As Of Filer Filing For·On·As Docs:Size 11/02/22 Energea Portfolio 3 Africa LLC 1-U:1 11/01/22 1:90K |
Document/Exhibit Description Pages Size 1: 1-U Current Report HTML 89K
Project Owner
|
Energea Portfolio 3 LLC
|
Project Location
|
Cape Town, South Africa
|
Technology
|
Rooftop Solar
|
System Size (AC/DC)
|
100 kW/104 kWp
|
Estimated Year 1 Production
|
146 MWh
|
Coordinates
|
32.996602° S 27.912141° E
|
Roof Status
|
Verified by a third-party
engineer
|
Project Status
|
Notice to Proceed
|
Useful Equipment Life
(Years)
|
25
|
SPE
|
The Sun Exchange (SA)
Bewind Trust
|
Offtaker
|
Baysville Special School
|
EPC Contractor
|
Dorman Projects (PTY) LTD
|
O&M Contractor
|
TBD
|
Roof Owner
|
Baysville Special School
|
Asset Manager
|
The Sun Exchange (PTY) LTD.
("Sun Exchange")
|
Project
Hard Costs
|
1,469,813
ZAR
|
Project
Soft Costs
|
210,170
ZAR
|
Developer
Fee
|
283,025
ZAR
|
Total
Project Financing
|
1,963,008
ZAR
|
Debt
Funding
|
N/A
|
Equity
Funding
|
1,963,008
ZAR
|
Cell
Owner IRR
|
11.98%
($USD)
|
Revenue Contract Term
|
20 years
|
Asset Rental Rate
|
1.25 ZAR/kWh
|
Annual Adjustment
|
CPI + 2%
|
Acquisition Costs
|
N/A
|
N/A
|
|
|
|
Hard Costs
|
1,469,813 ZAR
|
14.17 ZAR/Wdc
|
|
|
|
Soft Costs
|
210,170 ZAR
|
2.03 ZAR/Wdc
|
|
|
|
Developer Fees
|
283,025 ZAR
|
2.73 ZAR/Wdc
|
|
|
|
Pre-COD OpEx
|
N/A
|
N/A
|
|
|
|
Total CapEx (All-In)
|
1,963,008 ZAR
|
18.93 ZAR/Wdc
|
Total CapEx (All-In)
|
115,471 USD
|
1.11 USD/Wdc
|
Asset Lease to Own
Agreement
|
|
Date
|
May 20th, 2022
|
Parties
|
The Sun Exchange (SA)
Bewind Trust - As Lessor
Baysville Special School -
As Lessee
|
Term
|
20 years from the
Commercial Operation Date
|
Object
|
Lessor will lease to Lessee
the asset, a photovoltaic electricity power generator, fixed to the premises
of Lessee at 2 Burnett Rd, Baysville, East London, 5241, South Africa
|
Asset Rental Rate (kWh)
|
R1.25
|
Asset Rental Annual
Escalation Rate
|
CPI+2%
|
Payment
|
Monthly, within 14 (fourteen)
days of receipt of each monthly invoice
|
Late Payment
|
Interest of 2% (two per
cent) per month
|
Currency
|
South African Rand
|
Insurance
|
Lessor shall insure the
asset from the COD for an amount equal to the full insurable value of the
asset, the premiums and any increases payable in respect of such insurance
being for the account of the Lessor.
|
Buy Out Option
|
Lessee has the option at
any time to purchase the asset (and all its component parts) from Lessor.
|
Remedy of Lessee
|
Lessee's remedy against the
Lessor for a breach of any obligation is to claim specific performance.
Lessee is precluded from cancelling the agreement pursuant to Lessor's
breach.
|
Dispute Resolution
|
Arbitration
|
EPC Company
|
Dorman Projects
|
Turnkey EPC Agreement
|
|
Date
|
August 29th,
2022
|
Parties
|
The Sun Exchange (PTY) LTD
- as Customer
Dorman Projects (PTY) LTD -
as Contractor
|
Object
|
Contractor
will design, procure, manufacture, construct, install and test a fully operational
photovoltaic power plant, with total electrical capacity of 103.68kWp.
|
Price
|
1,440,291.00
South African Rand (exclusive of VAT)
|
Warranty Period
|
2 (two) years from the date
of issuance of COD notice
|
Delay Liquidated Damages
|
Appendix 13 - Delayed
Liquidated Damages will be calculated by multiplying the Expected Asset Usage
(kWh) for the pro-rata days when the Asset was non-operational multiplied by
the energy tariff
as defined in the lease
agreement, for each day in excess of 15 (fifteen) business days after the
scheduled date for practical completion up to and including the date of
practical completion or the date the EPC is terminated in accordance with its
terms, whichever occurs first
|
Performance Liquidated
Damages
|
If the guaranteed performance
ratio is not achieved at the performance ratio test, and provided the
achieved performance ratio at such performance ratio test is above the
minimum performance ratio, the Contractor shall be liable to pay the Customer
performance liquidated damages according to Appendix 13.
|
Termination by Contractor
|
In case of delay in payment
by Customer for a period of more than 20 (twenty) business days
|
Appendices
|
Appendix 1 Definitions
Appendix 2 Solar Plant
Appendix 3 Scope of Works
Appendix 4 Pre-construction
Protocol
Appendix 5 Payment Plan
Appendix 6 Commissioning
Protocol
Appendix 7
Post-construction Protocol
Appendix 8 Notice To
Proceed
Appendix 9 Practical
Completion Document
Appendix 10 Technical
Documentation
Appendix 11 Practical
Completion Certificate
Appendix 12 Final
Completion Certificate
Appendix 13 Delay
Liquidated Damages
Appendix 14 Final Energy
Yield Report
Appendix 15 Environmental,
Operational, Health and Safety Compliance
Appendix 16 Administrative
Requirements
Appendix 17 Performance
Tests
Appendix 18 Company
Guarantee
Appendix 19 Commercial
Operation Date Notice
|
Design and Application
|
Bills
|
X
|
Helioscope
Reports
|
X
|
|
Meter Data
|
X
|
|
Site and Roof Assessment
|
X
|
|
Self-Consumption
Analysis
|
X
|
|
Interconnection Application
|
Interconnection
Application
|
X
|
Permission to
Install Letter
|
X
|
|
Offtaker
|
Offtaker Credit
Analysis
|
X
|
Lease Agreement
|
X
|
|
Incentives
|
|
|
EPC
|
Construction
Set*
|
|
Equipment Warranties
|
||
Equipment
Purchase Order
|
||
Equipment
Datasheet
|
||
EPC Contract
|
X
|
|
EPC Insurance
|
||
Asset Management
|
O&M
Agreement**
|
|
Asset
Management Agreement
|
|
|
Investment
|
Project Model
|
X
|
This ‘1-U’ Filing | Date | Other Filings | ||
---|---|---|---|---|
Filed as of: | 11/2/22 | 1-U | ||
Filed on / For Period end: | 11/1/22 | 1-U | ||
10/17/22 | ||||
List all Filings |
As Of Filer Filing For·On·As Docs:Size Issuer Filing Agent 4/03/24 Energea Portfolio 3 Africa LLC 1-A/A 4:691K 3/04/24 Energea Portfolio 3 Africa LLC 1-A/A 3/01/24 3:632K 1/04/24 Energea Portfolio 3 Africa LLC 1-A 2:691K 10/10/23 Energea Portfolio 3 Africa LLC 1-A POS 10/06/23 3:727K 10/02/23 Energea Portfolio 3 Africa LLC 1-SA 6/30/23 1:211K Energea Port 4 USA LLC 9/29/23 Energea Portfolio 3 Africa LLC 1-A/A 2:703K 9/25/23 Energea Portfolio 3 Africa LLC 1-A/A 2:700K 9/13/23 Energea Portfolio 3 Africa LLC 1-A/A 9/12/23 2:682K 7/03/23 Energea Portfolio 3 Africa LLC 1-A/A 6/30/23 2:1.2M 5/01/23 Energea Portfolio 3 Africa LLC 1-K 12/31/22 2:408K |