SEC Info  
    Home      Search      My Interests      Help      Sign In      Please Sign In

Transcanada Pipelines Ltd – ‘U-57’ on 2/7/06

On:  Tuesday, 2/7/06, at 4:31pm ET   ·   Accession #:  950120-6-77   ·   File #:  73-00256

Previous ‘U-57’:  ‘U-57’ on 2/7/06   ·   Latest ‘U-57’:  This Filing

Find Words in Filings emoji
 
  in    Show  and   Hints

  As Of                Filer                Filing    For·On·As Docs:Size              Issuer               Agent

 2/07/06  Transcanada Pipelines Ltd         U-57                   1:26K                                    Thelen LLP/FA

Notice of Foreign Utility Company Status   —   Form U-57
Filing Table of Contents

Document/Exhibit                   Description                      Pages   Size 

 1: U-57        Form U-57 - Transcanada Pipelines Ltd. (Huron Wind  HTML     17K 
                          L.P.)                                                  


This is an HTML Document rendered as filed.  [ Alternative Formats ]



  Form U-57 - TransCanada Pipelines Ltd. (Huron Wind L.P.)  
 
File No. 073-[_______]
 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, DC 20549

FORM U-57

NOTIFICATION OF FOREIGN UTILITY COMPANY STATUS

Filed Under Section 33(a) of the

Public Utility Holding Company Act of 1935, as amended


Huron Wind L.P.
Huron Wind Desk, B32
Box 1540, Tiverton, Ontario
NOG 2TO

(Name of foreign utility company)

TransCanada PipeLines Limited
450 - 1 Street S.W.
Calgary, Alberta, Canada
T2P 5H1

(Name of filing company, if filed on behalf of
a foreign utility company)

GENERAL INSTRUCTIONS

1. Use of Form

A notification to the Commission that a company is or proposes to become a foreign utility company shall be filed on Form U-57 by or on behalf of such company.

2. Formal Requirements

(a) Two copies of the notification on this form, including the exhibit specified, shall be filed with the Commission. At least one of such copies shall be manually signed and filed at the place designated by the Commission for filings under the laws it administers. The second copy shall be addressed to the Division or Office responsible for administering the Act. Entities that have (or propose to have) a domestic associate public-utility company shall file one copy of this notification with each state or federal commission having jurisdiction over the retail rates of such public-utility company.

(b) The notification shall be on good quality, unglazed white paper, 8-1/2" x 11" in size.

 
 

 

3. Definitions

All terms used have the same meaning as in the Public Utility Holding Company Act of 1935, as amended, and the rules and regulations thereunder.
 
4. Withdrawal of Filing

Within 45 days after determination that the entity filing for notification does not require foreign utility company status (whether due to termination of the proposed acquisition, change in applicable law or otherwise), all entities having filed a Notification of Foreign Utility Company Status with the Commission shall notify the Commission by amendment to such form that such entity no longer requires such status.

Item 1

State the name of the entity claiming foreign utility company status, its business address, and a description of the facilities used for the generation, transmission and distribution of electric energy for sale or for the distribution at retail of natural or manufactured gas. To the extent known, identify each person that holds five percent (5%) or more of any class of voting securities of the foreign utility company and describe the amount and nature of the interest.

Huron Wind L.P.
Huron Wind Desk, B32
Box 1540, Tiverton, Ontario
NOG 2TO

Huron Wind L.P. (“Huron Wind”), a limited partnership formed under the laws of Ontario, Canada, developed Ontario’s first commercial wind farm, located near the shore of Lake Huron in Bruce County, Ontario. The wind farm consists of five 1.8 megawatt (MW) wind turbine generators. Huron Wind is indirectly co-owned by Ontario Power Generation (50%), TransCanada Pipelines Limited (16-2/3%), BPC Generation Infrastructure Trust (16-2/3%), and Cameco Corporation (16-2/3%). The electric energy produced by Huron Wind is sold on the spot market and fed into the local distribution system in Ontario, Canada.

Item 2

State the name of any domestic associate public-utility company and, if applicable, its holding company, and a description of the relationship between the foreign utility company and such company, and the purchase price paid by any such domestic associate public utility company for its interest in the foreign utility company.

None.
EXHIBIT A

If applicable, the state certification(s) required under section 33(a)(2) of the Act. Certification(s) previously filed with the Commission may be incorporated by reference. If the certification(s) is not available at the time of filing the Form U-57, so state, and undertake to file such certification as an amendment when available; however, foreign utility company status will not be deemed obtained until all required certification(s) have been filed.

Not Applicable.
 
 
2

 

SIGNATURES

The undersigned company has duly caused this statement to be signed on its behalf by the undersigned thereunto duly authorized.


Date: February 7, 2006
 
 
 TransCanada PipeLines Limited
 
 
By: /s/
Rhondda E. S. Grant
 
Name:
Rhondda E. S. Grant
 
Title:
Vice-President, Communications
     
 
By: /s/
Alexander J. Pourbaix
 
Name:
Alexander J. Pourbaix
 
Title:
Executive Vice-President, Power
 
 
3

 

Dates Referenced Herein   and   Documents Incorporated by Reference

This ‘U-57’ Filing    Date    Other Filings
Filed on:2/7/06U-57
 List all Filings 
Top
Filing Submission 0000950120-06-000077   –   Alternative Formats (Word / Rich Text, HTML, Plain Text, et al.)

Copyright © 2024 Fran Finnegan & Company LLC – All Rights Reserved.
AboutPrivacyRedactionsHelp — Thu., Apr. 25, 12:24:14.1am ET