Q1 Consolidated Revenues up 33% to Rs 61,391 million
Q1 Consolidated PAT up 38% to Rs 16,829 million
Highlights
• |
|
Lists on NYSE, raised US$2 billion in ADS offering |
|
• |
|
Highest ever mine metal production at HZL |
|
• |
|
Consistent achievement of rated capacity for third consecutive quarter at the new Korba smelter |
|
• |
|
EBITDA of Rs 25,062 million against Rs 19,854 million in corresponding prior period |
Sterlite Industries (India) Limited (“Sterlite”) today announced results for the
first quarter ended 30 June 2007 (“Q1”). Consolidated revenues and net profits for Q1
were Rs 61,391 million and Rs. 16,829 million, an increase of 33% and 38%,
respectively, over the corresponding period last year.
Consolidated Unaudited Financial Highlights
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(In Rs million, except as stated) |
|
|
|
|
First Quarter ended June 30 |
|
|
|
2007 |
|
|
2006 |
|
|
% |
|
Net Sales/Income from operations |
|
|
61,391 |
|
|
|
46,030 |
|
|
|
33 |
% |
EBITDA |
|
|
25,062 |
|
|
|
19,854 |
|
|
|
26 |
% |
Net Profit after Tax |
|
|
16,829 |
|
|
|
12,209 |
|
|
|
38 |
% |
Attributable PAT |
|
|
11,429 |
|
|
|
8,790 |
|
|
|
30 |
% |
Diluted Earnings Per Share (Rs) (not annualised) |
|
|
19.93 |
|
|
|
15.73 |
|
|
|
27 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
Production (’000 tonnes) |
|
|
|
|
|
|
|
|
|
|
|
|
Aluminium |
|
|
88 |
|
|
|
67 |
|
|
|
32 |
% |
Copper |
|
|
|
|
|
|
|
|
|
|
|
|
Mined metal content |
|
|
6 |
|
|
|
8 |
|
|
|
-17 |
% |
Copper — Cathode |
|
|
81 |
|
|
|
57 |
|
|
|
42 |
% |
Zinc |
|
|
|
|
|
|
|
|
|
|
|
|
Zinc — Mined Metal Content |
|
|
134 |
|
|
|
131 |
|
|
|
2 |
% |
Refined Zinc |
|
|
93 |
|
|
|
82 |
|
|
|
13 |
% |
|
|
|
Sterlite Industries (India) Limited
Results for the First Quarter Ended 30 June 2007
|
|
Page 2 of 4 |
|
|
|
|
Aluminium
The Korba smelters produced 88,000 tonnes of metal in the current quarter,
higher than their rated capacity. Both the Korba smelters have consistently produced
at these levels for the last two quarters. The new smelter produced over 62,000
tonnes of hot metal during the quarter and has consistently performed at these levels
for three consecutive quarters.
Q1 revenues were Rs. 10,553 million and EBITDA was Rs. 4,179 million. Sales volumes
were largely in-line with the production volumes during the quarter and the costs too
were largely stable. The increase in revenues and EBITDA, as compared to the
corresponding prior quarter, was primarily on account of higher volumes from the new
Korba smelter and better LME prices partially offset by appreciation of the Indian
rupee against the US dollar. EBITDA was higher in the preceding quarter due to
additional sales of inventory which had built up during the course of last year.
During the quarter our operating costs have been stable. However, the global alumina
prices have seen an upward trend in the first quarter of the current fiscal which has
impacted our cost.
BALCO was recently awarded the coveted President of India’s Nirmal Gram Award for its
sanitation project in Korba by the Ministry of Rural Development, Government of
India.
Copper
During the quarter copper cathode production at our Tuticorin plant was 81,000
tonnes. This is comparable with the preceding quarter except for the effect of the
planned maintenance shutdown in April 2007.
Q1 revenue was Rs. 31,139 million as compared with Rs. 23,734 million in the
corresponding prior quarter, primarily due to higher volumes and higher metal prices.
EBITDA was Rs. 3,825 million as compared to Rs. 4,488 million in the corresponding
quarter last year, primarily due to lower TCRC realisations considering the current
market environment and lower dispatches from our captive mines.
Sterlite was recently awarded the ‘Excellent Energy Efficient Unit’ award by the
Confederation of Indian Industry.
Zinc
The mined metal production at 134,000 tonnes during the quarter is the highest
ever quarterly production. The refined zinc production during the quarter was 93,000
tonnes. The production from the Chanderiya Hydro smelter was around 41,000 tonnes,
the highest ever quarterly production.
Sales during the current quarter were augmented by sales of about 50,000 dry metric
tonnes of zinc concentrate and about 5,000 dry metric tonnes of lead concentrate.
Q1 revenues were Rs. 19,699 million as compared to Rs. 16,094 million in the
corresponding prior quarter and EBITDA was Rs. 17,058 million as compared to Rs.
12,827 million in the corresponding prior quarter. The increase in revenue and
EBITDA was primarily on account of
|
|
|
Sterlite Industries (India) Limited
Results for the First Quarter Ended 30 June 2007
|
|
Page 3 of 4 |
|
|
|
|
higher volumes from the new Chanderiya smelter and
higher metal prices, partially offset by appreciation of the Indian rupee against the
US dollar.
Projects Update
Commercial Energy
Work on the 2,400 MW (4X600 MW) coal based independent thermal power plant has
commenced. An EPC
contract has been released and the construction work is going at
full swing. Overall the project is on schedule for progressive commissioning from
late 2009 as announced.
Zinc
The construction activities for the second 170,000 tpa smelter at Chanderiya with its
associated captive power plant are in full swing, with all orders placed. The roaster
plant, which is the first stage of the smelting process, has been commissioned. The
leaching and purification plant and the cell house plant are also on track. Similarly
work on the captive power plant and at the Agucha concentrator, to raise the milling
capacity to 5.0 million tpa, is progressing well. The progress on the overall project
is good and we expect to commission the project as scheduled by early 2008.
The Wind Energy project at Karnataka, Gujarat and Maharashtra, totaling 110.4 MW, is
progressing as per schedule. Post completion of these projects,
the company will have
a total wind power capacity of 148.8 MW.
|
|
|
Sterlite Industries (India) Limited
Results for the First Quarter Ended 30 June 2007
|
|
Page 4 of 4 |
|
|
|
|
|
|
|
For further information, please contact: |
|
|
Sumanth Cidambi |
|
sumanth.cidambi@vedanta.co.in |
Associate Director — Investor Relations |
|
Tel: +91 22 6646 1531 |
Sterlite Industries (India) Limited |
|
|
|
|
|
Sheetal Khanduja |
|
Sheetal.khanduja@vedanta.co.in |
Manager — Investor Relations |
|
Tel: +91 22 6646 1427 |
Sterlite Industries (India) Limited |
|
|
About Sterlite
Sterlite is one of India’s leading diversified mining and metals company with
interests and operations in aluminium, copper, zinc and lead.
The company’s main
operating
subsidiaries are Hindustan Zinc Limited for its zinc and lead operations;
Copper Mines of Tasmania Pty Limited for its copper operations in Australia; and
Bharat Aluminium Company Limited for its aluminium operations.
The company is
entering into the commercial power generation business by setting up a large scale
2,400 MW coal based independent thermal power plant in Jharsuguda, Orissa. Sterlite
recently completed a $2 billion ADS issue and is now listed on the NYSE. Sterlite is
a subsidiary of Vedanta Resources plc, a London-based diversified FTSE 100 metals and
mining group
Disclaimer
This
press release contains
“forward-looking statements” — that is, statements
related to future, not past, events. In this context, forward-looking statements
often address our expected future business and financial performance, and often
contain words such as
“expects,” “anticipates,” “intends,” “plans,” “believes,”
“seeks,” “should” or
“will.” Forward–looking statements by their nature address
matters that are, to different degrees, uncertain. For us, uncertainties arise from
the behaviour of financial and metals markets including the London Metal Exchange,
fluctuations in interest and or exchange rates and metal prices; from future
integration of acquired businesses; and from numerous other matters of national,
regional and global scale, including those of a political, economic, business,
competitive or regulatory nature. These uncertainties may cause our actual future
results to be materially different that those expressed in our forward-looking
statements. We do not undertake to update our forward-looking statements.