145 3,170    3,254 
Copper             $/lb    0.81    1.30    1.46    0.93    1.24 1.27 1.29    1.40    1.43 1.44    1.48 
Gold             $/toz    363.5    409.2    423.7    391.9    408.4 393.1 401.3    434.0    442.1 424.0    423.4 

This report is extracted from one provided by the World Bank on the Internet at http://www.worldbank.org/prospects For copper, conversions from $/mt to $/lb were done by A.V. Moran metric = metric tonne; lb = pound; toz = troy ounce, $ = US dollar

Appendix A
Page 2 of 3


The following information was obtained from the Cobalt Development Institute, at http://www.thecdi.com/statistics/index.html. The Cobalt Institute, formed in 1982, is an international organization, as an association of producers, users, and traders of cobalt; currently there are 44 members from 18 countries, including all the major cobalt producers. The Institute website provides topical information on cobalt uses, supply, and demand, including the information in table A-4.

Table A-4 Cobalt Production Statistics (MT)
Refined Cobalt Availability                             
Member companies    1996    1997    1998    1999    2000    2001    2002    2003 
CTT Morocco    80    220    241    470    1200    1200    1100    1100 
Falconbridge Norway    3099    3417    3851    4009    3433    3314    3993    4556 
ICCI Canada    2070    2250    2640    2770    2855    2943    3065    3141 
Inco Canada    1544    1500    1740    1420    1470    1450    1480    1000 
OMG Finland    4160    5000    5250    6200    7700    8100    8200    7990 
QNI Australia        617    1395    1539    1520    1818    1863    1800 
Sumitomo Japan    228    263    329    221    311    350    354    379 
Zambia    4799    3949    5011    3946    2316    2789    4344    4500 
Eramet France    174    159    172    180    204    199    176    181 
Union Miniere Belguim    1200    1200    1200    950    1110    1090    1135    1704 
Total    17354    18575    21829    21705    22119    23253    25710    26351 
Non-Member companies                                 
Brazil    193    266    364    630    792    889    960    1097 
Bulong                79    192    203    200    0 
China    1200    1200    1200    1200    1200    1470    1842    4576 
Gecamines    3540    2808    4490    5180    4320    3199    2149    1200 
India        110    120    120    206    250    270    255 
Mopani Copper Zambia                    1026    1876    1800    2050 
RSA South Africa    292    294    320    320    320    252    256    307 
Russia    2700    3800    3700    4000    4100    4600    4200    4654 
Kasese Uganda                77    420    634    450    0 
Murrin Murrin Australia                83    925    1452    1838    2039 
Total    7925    8478    10194    11689    13501    14825    13965    16178 
Other Sources of Supply                                 
DLA Deliveries    2052    1621    2310    1679    3083    1893    1284    1987 
Other Stockpiles    500                             
Total    2552    1621    2310    1679    3083    1893    1284    1987 

Appendix A
Page 3 of 3


Total Supply

27831 28674 34333 35073 38704 39971 40959 44516

(MT = Metric tonnes)



COBALT CHEMICALS MARKET

REVIEW

Prepared For

FORMATION CAPITAL CORPORATION

By
Dr. Hannelie de Beer
March 2005



EXECUTIVE SUMMARY

Cobalt is a strategic and critical metal, which, because of its unique chemical and physical properties, is used mainly in specialist industrial and military applications. In addition to its numerous applications in the aerospace industry, cobalt is also used to make magnets, corrosion and wear resistant alloys, high speed cutting steels, cemented carbides (hardmetals), diamond tools, catalysts for petroleum and chemical industries, drying agents, pigments, battery components, steel belted tires, prosthetics and magnetic recording media.

Depending on the application, cobalt is consumed either as metal, powder or chemicals. In 2003, chemicals accounted for more than 40% of the 45,800t of (end-use) cobalt consumed globally, with more than half of this being produced using metal as starting material. Cobalt chemicals adhere to stringent chemical and physical specification and usually attain premiums from US$1.00 to US$4.00 per pound of contained cobalt, over the prevailing metal price. The main applications for chemicals are the rechargeable battery industry, catalysts, pigments, adhesives and driers, with the biggest growth anticipated in the first two.

Whilst cobalt is mined and refined by a relatively large number of operators globally, the number of chemical producers is limited. In fact, the two market leaders – OMG and Umicore – probably produce more than 75% of all commercially manufactured chemicals. OMG has a distinct advantage over its rivals, in that it sources most of its cobalt feed material from its own operations. It does however need to transport the low-grade ores and concentrates from all over the world, to its facility in Europe, thus adding to its overall processing costs.

Despite the current and anticipated growth in demand for cobalt chemicals, only a limited number of new players have entered the chemical manufacturing industry in recent years. In fact, the squeeze in product margins has led to some players being eliminated from the market. Umicore is continuously expanding its capacity in Asia, yet OMG has indicated that it does not anticipate increasing its existing capacity in the foreseeable future. The proportion of cobalt chemicals supplied from primary manufacturing is therefore expected to decline, presenting an extensive opportunity in the market. It is not anticipated that any of the current metal producers will spend additional capital to diversify their product range; this opportunity therefore lies at the door of the new cobalt projects that are forecasted to come on stream in the next few years.

Considering all the above, the Idaho Cobalt Project (ICP) should investigate and evaluate the opportunity to produce cobalt chemicals rather than producing metal. Not only will ICP become the first cobalt producer on US soil, it could – more importantly - become a primary chemical producer with both its feed and refinery in the same country. Cobalt demand in the USA is in excess of 8,000tpy, which means that ICP could essentially place its entire anticipated production of 1,500tpy in the local market – irrespective of the product form.

Providing that the cobalt metal meets the general industry requirements, it can be expected that placement of the metal, as broken cathode, will not require an extraordinary marketing effort. However,



with the US cobalt chemicals industry currently being serviced by global players with US based manufacturing facilities, it seems inevitable that a substantial effort and revolutionary marketing approach will be required for entry into the market and to secure a portion of the competition’s market share. This option does however offer an opportunity for ICP to attain premiums on the cobalt price and whilst ICP’s overall production costs should be less than those of the other manufacturers, ICP could potentially present a price benefit to the consumers.

It is recommended that ICP gear its processes to the production of high purity cobalt salts, to not only supply the local chemicals markets, but to offer an alternative to those industries that usually leach the cathode, for further processing as a cobalt liquor.

ICP should aim to enter into long-term supply agreements within both established and new growth industries for at least half of its production, with the rest being placed on short-term and spot basis. This approach will allow for additional profit taking from short-term upswings in the cobalt price, whilst reducing the risk of non-delivery on long-term contracts, when unexpected plant shutdowns or slow-downs occur.

This report presents an update of the cobalt industry, with specific focus on chemicals. It investigates the consumption of cobalt chemicals by form, application and region and further presents a discussion on the physico-chemical requirements and pricing mechanisms of some of the cobalt chemicals.

____________________
Dr. Hannelie de Beer
March 2005



Dates Referenced Herein   and   Documents Incorporated by Reference

This ‘40FR12B’ Filing    Date    Other Filings
Filed on:5/27/05F-X
4/30/05
4/29/05
3/31/05
2/18/05
1/19/05
9/17/04
8/26/04
3/11/04
3/9/04
2/27/04
11/19/03
5/22/01
9/8/97
7/1/94
 List all Filings 
Top
Filing Submission 0001176256-05-000199   –   Alternative Formats (Word / Rich Text, HTML, Plain Text, et al.)

Copyright © 2024 Fran Finnegan & Company LLC – All Rights Reserved.
AboutPrivacyRedactionsHelp — Tue., May 7, 6:52:05.3am ET