SEC Info  
    Home      Search      My Interests      Help      Sign In      Please Sign In

Seiler Pollution Control Systems Inc – ‘10-K405’ for 3/31/96 – EX-10.4

As of:  Friday, 7/12/96   ·   For:  3/31/96   ·   Accession #:  889812-96-872   ·   File #:  0-22630

Previous ‘10-K405’:  None   ·   Next & Latest:  ‘10-K405/A’ on 7/16/96 for 3/31/96

Find Words in Filings emoji
 
  in    Show  and   Hints

  As Of                Filer                Filing    For·On·As Docs:Size              Issuer               Agent

 7/12/96  Seiler Pollution Control Sys… Inc 10-K405     3/31/96   15:362K                                   Global Fin’l Press/NY/FA

Annual Report — [x] Reg. S-K Item 405   —   Form 10-K
Filing Table of Contents

Document/Exhibit                   Description                      Pages   Size 

 1: 10-K405     Annual Report                                         62    252K 
 2: EX-3.1      Certificate of Incorporation                           6     25K 
 3: EX-3.2      Certificate for Renewal and Revival of Certificate     1     10K 
                          of Incorporation                                       
 4: EX-3.3      Certificate of Amendment of Certificate of             1     10K 
                          Incorporation                                          
 5: EX-3.4      Certificate of Amendment of Certificate of             2     11K 
                          Incorporation                                          
 6: EX-3.5      By-Laws of World Imports - U.S.A., Inc.                7     30K 
 7: EX-10.1     License Agreement                                     20     49K 
 8: EX-10.2     License Agreement                                     20     49K 
 9: EX-10.3     Delivery Contract                                     14     30K 
10: EX-10.4     Delivery Contract                                     15     31K 
11: EX-10.5     Delivery Contract                                     15     32K 
12: EX-10.6     1993 Non-Statutory Stock Option Plan                   7     34K 
13: EX-10.7     1994 Non-Statutory Stock Option Plan                   7     34K 
14: EX-10.8     1995 Non-Statutory Stock Option Plan                   7     33K 
15: EX-10.9     1996 Non-Statutory Stock Option Plan                   7     33K 


EX-10.4   —   Delivery Contract

EX-10.41st Page of 15TOCTopPreviousNextBottomJust 1st
 

EXHIBIT 10.4 Delivery Contract between Seiler Pollution Control AG (SEPC) Bahnhofstrasse CH - 4353 Leibstadt and deliverer SEILER Hochtemperatur - Trennanlagen AG CH-5316 Leuggern, Switzerland Tel. +41 56 245 72 45 Fax +41 56 245 73 74 for the supply of a drying and High-Temperature Separation System for the Vitrification of Hazardous Wastes (System SHT)
EX-10.42nd Page of 15TOC1stPreviousNextBottomJust 2nd
List of Contents Part A Commercial A1 Initial situation A2 Contractual basis A3 Price quotation A4 Prices A5 Terms and conditions of payment A6 Duties and taxes A7 Dates A8 Validity Part B Technical Section B1 Technical basis for the offer B2 Process specification B3 Subassembly specification B4 Design data B5 Guarantee data B6 Scope of supplies and services B7 Limit of supply B8 Supply exclusions B9 Maintenance and servicing B10 Confidentiality - i -
EX-10.43rd Page of 15TOC1stPreviousNextBottomJust 3rd
Part C Charts and Drawings Part D General Conditions of Delivery D1 General terms and conditions of business of Seiler HT AG D2 General conditions of delivery for machines and systems, VSM D3 General assembly conditions, VSM D4 General delivery conditions for machines and replacement parts, VSM - ii -
EX-10.44th Page of 15TOC1stPreviousNextBottomJust 4th
Part A Commercial A1 Initial situation A2 Contractual basis A3 Price quotation A4 Prices A5 Terms and conditions of payment A6 Duties and taxes A7 Dates A8 Validity A Commercial Section A1 Initial situation SEPC wishes to dry hazardous waste streams such as paint- and hydroxide sludges, and to vitrify these wastes in a Seiler high-temperature separation system at temperatures of approximately 1500 degrees C. A2 Contractual basis This offer is based essentially on the principles set out below. These are an integral part of this offer. They are essentially as follows: - Waste: Hazardous Waste containing heavy metals like Hydroxide -or paintsludges, water-soluble (water content of sludges <= 50%) - Drying plant Nominal output 250 kg/h, dry matter content > 95% - Separation plant Nominal output 350 kg/h, dry matter content > 95% Maximum output 500 kg/h of dry matter content > 95%
EX-10.45th Page of 15TOC1stPreviousNextBottomJust 5th
A3 Price quotation Inclusive Complete plant, delivered free to place of use, installed, including commissioning and trial operation for four weeks, and with one of our specialists on-site for a period of one month. Excluding Pre-mix plant for the pre-treatment of the sludges. A4 Prices process line Project management, factory assembly and site installation, IBN; PB Product drying, storage Fuel supply, gas and oxygen Product separation Gas cooling, complete Waste gas purification, complete (without waste water purification) Electrical and process line engineering Total Systemprice SFr. 6.455.750.-- The total price relates to the aforementioned plant configuration, delivered free to the plant, installed, excluding statutory Value Added Tax, including commissioning and trial operation for four weeks, with one of our specialists on-site for a period of one month, without any approval fees of any kind or costs involved in statutory output and emission measurements performed by the TUV or Gewerbeaufsichtsamt (Factories Inspectorate). A5 Terms and conditions of payment 1st rate SFr. 100.000 on awarding the contract at 16.7.1993 SFr. 800.000 at 31.7.1993 2nd rate 10% at 31.8.1993 3rd rate 20% at 31.10.1993 4th rate 20% at 30.10.1993 5th rate 20% when ready for shipment - 2 -
EX-10.46th Page of 15TOC1stPreviousNextBottomJust 6th
6th rate 10% begin of installation 7th rate 10% after successful start up 10% 30 days after start of commissioning Conditions net, after presentation of invoice, although not later than the commencement of commercial operation A6 Duties and taxes The offer price shall be understood not to include customs clearance charges, customary duties in this country, or Value Added Tax. A7 Dates according agreements A8 Validity This offer shall remain valid as long as agreed. Leuggern, 16.07.1993 Seiler Hochtemperatur - Trennanlagen AG Seiler Pollution Control AG (SEPC) - 3 -
EX-10.47th Page of 15TOC1stPreviousNextBottomJust 7th
Part B Technical Section B1 Technical basis for the offer B2 Process specification B3 Subassembly specification B4 Design data B5 Guarantee data B6 Scope of supplies and services B7 Limits of supply B8 Supply exclusions B9 Maintenance and servicing B10 Confidentiality B1 Technical basis for the offer o The offer is based essentially on the information currently in our possession provided by the customer. B2 Process Specification B2.1 Product drying, storage Hazardous wastes like Paint and hydroxide sludges are coagulated (mineral flocculation) by the customer, divested of adhesive, and delivered in barrels for intermediate storage. Drying takes place on a drum-type drier with an integral separator system for the dried material. B2.2 Pre-heating The dried material is taken from the daily storage silo by means of a cell wheel and is transferred to the buffer container of the pre-heaterplant. The dried material, which is heated - 4 -
EX-10.48th Page of 15TOC1stPreviousNextBottomJust 8th
indirectly by means of (gas-heated) hot air, is gasified at about 700 degrees C under controlled conditions. Volatile fractions are released and are introduced into the high-temperature converter at the same time as the inert material via a product burner. B2.3 High-temperature converter The gaseous and solid material fractions introduced into the converter (glass furnace) are subjected to thermal decomposition with a modulating pilot flame (gas firing) at approx. 1 500-1600 degrees C. Volatile heavy metalcompounds, such as from Cd and Pb are already vaporized at temperatures of 800 degrees C to 1 050 degrees C. In order to guarantee the desired high degree of oxidation of the heavy metals, additional technical oxygen can be added with gas/oxygen burners. It can be demonstrated that organic substances, such as aromatic and polycyclic hydrocarbons, together with any dioxins and furanes that may be present, are completely destroyed at the burner and converter temperatures. Depending on the intended application for the glass, the purity (proportions of heavy metals in the glass matrix) can be influenced with the oxygen burners (oxidation of heavy metals). Once a particular liquid glass volume is reached inside the converter, the glass runs out continuously via a specially designed outlet and is granulated by means of cooled belts or a water bath to form a product like medium abrasives. B2.4 Heat recovery The waste gas, of which the temperature is approx. 1 550 degrees C as it leaves the converter, is cooled to around 600 degrees C in a air/flue gas heat exchanger. The energy (hot air) released in this way can be used for drying the sludges. B2.5 Dioxin trap In order to prevent the further formation of dioxins, the waste gas leaving the heat exchanger at a temperature of 600 degrees C is cooled abruptly to approx 300 degrees C in a further quenching stage (water). B2.6 Separation of dust and metal oxides The waste gas next flows through a ceramic multiple-tube dust filter. The separated/condensed and enriched metal oxide dusts and chlorides assume the form of a powdery/crumb-like substance (specific gravity approx. 0.1) and are filled into tightly sealing plastic containers and sent for further processing. - 5 -
EX-10.49th Page of 15TOC1stPreviousNextBottomJust 9th
B2.7 Gas purification By mixing ammonia into the gas flow, the waste gas is conditioned and fed to the following catalytic nitrogen removal stage. The waste gas, which leaves the catalyst at a temperature of approx. 280 degrees C, is then divested of HCL and HF at a gas temperature of approx. 73 degrees C in a quenching and washing circuit (first stage) located ahead of the wet gas cleaning stage, SO2 is washed out in the second stage, and aerosols in the third step. The outgoing water from all stages is neutralized in a compact plant and any solids are brought into a fine filter press for dehydration. Depending on the concentration the sludges are brought to the dryer for later vitrification. The exhaust air is finally discharged into the atmosphere via an active carbon filter (a so-called police filter) at a temperature of 70 degrees C (saturated) via an exhaust air flue. B2.8 Service facilities Liquid petroleum gas or natural gas is used for firing the high-temperature converter, and technical-grade oxygen (option) is used for the reduction of heavy metals. The tank facilities and batteries of cylinders are positioned outside the building for safety reasons. B3 Subassembly specification B3.1 Container construction The entire plant is constructed semi-mobile. The equipment is combined into subassemblies and built into transport frames. These frames can be moved by loading them by crane onto low-loader transport vehicles. Once at their destination, the modular units are positioned as required, connected to the energy supply services (electricity, gas, water, compressed air), and are then ready to be started up. The complete plant essentially consists of the following units: oDrying station oPre-silo for dry material (daily silo) oPre-heater oHigh-Temperature Converter oQuenching station, heat exchanger oFilter plant - 6 -
EX-10.410th Page of 15TOC1stPreviousNextBottomJust 10th
oDenox plant oWet gas purification, Stage 1 oWet gas purification, Stage 2 oWatertreatment Plant for neutralization, filter press for wet gas washer etc. oActive carbon filter oControl (central), Emergency power supply, waste gas fan B4 Design data B4.1 Technical data for production plant Operating period per process line / converter Operating period, nominal (3-shift running) 7 500 h/year Travelling time, approx. 3 x 2 500 h Interim overhaul/inspection 2 x 100 h Annual overhaul 1 x 760 h B4.2 Plant output Per Process line / converter Hourly Input nominal for a dry matter content of 95% 350 kg maximum short-duration 700 kg average 500 kg average Input nominal 7500 h/year of dry matter (with a 3750 t per year humidity content of 95%) average input of nominal mixture of different waste streams 5-6000 t waste per year not pretreated - 7 -
EX-10.411th Page of 15TOC1stPreviousNextBottomJust 11th
B4.3 Mass flows See Process Chart B5 Guarantee data B5.1 Materials guarantee We guarantee materials for a period of one year from the start of commissioning on all commercially available components. The manufacturer's guarantees shall apply for motors, transmissions, electrical components and fans. The supplier will replace any defective components. However, the cost of their installation must be met by the operator. B5.2 Guarantee exclusion All wearing parts throughout the entire plant and all materials that are exposed to high temperatures, including refractory linings in the vitrification chamber and the gas mixing chamber, are excluded. B6 Scope of Supplies and services B6.0 Sludge drying Charging device with mixer Drier Cyclone, dust discharge Dust washer for part of gas flow B6.1 Material storage Silo for dry material, 10 m3 B6.2 Fuel supply LPG tank (rented tank on-site) Oxygen cylinder battery (rented cylinders on-site) Pipework Safety equipment B6.3 Pre-heater / Gasifier Buffer container for dry material Discharge equipment Pre-heater, auxiliary burner plant B6.4 High-temperature Converter housing, refractory linings converter Product burner Burner plants, support firing Burner plants, main firing Burner plant, oxygen Ventilation and fans Steel plate belt for glass discharge Glass cooling equipment B6.5 Flue gas cooling Air/flue gas heat exchanger Hot air fan, pipework Quenching, dioxin trap - 8 -
EX-10.412th Page of 15TOC1stPreviousNextBottomJust 12th
B6.6 Dust separation Hot gas filter, solids discharge Drum filling equipment for oxides B6.7 Nitrogen removal Ammonia mixer Denox plant B6.8 Exhaust gas Quenching, HCL and HF separation purification SO2, aerosols 1st. + 2nd. stages Waste water treatment (option) Sludge dehydration (option) B6.9 Dioxin removal Active carbon filter B6.10 Flue gas discharge Gas lines, flue gas fan, Flue system B6.11 Electrical System Mimic diagram for separation plant Process wiring, SPS Siemens Low-voltage switchgear, Siemens Field wiring Emissions measurement O2, CO2, CO, NOx We expressly reserve the right to introduce technical changes to the component parts of individual subassemblies. B7 Limits of supply o Gas Line flange after gas tank o Drinking water Line flange after fresh water distributor o Industrial water Line flange after industrial water distributor o Waste water Discharge from waste gas purification o Electrical Terminal for high-voltage distribution o Compressed air Line flange after compressed air distributor o Process air Induction o Waste air Flue outlet o Waste gas Flue outlet o Wet sludge Hopper, drier o Glass Discharge plate conveyor / Cooler - 9 -
EX-10.413th Page of 15TOC1stPreviousNextBottomJust 13th
B8 Delivery exclusions o Buildings and their infrastructure o Workplace lighting and mains power supply sockets o Internal technical services, staff areas, laboratory facilities o Approval and authorization costs o All necessary certificates for the authorization procedure o Costs involved in official output measurements o Connections/charges for power, water and waste water, etc. o High-voltage transformer station and distribution o Consumables and energy of all kinds for IBN and PB o Securing sales of valuable materials and residues o Customary duties in this country, such as Value Added Tax or other charges B9 Maintenance and servicing The supplier reserves all rights and interests in technically indicated, necessary and recurring overhaul and servicing operations for the proper maintenance of the high-temperature separation plant. The areas of drying, gasification, vitrification and gas cooling may only be inspected and overhauled by the supplier exclusively, expressly and unconditionally. The necessary replacement parts or components must be obtained exclusively from the supplier. B10 Confidentiality All documents, specifications, process charts and measurements relating to or contained in this offer, and those provided in the event of the award of the contract, are expressly subject to confidentiality. They may be used expressly only in conjunction with projects and plants, and they must not be shown or made available to third parties, or copied for other purposes. They may only be published subject to the express written agreement of the supplier. - 10 -
EX-10.414th Page of 15TOC1stPreviousNextBottomJust 14th
Part C Charts and Drawings Part C Charts and Drawings Brochure Outline process chart Subassembly drawings Part D General Conditions of Delivery Part D General Conditions of Delivery D1 General terms and conditions of business of Seiler HT AG D2 General conditions of delivery, VSM (Verein schweizerischer Maschinenindustrieller - Swiss Mechanical Engineering Association). D3 General assembly conditions, VSM (Verein schweizerischer Maschinenindustrieller - Swiss Mechanical Engineering Association). D4 General delivery conditions for machines and replacement parts, VSM (Verein schweizerischer Maschinenindustrieller - Swiss Mechanical Engineering Association). UNTERSCHRIFTEN Leuggern, 16.07.1993 - 11 -
EX-10.4Last Page of 15TOC1stPreviousNextBottomJust 15th
Seiler Hochtemperatur - Trennanlagen AG ------------------------------------------------------------------------------ Seiler Pollution Control AG (SEPC) ------------------------------------------------------------------------------ - 12 -
Top
Filing Submission 0000889812-96-000872   –   Alternative Formats (Word / Rich Text, HTML, Plain Text, et al.)