Document/Exhibit Description Pages Size 1: 10-Q Quarterly Report HTML 1.18M 2: EX-10.1 Material Contract HTML 460K 7: EX-10.11.4A Material Contract HTML 107K 3: EX-10.2 Material Contract HTML 513K 4: EX-10.3 Material Contract HTML 529K 5: EX-10.4 Material Contract HTML 541K 6: EX-10.7.4C Material Contract HTML 386K 8: EX-12.1 Statement re: Computation of Ratios HTML 43K 9: EX-12.2 Statement re: Computation of Ratios HTML 43K 10: EX-12.3 Statement re: Computation of Ratios HTML 57K 11: EX-31.1 Certification -- §302 - SOA'02 HTML 32K 12: EX-31.2 Certification -- §302 - SOA'02 HTML 32K 13: EX-31.3 Certification -- §302 - SOA'02 HTML 32K 14: EX-31.4 Certification -- §302 - SOA'02 HTML 32K 15: EX-32.1 Certification -- §906 - SOA'02 HTML 29K 16: EX-32.2 Certification -- §906 - SOA'02 HTML 29K 23: R1 Document and Entity Information HTML 52K 24: R2 Condensed Consolidated Statements of Income HTML 125K (Unaudited) 25: R3 Condensed Consolidated Statements of Comprehensive HTML 62K Income (Unaudited) 26: R4 Condensed Consolidated Statements of Comprehensive HTML 37K Income (Unaudited) (Parenthetical) 27: R5 Condensed Consolidated Balance Sheets (Unaudited) HTML 241K 28: R6 Condensed Consolidated Balance Sheets (Unaudited) HTML 36K (Parenthetical) 29: R7 Condensed Consolidated Statements of Cash Flows HTML 174K (Unaudited) 30: R8 Condensed Consolidated Statements of Changes in HTML 99K Equity (Unaudited) 31: R9 Consolidation and Nature of Operations HTML 43K 32: R10 Revenue HTML 52K 33: R11 Long-Term Debt and Liquidity Matters HTML 54K 34: R12 Regulatory Matters HTML 256K 35: R13 Retirement Plans and Other Postretirement Benefits HTML 93K 36: R14 Palo Verde Sale Leaseback Variable Interest HTML 40K Entities 37: R15 Derivative Accounting HTML 162K 38: R16 Commitments and Contingencies HTML 90K 39: R17 Other Income and Other Expense HTML 97K 40: R18 Earnings Per Share HTML 56K 41: R19 Fair Value Measurements HTML 313K 42: R20 Investments in Nuclear Decommissioning Trusts and HTML 139K Other Special Use Funds 43: R21 New Accounting Standards HTML 50K 44: R22 Changes in Accumulated Other Comprehensive Loss HTML 181K 45: R23 Income Taxes HTML 34K 46: R24 New Accounting Standards (Policies) HTML 49K 47: R25 Consolidation and Nature of Operations (Tables) HTML 37K 48: R26 Revenue (Tables) HTML 41K 49: R27 Long-Term Debt and Liquidity Matters (Tables) HTML 43K 50: R28 Regulatory Matters (Tables) HTML 167K 51: R29 Retirement Plans and Other Postretirement Benefits HTML 88K (Tables) 52: R30 Palo Verde Sale Leaseback Variable Interest HTML 38K Entities (Tables) 53: R31 Derivative Accounting (Tables) HTML 242K 54: R32 Other Income and Other Expense (Tables) HTML 96K 55: R33 Earnings Per Share (Tables) HTML 56K 56: R34 Fair Value Measurements (Tables) HTML 297K 57: R35 Investments in Nuclear Decommissioning Trusts and HTML 136K Other Special Use Funds (Tables) 58: R36 Changes in Accumulated Other Comprehensive Loss HTML 181K (Tables) 59: R37 Consolidation and Nature of Operations (Details) HTML 40K 60: R38 Revenue (Details) HTML 45K 61: R39 Long-Term Debt and Liquidity Matters - Narrative HTML 120K (Details) 62: R40 Long-Term Debt and Liquidity Matters - Estimated HTML 35K Fair Value of Long-Term Debt (Details) 63: R41 Regulatory Matters - Retail Rate Case Filing HTML 70K (Details) 64: R42 Regulatory Matters - Cost Recovery Mechanism and HTML 235K Net Metering (Details) 65: R43 Regulatory Matters - Four Corners and Cholla HTML 54K (Details) 66: R44 Regulatory Matters - Schedule of Regulatory Assets HTML 77K (Details) 67: R45 Regulatory Matters - Schedule of Regulatory HTML 69K Liabilities (Details) 68: R46 Retirement Plans and Other Postretirement Benefits HTML 44K - Narrative (Details) 69: R47 Retirement Plans and Other Postretirement Benefits HTML 57K - Schedule of Net Benefit Cost (Details) 70: R48 Palo Verde Sale Leaseback Variable Interest HTML 60K Entities - Narrative (Details) 71: R49 Palo Verde Sale Leaseback Variable Interest HTML 37K Entities - Schedule of VIEs (Details) 72: R50 Derivative Accounting - Narrative (Details) HTML 37K 73: R51 Derivative Accounting - Schedule of Gross Notional HTML 30K Amounts Outstanding (Details) 74: R52 Derivative Accounting - Gains and Losses from HTML 52K Derivative Instruments (Details) 75: R53 Derivative Accounting - Derivative Instruments in HTML 92K the Balance Sheets (Details) 76: R54 Derivative Accounting - Credit Risk and Credit HTML 34K Related Contingent Features (Details) 77: R55 Commitments and Contingencies - Palo Verde Nuclear HTML 67K Generating Station and Contractual Obligations (Details) 78: R56 Commitments and Contingencies - Superfund-Related HTML 34K Matters, Southwest Power Outage and Clean Air Act (Details) 79: R57 Commitments and Contingencies - Environmental HTML 101K Matters and Financial Assurances (Details) 80: R58 Other Income and Other Expense (Details) HTML 52K 81: R59 Earnings Per Share (Details) HTML 52K 82: R60 Fair Value Measurements - Assets and Liabilities HTML 125K Measured on a Recurring Basis (Details) 83: R61 Fair Value Measurements - Significant Unobservable HTML 67K Inputs Used to Value Level 3 Instruments (Details 2) 84: R62 Fair Value Measurements - Level 3 Rollforward HTML 49K Derivatives (Details) 85: R63 Investments in Nuclear Decommissioning Trusts and HTML 121K Other Special Use Funds (Details) 86: R64 New Accounting Standards (Details) HTML 49K 87: R65 Changes in Accumulated Other Comprehensive Loss HTML 65K (Details) 88: R66 Income Taxes (Details) HTML 37K 90: XML IDEA XML File -- Filing Summary XML 149K 89: EXCEL IDEA Workbook of Financial Reports XLSX 125K 17: EX-101.INS XBRL Instance -- pnw-20180630 XML 4.93M 19: EX-101.CAL XBRL Calculations -- pnw-20180630_cal XML 299K 20: EX-101.DEF XBRL Definitions -- pnw-20180630_def XML 1.20M 21: EX-101.LAB XBRL Labels -- pnw-20180630_lab XML 2.32M 22: EX-101.PRE XBRL Presentations -- pnw-20180630_pre XML 1.34M 18: EX-101.SCH XBRL Schema -- pnw-20180630 XSD 269K 91: ZIP XBRL Zipped Folder -- 0000764622-18-000052-xbrl Zip 404K
Exhibit |
5
| DEFINITIONS: |
1. | PARTIES: |
2. |
RECITALS: |
2.1. | Arizona is an Arizona corporation engaged in the generation of electric power and energy in the State of New Mexico and the generation, transmission and distribution of electric power and energy as an electric utility in part of the State of Arizona. |
2.2. | 4CA is limited liability company in the business of directly and indirectly constructing, investing
in, acquiring and holding interests in electric generation facilities. |
2.3. | On May 15, 2015, the Participants and El Paso Electric Company (“El Paso”) entered into Amendment No. 8 of this Agreement, which reflected the sale of El Paso’s interest in the Four Corners Project and Facilities Switchyard (the “Interest”) to Arizona under that certain Purchase and Sale Agreement, dated as of February 17, 2015 (the “Purchase Agreement”). On May
15, 2015, the Participants entered into Amendment No. 9 of this Agreement. At the time Amendment No. 8 and No. 9 were executed Arizona intended that it or one of its affiliates would be the party to the Purchase Agreement. Prior to or contemporaneously with the Effective date of Amendment No. 10 of this Agreement, Arizona assigned the Purchase Agreement to 4C Acquisition, LLC. (“4CA”), an Arizona affiliate, and El Paso sold the Interest to 4CA. Among other things, Amendment No. 10 replaces Arizona with 4CA as the owner of the Interest. |
2.4. | El Paso Electric Company (hereinafter referred to as “El Paso”) is an electric utility engaged in the generation, transmission and distribution of electric power and energy in parts of the States
of Texas and New Mexico. Amendment No. 8 to this Agreement (“Amendment No. 8”) provides, among other things, for updated ownership percentages as they existed following the consummation of the transfer to Arizona by El Paso of El Paso’s interests in the Four Corners Project pursuant to that certain Purchase and Sale Agreement, dated as of February 17, 2015. As of the effective date of Amendment No. 8, El Paso is no longer a party to this Agreement, and all references to El Paso, as well as El Paso’s designation as a Participant, as |
2.5. | NTEC
is a limited liability company in the business of directly and indirectly constructing, investing in, acquiring and holding interests in electric generation facilities. Amendment No. 11 to this Agreement (“Amendment No. 11”) provides, among other things, for updated ownership percentages as they exist following the consummation of the transfer to NTEC by 4CA of 4CA’s interests in the Four Corners Project pursuant to that certain Purchase and Sale Agreement, the form of which will be filed by 4CA in FERC Docket No. EC15-159 in May 2018. |
2.6. | New
Mexico is an electric utility engaged in the generation, transmission and distribution of electric power and energy in a part of the State of New Mexico. |
2.7. | Salt River Project is an agricultural improvement district organized and existing under the laws of the State of Arizona and is engaged in the generation, transmission and distribution of electric power and energy in part of the State of Arizona. |
2.8. | Southern
California Edison Company, a California corporation (hereinafter referred to as “Edison”) is an electric utility engaged in the generation of electric power and energy in the States of California and Arizona and in the transmission and distribution of electric power and energy in parts of the States of California and Nevada. Amendment No. 7 to this Agreement (“Amendment No. 7”) provides, among other things, for updated ownership percentages as they existed following the consummation of the transfer to Arizona by Edison of Edison’s interests in the Four Corners Project pursuant to that certain Purchase and Sale Agreement, dated as of November 8, 2010 (the “Purchase Agreement”). As of the effective date of Amendment No. 7, Edison is no longer a party to this Agreement, and all references to Edison as well as Edison’s designation as a Participant, as that term is defined in Section 5.27 herein, are
limited to facts or matters occurring or agreements entered into prior to the effective date of Amendment No. 7. |
2.9. | Tucson is an electric utility engaged in the generation, transmission and distribution of electric power and energy in part of the State of Arizona. |
2.10. | On the 27th day of May, 1966, the Participants executed and delivered an application and form of grant of rights-of-way and easements pursuant to which the Secretary of Interior will grant to the Participants rights-of-way and easements pursuant to the §323 Grant
for the construction, reconstruction, use, operation, maintenance, relocation and removal of the Four Corners Project in, over, under, on, along and across the Granted Lands. |
2.11. | On the 27th day of May, 1966, Arizona executed and delivered an application and form of grant of rights-of-way and easements pursuant to which the Secretary of Interior will grant to Arizona rights-of-way and easements pursuant to the Arizona §323 Grant pursuant to which it will reconstruct, use, operate, maintain, relocate and remove the Initial Four Corners Plant. |
2.12. | On
the 27th day of May, 1966, the Navajo Tribe of Indians, as Lessor, and Arizona, El Paso, New Mexico, Salt River Project, Edison and Tucson, all as Lessees, entered into the Supplemental Lease wherein the Participants are leased certain rights in and to certain real property located within the Navajo Reservation, including the Leased Lands, for the construction, reconstruction, use, operation, maintenance, relocation and removal of the Four Corners Project, and which amends, supplements and revises the Original Lease. |
2.13. | On the 6th day of July, 1966, the Secretary of Interior approved the application for and form of the §323 Grant and the Arizona §323 Grant subject to the Participants’ acceptance of modifications in certain of the terms and conditions
therein contained, which such modifications were accepted by the Participants on the 19th day of July, 1966. |
2.14. | The §323 Grant, the Arizona §323 Grant, the Supplemental Lease and this Co- Tenancy Agreement will be recorded concurrently in the office of the County Clerk of San Juan County, New Mexico. |
2.15. | The parties hereto desire by this Co-Tenancy Agreement to establish certain terms and conditions relating to their ownership and operation of the Four |
3. | AGREEMENT: |
4. | EFFECTIVE DATE: |
4.1. | It
has been duly executed and delivered on behalf of all of the Participants. |
4.2. | The §323 Grant becomes effective; provided, however, that the effective date and time of this Co-Tenancy Agreement shall be contemporaneous with the effective date and time of said §323 Grant. |
5. | DEFINITIONS: |
5.0(a). | Accounting
Practice: Generally accepted accounting principles, in accordance with FERC Accounts, applicable to electric utility operations. |
5.1. | Additional Fuel Agreement: Four Corners Fuel Agreement No. 2 between the Participants and Utah Mining relating to fuel for Units 4 and 5. |
5.2. | Amended Original Lease: The Original Lease, as amended, supplemented and revised by the Supplemental Lease. |
5.3. | Arizona
§323 Grant: Grant of rights-of-way and easements under the Act of February 5, 1948 (62 Stat. 17, 18, 25 U.S.C. §323-328), the Act of March 3, 1879 (20 Stat. 394, 5 U.S.C. §485), as amended, and the Acts of July 9, 1832 and July 27, 1868 (4 Stat. 564, 15 Stat. 228, 25 U.S.C. §2), and such |
5.4. | Capital Additions: Any
Units of Property which are added to the Four Corners Project, to the Common Facilities or to the Related Facilities which serve in connection with the Initial Four Corners Plant, which do not substitute for any existing Units of Property constituting a part of the Four Corners Project, or for the Common Facilities or the Related Facilities which serve in connection with the Initial Four Corners Plant, and any land or land rights which are added to the Four Corners Project, or to the Common Facilities or to the Related Facilities which serve in connection with the Initial Four Corners Plant, which do not substitute for any existing land or land rights constituting a part of the Four Corners Project, or for the Common Facilities or for the Related Facilities which serve in connection with the Initial Four Corners Plant, and which, in accordance with Accounting Practice, would be capitalized. |
5.5. | Capital
Betterments: The improvement of land or land rights or the enlargement or improvement of any structures, facilities or equipment constituting a part of the Four Corners Project or of the Common Facilities or the Related Facilities which serve in connection with the Initial Four Corners Plant, or the substitution of other structures, facilities or equipment constituting a part of the Four Corners Project, or of the Common Facilities or the Related Facilities which serve in connection with the Initial Four |
5.5(a). | Capital
Improvements: Those additions, betterments and replacements of the Initial Four Corners Plant or the Four Corners Project. |
5.5(b). | Capital Items: Any, some, or all of Capital Additions, Capital Betterments, Capital Improvements and Capital Replacements. |
5.6. | Capital Replacements: The substitution of any Units of Property, land or land rights constituting a part of the Four Corners Project, or of the Common Facilities or the Related Facilities which serve in connection
with the Initial Four Corners Plant, for other Units of Property or land or land rights, where the substitution does not constitute an enlargement or improvement of the thing for which it is substituted, and which, in accordance with Accounting Practice, would be capitalized. |
5.7. | Coal Lease: The lease between the Tribe and Utah Mining dated as of July 26, 1957, and recorded in Book 480, page 74, in the office of the County Clerk of San Juan County, New Mexico, and amended by amendment dated October 18, 1957, and recorded in Book 480, page 75-V, and amended by amendment dated October 24, 1961, and recorded in Book 663, page 276, and amended by amendment dated March 29, 1965, and recorded in Book 663, page 277, all in the office
of the County Clerk of San Juan County, New Mexico. |
5.8. | Common Facilities: Those existing facilities, more particularly described in Exhibit 1 hereto, which are located on the real property described in Exhibit 5 of the Co-Tenancy Agreement, and which will serve in connection with the operation and maintenance both of Units 4 and 5 and of the existing three units of the Initial Four Corners Plant. |
5.9. | Conditional
Partial Assignment: An assignment dated September 2, 1966 between Utah Mining, as Assignor, and the Participants, as Assignees, whereby Utah Mining conditionally transfers and assigns to the Participants its rights, title and interest in, to and under the Coal Lease, insofar as it pertains to the coal lands dedicated pursuant to the Original Fuel Agreement and the Additional Fuel Agreement, and its right, title and interest in and to that portion of the Utah Mining Leased Lands dedicated pursuant to said agreements; which assignment was recorded on March 2, 1967 in Book 650, page 2, of Official Records in the office of the County Clerk of San Juan County, New Mexico. |
5.9(a). | Connection to 345 KV Switchyard Facilities: Connection
to positions No. 1 and No. 3 of the 345 KV switchyard from the existing 345 KV bushings of the Reserve Auxiliary Power Source. |
5.10. | Construction Agreement: The Four Corners Project Construction Agreement between the Participants, which provides for the construction of the Four Corners Project, with the exception of the Common Facilities allocated thereto. |
5.11. | Contingent
Sale Agreement: Contingent Sale Agreement between Arizona, as First Party, and El Paso, New Mexico, Salt River Project, Edison and Tucson, as Second Parties, wherein Arizona has agreed to sell on a contingent basis an undivided interest in the Common Facilities to Second Parties. |
5.12. | Date of Firm Operation: The date established in accordance with the Project Agreements in each case for Units 4 and 5 which will follow the start-up period of a generating Unit during which any necessary adjustments and/or alterations will be made to provide for the Unit’s safe and dependable operation, and which is the date on which the Unit is determined to be reliable as a source of generation and upon which the Unit can be reasonably expected to operate continuously at its rated capacity. |
5.13. | Enlarged
Four Corners Generating Station: The Initial Four Corners Plant and the Four Corners Project. |
5.14. | Exchange Agreement: Exchange Agreement (to be recorded contemporaneously herewith in the offices of the County Clerks of San Juan County and McKinley County, New Mexico), dated March 28, 1967, between Arizona, as First Party, and El Paso, New Mexico, Salt River Project, Edison and Tucson, as Second Parties, wherein Arizona conditionally agreed to exchange an undivided interest in the Common Facilities for an undivided interest in the New Facilities; as amended by letter of agreement among the Participants dated March 28, 1967, a copy of which is attached as Exhibit 6 hereto. |
5.15. | Four
Corners: The site of the Enlarged Four Corners Generating Station located on the Navajo Reservation near Shiprock, New Mexico. |
5.16. | Four Corners Project: Unit 4 and Unit 5, each to be 755 MW (nameplate), all facilities and structures used therewith or related thereto, the Switchyard Facilities therefor, and the respective undivided interests in the Common Facilities and the Related Facilities allocated thereto (all as described in Exhibits 1, 2 and 3 attached to the Co-Tenancy Agreement as amended), to be constructed and acquired at Four Corners
by the Participants on the Granted Lands and the Leased Lands. |
5.17. | Granted
Lands: The Amended Original Plant Site, New Plant Site, Pumping Plant Site, Dam Site, Common and Related Facilities Area, Ash Disposal Area, and the Reservation Lands located within the rights-of-way and easements described in the §323 Grant as such terms are defined in the §323 Grant, which said defined areas are described in Exhibit 5 hereto attached. |
5.18. | Initial Four Corners Plant: The existing generating station of Arizona, located on the Navajo Reservation near Shiprock, New Mexico, on lands leased by Arizona pursuant to the Amended Original
Lease, consisting of Units 1 and 2, each 175 MW (nameplate), and Unit 3, 225 MW (nameplate), all facilities and structures used therewith or related thereto, the related switchyard and substation facilities therefor, and the respective undivided interests in the Common Facilities and the Related Facilities allocated thereto, which are located on the real property more particularly described in the Amended Original Lease. |
5.19. | Leased Lands: The
Amended Original Plant Site, New Plant Site, Pumping Plant Site, Dam Site, Common and Related Facilities Area and Ash Disposal Area, as such terms are defined in the Supplemental Lease, and which said defined areas are described in Exhibit 5 hereto attached. |
5.20. | Minimum Coal Storage Pile: The Minimum Coal Storage Pile, as determined by the Participants, for Units 4 and 5, to be drawn upon when fuel deliveries from Utah Mining may be interrupted. |
5.21. | Net Effective Generating Capacity: The
maximum continuous ability of each Unit of the Enlarged Four Corners Generating Station to produce power, which shall be determined for each Unit of the Enlarged Four Corners Generating Station in accordance with the Operating Agreement. |
5.22. | New Facilities: Existing New Facilities and Future New Facilities. |
5.23. | New Lease: The
provisions of the Supplemental Lease which are applicable to the Four Corners Project and under which the Participants will acquire leasehold rights to construct, reconstruct, use, operate, maintain, relocate and remove the Four Corners Project. |
5.24. | Operating Agreement: Operating Agreement between the Participants providing for the operation and maintenance of the Four Corners Project. |
5.25. | Original Fuel Agreement: Fuel Agreement dated August 18, 1960, as amended and supplemented
by five supplements, including the Fifth Supplement, between Utah Mining and Arizona, relating to fuel for the Initial Four Corners Plant. |
5.26. | Original Lease: Indenture of Lease dated December 1, 1960, between the Tribe and Arizona, leasing to Arizona certain leasehold rights pursuant to which it has constructed the Initial Four Corners Plant, said Original Lease being of record in Book 474, page 187, in the office of the County Clerk of San Juan County, New Mexico, and supplemental exhibits to said Original Lease recorded in Book 511, page 65, in the office of the County Clerk of San Juan County, New Mexico. |
5.27. | Participant(s): One
or more entities, including Arizona, NTEC, New Mexico, Salt River Project and Tucson, with an ownership interest in the Four Corners Project, and, when referring specifically to facts or matters occurring or agreements entered into prior to the effective date of Amendment No. 8, El Paso. The term “Original Participants” shall refer to “Arizona, El Paso, New |
5.28. | Project Agreements: The §323 Grant, the New Lease, the Co-Tenancy Agreement, the Construction Agreement, the Operating Agreement, the Additional Fuel Agreement, the Conditional Partial Assignment, the Recorded Memorandum, the Exchange Agreement and the Contingent Sale Agreement. |
5.29. | Related Facilities: Existing Related Facilities and Future Related Facilities. |
5.30. | Reservation Lands: The lands of the Tribe located within the Navajo Reservation. |
5.31. | §323 Grant: Grant of rights-of-way and easements under the Act of February 5, 1948 (62 Stat. 17, 18, 25 U.S.C. §323-328), the Act of March 3, 1879 (20 Stat. 394, 5 U.S.C. §485), as amended, and the Acts of July 9, 1832 and July 27, 1868 (4 Stat. 564, 15 Stat. 228, 25 U.S.C. §2), and such regulations promulgated thereunder as are applicable, including 25 CFR §1.2 and Part 161, to Arizona, Edison, New Mexico, El Paso, Tucson and Salt River Project, pursuant to which they will construct, reconstruct, use, operate, maintain, relocate and remove the Four Corners Project. |
5.32. | Supplemental
Lease: The Supplemental and Additional Indenture of Lease dated the 27th day of May 1966, which combines the amendments and supplements to and the revisions of the Original Lease, and the New Lease. |
5.33. | Switchyard Facilities: The 345 KV and 500 KV switchyards and facilities related thereto to be utilized by Units 4 and 5, described in Exhibit 2 hereto attached. |
5.34. | Tribe: The Navajo Tribe of Indians. |
5.35. | Unit
4: Steam Electric Generating Unit with a nameplate rating of 755 MW described in Exhibit 2 hereto attached. |
5.36. | Unit 5: Steam Electric Generating Unit with a nameplate rating of 755 MW described in Exhibit 2 hereto attached. |
5.37. | Utah Mining: Utah Construction & Mining Co., a Delaware corporation. |
6. | OWNERSHIPS AND TITLES: |
6.1. | The
Participants shall construct the Four Corners Project in accordance with the Project Agreements and their rights, titles and interests therein shall be as provided in this Co-Tenancy Agreement, the §323 Grant and the New Lease. |
6.1.1. | For those Participants in the Enlarged Four Corners Generating Station who have made or are committed to make, as of December 31, 1981, those Capital Items shown on Exhibit 7 or Exhibit 8 hereto on any of the Leased Lands, such Participants are hereby granted an easement or easements for such uses of the occupied Leased Lands on which such Capital Items are located or are to be located, for the term of the Co-Tenancy Agreement. The ownership of each Participant in such Capital Items and the right of such Participant
to occupy a portion of such Leased Lands shall be equal to the percentage cost of investment in such Capital Items paid by such Participant. At the request of a Participant, approved easements will be evidenced |
6.1.2. | Any of the Participants in the Enlarged Four Corners Generating Station shall have the right, at its own expense, to add any Capital Item on the Leased Lands and to use the portion of the Leased Lands occupied by such Capital Item
for the term of this Co-Tenancy Agreement; provided that approval has been obtained pursuant to Section 8.6 of the Four Corners Project Operating Agreement. |
6.1.3. | Any Participant owning an interest in a Capital Item shall have the right to affix its name to such Capital Item in a manner and at a location to be approved pursuant to Section 8.6 of the Operating Agreement. |
6.1.4. | If any Capital Item is severed or removed from such Leased Lands, at the request of the grantor Participant of such Leased Lands, such severance or removal
shall be evidenced by bills of sale from the grantee Participant to the grantor Participant. |
6.2. | The Participants shall hold title to and own as tenants in common all the facilities forming part of the Four Corners Project (excluding the Common Facilities, the Switchyard Facilities, the New Facilities, the Related Facilities not included in the New Facilities, and the Reserve Auxiliary Power Source) as follows: |
6.2.1. | Arizona shall own an undivided 63% interest therein. |
6.2.2. | NTEC
shall own an undivided 7% interest therein. |
6.2.3. | New Mexico shall own an undivided 13% interest therein. |
6.2.4. | Salt River Project shall own an undivided 10% interest therein. |
6.2.5. | Tucson
shall own an undivided 7% interest therein. |
6.2(a). | The Participants shall hold title to and own as tenants in common the Related Facilities not included in the New Facilities existing on the effective date of Amendment No. 8 as follows: |
6.3. | The
Participants shall hold title to and own as tenants in common the Existing New Facilities (excluding Existing Related Facilities) as follows: |
6.3.1. | Arizona shall own an undivided 63% interest therein. |
6.3.2. | NTEC shall own an undivided 7% interest therein. |
6.3.3. | [Reserved] |
6.3.4. | New
Mexico shall own an undivided 13% interest therein. |
6.3.5. | Salt River Project shall own an undivided 10% interest therein. |
6.3.6. | Tucson shall own an undivided 7% interest therein. |
6.3(a). | Until such time as the exchange of the Future New Facilities provided for in the last sentence of Section 3 of the Exchange
Agreement shall have occurred, the following Participants shall receive title to and own as tenants in common the Future New Facilities, as follows: |
6.3(a)4. | Salt River Project shall own an undivided 11.76% interest therein. |
6.4. | From
and after the date upon which the exchange or sale shall have occurred, pursuant to the terms and conditions of the Exchange Agreement or the Contingent Sale Agreement, as the case may be, the Participants shall hold title to and own as tenants in common the New Facilities, excluding the Related Facilities, as follows: |
6.4.1. | Arizona shall own an undivided 63% interest therein. |
6.4.2. | NTEC shall own an undivided 7% interest therein. |
6.4.3. | [Reserved] |
6.4.4. | New
Mexico shall own an undivided 13% interest therein. |
6.4.5. | Salt River Project shall own an undivided 10% interest therein. |
6.4.6. | Tucson shall own an undivided 7% interest therein. |
6.5. | The
Participants shall hold title to and own as tenants in common the Common Facilities and the Existing Related Facilities included in the New Facilities, in both cases, existing on the effective date of Amendment No. 8 as follows: |
6.5.1. | Arizona shall own an undivided 73.20% interest therein. |
6.5.2. | NTEC shall own an undivided 5.07% interest therein. |
6.5.3. | New
Mexico shall own an undivided 9.42% interest therein. |
6.5.4. | Salt River Project shall own an undivided 7.24% interest therein. |
6.5.5. | Tucson shall own an undivided 5.07% interest therein. |
6.5.6. | Arizona
shall own an undivided 63% interest therein. |
6.5.7. | NTEC shall own an undivided 7% interest therein. |
6.5.8. | New Mexico shall own an undivided 13% interest therein. |
6.5.9. | Tucson shall own an undivided 7%
interest therein. |
6.6. | The Participants shall receive title to and own as tenants in common the Minimum Coal Storage Pile for the Four Corners Project as follows: |
6.6.1. | Arizona shall own an undivided 63% interest therein. |
6.6.2. | NTEC shall own an undivided 7% interest therein. |
6.6.3. | [Reserved] |
6.6.4. | New
Mexico shall own an undivided 13% interest therein. |
6.6.5. | Salt River Project shall own an undivided 10% interest therein. |
6.6.6. | Tucson shall own an undivided 7% interest therein. |
6.7. | The
ownerships and titles described in Sections 6.2 and 6.6 shall vest simultaneously in Arizona, NTEC, New Mexico, Salt River Project and Tucson so that the estate of each is concurrent as to time, right and priority. |
6.8. | The ownerships and titles described in Section 6.3 shall vest simultaneously in NTEC, New Mexico, Salt River Project and Tucson so that the estate of each is concurrent as to time, right and priority, subject to the terms and conditions of the Exchange Agreement and the Contingent Sale Agreement. |
6.9. | From and after
the date upon which the exchange or sale shall have occurred, pursuant to the terms and conditions of the Exchange Agreement or the Contingent Sale Agreement, as the case may be, the estates of NTEC, Arizona, New Mexico, Salt River Project and Tucson in and to the Common Facilities and the New Facilities shall be deemed to be concurrent as to time, right and priority. |
6.10. | Within eighteen (18) months following the Date of Firm Operation of Unit 5, the Participants shall jointly make, execute and deliver a supplement to this Co-Tenancy Agreement in recordable form, which shall describe with particularity and detail the facilities, equipment and other property then constituting the Four Corners Project not specifically described in the exhibits hereto
or deleted therefrom, and such supplement, when prepared, shall be and become a part of this Co-Tenancy Agreement. The percentage undivided ownership interests of the Participants in and to the various facilities |
6.11. | In the event that any Participant transfers or assigns any of its right, title or interest (collectively, “interest”) in and to the Four Corners Project in accordance with the terms and conditions of this Co-Tenancy Agreement, the Participant assigning
or transferring such interest shall, upon completion of such transfer or assignment, provide written notice to the other Participants and the Operating Agent, as defined in the Operating Agreement, of any changes in the interests of that Participant in the Four Corners Project. Upon receipt of such notice, the Operating Agent shall prepare for signature by the Participants an amendment to the Co-Tenancy Agreement reflecting such changes. |
7. | OWNERSHIP OF SWITCHYARD FACILITIES: |
7.1. | The Participants shall receive
title to and own as tenants in common the 500 KV Switchyard Facilities described in Exhibit 2 hereto attached, as follows: |
7.1.1. | Arizona shall own an undivided 81.50% interest therein. |
7.1.2. | NTEC shall own an undivided 3.50% interest therein. |
7.1.3. | [Reserved] |
7.1.4. | New
Mexico shall own an undivided 6.50% interest therein. |
7.1.5. | Salt River Project shall own an undivided 5.00% interest therein. |
7.1.6. | Tucson shall own an undivided 3.50% interest therein. |
7.2. | The Participants shall receive title to and own as tenants in common the 345 KV Switchyard Facilities described in Exhibit
2 hereto attached, as follows: |
7.2.1. | Arizona shall own an undivided 59.32% interest therein. |
7.2.2. | NTEC shall own an undivided 8.94% interest therein. |
7.2.3. | [Reserved] |
7.2.4. | New
Mexico shall own an undivided 19.26% interest therein. |
7.2.5. | Salt River Project shall own an undivided 8.52% interest therein. |
7.2.6. | Tucson shall own an undivided 3.96% interest therein. |
7.3. | The Participants shall receive title to and own as tenants in common that portion of the Switchyard Facilities described
in Exhibit 2 hereto attached as the 345-500 KV transformer and the Connection to Reserve Auxiliary Power Source, as follows: |
7.3.1. | Arizona shall own an undivided 63% interest therein. |
7.3.2. | NTEC shall own an undivided 7% interest therein. |
7.3.3. | [Reserved] |
7.3.4. | New
Mexico shall own an undivided 13% interest therein. |
7.3.5. | Salt River Project shall own an undivided 10% interest therein. |
7.3.6. | Tucson shall own an undivided 7% interest therein. |
7.4. | APS shall have title and own the newly installed second 345/500 KV transformer |
7.5. | The
Participants shall receive title to and own as tenants in common the Reserve Auxiliary Power Source as follows: |
7.5.1. | Arizona shall own an undivided 63.00% interest therein. |
7.5.2. | NTEC shall own an undivided 7.00% interest therein. |
7.5.3. | [Reserved] |
7.5.4. | New
Mexico shall own an undivided 13.00% interest therein. |
7.5.5. | Salt River Project shall own an undivided 10.00% interest therein. |
7.5.6. | Tucson shall own an undivided 7.00% interest therein. |
7.6. | The Participants shall receive title to and own as tenants in common the Connection to 345 KV Switchyard Facilities
as follows: |
7.6.1 | Arizona shall own an undivided 53.95% interest therein. |
7.6.2 | NTEC shall own an undivided 6.00% interest therein. |
7.6.3 | [Reserved] |
7.6.4 | New
Mexico shall own an undivided 25.49% interest therein. |
7.6.5 | Salt River Project shall own an undivided 8.56% interest therein. |
7.6.6 | Tucson shall own an undivided 6.00% interest therein. |
7.7. | Pursuant to separate agreement, and by separate instrument, Arizona shall transfer and convey to the other Participants
their respective interests in the Reserve Auxiliary Power Source. These interests shall be referred to in the supplement described in Section 6.10 hereof. |
7.8. | The ownerships and titles described in Sections 7.1, 7.2, 7.3, 7.4 and 7.6 hereof shall vest simultaneously in Arizona, NTEC, New Mexico, Salt River Project and Tucson so that the estate of each is concurrent as to time, right and priority. |
8. | ENTITLEMENT TO PLANT CAPACITY AND ENERGY: |
8.1. | Subject
to the provisions of Section 20.2, Participants shall own and be entitled to the following percentages of the Net Effective Generating Capacity of Units 4 and 5, as follows: |
8.1.1. | Arizona shall own an undivided 63% interest therein. |
8.1.2. | NTEC shall own an undivided 7% interest therein. |
8.1.3. | [Reserved] |
8.1.4. | New
Mexico shall own an undivided 13% interest therein. |
8.1.5. | Salt River Project shall own an undivided 10% interest therein. |
8.1.6. | Tucson shall own an undivided 7% interest therein. |
8.2. | The electrical capacity in the Switchyard Facilities shall be made available to the Participants in the manner and in the amounts
as set forth in the Operating Agreement. |
8.3. | Arizona shall retain the entire capacity and shall receive the entire output of the Initial Four Corners Plant, except to the extent that it has agreed to provide the requirements for the operation of the Four Corners Project from the output of the Initial Four Corners Plant in accordance with the terms and conditions of the Operating Agreement. |
9. | COORDINATION COMMITTEE: |
9.1. | As
a means of securing effective cooperation and interchange of information and of providing consultation on a prompt and orderly basis among the Participants in connection with various administrative and technical problems, which may arise from time to time in connection with the terms and, conditions of this Co-Tenancy Agreement, the parties hereto hereby establish a Coordination Committee. |
9.2. | The Coordination Committee shall consist of one representative from each Participant, who shall be an officer of the Participant, except in the case of |
9.3. | The Coordination Committee shall have no authority to modify any of the provisions of this Co-Tenancy Agreement. |
9.4. | Each Participant shall notify the other Participants promptly of the designation
of its representative or representatives on the Coordination Committee and of any subsequent change in such designation. Any of the Participants may, by written notice to the other Participants, designate an alternate or substitute to act as its representative on the Coordination Committee in the absence of the regular member of the Coordination Committee or to act on specified occasions or with respect to specified matters. |
9.5. | Any action or determination of the Coordination Committee shall require the following vote: |
(a) | The
affirmative vote of the Participants owning at least 75% of the Net Effective Generating Capacity; and |
(b) | The affirmative vote of at least 60% of the individual Participants. For purposes of this Section 9.5(b) and any other provisions requiring the vote of a committee, for any two or more Participants where: (i) one of the Participants directly or indirectly controls the other Participant(s) |
9.6. | Notwithstanding Section 9.5, any actions or determinations of the Coordination Committee related to the matters set forth below shall require the unanimous vote of the Participants: |
(a) | Any change in a Participant’s share of Net Effective Generating Capacity or energy, or ancillary services therefrom, except as provided in Section 20.2, or increase of a Participant’s share of the operating expenses or capital expenditures of the Four Corners
Project; |
(b) | Except as set forth in Section 9.9, approval of a Capital Improvement with an estimated cost, at the time of consideration by the Coordination Committee, in excess of $200,000,000, as adjusted for increases or decreases in the Consumer Price Index occurring after July 16, 2016; or |
(c) | A decision to rebuild Unit 4 or Unit 5 of the Four Corners Project if all or substantially all of Unit 4 or Unit 5 is destroyed or damaged. |
9.7. | For
purposes of Section 9, a “Capital Improvement” shall have the meaning set forth in Section 5.5(a), but also mean a singular project for which the total aggregate cost, which may include multiple purchase orders and multiple contractors, exceeds $200,000,000.00. In the event a Capital Project involves Unit 4 or Unit 5, each unit shall be treated separately and the $200,000,000 amount shall apply per unit and not be aggregated. |
9.8. | In no event may the Operating Agent, as that term is defined in the Operating Agreement, claim that a Capital Improvement meeting the definitions set forth
in Section 5.5(a) and Section 9.7, is necessary to operate the Four Corners Project in accordance with Prudent Utility Practice, as provided for in Section 14.4 of the Operating Agreement. |
9.9. | Beginning on July 6, 2016, Section 9.6(b) shall not apply to the installation of selective catalytic reduction equipment on either Unit 4 or Unit 5, as required by federal law (“SCR Projects”) and SCR Projects shall be subject to the voting requirements of Section 9.5. |
9.10. | In the
event that the Coordination Committee does not approve a Capital Project subject to the voting requirements of Section 9.6(b), the Participant(s) that voted against the Capital Project shall work in good faith with the Participants that voted in favor of the Capital Project, in order to assure the continued operation of the Four Corners Project, including commercially reasonable efforts by the Participants that voted against the Capital Improvements Project to sell their interests in the Four Corners Project. If the Participants cannot agree on a sale or transfer of their respective rights, titles and interests to the Four Corners Project, pursuant to Section 13, the Participants agree that each of them shall have the right to seek equitable relief, without being subject to the dispute resolution requirements of Section 19. |
9.11. | In
the event one or more Participants abstains from a vote governed by Section 9.5, does not participate in consideration of a particular matter, |
9.12. | In
the event one or more Participants abstains from or does not participate in a vote governed by Section 9.6, or cannot vote as a result of a default, actions or determinations brought before the Coordination Committee shall require the unanimous affirmative vote of the voting Participants. |
9.13. | A Participant shall abstain from voting on any matter if the Participant has a conflict of interest with respect to that matter. |
9.14. | Each Participant shall advise the Coordination Committee if the Participant has a conflict of interest
with respect to any matter being considered by the Coordination Committee, provided that the failure of a Participant to advise the Coordination Committee of a conflict of interest shall not relieve that Participant of its obligation to abstain from voting on the matter. A conflict of interest shall include matters relating to the new uses of land or other property rights for the Four Corners Project and contracts or other agreements to provide goods or services (other than the services provided by the Operating Agent), including fuel, to the Four Corners Project, where such |
9.15. | For the avoidance of doubt, in the event of matters involving directly or indirectly the permanent shutdown of the operations of the Four Corners Project and/or the termination of the 2016 Four Corners Coal Supply Agreement (the “CSA”), NTEC affirmatively agrees and acknowledges that it will or may have a conflict of interest in such matter(s), and expressly agrees that it: (i) shall not oppose or object to such matter(s) and (ii) shall abstain from any vote as to such matter(s). This provision overrides and supersedes anything contrary to, or directly or indirectly inconsistent with, this provision in the Project Agreements, the CSA, or any other related documents. |
10. | USE
OF COMMON FACILITIES AND RELATED FACILITIES DURING CURTAILMENTS: |
10.1. | If, because of emergency or planned shutdowns of Common Facilities or Related Facilities or the curtailment for any cause in the use thereof, Units 1, 2, 3 (prior to their respective retirements), 4 and 5 are not all operable simultaneously and continuously at their Net Effective Generating Capacity, then the reduced capacity entitlement of each Participant, because of the inability to operate said Units simultaneously and continuously at their Net Effective Generating Capacity, shall be determined as follows: |
10.2. | Curtailments in capacity entitlements necessitated by reason of shortages in the supply of
fuel, water or other supplies or services affecting all of the five Units of the Enlarged Four Corners Generating Station commonly shall be treated in the same manner as curtailments necessitated because of emergency or planned shutdowns of Common Facilities or Related Facilities; provided, however, that nothing contained in this Section 10 shall be construed to |
10.3. | Except as otherwise provided in Section 10, no Participant shall exercise its rights relating to the
Common Facilities or Related Facilities so as to endanger or unreasonably interfere with the operation of the Initial Four Corners Plant (prior to the retirement of each of Units 1, 2 and 3 of the Initial Four Corners Plant) or the Four Corners Project. |
11. | WAIVER OF RIGHT TO PARTITION: |
11.1. | The Participants, and each of them, accept title to the Four Corners Project and title in the Granted Lands and Leased Lands as tenants in common, and agree that their interests therein shall be held in such tenancy in
common for the duration of the term of this Co-Tenancy Agreement, including any extension thereof. During the term of this Co-Tenancy Agreement, each Participant agrees as follows: |
11.1.1. | That it hereby waives the right to partition the Four Corners Project or the Granted Lands and Leased Lands (whether by partitionment in kind or by sale and division of the proceeds thereof); and |
11.1.2. | That it will not resort to any action at law or in equity to partition (in either such manner) the Four Corners Project or the Granted Lands
and Leased Lands, and waives the benefits of all laws that may now or hereafter authorize such partition. |
11.2. | During the term of this Co-Tenancy Agreement, Arizona waives the right to partition (whether by partitionment in kind or by sale and division of the |
11.3. | During the term of this Co-Tenancy Agreement, the Participants waive the right to partition (whether by partitionment in kind or by sale and division of the proceeds thereof) and agree that they will not resort to any action at law or in equity to partition (in either such manner) and waive the benefits of all laws that may now or hereafter authorize such partition of the Common Facilities and the Related Facilities allocated to the Four Corners Project from the Common Facilities and the Related Facilities allocated to the Initial Four Corners Plant. |
12. | MORTGAGE
AND TRANSFER OF PARTICIPANTS’ INTERESTS: |
12.1. | The Participants, and each of them, shall have the right at any time and from time to time to mortgage, create or provide for a security interest in or convey in trust their respective rights, titles and interests in the Four Corners Project, their respective rights, titles and interests in, to and under the Project Agreements and/or their rights, titles and interests in the Granted Lands and Leased Lands, to a trustee or trustees under deeds of trust, mortgages or indentures, or to secured parties under a security agreement, as security for their present or future bonds or other obligations or securities, and to any |
12.2. | Any mortgagee, trustee or secured party under present or future deeds of trust, mortgages, indentures or security agreements of any of the Participants and any successor or assign thereof, and any receiver, referee, or trustee in bankruptcy or reorganization of any on the Participants, and any successor by action of law or otherwise, and any purchaser, transferee or assignee of any thereof may, without need for the prior written consent of the other Participants, succeed to and acquire all the rights, titles and interests
of such Participant in the Four Corners Project, in, to and under the Project Agreements and/or the rights, titles and interests of such Participant in the Granted Lands and Leased Lands, and may take over possession of or foreclose upon said property, rights, titles and interests of such Participant. |
12.3. | Each Participant shall have the right to transfer or assign all or any portion of its respective rights, undivided titles and interests in the Four Corners Project, in, to and under the Project Agreements and/or in the Granted Lands and Leased Lands, without the need for prior written consent of any other Participant, at any time to any of the following: |
12.3.1. | To
any corporation or other entity acquiring all or substantially all of the property of such Participant; or |
12.3.2. | To any corporation or entity into which or with which such Participant may be merged or consolidated; or |
12.3.3. | To any corporation or entity the stock or ownership of which is wholly owned by a Participant; or |
12.3.4. | To
any third party transferee in connection with a financing by such Participant involving or relating to such Participant’s rights, titles and interests in the Four Corners Project, in, to and under the Project Agreements and/or in the Granted Lands and Leased Lands, without such third party transferee assuming or becoming obligated in any respect to perform any of the obligations of such Participant pursuant to this Co-Tenancy Agreement, provided that any and all such rights, titles and interests transferred to such third party transferee are immediately re-purchased by such Participant and are thereupon subject to all of the provisions of this Co-Tenancy Agreement, including, but not limited to, the “right of first refusal” provisions of Section 13 hereof; or |
12.3.5. | To
the Salt River Valley Water Users’ Association, an Arizona corporation, in the case of a transfer by Salt River Project; or |
12.3.6. | To any corporation which owns all of the outstanding common stock of a Participant, or in the case of a Participant which has no common stock, to an entity which owns all of the ownership interest of the Participant (the corporation or entity shall be referred to herein as the “Parent”); or |
12.3.7. | To
any corporation or entity the common stock or other ownership interest of which is wholly owned by the Parent of such Participant. |
12.4. | Except as otherwise provided in Sections 12.1, 12.2, 12.3.4 and 24.4 hereof, any successor to the rights, titles and interests of a Participant in the Four Corners Project, to the rights, titles and interests of a Participant in, to and under the Project Agreements and/or in the Granted Lands and Leased Lands shall assume and agree to fully perform and discharge all of the obligations hereunder of such Participant, and such successor shall notify each of the other Participants in writing of such transfer, assignment or merger. Any such successor shall specifically agree in writing with the remaining Participants at
the time of such transfer, assignment or merger that it will not transfer or assign any rights, titles and interests acquired from a Participant without complying with the terms and conditions of Section 13 hereof. |
12.5. | No Participant shall be relieved of any of its obligations and duties under the Project Agreements by an assignment under this Section 12 without the express prior written consent of all of the remaining Participants. |
12.6. | Except as otherwise provided in Section 12.4 hereof, any transfer, assignment or merger made
pursuant to the provisions of this Section 12 shall not be subject to the terms and conditions set forth and contained in Section 13 hereof. |
12.7. | Without implying that any provision other than Article 6 and Article 7 herein allows a Participant to own an undivided ownership interest in any component of the Four Corners Project which is not the same as the undivided ownership |
13. | RIGHT
OF FIRST REFUSAL: |
13.1. | Except as provided in Section 12 hereof should any Participant desire to assign, transfer, convey or otherwise dispose of (hereinafter collectively referred to as “Assign”) its rights, titles and interests in the Four Corners Project, or its rights, titles and interests, in, to and under the Project Agreements, or its rights, titles and interests in the Granted Lands or Leased Lands, or any part thereof or interest therein (hereinafter referred to as “Transfer Interest”), to any person, company, corporation, governmental agency or sovereign entity, or any other Participant (hereinafter referred to as “Outside Party”), the remaining Participants, or any one or more of them, shall have
the right of first refusal, as hereinafter described, to purchase such Transfer Interest on the basis of the greater of the following amounts: |
13.1.1. | The amount of a bona fide written offer from a buyer ready, willing and able to purchase the Transfer Interest after the expiration of the periods for giving notices specified in Sections 13.3 to 13.7 inclusive hereof; or |
13.1.2. | The fair market value of the Transfer Interest. As used herein, the term “fair market value” is defined as the amount of money which a purchaser,
willing but not obligated to buy the property, will pay to an owner, willing but not obligated to sell it, taking into consideration all of the uses to which the Transfer Interest is adapted |
13.2. | Such right of first refusal shall exist as of the effective date of this Co-Tenancy Agreement and shall continue for the term of this Co-Tenancy Agreement. |
13.3. | At
least one hundred eighty (180) days prior to its intended date to Assign, and after its receipt of a bona fide written offer of the type described in Section 13.1 above, the Participant desiring to Assign its Transfer Interest shall serve written notice of its intention to do so upon the remaining Participants who have an interest in that portion of the Four Corners Project that is the subject of the Transfer Interest in accordance with Section 23 of this Co-Tenancy Agreement. Such notice to the remaining Participants shall contain the approximate proposed date to Assign, the terms and conditions of said bona fide written offer received by such Participant, and the terms and conditions of the proposed assignment. The terms and conditions contained in such notice shall be at least as favorable to the remaining Participants as the terms and conditions of said bona fide written offer, or may be the same terms and conditions as set forth in said offer. |
13.4. | Each
remaining Participant having an ownership interest in the portion of Four Corners Project that is the subject of the Transfer Interest, including the Outside Party if such Outside Party is a Participant, shall signify its desire to purchase the entire Transfer Interest, or any percentage interest therein, or not to purchase all or any percentage interest therein, by serving written |
13.5. | If all or some of the remaining Participants should signify their intention under Section 13.4 to purchase in aggregate more than the entire Transfer Interest, the percentage ownership of the Transfer Interest to be acquired by each such remaining Participant shall be limited to the percentage determined by the formula set forth in Section 13.10.1 hereof. |
13.6. | If the remaining Participants, or any one or more of them, should signify its or their intention
under Section 13.4 to purchase less than the entire Transfer Interest, the Participant desiring to Assign shall serve written notice of this fact upon the remaining Participants in accordance with Section 23 hereof within ten (10) days after its receipt of the last of the written notices given pursuant to Section 13.4 hereof, or after the expiration of the one hundred twenty (120) day period referred to in Section 13.4 hereof, whichever is earlier. |
13.7. | The one or more remaining Participants who signify an intention to purchase less than the entire Transfer Interest may signify the intention to purchase the remainder of the Transfer Interest by serving written notice pursuant to |
13.8. | When intention to purchase the entire Transfer Interest has been indicated by notices duly given hereunder by the applicable Participant(s) desiring to purchase the Transfer Interest, the Participants shall thereby incur the following obligations: |
13.8.1. | The Participant desiring to Assign and the Participant(s) desiring to purchase the Transfer Interest shall
be obligated to proceed in good faith and with diligence to obtain all required authorizations and approvals to Assign; |
13.8.2. | The Participant desiring to Assign shall be obligated to obtain the release of any liens imposed by or through it upon any part of the Transfer Interest, and to Assign the Transfer Interest at the earliest practicable date thereafter; and |
13.8.3. | The Participant(s) desiring to purchase the Transfer Interest shall be obligated to perform all terms and conditions required of it or them to complete the
purchase of the Transfer Interest. The purchase of the Transfer Interest shall be fully consummated within eighteen (18) months following the date upon which all notices required to be given under this Section 13 have been duly served, unless the Participant(s) are then diligently pursuing applications to appropriate regulatory bodies (if any) for required authorizations |
13.9. | If
the intention to purchase the entire Transfer Interest has not been indicated by notices given within the time periods specified in this Section 13 by the Participant(s) desiring to purchase the Transfer Interest, the Participant desiring to Assign shall be free to Assign all but not less than all of its Transfer Interest to the Outside Party that made the bona fide written offer of the type described in Section 13.1.1 upon the terms and conditions set forth in said bona fide written offer. If such assignment of the entire Transfer Interest to the Outside Party is not completed within eighteen (18) months after the approximate proposed date to assign specified in the notice given pursuant to Section 13.3, the Participant desiring to Assign its Transfer Interest must, unless it is then diligently pursuing its applications to appropriate regulatory bodies (if any) for required authorizations to effect such assignment, or is then diligently prosecuting or defending appeals
from orders entered or authorizations issued in connection with such applications, give another complete new right of first refusal to the remaining Participants pursuant to the provisions of this Section 13, before such Participant shall be free to Assign a Transfer Interest to said Outside Party. |
13.10. | The Participant(s) who purchase the Transfer Interest shall receive title to and shall own the Transfer Interest as tenants in common, subject to the same rights and obligations as are applied to the Transfer Interest in the hands of the assigning Participant, and shall acquire the Transfer
Interest as follows: |
13.10.1. | Unless otherwise agreed to by the purchasing Participants, if there is more than one purchasing Participant, the percentage interest of each such purchasing Participant in the Transfer Interest shall be determined by the following formula: |
T = | A x C |
T
= | The percentage of the Transfer Interest to be purchased by each Participant desiring to purchase. |
A = | The existing undivided percentage interest of such Participant in the capacity entitlement of the Four Corners Project. |
B = | The total undivided percentage interests in the capacity entitlement of the Four Corners Project of all Participants desiring to purchase the Transfer Interest. |
C
= | The percentage interest in the Four Corners Project of the Transfer Interest. |
13.10.2. | If there is only one purchasing Participant, it shall acquire title to and own the entire Transfer Interest. |
13.11. | No assignment of a Transfer Interest, whether to another Participant or to an Outside Party, shall relieve
the assigning Participant from full liability and financial responsibility for performance after any such assignment: |
13.11.1. | Of all obligations and duties incurred by such Participant prior to such assignment under the terms and conditions of the Project Agreements; and/or |
13.11.2. | Of all obligations and duties provided and imposed after such assignment upon such assigning Participant under the terms and conditions of the Project Agreements; unless and until the assignee shall agree in writing with the remaining Participants
to assume such obligations and duties; provided further, however, that such assignor shall not be relieved of any of its obligations and duties by an assignment under this Section 13, without the express prior written consent of all of the remaining Participants. [See note below.] |
13.12. | Any transferee, successor or assignee, or any party who may succeed to the Transfer Interest pursuant to this Section 13, shall specifically agree in writing with the remaining Participants at the time of such transfer or assignment that it will not transfer or assign all or any portion of the Transfer Interest so acquired without complying with the terms and conditions of this Section 13. |
13.13. | Nothing
contained in this Section 13 shall be deemed to apply to or limit the right of Arizona to assign, transfer, convey or otherwise dispose of its rights, |
13.14. | Any
assignment of a Transfer Interest to an Outside Party that is not then a Participant that is a governmental or sovereign entity, agency or instrument of a governmental or sovereign entity or a foreign person shall not be effective unless the assumption by such Outside Party of the obligations of the transferring Participant includes a waiver of sovereign immunity, a consent to the dispute resolution provisions of Section 19 of this Co-Tenancy Agreement, a consent to the governing law provisions of Section 25.4 of this Co-Tenancy Agreement, and any other consents or waivers the Participants deem necessary, sufficient to assure the remaining Participants of the enforceability of the obligations of such Outside Party under the Project Agreements. |
13.15. | A
Party shall be prohibited from assigning its Transfer Interest to an Outside Party unless such Outside Party, concurrently with such transfer, provides to the Operating Agent any financial assurance or guarantee required by the Financial Assurance Policy, attached as Exhibit 1 to Amendment No. 16 of the Operating Agreement, as then in effect, and the transferring Participant provides evidence, to the reasonable satisfaction of the non-transferring |
14. | SEVERANCE
OF IMPROVEMENTS FROM LEASEHOLD: |
14.1. | With the exception of any of the “non-removable buildings” defined in the |
15. | CAPITAL
ADDITIONS, CAPITAL BETTERMENTS, CAPITAL REPLACEMENTS AND RETIREMENTS OF FOUR CORNERS PROJECT: |
15.1. | The Participants hereto recognize that from time to time it may be necessary or desirable to make Capital Additions or Capital Betterments to, Capital Replacements of and retirements of facilities comprising the Four Corners Project, including Common Facilities and Related Facilities. |
15.2. | Any such Capital Additions, Capital Betterments, Capital Replacements and
retirements shall be noted in or supplement to the appropriate exhibits attached hereto or through procedures established by the Operating Agent and approved by the Coordination Committee. |
15.3. | The rights, titles and interests, including percentage ownership interests, of any Participant in and to any Capital Additions, Capital Betterments or Capital Replacements of facilities shall be as provided for the respective classes of property described in Sections 6 or 7 hereof, as the case may be. The Participants shall be obligated for the costs of such Capital Additions, Capital Betterments or
Capital Replacements in the same percentages as their percentage ownership interests therein. |
15.4. | In the event of the removal or retirement of any facilities comprising part of the Four Corners Project, any proceeds realized from the salvage of such facilities shall be distributed to the Participants in accordance with their percentage ownership interests therein, or shall be applied on account of the Participant’s obligations to pay for Capital Additions, Capital Betterments or Capital Replacements replacing facilities removed or retired. |
15.5. | Each
Participant shall have the right, at its own expense, to add facilities to the Leased Lands including the Switchyard Facilities and to use the portion of the Leased Lands occupied by such facilities, subject to approval pursuant to Section 8.6 of the Operating Agreement; provided, however, the facilities shown on Exhibit 7 and Exhibit 8 hereto shall be deemed to have been so approved. However, if such additions of facilities involve a new interconnection to the Switchyard Facilities, approval to interconnect to the Switchyard Facilities shall be set forth in a written agreement among the Participants. Such agreement shall specify the terms and conditions for the |
15.6. | Each Participant shall have the right at its own expense to add protective relay or communication equipment to facilities solely owned by it, if the Participant determines the protective relay or communication equipment is needed for the protection of its electric system. |
16. | DESTRUCTION, DAMAGE OR CONDEMNATION OF THE FOUR CORNERS PROJECT: |
16.1. | If
all, or substantially all of Unit 4 or Unit 5 of the Four Corners Project should be destroyed, damaged or condemned, then the Participants may elect to repair, restore or reconstruct the damaged, destroyed or condemned facilities in such a manner as to restore the facilities to substantially the same general character or use as the original, or to such other character or use as the Participants may then agree. In the event of such election, it shall be the obligation of the Participants to pay for the costs of such repair, restoration or reconstruction in accordance with the percentage ownership interests of the respective Participants in such facilities, and, upon completion thereof, the Participants’ rights, titles and interests therein shall be as provided in this Co- Tenancy Agreement. |
16.2. | If
the Participants elect not to repair, restore or reconstruct the damaged, destroyed or condemned facilities, the proceeds from any insurance or from any award shall be distributed to the Participants in accordance with their respective percentage ownership interests in and to such facilities. The |
16.3. | In
the event that less than substantially all of Unit 4 or Unit 5 of the Four Corners Project shall be destroyed, damaged or condemned, then it shall be the obligation of the Participants to repair, restore or reconstruct the damaged, destroyed or condemned facilities in such a manner as to restore such facilities to substantially the same general character or use as the original. Each Participant shall be obligated to pay its proportionate share of the costs of such repair, restoration or reconstruction. The requirements set forth above shall similarly apply to all or any portion of the Common Facilities or the Related Facilities necessary for the operation of Unit 4 or Unit 5, as the case may be. |
17. | RIGHTS OF PARTICIPANTS UPON TERMINATION: |
17.1. | Within
one hundred twenty (120) days after the termination of the New Lease and the §323 Grant, the facilities forming the Four Corners Project (exclusive of the Common Facilities and Related Facilities) shall be disposed of by the Participants in a manner to be mutually agreed upon, and the proceeds from such disposition shall be distributed to the Participants in accordance with their respective percentage ownership interests in such facilities, but the Common Facilities and Related Facilities shall not be so disposed of until one hundred twenty (120) days after the later to terminate or expire of the |
17.2. | In
the event the Participants by mutual agreement abandon the Four Corners Project prior to the termination of this Co-Tenancy Agreement, the Facilities forming the Four Corners Project (exclusive of the Common Facilities) shall be disposed of by the Participants in a manner to be mutually agreed upon and the proceeds from such disposition shall be distributed to such Participants in accordance with their respective percentage ownership interests in such facilities. |
18. | RIGHTS OF PARTICIPANTS IN WATER AND COAL: |
18.1. | If,
pursuant to the terms and conditions of the Original Fuel Agreement, the Additional Fuel Agreement or the Conditional Partial Assignment, the Participants succeed to some or all of the rights of Utah Mining under the Coal Lease and in the Utah Mining Leased Lands, the rights, titles and interests of the Participants therein, and the rights, titles and interests of the Participants in the water rights assigned pursuant to the terms and conditions of the Original Fuel Agreement and the Additional Fuel Agreement shall be held as tenants in common, with each Participant having the same undivided percentage ownership interests therein as provided in Section 6.5 hereof, and such rights, titles and interests shall be subject to all the terms and conditions set forth and contained in this Co-Tenancy Agreement. |
19. | ARBITRATION: |
19.1. | In
the event that any Unresolved Dispute between some or all of the Participants should arise under the Project Agreements, any of such Participants may call for resolution of such Unresolved Dispute in the manner hereinafter set forth, which call shall be binding upon all Participants. |
19.2. | An Unresolved Dispute shall mean a disagreement, dispute, controversy or claim arising under or relating to the Project Agreements that has been identified as the same by a Participant in a written Notice submitted to all other involved Participants. |
19.3. | The
Participants, through the Coordination Committee, agree to use diligent efforts to attempt to resolve all Unresolved Disputes, equitably and in good faith, and further agree to provide each other, in a timely manner, with reasonable non-privileged records, information and data pertaining to any such Unresolved Dispute. |
19.4. | If the Unresolved Dispute has not been resolved within 90 days after notice of the Unresolved Dispute has been given pursuant to Section 19.2, and a Participant has determined in its sole discretion that it has exhausted opportunities to settle any such Unresolved Dispute in accordance with Section 19.3 and has determined that it desires to commence arbitration, it may initiate arbitration in accordance with Section 19.5 (“Arbitration”)
hereof by serving upon the other involved Participants a formal demand for arbitration. |
19.5. | The arbitration procedure shall follow the Commercial Arbitration Rules of the American Arbitration Association then in effect, except as modified |
19.5.1. | Within twenty (20) business days after the later of receipt of the notice or the availability of the documentation, the other Participants involved in the dispute may issue to the initiating Participants, and file with the American Arbitration Association, their own statement of the matter at issue, in adequate detail, and address additional related matters or issues to be arbitrated. If documentation is material, the notice delivered to the other Participants shall be accompanied by a copy or a description by category of the documents and tangible things that the Participant providing notice has in its possession, custody, or control and may use to support its claims or defenses, unless the use would be solely for
impeachment. Any documents that do not accompany the notice shall be made available for review within five (5) business days at a mutually convenient location. |
19.5.2. | Within ten (10) business days after the later of receipt of the statement of additional matters or issues to be arbitrated or the availability of documentation, the initiating Participant(s) may |
19.6. | The
Participants shall agree on arbitrator(s) within fifteen (15) business days after receipt of the notice initiating arbitration; otherwise they shall follow the procedures in AAA rules for selection, as modified herein. |
19.6.1. | The arbitrators must be impartial and independent, as well as experienced in issues arising in jointly owned industrial projects. |
19.6.2. | All decisions of the arbitrators regarding discovery are to be consistent with the principles of proportionality, set forth in Rule 26(b)(2)(C) of the Federal Rules of
Civil Procedure, as it is then in effect. |
19.7. | The time allowed for discovery shall be set by the arbitrators, consistent with the expedited nature of arbitration and the principles of proportionality set forth in the Federal Rules of Civil Procedure; provided that in no event shall the time for discovery (other than of experts) be more than forty-five (45) days. |
19.7.1. | Documents to be produced shall include electronically stored information (1) with the consent of the Participants, subject to such limitations as they shall agree,
or (2) otherwise, only if permitted by the arbitrators, for good cause shown. |
(a) | Electronically stored information shall be produced in native format, unless the Participants agree otherwise or the arbitrators decide otherwise, for good cause shown. |
19.7.1. | Requests for documents in addition to the initial disclosures may be permitted by the arbitrators, for good cause
shown. |
19.7.2. | Depositions are discouraged, but up to three (3) depositions of up to one day each per side may be permitted by the arbitrators, for good cause shown. |
(a) | If depositions are permitted, witnesses who are employees or consultants of Participants shall be made to appear voluntarily, by the respective Participants. |
19.7.3. | Disclosures
shall be made consistent with FRCP 26(a)(2)(B), for any witness who will be providing evidence as an expert. |
19.7.4. | Depositions of expert witnesses of up to two days each may be permitted by the arbitrators, for good cause shown. |
19.7.5. | If depositions of experts are allowed, the arbitrators shall apply the principles of FRCP 26(b)(4)(E). |
19.8. | Not
less than five (5) days before the beginning of the hearing, the arbitrators will set the number of days of testimony to be permitted for the hearing. |
19.8.1. | The arbitrators will seek to set sufficient hearing time to allow for the presentation of each Participant’s reasonably material and pertinent evidence, consistent with the expedited nature of arbitration and the principle of proportionality to the complexity of the matters |
(a) | In setting the length of the hearing, the arbitrators may consider, but need not follow, the recommendations of the Participants, as to the number of days required. |
(b) | The time set for the hearing will not be expanded during the hearing except for circumstances that could not reasonably have been anticipated by the Participants and the Panel. |
19.8.2. | The
time for the hearing will be divided substantially evenly among the respective sides. In determining the allocation, time for cross-examination by a Participant will be included with time for direct examination by that Participant. |
19.8.3. | A decision of the Panel shall be determined by a majority of the Panel. |
19.8.4. | Unless the Participants agree otherwise, the award will be accompanied by a statement describing the factors considered by the panel and how the panel reached its decision. |
19.8.5. | Unless
the Participants agree otherwise, the award shall have a precedential effect on future disputes and the conduct of the Participants. |
19.8.6. | Awards of fees and expenses may be made only to a substantially prevailing party, as may be determined by the arbitrators on an issue-by-issue basis. |
20. | DEFAULTS AND COVENANTS REGARDING OTHER AGREEMENTS: |
20.1. | Each
Participant hereby agrees with all of the other Participants that it shall pay all monies and carry out all other performances, duties and obligations agreed to be paid and/or performed by it pursuant to all of the terms and conditions set forth and contained in the Project Agreements, and a default by any Participant in the covenants and obligations to be by it kept and performed pursuant to the terms and conditions set forth and contained in any of the Project Agreements shall be an act of default under this Co-Tenancy Agreement. |
20.2. | Upon: (a) a default in the payment by a Participant of any amount due pursuant to the monthly bill from the Operating Agent, (b) a default by a Participant of any other amount due from such Participant (subsentences
(a) and (b) hereinafter collectively referred to as a “Payment Default”), or (c) an event of default for any other reason, then: |
20.2.1. | [Reserved] |
20.2.2. | The Operating Agent shall, and any non-defaulting Participant may, give written notice of such default to each member of the Coordination Committee. |
20.2.3. | If
the default is a Payment Default, and provided that the defaulting Participant has received fifteen (15) days prior written notice of the Payment Default, pursuant to Section 20.2.2, the Operating Agent or such other entity designated by the Coordination Committee shall draw on or seek payment under the Financial Assurance Policy, |
20.2.4. | If
the Operating Agent or such other entity designated by the Coordination Committee draws on or seeks payment under the Financial Assurance Policy, the Operating Agent shall give written notice of the same to each member of the Coordination Committee. |
20.2.5. | For a Payment Default that remains uncured, the Operating Agent or such other entity designated by the Coordination Committee, shall, on the sixtieth (60th) day following the original written notice of default, as set forth in Section 20.2.2, suspend the defaulting Participant’s
voting rights and its entitlement to its Net Effective Generating Capacity from the Four Corners Project. The suspension of a defaulting Participant’s rights shall not suspend its obligations under the Project Agreements. |
20.2.6. | For a performance default that is not being disputed, the Operating Agent or such other entity designated by the Coordination Committee, may, on the sixtieth (60th) day following the original written notice of default, as set forth in Section 20.2.2, suspend the defaulting Participant’s voting rights. The suspension of a defaulting Participant’s voting rights shall not suspend its obligations under the Project Agreements. A suspension under this Section
20.2.6 shall require the approval of the Coordination Committee. |
20.2.7. | Upon a suspension for a Payment Default, as set forth in Section 20.2.5, the non-defaulting Participants, through the Coordination Committee, may either reduce the energy generation of the Four Corners Project or one or more non-defaulting Participants may elect to take additional generation from the Four Corners Project. If more than one non-defaulting Participant elects to take additional |
20.2.8. | For a period of 180 days from the notice of a Payment Default, set forth in Section 20.2.2, the defaulting Participant may reinstate its entitlement to its Net Effective Generating Capacity by paying to the respective non-defaulting Participants the total amount of money (and/or the reasonable equivalent in money for services or property provided) paid by each non-defaulting Participant, together with interest
thereon at a rate of interest 2 percent greater than the “prime rate.” The right of a defaulting Participant to reinstate its entitlement to its Net Effective Generating Capacity, shall be limited to three times during the term of the Project Agreements (provided such right may be exercised only once in any five (5) year period), unless the Coordination Committee consents to an additional number of times that a defaulting Participant may reinstate its entitlement to its Net Effective Generating Capacity. |
20.2.9. | If the defaulting Participant has not cured a Payment Default during
the 180-day cure period set forth in Section 20.2.8, such event of default shall be deemed incurable and the non-defaulting Participants shall have the right to continue to exercise their rights under Section 20.2.7 and shall have the right to permanently transfer the defaulting Participant’s Net Effective Generating Capacity to one or more of the other Participants or a third party (such party being a “Permanent Transferee” and such transfer being a “Permanent Transfer”), who shall: (a) pay the non-capital operating expenses, including fuel costs, and capital expenditures associated with such Net Effective Generating Capacity following the Permanent Transfer and (b) reimburse the other non-defaulting Participants the pro-rata share of any capital expenditures associated with the additional generation used by the Permanent Transferee (as set forth in Section 20.2.7) and funded by the other non-defaulting Participants prior to the Permanent Transfer. Such
agreement by a Permanent Transferee shall not relieve the defaulting Participant from any other liabilities under the Project Agreements for the remainder of the term of the Project Agreements. |
20.3. | [Reserved] |
20.4. | In the event that any Participant shall dispute an asserted default by it, then such Participant shall pay the disputed payment or perform the disputed |
20.5. | [Reserved] |
20.6. | No waiver by a Participant of its rights with respect to a default under this Co-Tenancy Agreement, or with respect to any other matter arising in connection
with this Co-Tenancy Agreement, shall be effective unless all |
20.7. | The rights and remedies provided in this Co-Tenancy Agreement shall be in addition to the rights and remedies of the Participants as set forth and contained in any other of the Project
Agreements. |
20.8. | Other Remedies Available to Non-Defaulting Participants. The Coordination Committee may elect to impose any one or more of the alternative remedies set forth below, in lieu of or in addition to the remedy set forth in Section 20.2: |
20.8.1. | Extend the time for the defaulting Participant to cure the default, before the defaulting Participant’s Net Effective Generating Capacity is temporarily or permanently transferred to the non-defaulting Participants. |
20.8.2. | Seek
injunctive relief against or specific performance by the defaulting Participant to compel performance by the defaulting Participant of its obligations hereunder to permit the non-defaulting Participants to exercise their remedies herewith. |
21. | TERM: |
21.1. | This Co-Tenancy Agreement shall terminate on July 7, 2041, provided, however, that all liabilities and obligations of the Participants arising under the Project Agreements, as well as the sections of the Project Agreements |
22. | RELATIONSHIP OF PARTIES: |
22.1. | The duties, obligations and liabilities of the Participants hereto are intended to be several and not joint or collective, and nothing herein contained shall ever be construed to create an association, joint venture, trust or partnership, or
impose a trust or partnership duty, obligation or liability on or with regard to any one or more of the Participants hereto. Each Participant hereto shall be individually responsible for its own obligations as herein provided. No Participant or group of Participants shall be under the control of or shall be deemed to control any other Participant or the Participants as a group. No Participant shall have a right or power to bind any other Participant(s) without its or their express written consent, except as expressly provided in this Co-Tenancy Agreement, the Construction Agreement or the Operating Agreement. |
22.2. | The Participants intend that the Project Agreements, including this Co-Tenancy Agreement, are to be part of an integrated transaction
and that the Project Agreements may not be individually or selectively disaffirmed by a bankruptcy trustee. |
23. | NOTICES: |
23.1. | Any notice, demand or request provided for in this Co-Tenancy Agreement, or served, given or made in connection with it, shall be deemed properly served, given or made if delivered in person or sent by Registered or Certified
Mail, postage prepaid, to the persons specified below: |
23.1.1. | Arizona Public Service Company |
23.1.3 | Public
Service Company of New Mexico |
23.1.4 | Salt River Project Agricultural |
23.1.5 | [Reserved] |
23.1.6 | Tucson
Electric Power Company |
23.2 | Any Participant may at any time or from time to time, by written notice to all other Participants, change the designation or address of the person so |
24. | COVENANTS RUNNING WITH THE LAND: |
24.1. | Except as otherwise provided in Section 24.4 hereof, all of the respective covenants and obligations of each of the Participants set forth and contained in the Project Agreements shall bind and shall be and become the respective obligations of: |
24.1.1. | Each
such Participant; |
24.1.2. | All mortgagees, trustees and secured parties under all present and future mortgages, indentures and deeds of trust, and security agreements which are or may become a lien upon any of the properties of such Participant; |
24.1.3. | All receivers, assignees for the benefit of creditors, bankruptcy trustees and referees of such Participant; |
24.1.4. | All
other persons, firms, partnerships or corporations claiming through or under any of the foregoing; and |
24.1.5. | Any successors or assigns of any of those mentioned in Sections 24.1.1 to 24.1.4, inclusive, and shall be obligations running with the Participants’ rights, titles and interests in the Four Corners Project, with all of the rights, titles and interests of each Participant, in, to and under the Project Agreements and with their rights, titles and interests in the Granted Lands and Leased Lands, excluding the Amended Original Plant Site except to the extent that it is subject |
24.2. | Except
as otherwise provided in Section 24.4 hereof, all of the covenants and obligations of Arizona set forth and contained in the Project Agreements pertaining to the Common Facilities and the Related Facilities allocated to the Initial Four Corners Plant, subject to the terms and conditions set forth and contained in Arizona’s existing *Indenture of Mortgage, shall bind and shall be and become the obligations of: |
24.2.1. | Arizona; |
24.2.2. | All mortgagees, trustees
and secured parties under all present and future mortgages, indentures, deeds of trust and security |
24.2.3. | All receivers, assignees for the benefit of creditors, bankruptcy trustees and referees of Arizona; |
24.2.4. | All other persons, firms, partnerships
or corporations claiming through or under any of the foregoing; and |
24.2.5. | Any successors or assigns of any of those mentioned in Sections 24.2.1 to 24.2.4, inclusive, and shall, subject to said Indenture of Mortgage, be obligations running with the rights, titles and interests of Arizona, in, to and under the Project Agreements, in and to the Common Facilities and the Related Facilities allocated to the Initial Four Corners Plant, and in and to the Granted Lands and Leased Lands, excluding the Amended Original Plant Site except to the extent it is subject to the rights granted in the §323 Grant or leased in the New Lease for the Common Facilities and Related Facilities that may be located thereon. Except as herein otherwise provided, it is the
specific intention of this provision that, subject to said Indenture of Mortgage, all of the covenants and obligations of Arizona set forth and contained in the Project Agreements pertaining to the Common Facilities and the Related Facilities allocated to the Initial Four Corners Plant shall be binding upon any party that acquires any of the rights, titles or interests of Arizona in and to the Common Facilities and the Related Facilities allocated |
24.3. | The rights, titles and interests of each Participant in the Four Corners Project, its rights, titles and interests in, to and under the Project Agreements and its rights, titles and interests in and to the Granted Lands and Leased Lands, shall inure to the benefit of its successors and assigns, including any successors and assigns of Arizona’s rights, titles and interests in the Initial Four Corners Plant. |
24.4. | Any mortgagee, trustee or secured party, or any receiver or trustee appointed pursuant to the provisions of any present
or future mortgage, deed of trust, indenture or security agreement creating a lien upon or encumbering the rights, titles or interests of any Participant in the Four Corners Project, in, to and under the Project Agreements and/or in the Granted Lands or Leased Lands, and any successor thereof by action of law or otherwise, and any purchaser, transferee or assignee of any thereof, shall not be obligated to pay any monies accruing on account of any of the obligations or duties of such Participant under the Project Agreements incurred prior to the taking of possession or the initiation of foreclosure or other remedial proceedings by such mortgagee, trustee or secured party. |
24.5. | In
the event that any or all of the provisions of this Section 24 shall not be legally effective as to any Participant, or its mortgagees, trustees, secured parties, receivers, successors or assigns, then such Participant shall not be deemed in violation of this Section 24 by reason thereof. |
25. | MISCELLANEOUS PROVISIONS: |
25.1. | Each Participant agrees, upon request by the other Participant, to make, execute and deliver any and all documents reasonably required to implement the terms of this Co-Tenancy Agreement. |
25.2. | No
Participant shall be considered to be in default in the performance of any of the obligations hereunder (other than obligations of any of said Participants to pay costs and expenses) if failure of performance shall be due to uncontrollable forces. The term “uncontrollable forces” shall mean any cause beyond the control of the Participant affected, including but not limited to failure of facilities, flood, earthquake, storm, fire, lightning, epidemic, war, riot, civil disturbance, labor dispute, sabotage and restraint by Court order or public authority, which by exercise of due diligence and foresight such Participant could not reasonably have been expected to avoid and which by exercise of due diligence it shall be unable to overcome. Nothing contained herein shall be construed so as to require a Participant to settle any strike or labor dispute in which it may be involved. Any party rendered unable to fulfill any obligation by reason of uncontrollable forces
shall exercise due diligence to remove such inability with all reasonable dispatch. |
25.3. | Any federal or state regulatory or legal prohibition that prevents performance by a Participant of its obligations hereunder shall constitute an “uncontrollable force” provided that such Participant shall have provided to the other Participants an opinion of independent counsel confirming the effect of the regulatory or legal prohibition. Such federal or state regulatory or legal prohibition shall not excuse the affected Participant from its payment obligations, including operating expenses, capital
expenditures, decommissioning costs, or liabilities to the other Participants. If, after reasonably commercial efforts, the affected Participant is unable to mitigate the federal or state regulatory or legal prohibition to allow it to substantially perform its obligations under the Project Agreements, the affected Participant may meet its financial obligations through one or more of the following alternatives: |
(a) | Transfer or sale of the affected Participant’s Net Effective Generating Capacity to an unregulated affiliate of the affected Participant or to a third party; or |
(b) | Allow
one or more of the other Participants to utilize the affected Participant’s Net Effective Generating Capacity until such federal or state regulatory or legal prohibition is removed; provided that the Participant(s) utilizing the affected Participant’s Net Effective Generating Capacity agree(s) to pay all associated non-capital operating costs. |
25.4. | The captions and headings appearing in this Co-Tenancy Agreement are inserted merely to facilitate reference and shall have no bearing upon the interpretation of the provisions hereof. |
25.5. | This
Co-Tenancy Agreement is made under and shall be governed by the laws of the State of New Mexico. |
25.6. | This Co-Tenancy Agreement may be executed in any number of counterparts, and each executed counterpart shall have the same force and effect as an original instrument as if all the Participants to the aggregated counterparts had signed the same instrument. Any signature page of this Co-Tenancy Agreement may be detached from any counterpart thereof without impairing the legal effect of any signatures thereon and may be attached to any other counterpart of this Co-Tenancy Agreement identical in form thereto but having attached to it one or more additional pages. |
25.7. | The
covenants and obligations set forth and contained in this Co-Tenancy Agreement are to be deemed to be independent covenants not dependent covenants, and the obligation of any Participant to perform all of the obligations and covenants to be by it kept and performed is not conditioned on the performance by the other Participants of all of the covenants and obligations to be kept and performed by them. |
25.8. | In the event that any of the terms or conditions of this Co-Tenancy Agreement, or the application of any such term or condition to any person or circumstance, shall be held invalid by any Court having jurisdiction in the premises, the remainder of this Co-Tenancy Agreement, and the application of such terms |
26. | WAIVER OF SOVEREIGN IMMUNITY. |
26.1. | For purposes of this Section 26, the term “Project Agreements” means: (a) the Project Agreements, as defined in Section 5.28, (b) all agreements listed on Schedule 2.1(h) of the Purchase and Sale Agreement, by and between 4CA and NTEC, the form of which will be filed by 4CA in FERC Docket o. EC15-159 in May 2018, and (c) any future Amendments to the Project Agreements or other agreements
executed by NTEC or approved by a vote of the Coordination Committee (in accordance with Section 9.5) that binds NTEC to obligations or entitles NTEC to rights related to the Four Corners Project. |
26.2. | If, in the judgment of the Operating Agent, an express waiver of sovereign immunity is required in any future Project Agreement executed by NTEC that binds NTEC to obligations or entitles NTEC to rights related to the Four Corners Project, NTEC agrees that it shall clearly, expressly, unequivocally, and irrevocably waive its sovereign immunity in such Project Agreement to the same extent it has done so in this Section 26. |
26.3. | NTEC
agrees to waive and hereby waives its sovereign immunity and consents to arbitration and litigation proceedings as described in the Project Agreements, to the extent necessary to make the Project Agreements enforceable as to the Participants. All future references in this Section 26 to |
26.4. | NTEC clearly, expressly, unequivocally, and irrevocably, waives its sovereign immunity and
consents to arbitration and litigation proceedings as described in the Project Agreements for purposes of the Project Agreements, and in accordance with and as limited by, the terms of the Project Agreements, to the extent necessary to make the Project Agreements enforceable as to the Participants. |
26.5. | NTEC agrees that, to the extent it possesses sovereign immunity from suit by any third parties, the provisions of this Section 26 apply to NTEC’s liability to the Participants for: (a) Operating Work Liability, as that term is defined in Section 5.53 of the Operating Agreement, and (b) any other liability that NTEC, as a Participant, has or may have to the Participants under the Project Agreements, including without limitation any liability of NTEC
under the Project Agreements arising from third party claims or suits; provided, nothing herein shall be construed as a waiver of NTEC’s sovereign immunity to any third party or to limit NTEC’s ability to intervene, or limitedly intervene, in any third-party proceeding, including for purposes of moving to dismiss such proceeding on the basis of NTEC’s sovereign immunity from suit by such third parties. |
26.6. | NTEC limitedly waives its sovereign immunity from suit in accordance with and for the limited purposes described in this Section 26, for arbitration and any litigation proceedings necessary to compel arbitration, or to enforce an |
26.6.1. | To the extent arbitration must be compelled, challenged,
or sought to be enforced by a Participant, NTEC consents to such judicial proceedings in a New Mexico state court of competent jurisdiction, as necessary to compel a Participant’s participation in arbitration, a Participant’s challenge of award, or a Participant’s enforcement of an award. |
26.6.2. | A Participant may seek and obtain specific performance, money damages, and injunctive relief. |
26.6.3. | NTEC waives any benefits, rights, immunities, privileges, or limitations in applicable Navajo Nation Law that
would otherwise foreclose specific performance, injunctive relief, or money damages. |
26.6.4. | NTEC waives any otherwise existing right or claim of right to require exhaustion of tribal administrative or judicial remedies prior to exercise of the dispute resolution provisions of the Project Agreements, including with respect to arbitration and any ancillary litigation proceedings, to compel arbitration or enforce any arbitration award in a New Mexico state court of competent jurisdiction. NTEC’s consent to the jurisdiction of a New Mexico state court of competent jurisdiction as provided in
this Agreement is irrevocable. NTEC waives any rights to have any dispute heard in a Navajo Nation tribunal, in any Navajo Nation administrative or judicial body whatsoever. |
26.6.5. | NTEC agrees and expressly, unequivocally, and irrevocably waives its sovereign immunity, but only to the Participants and its successors and assigns, and exclusively for the purposes the Project Agreement, to have binding arbitration conducted pursuant to and in accordance with the provisions of the Project Agreements or, if no dispute resolution provision exists in the applicable Project Agreement, this Co-Tenancy Agreement. |
26.6.6. |
To the extent arbitration must be compelled, a Participant challenges an arbitration award, or a Participant seeks to enforce an arbitration award, NTEC clearly, expressly, unequivocally, and irrevocably consents to such judicial proceedings in a New Mexico state court of competent jurisdiction. |
26.6.7. | NTEC agrees and expressly, unequivocally, and irrevocably waives its sovereign immunity and any right otherwise existing, but only to the Participants, to have a dispute between the Participants heard in any Navajo Nation adjudicatory tribunal, forum, or other bodies that may otherwise have
exclusive or concurrent jurisdiction over any such dispute, whether or not the same now exist or are hereinafter created. |
26.6.8. | NTEC agrees and expressly, unequivocally, and irrevocably waives its sovereign immunity, but only to the Participants, for recourse and enforcement against any and all of the assets of NTEC only. NTEC’s agreement and express, unequivocal, and irrevocable waiver of its sovereign immunity shall not be asserted, interpreted, or applied to any other assets except NTEC’s assets, [including any other assets owned directly by NTEC], the Navajo Nation or by any of the Navajo Nation’s arms, entities or instrumentalities, or to permit or authorize the sale or transfer of any property held by NTEC or the Navajo Nation apart from
NTEC’s property, or any other property held by any other Navajo Nation arm, instrumentality or entity other than NTEC, whether such property is held in trust by the United States, or otherwise, and nothing herein shall be construed to create a lien of any kind in the property of NTEC, the Navajo Nation, or any other, arm, entity or instrumentality of the Navajo Nation. |
26.6.9. | NTEC clearly, expressly, unequivocally, and irrevocably waives its sovereign immunity for a Participant’s disputes with NTEC, a Participant’s claims against NTEC, or a Participant’s causes of action against NTEC,
but only for a Participant to enforce its rights and the obligations of NTEC created and existing pursuant to the Project Agreements. NTEC clearly, expressly, unequivocally, and irrevocably waives its sovereign immunity for the Participants to seek to obtain, and where deemed appropriate by an arbitrator, an arbitration panel, or a judge of a New Mexico state court of competent jurisdiction, for a Participant to obtain one or more of the following: (A) to interpret a Project Agreement; (B) to make NTEC perform a specific action NTEC is obligated to perform pursuant to a Project Agreement or to make NTEC discontinue some specific action that NTEC is precluded from performing pursuant to the Project Agreements; or (C) to require NTEC to comply with the duties and obligations clearly and expressly agreed to by NTEC within the Project Agreements. |
26.6.10. | NTEC
clearly, expressly, unequivocally, and irrevocably waives its sovereign immunity solely with respect to actions by a Participant in accordance with the terms of the Project Agreements, and NTEC’s limited waiver shall survive the termination or expiration of the Project Agreements and remain effective until any applicable statute of limitations runs. |
26.6.11. | NTEC clearly, expressly, unequivocally, and irrevocably agrees that, to the extent NTEC changes its company, corporate, or organizational form, any resulting company, corporation, or organization will, by Navajo Nation Council resolution
if necessary, provide all of the same limited waivers of sovereign immunity to the Participants as those set forth in this Section 26. |
26.6.12. | NTEC agrees that to the extent any later changes in Navajo Nation Law cause NTEC to be unable to comply with any provision(s) of a Project Agreement, NTEC shall nonetheless remain subject to all of its obligations under the applicable Project Agreement or Agreements notwithstanding any such changes in Navajo Nation Law, and NTEC’s failure to comply with any provision(s) of a Project Agreement on the basis of any such change in Navajo Nation Law shall not be excused and shall constitute a breach of the applicable Project Agreement(s) and be actionable under the dispute resolution terms
of the applicable Project Agreement(s). |
26.6.13. | NTEC agrees that the Navajo Nation’s independent covenant not to regulate any aspects of the Four Corners Project remains unchanged and unaffected by the Project Agreements; |
26.7. | NTEC’s agreement and express, unequivocal, and irrevocable waiver of its sovereign immunity in the Project Agreements shall not apply, redound, or inure to, without limitation, any third-party (or non-Party) person
or entity, shall apply only to the Participants and their successors and assigns, and |
26.8. | The Participants agree that nothing in the Project Agreements shall be asserted, interpreted, or otherwise understood to constitute any waiver of the Navajo Nation’s sovereign immunity, nor any waiver
of any of the Navajo Nation’s rights, powers, or authorities as a sovereign governmental institution, whether express or implied. |
26.8.1. | The Participants agree that although NTEC is a wholly-owned instrumentality of the Navajo Nation that otherwise possesses sovereign immunity, by virtue of its relationship to and with the Navajo Nation, NTEC is a company with its own particular assets, liabilities, rights, and obligations. |
26.8.2. | NTEC’s limited waiver of sovereign immunity with respect to the Project Agreements extends only
to the Participants, and only as described in this Section 26, and shall not be asserted, interpreted, implied or applied to permit or authorize the sale or transfer of any property held by the Navajo Nation apart from NTEC’s property, whether such Navajo Nation property is held in trust for the Navajo Nation by the United States, or otherwise. |
26.8.3. | NTEC’s limited waiver of sovereign immunity shall not be asserted, interpreted, implied or applied to permit or authorize the sale or |
26.8.4. | NTEC agrees that the Navajo Nation’s independent covenant not to regulate any aspects of the Four Corners Project pursuant to the Original Lease and the New Lease Amendments remains unchanged and unaffected by the Project Agreements; . Except for the Original Lease and the New Lease, the Navajo Nation is not a party to the Project Agreements. |
27. | AUTHORITY TO BIND AND OBLIGATE. |
27.1. | Each
Participant represents and warrants that the person or persons executing the Project Agreements or who will in the future execute any Project Agreement on behalf of such Participant, are or will be, as the case may be, duly authorized by any and all necessary actions on the part of such Participant and, as necessary, such Participant’s owner, as applicable, including the Navajo Nation as to NTEC, to execute the applicable Project Agreement, and that the person or persons are vested with all authorities necessary to bind and obligate such Participant to the terms of the applicable Project Agreement. |
311.100 | Clearing Site of Brush and Rough Grading |
311.13 | Yard Lighting Standards, Conduit, Cable Foundations and Lamps |
312.1863 | Coal Mobile Equipment, includes Hough D500 Paydozer |
315.1113 | Circulating and Service Water Intake Motor Control Center |
1. | As actual design of Units 4 and 5 proceeds, there may be additions or deletions to the above list of Common Facilities. The list is subject to final adjustment, by mutual
consent as a result of such additions or deletions. |
I. | 345
KV Switchyard |
II. | 500 KV Switchyard |
III. | 345‑500 KV Transformer |
IV. | Reserve Auxiliary Power Source |
VII. | All metering protective
equipment, communication equipment, control, relay house, etc., associated with the facilities described in Paragraphs I, II, III, IV, V and VI above. |
1. | Coal Handling System |
19. | Switchyard Shop |
A. | This list of 74 items, which shall be acquired by the six Participants pursuant to Section 6.2 of the Co-Tenancy Agreement: |
2. | Heating,
ventilating and air conditioning systems (to be installed by supplier). |
6. | Condensers, including condensate pumps, motor drives and air removal equipment. |
11. | Flue gas duct precipitators, breeching and supports (to be installed by supplier). |
13. | Evaporators,
including evaporator condensers, preheaters and blowdown heat exchangers. |
17. | Forced draft fans, including motor drives, couplings, vane and damper control. |
18. | Ash
disposal system, including pumps, drives, tanks, special piping and valves, and all related equipment from point of collection to storage bins for outloading into trucks. |
19. | Coal handling facilities, including conveyors, supports, walkways, enclosures, motor drive equipment, scales, magnetic separators, feeders, metal hoppers, stackers, trippers, coal bunkers and supports, bunker house, dust collection equipment and all related equipment from point of coal delivery to entrance of pulverizer feeders. |
36. | Evaporator
feed pumps, including drives. |
50. | Auxiliary
power transformers, 22/4 KV. |
53. | Switchgear, 440 volts. |
57. | Area load frequency control equipment. |
58. | Oscillograph. |
61. | Intercommunication
equipment. |
74. | Valves, control and controllers, regulating, temperature, steam and feedwater sampling. |
B. | Related
Facilities included in items 19, 34, 39, 40, 41, 42, 43 and 44 of Section A above. |
G. | The portion of the Switchyard Facilities described in Exhibit 2 of the Co-Tenancy Agreement as the 345‑500
KV transformer. |
J. | The Connection to 345 KV Switchyard Facilities. |
1. | The
definition of Common Facilities in Section 5.8 of the CO‑Tenancy Agreement shall apply to this Attachment A. |
2. | Arizona, for value received, hereby grants, bargains, sells and conveys to El Paso, New Mexico, Salt River Project, Edison and Tucson, hereinafter referred to as “Second Parties”, their successors and assigns, the following undivided interests in the Common Facilities, to wit: |
3. | Arizona binds itself and its successors and assigns to warrant and defend the rights, titles, interests and estates herein granted, bargained, sold and conveyed to Second Parties against the lawful claims and demands of all persons claiming or to claim said rights, titles, Interests and estates, or any part thereof by, through or under Arizona, and no other. |
4. | This Bill of Sale is made
upon the express condition that the rights, titles, interests and estates herein granted, bargained, sold and conveyed to Second Parties shall be held by Second Parties in accordance with the Co-Tenancy Agreement. |
5. | Arizona agrees that the 38.44% interest in the Common Facilities retained by Arizona shall be held by Arizona as a tenant in common with Second Parties, and shall be subject to the Co‑Tenancy Agreement. |
6. | Arizona shall not be deemed to be in violation of Section 7 of the Exchange Agreement in the event that
the provisions of said Section 7shall not be legally effective as to Arizona, its mortgagees, trustees, secured parties, receivers, successors or assigns. |
1. | The definitions of Existing New Facilities and
Existing Related Facilities in Sections 5.14(a) and 5.14(b) of the Co‑Tenancy Agreement shall apply to this Attachment B. |
2. | El Paso, New Mexico, Salt River Project, Edison and Tucson (hereinafter collectively referred to in this Attachment B as “First Parties” and singularly as “First Party”), for value received, hereby respectively grant, bargain, sell and convey to Arizona, its successors and assigns, undivided 1.24%, 2.29%, 1.76%, 8.47% and 1.24% interests in the Ddsting New Facilities [being in total, an undivided 15% in the Existing New Facilities (except for the Existing Related Facilities)], and undivided 3.17%, 5.87%0 4.52%, 21.71% and 3.17% interests in the Eidsting Related Facilities (being in total an undivided 38.44%
Miterest in the Existing Related Facilities (27.58% of which is allocated to the Initial Four Corners Plant and 10.86% of which is allocated to Arizona’s interest in the Four Corners Project)], to have and to hold as a tenant in common with First Parties. |
3. | First Parties, respectively, bind themselves and their successors and assigns to warrant and defend the rights, titles, interests and estates herein respectively granted, bargained, sold and conveyed to Arizona against the lawful claims and demands of all persons claiming or to claim said rights, titles, interests and estates, or any part thereof, by, through or under First Parties, respectively, and no other. |
4. | This
Bill of Sale is made upon the express condition that the rights, titles interests and estates herein granted, bargained, sold and conveyed to Arizona shall be held by Arizona in accordance with the Co‑Tenancy Agreement. |
5. | First Parties hereby agree that the following undivided interests in the Existing New Facilities (excepting the Existing Related Facilities), to wit: El Paso as to 7%, New Mexico as to 13%, Salt River Project as to 10%, Edison as to 48%, and Tucson as to 7%, and the following undivided interests in the Eidsting Related Facilities, to wit: El Paso as to 5.07%, New Mexico as to 9.42%, Salt River Project as to 7.24%, Edison as to 34.76%, and Tucson as to 5.07%, retained by First Parties, respectively, shall be held by First Parties
as tenants in common with Arizona, and shall be subject to the Co‑Tenancy Agreement. |
6. | No First Party shall be deemed to be in violation of Section 7 of the Exchange Agreement in the event that. the provisions of said Section 7 shall not be legally effective as to it, its mortgagee$, trustees, secured parties, receivers, successors or assigns. |
1. | Arizona, for remuneration received pursuant to Section 3 hereof hereby grants, bargains, sells and conveys to El Paso, New Mexico, Salt River Project, Edison and Tucson, (hereinafter collectively referred to as “Purchasing Participants”), their successors and assigns, the following undivided interests in the brine concentrator and capital improvements thereto, to wit: |
2. | The purchase price of the brine concentrator and capital improvements thereto has been computed by straight line depreciation of the replacement cost of such facilities to be $4,479,922. Such determination was computed using the Handy Whitman Index for boiler plant in the Plateau Region from the date of installation (July 1, 1979) till June 1, 1983. |
3. | The
Purchasing Participants have, prior to July 1, 1983, individually paid to Arizona the $4,479,922 purchase price of the brine concentrator and capital improvements thereto, in the following amounts: |
4. | The brine concentrator and the capital improvements thereto shall become a part of the SOD2U Removal Project for Units 4 and 5 at the Enlarged Four Corners Generating
Station. |
5. | Arizona binds itself and its successors and assigns to warrant and defend the rights, titles, interests and estates herein granted, bargained, sold and conveyed to the Purchasing Participants against the lawful claims and demands of all persons claiming or attempting to claim said rights, titles, interests and estates, or any part thereof by, through or under Arizona, and no other. |
6. | This Bill of Sale is made upon the express condition that the rights, titles interests and estates herein granted, bargained, sold and
conveyed to the Purchasing Participants shall be held by such Purchasing Participants in accordance with the Co‑Tenancy Agreement. |
7. | Arizona agrees that the 38.44% interest in the brine concentrator and the capital improvements thereto retained by Arizona shall be held by Arizona as a tenant in common with the Purchasing Participants, and shall be subject to the Co‑Tenancy Agreement. |
8. | The terms and conditions agreed to herein pertain only to the purchase of the brine concentrator and the capital improvements thereto
and shall not establish a basis or set a precedent for any further transactions involving the sale of machinery or equipment or other ownership rights regarding the Enlarged Four Corners Generating Station. |
This ‘10-Q’ Filing | Date | Other Filings | ||
---|---|---|---|---|
Filed on: | 8/3/18 | 8-K | ||
For Period end: | 6/30/18 | |||
7/16/16 | ||||
7/6/16 | ||||
5/15/15 | 424B2 | |||
2/17/15 | 4, 4/A | |||
11/8/10 | 8-K | |||