SEC Info  
    Home      Search      My Interests      Help      Sign In      Please Sign In

BHP Billiton Ltd, et al. – ‘6-K’ for 4/20/16

On:  Wednesday, 4/20/16, at 6:05am ET   ·   For:  4/20/16   ·   Accession #:  1193125-16-547086   ·   File #s:  1-09526, 1-31714

Previous ‘6-K’:  ‘6-K’ on / for 3/18/16   ·   Next:  ‘6-K’ on / for 5/4/16   ·   Latest:  ‘6-K’ on / for 4/18/24

Find Words in Filings emoji
 
  in    Show  and   Hints

  As Of                Filer                Filing    For·On·As Docs:Size              Issuer               Agent

 4/20/16  BHP Billiton Ltd                  6-K         4/20/16    1:812K                                   RR Donnelley/FA
          BHP Billiton PLC

Report by a Foreign Private Issuer   —   Form 6-K
Filing Table of Contents

Document/Exhibit                   Description                      Pages   Size 

 1: 6-K         Report by a Foreign Private Issuer                  HTML    516K 


This is an HTML Document rendered as filed.  [ Alternative Formats ]



  Form 6-K  

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

Form 6-K

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

April 20, 2016

 

 

 

BHP BILLITON LIMITED    BHP BILLITON PLC
(ABN 49 004 028 077)    (REG. NO. 3196209)
(Exact name of Registrant as specified in its charter)    (Exact name of Registrant as specified in its charter)

 

VICTORIA, AUSTRALIA    ENGLAND AND WALES
(Jurisdiction of incorporation or organisation)    (Jurisdiction of incorporation or organisation)

171 COLLINS STREET, MELBOURNE,

VICTORIA 3000 AUSTRALIA

  

NEATHOUSE PLACE, LONDON,

UNITED KINGDOM

(Address of principal executive offices)    (Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:  x Form 20-F    ¨ Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):  ¨

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):  ¨

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934:  ¨ Yes    x No

If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): n/a

 

 

 


NEWS RELEASE    LOGO

 

Release Time            IMMEDIATE
Date    20 April 2016
Release Number    10/16

BHP BILLITON OPERATIONAL REVIEW

FOR THE NINE MONTHS END D 31 MARCH 2016

 

  On track to deliver an average unit cost improvement of 14% across our major assets(1) as productivity gains continue to be realised.

 

  Full year production guidance maintained for Petroleum, Copper and Coal.

 

  Guidance at Western Australia Iron Ore (WAIO) reduced by 10 Mt to approximately 260 Mt (100% basis) as a result of adverse weather and the initiation of an accelerated rail network maintenance program.

 

  In Petroleum, a US$640 million exploration program is now planned for the 2 016 financial year to fund additional access and testing of our future growth opportunities.

 

  Four major projects under development are tracking to plan. The Escondida Bioleach Pad Extension project was completed as planned during the March 2016 quarter.

 

Production

   Mar 2016
YTD
     vs Mar 2015
YTD
     

Petroleum (MMboe)

     184         (4 %)    Strong Conventional performance offset by deferral of development activity in Onshore US for value.

Copper (Mt)

     1.2         (8 %)    Increased throughput at Escondida and strong operating performance across the business partially offset lower grades at Escondida.

Iron ore (Mt)

     171         (1 %)    Record WAIO volumes offset by the suspension of operations at Samarco.

Metallurgical coal (Mt)

     31         (1 %)    Record production at six Queensland Co al mines offset by the planned closure of Crinum.

Energy coal (Mt)

     27         (10 %)    Unfavourable weather conditions at NSW EC and Cerrejón and divestment of the San Juan Mine.

BHP Billiton Chief Executive Officer, Andrew Mackenzie, said: “The productivity of our Company continues to improve notwithstanding the disruption largely caused by adverse weather this quarter. Over the last 12 months, we have taken a number of steps to strengthen BHP Billiton, including asset sales and the deferral of investment for long-term value. While these measures will reduce our output this year, they have increased our focus on our highest-quality operations and will support stronger margins and returns.

“We have the potential to significantly grow the value of our Company. Our simpler organisational structure will promote greater efficiency, rapid sharing of best practice and adoption of new technology to deliver the next level of safe productivity. Debottlenecking our assets at very low cost will generate high returns and substantial value. We have a pipeline of projects in copper and oil that allow us to bring high-margin volumes to market when the time is right. And as others cut back on exploration, our investment will go further and help create new options for the future.”

 

 

   1


Summary

Operational performance

Production for the nine months and quarter ended March 2016 and guidance for the 2016 financial year are summarised in the table below.

 

     Mar      Mar      Mar YTD16     Mar Q16     Mar Q16     Previous      Current  
     2016      2016      vs     vs     vs     FY16      FY16  

Production

   YTD      Qtr      Mar YTD15     Mar Q15     Dec Q15     guidance      guidance  

Petroleum (MMboe)

     184.1         59.4         (4 %)      (3 %)      (1 %)      237         237   

Onshore US (MMboe)

     85.8         27.4         (9 %)      (16 %)      (4 %)      109         109   

Conventional (MMboe)

     98.4         32.0         0     10     1     128         128   

Copper (Mt)

     1.2         0.4         (8 %)      (12 %)      5     1.5         1.5   

Escondida (kt)

     711         260         (20 %)      (23 %)      18     940         940   

Other copper(i) (kt)

     455         145         19     19     (11 %)      —           —     

Iron ore (Mt)

     171         53         (1 %)      (10 %)      (7 %)      237         229   

WAIO (100% basis) (Mt)

     193         61         2     (5 %)      (4 %)      270         260   

Metallurgical coal (Mt)

     31         10         (1 %)      4     (4 %)      40         40   

Energy coal (Mt)

     27         8         (10 %)      (24 %)      (17 %)      37         37   

 

(i) Other copper comprises Pampa Norte, Olympic Dam and Antamina.

Major development projects

At the end of the March 2016 quarter, BHP Billiton had four major projects under development in Petroleum, Copper and Potash, with a combined budget of US$6.9 billion over the life of the projects.

Corporate update

On 2 March 2016, Samarco Mineraçăo S.A and its two shareholders, Vale S.A and BHP Billiton Brasil LTDA, entered into an agreement with the Federal Attorney General of Brazil, the States of Espírito Santo and Minas Gerais and certain other public authorities for the restoration of the environment and communities affected by the Samarco dam failure on 5 November 2015. The Agreement provides a long-term remedial and compensation framework for responding to the impact of the Samarco tragedy.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    2


Petroleum

Production

 

     Mar      Mar      Mar YTD16     Mar Q16     Mar Q16  
     2016      2016      vs     vs     vs  
     YTD      Qtr      Mar YTD15     Mar Q15     Dec Q15  

Crude oil, condensate and natural gas liquids (MMboe)

     89.7         29.2         (4 %)      (7 %)      (2 %) 

Natural gas (bcf)

     567.0         181.4         (5 %)      0     (1 %) 
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Total petroleum production (MMboe)

     184.1         59.4         (4 %)      (3 %)      (1 %) 
  

 

 

    

 

 

    

 

 

   

 

 

   

 

 

 

Total petroleum production – Total petroleum production for the nine months ended March 2016 decreased by four per cent to 184.1 MMboe. Guidance for the 2016 financial year remains unchanged at 237 MMboe as the strong performance by our Conventional business offset the reduction in Onshore US activity and the divestment of our gas business in Pakistan.

Crude oil, condensate and natural gas liquids – Crude oil, condensate and natural gas liquids production for the nine months ended March 2016 decreased by four per cent to 89.7 MMboe.

Onshore US liquids volumes declined by four per cent to 38.7 MMboe as unchanged total liquids production from the Black Hawk and Permian was offset by the suspension of drilling activity in the Hawkville. Liquids production at Onshore US for the 2016 financial year is expected to decline 12 per cent as a result of reduced development activity in the Black Hawk and Hawkville.

In our Conventional business, a four per cent reduction in liquids production reflects natural field decline across the portfolio and industrial action at Bass Strait, which more than offset volumes from new production wells at Atlantis, Mad Dog and Pyrenees.

Natural gas – Natural gas production for the nine months ended March 2016 declined by five per cent to 567 bcf.

The decline primarily reflects lower Onshore US gas volumes as a result of the decision to defer development activity for longer-term value and the successful divestment of our gas business in Pakistan. This was partially offset by higher seasonal demand at Bass Strait and Macedon.

Projects

 

Project and ownership

   Capital
expenditure
(US$m)
     Initial
production
target date
    

Capacity

  

Progress

Bass Strait Longford Gas

Conditioning Plant

(Australia)

50% (non-operator)

     520         CY16       Designed to process approximately 400 MMcf/d of high-CO2 gas.    On schedule and budget. The overall project is 89% complete.

North West Shelf

Greater Western Flank-B

(Australia)

16.67% (non-operator)

     314         CY19       To maintain LNG plant throughput from the North West Shelf operations.    On schedule and budget. The overall project is 10% complete.

Petroleum capital expenditure of approximately US$2.7 billion is planned for the 2016 financial year. This includes Conventional capital expenditure of US$1.4 billion, which remains focused on high-return infill drilling opportunities in the Gulf of Mexico and life extension projects at Bass Strait and North West Shelf, and Onshore US capital expenditure of US$1.3 billion, of which approximately US$300 million relates to a reduction in capital creditors.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    3


Onshore US development activity

Onshore US drilling and development expenditure for the nine months ended March 2016 was approximately US$1.1 billion, a 63 per cent decline relative to the nine months ended March 2015. Our operated rig count declined from seven to five in the March 2016 quarter as planned. In addition, completions activity in the Black Hawk has been temporarily halted as we continue to defer development activity to preserve value. The resulting inventory of drilled but uncompleted wells will effectively position us to quickly respond to improved market conditions.

We have continued confidence in the quality of our Onshore US acreage, and our track record in operating performance and capital productivity is among the best in the industry. While we are focused on value and cash flow preservation as we manage through this period of lower prices, we retain the option to develop our resources as prices recover to maximise the value of these quality assets.

 

March 2016 YTD        Liquids focused areas     Gas focused areas        

(March 2015 YTD)

       Eagle Ford     Permian     Haynesville     Fayetteville     Total  

Capital expenditure(i)

   US$ billion     0.7 (1.9     0.3 (0.6     0.0 (0.3     0.0 (0.2     1.1 (3.0

Rig allocation

   At period end     3 (12     2 (4     0 (1     0 (0     5 (17

Net wells drilled and completed(ii)

   Period total     88 (153     25 (32     5 (18     10 (36     128 (239

Net productive wells

   At period end     926 (796     100 (63     411 (388     1,086 (1,028     2,523 (2,275

 

(i) Includes land acquisition, site preparation, drilling, completions, well site facilities, mid-stream infrastructure and pipelines.
(ii) Can vary between periods based on changes in rig activity and the inventory of wells drilled but not yet completed at period end.

Petroleum exploration

Exploration and appraisal wells drilled during the March 2016 quarter are summarised below.

 

Well

   Location    Target    BHP
Billiton
equity
   Spud date    Water depth      Total well
depth
    

Status

Shenzi North-ST3

   Gulf of
Mexico
GC609
   Oil    72%
(operator)
   24 October
2015
     1,309 m         9,577 m       Hydrocarbons encountered; Plugged and abandoned

Our Petroleum exploration program is focused in the deepwater Gulf of Mexico, the Caribbean and the Beagle sub-basin off the coast of Western Australia where we are pursuing Tier 1 oil plays. In March 2016, BHP Billiton was the apparent high bidder on four blocks in the Central Gulf of Mexico Lease Sale 241. The award of the blocks remain subject to regulatory approval.

Petroleum exploration expenditure for the nine months ended March 2016 was US$390 million, of which US$177 million was expensed. A US$640 million exploration program is now planned for the 2016 financial year to fund additional access and testing of our future growth opportunities.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    4


Copper

Production

 

     Mar
2016
YTD
     Mar
2016
Qtr
     Mar YTD16
vs
Mar YTD15
    Mar Q16
vs
Mar Q15
    Mar Q16
vs
Dec Q15
 

Copper (kt)

     1,167         405         (8 %)      (12 %)      5

Zinc (t)

     48,964         11,913         (3 %)      (12 %)      (28 %) 

Silver (troy koz)

     9,525         3,469         39     45     21

Uranium oxide concentrate (t)

     3,508         961         38     58     (31 %) 

Copper – Total copper production for the nine months ended March 2016 decreased by eight per cent to 1.2 Mt as continued strong operating performance across the business was offset by grade decline at Escondida, as anticipated. Guidance for the 2016 financial year remains unchanged at 1.5 Mt.

Escondida copper production for the nine months ended March 2016 decreased by 20 per cent to 711 kt, despite an 18 per cent increase during the March 2016 quarter. Strong operating performance, including improvements in truck availability, utilisation and maintenance, and record material mined, was more than offset by a 28 per cent decline in grade. Production increased by 18 per cent from the December 2015 quarter as higher concentrator throughput was achieved as a result of improved water availability. The Escondida Bioleach Pad Extension project, which includes the expansion of the leach pad to four layers, was completed as planned during the March 2016 quarter.

Production guidance for Escondida remains unchanged at approximately 940 kt for the 2016 financial year as the ramp up of Organic Growth Project 1 progresses ahead of plan and is expected to reach full capacity in the June 2016 quarter. The Los Colorados concentrator was placed on care and maintenance in the March 2016 quarter. In the medium term, completion of the Escondida Water Supply project and the potential life extension of Los Colorados will enable the utilisation of three concentrators(2).

Pampa Norte copper production for the nine months ended March 2016 decreased by three per cent to 186 kt as record ore milled at Spence and Cerro Colorado, and higher grades at Spence, were offset by the impact of planned maintenance at Spence and industrial action at Cerro Colorado in the March 2016 quarter. Production at Pampa Norte for the 2016 financial year is expected to be ahead of the prior year. In the short to medium term, the Spence Recovery Optimisation project will enable the full utilisation of approximately 200 ktpa of tankhouse capacity. The Spence Growth Option remains in feasibility with the potential to extend mining operations by more than 50 years and increase copper capacity by approximately 200 ktpa.

Olympic Dam copper production for the nine months ended March 2016 increased by 46 per cent to a record 162 kt and reflects improved smelter and mill utilisation, and the Svedala mill outage in the prior period. Copper production decreased by 13 per cent from the December 2015 quarter following planned mill maintenance. Olympic Dam copper production remains on track to exceed 200 kt for the 2016 financial year with planned smelter maintenance scheduled for the June 2016 quarter.

Antamina copper production for the nine months ended March 2016 increased by 35 per cent to 108 kt as higher grades and recoveries, supported by record material mined and milled, more than offset the impact of planned maintenance in the March 2016 quarter. Antamina copper production of 136 kt is forecast for the 2016 financial year.

Project

 

Project and ownership

   Capital
expenditure
(US$m)
     Initial
production
target date
    

Capacity

  

Progress

Escondida Water

Supply

(Chile)

57.5%

     3,430         CY17       New desalination facility to ensure continued water supply to Escondida.    On schedule and budget. The overall project is 86% complete.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    5


Iron Ore

Production

 

     Mar
2016
YTD
     Mar
2016
Qtr
     Mar YTD16
vs
Mar YTD15
    Mar Q16
vs
Mar Q15
    Mar Q16
vs
Dec Q15
 

Iron ore (kt)

     171,332         53,057         (1 %)      (10 %)      (7 %) 

Iron ore – Total iron ore production for the nine months ended March 2016 was broadly unchanged at 171 Mt. Production for the 2016 financial year is now expected to be approximately 229 Mt, three per cent below prior guidance, and reflects a reduction in guidance at WAIO.

WAIO production for the nine months ended March 2016 increased by two per cent to a record 193 Mt (100 per cent basis) and reflected the Jimblebar mining hub operating at full capacity and improved ore handling plant utilisation at Newman. This was partially offset by one-off operational issues in the December 2015 quarter, along with the impact of adverse weather conditions and the initiation of an accelerated rail network maintenance program in the March 2016 quarter. WAIO production of approximately 260 Mt is now anticipated for the 2016 financial year, four per cent below prior guidance, however unit cost guidance remains unchanged at US$15 per tonne(3).

Our WAIO business remains focused on productivity in our integrated supply chain and this is further supported by the 24 month rail renewal and maintenance program that has been initiated. These improvements in our supply chain along with the ramp-up of additional capacity at the Jimblebar mining hub, will deliver an increase in system capacity to 290 Mtpa over time.

Samarco production for the nine months ended March 2016 was 11 Mt (100 per cent basis). Mining and processing operations at Samarco remain suspended following the failure of the Fundăo tailings dam and Santarém water dam on 5 November 2015. Sales from the final shipment of pellets from stockpiles will be settled in the June 2016 quarter.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    6


Coal

Production

 

     Mar
2016
YTD
     Mar
2016
Qtr
     Mar YTD16
vs
Mar YTD15
    Mar Q16
vs
Mar Q15
    Mar Q16
vs
Dec Q15
 

Metallurgical coal (kt)

     31,010         10,076         (1 %)      4     (4 %) 

Energy coal (kt)

     27,295         7,911         (10 %)      (24 %)      (17 %) 

Metallurgical coal – Metallurgical coal production for the nine months ended March 2016 remained broadly in line at 31 Mt. Guidance for the 2016 financial year remains unchanged at 40 Mt.

Queensland Coal production was flat as record production at six mines, underpinned by increased plant and equipment utilisation, offset the completion of longwall mining at Crinum which is now under care and maintenance, a convergence event at the Broadmeadow mine and unfavourable weather conditions.

First shipment from the Haju mine in Indonesia was achieved during the March 2016 quarter. BHP Billiton is conducting a strategic review of the long-term future options for its Indonesian coal interests, IndoMet Coal, which comprises seven coal contracts of work within the provinces of Central and East Kalimantan.

Energy coal – Energy coal production for the nine months ended March 2016 decreased by 10 per cent to 27 Mt. Guidance for the 2016 financial year remains unchanged at 37 Mt.

New South Wales Energy Coal production for the nine months ended March 2016 declined by 10 per cent due to the impact of heavy rainfall, blasting constraints and the progression of the mine plan through a higher strip ratio zone. Cerrejón volumes declined by seven per cent as drought conditions continued to constrain production.

Navajo Coal production for the nine months ended March 2016 was broadly unchanged, despite a 51 per cent decline during the March 2016 quarter reflecting lower customer demand. The transfer of management and operatorship for Navajo Coal to Navajo Transitional Energy Company remains on track for 31 December 2016. The sale of the San Juan Mine to Westmoreland Coal Company was completed on 31 January 2016.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    7


Other

Nickel production

 

     Mar
2016
YTD
     Mar
2016
Qtr
     Mar YTD16
vs

Mar YTD15
    Mar Q16
vs

Mar Q15
    Mar Q16
vs

Dec Q15
 

Nickel (kt)

     57.3         20.0         (19 %)      (9 %)      32

Nickel – Nickel West production for the nine months ended March 2016 decreased by 19 per cent to 57 kt and reflected planned major maintenance outages at the Kalgoorlie smelter and Kwinana refinery during the December 2015 quarter, and a reduction in third party ore delivered to the Kambalda concentrator. Higher nickel metal production during the March 2016 quarter was underpinned by throughput improvements at the Kwinana refinery.

Potash project

 

Project and ownership

   Investment
(US$m)
    

Scope

  

Progress

Jansen Potash

(Canada)

100%

     2,600       Investment to finish the excavation and lining of the production and service shafts, and to continue the installation of essential surface infrastructure and utilities.    The project is 58% complete and within the approved budget. Shaft excavation is progressing.

Minerals exploration

Minerals exploration expenditure for the nine months ended March 2016 was US$126 million, of which US$109 million was expensed. Greenfield minerals exploration is predominantly focused on advancing copper targets within Chile, Peru and the South-West United States.

 

 

Variance analysis relates to the relative performance of BHP Billiton and/or its operations during the nine months ended March 2016 compared with the nine months ended March 2015, unless otherwise noted. Production volumes, sales volumes and capital and exploration expenditure from subsidiaries are reported on a 100 per cent basis; production and sales volumes from equity accounted investments and other operations are reported on a proportionate consolidation basis.

The following footnotes apply to this Operational Review:

 

(1)  Represents the average reduction in 2016 financial year guidance for Escondida grade-adjusted, Western Australia Iron Ore and Queensland Coal unit costs relative to the 2015 financial year.
(2)  Subject to Escondida Owners Council approval.
(3)  WAIO unit cash cost excludes freight and royalties. 2016 financial year guidance is based on an exchange rate of AUD/USD 0.72.

The following abbreviations may have been used throughout this report: barrels (bbl); billion cubic feet (bcf); cost and freight (CFR); cost, insurance and freight (CIF); dry metric tonne unit (dmtu); free on board (FOB); grams per tonne (g/t); kilograms per tonne (kg/t); kilometre (km); metre (m); million barrels of oil equivalent (MMboe); million cubic feet per day (MMcf/d); million tonnes (Mt); million tonnes per annum (Mtpa); ounces (oz); pounds (lb); thousand barrels of oil equivalent (Mboe); thousand ounces (koz); thousand standard cubic feet (Mscf); thousand tonnes (kt); thousand tonnes per annum (ktpa); thousand tonnes per day (ktpd); tonnes (t); and wet metric tonnes (wmt).

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    8


Further information on BHP Billiton can be found at: bhpbilliton.com

 

Media Relations

 

Australia and Asia

 

Eleanor Colonico

Tel: +61 3 9609 2360 Mobile +61 407 064 748

Email: Eleanor.Colonico@bhpbilliton.com

 

Paul Hitchins

Tel: +61 3 9609 2592 Mobile +61 419 315 001

Email: Paul.Hitchins@bhpbilliton.com

 

Fiona Hadley

Tel: +61 3 9609 2211 Mobile +61 427 777 908

Email: Fiona.Hadley@bhpbilliton.com

 

United Kingdom and South Africa

 

Ruban Yogarajah

Tel: +44 207 802 4033 Mobile +44 7827 082 022

Email: Ruban.Yogarajah@bhpbilliton.com

 

Jennifer White

Tel: +44 207 802 7462 Mobile +44 7827 253 764

Email: Jennifer.White@bhpbilliton.com

 

North America

 

Jaryl Strong

Tel: +1 713 499 5548 Mobile: +1 281 222 6627

Email: Jaryl.Strong@bhpbilliton.com

  

Investor Relations

 

Australia and Asia

 

Tara Dines

Tel: +61 3 9609 2222 Mobile: +61 499 249 005

Email: Tara.Dines@bhpbilliton.com

 

Andrew Gunn

Tel: +61 3 9609 3575 Mobile: +61 402 087 354

Email: Andrew.Gunn@bhpbilliton.com

 

United Kingdom and South Africa

 

Jonathan Price

Tel: +44 20 7802 4131 Mobile: +44 7990 527 726

Email: Jonathan.H.Price@bhpbilliton.com

 

Rob Clifford

Tel: +44 20 7802 4131 Mobile: +44 7788 308 844

Email: Rob.Clifford@bhpbilliton.com

 

Americas

 

James Wear

Tel: +1 212 310 1421 Mobile: +1 347 882 3011

Email: James.Wear@bhpbilliton.com

 

Joseph Suarez

Tel: +1 212 310 1422 Mobile: +1 646 400 3803

Email: Joseph.Suarez@bhpbilliton.com

  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

BHP Billiton Limited ABN 49 004 028 077

Registered in Australia

Registered Office: Level 18, 171 Collins Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015

  

BHP Billiton Plc Registration number 3196209

Registered in England and Wales

Registered Office: Neathouse Place

London SW1V 1LH United Kingdom

Tel +44 20 7802 4000 Fax +44 20 7802 4111

Members of the BHP Billiton Group which is

headquartered in Australia

  

 

     LOGO

Follow us on social media

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    9


PRODUCTION SUMMARY

 

           QUARTER ENDED      YEAR TO DATE  
     BHP Billiton
interest
    MAR
2015
     JUN
2015
     SEP
2015
     DEC
2015
     MAR
2016
     MAR
2016
     MAR
2015
 

Petroleum (1)

                      

Petroleum

                      

Crude oil, condensate and NGL (Mboe)

                      

Onshore US

       15,848         15,413         13,453         12,805         12,454         38,712         40,213   

Conventional

       15,450         15,759         17,259         16,976         16,727         50,962         53,193   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       31,298         31,172         30,712         29,781         29,181         89,674         93,406   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Natural gas (bcf)

                      

Onshore US

       99.9         96.4         98.2         94.4         89.9         282.5         323.8   

Conventional

       81.6         95.4         104.6         88.4         91.5         284.5         271.0   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       181.5         191.8         202.8         182.8         181.4         567.0         594.8   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 
                      
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum production (MMboe)

       61.5         63.2         64.5         60.2         59.4         184.1         192.5   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Copper (2)

                      

Copper

                      

Payable metal in concentrate (kt)

                      

Escondida (3)

     57.5     260.9         247.0         159.6         131.7         174.9         466.2         669.1   

Antamina

     33.8     26.7         28.0         35.1         37.2         35.4         107.7         79.7   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       287.6         275.0         194.7         168.9         210.3         573.9         748.8   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Cathode (kt)

                      

Escondida (3)

     57.5     77.3         88.8         70.9         89.3         84.8         245.0         221.6   

Pampa Norte (4)

     100     66.5         57.7         56.8         69.0         59.8         185.6         191.9   

Olympic Dam

     100     28.6         13.7         54.9         57.4         49.8         162.1         110.8   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       172.4         160.2         182.6         215.7         194.4         592.7         524.3   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 
                      
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total copper

       460.0         435.2         377.3         384.6         404.7         1,166.6         1,273.1   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Lead

                      

Payable metal in concentrate (t)

                      

Antamina

     33.8     493         448         857         1,024         1,193         3,074         1,612   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       493         448         857         1,024         1,193         3,074         1,612   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Zinc

                      

Payable metal in concentrate (t)

                      

Antamina

     33.8     13,571         15,857         20,597         16,454         11,913         48,964         50,578   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       13,571         15,857         20,597         16,454         11,913         48,964         50,578   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Gold

                      

Payable metal in concentrate (troy oz)

                      

Escondida (3)

     57.5     21,265         25,554         23,805         17,889         31,408         73,102         55,955   

Olympic Dam (refined gold)

     100     26,441         9,438         29,349         39,299         29,028         97,676         95,342   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       47,706         34,992         53,154         57,188         60,436         170,778         151,297   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Silver

                      

Payable metal in concentrate (troy koz)

                      

Escondida (3)

     57.5     1,355         1,314         1,181         962         1,544         3,687         3,472   

Antamina

     33.8     872         1,115         1,766         1,636         1,751         5,153         2,711   

Olympic Dam (refined silver)

     100     172         55         246         265         174         685         669   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       2,399         2,484         3,193         2,863         3,469         9,525         6,852   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Uranium

                      

Payable metal in concentrate (t)

                      

Olympic Dam

     100     607         595         1,161         1,386         961         3,508         2,549   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       607         595         1,161         1,386         961         3,508         2,549   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Molybdenum

                      

Payable metal in concentrate (t)

                      

Antamina

     33.8     151         206         92         232         227         551         266   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       151         206         92         232         227         551         266   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    10


PRODUCTION SUMMARY

 

           QUARTER ENDED      YEAR TO DATE  
     BHP Billiton
interest
    MAR
2015
     JUN
2015
     SEP
2015
     DEC
2015
     MAR
2016
     MAR
2016
     MAR
2015
 

Iron Ore

                      

Iron Ore

                      

Production (kt) (5)

                      

Newman

     85     14,916         16,062         18,006         17,003         15,817         50,826         47,635   

Area C Joint Venture

     85     13,201         12,214         12,163         11,723         11,002         34,888         37,780   

Yandi Joint Venture

     85     16,798         17,452         16,886         15,960         16,204         49,050         51,099   

Jimblebar (6)

     85     4,513         5,462         3,262         4,852         5,472         13,586         11,297   

Wheelarra

     85     5,965         5,159         7,259         5,757         4,562         17,578         13,835   

Samarco

     50     3,586         3,737         3,739         1,665         —           5,404         10,776   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       58,979         60,086         61,315         56,960         53,057         171,332         172,422   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Coal

                      

Metallurgical coal

                      

Production (kt) (7)

                      

BMA

     50     7,602         9,023         8,087         8,207         7,894         24,188         24,839   

BHP Billiton Mitsui Coal (8)

     80     2,057         2,370         2,347         2,191         2,015         6,553         6,389   

Haju (9)

     75     —           —           15         87         167         269         —     
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       9,659         11,393         10,449         10,485         10,076         31,010         31,228   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Energy coal

                      

Production (kt)

                      

USA

     100     2,247         2,574         2,676         2,632         1,112         6,420         7,449   

Australia

     100     5,252         5,086         4,644         4,277         4,189         13,110         14,612   

Colombia

     33.3     2,975         2,944         2,527         2,628         2,610         7,765         8,347   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       10,474         10,604         9,847         9,537         7,911         27,295         30,408   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Other

                      

Nickel

                      

Saleable production (kt)

                      

Nickel West

     100     21.9         19.3         22.1         15.2         20.0         57.3         70.6   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       21.9         19.3         22.1         15.2         20.0         57.3         70.6   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

(1) LPG and ethane are reported as natural gas liquids (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe). Total boe conversions are based on 6 bcf of natural gas equals 1 MMboe.
(2) Metal production is reported on the basis of payable metal.
(3) Shown on a 100% basis. BHP Billiton interest in saleable production is 57.5%.
(4) Includes Cerro Colorado and Spence.
(5) Iron ore production is reported on a wet tonnes basis.
(6) Shown on a 100% basis. BHP Billiton interest in saleable production is 85%.
(7) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(8) Shown on a 100% basis. BHP Billiton interest in saleable production is 80%.
(9) Shown on a 100% basis. BHP Billiton interest in saleable production is 75%.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    11


PRODUCTION AND SALES REPORT

 

          QUARTER ENDED      YEAR TO DATE  
          MAR
2015
     JUN
2015
     SEP
2015
    DEC
2015
     MAR
2016
     MAR
2016
    MAR
2015
 

Petroleum (1)

                     

Bass Strait

                     

Crude oil and condensate

   (Mboe)      1,156         1,707         1,877        1,390         1,813         5,080        6,258   

NGL

   (Mboe)      961         1,548         2,091        1,307         1,455         4,853        4,634   

Natural gas

   (bcf)      18.3         31.9         38.7        23.9         30.3         92.9        70.4   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      5.2         8.6         10.4        6.7         8.3         25.4        22.6   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

North West Shelf

                     

Crude oil and condensate

   (Mboe)      1,355         1,215         1,362        1,423         1,124         3,909        4,251   

NGL

   (Mboe)      268         198         227        235         259         721        834   

Natural gas

   (bcf)      32.8         29.9         33.9        34.9         33.8         102.6        103.1   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      7.1         6.4         7.2        7.5         7.0         21.7        22.3   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Stybarrow (2)

                     

Crude oil and condensate

   (Mboe)      194         93         (8     —           —           (8     667   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      0.2         0.1         (0.0     —           —           (0.0     0.7   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Pyrenees

                     

Crude oil and condensate

   (Mboe)      1,709         1,435         2,096        2,331         2,093         6,520        5,719   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      1.7         1.4         2.1        2.3         2.1         6.5        5.7   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Other Australia (3)

                     

Crude oil and condensate

   (Mboe)      11         13         13        9         8         30        39   

Natural gas

   (bcf)      14.1         16.0         16.6        14.4         16.2         47.2        43.5   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      2.4         2.7         2.8        2.4         2.7         7.9        7.3   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Atlantis (4)

                     

Crude oil and condensate

   (Mboe)      3,645         3,110         3,637        4,257         4,056         11,950        11,560   

NGL

   (Mboe)      245         209         231        278         270         779        787   

Natural gas

   (bcf)      1.7         1.7         1.6        2.0         1.9         5.5        5.7   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      4.2         3.6         4.1        4.9         4.6         13.6        13.3   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Mad Dog (4)

                     

Crude oil and condensate

   (Mboe)      720         651         588        648         880         2,116        1,987   

NGL

   (Mboe)      37         20         23        41         41         105        100   

Natural gas

   (bcf)      0.1         0.1         0.1        0.1         0.1         0.3        0.3   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      0.8         0.7         0.6        0.7         0.9         2.3        2.1   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Shenzi (4)

                     

Crude oil and condensate

   (Mboe)      3,283         3,369         3,277        3,185         3,094         9,556        10,315   

NGL

   (Mboe)      235         174         236        269         206         711        766   

Natural gas

   (bcf)      0.7         0.7         0.7        0.8         0.6         2.1        2.3   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      3.6         3.7         3.6        3.6         3.4         10.6        11.5   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Eagle Ford (5)

                     

Crude oil and condensate

   (Mboe)      10,837         9,363         7,700        7,156         7,018         21,874        25,995   

NGL

   (Mboe)      3,868         4,183         3,799        3,806         3,649         11,254        10,927   

Natural gas

   (bcf)      27.7         26.1         25.8        25.4         25.1         76.3        82.5   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      19.3         17.9         15.8        15.2         14.9         45.8        50.7   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Permian (5)

                     

Crude oil and condensate

   (Mboe)      856         1,447         1,481        1,354         1,499         4,334        2,264   

NGL

   (Mboe)      287         420         473        488         288         1,249        1,007   

Natural gas

   (bcf)      2.1         3.0         3.9        3.4         2.4         9.7        7.9   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      1.5         2.4         2.6        2.4         2.2         7.2        4.6   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Haynesville (5) (6)

                     

Crude oil and condensate

   (Mboe)      —           —           —          1         —           1        20   

Natural gas

   (bcf)      37.8         35.4         36.4        34.7         34.4         105.5        127.1   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total petroleum products

   (MMboe)      6.3         5.9         6.1        5.8         5.7         17.6        21.2   
     

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    12


PRODUCTION AND SALES REPORT

 

         QUARTER ENDED      YEAR TO DATE  
         MAR
2015
     JUN
2015
     SEP
2015
    DEC
2015
     MAR
2016
     MAR
2016
     MAR
2015
 

Fayetteville (5)

                     

Natural gas

   (bcf)     32.3         31.9         32.1        30.9         28.0         91.0         106.3   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products

   (MMboe)     5.4         5.3         5.4        5.2         4.7         15.2         17.7   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Trinidad/Tobago

                     

Crude oil and condensate

   (Mboe)     196         562         242        185         120         547         675   

Natural gas

   (bcf)     7.2         9.1         7.6        7.4         7.4         22.4         23.8   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products

   (MMboe)     1.4         2.1         1.5        1.4         1.4         4.3         4.6   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Other Americas (4) (7)

                     

Crude oil and condensate

   (Mboe)     348         348         361        360         334         1,055         1,197   

NGL

   (Mboe)     14         11         12        16         12         40         77   

Natural gas

   (bcf)     0.2         0.1         0.2        0.2         0.2         0.6         0.6   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products

   (MMboe)     0.4         0.4         0.4        0.4         0.4         1.2         1.4   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

UK

                     

Crude oil and condensate

   (Mboe)     64         76         59        74         65         198         175   

NGL

   (Mboe)     7         83         (4     27         10         33         18   

Natural gas

   (bcf)     1.1         1.0         1.0        1.0         1.0         3.0         3.2   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products

   (MMboe)     0.3         0.3         0.2        0.3         0.2         0.7         0.7   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Algeria

                     

Crude oil and condensate

   (Mboe)     975         912         916        922         887         2,725         3,036   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products

   (MMboe)     1.0         0.9         0.9        0.9         0.9         2.7         3.0   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Pakistan (8)

                     

Crude oil and condensate

   (Mboe)     27         25         23        19         —           42         98   

Natural gas

   (bcf)     5.4         4.9         4.2        3.7         —           7.9         18.1   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products

   (MMboe)     0.9         0.8         0.7        0.6         —           1.4         3.1   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products

                     

Crude oil and condensate

                     

Onshore US

   (Mboe)     11,693         10,810         9,181        8,511         8,517         26,209         28,279   

Conventional

   (Mboe)     13,683         13,516         14,443        14,803         14,474         43,720         45,977   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total

   (Mboe)     25,376         24,326         23,624        23,314         22,991         69,929         74,256   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

NGL

                     

Onshore US

   (Mboe)     4,155         4,603         4,272        4,294         3,937         12,503         11,934   

Conventional

   (Mboe)     1,767         2,243         2,816        2,173         2,253         7,242         7,216   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total

   (Mboe)     5,922         6,846         7,088        6,467         6,190         19,745         19,150   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Natural gas

                     

Onshore US

   (bcf)     99.9         96.4         98.2        94.4         89.9         282.5         323.8   

Conventional

   (bcf)     81.6         95.4         104.6        88.4         91.5         284.5         271.0   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

Total

   (bcf)     181.5         191.8         202.8        182.8         181.4         567.0         594.8   
    

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

    

 

 

 

 

(1) Total boe conversions are based on 6 bcf of natural gas equals 1 MMboe. Negative production figures represent finalisation adjustments.
(2) Stybarrow ceased production on 26 June 2015.
(3) Other Australia includes Minerva and Macedon.
(4) Gulf of Mexico volumes are net of royalties.
(5) Onshore US volumes are net of mineral holder royalties.
(6) Haynesville includes North Louisiana Conventional.
(7) Other Americas includes Neptune, Genesis and Overriding Royalty Interest.
(8) BHP Billiton completed the sale of the Pakistan gas business on 16 February 2015.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    13


PRODUCTION AND SALES REPORT

 

         QUARTER ENDED     YEAR TO DATE  
         MAR
2015
    JUN
2015
    SEP
2015
    DEC
2015
    MAR
2016
    MAR
2016
    MAR
2015
 

Copper

                

Metals production is payable metal unless otherwise stated.

  

Escondida, Chile (1)

                

Material mined

   (kt)     91,139        96,337        110,067        109,200        105,970        325,237        288,363   

Sulphide ore milled

   (kt)     21,382        22,909        22,820        18,076        21,188        62,084        60,387   

Average copper grade

   (%)     1.49     1.32     1.00     0.99     0.99     0.99     1.38

Production ex mill

   (kt)     266.3        249.6        169.7        142.8        175.8        488.3        687.3   

Production

                

Payable copper

   (kt)     260.9        247.0        159.6        131.7        174.9        466.2        669.1   

Copper cathode (EW)

   (kt)     77.3        88.8        70.9        89.3        84.8        245.0        221.6   

Payable gold concentrate

   (troy oz)     21,265        25,554        23,805        17,889        31,408        73,102        55,955   

Payable silver concentrate

   (troy koz)     1,355        1,314        1,181        962        1,544        3,687        3,472   

Sales

                

Payable copper

   (kt)     269.6        243.0        157.6        123.8        181.7        463.1        676.1   

Copper cathode (EW)

   (kt)     64.9        101.4        63.8        101.1        80.3        245.2        208.8   

Payable gold concentrate

   (troy oz)     21,265        25,554        23,805        17,889        31,408        73,102        55,955   

Payable silver concentrate

   (troy koz)     1,355        1,314        1,181        962        1,544        3,687        3,473   

(1)    Shown on a 100% basis. BHP Billiton interest in saleable production is 57.5%.

       

Pampa Norte, Chile

                

Cerro Colorado

                

Material mined

   (kt)     15,030        14,211        13,870        14,930        12,415        41,215        46,671   

Ore milled

   (kt)     4,501        4,798        4,703        4,856        4,012        13,571        13,136   

Average copper grade

   (%)     0.68     0.70     0.64     0.82     0.84     0.76     0.72

Production

                

Copper cathode (EW)

   (kt)     21.5        20.4        13.7        18.8        20.0        52.5        57.8   

Sales

                

Copper cathode (EW)

   (kt)     22.0        20.8        13.0        19.7        18.6        51.3        63.0   

Spence

                

Material mined

   (kt)     21,429        21,062        22,922        21,593        22,549        67,064        69,089   

Ore milled

   (kt)     3,783        4,082        4,919        5,146        4,355        14,420        12,752   

Average copper grade

   (%)     1.06     1.24     1.41     1.30     1.39     1.36     1.20

Production

                

Copper cathode (EW)

   (kt)     45.0        37.3        43.1        50.2        39.8        133.1        134.1   

Sales

                

Copper cathode (EW)

   (kt)     45.0        40.6        38.2        56.1        38.4        132.7        133.7   

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    14


PRODUCTION AND SALES REPORT

 

         QUARTER ENDED     YEAR TO DATE  
         MAR
2015
    JUN
2015
    SEP
2015
    DEC
2015
    MAR
2016
    MAR
2016
    MAR
2015
 

Copper (continued)

                

Metals production is payable metal unless otherwise stated.

  

Antamina, Peru

                

Material mined (100%)

   (kt)     49,787        56,944        56,793        52,130        55,183        164,106        148,255   

Sulphide ore milled (100%)

   (kt)     12,880        14,831        14,300        14,184        12,414        40,898        38,844   

Average head grades

                

- Copper

   (%)     0.79     0.74     0.88     0.92     1.02     0.94     0.78

- Zinc

   (%)     0.69     0.56     0.79     0.55     0.54     0.63     0.73

Production

                

Payable copper

   (kt)     26.7        28.0        35.1        37.2        35.4        107.7        79.7   

Payable zinc

   (t)     13,571        15,857        20,597        16,454        11,913        48,964        50,578   

Payable silver

   (troy koz)     872        1,115        1,766        1,636        1,751        5,153        2,711   

Payable lead

   (t)     493        448        857        1,024        1,193        3,074        1,612   

Payable molybdenum

   (t)     151        206        92        232        227        551        266   

Sales

                

Payable copper

   (kt)     26.5        26.3        30.8        42.9        29.3        103.0        82.6   

Payable zinc

   (t)     15,545        13,645        18,747        20,423        12,097        51,267        49,916   

Payable silver

   (troy koz)     915        911        1,522        2,048        1,331        4,901        2,837   

Payable lead

   (t)     461        624        266        1,056        1,073        2,395        1,492   

Payable molybdenum

   (t)     163        157        156        138        178        472        303   

Olympic Dam, Australia

                

Material mined (1)

   (kt)     2,186        1,773        2,357        2,372        2,210        6,939        7,545   

Ore milled

   (kt)     1,477        1,469        2,727        2,767        2,174        7,668        6,459   

Average copper grade

   (%)     1.88     1.97     1.64     2.22     2.01     1.95     1.83

Average uranium grade

   (kg/t)     0.56        0.62        0.60        0.62        0.61        0.61        0.56   

Production

                

Copper cathode (ER and EW)

   (kt)     28.6        13.7        54.9        57.4        49.8        162.1        110.8   

Uranium oxide concentrate

   (t)     607        595        1,161        1,386        961        3,508        2,549   

Refined gold

   (troy oz)     26,441        9,438        29,349        39,299        29,028        97,676        95,342   

Refined silver

   (troy koz)     172        55        246        265        174        685        669   

Sales

                

Copper cathode (ER and EW)

   (kt)     30.7        14.5        52.5        57.3        49.4        159.2        112.8   

Uranium oxide concentrate

   (t)     877        818        677        1,013        1,261        2,951        2,850   

Refined gold

   (troy oz)     31,938        9,064        25,598        39,168        32,052        96,818        97,583   

Refined silver

   (troy koz)     206        61        213        265        198        676        671   

(1)    Material mined refers to run of mine ore mined and hoisted.

       

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    15


PRODUCTION AND SALES REPORT

 

         QUARTER ENDED      YEAR TO DATE  
         MAR
2015
     JUN
2015
     SEP
2015
     DEC
2015
     MAR
2016
     MAR
2016
     MAR
2015
 

Iron Ore

                      

Iron ore production and sales are reported on a wet tonnes basis.

  

Pilbara, Australia

                      

Production

                      

Newman

   (kt)     14,916         16,062         18,006         17,003         15,817         50,826         47,635   

Area C Joint Venture

   (kt)     13,201         12,214         12,163         11,723         11,002         34,888         37,780   

Yandi Joint Venture

   (kt)     16,798         17,452         16,886         15,960         16,204         49,050         51,099   

Jimblebar (1)

   (kt)     4,513         5,462         3,262         4,852         5,472         13,586         11,297   

Wheelarra

   (kt)     5,965         5,159         7,259         5,757         4,562         17,578         13,835   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total production

   (kt)     55,393         56,349         57,576         55,295         53,057         165,928         161,646   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total production (100%)

   (kt)     64,372         65,330         67,161         64,197         61,454         192,812         188,179   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                      

Lump

   (kt)     12,617         13,234         14,003         13,886         13,380         41,269         38,044   

Fines

   (kt)     42,635         43,430         43,587         40,917         40,078         124,582         125,453   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   (kt)     55,252         56,664         57,590         54,803         53,458         165,851         163,497   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total sales (100%)

   (kt)     64,201         65,703         67,177         63,625         61,927         192,729         190,352   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

(1)    Shown on a 100% basis. BHP Billiton interest in saleable production is 85%.

       

        

Samarco, Brazil (1)

                      

Production

   (kt)     3,586         3,737         3,739         1,665         —           5,404         10,776   

Sales

   (kt)     2,876         3,627         3,531         2,425         224         6,180         10,330   

 

(1) Mining and processing operations remain suspended following the failure of the Fundăo tailings dam and Santarém water dam on 5 November 2015.

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    16


PRODUCTION AND SALES REPORT

 

          QUARTER ENDED      YEAR TO DATE  
          MAR
2015
     JUN
2015
     SEP
2015
     DEC
2015
     MAR
2016
     MAR
2016
     MAR
2015
 

Coal

                       

Coal production is reported on the basis of saleable product.

                    

Queensland Coal

                       

Production (1)

                       

BMA

                       

Blackwater

   (kt)      1,569         1,873         1,803         1,861         1,756         5,420         5,121   

Goonyella

   (kt)      1,951         2,065         1,868         1,941         2,478         6,287         6,445   

Peak Downs

   (kt)      1,263         1,469         1,164         1,323         1,159         3,646         3,642   

Saraji

   (kt)      1,033         1,194         1,037         1,000         1,046         3,083         3,312   

Gregory Joint Venture (2)

   (kt)      607         885         707         609         13         1,329         2,409   

Daunia

   (kt)      489         649         698         616         626         1,940         1,734   

Caval Ridge

   (kt)      690         888         810         857         816         2,483         2,176   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total BMA

   (kt)      7,602         9,023         8,087         8,207         7,894         24,188         24,839   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

BHP Billiton Mitsui Coal (3)

                       

South Walker Creek

   (kt)      1,282         1,384         1,511         1,275         1,268         4,054         3,909   

Poitrel

   (kt)      775         986         836         916         747         2,499         2,480   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total BHP Billiton Mitsui Coal

   (kt)      2,057         2,370         2,347         2,191         2,015         6,553         6,389   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Queensland Coal

   (kt)      9,659         11,393         10,434         10,398         9,909         30,741         31,228   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                       

Coking coal

   (kt)      7,118         7,616         7,015         7,642         7,348         22,005         22,803   

Weak coking coal

   (kt)      2,720         2,850         3,246         2,695         2,681         8,622         8,249   

Thermal coal

   (kt)      182         375         86         290         241         617         396   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   (kt)      10,020         10,841         10,347         10,627         10,270         31,244         31,448   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

(1)    Production figures include some thermal coal.

(2)    Longwall mining at Crinum completed during the December 2015 quarter.

(3)    Shown on a 100% basis. BHP Billiton interest in saleable production is 80%.

       

       

       

Haju, Indonesia (1)

                       

Production

   (kt)      —           —           15         87         167         269         —     

Sales - export

   (kt)      —           —           —           —           148         148         —     

(1)    Shown on 100% basis. BHP Billiton interest in saleable production is 75%.

       

New Mexico, USA

                       

Production

                       

Navajo Coal (1)

   (kt)      1,156         1,395         1,270         1,403         694         3,367         3,463   

San Juan Coal (2)

   (kt)      1,091         1,179         1,406         1,229         418         3,053         3,986   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   (kt)      2,247         2,574         2,676         2,632         1,112         6,420         7,449   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales thermal coal - local utility

        2,177         2,539         2,671         2,661         1,106         6,438         7,492   

(1)    BHP Billiton completed the sale of Navajo Mine on 30 December 2013. As BHP Billiton will retain control of the mine until full consideration is received, production will continue to be reported by the Group.

(2)    BHP Billiton completed the sale of San Juan Mine on 31 January 2016.

        

       

NSW Energy Coal, Australia

                       

Production

   (kt)      5,252         5,086         4,644         4,277         4,189         13,110         14,612   

Sales

                       

Export thermal coal

   (kt)      4,897         4,550         4,130         5,081         3,410         12,621         14,309   

Inland thermal coal

   (kt)      337         286         253         229         234         716         936   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

   (kt)      5,234         4,836         4,383         5,310         3,644         13,337         15,245   
     

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Cerrejón, Colombia

                       

Production

   (kt)      2,975         2,944         2,527         2,628         2,610         7,765         8,347   

Sales thermal coal - export

   (kt)      3,005         2,766         2,853         2,565         2,339         7,757         8,814   

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    17


PRODUCTION AND SALES REPORT

 

         QUARTER ENDED      YEAR TO DATE  
         MAR
2015
     JUN
2015
     SEP
2015
     DEC
2015
     MAR
2016
     MAR
2016
     MAR
2015
 

Other

                      

Nickel production is reported on the basis of saleable product

                   

Nickel West, Australia

                      

Production

                      

Nickel contained in concentrate

   (kt)     1.9         1.5         0.7         0.2         0.3         1.2         5.8   

Nickel contained in finished matte

   (kt)     6.1         3.9         5.0         2.6         2.8         10.4         20.7   

Nickel metal

   (kt)     13.9         13.9         16.4         12.4         16.9         45.7         44.1   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total nickel production

   (kt)     21.9         19.3         22.1         15.2         20.0         57.3         70.6   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                      

Nickel contained in concentrate

   (kt)     2.0         1.6         0.7         0.2         0.3         1.2         5.7   

Nickel contained in finished matte

   (kt)     6.4         4.4         4.2         3.7         2.7         10.6         20.4   

Nickel metal

   (kt)     13.5         15.7         15.6         12.1         17.8         45.5         42.9   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total nickel sales

   (kt)     21.9         21.7         20.5         16.0         20.8         57.3         69.0   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

 

BHP Billiton Operational Review for the nine months ended 31 March 2016    18


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

      BHP Billiton Limited and BHP Billiton Plc
Date: April 20, 2016     By:  

/s/ Rachel Agnew

    Name:   Rachel Agnew
    Title:   Company Secretary

Dates Referenced Herein

This ‘6-K’ Filing    Date    Other Filings
Filed on / For Period End:4/20/16None on these Dates
 List all Filings 
Top
Filing Submission 0001193125-16-547086   –   Alternative Formats (Word / Rich Text, HTML, Plain Text, et al.)

Copyright © 2024 Fran Finnegan & Company LLC – All Rights Reserved.
AboutPrivacyRedactionsHelp — Fri., Apr. 19, 8:09:01.2pm ET