1.1 | Project Description. The Task Order involves all aspects of the Owner’s program for the DFW Expansion - ### Project, all as
more fully described in the Exhibit A. The list of Contract Documents for this Task Order is attached hereto and incorporated herein as Exhibit B. |
1.2 | Haskell’s Compensation. The Owner shall pay Haskell, subject to the terms and conditions set forth herein and in the MASTER AGREEMENT, the Contract Sum for Haskell’s proper performance of the TASK ORDER. Subject to any additions and/or deductions as provided in the Contract
Documents, the Contract Sum shall be as further described in one or more of the following exhibits (as indicated by the checked box(es) below): |
1.3 | Supplemental Insurance Requirements. Additions and/or modifications to the coverages and/or requirements provided for in the MASTER AGREEMENT are provided below: [None] |
1.4 | Payment and Performance Bonds. If
requested by Owner, Haskell shall provide, attached as Exhibit D to this TASK ORDER, executed Payment and Performance Bonds in accordance with the MASTER AGREEMENT, and in the form specified in Exhibit B thereof. |
1.5 | This TASK ORDER requires Haskell to furnish all materials, labor and professional services reasonably necessary to safely and properly perform the IDB Work assigned herein. |
2.1 | In addition to IDB Work described in the MASTER AGREEMENT and Article I of this TASK ORDER, Haskell shall provide all IDB Work described below and/or in the attached Exhibit A: |
3.1 | Unless sooner terminated in accordance with the MASTER AGREEMENT, or extended by mutual written agreement approved by Owner, the term of this TASK ORDER shall be
from the date of signature hereon (the “TASK ORDER Effective Date”) through final completion of all IDB Work described herein and finalization of the Project and resolution of any outstanding Project-related claims or disputes. |
3.2 | Completion of this Project Specific Task Order shall be determined by mutual agreement of the parties, and shall be based on Haskell’s receipt of all necessary down payments from Owner and Owner’s concurrence to Haskell’s ordering schedule as determined by equipment availability from approved vendors. The date of completion of this Task Order shall be incorporated into the IDB Work Contract Schedule as that schedule is developed
during the Project. The time for performance of any additional IDB Work shall be addressed via Change Order, which, if approved in writing by Owner, shall operate to amend this TASK ORDER. |
3.3 | [Check box if applicable: □] Liquidated Damages. The pecuniary damages suffered by Owner for late completion, are by their very nature difficult to ascertain precisely. As such, for each consecutive day that any Work is not substantially completed in accordance with the Date of Substantial Completion, Haskell shall be liable to pay to Owner, and the Owner shall be entitled to deduct and offset from amounts otherwise due Haskell, liquidated damages calculated at the
daily rates stated below for each day of delay in the completion of the IDB Work necessary to achieve such completion, not as a penalty but as liquidated damages representing the parties’ reasonable estimate at the time of contract execution of the damages that Owner will sustain for late completion. It is expressly understood that the sum per day (if applicable) is agreed upon as a fair estimate of the pecuniary damages Owner will sustain if the IDB Work is not completed by the Date of Substantial Completion specified in Section 3.02, and/or in Exhibit __ of this TASK ORDER, or within any legally required extension thereof. Liquidated Damages shall continue to accrue on a cumulative basis until Haskell achieves Substantial Completion of the Work. |
KEY
COMPLETION DATE | APPLICABLE DAILY RATE OF LIQUIDATED DAMAGES |
[Not Applicable] | |
3.4 | [Check box if applicable: □] Limitation of Liability. Haskell’s aggregate liability for damage
claims asserted against it by Owner, whether such claim(s) is based on breach of contract or warranty, tort, product liability, indemnity, contribution, strict liability, Liquidated Damages, or any other legal |
4.1 | The following attachments and exhibits are incorporated into this TASK ORDER by reference and are Contract Documents: |
/s/
E.D. Iobst OWNER (Signature) | /s/ Keith Perkey Haskell (Signature) |
E.D. Iobst, Chief Operations Officer (Printed name and title) | Keith Perkey, VP – Food & Beverage (Printed name and title) |
1.1 | Costs which would cause the GMP to be exceeded shall be paid by Haskell without reimbursement by the Owner. |
1.2 | Task
Order Price: |
Description | Cost | % of Total Cost | Notes | ||
Engineering Through GMP | $ | 1,196,697.00 | 6.20% | ||
Task
Order #01 | $ | 657,030.00 | 3.40% | Tempering Bins / SS Filler / SS Chain Conveyor | |
Task Order #02 | $ | 1,668,103.00 | 8.70% | Retail Filler | |
Task Order #03 | $ | 228,690.00 | 1.20% | BAR
Mixers (Qty 2) | |
Task Order #04 | $ | 811,687.00 | 4.20% | Fractional Filler | |
Task Order #05 | $ | 1,688,232.00 | 8.80% | Chain Conveyor | |
Task
Order #06 Balance of GMP | $ | 13,006,346.08 | 67.50% | Balance of GMP | |
TOTAL | $ | 19,256,785.08 |
This ‘8-K’ Filing | Date | Other Filings | ||
---|---|---|---|---|
Filed on: | 2/15/18 | |||
For Period End: | 2/9/18 | |||
12/8/17 | 4 | |||
10/23/17 | 8-K | |||
10/13/17 | ||||
List all Filings |
As Of Filer Filing For·On·As Docs:Size Issuer Filing Agent 10/27/22 Farmer Brothers Co. 10-K/A 6/30/22 14:1.4M Broadridge Fin’l So… Inc 9/02/22 Farmer Brothers Co. 10-K 6/30/22 126:15M 9/10/21 Farmer Brothers Co. 10-K 6/30/21 124:15M 9/11/20 Farmer Brothers Co. 10-K 6/30/20 140:24M |